13.07.2015 Views

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 1.2 - Layout of <strong>A6</strong> Rushden <strong>–</strong> Higham Ferrers BypassProblems Prior to Scheme1.9 The problems in Rushden and Higham Ferrers prior to the scheme opening asdetailed in the Appraisal Summary Table (AST) result from the tortuous alignmentof the <strong>A6</strong> and the high volume of traffic. The problems can be summarised asfollows:Poor Safety <strong>–</strong> high numbers of accidents due to a lack of separation ofthrough traffic from pedestrians and local traffic;Poor Journey time reliability <strong>–</strong> due to high traffic volumes and one waysystem through Rushden ; andEnvironmental problems <strong>–</strong> Poor air quality due to congestion and throughtraffic in Rushden and Higham Ferrers. Problems associated with the integrityand residential amenity within the two towns.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!