13.07.2015 Views

CALL FOR TENDERS

CALL FOR TENDERS

CALL FOR TENDERS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ARTICLE 6. Unsealing and Evaluation of Tenders.6.1. Unsealing of the Tenders will take place in the premises of GenerationMaterials - Fuel and Purchasing Department of PPC, at the address andtime specified in paragraph 5.2 above.6.2. On the closing date and time the Evaluation Committee shall proceed withunsealing of all Tenders (stage A). The Envelopes marked as “FINANCIALOFFER” shall remain sealed.6.3. The contents of each of the Tenders shall be checked against theprovisions of ARTICLE 4 hereinabove, and the Evaluation Committee shalldetermine which of the tenders shall be declared as “formally accepted”.6.4. Technical evaluation shall be made only for tenders that are declared as“formally accepted” as well as for those that were initially declared as“formally not accepted” but were subsequently vindicated by objection.Technical evaluation shall include, without, however, being limited to thefollowing:• The data submitted regarding the two (2) projects, bearing significantsimilarities with the project in question, which the Bidder uses to meetthe requirement set forth by the present Call for Tenders regarding theeligibility for Participation in the Tender, according to paragraph 3.1 ofthe Document “Call for Tenders”. The similarity between those twoprojects and the project in question as well as the role assumed by theBidder shall be assessed.• The Technical Proposal itself. The understanding by the Consultant ofthe problem of the project in question, the general methodologicalapproach he proposes to follow and the integrity of the technicalproposal (project management, timetable proposed, personnelassignment etc.) shall be assessed.According to the results of the technical evaluation procedure, theEvaluation Committee shall classify the Tenders as either “TechnicallyAccepted” or “Technically Not Accepted”.6.5. Thereafter, the Evaluation Committee shall proceed with unsealing (stageB) the separate envelopes marked “FINANCIAL OFFER” of all technicallyaccepted Tenders (either initially accepted or accepted following the trial ofa relevant objection). All Bidders, whose Tenders were classified as“Technically accepted” shall be officially notified about the date and time ofunsealing the “Financial Offers”. Further down, the Evaluation Committeeshall examine the presence and adequacy of the economic elements,according to the provisions of paragraph 4.4.12 hereinabove and shalldeem the Tenders as “formally accepted” or “formally not accepted”.6.6. Economic evaluation concerns only the bids which during stage B ofunsealing were declared as “formally accepted”.ARTICLE 7. Objection Procedures.18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!