13.07.2015 Views

MR87-1_REDUCED.pdf

MR87-1_REDUCED.pdf

MR87-1_REDUCED.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

adly deteriorated with a high percentage of thepipehaving the invert totally rusted out . The originalpipe couldnot be extended due to its condition andneeded replacement .The CSP were originally installedon this project in 1932 - 34. Two crossroad CSP hadbeen replaced prior to this project by the Department ' sMaintenance personnel .This project was 9.633 miles long and required2 , 824 linear feet of pipe. The 2,824 linear feet ofCSP was placed at a cost of $53,549 . 50 or a weightedaverage cost of $18 . 96 per linear foot .Total cost ofthe pipe installation ,including end sections , was$63,371.50.In addition to the cost of total replacement by age54 years , replacing the pipe created another problem .It is very difficult to recompact a cut trench withoutgetting some settlement at a later date .installations have now settled andMost of thesethere is adepressionin the roadway surface which is noticeableto the traveling public .Project F-8- 1(9) Secs A and B, Route 8, CrawfordCounty was let to contract in June 1986. It wasprimarily a resurfacing project . The project was16.596 miles long . The CSP were originally installedon this project in 1937 . No record of maintenancereplacement prior to 1986 was available .- 22 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!