13.07.2015 Views

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

nfcl, mangalore dap/npk plant feasibility study - Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5ANNEXURE-VII• Collection of demographic data pertaining to human settlement, male to female ratio,age distribution pattern, income, health, endemic diseases, mortality, occupation andemployment pattern in the <strong>study</strong> region.• Collection of information related to prominent endemic diseases (flourosis, malaria,filarial, malnutrition) including mortality rates in the <strong>study</strong> region.• Projection of anticipated changes with respect to above parameters and delineation ofguidelines to minimize the adverse impacts.• Assessment of aesthetic impairment.• Assessment of socio-economic benefits to the community and environment due to existingand proposed projects.I.4.0 <strong>Environmental</strong> Management Plan<strong>Environmental</strong> Management Plan (EMP) will be drawn after identifying, predicting and evaluation thesignificant impacts on each component of the environment with a view to maximi8zing the benefitsfrom proposed <strong>plant</strong>. Post-project <strong>Environmental</strong> Monitoring (PPEM) for various environmentalcomponents will be delineated. The following measures will also be included in EMP.• Recommended mitigation measures required to address environmental concerns such as,clearing and timber salvage, wildlife and habitat protection, cultural and archaeologicalsites protection, terrain stabilization, maintaining fresh water horizons, debris disposaland conservation of natural drainage and water flow.• Assess additional infrastructures for treatment of flue gases, wastewater, sewage, andsolid/hazardous waste.• Provide a comprehensive and detailed plan covering environmental and social variables tobe monitored, the location and timing of sampling and the use to be made of monitoringdata to ensure compliance with the applicable environmental rules/regulationsthroughout the life of the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!