18.04.2012 Enem<strong>on</strong>a-<br />

Galabovo<br />

AD<br />

<strong>for</strong> site: „Executi<strong>on</strong> <strong>of</strong> <strong>the</strong> C<strong>on</strong>veying and<br />

transfer area – Civil, Structural and<br />

Mechanical Works – Area 27 –<br />

Underground Crusher and C<strong>on</strong>veyors<br />

System Project at Chelopech Mining<br />

EAD”.<br />

Annex № 3 to framework c<strong>on</strong>tract<br />

№1138/01.08.2011 <strong>for</strong> Temporary and<br />

paid usage <strong>of</strong> an auto-crane 35 t<strong>on</strong>es<br />

and auto-crane 80 t<strong>on</strong>es <strong>for</strong> site:<br />

”C<strong>on</strong>structi<strong>on</strong> <strong>of</strong> a new cyclic flow<br />

technology /CFT/ <strong>for</strong> transportati<strong>on</strong> <strong>of</strong><br />

<strong>the</strong> overburden from Asarel mine to<br />

West Dump site with a capacity <strong>of</strong> 5 000<br />

t<strong>on</strong>es/hour”<br />

20.04.2012 EMCO AD Annex №47 to framework c<strong>on</strong>tract<br />

№351/13.07.2010 <strong>for</strong> Fabricati<strong>on</strong> and<br />

delivery <strong>of</strong> a metal structure <strong>for</strong> site:<br />

„Executi<strong>on</strong> <strong>of</strong> <strong>the</strong> C<strong>on</strong>veying and<br />

transfer area – Civil, Structural and<br />

Mechanical Works – Area 27 –<br />

Underground Crusher and C<strong>on</strong>veyors<br />

System Project at Chelopech Mining<br />

09.05.2012 Enem<strong>on</strong>a-<br />

Galabovo<br />

AD<br />

EAD”.<br />

Annex № 4 to framework c<strong>on</strong>tract<br />

№1138/01.08.2011 <strong>for</strong> Temporary<br />

and paid usage <strong>of</strong> a five-t<strong>on</strong>e heavy<br />

truck <strong>for</strong> site: ”C<strong>on</strong>structi<strong>on</strong> <strong>of</strong> a new<br />

cyclic flow technology /CFT/ <strong>for</strong><br />

transportati<strong>on</strong> <strong>of</strong> <strong>the</strong> overburden<br />

from Asarel mine to West Dump site<br />

with a capacity <strong>of</strong><br />

5 000 t<strong>on</strong>es/hour”<br />

15.5.2012 EMCO AD Annex № 48 to c<strong>on</strong>tract<br />

№351/13.07.2010 <strong>for</strong> Fabricati<strong>on</strong><br />

and delivery <strong>of</strong> a metal structure <strong>for</strong><br />

site: Installati<strong>on</strong> <strong>of</strong> c<strong>on</strong>structi<strong>on</strong> and<br />

mechanical part and pipelines” <strong>for</strong><br />

Z<strong>on</strong>e 78- tailings thickener” <strong>of</strong><br />

15.5.2012 Enem<strong>on</strong>a-<br />

Galabovo<br />

AD<br />

Chelopech Mining EAD.<br />

Annex № 18 to framework c<strong>on</strong>tract<br />

№349/13.07.2012 <strong>for</strong> C<strong>on</strong>structi<strong>on</strong><br />

and Assembly works <strong>for</strong> site:<br />

Installati<strong>on</strong> <strong>of</strong> c<strong>on</strong>structi<strong>on</strong> and<br />

mechanical part and pipelines” <strong>for</strong><br />

Z<strong>on</strong>e 78- tailings thickener” <strong>of</strong><br />

1 m<strong>on</strong>th For crane 35<br />

t<strong>on</strong>es – BGN<br />

400.00 a<br />

m<strong>on</strong>th; For<br />

crane<br />

80 t<strong>on</strong>es -<br />

BGN<br />

1 000.00 a<br />

m<strong>on</strong>th<br />

16.05.2012 32 360.00<br />

2 m<strong>on</strong>ths BGN 200 a<br />

m<strong>on</strong>th;<br />

BGN 2 a km<br />

3 days after<br />

signing<br />

3 calendar<br />

days after<br />

signing<br />

7 526.31<br />

49 326.14<br />

This document is a translati<strong>on</strong> <strong>of</strong> <strong>the</strong> original Bulgarian text, in case <strong>of</strong> divergence <strong>the</strong> Bulgarian text shall prevail.<br />