13.07.2015 Views

Appendix Two - Q4 Performance Report , item 4. PDF 3 MB

Appendix Two - Q4 Performance Report , item 4. PDF 3 MB

Appendix Two - Q4 Performance Report , item 4. PDF 3 MB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Corporate Business Plan - Measures ofAccountability<strong>Appendix</strong> <strong>Two</strong> - Quarterly UpdateCBP 5 - Cleanliness (GBC)This Year to Date (Last Value)DescriptionOwner: Director (Finance and Environment)Standard of cleanliness in the borough (% of areas unacceptable standard for litter).Year-end target for 2012-13 - 4%Period TableActual Target Previous Year2011/<strong>Q4</strong> 5% 5% --2012/Q1 5% 4% --2012/Q2 5% 4% 5%2012/Q3 5% 4% 5%2012/<strong>Q4</strong> 5% 4% 5%Commentary (2012/<strong>Q4</strong>)The cleansing schedules have been aligned with the refuse collections days, so cleaning is carried outon the next working day to ensure any refuse related litter is removed. Along with these changes thelitter picking of parks and open spaces has been increased.The new schedules have led to an improvement in the quality of street cleansing with only 7 out of 180locations inspected (4%) not being to an acceptable standard of cleanliness.Work is ongoing to reduce flytipping of rubbish at certain recycling sites and locating streets whereadditional litter bins would help reduce littering. Targeted visits are being made to pubs, shops and fastfood establishments with the aim of getting them to clean outside their properties especially over theweekend period.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!