Contam<strong>in</strong>ated Sites<br />

Prelim<strong>in</strong>ary <strong>in</strong>vestigations and clean-up<br />

The topic of site contam<strong>in</strong>ation plays an important role<br />

<strong>in</strong> all construction projects at <strong>the</strong> <strong>Ingolstadt</strong> plant.<br />

As early as <strong>in</strong> <strong>the</strong> plann<strong>in</strong>g phase, <strong>the</strong> <strong>Plant</strong> <strong>Environmental</strong><br />

Protection department assesses whe<strong>the</strong>r<br />

pollutant contam<strong>in</strong>ation is to be expected, and<br />

commissions suitable prelim<strong>in</strong>ary <strong>in</strong>vestigations.<br />

In <strong>the</strong> case of changes to old <strong>in</strong>stallations and<br />

build<strong>in</strong>gs, <strong>the</strong> focus is on tests of <strong>the</strong> build<strong>in</strong>g structure<br />

<strong>for</strong> asbestos, PCBs or materials conta<strong>in</strong><strong>in</strong>g tar.<br />

In this way it is possible to ensure selective dismantl<strong>in</strong>g<br />

and <strong>the</strong> appropriate disposal of environmentally<br />

hazardous build<strong>in</strong>g materials.<br />

Water pollution control has top priority when plann<strong>in</strong>g<br />

new build<strong>in</strong>gs. Above all, areas that have already been<br />

used as <strong>in</strong>dustrial sites be<strong>for</strong>e be<strong>in</strong>g acquired by <strong>Audi</strong><br />

are <strong>in</strong>tensively exam<strong>in</strong>ed <strong>for</strong> groundwater pollutants.<br />

All results of <strong>the</strong>se prelim<strong>in</strong>ary <strong>in</strong>vestigations are made<br />

available to <strong>the</strong> plann<strong>in</strong>g departments and <strong>in</strong>cluded <strong>in</strong><br />

<strong>the</strong> tender documents. In this way any exist<strong>in</strong>g soil<br />

contam<strong>in</strong>ation can be removed be<strong>for</strong>e construction<br />

beg<strong>in</strong>s. Fur<strong>the</strong>rmore, <strong>in</strong>vestigations <strong>in</strong>to construction<br />

water and groundwater are carried out <strong>for</strong> all build<strong>in</strong>g<br />

activities. This prevents surface and groundwater from<br />

be<strong>in</strong>g put at risk.<br />

The <strong>Plant</strong> <strong>Environmental</strong> Protection department also<br />

takes action <strong>in</strong> <strong>the</strong> area of environmentally relevant<br />

production facilities if <strong>the</strong>re is a suspicion of pollution<br />

with hazardous substances. For example, <strong>Audi</strong> had<br />

already begun to clean up <strong>the</strong> subsoil <strong>in</strong> <strong>the</strong> area of <strong>the</strong><br />

pa<strong>in</strong>t shop <strong>in</strong> <strong>the</strong> south of <strong>the</strong> plant premises <strong>in</strong> 1997.<br />

Follow<strong>in</strong>g an <strong>in</strong>terruption caused by comprehensive<br />

dismantl<strong>in</strong>g work, <strong>the</strong> clean-up was resumed <strong>in</strong><br />

mid-2001. In <strong>the</strong> meantime 3,425 kg of solvents have<br />

been removed from soil air and groundwater with<strong>in</strong><br />

eleven years. As a result of <strong>the</strong>se successful measures,<br />

it has been possible to modify <strong>the</strong> operation of <strong>the</strong><br />

clean-up system:<br />

soil air extraction has now ceased and groundwater is<br />

now only removed and cleaned by means of a wellhead.<br />

38<br />

Extraction of solvents (BTEX)<br />

From soil air and ground water <strong>in</strong> kg (s<strong>in</strong>ce 2001)<br />

<strong>in</strong> <strong>the</strong> area of <strong>the</strong> <strong>for</strong>mer pa<strong>in</strong>t shop south<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

2. Hj 01<br />

02<br />

03<br />

04<br />

Soil air Groundwater<br />

05<br />

06 07 08<br />

09<br />

<strong>Environmental</strong>ly relevant <strong>in</strong>stallations<br />

at <strong>the</strong> <strong>Ingolstadt</strong> plant<br />

Requir<strong>in</strong>g approval accord<strong>in</strong>g to <strong>the</strong> Federal Emission Protection Act (BImSchG)<br />

<strong>Environmental</strong> effects<br />

Car plant<br />

– Pa<strong>in</strong>t shop<br />

– Body shop<br />

– Assembly<br />

– Ancillary <strong>in</strong>stallations (such as large-scale <strong>in</strong>c<strong>in</strong>erators, waste and recycl<strong>in</strong>g treatment systems)<br />

Additional plants requir<strong>in</strong>g authorisation<br />

Test rig groups (eng<strong>in</strong>e and transmission test rigs), storage area <strong>for</strong> crash vehicles,<br />

w<strong>in</strong>d tunnel centre, emulsion evaporation plant, scrap presses<br />

Emissions <strong>in</strong> <strong>the</strong> <strong>for</strong>m of organic solvents, CO2, SO2, CO and NOx , smells, noise, water pollutants<br />

and waste, noise<br />

Requir<strong>in</strong>g approval accord<strong>in</strong>g to <strong>the</strong> Water Resources Act<br />

Installations<br />

In <strong>the</strong> period under review:<br />

Federal emissions protection law approvals<br />

– Federal emission control legislation related<br />

authorisation <strong>for</strong> <strong>the</strong> construction of a new<br />

body shop (2009)<br />

– Change authorisation <strong>for</strong> transmission development<br />

and emission centre – construction of an <strong>in</strong>tegration<br />

centre electrification (2009)<br />

– Expansion of <strong>the</strong> scrap bal<strong>in</strong>g press by an additional<br />

unit (2009)<br />

Federal emission control legislation related notices<br />

– Replacement of Quattro pa<strong>in</strong>t<strong>in</strong>g (2009)<br />

– Amendment of <strong>the</strong> approval notice of <strong>the</strong> w<strong>in</strong>d<br />

tunnel centre (2009)<br />

<strong>Environmental</strong> effects<br />

Central wastewater process<strong>in</strong>g Wastewater polluted with heavy metals<br />

Accord<strong>in</strong>g to § 52a BImSchG [Federal Emission Control<br />

Act] “Compulsory Notification Relat<strong>in</strong>g to <strong>the</strong> <strong>Plant</strong><br />

Organisation”, it is necessary to ensure “that <strong>the</strong><br />

regulations and ord<strong>in</strong>ances serv<strong>in</strong>g to protect aga<strong>in</strong>st<br />

harmful environmental effects and aga<strong>in</strong>st o<strong>the</strong>r<br />

hazards, significant disadvantages and considerable<br />

<strong>in</strong>conveniences are observed dur<strong>in</strong>g operations.”<br />

<strong>Audi</strong> <strong>Ingolstadt</strong> is thus obligated to give notice of who<br />

at <strong>the</strong> plant is responsible <strong>for</strong> observ<strong>in</strong>g <strong>the</strong><br />

operator’s duties <strong>for</strong> <strong>the</strong> <strong>in</strong>stallations requir<strong>in</strong>g<br />

approval. In 2009 an <strong>in</strong><strong>for</strong>mation event and tra<strong>in</strong><strong>in</strong>g<br />

course of <strong>the</strong> operators of emission control legislation<br />

related plants delegated by <strong>the</strong> Director of Production<br />

accord<strong>in</strong>g to § 52a BImSchG was carried out.<br />