13.07.2015 Views

Design and Construction Guidelines for the ... - Kinder Morgan

Design and Construction Guidelines for the ... - Kinder Morgan

Design and Construction Guidelines for the ... - Kinder Morgan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rev. 2 August 4, 2010 Page 2 of 8<strong>Design</strong> <strong>and</strong> <strong>Construction</strong> <strong>Guidelines</strong> <strong>for</strong> <strong>the</strong> Installation of Facilities inProximity to <strong>Kinder</strong> <strong>Morgan</strong> Pipelines <strong>and</strong> Rights-of-WayBC Provincial Oil <strong>and</strong> Gas Commission BC Pipeline Act <strong>and</strong> RegulationUnited StatesFederalCanadian St<strong>and</strong>ards AssociationTransport CanadaUS Dept. of Transportation,Office of Pipeline SafetyAmerican Society of MechanicalEngineersCSA Z662 – Oil <strong>and</strong> Gas PipelineSystemsCSA C22.3 No. 1 – Overhead SystemsTC E-10 – St<strong>and</strong>ards RespectingPipeline Crossings Under RailwaysCode of Federal Regulations Part 195 –Transportation of Hazardous Liquids byPipelineASME B31.4 – Pipeline TransportationSystems <strong>for</strong> Liquid Hydrocarbons <strong>and</strong>O<strong>the</strong>r Liquids4.0 DRAWING AND DESIGN REQUIREMENTS4.1 General4.1.1 Crossing AngleThe crossing angle of proposed new facilities crossing <strong>Kinder</strong><strong>Morgan</strong>’s pipeline(s) <strong>and</strong>/or rights-of-way shall be as close to 90° aspossible.4.1.2 Pre-LoadingNo pre-load or surcharge will be allowed within a <strong>Kinder</strong> <strong>Morgan</strong> rightof-wayor its projected limits. Pre-loading adjacent to a right-of-way issubject to review <strong>and</strong> approval by <strong>Kinder</strong> <strong>Morgan</strong>.4.1.3 Locating <strong>Kinder</strong> <strong>Morgan</strong>’s PipelinesTo determine if a <strong>Kinder</strong> <strong>Morgan</strong> pipeline right of way or safety zone isin <strong>the</strong> vicinity of proposed works, contact <strong>the</strong> appropriate one callcentre in your jurisdiction. The one call centre will notify <strong>Kinder</strong><strong>Morgan</strong> of <strong>the</strong> contact, <strong>and</strong> <strong>Kinder</strong> <strong>Morgan</strong> will contact you if <strong>the</strong>proposed works are within <strong>the</strong> right of way or safety zone. If <strong>the</strong>proposed works are within <strong>the</strong> right of way or safety zone, <strong>the</strong>n aGround Disturbance Permit will be required. If <strong>the</strong> proposed worksinclude <strong>the</strong> installation of facilities, <strong>the</strong>n additionally a PipelineProximity Installation Permit will be required.4.1.4 Plan View Drawing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!