13.07.2015 Views

Substation Automation System And A.C. KIOSKS - Hvpn.gov.in

Substation Automation System And A.C. KIOSKS - Hvpn.gov.in

Substation Automation System And A.C. KIOSKS - Hvpn.gov.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a) S<strong>in</strong>gle-l<strong>in</strong>e diagram show<strong>in</strong>g the switchgear status and measured valuesb) Control dialogues with <strong>in</strong>terlock<strong>in</strong>g and block<strong>in</strong>g details.This control dialogue shall tell the operator whether the device operation ispermitted or blocked.a) Measurement dialoguesb) Alarm list, station / bay-orientedc) Event list, station / bay-orientedd) <strong>System</strong> status3.2.4.3 HMI DESIGN PRINCIPLES:Consistent design pr<strong>in</strong>ciples shall be adopted with the HMI concern<strong>in</strong>g labels,colors, dialogues and fonts. Non-valid selections shall be dimmed out.The object status shall be <strong>in</strong>dicated us<strong>in</strong>g different status colors for:a) Selected object under commandb) Selected on the screenc) Not updated, obsolete values, not <strong>in</strong> use or not sampledd) Alarm or faulty statee) Warn<strong>in</strong>g or blockedf) Update blocked or manually updatedg) Control blockedh) Normal state3.2.4.4 PROCESS STATUS DISPLAYS AND COMMAND PROCEDURES:The process status of the substation <strong>in</strong> terms of actual values of currents,voltages, frequency, active and reactive powers as well as the positions of circuitbreakers, isolators and transformer tap-changers shall be displayed <strong>in</strong> the stations<strong>in</strong>gle-l<strong>in</strong>e diagram.In order to ensure a high degree of security aga<strong>in</strong>st undesired operation, a"select-before-execute" command procedure shall be provided. After the"selection" of a switch, the operator shall be able to recognize the selecteddevice on the screen, and all other switchgear shall be blocked. Ascommunication between control centre and device to be controlled is established,the operator shall be prompted to confirm the control action and only then f<strong>in</strong>alexecute command shall be accepted. After the “execution” of the command theoperated switch<strong>in</strong>g symbol shall flash until the switch has reached its newposition.The operator shall be <strong>in</strong> a position to execute a command only, if the switch isnot blocked and if no <strong>in</strong>terlock<strong>in</strong>g condition is go<strong>in</strong>g to be violated. The<strong>in</strong>terlock<strong>in</strong>g statements shall be checked by the <strong>in</strong>terlock<strong>in</strong>g schemeimplemented at bay and station level.After command execution the operator shall receive a confirmation that the newswitch<strong>in</strong>g position has been reached or an <strong>in</strong>dication that the switch<strong>in</strong>g procedurewas unsuccessful with the <strong>in</strong>dication of the reason for non-function<strong>in</strong>g.3.2.4.5 SYSTEM SUPERVISION & DISPLAY:The SAS system shall be comprehensively self-monitored such that faults areimmediately <strong>in</strong>dicated to the operator, possibly before they develop <strong>in</strong>to seriousC:\Users\itms\Downloads\SAS Spec. (1).doc - 9 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!