13.07.2015 Views

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

A6 RUSHDEN – HIGHAM FERRERS BYPASS ... - Highways Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. EconomyIntroduction4.1 This chapter first reports the actual cost of the scheme, and compares this with theforecast cost. In addition an evaluation of the actual monetary benefit isundertaken as follows:A comparison is made of the actual time and accident savings on key linkswith COBA forecasts of savings on these same links;The COBA predicted 30-year benefit is then adjusted by the same proportionto give the actual monetary benefit;This benefit is compared to actual costs to determine the scheme value formoney, presented as the Benefit/Cost Ratio (BCR).4.2 A schematic representation of the stages of the POPE methodology is included inFigure 4.1.The chapter concludes by evaluating journey time reliability andregeneration.Adjustment FactorActual / PredictedFigure 4.1 - Schematic representation of the stages of the POPEmethodologyOutturn Cost4.3 The cost of the scheme was £16.2 million, as notified by the <strong>Highways</strong> <strong>Agency</strong> inAugust 2008. This figure includes works, land, preparation, and supervision. Mostof this was spent between the years 2000 and 2003, with small items ofexpenditure continuing until 2008.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!