STAGING THE DCS AND THE SIMULATOR<br />

Initial Plan<br />

During the course of <strong>Simulator</strong> staging activities in each process area, three important steps stand out:<br />

1. Mapping of DCS/<strong>Simulator</strong> inputs and outputs (I/O Mapping);<br />

2. Verification of the individual control loops; and<br />

3. Verification of the EPC operating procedures and final validation of the process models (the Joint –<br />

FAT).<br />

Foxboro<br />

Activities<br />

1st SaveAll<br />

AMEC <strong>Simulator</strong><br />

Staging Activities<br />

Foxboro Pre - FAT<br />

(CP Hardware)<br />

Duration : Variable<br />

I/O Mapping<br />

Personnel : AMEC, Si ndus<br />

Duration : 1 week<br />

2nd SaveAll<br />

Fox App SW Fox App SW<br />

Foxboro FAT<br />

(CP Hardware)<br />

Duration : Variable<br />

IDEAS Mini - Sys te m IDEAS Mini - Sys te m<br />

Activities : build cross -<br />

reference database,<br />

finalize I/O addresses , I/O<br />

communications check<br />

Modifications to<br />

Fox App SW<br />

Initial <strong>System</strong> - W ide<br />

Check<br />

Preparation <strong>for</strong> Final Joint FAT<br />

Activities : Individual control<br />

loops and motor start -<br />

stops tested tes ted , Foxboro App<br />

SW & model pre - check ,<br />

controller pre - tuning<br />

Personnel : AMEC, Si ndus ,<br />

<strong>Aracruz</strong> Operator<br />

Duration : 1 week<br />

3rd SaveAll<br />

Fox App SW<br />

IDEAS Model<br />

Figure 6 Initial In<strong>for</strong>mation and Workflows during Staging<br />

Final SaveAll<br />

(CP Hardware)<br />

Fox App SW<br />

Final SaveAll<br />

(FSIM Softwar e)<br />

IDEAS Mini - Sys te m<br />

Joint Fox App S W FAT<br />

Activities : Area - wide start - up<br />

& shutdown witnessed by<br />

EPC Supplier & Foxboro ,<br />

group starts tested ; changes<br />

made to Foxboro App SW<br />

Personnel : AMEC, <strong>Aracruz</strong>,<br />

Foxboro , EPC Supplier<br />

Duration : 1 week<br />

At the onset, we developed a diagram, which describes the flow of in<strong>for</strong>mation and activities of the <strong>Simulator</strong><br />

in relation to DCS staging. It is shown as Figure 6, below.<br />

To support this work process and the proposed schedule, we also developed three so-called "mini-systems".<br />

These systems were hardware abbreviations of our final system architecture, but they were able to run the<br />

same software <strong>for</strong> a single area. Later in the staging process we developed techniques to allow the staging of<br />

two areas using a slightly modified mini-system.<br />