13.07.2015 Views

General Conditions of Tender

General Conditions of Tender

General Conditions of Tender

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>General</strong> <strong>Conditions</strong> <strong>of</strong> <strong>Tender</strong>ClauseRemarks/Guidelines(ii)*(iii)*(iv)*(v)*(vi)*(vii)*(viii)*(ix)submission <strong>of</strong> the *Bills <strong>of</strong> Quantities/*Schedule <strong>of</strong> Quantities/*Schedule <strong>of</strong> Ratesrequired under GCT Clauses 4(1)(a)(ii) and4(1)(b)submission <strong>of</strong> the programme <strong>of</strong> Worksrequired under SCT Clause [ ]submission <strong>of</strong> design required for part <strong>of</strong>the Works not covered by the Engineer’sdesign required under SCT Clause [ ]submission <strong>of</strong> Temporary Works designrequired under SCT Clause [ ]submission <strong>of</strong> Outline Safety Plan requiredunder SCT Clause [ ]submission <strong>of</strong> outline quality system forstructural concrete required under SCTClause [ ]submission <strong>of</strong> Sub-contractor ManagementPlan required under GCT Claus e 20.submission <strong>of</strong> outline Waste ManagementPlan required under SCT Clause [ ][*Delete as appropriate]the “remark” for SCT.* The items from (iii) onwards areused only in rare cases. Please referto the individual SCT Clause forguidance.These items are to be included asessential requirements if required tobe submitted by the tenderers. Ifthese are not regarded as essentialrequirements they should not berequired to be submitted.GCT 22 Contractors under suspension(1) If the tenderer or, if the tenderer is apartnership or an unincorporated orincorporated joint venture, any participant<strong>of</strong> the partnership or unincorporated jointventure or shareholder <strong>of</strong> the incorporatedjoint venture is under suspension fromtendering for *any <strong>of</strong>/*all <strong>of</strong> the followingcategory [or categories] <strong>of</strong> public works,his tender will not be considered unless thesuspension is lifted by the relevant worksRef: ETWB TC(W) No. 10/2004.<strong>General</strong> <strong>Conditions</strong> <strong>of</strong> <strong>Tender</strong> (19.10.2004) Page 16 <strong>of</strong> 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!