4. EconomyIntroduction4.1 This chapter first reports the actual cost of the scheme, and compares this with theforecast cost. In addition an evaluation of the actual monetary benefit isundertaken as follows:A comparison is made of the actual time and accident savings on key linkswith COBA forecasts of savings on these same links;The COBA predicted 30-year benefit is then adjusted by the same proportionto give the actual monetary benefit;This benefit is compared to actual costs to determine the scheme value formoney, presented as the Benefit/Cost Ratio (BCR).4.2 A schematic representation of the stages of the POPE methodology is included inFigure 4.1.The chapter concludes by evaluating journey time reliability andregeneration.Adjustment FactorActual / PredictedFigure 4.1 - Schematic representation of the stages of the POPEmethodologyOutturn Cost4.3 The cost of the scheme was £16.2 million, as notified by the <strong>Highways</strong> <strong>Agency</strong> inAugust 2008. This figure includes works, land, preparation, and supervision. Mostof this was spent between the years 2000 and 2003, with small items ofexpenditure continuing until 2008.40