IEE Haveri (23-05-09).pdf - kuidfc
IEE Haveri (23-05-09).pdf - kuidfc
IEE Haveri (23-05-09).pdf - kuidfc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationImpactDescriptionRoad blocking dueto laying of watersupply networkand increasedtraffic flow due tovehicle movementfor constructionactivities;inconvenience tothe localcommunity.Dust and noisefrom constructionactivities.Improper disposalof BituminouswasteSignificance ofthe ImpactN/TThe proposednetwork will belaid in thepresentlyunserved fringeand extensionareas. As theseareas are notdenselypopulated areasthe impacts dueto constructionactivities may notbe significant.TrafficManagement Planfor theconstructionphase has to beprepared forrerouting andavoiding slowmovement ofvehicles.M/TDue to dryclimatic conditionthe dustgeneration maybe considerable.No major noisegeneratingactivities such asrock blasting anduse of heavy noisegeneratingequipment is notenvisaged.M/PMitigation Measuresbe trenched at a time.Traffic managementwith diversionthrough alternateroutes will beimplemented byproviding adequatesign boards.Construction materialshall be stockpiled tominimize trafficblockages.Poor performance ofthe contractor maypotentially exacerbatethese impacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.The practices such asspraying of water toarrest dust shall beemployed. Allequipments used inconstruction activitiesshall comply to CPCBnoise emission norms.Bituminous waste topbe disposed inapproved wasteImplementationResponsibility<strong>Haveri</strong> CMCHeadContractor/CMCHeadContractor/CMCHead ContractorPreliminaryCostingPart ofconstructioncostsPart ofConstructionCost. .Part ofconstructioncostsKUIDFC44WSAPL