13.07.2015 Views

UFGS 09 30 13 Ceramic Tiling - The Whole Building Design Guide

UFGS 09 30 13 Ceramic Tiling - The Whole Building Design Guide

UFGS 09 30 13 Ceramic Tiling - The Whole Building Design Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MARBLE INSTITUTE OF AMERICA (MIA)MIA <strong>Design</strong> Manual(2003) Dimension Stone <strong>Design</strong> ManualSOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)SCAQMD Rule 1168(1989; R 2005) Adhesive and SealantApplicationsTILE COUNCIL OF NORTH AMERICA (TCNA)TCNA Hdbk(20<strong>13</strong>) Handbook for <strong>Ceramic</strong>, Glass, andStone Tile InstallationU.S. GREEN BUILDING COUNCIL (USGBC)LEED GBDCLEED NC(20<strong>09</strong>) LEED Reference <strong>Guide</strong> for Green<strong>Building</strong> <strong>Design</strong> and Construction(20<strong>09</strong>) Leadership in Energy andEnvironmental <strong>Design</strong>(tm) New ConstructionRating SystemU.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)36 CFR 1191 Americans with Disabilities Act (ADA)Accessibility <strong>Guide</strong>lines for <strong>Building</strong>s andFacilities; Architectural Barriers Act(ABA) Accessibility <strong>Guide</strong>lines1.2 SUSTAINABILITY REQUIREMENTS**************************************************************************NOTE: <strong>The</strong> bracketed items are representative ofLEED material documentation and requirements thatmay apply to this project. <strong>The</strong>se items should beedited to reflect the project requirements.**************************************************************************Materials in this technical specification may contribute towards contractcompliance with sustainability requirements. See Section 01 33 29 LEEDDOCUMENTATION for project LEED NC [local/regional materials,] [low-emittingmaterials,] [ recycled content,] [ ____] [ and ] [rapidly renewablematerials] requirements.1.3 SUBMITTALS**************************************************************************NOTE: Review submittal description (SD) definitionsin Section 01 33 00 SUBMITTAL PROCEDURES and editthe following list to reflect only the submittalsrequired for the project.<strong>The</strong> <strong>Guide</strong> Specification technical editors havedesignated those items that require Governmentapproval, due to their complexity or criticality,with a "G." Generally, other submittal items can bereviewed by the Contractor's Quality ControlSystem. Only add a “G” to an item, if the submittalSECTION <strong>09</strong> <strong>30</strong> <strong>13</strong> Page 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!