installation manual operation manual inspection log kannad 406 as
installation manual operation manual inspection log kannad 406 as
installation manual operation manual inspection log kannad 406 as
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOGKANNAD <strong>406</strong> ASC. Battery replacementBattery replacement is mandatory:• after more than 1 hour of real transmission (cumulated duration);• before or on the battery expiration date.Only original battery pack included in battery kit(KIT BAT 300, P/N S1820516-99)supplied by KANNAD can be installed.KANNAD refuse all responsibility and invalidateall warranty should other packs be installed.PAGE 602FEB 01/2008