13.07.2015 Views

Highly productive wastewater treatment systems up ... - KLARO GmbH

Highly productive wastewater treatment systems up ... - KLARO GmbH

Highly productive wastewater treatment systems up ... - KLARO GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Holiday homes / Hotel4 PE to 200 PEWalchensee and Hotel Post major projectBy the Walchensee lake lies the villageof Walchensee with approximately600 inhabitants. For years, there werediscussions over which opportunityof <strong>wastewater</strong> <strong>treatment</strong> was thebest. The decentralised solution wasultimately chosen - a contributing factorwas <strong>KLARO</strong>‘s clear cost structure,whereby everyone knew from the outsetwhat costs they would incur.In addition, the Hotel Post locatedthere needed to be „retrofitted“. Limitedspace, heavily fluctuating <strong>wastewater</strong>incidence due to seasonal factorsand high <strong>treatment</strong> requirementswere only some of the challenges posedto the system.The solution: a two-line system, eachwith an output of 100 PE. Additionaldispensing technology for P precipitationand a UV module were installedwith the machine technology in aneasily accessible manner in a cellarroom of the hotel.Project dataLocation: Walchensee, GermanyNumber of plants: ca. 150Sizes: 4 PE - 200 PEConstruction: 2010Extra: with phosphate precipitationand partly disinfectionDrawing:200 PE Hotel Post, two-line plant4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!