Alstom Power Italia SpA Annex № 1 <strong>for</strong> <strong>ad</strong>diti<strong>on</strong>al activities <strong>for</strong> site: Producti<strong>on</strong> and steel<br />

c<strong>on</strong>structi<strong>on</strong>s delivery <strong>the</strong> c<strong>on</strong>tractors site - San Giuseppe di Cairo<br />

SV, Italiana Coke.<br />

Schneider Electric Energy<br />

GmbH<br />

Implementati<strong>on</strong> <strong>of</strong> <strong>ad</strong>diti<strong>on</strong>al assembly network operati<strong>on</strong>s in<br />

Moorburg Power Plant<br />

Kozloduy NPP EAD Design, supply and installati<strong>on</strong> <strong>of</strong> power supply cabinets 0,4kV.<br />

Bauer Elektroanlagen GmbH Annex № 1 <strong>for</strong> <strong>ad</strong>diti<strong>on</strong>al activities <strong>for</strong> site: C<strong>on</strong>structi<strong>on</strong> <strong>of</strong> a new<br />

building <strong>for</strong> <strong>the</strong> <strong>of</strong>fice <strong>of</strong> Urban Planning and Envir<strong>on</strong>ment in<br />

Hamburg, Wilhemsburg.<br />

Chelopech Mining EAD Manufacture and assembly <strong>of</strong> hydraulic pipelines - Area 27-<br />

Project <strong>for</strong> underground crusher and c<strong>on</strong>veyor belt system at<br />

Chelopech Mining EAD<br />

Enem<strong>on</strong>a Start AD Repair <strong>of</strong> ceilings and sanitati<strong>on</strong>.<br />

Key Developments EOOD Service with an excavator (Hyundai 450-LC7A, 45 t<strong>on</strong>s).<br />

Chelopech Mining EAD Annex № 1 to C<strong>on</strong>tract № 1201/14.10.2011. Additi<strong>on</strong>al activities<br />

<strong>for</strong> site: “Implementati<strong>on</strong> <strong>of</strong> c<strong>on</strong>crete work and installati<strong>on</strong> <strong>of</strong><br />

structural and mechanical part <strong>of</strong> <strong>the</strong> c<strong>on</strong>veyor area and<br />

reclaiming units - Area 27 - Underground Crusher and C<strong>on</strong>veyors<br />

System Project at Chelopech Mining EAD<br />

The value <strong>of</strong> new energy efficiency c<strong>on</strong>tracts signed in Q2 2012 totalled BGN 3.76 milli<strong>on</strong>, excl.<br />

VAT<br />

C<strong>on</strong>tractor Subject<br />

Municipality <strong>of</strong> Strelcha Annex to C<strong>on</strong>tract № 4646/20.06.2007 regarding <strong>the</strong> closure <strong>of</strong><br />

<strong>the</strong> m<strong>on</strong>itoring activities <strong>for</strong> <strong>the</strong> building <strong>of</strong> St.St. Kiril y Metodi<br />

school, in <strong>the</strong> town <strong>of</strong> Strelcha.<br />

Energok<strong>on</strong>sult EOOD<br />

Multipr<strong>of</strong>ile Hospital <strong>for</strong><br />

Active Treatment St.Ivan<br />

Rilski, Razgr<strong>ad</strong><br />

ESCO c<strong>on</strong>tract with guaranteed energy saving results<br />

Municipality <strong>of</strong> Haskovo Implementati<strong>on</strong> <strong>of</strong> engineering with guaranteed energy saving<br />

results <strong>for</strong> <strong>the</strong> <strong>ad</strong>ministrative building <strong>of</strong> <strong>the</strong> Munisipality.<br />

This document is a translati<strong>on</strong> <strong>of</strong> <strong>the</strong> original Bulgarian text, in case <strong>of</strong> divergence <strong>the</strong> Bulgarian text shall prevail.<br />