STAGING THE DCS AND THE SIMULATOR<br />
Initial Plan<br />
During the course of <strong>Simulator</strong> staging activities in each process area, three important steps stand out:<br />
1. Mapping of DCS/<strong>Simulator</strong> inputs and outputs (I/O Mapping);<br />
2. Verification of the individual control loops; and<br />
3. Verification of the EPC operating procedures and final validation of the process models (the Joint –<br />
FAT).<br />
Foxboro<br />
Activities<br />
1st SaveAll<br />
AMEC <strong>Simulator</strong><br />
Staging Activities<br />
Foxboro Pre - FAT<br />
(CP Hardware)<br />
Duration : Variable<br />
I/O Mapping<br />
Personnel : AMEC, Si ndus<br />
Duration : 1 week<br />
2nd SaveAll<br />
Fox App SW Fox App SW<br />
Foxboro FAT<br />
(CP Hardware)<br />
Duration : Variable<br />
IDEAS Mini - Sys te m IDEAS Mini - Sys te m<br />
Activities : build cross -<br />
reference database,<br />
finalize I/O addresses , I/O<br />
communications check<br />
Modifications to<br />
Fox App SW<br />
Initial <strong>System</strong> - W ide<br />
Check<br />
Preparation <strong>for</strong> Final Joint FAT<br />
Activities : Individual control<br />
loops and motor start -<br />
stops tested tes ted , Foxboro App<br />
SW & model pre - check ,<br />
controller pre - tuning<br />
Personnel : AMEC, Si ndus ,<br />
<strong>Aracruz</strong> Operator<br />
Duration : 1 week<br />
3rd SaveAll<br />
Fox App SW<br />
IDEAS Model<br />
Figure 6 Initial In<strong>for</strong>mation and Workflows during Staging<br />
Final SaveAll<br />
(CP Hardware)<br />
Fox App SW<br />
Final SaveAll<br />
(FSIM Softwar e)<br />
IDEAS Mini - Sys te m<br />
Joint Fox App S W FAT<br />
Activities : Area - wide start - up<br />
& shutdown witnessed by<br />
EPC Supplier & Foxboro ,<br />
group starts tested ; changes<br />
made to Foxboro App SW<br />
Personnel : AMEC, <strong>Aracruz</strong>,<br />
Foxboro , EPC Supplier<br />
Duration : 1 week<br />
At the onset, we developed a diagram, which describes the flow of in<strong>for</strong>mation and activities of the <strong>Simulator</strong><br />
in relation to DCS staging. It is shown as Figure 6, below.<br />
To support this work process and the proposed schedule, we also developed three so-called "mini-systems".<br />
These systems were hardware abbreviations of our final system architecture, but they were able to run the<br />
same software <strong>for</strong> a single area. Later in the staging process we developed techniques to allow the staging of<br />
two areas using a slightly modified mini-system.<br />
www.andritz.com 8 of 16