13.07.2015 Views

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4ANNEXURE-VI15 0.99 0.936 0.84620 1.026 0.99 0.930 1.128 0.966 0.97250 1.23 1.188 1.092100 1.386 1.338 1.23Note: Linear interpolation for intermediate heights shall befollowed.Barometric PressureMax. barometric pressure : 1.0135 bar aMin. barometric pressure : 1.0011 bar aDesign barometric pressure : 1.007 bar aSeismic FactorSeismic Zone : Zone IIICategory & importance factor considered : As per IS 1893 : Part 4 :2005:Annex APLANT Site ConditionsPLANT AREASite filling up to 5.5meters above MSL.Soil Exploration DataSoil conditions: As per soil report by the JESCO.Net safe Bearing pressure : 3 to 5 mt/m² at 2.0 m depth withFilling of 4.0 m for 25mm settlement.Ground water level : Almost at the existing ground levelFoundation depth (below base line) :of @ 31m.Pile foundation with a length

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!