13.07.2015 Views

CALL FOR TENDERS

CALL FOR TENDERS

CALL FOR TENDERS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Following the above presentation and review of the available options, themost suitable gas sourcing strategy shall be proposed to PPC.2.5. Strategy Implementation.Action plan and procedures for the implementation of the proposed gassourcing strategy including but not limited to the following:- Support for the renegotiation of the existing Contract with DEPA.- Recommended procedures for evaluation / decision making.- Recommended procedures for contracting the supply of natural gas(e.g. call for tenders, call for the expression of interest, negotiationsetc.)All the above are elaborated in further detail in the technical proposal submittedby the Contractor for the inquiry DYKPP-750 and is included, as Appendix A, inthis Contract comprising an integral part thereof.ARTICLE 3. CONSULTANT’S PERSONNEL3.1. Description of PersonnelThe titles, agreed job descriptions, minimum qualifications, and estimatedperiods of engagement in the carrying out of the Services of theConsultant’s Key Personnel are described in Appendix A. The KeyPersonnel listed by title as well as by name in Appendix A are herebyapproved by the Client. The Contractor is solely responsible in connectionwith, and toward, his employees, and shall arrange and provide for theirinsurance.3.2. Removal and/or Replacement of Personnela) Except as the Client may otherwise agree, no changes shall be made inthe Key Personnel. If, for any reason beyond the reasonable control ofthe Consultant, it becomes necessary to replace any of the KeyPersonnel, the Consultant shall provide as a replacement a person ofequivalent or better qualifications.b) The Consultant shall have no claim for additional costs arising out of orincidental to any removal and/or replacement of Personnel.ARTICLE 4. DELIVERABLES AND TIME SCHEDULE4.1. The work of the Consultant shall be summarized and submitted to theClient in two reports, as follows:- «Project Report – Milestone #1» shall include all findings / discussion /recommendations pertaining to the items in subparagraphs 2.1, 2.2and 2.3 of the present contract.- «Project Report – Milestone #2» shall include all findings / discussion/ recommendations pertaining to the items in subparagraphs 2.4 and2.5 of the present contract.30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!