- Page 11 and 12: MANGALORE JESCO SITE MAP
- Page 13 and 14: JESCO SITE-MANGALORE
- Page 15 and 16: 2ANNEXURE-IVSulphuric acid is used
- Page 17 and 18: 4ANNEXURE-IVPipe ReactorThe reactio
- Page 19 and 20: 6ANNEXURE-IVThe granulator is a car
- Page 21 and 22: 8ANNEXURE-IVTo improve screen effic
- Page 23 and 24: 10ANNEXURE-IVTo prevent absorption
- Page 25 and 26: 1ANNEXURE-IXENVIRONMENT CONTROL, SA
- Page 27 and 28: 3ANNEXURE-IXlower emissions, both t
- Page 29 and 30: 5ANNEXURE-IXFire Water Storage & Pu
- Page 31 and 32: 2ANNEXURE-VTwo platforms (each15 me
- Page 33: 2ANNEXURE-VICLIMATE DATAAir Tempera
- Page 37 and 38: 1ANNEXURE-VIITerms of Reference (TO
- Page 39 and 40: 3• Identification, quantification
- Page 41 and 42: 5ANNEXURE-VII• Collection of demo
- Page 43 and 44: 7ANNEXURE-VIIHazard prone operation
- Page 45 and 46: 2ANNEXURE-VIIIwhereas the other 55-
- Page 47 and 48: 4ANNEXURE-VIIINoise Level inside Pr
- Page 49 and 50: INDEXPART ICHAPTER 1CHAPTER 2CHAPTE
- Page 51 and 52: CHAPTER - 1PROJECT AT A GLANCE4
- Page 53 and 54: CHAPTER - 2EXECUTIVE SUMMARY6
- Page 55 and 56: CHAPTER - 3INTRODUCTION8
- Page 57 and 58: NPK Fertilizer Manufacturing Plant
- Page 59 and 60: Phosphoric AcidP205 : 50 to 54% WtH
- Page 61 and 62: Sulphuric Acid StorageCentral Contr
- Page 63 and 64: Effluent waterTo be discharged afte
- Page 65 and 66: Apart from other equipment for bagg
- Page 67 and 68: Available Technologies for DAP / NP
- Page 69 and 70: All available process technologies
- Page 71 and 72: AVAILABLE PROCESSES FOR NPK / DAPPI
- Page 73 and 74: ammoniation in the granulator. This
- Page 75 and 76: CHAPTER - 5SITE DETAILS28
- Page 77 and 78: 30Note 1: Design relative humidity
- Page 79 and 80: 32CHAPTER - 6PLANT DESCRIPTION & CO
- Page 81 and 82: 34Sulphuric acid is used for pH and
- Page 83 and 84: 36Pipe ReactorThe reaction between
- Page 85 and 86:
38The granulator is a carbon steel
- Page 87 and 88:
40These mills directly discharge on
- Page 89 and 90:
42from ammonia separator. The chill
- Page 91 and 92:
44whereas the other 55-65 % is sent
- Page 93 and 94:
46CHAPTER -7ENVIRONMENT CONTROL, SA
- Page 95 and 96:
48Prevention of Air PollutionEmissi
- Page 97 and 98:
50Integration in the whole PlantMod
- Page 99 and 100:
52Solid wastesAll solid waste and s
- Page 101 and 102:
54(2) Fire protection facilities sh
- Page 103 and 104:
56PART II
- Page 105 and 106:
581.1 IntroductionOwnerConsultantPl
- Page 107 and 108:
60Other parameters considered in fi
- Page 109 and 110:
621.1 ConclusionsTotal investment i
- Page 111 and 112:
telephone nos. to be given) Mangalo
- Page 113 and 114:
loads for the new equipments. But n
- Page 115 and 116:
3. Use, storage, transport, handlin
- Page 117 and 118:
Sl.No.Information/Checklist confirm
- Page 119 and 120:
environment9.3 Set a precedent for
- Page 121 and 122:
1. Annexure - I : Site Map2. Annexu
- Page 123 and 124:
IDC &WC Margin10.0 Funding10.1 Debt
- Page 125 and 126:
Jaiprakash Engineering and steer co
- Page 127 and 128:
ISSUED FOR FEASIBILITY STUDYNAGARJU
- Page 129 and 130:
ISSUED FOR FEASIBILITY STUDYNAGARJU
- Page 131 and 132:
FUEL OILFUEL OILCONDITIONINGUNITISS
- Page 134 and 135:
FROMK 11040-PI-UK-100206H018B06H019
- Page 136 and 137:
2A/BRESERVOIRA/BRESERVOIR PUMPTURBI
- Page 138 and 139:
AMMONIA STORAGE ANDREFRIGERATION SY
- Page 140:
TRAIN A DAP/NPKSULPHURIC ACID SHIPU