31.07.2015 Views

installation manual operation manual inspection log kannad 406 as

installation manual operation manual inspection log kannad 406 as

installation manual operation manual inspection log kannad 406 as

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOGKANNAD <strong>406</strong> ASB. Installation with mounting bracket(1)Bracket <strong>installation</strong>• Determine the location of the ELT on board according to FAR/RTCArecommendations.• Drill 3 holes Ø 5,5 mm in the aircraft structure according to "Drilling m<strong>as</strong>k"page 503 of this document.• Fix the bracket with the 3 screws and nylstop nuts or 3 rivets.(2) ELT <strong>installation</strong>• Check that the ELT identification label matches the aircraft tail number.• If the mounting bracket is fitted with a Programming Dongle (P/NS1820514-01), remove the Water Switch Sensor connector and connectthe programming dongle to the ELT.Ant Arm Off On RCAnt Arm Off On RC• Perform a Self-test (see paragraph "SELF-TEST").• If test result is OK, switch back to "OFF".• Disconnect the ProgrammingDongle (if applicable) and stowit in the compartment designedto this effect inside the bracket.PAGE 204FEB 01/2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!