27.08.2015 Views

Program Delivery Plan

Program Delivery Plan - Baton Rouge Department of Public Works ...

Program Delivery Plan - Baton Rouge Department of Public Works ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Sanitary Sewer Overflow (SSO)<br />

Control and Wastewater Facilities <strong>Program</strong><br />

Prepared for<br />

City of Baton Rouge/East Baton Rouge Parish<br />

Department of Public Works<br />

Prepared by<br />

In association with<br />

SIGMA Consulting Group, Inc.<br />

ILSI Engineering<br />

WBG121410141812GNV<br />

January 2011 • Revision 5


Contents<br />

Section<br />

Page<br />

Executive Summary ...................................................................................................................... ES-1<br />

1BOverview ......................................................................................................................... ES-1<br />

<strong>Program</strong> Description ........................................................................................................ ES-2<br />

3BCComprehensive Rehabilitation Projects ........................................................... ES-2<br />

4BCapacity Improvement Projects ........................................................................ ES-2<br />

Wastewater Treatment Improvements/Storage Projects .............................. ES-7<br />

Preliminary Master <strong>Plan</strong> Projects ...................................................................... ES-8<br />

List of Completed Project, Active Projects, and Projects to be Appropriated<br />

in 2011 .............................................................................................................................. ES-11<br />

Functionally Completed Projects .................................................................... ES-11<br />

Active Projects .................................................................................................... ES-11<br />

Projects for 2011 ................................................................................................. ES-13<br />

1 Overview .............................................................................................................................. 1-1<br />

1.1 Background ............................................................................................................. 1-1<br />

1.2 Major <strong>Program</strong> Goals ............................................................................................. 1-1<br />

1.3 <strong>Program</strong> Description .............................................................................................. 1-2<br />

1.3.1 Comprehensive Rehabilitation Projects .................................................. 1-2<br />

1.3.2 Capacity Improvement Projects ............................................................... 1-3<br />

1.3.3 Wastewater Treatment Improvement/Storage Projects ....................... 1-3<br />

1.4 Project <strong>Delivery</strong> Summary .................................................................................... 1-3<br />

1.5 Report Contents ...................................................................................................... 1-4<br />

2 <strong>Plan</strong>ning Description ......................................................................................................... 2-1<br />

2.1 <strong>Plan</strong>ning Overview ................................................................................................ 2-1<br />

2.2 Comprehensive Rehabilitation <strong>Plan</strong>ning ............................................................ 2-1<br />

2.3 Capacity Improvement <strong>Plan</strong>ning ......................................................................... 2-1<br />

2.4 Wastewater Treatment/Storage <strong>Plan</strong>ning .......................................................... 2-2<br />

3 South Basin Projects .......................................................................................................... 3-1<br />

3.1 South Gravity System Comprehensive Rehabilitation Projects ....................... 3-7<br />

3.1.1 SGC-R-0001a, SCG-R-001b, SGC-R-0002a, SGC-R-0002b,<br />

SGC-R-0003, SGC-R-0004, SGL-R-0001, SGL-R-0002, SGL-R-0003,<br />

SGU-R-0001, SGU-R-0002, SGU-R-0003 ................................................. 3-7<br />

3.2 South Gravity System Capacity Improvements Projects ................................... 23<br />

3.2.1 SGU-C-0001 (Multiple PSs - Florida Blvd - Sherwood Forest<br />

Blvd) .......................................................................................................... 3-23<br />

3.2.2 SGU-C-0002 (Airline Highway - Interstate 12) .................................... 3-23<br />

3.2.3 SGU-C-0003 (Sherwood Forest Blvd- Goodwood Blvd Pipeline<br />

Improvements) ......................................................................................... 3-23<br />

3.2.4 SGU-C-0004 (Goodwood Blvd - South Flannery Road) ..................... 3-28<br />

GNV31031158642.DOCX/110310007 III JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Section<br />

Page<br />

3.2.5 SGU-C-0005 (Oak Villa Blvd - Monterey Blvd Sewer Area<br />

Upgrades) ................................................................................................. 3-28<br />

3.2.6 SGC-C-0001 (Florida Blvd PS Improvements) .................................... 3-31<br />

3.2.7 SGC-C-0002 (Airline Highway Pipeline Improvements) .................. 3-33<br />

3.2.8 SGC-C-0003 (Essen Lane - Interstate 12) .............................................. 3-40<br />

3.2.9 SGC-C-PS58A (Pump Station 58 Replacement) .................................. 3-40<br />

3.2.10 SGC-C-PS58FM-A (Staring Lane FM - Phase I – Burbank Drive to<br />

Highland Road) ....................................................................................... 3-42<br />

3.2.11 SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to<br />

Perkins Road) ........................................................................................... 3-44<br />

3.2.12 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to<br />

PS 58) ......................................................................................................... 3-46<br />

3.2.13 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain<br />

Improvements) ......................................................................................... 3-48<br />

3.2.14 SGL-C-0001 (Essen/Staring Area PS 57 Improvements) ................... 3-50<br />

3.2.15 SGL-C-0002 (Multiple PSs – Highland Road – Kenilworth<br />

Parkway) ................................................................................................... 3-50<br />

3.2.16 SGL-C-0003 (Highland Road Pipeline Improvements) ...................... 3-53<br />

3.2.17 SGL-C-0004 (Highland Road – Lee Drive) ........................................... 3-59<br />

3.2.18 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) .................... 3-59<br />

3.3 South Forced System Comprehensive Rehabilitation Projects ...................... 3-63<br />

3.3.1 SFL-R-0001, SFL-R-0002, SFL-R-0003, AND SFU-R-0001................... 3-63<br />

3.4 South Forced System Capacity Improvements Projects ................................. 3-69<br />

3.4.1 SFL-C-0001 (Multiple PSs – Nicholson Drive – Brightside Drive) ... 3-69<br />

3.4.2 SFL-C-0002 (Perkins/Old Perkins Area BPS 514 Improvements) .... 3-71<br />

3.4.3 SFL-C-0003 (Multiple PSs - Burbank Drive – Siegen Lane) ............... 3-73<br />

3.4.4 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road<br />

Area Sewer Upgrades) ............................................................................ 3-75<br />

3.4.5 SFL-C-0005 (Highland Road – Burbank Drive Capacity<br />

Improvements) ......................................................................................... 3-77<br />

3.4.6 SFL-C-0006 (Nicholson Drive – Highland Road – Perkins Road<br />

Capacity Improvements) ........................................................................ 3-79<br />

3.4.7 SFU-C-0001 (Multiple PSs – Jefferson Highway – Park Forest<br />

Drive) ........................................................................................................ 3-87<br />

3.4.8 SFU-C-0002a (O’Neal Lane Pump Stations Group A) ........................ 3-89<br />

3.4.9 SFU-C-0002b (O’Neal Lane Pump Stations Group B) ........................ 3-91<br />

3.4.10 SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12) ................. 3-93<br />

3.4.11 SFU-C-0004 (Multiple Pump Stations – O’Neal Lane – South<br />

Harrell’s Ferry Road) .............................................................................. 3-93<br />

3.4.12 SFU-C-0005 (O’Neal Lane Pipeline Improvements) ........................... 3-93<br />

3.4.13 SFU-C-0006 (O’Neal Lane – Tiger Bend Road) ................................. 3-100<br />

3.5 South WWTP Projects ........................................................................................ 3-101<br />

3.5.1 STP-C-0001 South WWTP – Phase 1 ................................................... 3-101<br />

3.5.2 STP-C-0002 South WWTP – Phase 2 ................................................... 3-105<br />

3.5.3 South WWTP Immediate Action Projects .......................................... 3-107<br />

GNV31031158642.DOCX/110310007 IV JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Section<br />

Page<br />

4 Central Basin Projects ........................................................................................................ 4-1<br />

4.1 Central Gravity System Comprehensive Rehabilitation Projects .................... 4-7<br />

4.1.1 CGS-R-0001, CGS-R-0002, CGS-R-0003, CGS-R-0004, CGS-R-0005,<br />

CGN-R-0001a, CGN-R-0001b, and CGN-R-0002 .................................. 4-7<br />

4.2 Central Gravity System Capacity Improvements Projects ............................. 4-17<br />

4.2.1 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />

Improvements) ......................................................................................... 4-17<br />

4.2.2 CGN-C-0002 (25 th Street – North Acadian Thruway).......................... 4-20<br />

4.2.3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area<br />

Upgrades) ................................................................................................. 4-21<br />

4.2.4 CGN-C-0004 (Downtown Area –PS 59 Improvements) ...................... 4-25<br />

4.2.5 CGN-C-0005 (Downtown Area Pump Station Improvements) ......... 4-25<br />

4.2.6 CGS-C-0001 (Roosevelt Street Area – PS 1 Improvements) ................ 4-27<br />

4.2.7 CGS-C-0002 (University Lake Area – PS2, PS5, and PS6<br />

Improvements) ......................................................................................... 4-27<br />

4.2.8 CGS-C-0003 (Acadian/Claycut Area – PS3 and PS4<br />

Improvements) ......................................................................................... 4-27<br />

4.2.9 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer<br />

Upgrades) ................................................................................................. 4-27<br />

4.2.10 CGS-C-0005 (Stanford Avenue – Ferndale Avenue) .......................... 4-31<br />

4.2.11 CGS-C-0006 (Government Street – South Acadian Thruway<br />

Sewer Area Upgrades) ........................................................................... 4-31<br />

4.2.12 CGS-C-0007 (Central Storage/Equalization) ....................................... 4-34<br />

4.2.13 CC-WWTP-PS (PS 42) ............................................................................. 4-34<br />

4.2.14 CC-EAST-PS (Central Consolidated PSs) ............................................ 4-36<br />

4.2.15 CC–WWTP-FM (PS 42 FM) .................................................................... 4-38<br />

4.2.16 CC-EAST-FM (Central Consolidated FM) ........................................... 4-41<br />

5 North Basin Projects .......................................................................................................... 5-1<br />

5.1 North Gravity System Comprehensive Rehabilitation Projects ...................... 5-7<br />

5.1.1 NGS-R-0001 and NGS-R-0002 ................................................................... 5-7<br />

5.2 North Gravity System Capacity Improvements Projects ................................ 5-11<br />

5.2.1 NGS-C-0001 (Progress Road – Baton Rouge Metro Airport) ............. 5-11<br />

5.2.2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area<br />

Upgrades) ................................................................................................. 5-11<br />

5.2.3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) ................... 5-15<br />

5.2.4 NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding<br />

Boulevard) ................................................................................................ 5-17<br />

5.3 North Forced System Comprehensive Rehabilitation Projects ...................... 5-19<br />

5.3.1 NFW-R-0001, NFW-R-0002, and NFE-R-0001 ...................................... 5-19<br />

5.4 North Forced System Capacity Improvements Projects ................................. 5-25<br />

5.4.1 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) ....... 5-25<br />

5.4.2 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer<br />

Area Upgrades) ........................................................................................ 5-28<br />

5.4.3 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades -<br />

Phase I) ...................................................................................................... 5-31<br />

GNV31031158642.DOCX/110310007 V JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Section<br />

Page<br />

5.4.4 NFE-C-0004 (Foster Road – Hooper Road Sewer Area<br />

Upgrades) ................................................................................................. 5-34<br />

5.4.5 NFE-C-0005 (Hooper Road Pump Station Improvements) ................ 5-36<br />

5.4.6 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer<br />

Area Upgrades) ........................................................................................ 5-38<br />

5.4.7 NFE-C-0007 (Multiple BPS – Hooper Road – Lovett Road) ............... 5-43<br />

5.4.8 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area<br />

Upgrades) ................................................................................................. 5-44<br />

5.4.9 NFW-C-0002 (Choctaw Storage and Pump Station Facility).............. 5-47<br />

5.4.10 NFW-C-0003 (Choctaw Storage Pump Station) .................................. 5-50<br />

5.4.11 NFW-C-0004 (Hooper Storage Facility) ............................................... 5-50<br />

5.4.12 Group Project 1A (Metro Airport Sewer Upgrades) .......................... 5-52<br />

5.4.13 Group Project 1B (Metro Airport Sewer Area Pump Station and<br />

Forcemain Upgrades).............................................................................. 5-58<br />

5.4.14 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer<br />

Area Upgrades) ........................................................................................ 5-62<br />

5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 –<br />

<strong>Plan</strong>k Road) .............................................................................................. 5-65<br />

5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road –<br />

Greenwell Springs Road) ....................................................................... 5-67<br />

5.4.17 NFW-HWY61 (Zachary Area Transmission Network<br />

Improvement Project – Phases I, II, III, and IV) .................................. 5-69<br />

5.5 North WWTP Master <strong>Plan</strong> Improvements ....................................................... 5-73<br />

5.5.1 Background ............................................................................................... 5-73<br />

5.5.2 Priority One Improvements .................................................................... 5-73<br />

5.5.3 Priority Two Improvements ................................................................... 5-74<br />

5.5.4 Estimated Costs ........................................................................................ 5-75<br />

6 Emergency Generators ....................................................................................................... 6-1<br />

6.1 Background ............................................................................................................. 6-1<br />

6.2 Collection System Pump Stations ........................................................................ 6-1<br />

6.3 Wastewater Treatment <strong>Plan</strong>ts ............................................................................... 6-3<br />

6.4 Generator Project <strong>Delivery</strong> <strong>Plan</strong> ........................................................................... 6-3<br />

7 Supervisory Control and Data Acquisition (SCADA) ................................................ 7-1<br />

7.1 Background ............................................................................................................. 7-1<br />

7.2 SCADA Operations Data/Control Center .......................................................... 7-1<br />

7.3 Collection System SCADA System ...................................................................... 7-2<br />

7.4 North Wastewater Treatment <strong>Plan</strong>t ..................................................................... 7-3<br />

7.5 SCADA Project <strong>Delivery</strong> <strong>Plan</strong> .............................................................................. 7-3<br />

GNV31031158642.DOCX/110310007 VI JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Tables<br />

ES-1<br />

ES-2<br />

ES-3<br />

ES-4<br />

Page<br />

Reservoir Storage and Repumping Projects ................................................................. ES-7<br />

List of Completed Projects ............................................................................................ ES-11<br />

List of Active Projects ..................................................................................................... ES-11<br />

List of Projects for 2010 .................................................................................................. ES-13<br />

1-1 Project Funding Schedule ................................................................................................... 1-5<br />

3-1 Estimated Construction Costs for South Gravity System Comprehensive<br />

Rehabilitation Projects ........................................................................................................ 3-8<br />

3-2 SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) –<br />

Pipeline Information ......................................................................................................... 3-25<br />

3-3 SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) –<br />

Pipeline Information ......................................................................................................... 3-29<br />

3-4 SGC-C-0001 (Florida Blvd Pump Station Improvements) – Pump Station<br />

Information ......................................................................................................................... 3-31<br />

3-5 SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information .... 3-37<br />

3-6 SGC-C-PS58A (Pump Station 58 Replacement) - Pump Station Information ........... 3-40<br />

3-7 SGC-C-PS58FM-A (Staring Lane FM-Phase I - Burbank Drive to Highland<br />

Road) – Pipeline Information ........................................................................................... 3-42<br />

3-8 SGC-C-PS58FM-B (Staring Lane FM-Phase II - Highland Road to Perkins<br />

Road) – Pipeline Information ........................................................................................... 3-44<br />

3-9 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) –<br />

Pipeline Information ......................................................................................................... 3-46<br />

3-10 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) –<br />

Pump Station Information ................................................................................................ 3-48<br />

3-11 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) –<br />

Pipeline Information ......................................................................................................... 3-48<br />

3-12 SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) –<br />

Pump Station Information ................................................................................................ 3-50<br />

3-13 SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information ....... 3-56<br />

3-14 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) – Pipeline Information ..... 3-60<br />

3-15 Estimated Construction Costs for South Forced System Comprehensive<br />

Rehabilitation Projects ...................................................................................................... 3-64<br />

3-16 SFL-C-0001 (Multiple Pump Stations – Nicholson Drive – Brightside Drive) –<br />

Pump Station Information ................................................................................................ 3-69<br />

3-17 SFL-C-0002 (Perkins/Old Perkins Area BSP 514 Improvements) – Pump Station<br />

Information ......................................................................................................................... 3-71<br />

3-18 SFL-C-0003 (Multiple Pump Stations - Burbank Drive - Siegen Lane) – Pump<br />

Station Information ........................................................................................................... 3-73<br />

3-19 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer<br />

Upgrades) – Pump Station Information ......................................................................... 3-75<br />

3-20 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) –<br />

Pipeline Information ......................................................................................................... 3-77<br />

3-21A SFL-C-0006 (Phase A - Willow Lane Capacity Improvements) .................................. 3-82<br />

3-21B SFL-C-0006 (Phase B - Nicholson Drive – Highland Road – Perkins Road<br />

Capacity Improvements) – Pipeline Information ......................................................... 3-83<br />

GNV31031158642.DOCX/110310007 VII JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Tables<br />

Page<br />

3-22 SFU-C-0001 (Multiple PSs - Jefferson Highway - Park Forest Drive) – Pump<br />

Station Information ........................................................................................................... 3-87<br />

3-23A O’Neal Lane Pump Stations Group A – Pump Station Information .......................... 3-89<br />

3-23B O’Neal Lane Pump Stations Group B – Pump Station Information ........................... 3-91<br />

3-24 SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information ............ 3-97<br />

4-1 Estimated Construction Costs for Central Gravity System Comprehensive<br />

Rehabilitation Projects ........................................................................................................ 4-8<br />

4-2 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />

Improvements) – Pipeline Information .......................................................................... 4-18<br />

4-3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) –<br />

Pipeline Information ......................................................................................................... 4-22<br />

4-4 CGN-C-0005 (Downtown Area Pump Station Improvements) – Pump Station<br />

Information ......................................................................................................................... 4-25<br />

4-5 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) –<br />

Pipeline Information ......................................................................................................... 4-29<br />

4-6 CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area<br />

Upgrades) – Pipeline Information ................................................................................... 4-32<br />

4-7 CC-WWTP-PS (PS 42) – Pump Station Information ..................................................... 4-34<br />

4-8 CC-EAST-PS (Central Consolidated PSs) – Pump Station Information .................... 4-36<br />

4-9 CC-WWTP-FM (PS42 FM) – Pipeline Information ....................................................... 4-39<br />

4-10 CC-EAST-FM (Central Consolidated FM ) – Pipeline Information ............................ 4-42<br />

5-1 Estimated Construction Costs for the North Gravity System Comprehensive<br />

Rehabilitation Projects ........................................................................................................ 5-7<br />

5-2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline<br />

Information ......................................................................................................................... 5-12<br />

5-3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) – Pump Station<br />

Information ......................................................................................................................... 5-15<br />

5-4 Estimated Construction Costs for North Forced System Comprehensive<br />

Rehabilitation Projects ...................................................................................................... 5-20<br />

5-5 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pump Station<br />

Information ......................................................................................................................... 5-25<br />

5-6 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pipeline<br />

Information ......................................................................................................................... 5-26<br />

5-7 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades) -<br />

Pump Station Information ............................................................................................... 5-28<br />

5-8 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road) – Pipeline Information ....... 5-29<br />

5-9 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) –<br />

Pump Station Information ................................................................................................ 5-31<br />

5-10 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) –<br />

Pipeline Information ......................................................................................................... 5-32<br />

5-11 NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) – Pipeline<br />

Information ......................................................................................................................... 5-34<br />

5-12 NFE-C-0005 (Hooper Road Pump Station Improvements) – Pump Station<br />

Information ......................................................................................................................... 5-36<br />

GNV31031158642.DOCX/110310007 VIII JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Tables<br />

Page<br />

5-13 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) –<br />

Pipeline Information ......................................................................................................... 5-40<br />

5-14 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades) –<br />

Pipeline Information ......................................................................................................... 5-45<br />

5-15 NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Pump Station<br />

Information ......................................................................................................................... 5-48<br />

5-16 NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Forcemain<br />

Information ......................................................................................................................... 5-48<br />

5-17 Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information ............ 5-54<br />

5-18 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />

Upgrades) – Pump Station Information ......................................................................... 5-59<br />

5-19 Group Project 1B (Metro Airport Area Forcemain Upgrades) – Forcemain<br />

Information ......................................................................................................................... 5-60<br />

5-20 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) –<br />

Pipeline Information ......................................................................................................... 5-63<br />

5-21 NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) – Pump<br />

Station Information ........................................................................................................... 5-65<br />

5-22 NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs<br />

Road) – Pump Station Information ................................................................................. 5-67<br />

5-23 NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) –<br />

Pump Station Information ................................................................................................ 5-69<br />

5-24 NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) -<br />

Forcemains .......................................................................................................................... 5-70<br />

5-25 Summary of Estimated Construction Costs for the North WWTP ............................. 5-75<br />

6-1 Summary of Generator Units Existing Pump Stations (not impacted by the PDP) ... 6-1<br />

6-2 Summary of Generator Units PDP Pump Stations ......................................................... 6-2<br />

6-3 Emergency Generators Cost Summary ............................................................................ 6-4<br />

6-4 Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong> ... 6-5<br />

7-1 SCADA Cost Summary ...................................................................................................... 7-4<br />

GNV31031158642.DOCX/110310007 IX JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Figures<br />

Page<br />

ES-1<br />

ES-2<br />

ES-3<br />

Geographic Orientation of the Hydraulic Basins ......................................................... ES-3<br />

Rehabilitation Project Areas ............................................................................................ ES-5<br />

Capacity and Wet Weather Treatment Projects ........................................................... ES-9<br />

1-1 <strong>Program</strong> Funding Schedule ............................................................................................. 1-27<br />

1-2 <strong>Program</strong> Schedule ............................................................................................................. 1-29<br />

3-1 South Basin Rehabilitation Projects .................................................................................. 3-3<br />

3-2 South Basin Capacity Improvement Projects .................................................................. 3-4<br />

3-3 Bluebonnet Boulevard – Jefferson Highway, Phase I and II ......................................... 3-9<br />

3-3a Bluebonnet Boulevard – Jefferson Highway, Phase I .................................................. 3-10<br />

3-3b Bluebonnet Boulevard – Jefferson Highway, Phase I I ................................................ 3-11<br />

3-4 Airline Highway – Goodwood Boulevard Phase I and II ............................................ 3-12<br />

3-4a Airline Highway – Goodwood Boulevard Phase I ....................................................... 3-13<br />

3-4b Airline Highway – Goodwood Boulevard Phase II ...................................................... 3-14<br />

3-5 Ardenwood Drive – Winborune Street .......................................................................... 3-15<br />

3-6 N. 38 th Street – Gus Young Avenue ................................................................................ 3-16<br />

3-7 Burbank Road – Gardere Lane ........................................................................................ 3-17<br />

3-8 Staring Lane – Boone Drive .............................................................................................. 3-18<br />

3-9 Kenilworth Boulevard – Boone Drive ............................................................................ 3-19<br />

3-10 Oak Villa Boulevard – Choctaw Street ........................................................................... 3-20<br />

3-11 Sharp Road – Florida Boulevard ..................................................................................... 3-21<br />

3-12 Flannery Road – Florida Street ........................................................................................ 3-22<br />

3-13 Sherwood Forest Boulevard – Goodwood Boulevard Pipeline Projects ................... 3-27<br />

3-14 Oak Villa Boulevard – Monterrey Boulevard ................................................................ 3-30<br />

3-15 Florida Boulevard PS Projects .......................................................................................... 3-32<br />

3-16 Airline Highway Pipeline Improvements Projects ....................................................... 3-39<br />

3-17 Pump Station 58 Replacement ......................................................................................... 3-41<br />

3-18 Staring Lane FM Phase I – Highland Road to Burbank Drive .................................... 3-43<br />

3-19 Staring Lane FM Phase II .................................................................................................. 3-45<br />

3-20 Staring Lane FM Phase III ................................................................................................ 3-47<br />

3-21 Citi Place/Essen Area PS 119 & FM ................................................................................ 3-49<br />

3-22 Multiple PS – Highland Road – Kenilworth Drive ....................................................... 3-52<br />

3-23 Highland Road Pipeline Improvements ........................................................................ 3-58<br />

3-24 Bayou Duplantier Area Sewer Upgrades ....................................................................... 3-61<br />

3-25 Jefferson Highway – Hoo Shoo Too Road ..................................................................... 3-65<br />

3-26 Jones Creek Road – Tiger Bend Road ............................................................................. 3-66<br />

3-27 Siegen Lane – Interstate 10 ............................................................................................... 3-67<br />

3-28 Antioch Road – Chadsford Drive .................................................................................... 3-68<br />

3-29 Multiple PS – Nicholson Drive – Brightside Drive ....................................................... 6-70<br />

3-30 Perkins – Old Perkins Area BPS514 ................................................................................ 3-72<br />

3-31 Multiple PS – Burbank Drive – Siegen Lane .................................................................. 3-74<br />

3-32 Group Project 2 .................................................................................................................. 3-76<br />

3-33 Highland Road – Burbank Drive ..................................................................................... 3-78<br />

3-34A Phase A (Willow Grove Capacity Improvements) ....................................................... 3-84<br />

GNV31031158642.DOCX/110310007 X JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Figures<br />

Page<br />

3-34B Phase B1 (Nicholson Drive – Highland Road – Perkins Road) Capacity<br />

Improvements .................................................................................................................... 3-85<br />

3-34C Phase B2 (Nicholson Drive – Highland Road – Perkins Road) Capacity<br />

Improvements .................................................................................................................... 3-86<br />

3-35 Multiple PS – Jefferson Highway - Park Forest Drive .................................................. 3-88<br />

3-36A O’Neal Lane Group A PS Projects ................................................................................... 3-90<br />

3-36B O’Neal Lane Group B PS Projects ................................................................................... 3-92<br />

3-37 O’Neal Lane Pipeline Projects ......................................................................................... 3-99<br />

3-38 SWWTP Improvement Projects ..................................................................................... 3-103<br />

4-1 Central Basin Rehabilitation Projects ................................................................................ 4-3<br />

4-2 Central Basin Capacity Improvement Projects ................................................................ 4-5<br />

4-3 Foster Drive – Government Street Phase A and B .......................................................... 4-9<br />

4-4 Highland Road – Washington Street. ............................................................................. 4-10<br />

4-5 Stanford Avenue – Morning Glory Road. ...................................................................... 4-11<br />

4-6 Acadian Thruway – Claycut Road .................................................................................. 4-12<br />

4-7 Acadian Thruway – Perkins Road. ................................................................................. 4-13<br />

4-8a Scenic Highway – Spanish Town Road Phase I ............................................................ 4-14<br />

4-8b Scenic Highway – Spanish Town Road Phase II ........................................................... 4-15<br />

4-9 East Boulevard – Government Street. ............................................................................. 4-16<br />

4-10 Capital Lake Drive – Gayosa Street ................................................................................ 4-19<br />

4-11 South Boulevard – St. Joseph Street Sewer Area Upgrades ........................................ 4-24<br />

4-12 Downtown Area PS Improvements ................................................................................ 4-26<br />

4-13 Highland Road – Buchanan Street Sewer Area Upgrades .......................................... 4-30<br />

4-14 Government Street – South Acadian Thruway Sewer Upgrades ............................... 4-33<br />

4-15 PS 42 .................................................................................................................................... 4-35<br />

4-16 Central Consolidated Pump Stations ............................................................................. 4-37<br />

4-17 Central Consolidation – PS 42 Forcemain ...................................................................... 4-40<br />

4-18 Central Consolidated Forcemain ..................................................................................... 4-43<br />

5-1 North Basin Rehabilitation Projects .................................................................................. 5-3<br />

5-2 North Basin Capacity Improvement Projects .................................................................. 5-5<br />

5-3 Elm Grove Road – Harding Boulevard ............................................................................ 5-8<br />

5-4 Scotland Avenue – Progress Road .................................................................................... 5-9<br />

5-5 <strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades ................................................. 5-14<br />

5-6 <strong>Plan</strong>k Road PS Projects ..................................................................................................... 5-16<br />

5-7 Brookstown Road – Evangeline Street, Phase I and Phase II ...................................... 5-21<br />

5-8 Interstate 110 – Hollywood Street. .................................................................................. 5-22<br />

5-9 Silverleaf Road – Ford Street. ........................................................................................... 5-23<br />

5-10 Gurney Road Sewer Area Upgrades .............................................................................. 5-27<br />

5-11 Sullivan Road/Lovett Road/ Wax Road Sewer Area Upgrades ................................ 5-30<br />

5-12 Comite Drive – Foster Road Sewer Area Upgrades Phase I ........................................ 5-33<br />

5-13 Foster Road – Hopper Road Sewer Area Upgrades ..................................................... 5-35<br />

5-14 Hooper Road PS Projects .................................................................................................. 5-37<br />

5-15 Lovett Road – Greenwell Springs Road ......................................................................... 5-42<br />

5-16 Joor Road – Greenwell Springs Road Sewer Area Upgrades ...................................... 5-46<br />

GNV31031158642.DOCX/110310007 XI JANUARY 2011<br />

REV. 5


CONTENTS, CONTINUED<br />

Figures<br />

Page<br />

5-17 ChoctawStorage, PS52A, PS51A, PS51AA, FM ............................................................. 5-49<br />

5-18 Hooper Street Facility ....................................................................................................... 5-51<br />

5-19 Metro Airport Area Sewer Upgrades (Group Project 1A) ........................................... 5-57<br />

5-20 Metro Airport Area Sewer Pump Station and Forcemain Upgrades ......................... 5-61<br />

5-21 <strong>Plan</strong>k Road – Port Hudson Pride Road .......................................................................... 5-64<br />

5-22 Multiple PS Highway 61 – <strong>Plan</strong>k Road .......................................................................... 5-66<br />

5-23 Multiple PS Road – Greenwell Springs Road ................................................................ 5-68<br />

5-24 Zachary Area Transmission Network Improvement Project ...................................... 5-71<br />

GNV31031158642.DOCX/110310007 XII JANUARY 2011<br />

REV. 5


Acronyms and Abbreviations<br />

BOD Biochemical Oxygen Demand<br />

BPS Booster Pump Station<br />

BTRSSO Baton Rouge Sanitary Sewer Overflow<br />

CCTV Closed Circuit Television<br />

C-P City of Baton Rouge, Parish of East Baton Rouge<br />

DPW Department of Public Works<br />

IAP Immediate Action Projects<br />

I/I<br />

inflow and infiltration<br />

MG Millions Gallons<br />

mgd million gallons per day<br />

MH manhole<br />

NPDES National Pollutant Discharge Elimination System<br />

OandPA Outreach and Public Awareness <strong>Program</strong><br />

PDP <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

PHF peak hourly flow<br />

PM<br />

Project Manager<br />

PMT <strong>Program</strong> Management Team<br />

PS<br />

Pump Station<br />

RDI Rainfall Dependent Infiltration<br />

RDII Rain Dependent Inflow and Infiltration<br />

RMAP1 Remedial Measures Action <strong>Plan</strong> 1<br />

RMAP2 Remedial Measures Action <strong>Plan</strong> 2<br />

SEP Supplementary Environmental Projects<br />

SSO Sewer System Overflow<br />

TF/SC trickling filter/solids contact<br />

TSS Total Suspended Solids<br />

VFD Variable Frequency Drive<br />

WWTP Wastewater Treatment <strong>Plan</strong>t<br />

GNV31031158642.DOCX/110310007 XIII JANUARY 2011<br />

REV. 5


This page intentionally left blank.<br />

GNV31031158642.DOCX/110310007 XIV JANUARY 2011<br />

REV. 5


Executive Summary<br />

1BOverview<br />

The City of Baton Rouge, Parish of East Baton Rouge (C-P) has contracted CH2M HILL to<br />

prepare a <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong> (PDP) that summarizes the Sewer System Overflow (SSO)<br />

Control and Wastewater Facilities <strong>Program</strong>. This document is the third annual update of the<br />

original PDP published in January 2008.<br />

This updated PDP incorporates several changes from the second annual update (published<br />

in November 2009) and reflects the extensive design and construction progress made since<br />

the onset of the program. As of the October 2010, seven projects have completed<br />

construction, 26 projects have begun construction, and 31 projects have begun design,<br />

including both first and second Remedial Measures Action <strong>Plan</strong> (RMAP1 and RMAP2)<br />

projects.<br />

During 2010, construction sequencing issues were once again re-evaluated which has lead to<br />

some splitting-up of capacity projects as they neared construction. Therefore, overall the<br />

total number of RMAP2 projects has increased from 82 to 87 (not including the three<br />

RMAP1 projects). The updated PDP schedule reflects the latest schedule for all active<br />

projects.<br />

The <strong>Program</strong> is divided into the following three wet weather components:<br />

<br />

<br />

<br />

Comprehensive rehabilitation projects<br />

Capacity improvement projects<br />

Wastewater treatment and storage improvements<br />

This PDP describes a total of 87 RMAP2 wet weather projects to be constructed by January<br />

1, 2015 at an estimated total program cost of $1.3 billion in September 2007 dollars. These<br />

costs include construction, design engineering, construction engineering and management,<br />

and program management. <strong>Program</strong> management and construction management has an<br />

estimated cost of $115 million. Costs stated herein do not include costs of city staff<br />

participation and projects previously undertaken by the C-P, such as RMAP1 projects.<br />

This PDP also describes 10 preliminary Master <strong>Plan</strong> projects that have an estimated total<br />

program cost of $115 million. The preliminary Master <strong>Plan</strong> projects include the master plan<br />

portion of the South Wastewater Treatment <strong>Plan</strong>t (WWTP) improvements, two emergency<br />

generator installation projects, Choctaw Maintenance Facility project, the LSU Pump Station<br />

portion of the SGL-C-0002 (Multiple PS – Highland Road – Kenilworth Parkway) project,<br />

two North WWTP priority projects, and three projects to implement a Supervisory Control<br />

and Data Acquisition (SCADA) system for the wastewater collection and treatment system.<br />

The goals of the SSO program are to:<br />

<br />

<br />

<br />

Reduce excess wet weather flows that cause SSOs<br />

Rehabilitate the collection system<br />

Increase the hydraulic capacity of the collection system<br />

GNV31031158570.DOCX/110050012 ES-1 JANUARY 2011<br />

REV. 5


EXECUTIVE SUMMARY<br />

<br />

<br />

<br />

Accommodate growth in project areas<br />

Comply with wastewater treatment plant National Pollutant Discharge Elimination<br />

System (NPDES) permits<br />

Comply with the terms of the Consent Decree<br />

The Consent Decree (Civil Action 01-978-B-M3 United States of America and State of<br />

Louisiana versus City of Baton Rouge, Parish of East Baton Rouge) states that the Collection<br />

System Remedial <strong>Program</strong> projects shall be completed by January 1, 2015.<br />

In preparing this PDP, the locations of known overflows are given highest priority in order<br />

to reduce the frequency of these overflows. Areas of the collection system that were found<br />

to have excessive levels of infiltration or inflow are also identified for rehabilitation.<br />

Hydraulic capacity improvement projects are sized to accommodate the predicted designed<br />

peak wet weather flows and anticipated growth in the project areas. Peak wet weather flows<br />

were predicted based on the previously selected 2-year frequency, 12-hour duration design<br />

storm. Figure ES-1 shows the ten hydraulic basins used in the evaluation of the program.<br />

<strong>Program</strong> Description<br />

3BCoComprehensive Rehabilitation Projects<br />

Sewer system comprehensive rehabilitation projects will be implemented to repair or<br />

replace components of the system that are defective and permit excessive infiltration and<br />

inflow.<br />

The comprehensive rehabilitation portion of the program consists of 30 construction projects<br />

located throughout the C-P. The first projects began in 2008, and the last project is scheduled<br />

for completion in late 2014. Approximately, four to six projects will begin construction each<br />

year. Design and construction will be continuous through 2014. Approximately 5 million<br />

feet of the gravity sewer will be inspected through execution of these rehabilitation projects.<br />

The areas selected for comprehensive rehabilitation are shown on Figure ES-2. Projects<br />

within these areas are described in detail in the body of this plan. The estimated total<br />

program cost of the comprehensive rehabilitation projects is approximately $260 million in<br />

September 2007 dollars.<br />

4BCapacity Improvement Projects<br />

Capacity improvement projects have been defined based on three factors:<br />

1. Computer “InfoWorks Model” comparison of existing capacity to predicted peak wet<br />

weather flows<br />

2. Physical evidence of inadequate capacity based on C-P Department of Public Works<br />

(DPW) records<br />

3. Predicted growth in demand for wastewater capacity<br />

Capacity projects include replacement of inadequately sized gravity sewers and force mains<br />

as well as rehabilitation or replacement of pump stations.<br />

Those projects located nearest to the wastewater treatment plants are in general, scheduled<br />

in the earlier years in the program.<br />

GNV31031158570.DOCX/110050012 ES-2 JANUARY 2011<br />

REV. 5


F<br />

3rd<br />

Lupine<br />

3rd<br />

22nd<br />

26th<br />

30th<br />

Golden<br />

Alba<br />

Sunshine<br />

Elm<br />

Whitter<br />

McHost<br />

Cora<br />

Marilyn<br />

Blackwater<br />

Aletha<br />

Sharp<br />

Bea<br />

Acres<br />

Black<br />

Aubin<br />

Tinley<br />

Burrel<br />

Devall<br />

Hubbs<br />

Anderson<br />

Sullivan<br />

Reames<br />

Millerville<br />

Beaver<br />

Hunt<br />

O'Neal<br />

Antioch<br />

Elliot<br />

Adams<br />

Sandy Springs<br />

Renee<br />

Treakle<br />

Port Hudson Plains<br />

Sutter<br />

Portwood<br />

Sunnyside<br />

Ligon<br />

Brian<br />

Shellmire<br />

Pony<br />

Safer<br />

Piper<br />

Vernon<br />

Hydraulic Basins<br />

Zachary-Slaughter<br />

Rush<br />

Lemon<br />

Jacock<br />

Port Hudson-Pride<br />

Zeb Chaney<br />

J Wicker<br />

Lemon B<br />

Mills<br />

Della<br />

Cook<br />

Scott Barr<br />

Edwards<br />

Jackson<br />

Williams<br />

Robinson<br />

Tom Drehr<br />

Chaney<br />

Riley<br />

Mount Pleasant Zachary<br />

Irene<br />

³<br />

Barnett<br />

Barsket<br />

Zimmerman<br />

Irene<br />

Samuels<br />

Carney<br />

Springfield<br />

Flonacher<br />

Zimmerman<br />

Old Scenic<br />

Dotson<br />

Scenic<br />

Groom<br />

Thomas<br />

North WWTP<br />

I<br />

H<br />

Brightside<br />

Riverbend<br />

Hovey<br />

Harding<br />

Stadium<br />

Swan<br />

Gourrier<br />

6th<br />

Rollins<br />

Church<br />

Main<br />

72nd<br />

North<br />

§¨¦I-110<br />

Central WWTP<br />

Ben Hur<br />

39th<br />

Heck Young<br />

Day<br />

New Rafe Meyer<br />

Lafayette<br />

Martin<br />

Fennwood<br />

Newell<br />

Lake Pointe<br />

Meadow Glen<br />

Magnolia<br />

St John<br />

Mengel<br />

France<br />

Emma<br />

4th<br />

Sorrel<br />

10th<br />

Julia<br />

Rita<br />

Scotland<br />

Central<br />

Stilt<br />

Cypress<br />

Rosenwald<br />

North<br />

Faith<br />

Landry<br />

Gsu<br />

17th<br />

Taft<br />

79th<br />

Shelley<br />

Gore<br />

Chippewa<br />

Terrace<br />

Dalrymple<br />

Laurel Lakes<br />

Legend<br />

3 Wastewater Treatment <strong>Plan</strong>t<br />

Hydraulic Basins<br />

East Baton Rouge<br />

0 1 2 4<br />

Miles<br />

Alvin Dark<br />

Mason<br />

Parker<br />

Doris<br />

14th<br />

15th<br />

18th<br />

Pope<br />

Nelson<br />

Epperson<br />

Wilbur<br />

Beech<br />

23rd<br />

Scotlandville-Zachary<br />

Stanford<br />

Wimbish<br />

Daniels<br />

Lavey<br />

Nicholson<br />

Baker<br />

Gibbens<br />

Hollywood<br />

Ozark<br />

Oleander<br />

May<br />

Ash<br />

Baker<br />

Spur<br />

Polk<br />

Gibbens<br />

Palmyra<br />

Veterans Memorial<br />

Monroe<br />

Mohican<br />

Acadian<br />

Kleinert<br />

Fiero<br />

Carriage<br />

Bella<br />

Ada<br />

Main<br />

Ben Hur<br />

Avenue A<br />

Husband<br />

Lee<br />

Highland<br />

River<br />

38th<br />

McHugh<br />

Evangeline<br />

Brady<br />

Burbank<br />

<strong>Plan</strong>k<br />

Winbourne<br />

Fairfields<br />

31st<br />

Hood<br />

Glendale<br />

Old Weis<br />

Wedgewood<br />

Devall<br />

36th<br />

Sinbad<br />

Steele<br />

Stuart<br />

Clark<br />

Chuck Yeager<br />

Central Gravity,<br />

North<br />

Hillcrest<br />

Paige<br />

Oaklan<br />

Lorraine<br />

Leo<br />

Dubois<br />

Tristian<br />

44th<br />

Greenwell<br />

Greenwell Springs<br />

Valcour<br />

Foster<br />

G S R I<br />

Bentley<br />

Frey<br />

Ford<br />

Sumrall<br />

Comite<br />

Government<br />

Clay Cut<br />

Bawell<br />

Eaton<br />

Dutton<br />

Hollier<br />

Beck<br />

Glasgow<br />

Chipley<br />

College<br />

Pollard<br />

Park<br />

Lower Zachary<br />

Rolling Acres<br />

Byron<br />

Ardenwood<br />

Boone<br />

Menlo<br />

Ned<br />

Myrtle<br />

Hope<br />

Ellen<br />

Sharon Hills<br />

Westdale<br />

Laca<br />

Brookstown<br />

Furr<br />

North Gravity<br />

Central Gravity,<br />

South<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIGUREES-1_PDP2010.MXD SGELPI 11/15/2010 12:49:20<br />

Troy<br />

Boone<br />

Celia<br />

St Ann<br />

Baird<br />

Glen Oaks<br />

Prescott<br />

Lobdell<br />

Dyer<br />

Pettit<br />

Goodwood<br />

Mickens<br />

South WWTP<br />

Elvin<br />

Kent<br />

Stoneview<br />

Corlett<br />

Ruby<br />

Rio<br />

Charlton<br />

Hanks<br />

Renoir<br />

Congress<br />

Quail<br />

Harry<br />

Donmoor<br />

Corporate<br />

Stratford<br />

Main<br />

Jupiter<br />

Caprice<br />

Burden<br />

Kenilworth<br />

Staring<br />

Keed<br />

Hall<br />

Cline<br />

Lanier<br />

Tom<br />

Wooddale<br />

Boyce<br />

Richards<br />

Chandler<br />

University Club<br />

Millwood Creek<br />

Kevel<br />

Angus<br />

Price<br />

Avis<br />

Airway<br />

Lasalle<br />

Airport<br />

Essen<br />

Brentwood<br />

Anselmo<br />

Tucker<br />

North Forced, West<br />

Foster<br />

Dan<br />

Ocean<br />

Atlanta<br />

Waters Edge<br />

Meadow<br />

Breeden<br />

North Forced, West<br />

Calumet<br />

Cody<br />

Oak View<br />

Reco<br />

Rienzi<br />

Brittany<br />

Bles<br />

Flora<br />

Hilltree<br />

Windingway<br />

Brown<br />

Tara<br />

Fleet<br />

Bluebonnet<br />

Tradition<br />

Berlin<br />

Carney<br />

Bliss<br />

Watson<br />

Vail<br />

Loudon<br />

Fairway<br />

Summa<br />

Obrien<br />

Ardoon<br />

Syble<br />

Shady Bluff<br />

Choctaw<br />

Monterrey<br />

Drusilla<br />

Hill<br />

Oakdale<br />

Arleen<br />

Mollylea<br />

Interline<br />

Gail<br />

Oak Hills<br />

Buck Horn<br />

El Scott<br />

Dancy<br />

Tracy<br />

Carmel<br />

Great Smokey<br />

Crescent<br />

Wartelle<br />

Strand<br />

Lakeview<br />

Smith<br />

Oakbrook<br />

Fawn<br />

Old Settlement<br />

Elain<br />

Cal<br />

Azrok<br />

Mint<br />

Darryl<br />

Tams<br />

Perkins<br />

Amiss<br />

Neil<br />

Siegen<br />

Lovett<br />

Peairs<br />

Greenwell Spg Pt Hudson<br />

Tallowwood<br />

Kenlee<br />

Daradele<br />

Hillyard<br />

Kathleen<br />

Briarhurst<br />

Ida<br />

Nelwyn<br />

Tudor<br />

Sherwood Forest<br />

Mall<br />

Core<br />

Gurney<br />

Landfair<br />

Mc Gehee<br />

Woodleigh<br />

Cook<br />

Lassen<br />

Hillsbury<br />

Reiger<br />

Joor<br />

McCullough<br />

Tinley<br />

Southpark<br />

Stan<br />

Archery<br />

Toulon<br />

Neff<br />

Frontier<br />

Sylvan<br />

Shoe Creek<br />

Pecos<br />

Bellfort<br />

Poydras<br />

Corsair<br />

Lariat<br />

Baylor<br />

Triple B<br />

Canterbury<br />

Ocala<br />

Parkside<br />

Hollyfield<br />

Pecue<br />

Joor<br />

Catalina<br />

Warfield<br />

Stockton<br />

Parkforest<br />

Elva<br />

Pecue<br />

Stumberg<br />

Old Perkins<br />

Cherryl<br />

Flannery<br />

Woodcliff<br />

Hooper<br />

Florida<br />

Arlingford<br />

Elwick<br />

Newcastle<br />

Oak Berry<br />

Dorset<br />

Woodland Ridge<br />

Rose<br />

Five Oaks<br />

Coursey<br />

Airline<br />

Pinewood<br />

Huntley<br />

North Forced, East<br />

South Gravity, Upper<br />

South Gravity, Central<br />

South Gravity, Lower<br />

Comal<br />

Pecue<br />

Stutgart<br />

Hickory Ridge<br />

Greens<br />

Denham<br />

Brent<br />

Trey<br />

Glenn<br />

Roundsaville<br />

Kohler<br />

Bluefield<br />

Bywood<br />

Holt<br />

Buzbee<br />

Sage<br />

Crystal<br />

§¨¦ I-10<br />

Wax<br />

Frenchtown<br />

Mora<br />

Breton<br />

Augusta<br />

Jones Creek<br />

Paint<br />

Alford<br />

Old Hammond<br />

Boreas<br />

Terrell<br />

Director<br />

Profit<br />

Barringer Foreman<br />

Lesage<br />

Lynbrook<br />

Sotile<br />

Pernecia<br />

Woodvale<br />

Droze<br />

Four Oaks<br />

Bristle Cone<br />

Stevendale<br />

Fir<br />

Roble<br />

Thibodeaux<br />

Strain<br />

Centurion<br />

Bristoe<br />

Chadsford<br />

Malvern Hill<br />

Antietam<br />

Morel<br />

Doyle<br />

Round Oak<br />

Spyglass Hill<br />

Trent Jones<br />

Norway Pine<br />

Black<br />

Lavell<br />

§¨¦ I-12<br />

Milldale<br />

Will<br />

Magnolia Bridge<br />

Bonham<br />

Gottlieb<br />

Riverview<br />

Beckfield<br />

Morgan<br />

Cicero<br />

<strong>Plan</strong>chet<br />

Jefferson<br />

Liberty<br />

Harrells Ferry<br />

Monitor<br />

South Forced, Upper<br />

South Forced, Lower<br />

Achord<br />

Talton<br />

Creek Hollow<br />

Stubbs<br />

Alphonse Forbes<br />

Vignes<br />

Lake Iris<br />

Babin<br />

Bengal<br />

Tiger Bend<br />

Figure ES-1


Avenue K<br />

F<br />

3rd<br />

3rd<br />

6th<br />

Lupine<br />

9th<br />

15th<br />

Village<br />

30th<br />

Alba<br />

East<br />

36th<br />

Wedgewood<br />

Sunshine<br />

Arena<br />

44th<br />

Troy<br />

Elm<br />

Waverly<br />

Whitter<br />

McHost<br />

Juban<br />

Lanier<br />

Charlton<br />

Carter<br />

Shawn<br />

Monterrey<br />

Cora<br />

Marilyn<br />

Fawn<br />

Blackwater<br />

Aletha<br />

Sharp<br />

Bea<br />

Acres<br />

Sam<br />

Arnold<br />

Black<br />

Aubin<br />

Tinley<br />

Sherwood Forest<br />

Burrel<br />

Devall<br />

Hubbs<br />

Anderson<br />

Lafitte<br />

Reames<br />

Sullivan<br />

Millerville<br />

Hunt<br />

O'Neal<br />

Antioch<br />

Norway Pine<br />

Round Oak<br />

Elliot<br />

Woodlake<br />

Rehabilitation Project Areas<br />

State Route 68<br />

Treakle<br />

Adams<br />

Sutter<br />

Port Hudson Plains<br />

Portwood<br />

Sunnyside<br />

Ligon<br />

Gen Gardner<br />

Brian<br />

Shellmire<br />

Pony<br />

Munson<br />

Vernon<br />

Zachary-Slaughter<br />

Graves<br />

Lemon<br />

Jacock<br />

Port Hudson-Pride<br />

Zeb Chaney<br />

Lemon B<br />

Mills<br />

Della<br />

Tucker<br />

Cook<br />

Scott Barr<br />

Jackson<br />

Edwards<br />

Williams<br />

Robinson<br />

Tom Drehr<br />

Riley<br />

Port Hickey<br />

Legend<br />

State Route 3113<br />

³<br />

Mount Pleasant Zachary<br />

3Wastewater Treatment <strong>Plan</strong>t<br />

WWTP Basins<br />

Project Name<br />

Jefferson Hwy. - Hoo Shoo Too Rd.<br />

Burbank Dr. - Gardere Ln.<br />

Staring Ln. - Boone Dr.<br />

Oak Villa Blvd. - Choctaw St.<br />

Scotland Ave. - Progress Rd.<br />

Elm Grove Garden Rd. - Harding Blvd.<br />

Sharp Rd. - Florida Blvd.<br />

Kenilworth Blvd. - Boone Dr.<br />

Foster Dr. - Government St. PHASE A & B<br />

Brookstown Rd. - Evangeline St. PHASE 1<br />

Brookstown Rd. - Evangeline St. PHASE 2<br />

Silverleaf Rd. - Ford St.<br />

Bluebonnet Blvd. - Jefferson Hwy. PHASE 1<br />

Bluebonnet Blvd. - Jefferson Hwy. PHASE 2<br />

Acadian Thrwy. - Perkins Rd.<br />

Stanford Ave. - Morning Glory Rd.<br />

Acadian Thrwy. - Claycut Rd.<br />

Highland Rd. - Washington St.<br />

Airline Hwy. - Goodwood Blvd. PHASE 1<br />

Airline Hwy. - Goodwood Blvd. PHASE 2<br />

Antioch Rd. - Chadsford Dr.<br />

Jones Creek Rd. - Tiger Bend Rd.<br />

Scenic Hwy. - Spanish Town Rd. PHASE 1<br />

Scenic Hwy. - Spanish Town Rd. PHASE 2<br />

Siegen Lan. - Interstate 10<br />

Interstate 110 - Hollywood St.<br />

Ardenwood Dr. - Winbourne St.<br />

Flannery Rd. - Florida St.<br />

East Blvd. - Government St.<br />

N. 38th St. - Gus Young Ave.<br />

East Baton Rouge<br />

Flonacher<br />

Irene<br />

Barnett<br />

McKee<br />

Irene<br />

Samuels<br />

Barsket<br />

Barnett<br />

Carney<br />

Springfield<br />

Zimmerman<br />

McCastle<br />

Dotson<br />

Edgar<br />

Barge Canal<br />

North WWTP<br />

Old Scenic<br />

Heck Young<br />

Glynn<br />

Groom<br />

E<br />

Thomas<br />

I<br />

H<br />

Brightside<br />

Riverbend<br />

Saul<br />

K<br />

Martin<br />

Hovey<br />

Elmer<br />

Fennwood<br />

Meadow Glen<br />

Central WWTP<br />

Riverbrook<br />

Avenue F<br />

Harding<br />

Gourrier<br />

Chamberlain<br />

Blount<br />

Scotland<br />

Swan<br />

Mengel<br />

Day<br />

Rollins<br />

New Rafe Meyer<br />

St John<br />

Merganzer<br />

Iowa<br />

Stadium<br />

Emma<br />

4th<br />

Newell<br />

Sorrel<br />

Church<br />

75th<br />

Convention<br />

France<br />

Faith<br />

Landry<br />

Leisure<br />

Magnolia<br />

Julia<br />

Grant<br />

Laurel Lakes<br />

10th<br />

Rita<br />

Central<br />

Gsu<br />

Ben Hur<br />

39th<br />

Main<br />

79th<br />

72nd<br />

77th<br />

Chippewa<br />

Terrace<br />

Dalrymple<br />

Tower<br />

Cypress<br />

17th<br />

68th<br />

Mason<br />

Gayosa<br />

Parker<br />

Cedar<br />

Texas<br />

18th<br />

July<br />

State<br />

Maple<br />

Old Baker Zachary<br />

Fairchild<br />

Foss<br />

Washington<br />

Taylor<br />

Alvin Dark<br />

July<br />

Mayhaw<br />

Capitol Lake<br />

13th<br />

Pimpernel<br />

Wisdom<br />

Polk<br />

Allen<br />

Epperson<br />

Brock<br />

Kaufman<br />

Louise<br />

Teal<br />

Doris<br />

Wilbur<br />

Scenic<br />

Pope<br />

40th<br />

<strong>Plan</strong>tation<br />

Pryce<br />

I-110<br />

22nd<br />

Scotlandville-Zachary<br />

Gore<br />

Ozark<br />

North<br />

Stanford<br />

Highland<br />

Nicholson<br />

Baker<br />

Gibbens<br />

Dayton<br />

Olive<br />

Wimbish<br />

Daniels<br />

Progress<br />

Roosevelt<br />

Hollywood<br />

Iberia<br />

Sycamore<br />

28th<br />

Shelley<br />

Winnebago<br />

Oleander<br />

May<br />

Dean Lee<br />

Baker<br />

Lavey<br />

Gibbens<br />

Farrar<br />

Erie<br />

Spain<br />

Virgil<br />

Acadian<br />

Myrtle<br />

Broussard<br />

Fiero<br />

25th<br />

Edwin<br />

Carriage<br />

Ben Hur<br />

Bella<br />

Turnley<br />

Central<br />

Ada<br />

Eugene<br />

31st<br />

Lee<br />

Avenue A<br />

Louise<br />

Mae<br />

Lee<br />

Whitehaven<br />

Ferndale<br />

Ashland<br />

Jefferson<br />

Myrtle<br />

Lavey<br />

Mohican<br />

Burbank<br />

River<br />

38th<br />

McHugh<br />

Winbourne<br />

Brady<br />

Hood<br />

Fairfields<br />

Steele<br />

Stuart<br />

Sinbad<br />

Chuck Yeager<br />

Monte Sano<br />

Cherrydale<br />

Ross<br />

Husband<br />

Algoa<br />

Devall<br />

Cannon<br />

Choctaw<br />

Valley<br />

Clark<br />

<strong>Plan</strong>k<br />

Ford<br />

Glen Oaks<br />

Dutton<br />

Beech<br />

Greenwell<br />

Evangeline<br />

Sherwood<br />

Leo<br />

Dubois<br />

Lila<br />

Hillcrest<br />

Scott<br />

Ingleside<br />

Bawell<br />

Palm<br />

Nelson<br />

Eaton<br />

Chemin<br />

Hollier<br />

Frey<br />

49th<br />

Foster<br />

College<br />

Wylie<br />

Bentley<br />

Peerless<br />

Charles<br />

Orchid<br />

Beck<br />

Park<br />

Chipley<br />

Bluebell<br />

South WWTP<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIGES-2_PDP2010.MXD SGELPI 11/15/2010 14:25:17<br />

G S R I<br />

Rolling Acres<br />

Comite<br />

Sumrall<br />

Greenwell Springs<br />

Ardenwood<br />

Government<br />

Clay Cut<br />

Pollard<br />

Dahlia<br />

Menlo<br />

Ned<br />

Myrtle<br />

Hope<br />

Ellen<br />

Brookstown<br />

Boone<br />

Baird<br />

Lower Zachary<br />

Celia<br />

St Ann<br />

Corlett<br />

San Juan<br />

Congress<br />

Moss Side<br />

Chippenham<br />

Leake<br />

Bank<br />

Silverleaf<br />

Quail<br />

Gardere<br />

Elvin<br />

Hanks<br />

Harry<br />

Prescott<br />

Lobdell<br />

Corporate<br />

Kenilworth<br />

Rodney<br />

Kent<br />

Stoneview<br />

Guynell<br />

Maplewood<br />

Kincaid<br />

Westdale<br />

White<br />

Ruby<br />

Hilton<br />

Meadow Bend<br />

Furr<br />

Rio<br />

Callahan<br />

Pascagoula<br />

Ruston<br />

Jupiter<br />

Renoir<br />

Donmoor<br />

Landis<br />

Staring<br />

Pettit<br />

Wooddale<br />

Tom<br />

Goodwood<br />

Sevenoaks<br />

University Club<br />

Victoria<br />

Lasalle<br />

Murphy<br />

Main<br />

Burden<br />

Castle Kirk<br />

Eric<br />

Hall<br />

North Ridge<br />

Flag<br />

Boyce<br />

Dalark<br />

Richards<br />

Picardy<br />

Flora<br />

Kingcrest<br />

Parkway<br />

Baja<br />

Angus<br />

Avis<br />

Tradition<br />

Cline<br />

Price<br />

Wright<br />

J Wicker<br />

Meadow<br />

Breeden<br />

Phebus<br />

Ocean<br />

Cody<br />

Oak View<br />

Reco<br />

Rienzi<br />

Ryder<br />

Waters Edge<br />

Anderson<br />

Guy<br />

Airway<br />

Airport<br />

Essen<br />

Hennessy<br />

Bles<br />

Hilltree<br />

Paris<br />

Anselmo<br />

Vienna<br />

Windingway<br />

Brown<br />

Mickens<br />

Colonial<br />

Bliss<br />

Cortana<br />

Brentwood<br />

Joyce<br />

Oak Villa<br />

Tara<br />

Fairway<br />

Downing<br />

Shady Lake<br />

Jodie<br />

Watson<br />

Vail<br />

Loudon<br />

Wartelle<br />

Summa<br />

Bluebonnet<br />

Villa<br />

Dyer<br />

Choctaw<br />

Riveroaks<br />

Drusilla<br />

Gail<br />

Buck Horn<br />

Shady Bluff<br />

Fleet<br />

Arleen<br />

Carmel<br />

El Scott<br />

Dancy<br />

Tracy<br />

Crescent<br />

Wimbledon<br />

Ventura<br />

Oakdale<br />

Lakeview<br />

Lake Estates<br />

0 1 2 4<br />

Miles<br />

Foster<br />

Campanile<br />

Watts<br />

Airline<br />

Ardoon<br />

Wagner<br />

Carney<br />

Vega<br />

Mollylea<br />

Interline<br />

Oak Forest<br />

Judi<br />

Floynell<br />

Oak Hills<br />

Reitz<br />

Smith<br />

Florida<br />

Bluebonnet<br />

Oakbrook<br />

Lazy K<br />

Old Settlement<br />

Elain<br />

Darryl<br />

Cal<br />

Mint<br />

Perkins<br />

Tams<br />

Red Oak<br />

Cedarcrest<br />

Ridgely<br />

Kinglet<br />

Peck<br />

Neil<br />

Ida<br />

Parkview<br />

Daradele<br />

King James<br />

Amiss<br />

Tallowwood<br />

Beta<br />

Kenlee<br />

Tudor<br />

Bramble<br />

Woodleigh<br />

Siegen<br />

Lovett<br />

Peairs<br />

Greenwell Spg Pt Hudson<br />

Cook<br />

Lassen<br />

Dual<br />

Mall<br />

Core<br />

Gurney<br />

Landfair<br />

Hillmont<br />

Rondo<br />

Browning<br />

Brillock<br />

Mc Gehee<br />

Southpark<br />

Reiger<br />

I-10<br />

Joor<br />

McCullough<br />

Tinley<br />

Pinta<br />

Oak Bend<br />

Bellfort<br />

Toulon<br />

Neff<br />

Pecos<br />

Little John<br />

Honore<br />

Poydras<br />

Conti<br />

St Alban's<br />

Corsair<br />

Monticello<br />

Archery<br />

Sylvan<br />

Shoe Creek<br />

Frontier<br />

Lariat<br />

Daytona<br />

Richcroft<br />

Dabney<br />

Baylor<br />

Triple B<br />

Catalina<br />

Industriplex<br />

Flannery<br />

Harrells Ferry<br />

Parkforest<br />

Cloverland<br />

Pecue<br />

Claiborne<br />

Parkside<br />

Joor<br />

Warfield<br />

Pecue<br />

Erin<br />

Shay<br />

Elva<br />

Cherryl<br />

Arlingford<br />

Millburn<br />

Warwick<br />

Newcastle<br />

Oak Berry<br />

Dorset<br />

Britain<br />

La Margie<br />

Justice<br />

Parnell<br />

Pecue<br />

British<br />

Coursey<br />

Stumberg<br />

Woodcliff<br />

Elwick<br />

Wyndy<br />

Briarwood<br />

Hooper<br />

Rushmore<br />

Airline<br />

Pinewood<br />

Huntley<br />

Hickory Ridge<br />

Old Perkins<br />

Five Oaks<br />

Quinn<br />

Saint Clare<br />

Hubbs Acres<br />

Forest View<br />

Oxley<br />

Holt<br />

Roundsaville<br />

Kohler<br />

Brent<br />

Trey<br />

Mapleton<br />

Florida<br />

Ponderosa<br />

Buckley<br />

Denham<br />

Crystal<br />

Firewood<br />

Kimbleton<br />

Pinehurst<br />

Castille<br />

Buzbee<br />

Glenn<br />

Libra<br />

Breton<br />

Jones Creek<br />

Paint<br />

Wax<br />

Old Hammond<br />

Jester<br />

Board<br />

Barringer<br />

Boulevard Louisiane<br />

Augusta<br />

Sage<br />

Russett<br />

Beaver<br />

Sessions<br />

Herridge<br />

Brookside<br />

Choctaw<br />

Perkins<br />

Shetland<br />

Chanove<br />

Alford<br />

Boreas<br />

Terrell<br />

Chaumont<br />

Stonewood<br />

El Ranchitos<br />

Profit<br />

Droze<br />

Stevendale<br />

Shenandoah<br />

Chaney<br />

Fir<br />

Magnolia Bridge<br />

Thibodeaux<br />

Morgan<br />

Frenchtown<br />

Strain<br />

Centurion<br />

Bristoe<br />

Ellis<br />

George Oneal<br />

Ferrell<br />

Broker<br />

Pernecia<br />

Donnybrook<br />

Woodvale<br />

Four Oaks<br />

Hamilton<br />

Hewwood<br />

Chadsford<br />

Alder<br />

Morel<br />

Doyle<br />

Spyglass Hill<br />

Trent Jones<br />

Umbehagen<br />

Lavell<br />

J L Fairchild<br />

Silver Sand<br />

Durmast<br />

Blouin<br />

Riverview<br />

I-12<br />

Hoyt<br />

Ronson<br />

Milldale<br />

Ashford<br />

Deer Lake<br />

Will<br />

Cicero<br />

Pine Hill<br />

Jefferson<br />

Talton<br />

Ednie<br />

Gottlieb<br />

Landmor<br />

<strong>Plan</strong>chet<br />

Monitor<br />

Coffee<br />

General Forrest<br />

Achord<br />

Barrett<br />

Jon Michelle<br />

Beachview<br />

Palmer<br />

Vignes<br />

Liberty<br />

Alphonse Forbes<br />

Hagerstown<br />

Stubbs<br />

Lake Iris<br />

Babin<br />

Bengal<br />

Tiger Bend<br />

Carson<br />

Phillips<br />

Figure ES-2


EXECUTIVE SUMMARY<br />

The capacity improvements portion of the program consists of 51 projects located<br />

throughout the C-P. The first projects started in 2007, and the last project is scheduled for<br />

completion in late 2014. Approximately, six to ten projects will begin construction every<br />

year from 2008 through 2013, and design and construction will be continuous through 2014.<br />

Approximately 350,000 linear feet of gravity sewer, 670,000 linear feet of forcemain, and 140<br />

pump stations (PSs) will be upgraded as a part of the capacity projects.<br />

Figure ES-3 shows the location of the capacity improvement projects. Projects within these<br />

areas are also described in detail in the body of this plan. The estimated total program cost<br />

of the capacity improvement projects is approximately $610 million in September 2007<br />

dollars.<br />

Wastewater Treatment Improvements/Storage Projects<br />

The PDP includes four reservoir storage and repumping projects, as noted in Table ES-1.<br />

The cost of the Zachary Area Transmission Network Improvements Project (ZATNIP)<br />

storage facility at Red Mud Lakes is included in a project that also includes collection system<br />

capacity improvements and therefore it is included in the aforementioned capacity projects.<br />

TABLE ES-1<br />

Reservoir Storage and Repumping Projects<br />

Location<br />

Storage Volume<br />

Choctaw Drive<br />

Hooper Road<br />

Red Mud Lakes (ZATNIP)<br />

South WWTP<br />

26 MG<br />

10 MG<br />

20 MG<br />

66 MG<br />

The PDP also includes three wastewater treatment capacity and/or compliance projects. The<br />

wet weather treatment capacity of the South WWTP will be expanded to accommodate the<br />

predicted peak flow of 200 million gallons per day (mgd) after peak shaving storage and to<br />

accommodate wet weather flows from the Central WWTP, which will be consolidated with<br />

the South WWTP, per the technical memorandum entitled Consolidation of South and Central<br />

Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge (CH2M HILL, 2008). The wet weather treatment<br />

capacity improvements will be accomplished in two projects. The South WWTP Phase 1<br />

project includes wet weather storage, influent pumping, and preliminary treatment. The<br />

South WWTP Phase 2 project (PDP portion) includes wet weather improvements within the<br />

treatment process<br />

In addition to the wet weather improvement and storage projects, five Immediate Action<br />

<strong>Plan</strong> (IAP) projects have been undertaken at the South WWTP. The purpose of these projects<br />

is to bring the plant in compliance with current discharge limits. These projects are<br />

described throughout the body of this report. Two of these Immediate Action Projects were<br />

either moved into another project (screenings improvements was moved to South WWTP<br />

Phase 1) or completed (Effluent Pumping Station project). The remaining three projects are<br />

being constructed as one construction project called SWWTP IAP (therefore, it has been<br />

counted and described as one project throughout this report).<br />

Design of the South WWTP IAP projects began in 2007. These projects are now under<br />

construction. The South WWTP – Phase 1 project and the Choctaw Storage and Pump<br />

GNV31031158570.DOCX/110050012 ES-7 JANUARY 2011<br />

REV. 5


EXECUTIVE SUMMARY<br />

Station Facility project are also under construction The Hooper Storage project and South<br />

WWTP – Phase 2 project are both under design, with construction commencing in 2011. The<br />

Red Mud Lakes (ZATNIP) storage project is under construction..<br />

Storage and treatment locations are shown on Figure ES-3. The total estimated program cost<br />

for the PDP portion of wastewater treatment and storage projects (excluding Red Mud<br />

Lakes) is $335 million in September 2007 dollars.<br />

Preliminary Master <strong>Plan</strong> Projects<br />

There are several additional projects that the C-P is already executing to continue to enhance<br />

performance of their wastewater treatment plants and collection systems, and also improve<br />

compliance as well. The Draft Master <strong>Plan</strong> (CH2M HILL, 2008) outlined several<br />

improvements to the existing South WWTP facilities that are necessary to keep the plant in<br />

operation. These improvements are included in the South WWTP Phase 2 project (master<br />

plan portion).<br />

In addition, due to the extended power outages experienced after Hurricane Gustav, the C-P<br />

desires to install emergency generators at each of the collection system pump stations and at<br />

each of the WWTPs as part of the preliminary master plan.<br />

The Draft Master <strong>Plan</strong> (CH2M HILL, 2008) also outlined the need for a SCADA system. The<br />

design of the SCADA system is scheduled to begin in 2010, with construction beginning in<br />

2011. SCADA components will be installed at all pump stations in the collection system as<br />

well as at the North WWTP. A SCADA system is already being designed for the South<br />

WWTP as part of the South WWTP – Phase 2 project.<br />

The planned closure of the Central WWTP has lead to a need to relocate the field pump<br />

maintenance staff and their warehouse, which are currently located at the Central WWTP.<br />

Since enough land was available at the Choctaw Storage site and it is somewhat centrally<br />

located in the C-P, the Choctaw site was selected as the new location for this facility. A new<br />

preliminary master plan project was added to this PDP for the Choctaw Maintenance<br />

Facility.<br />

The SGL-C-0002 (Multiple PS – Highland Road – Kenilworth Pkwy) project includes a new<br />

7,000 gpm (10 MGD) pump station for LSU. This pump station will be designed as part of<br />

the overall SGL-C-0002 project, but it’s construction is dependent on the schedule for the<br />

construction of the gravity system that is needed to convey flow to the LSU pump station.<br />

Therefore, the construction cost for the LSU pump station was counted as a preliminary<br />

master plan, since it may or may not be constructed separately from the rest of the project.<br />

The North WWTP priority one and priority two projects are outlined in the Draft Master<br />

<strong>Plan</strong> (CH2M HILL, 2008). The SCADA and secondary power are described in this PDP with<br />

the SCADA and generator chapters, respectively. The remaining portions of these projects<br />

are outlined in the North chapter of this PDP. While the projects are described as two<br />

projects (Priority One, Urgent Needs, and Priority Two, Operations and Maintenance<br />

Needs), it is likely that the construction will occur as one project. The construction of the<br />

North WWTP project(s) will occur in 2015, after the SSO <strong>Program</strong> has been completed.<br />

The total estimated program cost for the preliminary master plan is $115 million in<br />

September 2007 dollars.<br />

GNV31031158570.DOCX/110050012 ES-8 JANUARY 2011<br />

REV. 5


F<br />

3rd<br />

Iowa<br />

Lupine<br />

3rd<br />

10th<br />

15th<br />

16th<br />

22nd<br />

Acadian<br />

East<br />

Elm<br />

Whitter<br />

McHost<br />

Monterrey<br />

Cora<br />

Marilyn<br />

Blackwater<br />

Sharp<br />

Bea<br />

Acres<br />

Black<br />

Aubin<br />

Burrel<br />

Anderson<br />

Sullivan<br />

Reames<br />

Millerville<br />

Beaver<br />

Hunt<br />

O'Neal<br />

Antioch<br />

Elliot<br />

Lea<br />

Adams<br />

Sandy Springs<br />

Renee<br />

Bickham<br />

Irene<br />

Portwood<br />

Port Hudson Plains<br />

")<br />

Sunnyside<br />

Barnett<br />

McKee<br />

Samuels<br />

Ligon<br />

North WWTP<br />

River<br />

Flonacher<br />

Old Scenic<br />

Scenic<br />

Brian<br />

Mount Pleasant Zachary<br />

Irene<br />

Carney<br />

Springfield<br />

Capacity and Wet Weather Treatment Projects<br />

Zimmerman<br />

Groom<br />

Thomas<br />

I<br />

H<br />

Brightside<br />

Riverbend<br />

Glynn<br />

Shellmire<br />

Red Mud Lakes<br />

(20 MG)<br />

Northgate<br />

Fennwood<br />

Hovey<br />

Merganzer<br />

Newell<br />

Lake Pointe<br />

Meadow Glen<br />

Greely<br />

Dillard<br />

D<br />

Lafayette<br />

Farm<br />

Main<br />

Hooper Storage Tank<br />

(10 MG)<br />

Mengel<br />

Gourrier<br />

Rollins<br />

Harding<br />

6th<br />

France<br />

Stadium<br />

4th<br />

Church<br />

Ben Hur<br />

39th<br />

Heck Young<br />

Sorrel<br />

Rita<br />

Faith<br />

Landry<br />

72nd<br />

Chippewa<br />

Terrace<br />

Tyler<br />

Dalrymple<br />

Alvin Dark<br />

Pony<br />

Day<br />

Stilt<br />

79th<br />

Mason<br />

17th<br />

Fig<br />

Grant<br />

Laurel Lakes<br />

Polk<br />

Parker<br />

Cypress<br />

Wilbur<br />

Shelley<br />

Vernon<br />

Pope<br />

§¨¦I-110<br />

North<br />

23rd<br />

Central<br />

Beech<br />

18th<br />

Ozark<br />

Central<br />

Stanford<br />

Nicholson<br />

Zachary-Slaughter<br />

Scotlandville-Zachary<br />

Wimbish<br />

Daniels<br />

Baker<br />

Hollywood<br />

Madison<br />

Safer<br />

Lavey<br />

Oleander<br />

May<br />

Ash<br />

Baker<br />

Spur<br />

Main<br />

Carriage<br />

Ben Hur<br />

Bella<br />

Avenue A<br />

Husband<br />

Stuart<br />

Lee<br />

Highland<br />

38th<br />

Port Hudson-Pride<br />

McHugh<br />

Evangeline<br />

Mohican<br />

Winbourne<br />

31st<br />

36th<br />

Convention<br />

Eugene<br />

Sinbad<br />

Rush<br />

Chuck Yeager<br />

Marigold<br />

Hillcrest<br />

Paige<br />

Oaklan<br />

Lorraine<br />

Bawell<br />

Dubois<br />

44th<br />

Ingleside<br />

Burbank<br />

Lemon<br />

")<br />

Greenwell<br />

Prescott<br />

Lobdell<br />

Greenwell Springs<br />

Foster<br />

Ford<br />

Jacock<br />

Comite<br />

Government<br />

College<br />

G S R I<br />

Lower Zachary<br />

Bentley<br />

Chipley<br />

Orchid<br />

Frey<br />

Pollard<br />

Park<br />

Rolling Acres<br />

Myrtle<br />

Hope<br />

Mable<br />

Choctaw<br />

North<br />

Sumrall<br />

Laca<br />

Byron<br />

Ardenwood<br />

Boone<br />

Brookstown<br />

Baird<br />

Glen Oaks<br />

Dyer<br />

")<br />

Goodwood<br />

South WWTP<br />

Elvin<br />

Kent<br />

Garland<br />

Celia<br />

St Ann<br />

Corlett<br />

Rio<br />

Charlton<br />

Hanks<br />

Harry<br />

Congress<br />

Corporate<br />

Stratford<br />

Kenwood<br />

Quail<br />

Kenilworth<br />

Keed<br />

Staring<br />

Hall<br />

Caprice<br />

Burden<br />

Lanier<br />

Zeb Chaney<br />

Main<br />

Jupiter<br />

Foster<br />

Calumet<br />

Pettit<br />

Mickens<br />

Tom<br />

Wooddale<br />

Boyce<br />

Richards<br />

Kevel<br />

Angus<br />

Kilona<br />

Chandler<br />

Ocean<br />

J Wicker<br />

Cline<br />

Price<br />

Breeden<br />

Rienzi<br />

Flora<br />

Lasalle<br />

Bles<br />

Avis<br />

Cody<br />

Essen<br />

Lemon B<br />

Waters Edge<br />

Meadow<br />

Brittany<br />

Hilltree<br />

Airport<br />

Plaza<br />

Airway<br />

Anselmo<br />

Bliss<br />

Cortana<br />

<strong>Plan</strong>k<br />

Tucker<br />

Brown<br />

Carney<br />

Watson<br />

Vail<br />

Loudon<br />

North<br />

Tara<br />

Fairway<br />

Summa<br />

Bluebonnet<br />

Obrien<br />

Ardoon<br />

Drusilla<br />

Fleet<br />

Arleen<br />

Joor<br />

Choctaw Storage Tank<br />

(25 MG)<br />

Darryl<br />

HillGail<br />

Oakdale<br />

Oak Hills<br />

Buck Horn<br />

Mollylea<br />

Interline<br />

Baker<br />

Della<br />

Fawn<br />

Old Settlement<br />

Carmel<br />

Smith<br />

Oakbrook<br />

Daradele<br />

Choctaw<br />

Cal<br />

Azrok<br />

Mint<br />

Perkins<br />

Amiss<br />

Neil<br />

Tams<br />

Peairs<br />

Greenwell Spg Pt Hudson<br />

Ida<br />

Florida<br />

South<br />

Siegen<br />

McCullough<br />

Core<br />

Gurney<br />

Tallowwood<br />

Bramble<br />

Lovett<br />

Landfair<br />

Red Oak<br />

Tudor<br />

Voorhies<br />

Browning<br />

Briarhurst<br />

Mall<br />

Toulon<br />

Neff<br />

Stan<br />

Sylvan<br />

Reiger<br />

Shoe Creek<br />

Pecos<br />

Richcroft<br />

Tinley<br />

Bellfort<br />

Alco<br />

Pecue<br />

Brookhollow<br />

Prairie<br />

Warfield<br />

Stockton<br />

Baylor<br />

Cloverland<br />

Corsair<br />

Joor<br />

Elva<br />

Pecue<br />

Cook<br />

Stumberg<br />

Old Perkins<br />

Flannery<br />

Woodcliff<br />

Newcastle<br />

Oak Berry<br />

Devall Hubbs<br />

Elwick<br />

Hooper<br />

Rushmore<br />

Coursey<br />

Airline<br />

Jackson<br />

Denham<br />

Woodland Ridge<br />

Rose<br />

Five Oaks<br />

Huntley<br />

Hickory Ridge<br />

Brent<br />

Trey<br />

Mapleton<br />

Holly<br />

Glenn<br />

Roundsaville<br />

Kohler<br />

Holt<br />

Greens<br />

Mora<br />

Pinehurst<br />

Choctaw<br />

Buzbee<br />

Breton<br />

Crystal<br />

Jones Creek<br />

Edwards<br />

Paint<br />

Wax<br />

Chanove<br />

Alford<br />

Old Hammond<br />

Boreas<br />

Profit<br />

Barringer Foreman<br />

Chaumont<br />

Stonewood<br />

Pernecia<br />

Droze<br />

Stevendale<br />

Four Oaks<br />

Fir<br />

Roble<br />

Frenchtown<br />

Strain<br />

Bristoe<br />

§¨¦I-12<br />

Chadsford<br />

Shenandoah<br />

Morel<br />

Round Oak<br />

Spyglass Hill<br />

Trent Jones<br />

Norway Pine<br />

Robinson<br />

Lavell<br />

Chaney<br />

Milldale<br />

Will<br />

Gottlieb<br />

Jefferson<br />

Riley<br />

Magnolia Bridge<br />

Bristle Cone<br />

Riverview<br />

Bonham<br />

Tom Drehr<br />

Cicero<br />

Morgan<br />

<strong>Plan</strong>chet<br />

Liberty<br />

Harrells Ferry<br />

Monitor<br />

Achord<br />

Beckfield<br />

Talton<br />

Creek Hollow<br />

Stubbs<br />

Alphonse Forbes<br />

Vignes<br />

Lake Iris<br />

Babin<br />

Tiger Bend<br />

Phillips<br />

Bengal<br />

Mahoney<br />

Carson<br />

³<br />

Phillips<br />

Hoo Shoo Too<br />

Legend<br />

3<br />

WWTP Wastewater Treatment <strong>Plan</strong>t<br />

#* New Pump Stations<br />

")<br />

New Storage Facilities<br />

New Gravity Sewer / Force Main<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\FIGES-3_102009.MXD GBOQUIN 10/26/2009 09:07:59<br />

University Club<br />

South WWTP<br />

Wet Weather<br />

Improvements<br />

Tradition<br />

0 0.5 1 2 3 4<br />

Miles<br />

§¨¦I-10<br />

Figure ES-3


EXECUTIVE SUMMARY<br />

List of Completed Project, Active Projects, and Projects to be<br />

Appropriated in 2011<br />

Functionally Completed Projects<br />

Table ES-2 shows the list of completed projects. These projects have been functionally<br />

completed as of the dates as shown in Table ES-2.<br />

TABLE ES-2<br />

List of Completed Projects<br />

Project Number/Name<br />

Status<br />

(November 2010)<br />

Date<br />

SFL-R-0001 (Jefferson Hwy - HooShooToo Road) Functionally Complete 3 rd Quarter 2009<br />

03-RMP-S14 (RMAP1 – Kleinpeter Area Upgrades) Functionally Complete 2 nd Quarter 2009<br />

NFE-C-0001 (Gurney Road - Joor Road) Functionally Complete 4 th Quarter 2009<br />

SGC-C-PS58FM-A (Staring Lane FM Phase I - Burbank to Functionally Complete 2 nd Quarter 2010<br />

Highland)<br />

99-RMP)-S16 (RMAP1 – PS 136 Upgrades) Functionally Complete 3 rd Quarter 2010<br />

NFE-C-0003 (Comite Drive - Foster Road - Phase 1) Functionally Complete 2 nd Quarter 2010<br />

SGL-R-0002 (Staring Lane - Boone Drive) Functionally Complete 2 nd Quarter 2010<br />

Active Projects<br />

Table ES-3 shows the list of active projects, which includes projects currently under design<br />

and/or construction. These projects have already been appropriated for design and/or<br />

construction as shown in the table.<br />

TABLE ES-3<br />

List of Active Projects<br />

Project Number/Name<br />

Status<br />

(November 2010) Appropriations<br />

SGL-R-0001 (Burbank Drive – Gardere Lane) Construction Design & Construction<br />

SGU-R-0001 (Oak Villa Blvd - Choctaw Street) Construction Design & Construction<br />

NGS-R-0002 (Scotland Avenue - Progress Road) Construction Design & Construction<br />

NGS-R-0001 (Elm Grove Garden Road - Harding Blvd) Construction Design & Construction<br />

SGU-R-0002 (Sharp Road - Florida Blvd) Construction Design & Construction<br />

SGL-R-0003 (Kenilworth Blvd - Boone Drive) Design Design & Construction<br />

CGS-R-0001 (Foster Drive - Government Street) Construction Design & Construction<br />

NFE-R-0001 (Silverleaf Road - Ford Street) Design Design & Construction<br />

NFW-R-0001a (Brookstown Road - Evangeline Street - Phase 1) Construction Design & Construction<br />

NFW-R-0001b (Brookstown Road - Evangeline Street - Phase 2) Design Design & Construction<br />

SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy- Phase 1) Design Design & Construction<br />

SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy- Phase 2) Design Design & Construction<br />

CGS-R-0005 (Acadian Thruway - Perkins Road) Design Design<br />

CGS-R-0003 (Stanford Avenue - Morning Glory Road) Design Design<br />

CGS-R-0004 (Acadian Thruway - Claycut Road) Design Design<br />

CGS-R-0002 (Highland Road – Washington Street) Project Definition Design<br />

SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase 1) Project Definition Design<br />

SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase 2) Project Definition Design<br />

GNV31031158570.DOCX/110050012 ES-11 JANUARY 2011<br />

REV. 5


EXECUTIVE SUMMARY<br />

TABLE ES-3<br />

List of Active Projects<br />

Project Number/Name<br />

Status<br />

(November 2010)<br />

Appropriations<br />

CGN-C-0001 (Capital Lake Drive - Gayosa Street) Construction Design & Construction<br />

NFE-C-0001 (Gurney Road - Joor Road) Construction Design & Construction<br />

NFE-C-0002 (Sullivan Road - Lovett Road - Wax Road) Construction Design & Construction<br />

NFE-C-0004 (Foster Road - Hooper Road) Construction Design & Construction<br />

NFW-C-HWY61-I (ZATNIP, Phase I) Construction Design & Construction<br />

NFW-C-HWY61-II (ZATNIP, Phase II) Design Design & Construction<br />

NFW-C-HWY61-III (ZATNIP, Phase III) Construction Design & Construction<br />

NFW-C-HWY61-IV (ZATNIP, Phase IV) Construction Design & Construction<br />

CGN-C-0003 (South Boulevard - St. Joseph Street) Construction Design & Construction<br />

CGN-C-0005 (Downtown Area - PS 15, PS 19, &PS 59<br />

Construction Design & Construction<br />

Improvements)<br />

CGS-C-0004 (Highland Road - Buchanan Street) Construction Design & Construction<br />

SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain<br />

Improvements)<br />

Construction<br />

Design & Construction<br />

Group Project 1A (Metro Airport Area Sewer Upgrades) Construction Design & Construction<br />

Group Project 1B (Metro Airport Area PS and FM Upgrades) Design Design & Construction<br />

SFL-C-0004 (Group Project 2 - Highland Rd Area Sewer<br />

Upgrades)<br />

Construction Design & Construction<br />

SFL-C-0005 (Highland Road - Burbank Drive) Construction Design & Construction<br />

SGC-C-PS58A (Pump Station 58 Replacement) Design Design & Construction<br />

SGC-C-PS58FM-I (Staring Lane FM Phase I - Burbank to<br />

Highland)<br />

SGC-C-PS58FM-II (Staring Lane FM Phase II - Highland to<br />

Perkins)<br />

Construction<br />

Construction<br />

SGC-C-PS58FM-III (Staring Lane FM Phase III - Perkins to PS<br />

58) Design<br />

SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station<br />

514 Improvements) Design<br />

SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd) Design Design<br />

SGL-C-0005 (Bayou Duplantier Area Improvements Project) Design Design<br />

CGN-C-0002 (25th Street - North Acadian Thruway) Design Design*<br />

CGS-C-0006 (Government St - South Acadian Thruway) Design Design<br />

NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road) Design Design<br />

SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) Design Design<br />

Design & Construction<br />

Design & Construction<br />

Design & Construction<br />

Design & Construction<br />

SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) Design Design & Construction<br />

SFU-C-0005 (O’Neal Lane Pipeline Improvements) Design Design<br />

SGC-C-0002 (Airline Highway Pipeline Improvements) Design Design<br />

SGL-C-0002 (Multiple PS – Highland Rd – Kenilworth Pkwy) Design Design<br />

NFE-C-0005 ( Hooper Road Pump Station Improvements) Design Design<br />

NFE-C-0006 (Lovett Road – Greenwell Springs Road) Design Design<br />

GNV31031158570.DOCX/110050012 ES-12 JANUARY 2011<br />

REV. 5


EXECUTIVE SUMMARY<br />

TABLE ES-3<br />

List of Active Projects<br />

Project Number/Name<br />

SFU-C-0002a (O’Neal Lane Pump Station Improvements –<br />

Group A)<br />

SFU-C-0002b (O’Neal Lane Pump Station Improvements –<br />

Group B)<br />

Status<br />

(November 2010)<br />

Design<br />

Design<br />

Appropriations<br />

Design<br />

Design<br />

SGC-C-0001 (Florida Blvd Pump Station Improvements) Project Definition Design<br />

SGL-C-0003 (Highland Road Pipeline Improvements) Project Definition Design<br />

SGU-C-0003 (Sherwood Forest Blvd – Goodwood Blvd Pipeline<br />

Improvements)<br />

Project Definition Design<br />

CC-WWTP-PS (PS-42) Design Design & Construction<br />

CC-EAST-FM (Central Consolidated FM) Design Design & Construction<br />

CC-EAST-PS (Central Consolidated Pump Stations) Design Design & Construction<br />

CC-WWTP-FM (PS-42 FM) Design Design & Construction<br />

NFW-C-0002 (Choctaw Storage, Pump Stations and<br />

Construction Design & Construction<br />

Forcemains)<br />

NFW-C-0004 (Hooper Storage) Design Design & Construction<br />

STP-C-0001 (South WWTP - Phase 1) Construction Design & Construction<br />

STP-C-0002 (South WWTP - Phase 2) Design Design<br />

SSO Odor Control NWWTP (07-TP-BD-0030) Construction Design & Construction<br />

SWWTP IAP (08-TP-BD-0031) Construction Design & Construction<br />

RMAP1 – PS 136 Construction Design & Construction<br />

*Construction for 25th Street - North Acadian Thruway project has been split between Capital Lake-Gayosa<br />

Street and South Blvd - St. Joseph Street projects<br />

Projects for 2011<br />

Table ES-4 shows the list of projects that are to be appropriated for design and/or<br />

construction in 2011. Some projects in Table ES-3 above will be active in 2011 (going from<br />

design to construction), so if they are appropriated for design & construction in Table ES-3,<br />

they are not included in Table ES-4 below, although they will be active in 2011. For instance,<br />

The Group Project 1B (Metro Airport Area PS and FM Upgrades) project is under design in<br />

2010 and will begin construction in 2011, but it is fully appropriated for design and<br />

construction, so it is included in Table ES-3 only.<br />

TABLE ES-4<br />

List of Projects for 2011<br />

Project Number/Name Appropriations Needed for 2011<br />

CGS-R-0005 (Acadian Thruway - Perkins Road)<br />

Construction<br />

CGS-R-0003 (Stanford Avenue - Morning Glory Road)<br />

Construction<br />

CGS-R-0004 (Acadian Thruway - Claycut Road)<br />

Construction<br />

CGS-R-0002 (Highland Road - Washington Street)<br />

Construction<br />

SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase 1)<br />

Construction<br />

SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase 2)<br />

Construction<br />

SFU-R-0001 (Antioch Road – Chadsford Drive)<br />

Design & Construction*<br />

SFL-R-0002 (Jones Creek Road – Tiger Bend Road)<br />

Design & Construction*<br />

GNV31031158570.DOCX/110050012 ES-13 JANUARY 2011<br />

REV. 5


EXECUTIVE SUMMARY<br />

TABLE ES-4<br />

List of Projects for 2011<br />

Project Number/Name Appropriations Needed for 2011<br />

CGN-R-0001a (Scenic Highway – Spanish Town Road – Phase 1)<br />

CGN-R-0001b (Scenic Highway – Spanish Town Road – Phase 2)<br />

NFW-R-0002 (Interstate 110 – Hollywood Street)<br />

SFL-R-0003 (Siegen Lane – Interstate 10)<br />

SGC-R-0003 (Ardenwood Drive – Winbourne Street)<br />

SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd)<br />

SGL-C-0005 (Bayou Duplantier Area Improvements Project)<br />

CGS-C-0006 (Government St - South Acadian Thruway)<br />

NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road)<br />

SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr)<br />

SFU-C-0005 (O’Neal Lane Pipeline Improvements)<br />

SGC-C-0002 (Airline Highway Pipeline Improvements)<br />

NFE-C-0005 ( Hooper Road Pump Station Improvements)<br />

SGU-C-0005 (Oak Villa Blvd – Monterey Blvd)<br />

SFL-C-0003 (Multiple PS – Burbank Drive – Siegen Lane)<br />

NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />

NFW-C-0001 (Joor Road – Greenwell Springs Rd)<br />

NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road)<br />

NFW-C-0009 (Multiple PS – Highway 61 – <strong>Plan</strong>k Road)<br />

NFW-C-0010 (Multiple PS – Prescott Rd – Greenwell Springs Rd)<br />

NFE-C-0005 (Hooper Road PS Projects)<br />

STP-C-0002 (South WWTP - Phase 2 - PDP & MP)<br />

Sewer System Backup Power <strong>Program</strong><br />

Collection System SCADA<br />

SCADA Operations Data/Control Center<br />

Design*<br />

Design*<br />

Design<br />

Design<br />

Design<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Design<br />

Design<br />

Design<br />

Design<br />

Design<br />

Design<br />

Design<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

GNV31031158570.DOCX/110050012 ES-14 JANUARY 2011<br />

REV. 5


SECTION 1<br />

Overview<br />

1.1 Background<br />

The purpose of the Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities<br />

<strong>Program</strong> is to reduce sanitary sewer overflows while also planning for the future. The City<br />

of Baton Rouge, East Baton Rouge Parish (C-P) entered into a Consent Decree (Civil Action<br />

01-978-B-M3) with the United States Environmental Protection Agency (EPA) and the State<br />

of Louisiana to take remedial actions in the collection system to reduce SSOs, and also to<br />

meet National Pollution Discharge Elimination System (NPDES) permit requirements at the<br />

wastewater treatment plants (WWTPs) by January 1, 2015. The Consent Decree details<br />

requirements for several components, including the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Cross Connections<br />

Preventive Maintenance (Collection System and WWTPs)<br />

SSO Responses and Reporting<br />

Remedial Measures Action <strong>Plan</strong> 1 (RMAP1)<br />

Remedial Measures Action <strong>Plan</strong> 2 (RMAP2)<br />

Wastewater Treatment Facility Assessment<br />

Environmental Results Monitoring<br />

Outreach and Public Awareness (O&PA) Quarterly and Annual Reporting<br />

Supplemental Environmental Projects (SEPs)<br />

Recordkeeping<br />

This document constitutes the RMAP2. Other portions of the Consent Decree are addressed<br />

in other documents. This document is the third annual update of the <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

(PDP) that was initially published in January 2008.<br />

1.2 Major <strong>Program</strong> Goals<br />

The major goals of the program are to:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Reduce excess wet weather flows that cause SSOs<br />

Rehabilitate the collection system<br />

Increase the hydraulic capacity of the collection system<br />

Accommodate growth in project areas<br />

Comply with wastewater treatment plant National Pollutant Discharge Elimination<br />

System (NPDES) permit<br />

Comply with the terms of the Consent Decree<br />

GNV31031158568.DOCX/110050008 1-1 JANUARY 2011<br />

REV. 5


SECTION 1. OVERVIEW<br />

The preparation of the PDP considered the locations of known overflows to assure that the<br />

projects defined would reduce the frequency of these overflows. Areas of the collection<br />

system found to have defects were also identified for rehabilitation.<br />

1.3 <strong>Program</strong> Description<br />

The three types of projects identified for implementation are designated comprehensive<br />

rehabilitation projects, capacity improvement projects, and wastewater treatment<br />

improvement/storage projects. The following paragraphs define each project type.<br />

1.3.1 Comprehensive Rehabilitation Projects<br />

Areas targeted for sewer pipe rehabilitation work are those in which flow monitoring has<br />

indicated the highest levels of inflow and infiltration (I/I). Comprehensive rehabilitation<br />

projects are being implemented using a process developed and implemented by the<br />

<strong>Program</strong> Manager (PM) in association with Department of Public Works (DPW) technical<br />

staff. The I/I reduction plan for these projects has the following goals:<br />

<br />

<br />

<br />

<br />

<br />

Identify and reduce stormwater inflow sources into sanitary sewers<br />

Identify and reduce Rainfall Dependent Infiltration (RDI) sources in sanitary sewers<br />

Reduce overflow events<br />

Increase the sewer system useful life<br />

Minimize public inconvenience<br />

The process chosen for rehabilitation and/or reconstruction is generally referred to as “Find<br />

and Fix.” As the process description suggests, there are two phases to the process. The first<br />

is to find or identify areas that require rehabilitation or reconstruction, and the second is to<br />

determine the best engineering solution to fix the problem. After the “Find” phase, some<br />

portions of the system may not require rehabilitation. In those portions of the system, the<br />

Engineer will recommend No Action. The overall approach to the comprehensive<br />

rehabilitation portion of program is to complete the following tasks:<br />

1. Obtain basin data and perform basin field observations<br />

2. Perform I/I testing and inspection, including<br />

Flow monitoring assessment<br />

Smoke testing<br />

Manhole inspection<br />

Closed circuit television inspection<br />

3. Prepare I/I reduction plan<br />

4. Prepare plans, specifications, and cost estimates<br />

5. Implement I/I reduction construction<br />

6. Evaluate I/I reduction results. Compare to pre-rehabilitation flow monitoring<br />

7. Implement additional I/I reduction, if goals are not met<br />

Flow monitoring is an integral part of the overall rehabilitation and reconstruction portion<br />

of the program and will be an ongoing process. Pre-construction flow monitoring is<br />

required to establish existing conditions. Post-construction flow monitoring will gauge the<br />

effectiveness of the rehabilitation and reconstruction. Flow monitoring will continue for the<br />

duration of the program to calibrate the rehabilitation progress.<br />

GNV31031158568.DOCX/110050008 1-2 JANUARY 2011<br />

REV. 5


SECTION 1. OVERVIEW<br />

1.3.2 Capacity Improvement Projects<br />

Capacity improvement projects will reduce hydraulic bottlenecks in the system and convey<br />

wet weather flows to new upstream storage facilities and ultimately to the wastewater<br />

treatment plants (WWTPs). These projects will include installation of larger pipes or<br />

constructing parallel pipes to increase conveyance capacity, as well as replacement of pump<br />

stations to handle future wet weather peak flows.<br />

1.3.3 Wastewater Treatment Improvement/Storage Projects<br />

Design and construction of WWTP wet weather improvement projects will occur early in<br />

the program to store and treat wet weather flows. Wastewater treatment projects at the<br />

South WWTP include the following:<br />

<br />

<br />

<br />

<br />

Immediate Action Projects (IAPs) for dry weather permit compliance<br />

Consolidation with the Central WWTP (Refer to the Consolidation of South and Central<br />

Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge TM (CH2M HILL, 2008)<br />

Wet weather flow capacity increases to 200 million gallons per day (mgd) with hydraulic<br />

peak shaving<br />

Master <strong>Plan</strong> improvements<br />

The South WWTP immediate action projects and other South WWTP projects are included<br />

in this document and are part of the RMAP2 projects. However, the South WWTP Phase 2<br />

Master <strong>Plan</strong> project is described in a separate document (Draft Master <strong>Plan</strong>; CH2M HILL,<br />

2008), though its construction cost estimate is included in the Preliminary Master <strong>Plan</strong><br />

Section of Table 1-1. There are not any capacity improvements required at the North WWTP,<br />

so there are no wet weather (RMAP2) projects included in this report at the North WWTP.<br />

However, there are several improvements needed due to the age of the treatment plant<br />

which are briefly described in the Section 5 - North Basin chapter of this report. The Draft<br />

Master <strong>Plan</strong> (CH2M HILL, 2008) also describes in detail the needed improvements in two<br />

priorities at the North WWTP.<br />

Storage projects will be designed and constructed early in the program to store wet weather<br />

flows upstream in the basins and then release flows back into the system after the wet weather<br />

event has passed. Storage facilities will be sized to store the peak flow from a 2 year<br />

frequency, 12-hour duration storm event, assuming rehabilitation projects are complete.<br />

1.4 Project <strong>Delivery</strong> Summary<br />

The projects have been scheduled for both design and construction activities based on<br />

funding considerations, and placed into a resource-loaded schedule shown in Table 1-1 and<br />

depicted graphically as Figure 1-1. Figure 1-2 presents the schedule for pre-construction and<br />

construction activities for all the program projects.<br />

Note: Financial analysis and funding schedules are prepared by the C-P DPW and are not<br />

a part of this document.<br />

GNV31031158568.DOCX/110050008 1-3 JANUARY 2011<br />

REV. 5


SECTION 1. OVERVIEW<br />

1.5 Report Contents<br />

The content of this report includes the following.<br />

<br />

<br />

<br />

<br />

<br />

<br />

Section 2, <strong>Plan</strong>ning Description, presents the process used to define the projects in this<br />

document.<br />

Section 3, South Basin Projects, describes the projects located in the South Basin. GIS<br />

maps that show locations of the work included in each project are located at the end of<br />

each project summary. The South Basin is the collection system that collects and conveys<br />

flow to the South WWTP.<br />

Section 4, Central Basin Projects, describes projects that are located in the Central Basin<br />

and collect and convey flow to the Central WWTP and will be conveyed in the future to<br />

the South WWTP.<br />

Section 5, North Basin Projects, details projects that are located in the North Basin and<br />

collect and convey flow to the North WWTP.<br />

Section 6, Emergency Generators, describes the stand-by engine generators that are to be<br />

located at each C-P pump station and the two WWTPs.<br />

Section 7, SCADA, describes the SCADA system that is to be implemented in the<br />

collection system and at the North WWTP. The SCADA system for the South WWTP is<br />

being implemented as part of the South WWTP – Phase 2 project.<br />

GNV31031158568.DOCX/110050008 1-4 JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Comprehensive Rehabilitation Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 1,769,540<br />

$<br />

1,769,540<br />

Estimated SDC $ 75,960 $ -<br />

$<br />

75,960<br />

Project Sub-Total $ - $ 1,845,500 $ - $ - $ - $ - $ - $ - $<br />

1,845,500<br />

SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 5,427,000<br />

$<br />

5,427,000<br />

Estimated SDC $ - $ 279,720 $ 53,280<br />

$<br />

333,000<br />

Project Sub-Total $ - $ 5,427,000 $ 279,720 $ 53,280 $ - $ - $ - $ - $<br />

5,760,000<br />

SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 6,127,000<br />

$<br />

6,127,000<br />

Estimated SDC $ - $ 273,230 $ 33,770<br />

$<br />

307,000<br />

Project Sub-Total $ - $ 6,127,000 $ 273,230 $ 33,770 $ - $ - $ - $ - $<br />

6,434,000<br />

SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 8,997,000<br />

$<br />

8,997,000<br />

Estimated SDC $ - $ 9,990 $ 273,060 $ 49,950<br />

$<br />

333,000<br />

Project Sub-Total $ - $ 8,997,000 $ 9,990 $ 273,060 $ 49,950 $ - $ - $ - $<br />

9,330,000<br />

NGS-R-0002 (Scotland Avenue - Progress Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 9,208,000<br />

$<br />

9,208,000<br />

Estimated SDC $ - $ 424,650 $ 22,350<br />

$<br />

447,000<br />

Project Sub-Total $ - $ - $ 9,208,000 $ 424,650 $ 22,350 $ - $ - $ - $<br />

9,655,000<br />

NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 12,989,000<br />

$<br />

12,989,000<br />

Estimated SDC $ - $ 466,830 $ 46,170<br />

$<br />

513,000<br />

Project Sub-Total $ - $ - $ 12,989,000 $ 466,830 $ 46,170 $ - $ - $ - $<br />

13,502,000<br />

SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 17,493,000<br />

$<br />

17,493,000<br />

Estimated SDC $ - $ 345,600 $ 134,400<br />

$<br />

480,000<br />

Project Sub-Total $ - $ - $ 17,493,000 $ 345,600 $ 134,400 $ - $ - $ - $<br />

17,973,000<br />

SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 5,168,000<br />

$<br />

5,168,000<br />

Estimated SDC $ - $ 163,500 $ 163,500<br />

$<br />

327,000<br />

Project Sub-Total $ - $ - $ 5,168,000 $ 163,500 $ 163,500 $ - $ - $ - $<br />

5,495,000<br />

GNV31031158160.xlsx/110050009 1-5<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Comprehensive Rehabilitation Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

CGS-R-0001 (Foster Drive - Government Street Phase A & Phase B Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 7,683,000<br />

$<br />

7,683,000<br />

Estimated SDC $ - $ 136,290 $ 276,710<br />

$<br />

413,000<br />

Project Sub-Total $ - $ - $ 7,683,000 $ 136,290 $ 276,710 $ - $ - $ - $<br />

8,096,000<br />

NFW-R-0001a (Brookstown Road - Evangeline Street -Phase I Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 10,309,000<br />

$<br />

10,309,000<br />

Estimated SDC $ 20,010 $ 540,270 $ 106,720<br />

$<br />

667,000<br />

Project Sub-Total $ - $ - $ - $ 10,329,010 $ 540,270 $ 106,720 $ - $ - $<br />

10,976,000<br />

NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 5,468,000<br />

$<br />

5,468,000<br />

Estimated SDC $ - $ 533,600 $ 133,400<br />

$<br />

667,000<br />

Project Sub-Total $ - $ - $ - $ 5,468,000 $ 533,600 $ 133,400 $ - $ - $<br />

6,135,000<br />

NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 12,170,000<br />

$<br />

12,170,000<br />

Estimated SDC $ - $ 600,600 $ 59,400<br />

$<br />

660,000<br />

Project Sub-Total $ - $ - $ - $ 12,170,000 $ 600,600 $ 59,400 $ - $ - $<br />

12,830,000<br />

SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 4,850,000<br />

$<br />

4,850,000<br />

Estimated SDC $ - $ 332,000 $ 68,000<br />

$<br />

400,000<br />

Project Sub-Total $ - $ - $ - $ 4,850,000 $ 332,000 $ 68,000 $ - $ - $<br />

5,250,000<br />

SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 6,770,000<br />

$<br />

6,770,000<br />

Estimated SDC $ - $ 236,000 $ 164,000<br />

$<br />

400,000<br />

Project Sub-Total $ - $ - $ - $ 6,770,000 $ 236,000 $ 164,000 $ - $ - $<br />

7,170,000<br />

CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 3,915,500<br />

$<br />

3,915,500<br />

Estimated SDC $ - $ 74,100 $ 172,900<br />

$<br />

247,000<br />

Project Sub-Total $ - $ - $ - $ 3,915,500 $ 74,100 $ 172,900 $ - $ - $<br />

4,162,500<br />

CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 6,876,000<br />

$<br />

6,876,000<br />

Estimated SDC $ - $ 73,610 $ 359,390<br />

$<br />

433,000<br />

Project Sub-Total $ - $ - $ - $ 6,876,000 $ 73,610 $ 359,390 $ - $ - $<br />

7,309,000<br />

GNV31031158160.xlsx/110050009 1-7<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Comprehensive Rehabilitation Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 7,449,000<br />

$<br />

7,449,000<br />

Estimated SDC $ 23,350 $ 443,650<br />

$<br />

467,000<br />

Project Sub-Total $ - $ - $ - $ - $ 7,472,350 $ 443,650 $ - $ - $<br />

7,916,000<br />

CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 8,022,000<br />

$<br />

8,022,000<br />

Estimated SDC $ - $ 507,000<br />

$<br />

507,000<br />

Project Sub-Total $ - $ - $ - $ - $ 8,022,000 $ 507,000 $ - $ - $<br />

8,529,000<br />

SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 11,937,500<br />

$<br />

11,937,500<br />

Estimated SDC $ - $ 461,790 $ 271,210<br />

$<br />

733,000<br />

Project Sub-Total $ - $ - $ - $ - $ 11,937,500 $ 461,790 $ 271,210 $ - $<br />

12,670,500<br />

SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 11,937,500<br />

$<br />

11,937,500<br />

Estimated SDC $ - $ 278,540 $ 454,460<br />

$<br />

733,000<br />

Project Sub-Total $ - $ - $ - $ - $ 11,937,500 $ 278,540 $ 454,460 $ - $<br />

12,670,500<br />

SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 7,735,500<br />

$<br />

7,735,500<br />

Estimated SDC $ - $ 355,510 $ 131,490<br />

$<br />

487,000<br />

Project Sub-Total $ - $ - $ - $ - $ 7,735,500 $ 355,510 $ 131,490 $ - $<br />

8,222,500<br />

SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 5,157,000<br />

$<br />

5,157,000<br />

Estimated SDC $ - $ 179,850 $ 147,150<br />

$<br />

327,000<br />

Project Sub-Total $ - $ - $ - $ - $ 5,157,000 $ 179,850 $ 147,150 $ - $<br />

5,484,000<br />

CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 8,595,000<br />

$<br />

8,595,000<br />

Estimated SDC $ - $ 421,070 $ 111,930 $<br />

533,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 8,595,000 $ 421,070 $ 111,930 $<br />

9,128,000<br />

CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project)<br />

Estimated Find Work $ -<br />

$<br />

-<br />

Estimated Survey $ -<br />

$<br />

-<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 8,595,000<br />

$<br />

8,595,000<br />

Estimated SDC $ - $ 383,760 $ 149,240 $<br />

533,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 8,595,000 $ 383,760 $ 149,240 $<br />

9,128,000<br />

GNV31031158160.xlsx/110050009 1-9<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Comprehenisve Rehabilitation Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project)<br />

Estimated Find Work $ 530,000<br />

$<br />

530,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 360,000<br />

$<br />

360,000<br />

Estimated Construction $ 6,016,500<br />

$<br />

6,016,500<br />

Estimated SDC $ - $ 380,000<br />

$<br />

380,000<br />

Project Sub-Total $ - $ - $ - $ - $ 928,000 $ 6,016,500 $ 380,000 $ - $<br />

7,324,500<br />

SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project)<br />

Estimated Find Work $ 530,000<br />

$<br />

530,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 360,000<br />

$<br />

360,000<br />

Estimated Construction $ 6,112,000<br />

$<br />

6,112,000<br />

Estimated SDC $ - $ 367,650 $ 19,350 $<br />

387,000<br />

Project Sub-Total $ - $ - $ - $ - $ 928,000 $ 6,112,000 $ 367,650 $ 19,350 $<br />

7,427,000<br />

SGC-R-0003 (Ardenwood Drive - Winboume Street Area Rehabilitation Project)<br />

Estimated Find Work $ 410,000<br />

$<br />

410,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 280,000<br />

$<br />

280,000<br />

Estimated Construction $ 4,679,500<br />

$<br />

4,679,500<br />

Estimated SDC $ - $ 269,560 $ 23,440 $<br />

293,000<br />

Project Sub-Total $ - $ - $ - $ - $ 728,000 $ 4,679,500 $ 269,560 $ 23,440 $<br />

5,700,500<br />

SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project)<br />

Estimated Find Work $ 690,000<br />

$<br />

690,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 470,000<br />

$<br />

470,000<br />

Estimated Construction $ 7,926,500<br />

$<br />

7,926,500<br />

Estimated SDC $ 260,000 $ 240,000 $<br />

500,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 1,198,000 $ 8,186,500 $ 240,000 $<br />

9,624,500<br />

CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project)<br />

Estimated Find Work $ 870,000<br />

$<br />

870,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 600,000<br />

$<br />

600,000<br />

Estimated Construction $ 9,550,000<br />

$<br />

9,550,000<br />

Estimated SDC $ 48,000 $ 552,000 $<br />

600,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 1,508,000 $ 9,598,000 $ 552,000 $<br />

11,658,000<br />

SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project)<br />

Estimated Find Work $ 320,000<br />

$<br />

320,000<br />

Estimated Survey $ 38,000<br />

$<br />

38,000<br />

Estimated Design Engineering $ 220,000<br />

$<br />

220,000<br />

Estimated Construction $ 3,629,000<br />

$<br />

3,629,000<br />

Estimated SDC $ - $ 227,000 $<br />

227,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 578,000 $ 3,629,000 $ 227,000 $<br />

4,434,000<br />

Rehab Engineering Retainer Contracts<br />

Estimated Design Engineering $ 1,500,000 $ 1,000,000 $ 1,500,000 $ 1,000,000<br />

$<br />

5,000,000<br />

Estimated Construction $<br />

-<br />

Estimated SDC $<br />

-<br />

Project Sub-Total $ - $ 1,500,000 $ 1,000,000 $ 1,500,000 $ 1,000,000 $ - $ - $ - $<br />

5,000,000<br />

WWCS Evaluation & Management Project (06-WC-AR-0064)<br />

Estimated Design Engineering $<br />

-<br />

Estimated Construction $ 2,056,430<br />

$<br />

2,056,430<br />

Estimated SDC $ -<br />

$<br />

-<br />

Project Sub-Total $ - $ 2,056,430 $ - $ - $ - $ - $ - $ - $<br />

2,056,430<br />

Comprehensive Rehabilitation Estimated Total Project Cost $ - $ 26,000,000 $ 54,100,000 $ 53,800,000 $ 58,900,000 $ 40,600,000 $ 24,200,000 $ 1,300,000 $ 258,900,000<br />

GNV31031158160.xlsx/110050009 1-11<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Capacity Improvement Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements)<br />

Estimated Design Engineering $ 789,000<br />

$<br />

789,000<br />

Estimated Construction $ 10,498,000<br />

$<br />

10,498,000<br />

Estimated Land $ 58,000<br />

$<br />

58,000<br />

Estimated SDC $ 18,900 $ 296,100<br />

$<br />

315,000<br />

Project Sub-Total $ 789,000 $ -<br />

$ 10,574,900 $ 296,100 $ - $ - $ - $<br />

11,660,000<br />

NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 360,700<br />

$<br />

360,700<br />

Estimated Construction $ 1,550,300<br />

$<br />

1,550,300<br />

Estimated SDC $ 45,000<br />

$<br />

45,000<br />

Project Sub-Total $ 360,700 $ 1,595,300 $ - $ - $ - $ - $ - $ - $<br />

1,956,000<br />

NFE-C-0002 (Sullivan Rd./Lovett Rd./Wax Rd. Sewer Area Upgrades)<br />

Estimated Design Engineering $ 486,000<br />

$<br />

486,000<br />

Estimated Construction $ 2,200,000<br />

$<br />

2,200,000<br />

Estimated SDC $ - $ 24,700 $ 40,300<br />

$<br />

65,000<br />

Project Sub-Total $ 486,000 $ 2,200,000 $ 24,700 $ 40,300 $ - $ - $ - $ - $<br />

2,751,000<br />

NFE-C-0003 (Comite Road - Foster Road Sewer Area Upgrades - Phase I)<br />

Estimated Design Engineering $ 471,000<br />

$<br />

471,000<br />

Estimated Construction $ 1,925,000<br />

$<br />

1,925,000<br />

Estimated SDC $ - $ 9,000 $ 46,800 $ 4,200<br />

$<br />

60,000<br />

Project Sub-Total $ 471,000 $ 1,925,000 $ 9,000 $ 46,800 $ 4,200 $ - $ - $ - $<br />

2,456,000<br />

NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 367,000<br />

$<br />

367,000<br />

Estimated Construction $ 8,762,000<br />

$<br />

8,762,000<br />

Estimated SDC $ - $ 63,600 $ 201,400<br />

$<br />

265,000<br />

Project Sub-Total $ 367,000 $ 8,762,000 $ 63,600 $ 201,400 $ - $ - $ - $ - $<br />

9,394,000<br />

NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - general)<br />

Estimated Design Engineering $ 4,510,000<br />

$<br />

4,510,000<br />

Estimated Construction $ -<br />

$<br />

-<br />

Estimated Land $ 40,000 $ 68,587 $ 849,240<br />

$<br />

958,000<br />

Estimated SDC $ -<br />

$<br />

-<br />

Project Sub-Total $ - $ 4,550,000 $ 68,587 $ 849,240 $ - $ - $ - $ - $<br />

5,468,000<br />

NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - Ph I)<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 18,487,000<br />

$<br />

18,487,000<br />

Estimated Land $<br />

-<br />

Estimated SDC $ - $ 88,000 $ 363,000 $ 99,000<br />

$<br />

550,000<br />

Project Sub-Total $ - $ - $ - $ 18,487,000 $ 88,000 $ 363,000 $ 99,000 $ - $<br />

19,037,000<br />

NFW-C-HWY61-II (Zachary Area Transmission Network Improvements - Ph II)<br />

Estimated Design Engineering $<br />

-<br />

Estimated Construction $ 14,584,000<br />

$<br />

14,584,000<br />

Estimated Land $ 1,425,000<br />

$<br />

1,425,000<br />

Estimated SDC $ - $ 306,680 $ 144,320<br />

$<br />

451,000<br />

Project Sub-Total $ - $ - $ - $ 16,009,000 $ 306,680 $ 144,320 $ - $ - $<br />

16,460,000<br />

NFW-C-HWY61-III (Zachary Area Transmission Network Improvements - Ph III)<br />

Estimated Design Engineering $<br />

-<br />

Estimated Construction $ 8,948,000<br />

$<br />

8,948,000<br />

Estimated SDC $ - $ 42,880 $ 176,880 $ 48,240<br />

$<br />

268,000<br />

Project Sub-Total $ - $ - $ - $ 8,948,000 $ 42,880 $ 176,880 $ 48,240 $ - $<br />

9,216,000<br />

NFW-C-HWY61-IV (Zachary Area Transmission Network Improvements - Ph IV)<br />

Estimated Design Engineering $<br />

-<br />

Estimated Construction $ 7,091,000<br />

$<br />

7,091,000<br />

Estimated SDC $ - $ 31,800 $ 139,920 $ 40,280<br />

$<br />

212,000<br />

Project Sub-Total $ - $ - $ - $ 7,091,000 $ 31,800 $ 139,920 $ 40,280 $ - $<br />

7,303,000<br />

CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades)<br />

Estimated Design Engineering $ 809,000<br />

$<br />

809,000<br />

Estimated Construction $ 17,970,000<br />

$<br />

17,970,000<br />

Estimated SDC $ 91,800 $ 437,400 $ 10,800<br />

$<br />

540,000<br />

Project Sub-Total $ - $ 809,000<br />

$ 18,061,800 $ 437,400 $ 10,800 $ - $ - $<br />

19,319,000<br />

CGN-C-0005 (Downtown Area Pump Station Improvements)<br />

Estimated Design Engineering $ 900,000<br />

$<br />

900,000<br />

Estimated Construction $ 4,841,000<br />

$<br />

4,841,000<br />

Estimated SDC $ 2,900 $ 104,400 $ 37,700<br />

$<br />

145,000<br />

Project Sub-Total $ - $ 900,000<br />

$ 4,843,900 $ 104,400 $ 37,700 $ - $ - $<br />

5,886,000<br />

GNV31031158160.xlsx/110050009 1-13<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Capacity Improvement Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades)<br />

Estimated Design Engineering $ 532,000<br />

$<br />

532,000<br />

Estimated Construction $ 4,326,000<br />

$<br />

4,326,000<br />

Estimated SDC $ - $ 120,900 $ 9,100<br />

$<br />

130,000<br />

Project Sub-Total $ - $ 532,000 $ 4,326,000 $ 120,900 $ 9,100 $ - $ - $ - $<br />

4,988,000<br />

SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements)<br />

Estimated Design Engineering $ 480,000<br />

$<br />

480,000<br />

Estimated Construction $ 2,802,000<br />

$<br />

2,802,000<br />

Estimated SDC $ 31,450 $ 53,550<br />

$<br />

85,000<br />

Project Sub-Total $ - $ 480,000<br />

$ 2,833,450 $ 53,550 $ - $ - $ - $<br />

3,367,000<br />

Group Project 1A (Metro Airport Area Sewer Upgrades)<br />

Estimated Design Engineering $ 3,237,000<br />

$<br />

3,237,000<br />

Estimated Construction $ 19,581,000<br />

$<br />

19,581,000<br />

Estimated Land $ 840,000<br />

$<br />

840,000<br />

Estimated SDC $ - $ 70,200 $ 391,950 $ 122,850<br />

$<br />

585,000<br />

Project Sub-Total $ - $ 3,237,000 $ - $ 20,421,000 $ 70,200 $ 391,950 $ 122,850 $ - $<br />

24,243,000<br />

Group Project 1B (Metro AirportSewer Area PS and FM Upgrades)<br />

Estimated Design Engineering $ 2,561,000<br />

$<br />

2,561,000<br />

Estimated Construction $ 19,309,000<br />

$<br />

19,309,000<br />

Estimated Land $ 635,000<br />

$<br />

635,000<br />

Estimated SDC $ - $ 71,400 $ 398,650 $ 124,950<br />

$<br />

595,000<br />

Project Sub-Total $ - $ 2,561,000 $ - $ 19,944,000 $ 71,400 $ 398,650 $ 124,950 $ - $<br />

23,100,000<br />

SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements)<br />

Estimated Design Engineering $ 1,233,000<br />

$<br />

1,233,000<br />

Estimated Construction $ 7,730,000<br />

$<br />

7,730,000<br />

Estimated Land $ 203,000<br />

$<br />

203,000<br />

Estimated SDC $ - $ 88,800 $ 151,200<br />

$<br />

240,000<br />

Project Sub-Total $ - $ - $ 1,233,000 $ 7,933,000 $ 88,800 $ 151,200 $ - $ - $<br />

9,406,000<br />

SFL-C-0004 (Group Project 2 - Old Perkins - Highland Road Area Sewer Upgrades)<br />

Estimated Design Engineering $ 525,000<br />

$<br />

525,000<br />

Estimated Construction $ 3,476,000<br />

$<br />

3,476,000<br />

Estimated SDC $ - $ 7,350 $ 75,600 $ 22,050<br />

$<br />

105,000<br />

Project Sub-Total $ - $ 525,000 $ 3,476,000 $ 7,350 $ 75,600 $ 22,050 $ - $ - $<br />

4,106,000<br />

SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements)<br />

Estimated Design Engineering $ 1,574,000<br />

$<br />

1,574,000<br />

Estimated Construction $ 20,591,000<br />

$<br />

20,591,000<br />

Estimated Land $ 430,000<br />

$<br />

430,000<br />

Estimated SDC $ 18,600 $ 539,400 $ 62,000<br />

$<br />

620,000<br />

Project Sub-Total $ - $ 1,574,000<br />

$ 21,039,600 $ 539,400 $ 62,000 $ - $ - $<br />

23,215,000<br />

SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements)<br />

Estimated Design Engineering $ 1,127,000<br />

$<br />

1,127,000<br />

Estimated Construction $ 11,365,000<br />

$<br />

11,365,000<br />

Estimated Land $ 575,000<br />

$<br />

575,000<br />

Estimated SDC $ - $ 177,500 $ 177,500<br />

$<br />

355,000<br />

Project Sub-Total $ - $ - $ 1,127,000 $ - $ 11,940,000 $ 177,500 $ 177,500 $ - $<br />

13,422,000<br />

SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades)<br />

Estimated Design Engineering $ 534,000<br />

$<br />

534,000<br />

Estimated Construction $ 5,300,000<br />

$<br />

5,300,000<br />

Estimated Land $ 285,000<br />

$<br />

285,000<br />

Estimated SDC $ - $ 82,500 $ 82,500<br />

$<br />

165,000<br />

Project Sub-Total $ - $ - $ 534,000 $ - $ 5,585,000 $ 82,500 $ 82,500 $ - $<br />

6,284,000<br />

CGN-C-0002 (25th Street - North Acadian Thruway Capacity Improvements)<br />

Estimated Design Engineering $ 521,000<br />

$<br />

521,000<br />

Estimated Construction $ -<br />

$<br />

-<br />

Estimated SDC $ -<br />

$<br />

-<br />

Project Sub-Total $ - $ - $ 521,000 $ - $ - $ - $ - $ - $<br />

521,000<br />

GNV31031158160.xlsx/110050009 1-15<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Capacity Improvement Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades)<br />

Estimated Design Engineering $ 434,000<br />

$<br />

434,000<br />

Estimated Construction $ 4,680,000<br />

$<br />

4,680,000<br />

Estimated Land $ 190,000<br />

$<br />

190,000<br />

Estimated SDC $ - $ 72,500 $ 72,500<br />

$<br />

145,000<br />

Project Sub-Total $ - $ - $ 434,000 $ - $ 4,870,000 $ 72,500 $ 72,500 $ - $<br />

5,449,000<br />

NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 768,000<br />

$<br />

768,000<br />

Estimated Construction $ 8,000,000<br />

$<br />

8,000,000<br />

Estimated Land $ 490,000<br />

$<br />

490,000<br />

Estimated SDC $ - $ 125,000 $ 125,000<br />

$<br />

250,000<br />

Project Sub-Total $ - $ - $ 768,000 $ - $ 8,490,000 $ 125,000 $ 125,000 $ - $<br />

9,508,000<br />

SFU-C-0005 (O'Neal Lane Pipeline Improvements)<br />

Estimated Design Engineering $ 2,989,000<br />

$<br />

2,989,000<br />

Estimated Construction $ 17,286,000<br />

$<br />

17,286,000<br />

Estimated Land $ 1,035,000<br />

$<br />

1,035,000<br />

Estimated SDC $ - $ 272,500 $ 272,500<br />

$<br />

545,000<br />

Project Sub-Total $ - $ - $ - $ 2,989,000 $ 18,321,000 $ 272,500 $ 272,500 $ - $<br />

21,855,000<br />

SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr)<br />

Estimated Design Engineering $ 940,000<br />

$<br />

940,000<br />

Estimated Construction $ 5,950,000<br />

$<br />

5,950,000<br />

Estimated Land $ 175,000<br />

$<br />

175,000<br />

Estimated SDC $ 3,700 $ 144,300 $ 37,000<br />

$<br />

185,000<br />

Project Sub-Total $ - $ - $ 940,000 $ - $ 6,128,700 $ 144,300 $ 37,000 $ - $<br />

7,250,000<br />

SGC-C-PS58A (Pump Station 58 Replacement)<br />

Estimated Design Engineering $ 1,548,000<br />

$<br />

1,548,000<br />

Estimated Construction $ 15,750,000<br />

$<br />

15,750,000<br />

Estimated SDC $ - $ 121,250 $ 344,350 $ 19,400<br />

$<br />

485,000<br />

Project Sub-Total $ - $ - $ 1,548,000 $ 15,750,000 $ 121,250 $ 344,350 $ 19,400 $ - $<br />

17,783,000<br />

SGC-C-PS58FM-A (Staring Lane FM (Phase I - Burbank Dr to Highland Rd))<br />

Estimated Design Engineering $ 1,607,000<br />

$<br />

1,607,000<br />

Estimated Construction $ 4,616,000<br />

$<br />

4,616,000<br />

Estimated SDC $ 105,000 $ 35,000<br />

$<br />

140,000<br />

Project Sub-Total $ - $ 1,607,000 $ 4,721,000 $ 35,000 $ - $ - $ - $ - $<br />

6,363,000<br />

SGC-C-PS58FM-B (Staring Lane FM (Phase II - Highland Rd to Perkins Rd))<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 10,715,000<br />

$<br />

10,715,000<br />

Estimated SDC $ - $ 25,600 $ 265,600 $ 28,800<br />

$<br />

320,000<br />

Project Sub-Total $ - $ - $ - $ 10,715,000 $ 25,600 $ 265,600 $ 28,800 $ - $<br />

11,035,000<br />

SGC-C-PS58FM-C (Staring Lane FM (Phase III - Perkins Rd to PS 58))<br />

Estimated Design Engineering $ 471,000<br />

$<br />

471,000<br />

Estimated Construction $ 8,390,000<br />

$<br />

8,390,000<br />

Estimated Land $ 150,000<br />

$<br />

150,000<br />

Estimated SDC $ - $ 7,950 $ 235,850 $ 21,200<br />

$<br />

265,000<br />

Project Sub-Total $ - $ - $ 471,000 $ 8,540,000 $ 7,950 $ 235,850 $ 21,200 $ - $<br />

9,276,000<br />

SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr)<br />

Estimated Design Engineering $ 385,000<br />

$<br />

385,000<br />

Estimated Construction $ 2,560,000 $ -<br />

$<br />

2,560,000<br />

Estimated Land $ 175,000 $ -<br />

$<br />

175,000<br />

Estimated SDC $ 1,600 $ 43,200 $ 35,200<br />

$<br />

80,000<br />

Project Sub-Total $ - $ - $ 385,000 $ 2,735,000 $ 1,600 $ 43,200 $ 35,200 $ - $<br />

3,200,000<br />

SGC-C-0002 (Airline Highway Pipeline Improvements)<br />

Estimated Design Engineering $ 2,984,000<br />

$<br />

2,984,000<br />

Estimated Construction $ 35,240,000<br />

$<br />

35,240,000<br />

Estimated Land $ 575,000<br />

$<br />

575,000<br />

Estimated SDC $ - $ 629,850 $ 475,150<br />

$<br />

1,105,000<br />

Project Sub-Total $ - $ - $ 2,984,000 $ - $ 35,815,000 $ 629,850 $ 475,150 $ - $<br />

39,904,000<br />

GNV31031158160.xlsx/110050009 1-17<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Capacity Improvement Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road)<br />

Estimated Design Engineering $ 915,000<br />

$<br />

915,000<br />

Estimated Construction $ 5,919,000<br />

$<br />

5,919,000<br />

Estimated Land $ 183,000<br />

$<br />

183,000<br />

Estimated SDC $ 11,100 $ 173,900 $<br />

185,000<br />

Project Sub-Total $ - $ - $ - $ - $ 915,000 $ - $ 6,113,100 $ 173,900 $<br />

7,202,000<br />

SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - excluding LSU PS<br />

Estimated Design Engineering $ 1,720,000<br />

$<br />

1,720,000<br />

Estimated Construction $ 8,926,760<br />

$<br />

8,926,760<br />

Estimated Land $ 275,000<br />

$<br />

275,000<br />

Estimated SDC $ 5,500 $ 184,250 $ 85,250 $<br />

275,000<br />

Project Sub-Total $ - $ - $ - $ 1,720,000 $ - $ 9,207,260 $ 184,250 $ 85,250 $<br />

11,196,760<br />

SGC-C-0001 (Florida Blvd Pump Station Improvements)<br />

Estimated Design Engineering $ 2,235,000<br />

$<br />

2,235,000<br />

Estimated Construction $ 14,457,000<br />

$<br />

14,457,000<br />

Estimated Land $ 447,000<br />

$<br />

447,000<br />

Estimated SDC $ 22,250 $ 373,800 $ 48,950 $<br />

445,000<br />

Project Sub-Total $ - $ - $ - $ 2,235,000 $ - $ 14,926,250 $ 373,800 $ 48,950 $<br />

17,584,000<br />

NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />

Estimated Design Engineering $ 1,440,000<br />

$<br />

1,440,000<br />

Estimated Construction $ 9,315,000<br />

$<br />

9,315,000<br />

Estimated Land $ 288,000<br />

$<br />

288,000<br />

Estimated SDC $ - $ 162,400 $ 127,600 $<br />

290,000<br />

Project Sub-Total $ - $ - $ - $ - $ 1,440,000 $ 9,603,000 $ 162,400 $ 127,600 $<br />

11,333,000<br />

SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements)<br />

Estimated Design Engineering $ 925,000<br />

$<br />

925,000<br />

Estimated Construction $ 11,174,000<br />

$<br />

11,174,000<br />

Estimated Land $ 351,000<br />

$<br />

351,000<br />

Estimated SDC $ 21,000 $ 329,000 $<br />

350,000<br />

Project Sub-Total $ - $ - $ - $ 925,000 $ - $ - $ 11,546,000 $ 329,000 $<br />

12,800,000<br />

NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 1,100,000<br />

$<br />

1,100,000<br />

Estimated Construction $ 6,876,000<br />

$<br />

6,876,000<br />

Estimated Land $ 216,000<br />

$<br />

216,000<br />

Estimated SDC $ - $ 215,000 $<br />

215,000<br />

Project Sub-Total $ - $ - $ - $ - $ 1,100,000 $ - $ 7,092,000 $ 215,000 $<br />

8,407,000<br />

NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 1,200,000<br />

$<br />

1,200,000<br />

Estimated Construction $ 4,775,000<br />

$<br />

4,775,000<br />

Estimated Land $ 150,000<br />

$<br />

150,000<br />

Estimated SDC $ - $ 150,000 $<br />

150,000<br />

Project Sub-Total $ - $ - $ - $ - $ 1,200,000 $ - $ 4,925,000 $ 150,000 $<br />

6,275,000<br />

SGL-C-0003 (Highland Road Pipeline Improvements)<br />

Estimated Design Engineering $ 1,600,000<br />

$<br />

1,600,000<br />

Estimated Construction $ 17,763,000<br />

$<br />

17,763,000<br />

Estimated Land $ 558,000<br />

$<br />

558,000<br />

Estimated SDC $ - $ 224,000 $ 336,000 $<br />

560,000<br />

Project Sub-Total $ - $ - $ - $ 1,600,000 $ - $ 18,321,000 $ 224,000 $ 336,000 $<br />

20,481,000<br />

SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades)<br />

Estimated Design Engineering $ 740,000<br />

$<br />

740,000<br />

Estimated Construction $ 8,977,000<br />

$<br />

8,977,000<br />

Estimated Land $ 282,000<br />

$<br />

282,000<br />

Estimated SDC $ 16,800 $ 263,200 $<br />

280,000<br />

Project Sub-Total $ - $ - $ - $ 740,000 $ - $ - $ 9,275,800 $ 263,200 $<br />

10,279,000<br />

GNV31031158160.xlsx/110050009 1-19<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Capacity Improvement Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades)<br />

Estimated Design Engineering $ 3,508,000<br />

$<br />

3,508,000<br />

Estimated Construction $ 18,145,000<br />

$<br />

18,145,000<br />

Estimated Land $ 950,000<br />

$<br />

950,000<br />

Estimated SDC $ - $ 188,100 $ 381,900 $<br />

570,000<br />

Project Sub-Total $ - $ - $ - $ 3,508,000 $ - $ 19,095,000 $ 188,100 $ 381,900 $<br />

23,173,000<br />

NFE-C-0005 (Hooper Road Pump Station Improvements)<br />

Estimated Design Engineering $ 1,845,000<br />

$<br />

1,845,000<br />

Estimated Construction $ 11,935,000<br />

$<br />

11,935,000<br />

Estimated Land $ 650,000<br />

$<br />

650,000<br />

Estimated SDC $ - $ 99,900 $ 270,100<br />

$<br />

370,000<br />

Project Sub-Total $ - $ - $ - $ 1,845,000 $ 12,585,000 $ 99,900 $ 270,100 $ - $<br />

14,800,000<br />

NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd)<br />

Estimated Design Engineering $ 735,000<br />

$<br />

735,000<br />

Estimated Construction $ - $ 4,754,000<br />

$<br />

4,754,000<br />

Estimated Land $ - $ 147,000<br />

$<br />

147,000<br />

Estimated SDC $ - $ 31,900 $ 113,100 $<br />

145,000<br />

Project Sub-Total $ - $ - $ - $ - $ 735,000 $ - $ 4,932,900 $ 113,100 $<br />

5,781,000<br />

SFU-C-0002A (O'Neal Lane Pump Station Improvements - Group A)<br />

Estimated Design Engineering $ 1,890,000<br />

$<br />

1,890,000<br />

Estimated Construction $ 12,226,000<br />

$<br />

12,226,000<br />

Estimated Land $ 378,000<br />

$<br />

378,000<br />

Estimated SDC $ 19,000 $ 319,200 $ 41,800 $<br />

380,000<br />

Project Sub-Total $ - $ - $ - $ 1,890,000 $ - $ 12,623,000 $ 319,200 $ 41,800 $<br />

14,874,000<br />

SFU-C-0002B (O'Neal Lane Pump Station Improvements - Group B)<br />

Estimated Design Engineering $ 1,515,000<br />

$<br />

1,515,000<br />

Estimated Construction $ 9,800,000<br />

$<br />

9,800,000<br />

Estimated Land $ 303,000<br />

$<br />

303,000<br />

Estimated SDC $ 15,250 $ 256,200 $ 33,550 $<br />

305,000<br />

Project Sub-Total $ - $ - $ - $ 1,515,000 $ - $ 10,118,250 $ 256,200 $ 33,550 $<br />

11,923,000<br />

SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane)<br />

Estimated Design Engineering $ 630,000<br />

$<br />

630,000<br />

Estimated Construction $ 4,075,000<br />

$<br />

4,075,000<br />

Estimated Land $ 126,000<br />

$<br />

126,000<br />

Estimated SDC $ - $ 41,250 $ 83,750 $<br />

125,000<br />

Project Sub-Total $ - $ - $ - $ - $ 630,000 $ 4,201,000 $ 41,250 $ 83,750 $<br />

4,956,000<br />

CC-WWTP-PS (Pump Station 42)<br />

Estimated Design Engineering $ 1,447,000<br />

$<br />

1,447,000<br />

Estimated Construction $ 6,695,070<br />

$<br />

6,695,070<br />

Estimated SDC $ - $ 90,200 $ 114,800<br />

$<br />

205,000<br />

Project Sub-Total $ - $ - $ 1,447,000 $ 6,695,070 $ 90,200 $ 114,800 $ - $ - $<br />

8,347,070<br />

CC-East-PS (Central Consolidated Pump Stations)<br />

Estimated Design Engineering $ 1,804,000<br />

$<br />

1,804,000<br />

Estimated Construction $ 15,240,000<br />

$<br />

15,240,000<br />

Estimated Land $ 335,000<br />

$<br />

335,000<br />

Estimated SDC $ - $ 272,600 $ 197,400<br />

$<br />

470,000<br />

Project Sub-Total $ - $ - $ 1,804,000 $ 15,575,000 $ 272,600 $ 197,400 $ - $ - $<br />

17,849,000<br />

CC-WWTP-FM (Pump Station 42 Forcemain)<br />

Estimated Design Engineering $ 1,608,000<br />

$<br />

1,608,000<br />

Estimated Construction $ 25,021,000<br />

$<br />

25,021,000<br />

Estimated Land $ 375,000<br />

$<br />

375,000<br />

Estimated SDC $ - $ 243,350 $ 541,650<br />

$<br />

785,000<br />

Project Sub-Total $ - $ - $ 1,608,000 $ 25,396,000 $ 243,350 $ 541,650 $ - $ - $<br />

27,789,000<br />

CC-East-FM (Central Consolidated Forcemain)<br />

Estimated Design Engineering $ 1,387,000<br />

$<br />

1,387,000<br />

Estimated Construction $ 14,570,000<br />

$<br />

14,570,000<br />

Estimated Land $ 435,000<br />

$<br />

435,000<br />

Estimated SDC $ - $ 262,200 $ 197,800<br />

$<br />

460,000<br />

Project Sub-Total $ - $ - $ 1,387,000 $ 15,005,000 $ 262,200 $ 197,800 $ - $ - $<br />

16,852,000<br />

Capacity Improvement Estimated Total Project Cost $ 2,500,000 $ 31,300,000 $ 29,900,000 $ 276,900,000 $ 113,000,000 $ 103,500,000 $ 47,700,000 $ 2,400,000 $ 607,100,000<br />

GNV31031158160.xlsx/110050009 1-21<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

Wastewater Treatment/Storage Projects<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

NFW-C-0002 (Choctaw Storage and Pump Station Facility)<br />

Estimated Design Engineering $ 4,227,000<br />

$<br />

4,227,000<br />

Estimated Construction $ 43,237,000<br />

$<br />

43,237,000<br />

Estimated Land $ 1,218,720<br />

$ 285,280<br />

$<br />

1,504,000<br />

Estimated SDC $ -<br />

$ 1,185,000 $ 315,000<br />

$<br />

1,500,000<br />

Project Sub-Total $ 1,218,720 $ 4,227,000 $ - $ 43,522,280 $ 1,185,000 $ 315,000 $ - $ - $<br />

50,468,000<br />

NFW-C-0004 (Hooper Storage Facility)<br />

Estimated Design Engineering $ 1,555,000<br />

$<br />

1,555,000<br />

Estimated Construction $ 19,115,000<br />

$<br />

19,115,000<br />

Estimated Land $ 195,000<br />

$<br />

195,000<br />

Estimated SDC $ - $ 483,800 $ 106,200<br />

$<br />

590,000<br />

Project Sub-Total $ - $ - $ 1,555,000 $ 19,310,000 $ 483,800 $ 106,200 $ - $ - $<br />

21,455,000<br />

STP-C-0001 (South WWTP - Phase 1)<br />

Estimated Design Engineering $ 8,200,000<br />

$<br />

8,200,000<br />

Estimated Construction $ 108,200,000<br />

$ 108,200,000<br />

Estimated Land $ 6,400,000<br />

$<br />

6,400,000<br />

Estimated SDC $ - $ 81,000 $ 1,269,000 $ 1,269,000 $ 81,000<br />

$<br />

2,700,000<br />

Project Sub-Total $ - $ 8,200,000 $ 114,600,000 $ 81,000 $ 1,269,000 $ 1,269,000 $ 81,000 $ - $ 125,500,000<br />

STP-C-0002 (South WWTP - Phase 2-PDP)<br />

Estimated Design Engineering $ 9,560,000<br />

$<br />

9,560,000<br />

Estimated Construction $ 92,179,000<br />

$<br />

92,179,000<br />

Estimated Land $ 65,000<br />

$<br />

65,000<br />

Estimated SDC $ - $ 162,000 $ 1,593,000 $ 945,000<br />

$<br />

2,700,000<br />

Project Sub-Total $ - $ - $ 9,560,000 $ 65,000 $ 92,341,000 $ 1,593,000 $ 945,000 $ - $ 104,504,000<br />

SSO Odor Control NWWTP (07-TP-BD-0030)<br />

Estimated Design Engineering $ 101,000<br />

$<br />

101,000<br />

Estimated Construction $ 1,486,000<br />

$<br />

1,486,000<br />

Estimated SDC $<br />

-<br />

Project Sub-Total $ 101,000 $ 1,486,000 $ - $ - $ - $ - $ - $ - $<br />

1,587,000<br />

SWWTP IAP (08-TP-BD-0031)<br />

Estimated Design Engineering $ 2,839,112<br />

$<br />

2,839,112<br />

Estimated Construction $ 27,175,888<br />

$<br />

27,175,888<br />

Estimated SDC $ -<br />

$<br />

-<br />

Project Sub-Total $ 2,839,112 $ 27,175,888 $ - $ - $ - $ - $ - $ - $<br />

30,015,000<br />

WW Treatment/Storage Estimated Total Project Cost $ 4,200,000 $ 41,100,000 $ 125,700,000 $ 63,000,000 $ 95,300,000 $ 3,300,000 $ 1,030,000 $ - $ 333,500,000<br />

Estimated Construction Management Total (Based on 33%/50% - rehab/capacity - of SDC cost) $ - $ 48,000 $ 775,000 $ 1,911,000 $ 8,473,000 $ 11,311,000 $ 6,529,000 $ 3,064,000 $<br />

32,100,000<br />

Estimated <strong>Program</strong> Management Total $ 6,122,902 $ 10,074,758 $ 11,095,242 $ 15,516,000 $ 12,841,000 $ 12,336,000 $ 11,661,000 $ 5,933,000 $<br />

85,600,000<br />

Estimated Total of Construction Management and <strong>Program</strong> Management $ 6,122,902 $ 10,122,758 $ 11,870,242 $ 17,427,000 $ 21,314,000 $ 23,647,000 $ 18,190,000 $ 8,997,000 $ 117,700,000<br />

Total Estimated Wet Weather <strong>Program</strong> Cost (Sept. 2007 Dollars) $ 12,820,000 $ 108,520,000 $ 221,570,000 $ 411,130,000 $ 288,510,000 $ 171,050,000 $ 91,120,000 $ 12,700,000 $ 1,317,000,000<br />

Total Estimated Wet Weather <strong>Program</strong> Cost (Considering 3% Per Year Inflation Rate) $ 12,820,000 $ 108,520,000 $ 221,570,000 $ 411,130,000 $ 288,510,000 $ 175,500,000 $ 95,600,000 $ 13,000,000 $ 1,327,000,000<br />

GNV31031158160.xlsx/110050009 1-23<br />

JANUARY 2011<br />

REV. 5


TABLE 1-1<br />

Project Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

"Preliminary Master <strong>Plan</strong>"<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Project Description Estimated Cost<br />

STP-C-0002 (South WWTP - Phase 2 - MP)<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 15,040,000<br />

$<br />

15,040,000<br />

Estimated SDC $ -<br />

$<br />

-<br />

Project Sub-Total $ - $ - $ - $ - $ 15,040,000 $ - $ - $ - $<br />

15,040,000<br />

Sewer System & WWTP Backup Power <strong>Program</strong><br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 10,100,000 $ 10,000,000 $ 7,500,000 $ 2,500,000 $ 400,000<br />

$<br />

30,500,000<br />

Estimated SDC $ 305,000 $ 300,000 $ 225,000 $ 75,000 $ 10,000<br />

$<br />

915,000<br />

Project Sub-Total $ - $ - $ 10,405,000 $ 10,300,000 $ 7,725,000 $ 2,575,000 $ 410,000 $ - $<br />

31,415,000<br />

North WWTP Backup Power<br />

Estimated Design Engineering $ 385,000 $<br />

385,000<br />

Estimated Construction $ 5,337,000 $<br />

5,337,000<br />

Estimated SDC $ - $ - $ - $ - $ - $ 165,000 $<br />

165,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 5,887,000 $<br />

5,887,000<br />

Choctaw Sewer Collection Maintenance Facility<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 14,943,000<br />

$<br />

14,943,000<br />

Estimated SDC $ 460,000<br />

$<br />

460,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 15,403,000 $ - $ - $<br />

15,403,000<br />

SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway - LSU Pump Station)<br />

Estimated Design Engineering $<br />

-<br />

Estimated Construction $ 2,154,000<br />

$<br />

2,154,000<br />

Estimated SDC $ 1,300 $ 43,550 $ 20,150 $<br />

65,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ 2,155,300 $ 43,550 $ 20,150 $<br />

2,219,000<br />

North WWTP Priority One (Urgent Needs) Project<br />

Estimated Design Engineering $ -<br />

$ 740,000 $<br />

740,000<br />

Estimated Construction $ -<br />

$<br />

10,188,000<br />

Estimated SDC $ -<br />

$<br />

300,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 740,000 $<br />

11,228,000<br />

North WWTP Priority Two (O&M Needs) Project<br />

Estimated Design Engineering $ - $ 1,197,000 $<br />

1,197,000<br />

Estimated Construction $ - $<br />

16,592,000<br />

Estimated SDC $ - $<br />

500,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 1,197,000 $<br />

18,289,000<br />

North WWTP SCADA<br />

Estimated Design Engineering $ 161,000 $<br />

161,000<br />

Estimated Construction $ -<br />

$ 2,232,000 $<br />

2,232,000<br />

Estimated SDC $ -<br />

$ 70,000 $<br />

70,000<br />

Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 2,463,000 $<br />

2,463,000<br />

Collection System SCADA<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 6,258,500 $ 6,258,500<br />

$<br />

12,517,000<br />

Estimated SDC $ 192,500 $ 192,500<br />

$<br />

385,000<br />

Project Sub-Total $ - $ - $ - $ - $ 6,451,000 $ 6,451,000 $ - $ - $<br />

12,902,000<br />

SCADA Operations Data/Control Center<br />

Estimated Design Engineering $ -<br />

$<br />

-<br />

Estimated Construction $ 1,164,000<br />

$<br />

1,164,000<br />

Estimated SDC $ 50,000<br />

$<br />

50,000<br />

Project Sub-Total $ - $ - $ - $ - $ 1,214,000 $ - $ - $ - $<br />

1,214,000<br />

"Preliminary Master <strong>Plan</strong>" Total Project Cost $ - $ - $ 10,500,000 $ 10,300,000 $ 30,400,000 $ 26,600,000 $ 450,000 $ 10,300,000 $ 116,100,000<br />

Total Estimated <strong>Program</strong> Cost (Sept. 2007 Dollars) $ 12,800,000 $ 108,500,000 $ 232,100,000 $ 421,400,000 $ 318,900,000 $ 197,600,000 $ 91,600,000 $ 23,000,000 $ 1,433,000,000<br />

Total Estimated <strong>Program</strong> Cost (Considering 3% Per Year Inflation Rate) $ 12,800,000 $ 108,500,000 $ 232,100,000 $ 421,400,000 $ 318,900,000 $ 202,800,000 $ 96,100,000 $ 24,300,000 $ 1,448,000,000<br />

GNV31031158160.xlsx/110050009 1-25<br />

JANUARY 2011<br />

REV. 5


This page intentionally left blank.<br />

GNV31031158160.XLSX/110050009 1-26 JANUARY 2011<br />

REV. 5


FIGURE 1-1<br />

<strong>Program</strong> Funding Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

450,000,000<br />

Estim mated Total <strong>Program</strong> Cost<br />

400,000,000<br />

350,000,000<br />

300,000,000<br />

250,000,000<br />

200,000,000<br />

150,000,000000 000<br />

REHAB<br />

CAPACITY<br />

WWTP/STORAGE<br />

"PRELIM. MASTER PLAN"<br />

OVERALL PROGRAM<br />

100,000,000<br />

50,000,000<br />

0<br />

2007 2008 2009 2010 2011 2012 2013 2014<br />

Year<br />

GNV31031158160.xlsx/110050009 1-27<br />

JANUARY 2011<br />

REV. 5


This page intentionally left blank.<br />

GNV31031158160.XLSX/110050009 1-28 JANUARY 2011<br />

REV. 5


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

1 SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

2 SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project) - construction<br />

3 SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project) - pre-construction<br />

4 SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project) - construction<br />

5 SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project) - pre-construction<br />

6 SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project) - construction<br />

7 SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project) - pre-construction<br />

8 SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project) - construction<br />

9 NGS-R-0002 (Scotland Avenue - Progress Road Area Rehabilitation Project) - pre-construction<br />

10 NGS-R-0002 (Scotland Avenue - Progress Road Rehabilitation Project) - construction<br />

11 NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project) - pre-construction<br />

12 NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project) - construction<br />

13 SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project) - pre-construction<br />

14 SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project) - construction<br />

15 SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project) - pre-construction<br />

16 SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project) - construction<br />

17 CGS-R-0001 (Foster Drive - Government Street Area Rehabilitation Project) - pre-construction<br />

18 CGS-R-0001 (Foster Drive - Government Street Area Rehabilitation Project) - construction<br />

19 NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project) - pre-construction<br />

20 NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project) - construction<br />

21 NFW-R-0001a (Brookstown Road - Evangeline Street - Phase I Area Rehabilitation Project) - pre-construction<br />

22 NFW-R-0001a (Brookstown Road - Evangeline Street - Phase I Area Rehabilitation Project) - construction<br />

23 NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project) - pre-construction<br />

24 NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project) - construction<br />

25 SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project) - pre-construction<br />

26 SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project) - construction<br />

27 SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project) - pre-construction<br />

28 SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project) - construction<br />

29 CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project) - pre-construction<br />

30 CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project) - construction<br />

31 CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project) - pre-construction<br />

32 CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project) - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-29 JANUARY 2011<br />

REV 6


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

33 CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

34 CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project) - construction<br />

35 CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project) - pre-construction<br />

36 CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project) - construction<br />

37 SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project) - pre-construction<br />

38 SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project) - construction<br />

39 SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project)- pre-construction<br />

40 SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project) - construction<br />

41 SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project) - pre-construction<br />

42 SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project) - construction<br />

43 SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project) - pre-construction<br />

44 SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project) - construction<br />

45 CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project) - pre-construction<br />

46 CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project) - construction<br />

47 CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project) - pre-construction<br />

48 CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project) - construction<br />

49 NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project) - pre-construction<br />

50 NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project) - construction<br />

51 SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project) - pre-construction<br />

52 SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project) - construction<br />

53 SGC-R-0003 (Ardenwood Drive - Winbourne Street Area Rehabilitation Project) - pre-construction<br />

54 SGC-R-0003 (Ardenwood Drive - Winbourne Street Area Rehabilitation Project) - construction<br />

55 SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project) - pre-construction<br />

56 SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project) - construction<br />

57 CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project) - pre-construction<br />

58 CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project) - construction<br />

59 SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project) - pre-construction<br />

60 SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project) - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-31 JANUARY 2011<br />

REV 6


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

61 CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

62 CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements) - construction<br />

63 NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades) - pre-construction<br />

64 NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades) - construction<br />

65 NFE-C-0002 (Sullivan Road / Lovett Road / Wax Road Sewer Area Upgrades) - pre-construction<br />

66 NFE-C-0002 (Sullivan Road / Lovett Road / Wax Road Sewer Area Upgrades) - construction<br />

67 NFE-C-0003 (Comite Drive - Foster Road Sewer Area Upgrades - Phase 1) - pre-construction<br />

68 NFE-C-0003 (Comite Drive - Foster Road Sewer Area Upgrades - Phase 1) - construction<br />

69 NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades) - pre-construction<br />

70 NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades) - construction<br />

71 NFW-C-HWY61-I (ZATNIP - Phase I) - pre-construction<br />

72 NFW-C-HWY61-I (ZATNIP - Phase I) - construction<br />

73 NFW-C-HWY61-II (ZATNIP - Phase II) - pre-construction<br />

74 NFW-C-HWY61-II (ZATNIP - Phase II) - construction<br />

75 NFW-C-HWY61-III (ZATNIP - Phase III) - pre-construction<br />

76 NFW-C-HWY61-III (ZATNIP - Phase III) - construction<br />

77 NFW-C-HWY61-IV (ZATNIP - Phase IV) - pre-construction<br />

78 NFW-C-HWY61-IV (ZATNIP - Phase IV) - construction<br />

79 CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades) - pre-construction<br />

80 CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades) - construction<br />

81 CGN-C-0005 (Downtown Area Pump Stations Improvements) - pre-construction<br />

82 CGN-C-0005 (Downtown Area Pump Station Improvements) - construction<br />

83 CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades) - pre-construction<br />

84 CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades) - construction<br />

85 SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements) - pre-construction<br />

86 SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements) - construction<br />

87 Group Project 1A (Metro Airport Area Sewer Upgrades) - pre-construction<br />

88 Group Project 1A (Metro Airport Area Sewer Upgrades) - construction<br />

89 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) - pre-construction<br />

90 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) - construction<br />

91 SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements) - pre-construction<br />

92 SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements) - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-33 JANUARY 2011<br />

REV 6


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

93 Group Project 2 (Old Perkins - Highland Road Area Sewer Upgrades) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

94 Group Project 2 (Old Perkins - Highland Road Area Sewer Upgrades) - construction<br />

95 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) - pre-construction<br />

96 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) - construction<br />

97 SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements) - pre-construction<br />

98 SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements) - construction<br />

99 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) - pre-construction<br />

100 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) - construction<br />

101 CGN-C-0002 (25th Street - North Acadian Thruway Capacity Improvements) - pre-construction<br />

102 CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades) - pre-construction<br />

103 CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades) - construction<br />

104 NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades) - pre-construction<br />

105 NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades) - construction<br />

106 SFU-C-0005 (O'Neal Lane Pipeline Improvements) - pre-construction<br />

107 SFU-C-0005 (O'Neal Lane Pipeline Improvements) - construction<br />

108 SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) - pre-construction<br />

109 SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) - construction<br />

110 SGC-C-PS58A (Pump Station 58 Improvements) - pre-construction<br />

111 SGC-C-PS58A (Pump Station 58 Improvements) - construction<br />

112 SGC-C-PS58FM-A (Staring Lane FM (Ph I - Burbank Dr to Highland Rd)) - pre-construction<br />

113 SGC-C-PS58FM-A (Staring Lane FM (Ph I - Burbank Dr to Highland Rd)) - construction<br />

114 SGC-C-PS58FM-B (Staring Lane FM (Ph II - Highland Rd to Perkins Rd)) - pre-construction<br />

115 SGC-C-PS58FM-B (Staring Lane FM (Ph II - Highland Rd to Perkins Rd)) - construction<br />

116 SGC-C-PS58FM-C (Staring Lane FM (Ph III - Perkins Rd to PS 58)) - pre-construction<br />

117 SGC-C-PS58FM-C (Staring Lane FM (Ph III - Perkins Rd to PS 58)) - construction<br />

118 SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) - pre-construction<br />

119 SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) - construction<br />

120 SGC-C-0002 (Airline Hwy Pipeline Improvements) - pre-construction<br />

121 SGC-C-0002 (Airline Hwy Pipeline Improvements) - construction<br />

122 SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - pre-construction<br />

123 SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-35 JANUARY 2011<br />

REV 6


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

124 SGC-C-0001 (Florida Boulevard Pump Station Improvements) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

125 SGC-C-0001 (Florida Boulevard Pump Station Improvements) - construction<br />

126 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) - pre-construction<br />

127 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) - construction<br />

128 NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road) - pre-construction<br />

129 NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road) - construction<br />

130 SFU-C-0002a (O'Neal Lane Pump Station Improvements - Group A) - pre-construction<br />

131 SFU-C-0002a (O'Neal Lane Pump Station Improvements - Group A) - construction<br />

132 SFU-C-0002b (O'Neal Lane Pump Station Improvements - Group B) - pre-construction<br />

133 SFU-C-0002b (O'Neal Lane Pump Station Improvements - Group B) - construction<br />

134 SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements) - pre-construction<br />

135 SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements) - construction<br />

136 NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades) - pre-construction<br />

137 NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades) - construction<br />

138 NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades) - pre-construction<br />

139 NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades) - construction<br />

140 SGL-C-0003 (Highland Road Pipeline Improvements) - pre-construction<br />

141 SGL-C-0003 (Highland Road Pipeline Improvements) - construction<br />

142 SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades) - pre-construction<br />

143 SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades) - construction<br />

144 NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades) - pre-construction<br />

145 NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades) - construction<br />

146 NFE-C-0005 (Hooper Road Pump Station Improvements) - pre-construction<br />

147 NFE-C-0005 (Hooper Road Pump Station Improvements) - construction<br />

148 NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd) - pre-construction<br />

149 NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd) - construction<br />

150 SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane) - pre-construction<br />

151 SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane) - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-37 JANUARY 2011<br />

REV 6


FIGURE 1-2<br />

<strong>Program</strong> Schedule<br />

<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

ID<br />

Task Name<br />

152 CC-WWTP-PS (Pump Station 42) - pre-construction<br />

2007 2008 2009 2010 2011 2012 2013 2014 2015<br />

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />

153 CC-WWTP-PS (Pump Station 42) - construction<br />

154 CC-WWTP-FM (Pump Station 42 Forcemain) - pre-construction<br />

155 CC-WWTP-FM (Pump Station 42 Forcemain) - construction<br />

156 CC-East-PS (Central Consolidation Pump Stations) - pre-construction<br />

157 CC-East-PS (Central Consolidation Pump Stations) - construction<br />

158 CC-East-FM (Central Consolidated Forcemains) - pre-construction<br />

159 CC-East-FM (Central Consolidated Forcemains) - construction<br />

160 NFW-C-0002 (Choctaw Storage and Pump Station Facility) - pre-construction<br />

161 NFW-C-0002 (Choctaw Storage and Pump Station Facility) - construction<br />

162 NFW-C-0004 (Hooper Storage Facility) - pre-construction<br />

163 NFW-C-0004 (Hooper Storage Facility) - construction<br />

164 STP-C-0001 (SWWTP Wet Weather Improvements - Phase I) - pre-construction<br />

165 STP-C-0001 (SWWTP Wet Weather Improvements - Phase I) - construction<br />

166 STP-C-0002 (SWWTP Wet Weather Improvements - Phase II) - pre-construction<br />

167 STP-C-0002 (SWWTP Wet Weather Improvements - Phase II) - construction<br />

168 SWWTP Immediate Action Projects - pre-construction<br />

169 SWWTP Immediate Action Projects - construction<br />

Project: BTR_<strong>Program</strong>_Schedule_brok<br />

Date: Thu 1/27/11<br />

Task<br />

Split<br />

Progress<br />

Milestone<br />

Summary<br />

Project Summary<br />

External Tasks<br />

External Milestone<br />

Deadline<br />

1-39 JANUARY 2011<br />

REV 6


SECTION 2<br />

<strong>Plan</strong>ning Description<br />

2.1 <strong>Plan</strong>ning Overview<br />

This section describes the process used to define the projects outlined in this report. This<br />

planning was necessary to meet the goals of the C-P for a sewer system rehabilitation and<br />

replacement program for SSO reduction.<br />

2.2 Comprehensive Rehabilitation <strong>Plan</strong>ning<br />

Rainfall dependent infiltration/inflow (RDII) is the major cause of wet weather related<br />

capacity deficiencies. Previously conducted concurrent monitoring of flow and rainfall<br />

throughout the wastewater collection system during several rainfall events of different<br />

magnitudes was used to characterize RDII and predict the system’s wet weather response to<br />

rainfall.<br />

The collected data were then used to set up and calibrate a computational BTRSSO<br />

hydraulic model of the Baton Rouge collection and transmission system. Each subcatchment<br />

or drainage area was evaluated to establish the share of the rainfall that is<br />

predicted to enter the sewer system. Sub-catchments in which the RDII was excessive are<br />

scheduled for rehabilitation.<br />

The sub-catchments selected for comprehensive rehabilitation were then arranged into 30<br />

projects. Sections 3, 4, and 5 of this report describe the comprehensive rehabilitation<br />

projects.<br />

The sub-catchments selected for rehabilitation will undergo a review of the rehabilitation<br />

work already completed by the DPW. Portions of the sub-catchments that have been<br />

previously rehabilitated will be deleted from the individual rehabilitation projects.<br />

2.3 Capacity Improvement <strong>Plan</strong>ning<br />

Capacity improvement planning for the <strong>Program</strong> is based on evaluating and replacing those<br />

facilities in the collection system where the <strong>Program</strong> hydraulic modeling and field<br />

information indicate that the existing collection or transmission system is inadequate to<br />

handle the future peak wet weather flows appropriately.<br />

For this analysis, the C-P was divided into ten hydraulically independent basins in order to<br />

separate the collection and transmission systems for analysis. The <strong>Program</strong> Manager (PM)<br />

developed a process for evaluating the hydraulic model and analyzing its output. The PM<br />

utilized planning and design criteria as a basis for the process overview.<br />

The PM prepared and used a 12-step hydraulic basin analysis method throughout the<br />

planning process. The 12-step process included the following components:<br />

1. Dynamic model runs for evaluation of the capacity of existing pipes with predicted postrehabilitation<br />

flows<br />

GNV31031158569.DOCX/110050010 2-1 JANUARY 2011<br />

REV. 5


SECTION 2. PLANNING DESCRIPTION<br />

2. Steady state calculations for evaluation of required pipe capacity<br />

3. Dynamic models runs for evaluation of existing pipes with future flows added to postrehabilitation<br />

flows<br />

4. Steady state calculations for evaluation of required pipe capacity with future flows<br />

5. Test of the revised model for its ability to handle future wet weather flows<br />

6. Evaluation of the model output for acceptable design criteria and physical evidence of<br />

overflows<br />

7. Documentation of project list<br />

8. DPW endorsement<br />

9. Prioritization of projects<br />

10. Development of planning level cost estimates<br />

11. Determine projects for reduction of existing SSOs<br />

12. Definition of projects<br />

Based on these steps, the capacity projects, described in Sections 3, 4, and 5 of this report<br />

were developed.<br />

2.4 Wastewater Treatment/Storage <strong>Plan</strong>ning<br />

The wastewater treatment planning process began in 2006 and concluded with the<br />

development of the Master <strong>Plan</strong> (CH2M HILL, 2008). The following documents describe the<br />

planning efforts:<br />

<br />

<br />

Technical Memorandum entitled Addressing Existing Noncompliance Issues and Future<br />

Wet-weather Flow Management Requirements for the South Wastewater Treatment <strong>Plan</strong>t:<br />

Summary of Findings and Recommendations (CH2M HILL, 2006)<br />

South Wastewater Treatment <strong>Plan</strong>t Immediate Action <strong>Plan</strong> Basis of Design Report<br />

(CH2M HILL, 2007)<br />

Draft Wastewater Master <strong>Plan</strong> (CH2MHILL, 2008)<br />

<br />

Consolidation of South and Central Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge TM<br />

(CH2M HILL, 2008)<br />

This document describes the immediate action projects and wet weather capacity project for<br />

the South WWTP only. No wet weather capacity projects are required at the North WWTP.<br />

Other improvements at the treatment plants are not a part of this plan, since they are<br />

included in the Draft Master <strong>Plan</strong> (CH2MHILL, May 2008). Four of the preliminary master<br />

plan projects however, are briefly described in this document involve construction at the<br />

North WWTP, specifically those involving the priority one improvements, priority two<br />

improvements, standby generators and SCADA.<br />

This document also describes additional improvements that will be necessary at the South<br />

WWTP in order to consolidate the Central WWTP with the South WWTP. These<br />

GNV31031158569.DOCX/110050010 2-2 JANUARY 2011<br />

REV. 5


SECTION 2. PLANNING DESCRIPTION<br />

improvements include additional influent pumping and storage at the South WWTP to<br />

accommodate future wet weather peak flows from the Central WWTP.<br />

Storage for shaving of peak hydraulic flows in the system is employed to reduce the scope<br />

and cost of downstream capacity projects and treatment plant capacity. Storage facilities are<br />

reservoirs that retain wet weather flows for a short time until the wet weather period is past.<br />

At the end of the wet weather period, the flow is returned to the collection system for<br />

transport and treatment. Each storage facility is sized for the 2-year frequency, 12-hour<br />

duration storm event. The storage facilities will be used in any significant rain event in the<br />

future.<br />

GNV31031158569.DOCX/110050010 2-3 JANUARY 2011<br />

REV. 5


SECTION 2. PLANNING DESCRIPTION<br />

This page intentionally left blank.<br />

GNV31031158569.DOCX/110050010 2-4 JANUARY 2011<br />

REV. 5


SECTION 3<br />

South Basin Projects<br />

Section 3 presents summaries of the South Gravity System Comprehensive Rehabilitation<br />

Projects, the South Gravity System Capacity Improvement Projects, the South Forced System<br />

Comprehensive Rehabilitation Projects, the South Forced System Capacity Improvement<br />

Projects, and the South WWTP Projects. These projects are all shown on Figures 3-1 and 3-2.<br />

As of October 2010, there are three projects functionally completed, eight projects under<br />

construction, and 16 projects under design in the South Basin.<br />

The project summaries presented herein represent the information available during this<br />

annual update period. The PDP is revisited on an annual basis and revised as necessary<br />

based on results of additional hydraulic wastewater modeling, immediate needs, DPW and<br />

public input, and other factors.<br />

GNV31031158547.DOCX/103440004 3-1 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158547.DOCX/103440004 3-2 JANUARY 2011<br />

REV. 5


F<br />

3rd<br />

Lupine<br />

Alba<br />

East<br />

Sunshine<br />

Elm<br />

Waverly<br />

Whitter<br />

Juban<br />

Cora<br />

Marilyn<br />

Aletha<br />

Sharp<br />

Acres<br />

Sam<br />

Cedarcrest<br />

Aubin<br />

Little John<br />

Devall<br />

Sullivan<br />

Foxlane<br />

Millerville<br />

Beaver<br />

O'Neal<br />

Antioch<br />

Round Oak<br />

Elliot<br />

³<br />

McCastle<br />

Dotson<br />

Scenic<br />

Glynn<br />

Thomas<br />

North WWTP<br />

I<br />

H<br />

Brightside<br />

Riverbend<br />

E<br />

Mills<br />

Harding<br />

Mengel<br />

Gourrier<br />

Swan<br />

Main<br />

72nd<br />

Convention<br />

North<br />

§¨¦I-110<br />

Central WWTP<br />

Highland<br />

Nicholson<br />

Blount<br />

Acadian<br />

Lee<br />

Burbank<br />

River<br />

38th<br />

<strong>Plan</strong>k<br />

Greenwell<br />

Foster<br />

Ford<br />

Comite<br />

Greenwell Springs<br />

Government<br />

Prescott<br />

Lobdell<br />

Pettit<br />

Goodwood<br />

South WWTP<br />

Lanier<br />

Mickens<br />

Blackwater<br />

Choctaw<br />

3rdMollylea<br />

6th<br />

Day<br />

New Rafe Meyer<br />

K<br />

Lafayette<br />

St Philip<br />

St John<br />

Stadium<br />

4th<br />

Sorrel<br />

9th<br />

Julia<br />

Scotland<br />

Central<br />

Rosenwald<br />

Stilt<br />

Louisiana<br />

Alvin Dark<br />

10th<br />

13th<br />

Grant<br />

Laurel Lakes<br />

Snipe<br />

Gsu<br />

Ben Hur<br />

79th<br />

68th<br />

Chippewa<br />

Terrace<br />

Dalrymple<br />

Mason<br />

17th<br />

Gayosa<br />

Parker<br />

22nd<br />

Gore<br />

77th<br />

Beech<br />

Fuqua<br />

18th<br />

South<br />

Harding<br />

Pimpernel<br />

Tower<br />

Doris<br />

D<br />

Wilbur<br />

23rd<br />

Stanford<br />

Gibbens<br />

Hollywood<br />

Dayton<br />

Sycamore<br />

Shelley<br />

Winnebago<br />

Ozark<br />

Madison<br />

L S U<br />

Sandy<br />

Oleander<br />

Olive<br />

May<br />

Charry<br />

Gibbens<br />

Palmyra<br />

Erie<br />

28th<br />

Myrtle<br />

Broussard<br />

Fiero<br />

Bella<br />

29th<br />

Edwin<br />

Carriage<br />

Ben Hur<br />

Lavey<br />

Algoa<br />

31st<br />

Mohican<br />

Winbourne<br />

Brady<br />

Hood<br />

Fairfields<br />

36th<br />

Burgin<br />

Sinbad<br />

Steele<br />

Stuart<br />

Clark<br />

Chuck Yeager<br />

Choctaw<br />

Parker<br />

Glendale<br />

Paige<br />

Glen Oaks<br />

Evangeline<br />

Sherwood<br />

Bawell<br />

Nelson<br />

Crown<br />

Leo<br />

Eaton<br />

Dutton<br />

44th<br />

Ingleside<br />

Hollier<br />

Glasgow<br />

Frey<br />

Adams<br />

College<br />

G S R I<br />

Clay Cut<br />

Ormandy<br />

Paola<br />

Pollard<br />

Wylie<br />

Boone<br />

Menlo<br />

Ardenwood<br />

Corporate<br />

Ned<br />

Myrtle<br />

South Basin Rehabilitation Projects<br />

Wedgewood<br />

Arena<br />

Lavey<br />

North<br />

Bluebell<br />

Troy<br />

Hope<br />

Ellen<br />

Brookstown<br />

Furr<br />

Stoneview<br />

Celia<br />

St Ann<br />

Guynell<br />

Corlett<br />

San Juan<br />

Maplewood<br />

Bank<br />

Ruby<br />

Silverleaf<br />

Sumrall<br />

Quail<br />

Baird<br />

Elvin<br />

Hanks<br />

Harry<br />

Kenilworth<br />

Rodney<br />

Rio<br />

Callahan<br />

Congress<br />

Moss Side<br />

Hadley<br />

Renoir<br />

Longwood <strong>Plan</strong>tation<br />

Donmoor<br />

Foster<br />

North Ridge<br />

Landis<br />

Maribel<br />

Staring<br />

Wooddale<br />

Sevenoaks<br />

Burden<br />

Castle Kirk<br />

Coates<br />

Baja<br />

Boyce<br />

Dalark<br />

Richards<br />

Picardy<br />

Kingcrest<br />

Avis<br />

Cline<br />

Meadow<br />

Price<br />

Breeden<br />

Phebus<br />

Annabelle<br />

Murphy<br />

Flag<br />

Ocean<br />

Tom<br />

Tradition<br />

Wright<br />

Cody<br />

Oak View<br />

Reco<br />

Rienzi<br />

Ryder<br />

Waters Edge<br />

Anderson<br />

Lasalle<br />

Airway<br />

Airport<br />

Essen<br />

Hennessy<br />

Bles<br />

Flora<br />

Hilltree<br />

Paris<br />

Brentwood<br />

Anselmo<br />

Windingway<br />

Lils<br />

Bliss<br />

Cortana<br />

Brown<br />

Tara<br />

Fleet<br />

Bluebonnet<br />

Shady Lake<br />

Loudon<br />

Oak Villa<br />

Fairway<br />

Carney<br />

Monhegan<br />

Joyce<br />

Wartelle<br />

Summa<br />

Shady Bluff<br />

Monterrey<br />

Riveroaks<br />

Drusilla<br />

Baker<br />

Hill<br />

Oak Hills<br />

Oakdale<br />

El Scott<br />

Dancy<br />

Tracy<br />

Interline<br />

Gail<br />

Carmel<br />

Great Smokey<br />

Crescent<br />

Wimbledon<br />

Reitz<br />

Pastureview<br />

Smith<br />

Syble<br />

Cuyhanga<br />

Floynell<br />

Elain<br />

Cal<br />

Azrok<br />

Mint<br />

Tams<br />

Perkins<br />

Amiss<br />

Tallowwood<br />

Darryl<br />

Ridgely<br />

Kinglet<br />

Peck<br />

Neil<br />

Ida<br />

Browning<br />

Judi<br />

Oakbrook<br />

Lonita<br />

Daradele<br />

Beta<br />

Tudor<br />

Bramble<br />

Glen View<br />

Briarhurst<br />

Joor<br />

Siegen<br />

Lovett<br />

Lassen<br />

Sherwood Forest<br />

Mall<br />

Core<br />

Gurney<br />

Landfair<br />

Woodleigh<br />

Cook<br />

Hillmont<br />

Voorhies<br />

Tinley<br />

Southpark<br />

Bellfort<br />

Pecos<br />

Toulon<br />

Honore<br />

Reiger<br />

Poydras<br />

Corsair<br />

Stan<br />

Sylvan<br />

Shoe Creek<br />

Frontier<br />

Lariat<br />

Richcroft<br />

St Alban's<br />

Coral<br />

Ocala<br />

Dabney<br />

Baylor<br />

Triple B<br />

Catalina<br />

Archery<br />

Parkforest<br />

Cloverland<br />

Pecue<br />

Warfield<br />

Elva<br />

Pecue<br />

Erin<br />

Shay<br />

Millburn<br />

Warwick<br />

Justice<br />

Parkside<br />

Cherryl<br />

Flannery<br />

Coursey<br />

Stumberg<br />

Woodcliff<br />

Elwick<br />

Woodland Ridge<br />

Newcastle<br />

Sun Belt<br />

Dorset<br />

Langer<br />

Fulwar Skipwith<br />

Britain<br />

Wyndy<br />

Briarwood<br />

Hooper<br />

Huntley<br />

Florida<br />

Airline<br />

Hickory Ridge<br />

Old Perkins<br />

Five Oaks<br />

Quinn<br />

Saint Clare<br />

Dena Lynn<br />

Roundsaville<br />

Kohler<br />

Holt<br />

Brent<br />

Trey<br />

Mapleton<br />

Greens<br />

Sage<br />

Ponderosa<br />

Buckley<br />

Castille<br />

Augusta<br />

Chaucer<br />

Breton<br />

Firewood<br />

Sessions<br />

Herridge<br />

Jones Creek<br />

§¨¦I-10<br />

Paint<br />

Wax<br />

Frenchtown<br />

Old Hammond<br />

Jester<br />

Board<br />

Barringer<br />

Crystal<br />

Brookside<br />

Director<br />

Shetland<br />

Chanove<br />

Aspenwood<br />

Alford<br />

Chivre<br />

Choctaw<br />

Boreas<br />

Terrell<br />

Profit<br />

Droze<br />

Stevendale<br />

Fir<br />

Roble<br />

Magnolia Bridge<br />

Donnybrook<br />

Hamilton<br />

Woodvale<br />

Thibodeaux<br />

Strain<br />

Bristoe<br />

Ellis<br />

George Oneal<br />

Morgan<br />

Centurion<br />

Chadsford<br />

Hogenville<br />

Shenandoah<br />

Alder<br />

Morel<br />

Doyle<br />

Spyglass Hill<br />

Trent Jones<br />

J L Fairchild<br />

Lawnside<br />

Umbehagen<br />

Blouin<br />

Riverview<br />

§¨¦I-12<br />

Hoyt<br />

Ashford<br />

Deer Lake<br />

Will<br />

Gottlieb<br />

Cicero<br />

Landmor<br />

<strong>Plan</strong>chet<br />

Monitor<br />

Achord<br />

Talton<br />

Beachview<br />

Jefferson<br />

Harrells Ferry<br />

Wildflower<br />

Barrett<br />

Hagerstown<br />

Vignes<br />

Lake Iris<br />

Babin<br />

Bengal<br />

Tiger Bend<br />

Phillips<br />

Womack<br />

Jaybird<br />

Campanile<br />

Rehabilitation Projects<br />

Wastewater Treatment <strong>Plan</strong>t<br />

3<br />

Project Name<br />

Jefferson Hwy. - Hoo Shoo Too Rd.<br />

Burbank Rd. - Gardere Ln.<br />

Staring Ln. - Boone Dr.<br />

Oak Villa Blvd. - Choctaw St.<br />

Sharp Rd. - Florida Blvd.<br />

Kenilworth Blvd. - Boone Dr.<br />

Bluebonnet Blvd. - Jefferson Hwy. PHASE 1<br />

Bluebonnet Blvd. - Jefferson Hwy. PHASE 2<br />

Airline Hwy. - Goodwood Blvd. PHASE 1<br />

Airline Hwy. - Goodwood Blvd. PHASE 2<br />

Antioch Rd. - Chadsford Dr.<br />

Jones Creek Rd. - Tiger Bend Rd.<br />

Siegen Lan. - Interstate 10<br />

Ardenwood Dr. - Winbourne St.<br />

Flannery Rd. - Florida St.<br />

N. 38th St. - Gus Young Ave.<br />

Southern Basins<br />

East Baton Rouge<br />

0 1 2 4<br />

Miles Figure 3-1<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG3-1_PDP2010.MXD SGELPI 11/15/2010 12:12:09


F<br />

3rd<br />

Iowa<br />

Lupine<br />

Alba<br />

East<br />

Sunshine<br />

Elm<br />

Waverly<br />

Whitter<br />

Juban<br />

Cora<br />

Marilyn<br />

Aletha<br />

Sharp<br />

Acres<br />

Sam<br />

Cedarcrest<br />

Aubin<br />

Little John<br />

Devall<br />

Sullivan<br />

Foxlane<br />

Millerville<br />

Beaver<br />

O'Neal<br />

Antioch<br />

Round Oak<br />

Elliot<br />

McCastle<br />

Dotson<br />

Scenic<br />

Avenue L<br />

Glynn<br />

Thomas<br />

E<br />

I<br />

H<br />

Brightside<br />

Mills<br />

Harding<br />

Gourrier<br />

Blount<br />

Swan<br />

Main<br />

72nd<br />

Convention<br />

North<br />

§¨¦I-110<br />

Highland<br />

Nicholson<br />

Acadian<br />

Lee<br />

Burbank<br />

River<br />

38th<br />

<strong>Plan</strong>k<br />

Greenwell<br />

Foster<br />

Ford<br />

Comite<br />

Greenwell Springs<br />

Government<br />

Prescott<br />

Lobdell<br />

Pettit<br />

Lanier<br />

Goodwood<br />

Mickens<br />

Blackwater<br />

Joor<br />

Choctaw Storage Tank Facility<br />

Choctaw<br />

3rdMollylea<br />

6th<br />

Day<br />

New Rafe Meyer<br />

Hillcrest<br />

Riverbend<br />

Elmer<br />

K<br />

Lafayette<br />

St Philip<br />

St John<br />

Mengel<br />

Stadium<br />

Emma<br />

Sorrel<br />

9th<br />

Julia<br />

Scotland<br />

Silverwood<br />

4th<br />

Central<br />

Rosenwald<br />

Stilt<br />

Louisiana<br />

10th<br />

Alice<br />

Taylor<br />

Alvin Dark<br />

13th<br />

Grant<br />

Laurel Lakes<br />

Snipe<br />

Gsu<br />

Ben Hur<br />

79th<br />

68th<br />

Chippewa<br />

Terrace<br />

Dalrymple<br />

Pimpernel<br />

Mason<br />

17th<br />

Gayosa<br />

Parker<br />

22nd<br />

Gore<br />

77th<br />

Beech<br />

Fuqua<br />

18th<br />

South<br />

Tower<br />

Kentucky<br />

Doris<br />

D<br />

Wilbur<br />

Stanford<br />

Gibbens<br />

Hollywood<br />

Dayton<br />

23rd<br />

Sycamore<br />

Shelley<br />

Winnebago<br />

Ozark<br />

Madison<br />

L S U<br />

Sandy<br />

Oleander<br />

Olive<br />

May<br />

Charry<br />

Progress<br />

Erie<br />

Virgil<br />

Myrtle<br />

Broussard<br />

Fiero<br />

Bella<br />

29th<br />

Edwin<br />

Carriage<br />

28th<br />

Eugene<br />

Lavey<br />

31st<br />

Mohican<br />

Winbourne<br />

Brady<br />

Hood<br />

Fairfields<br />

36th<br />

Burgin<br />

Sinbad<br />

Steele<br />

Stuart<br />

Clark<br />

Chuck Yeager<br />

Glendale<br />

Paige<br />

Glen Oaks<br />

Evangeline<br />

Sherwood<br />

Bawell<br />

Nelson<br />

Crown<br />

Leo<br />

Eaton<br />

Dutton<br />

44th<br />

Ingleside<br />

Hollier<br />

Glasgow<br />

Frey<br />

Adams<br />

Clay Cut<br />

Ormandy<br />

College<br />

Paola<br />

Pollard<br />

Wylie<br />

G S R I<br />

Boone<br />

Menlo<br />

Ardenwood<br />

Corporate<br />

Ned<br />

Myrtle<br />

Algoa<br />

South Basin Capacity Improvement Projects<br />

Gibbens<br />

Palmyra<br />

Pryce<br />

Ben Hur<br />

South WWTP<br />

Wet Weather<br />

Improvements<br />

Wedgewood<br />

Devall<br />

Choctaw<br />

Arena<br />

Lavey<br />

North<br />

Bluebell<br />

Troy<br />

Hope<br />

Ellen<br />

Brookstown<br />

Celia<br />

St Ann<br />

Corlett<br />

San Juan<br />

Silverleaf<br />

Sumrall<br />

Congress<br />

Moss Side<br />

Leake<br />

Stoneview<br />

Guynell<br />

Maplewood<br />

Bank<br />

Ruby<br />

Meadow Bend<br />

Furr<br />

Quail<br />

Baird<br />

Gardere<br />

Elvin<br />

Hanks<br />

Harry<br />

Kenilworth<br />

Rodney<br />

Rio<br />

Callahan<br />

Pascagoula<br />

Renoir<br />

Donmoor<br />

Foster<br />

North Ridge<br />

Landis<br />

Maribel<br />

Staring<br />

Wooddale<br />

Sevenoaks<br />

Burden<br />

Castle Kirk<br />

Coates<br />

Baja<br />

Boyce<br />

Dalark<br />

Richards<br />

Kingcrest<br />

Avis<br />

Bluebonnet<br />

Cline<br />

Meadow<br />

Price<br />

Breeden<br />

Phebus<br />

Annabelle<br />

Murphy<br />

Flag<br />

Parkway<br />

Ocean<br />

Tom<br />

Picardy<br />

Tradition<br />

Wright<br />

Cody<br />

Oak View<br />

Rienzi<br />

Ryder<br />

Waters Edge<br />

Anderson<br />

Lasalle<br />

Airway<br />

Airport<br />

Essen<br />

Hennessy<br />

Bles<br />

Flora<br />

Hillmont<br />

Windingway<br />

Campanile<br />

Lils<br />

Brentwood<br />

Anselmo<br />

Bliss<br />

Cortana<br />

Shady Lake<br />

Brown<br />

Loudon<br />

Oak Villa<br />

Tara<br />

Fairway<br />

Fleet<br />

Carney<br />

Monhegan<br />

Wartelle<br />

Summa<br />

Paulet<br />

Shady Bluff<br />

Monterrey<br />

Riveroaks<br />

Drusilla<br />

Baker<br />

Hill<br />

Oak Hills<br />

Oakdale<br />

El Scott<br />

Dancy<br />

Tracy<br />

Crescent<br />

Wimbledon<br />

Reitz<br />

Interline<br />

Gail<br />

Pastureview<br />

Smith<br />

Syble<br />

Ventura<br />

Carmel<br />

Floynell<br />

Elain<br />

Darryl<br />

Cal<br />

Azrok<br />

Mint<br />

Tams<br />

Ridgely<br />

Kinglet<br />

Perkins<br />

Amiss<br />

Tallowwood<br />

Peck<br />

Neil<br />

Ida<br />

Red Oak<br />

Browning<br />

Judi<br />

Oakbrook<br />

Lonita<br />

Daradele<br />

Tudor<br />

Bramble<br />

Glen View<br />

Briarhurst<br />

Siegen<br />

Lovett<br />

Lassen<br />

Mall<br />

Core<br />

Gurney<br />

Landfair<br />

Woodleigh<br />

Cook<br />

Hillmont<br />

Voorhies<br />

Tinley<br />

Southpark<br />

Pecos<br />

Collins<br />

Bellfort<br />

Toulon<br />

Honore<br />

Reiger<br />

Poydras<br />

St Alban's<br />

Corsair<br />

Stan<br />

Sylvan<br />

Shoe Creek<br />

Frontier<br />

Lariat<br />

Coral<br />

Dabney<br />

Baylor<br />

Triple B<br />

Catalina<br />

Archery<br />

Parkforest<br />

Cloverland<br />

Pecue<br />

Warfield<br />

Elva<br />

Pecue<br />

Erin<br />

Shay<br />

Millburn<br />

Warwick<br />

Justice<br />

Parkside<br />

Cherryl<br />

Flannery<br />

Coursey<br />

Stumberg<br />

Woodcliff<br />

Elwick<br />

Woodland Ridge<br />

Newcastle<br />

Sun Belt<br />

Dorset<br />

Langer<br />

Fulwar Skipwith<br />

Britain<br />

Wyndy<br />

Briarwood<br />

Hooper<br />

Huntley<br />

Florida<br />

Airline<br />

Hickory Ridge<br />

Old Perkins<br />

Five Oaks<br />

Quinn<br />

Saint Clare<br />

Dena Lynn<br />

Roundsaville<br />

Kohler<br />

Holt<br />

Brent<br />

Trey<br />

Mapleton<br />

Greens<br />

Sage<br />

Ponderosa<br />

Buckley<br />

Castille<br />

Augusta<br />

Chaucer<br />

Breton<br />

Firewood<br />

Sessions<br />

Herridge<br />

Jones Creek<br />

§¨¦I-10<br />

Paint<br />

Wax<br />

Frenchtown<br />

Old Hammond<br />

Jester<br />

Board<br />

Barringer<br />

Crystal<br />

Brookside<br />

Director<br />

Shetland<br />

Chanove<br />

Aspenwood<br />

Alford<br />

Chivre<br />

Choctaw<br />

Boreas<br />

Terrell<br />

Profit<br />

Droze<br />

Stevendale<br />

Fir<br />

Roble<br />

Magnolia Bridge<br />

Donnybrook<br />

Hamilton<br />

Woodvale<br />

Thibodeaux<br />

Strain<br />

Bristoe<br />

Ellis<br />

George Oneal<br />

Morgan<br />

Centurion<br />

Chadsford<br />

Hogenville<br />

Shenandoah<br />

Alder<br />

Morel<br />

Doyle<br />

Spyglass Hill<br />

Trent Jones<br />

J L Fairchild<br />

Lawnside<br />

Umbehagen<br />

Blouin<br />

Riverview<br />

§¨¦I-12<br />

Hoyt<br />

Ashford<br />

Deer Lake<br />

Will<br />

Gottlieb<br />

Cicero<br />

Landmor<br />

<strong>Plan</strong>chet<br />

Monitor<br />

Achord<br />

Talton<br />

Beachview<br />

Jefferson<br />

Harrells Ferry<br />

Wildflower<br />

Barrett<br />

Hagerstown<br />

Vignes<br />

Lake Iris<br />

Babin<br />

Bengal<br />

Tiger Bend<br />

Phillips<br />

Womack<br />

Jaybird<br />

³<br />

Capacity Improvement Projects<br />

¬<br />

Waste<br />

")<br />

Water Treatment <strong>Plan</strong>t<br />

New Storage Facilities<br />

PDP Projects - South Basin<br />

#*<br />

Force Main<br />

Gravity Main<br />

PDP WWTP PS Projects<br />

Project Area<br />

Existing Force Main<br />

Existing Gravity Main<br />

#* Existing Pump Stations<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG3-2_PDP2010.MXD SGELPI 11/15/2010 14:43:50<br />

0 0.5 1 2<br />

Miles<br />

Figure 3-2


SECTION 3. SOUTH BASIN PROJECTS<br />

3.1 South Gravity System Comprehensive Rehabilitation<br />

Projects<br />

3.1.1 SGC-R-0001a, SCG-R-001b, SGC-R-0002a, SGC-R-0002b, SGC-R-0003, SGC-<br />

R-0004, SGL-R-0001, SGL-R-0002, SGL-R-0003, SGU-R-0001, SGU-R-0002,<br />

SGU-R-0003<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the collection system to reduce the amount of I/I that enter into the<br />

system.<br />

Purpose<br />

The purpose of comprehensive sewer rehabilitation is to correct defects in the system such<br />

as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources.<br />

The water that enters the system through the defects is a major contributor to sanitary sewer<br />

overflows. Comprehensive rehabilitation of the collection system will contribute to<br />

alleviating sanitary sewer overflows by reducing infiltration and inflow.<br />

Location<br />

There are 12 projects located primarily within the South Gravity Basin. The locations of the<br />

projects are shown on the maps following this section (Figures 3-3 through 3-12).<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including closed circuit television (CCTV) inspection of all pipes.<br />

Smoke testing will also be included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and, based on that<br />

analysis, a listing of recommended repairs with associated construction costs will be<br />

generated.<br />

An engineering firm will then complete preparation of construction documents for project<br />

bidding.<br />

The construction of comprehensive rehabilitation projects will typically include the<br />

following components.<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place liners<br />

Rehabilitation or replacement of sewer manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction cost for each project is presented in Table 3-1. These costs are<br />

based on preliminary estimates of the amounts of each component of the system that will<br />

require repair or replacement. During the physical inspection phase, the actual condition of<br />

GNV31031158547.DOCX/103440004 3-7 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

the components are assessed and appropriate methods recommended. At that time, the cost<br />

estimate for each project is revised. For those projects under construction, the bid amounts<br />

were included as construction costs in Table 3-1.<br />

TABLE 3-1<br />

Estimated Construction Costs for South Gravity System Comprehensive Rehabilitation Projects<br />

Project Description<br />

Estimated<br />

Construction<br />

Cost<br />

Scheduled Design<br />

Appropriation<br />

Year<br />

Scheduled<br />

Construction<br />

Appropriation Year<br />

Status<br />

SGC-R-0001a Bluebonnet<br />

Blvd-Jefferson Highway<br />

Phase I<br />

SGC-R-0001b Bluebonnet<br />

Blvd-Jefferson Highway<br />

Phase II<br />

SGC-R-0002a Airline<br />

Highway-Goodwood Blvd,<br />

Phase I<br />

SGC-R-0002b Airline<br />

Highway-Goodwood Blvd,<br />

Phase II<br />

SGC-R-0003 Ardenwood<br />

Drive-Winbourne Street<br />

SGC-R-0004 North 38 th<br />

Street-Gus Young Avenue<br />

SGL-R-0001 Burbank<br />

Drive – Gardere Lane<br />

SGL-R-0002 Staring Lane-<br />

Boone Drive<br />

SGL-R-0003 Kenilworth<br />

Blvd-Boone Drive<br />

SGU-R-0001 Oak Villa<br />

Blvd-Choctaw Street<br />

SGU-R-0002 Sharp Road-<br />

Florida Blvd<br />

SGU-R-0003 Flannery<br />

Road-Florida Blvd<br />

$6,700,000 2009* 2010* Design On-Going<br />

$6,700,000 2009* 2010* Design On-Going<br />

$11,900,000 2010* 2011 Not Started<br />

$11,900,000 2010* 2011 Not Started<br />

$4, 700,000 2011 2012 Not Started<br />

$3,600,000 2012 2013 Not Started<br />

$6,127,000 2008* 2008* Construction On-<br />

Going<br />

$5,417,000 2008* 2008* Functionally<br />

Complete<br />

$8,500,000 2009* 2009* Construction On-<br />

Going<br />

$8,997,000 2008* 2008* Construction On-<br />

Going<br />

$17,493,000 2009* 2009* Construction On-<br />

Going<br />

$7,900,000 2012 2013 Not Started<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />

GNV31031158547.DOCX/103440004 3-8 JANUARY 2011<br />

REV. 5


Energy<br />

Whitter<br />

Lobdell<br />

Cyril<br />

Carter<br />

Shawn<br />

Roseneath<br />

Bricklin<br />

Cora<br />

Marilyn<br />

Inniswold<br />

Idlewood<br />

Bea<br />

Aubin<br />

Bellfort<br />

Castile<br />

Ridge<br />

Bunker Hill<br />

Potomac<br />

Forsythia<br />

Hyacinth<br />

Dahlia<br />

Leycester<br />

Citiplace<br />

Boone<br />

Albert Hart<br />

Guilford<br />

Quail<br />

Pollard<br />

Bromley<br />

Jefferson<br />

Stratford<br />

Krista<br />

Brent<br />

Stokes<br />

Barford<br />

Stoneliegh<br />

Trenton<br />

Aries<br />

Louray<br />

Maxine<br />

Gates<br />

Rodney<br />

Baird<br />

Highland<br />

Corporate<br />

Peggy<br />

Burden<br />

Moss Side<br />

Orion<br />

Menlo<br />

Kimbro<br />

Carrollton<br />

Lasalle<br />

Irene<br />

Kenilworth<br />

Walden<br />

Applewood<br />

Harts Mill<br />

Magnolia Wood<br />

Staring<br />

Heatherwood<br />

East Baton Rouge Parish<br />

Pikes<br />

Castle Kirk<br />

Sheffield<br />

Joliet<br />

Woodstock<br />

Murphy<br />

Sevenoaks<br />

Keed<br />

Svendson<br />

Boyce<br />

Richards<br />

Dijon<br />

Perkins Place<br />

Camelia Trace<br />

Chandler<br />

Highpoint<br />

Kingcrest<br />

Kevel<br />

Mc Connell<br />

Thibodeaux<br />

Ryder<br />

Lake Calais<br />

Guy<br />

Bocage<br />

Mc Carroll<br />

Picardy<br />

Bles<br />

Kings Hill<br />

Mayfair Hill<br />

Theron<br />

Flora<br />

Avis<br />

Chanadia<br />

Arcadia<br />

Worthington Lake<br />

Legend<br />

Sabine<br />

Myrtle Hill<br />

Dove Hollow<br />

Owen<br />

Sholar<br />

Essen<br />

Hyacinth<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001.MXD SGELPI 11/9/2010 11:03:22<br />

Oak<br />

Anselmo<br />

Samoa<br />

Thayer<br />

Roundhill<br />

Windingway<br />

Lils<br />

Nouvelle<br />

Office Park<br />

Hickorylake<br />

Mancuso<br />

Madeira<br />

Myrtlelake<br />

Lasalle<br />

Argosy<br />

Plaza<br />

Rainbow<br />

Keswick<br />

Area Designated for<br />

Physical Inspection<br />

Phase I<br />

Area Designated for<br />

Physical Inspection<br />

Phase II<br />

Chevelle<br />

Brentwood<br />

Tara<br />

Barnett<br />

United Plaza<br />

Oak Hills<br />

Scarlett<br />

Old Hammond<br />

I-12<br />

Oakley<br />

Drusilla<br />

Summa<br />

Myrtle Grove<br />

Wakefield<br />

Forest Hill<br />

Cypress Point<br />

Thistlewood<br />

0 2,000 4,000 Feet<br />

Carter<br />

Paulet<br />

Obrien<br />

Downing<br />

Maiden<br />

Picardy<br />

Great Oak<br />

Fairway<br />

Fleet<br />

Rue Desiree<br />

Rue Crozat<br />

Crescent<br />

Tallyho<br />

Vista<br />

Carmen<br />

Strand<br />

Blecker<br />

Chelsea<br />

Field<br />

Houston<br />

Don Budge<br />

Jack Kramer<br />

q<br />

Contour<br />

Wimbledon<br />

Rue Le Bouef<br />

Keaty<br />

Hill<br />

Cammy<br />

Interline<br />

Baker<br />

Pine Park<br />

Oakdale<br />

Oakcliff<br />

Twisted Oak<br />

Brookline<br />

Barkley<br />

Partridge<br />

Reitz<br />

Purvis<br />

Bluebonnet<br />

Bluebonnet<br />

Cal<br />

Gail<br />

Blue Cross<br />

Oak Creek<br />

Ridgetop<br />

Judi<br />

Regency<br />

Dawnadele<br />

Willow Bay<br />

Oakbrook<br />

Carnforth<br />

Marilyn<br />

Upton<br />

St Regis<br />

Gwenadele<br />

Mc Innis<br />

Perkins<br />

Mayfair<br />

Winston<br />

Octavia<br />

Groner<br />

Woodhaven<br />

Daradele<br />

Floynell<br />

Azrok<br />

Glen View<br />

Mint<br />

Lebanon<br />

Cedarlane<br />

Coursey<br />

Ridgely<br />

Hillyard<br />

Groner<br />

Thrush<br />

Tudor<br />

Kinglet<br />

Arnold<br />

Oliphant<br />

Tanwood<br />

Mullen<br />

Meadowpark<br />

Elaine<br />

Seracedar<br />

Rondo<br />

Bronzebush<br />

Timberline<br />

Cedarcrest<br />

Sharp<br />

Oakline<br />

Harrells Ferry<br />

Stanley Aubin<br />

Airline<br />

Orleans<br />

Siegen<br />

Mead<br />

Southpark<br />

Airline Hwy Service Road<br />

Danbury<br />

Pinebrook<br />

Andrea<br />

Honey<br />

Metairie<br />

Ericson<br />

Oakley Trace<br />

Broad<br />

Darius<br />

E Heck<br />

Shoreline<br />

Jeffrey<br />

Cavalier<br />

Reiger<br />

Toulon<br />

Industriplex<br />

Poydras<br />

Telesmar<br />

Honore<br />

Mall<br />

I-10<br />

Sherwood Forest<br />

Paddock<br />

Jockey Club<br />

Fuller<br />

McCann<br />

Cedar Park<br />

Bluebonnet Blvd. - Jefferson Hwy.<br />

Phase I, II<br />

SGC-R-0001 A/B<br />

Project Vicinity Map<br />

Figure 3-3


Bennington<br />

Constitution<br />

Jamestown<br />

Revere<br />

Yorktown<br />

Brandywine<br />

Concord<br />

Bunker Hill<br />

Lexington<br />

Saratoga<br />

Monmouth<br />

Congress<br />

Potomac<br />

Perkins<br />

Guilford<br />

Krista<br />

Trenton<br />

Tarrytown<br />

Stratford<br />

Peggy<br />

Overton<br />

Murphy<br />

Burden<br />

Torrance<br />

Fritchie<br />

Richards<br />

Mc Carroll<br />

I-10<br />

Peebles<br />

Peebles<br />

I-12<br />

Sholar<br />

Office Park<br />

Rainbow<br />

Essen<br />

Brentwood<br />

Quarters Lake<br />

United Plaza<br />

Forest Hill<br />

Fairway<br />

Drusilla<br />

Jefferson<br />

Baker<br />

Strand<br />

Maiden<br />

Alma<br />

Pointer<br />

Burbank<br />

Wylie<br />

Pollard<br />

Columbine<br />

Seyburn<br />

Menlo<br />

Highland Park<br />

Highland<br />

Hibiscus<br />

Clematis<br />

Dahlia<br />

Beckenham<br />

Forsythia<br />

Chippenham<br />

Daventry<br />

Tipperary<br />

Boone<br />

Leycester<br />

Cardiff<br />

Bromley<br />

Albert Hart<br />

Quail<br />

Stoneliegh<br />

Louray<br />

Rodney<br />

Maxine<br />

Magnolia Wood<br />

Moss Side<br />

Orion<br />

Baird<br />

Irene<br />

Kimbro<br />

Kenilworth<br />

Applewood<br />

Walden<br />

Castle Kirk<br />

Pikes<br />

Chandler<br />

Nolen<br />

Staring<br />

Highpoint<br />

Camelia Trace<br />

Worth<br />

Ryder<br />

Dijon<br />

Alberta<br />

Didesse<br />

Picardy<br />

Bellonia<br />

Worthington Lake<br />

Brittany<br />

Theron<br />

Bles<br />

Arcadia<br />

Hennessy<br />

Avis<br />

Hyacinth<br />

Chanadia<br />

Elysian<br />

Southlawn<br />

Flanders<br />

Flora<br />

Mancuso<br />

Balboa<br />

Granada<br />

Thayer<br />

Sabine<br />

Roundhill<br />

Flatsway<br />

Windingway<br />

Corsica<br />

Bermuda<br />

Tasmania<br />

Samoa<br />

Rhine<br />

Hickorylake<br />

Margaret Ann<br />

Madeira<br />

Myrtlelake<br />

Essen Heights<br />

Blair<br />

Cypress Point<br />

Summa<br />

Anselmo<br />

Myrtle Grove<br />

Bluebonnet<br />

Obrien<br />

Downing<br />

Maiden<br />

Westminster<br />

Claus<br />

Elmcrest<br />

Chandler<br />

Sedley<br />

Amesbury<br />

Copperfield<br />

Columbine<br />

Hammatt<br />

East Baton Rouge Parish<br />

Stokes<br />

Quail Run<br />

Palmetto<br />

Blendon<br />

Aries<br />

Legend<br />

Delaville<br />

Harts Mill<br />

Menlo<br />

Thoreau<br />

Area Designated for<br />

Physical Inspection<br />

Phase I<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001A.MXD SGELPI 11/15/2010 11:16:27<br />

Perkins Place<br />

0 1,300 2,600 Feet<br />

Lake Calais<br />

Sharynwood<br />

O'Donovan<br />

Silverside<br />

Cedar Lake<br />

q<br />

Village Park<br />

Kings Hill<br />

Mayfair Hill<br />

Sabine<br />

One Calais<br />

Essen Park<br />

Payne<br />

Pennth<br />

Butter Creek<br />

Linkwood<br />

Capital<br />

Picardy<br />

World Ministry<br />

Rod Laver<br />

Great Oak<br />

Fleet<br />

Greenbriar Hollow<br />

Blecker<br />

Norfolk<br />

Sharlane<br />

Don Budge<br />

Wimbledon<br />

Chelsea<br />

Hill<br />

Gail<br />

Houston<br />

John Newcombe<br />

Field<br />

Lew Hoad<br />

Rue Baton<br />

Bluebonnet Blvd. - Jefferson Hwy.<br />

Phase I<br />

SGC-R-0001A<br />

Project Vicinity Map<br />

Figure 3-3a


Lobdell<br />

Crown<br />

Cyril<br />

Carter<br />

Lasalle Parc<br />

Shawn<br />

Riveroaks<br />

Cora<br />

Carolyn Sue<br />

Marilyn<br />

Hamblin<br />

Elizabeth<br />

Idlewood<br />

Bea<br />

Arnold<br />

Aubin<br />

Bellfort<br />

Wellington<br />

Audubon<br />

Baird<br />

Government<br />

Irene<br />

Keed<br />

Sevenoaks<br />

Lasalle<br />

Jefferson<br />

Burden<br />

Pikes<br />

Kenilworth<br />

Thoreau<br />

Alden<br />

Walden<br />

Finchley<br />

Joliet<br />

Corporate<br />

Staring<br />

Mc Connell<br />

Boyce<br />

Richards<br />

Dijon<br />

Perkins<br />

Goodwood<br />

Picardy<br />

Mc Carroll<br />

Avis<br />

I-12<br />

Hyacinth<br />

Anselmo<br />

Airport<br />

Colonial<br />

Essen<br />

Madeira<br />

Mancuso<br />

Ashland<br />

Chevelle<br />

Brentwood<br />

Tara<br />

Trinity<br />

Oakley<br />

Old Hammond<br />

Summa<br />

Paulet<br />

Drusilla<br />

Downing<br />

Fairway<br />

Fleet<br />

Crescent<br />

Annabelle Tallyho<br />

Woodstock<br />

Murphy<br />

Torrance<br />

Svendson<br />

Chandler<br />

Fritchie<br />

Perkins Place<br />

Camelia Trace<br />

Thibodeaux<br />

Ryder<br />

Lake Calais<br />

Windrush<br />

Gilbert<br />

Rienzi<br />

Conway<br />

Alberta<br />

Village Park<br />

East Baton Rouge Parish<br />

Linda<br />

Independence<br />

Guy<br />

Brittany<br />

Bles<br />

Kings Hill<br />

Bellonia<br />

Theron<br />

Lasalle<br />

Owen<br />

Sholar<br />

Hennessy<br />

Oak<br />

Wayside<br />

Dove Hollow<br />

Thayer<br />

Galloway<br />

Granada<br />

Samoa<br />

Legend<br />

Bermuda<br />

Lils<br />

Carter<br />

Nouvelle<br />

Office Park<br />

Argosy<br />

Rainbow<br />

Barnett<br />

Plaza<br />

Essen Heights<br />

Margaret Ann<br />

Pennth<br />

Payne<br />

Charmaine<br />

One Calais<br />

Cullen<br />

Scarlett<br />

Forest Hill<br />

United Plaza<br />

Butter Creek<br />

Connells Park<br />

Fairway<br />

Myrtle Grove<br />

Wakefield<br />

Stone's Throw<br />

Cypress Point<br />

Bayside<br />

Maiden<br />

World Ministry<br />

Area Designated for<br />

Physical Inspection<br />

Phase II<br />

0 1,500 3,000 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001A.MXD SGELPI 11/15/2010 11:16:27<br />

Picardy<br />

Vista<br />

Contour<br />

Carmen<br />

Strand<br />

Chelsea<br />

Sharlane<br />

Field<br />

Houston<br />

q<br />

Frances Harriet<br />

Airline<br />

Keaty<br />

Field<br />

Bordeaux<br />

Hill<br />

Cammy<br />

Baker<br />

Pine Park<br />

Damuth<br />

Cottondale<br />

Brookline<br />

Corinth<br />

Purvis<br />

Interline<br />

Partridge<br />

Bluebonnet<br />

Reitz<br />

Donald<br />

Bluebonnet<br />

Cal<br />

Gail<br />

Blue Cross<br />

Damuth<br />

Van<br />

Diane<br />

Judi<br />

Spencer<br />

Ridgetop<br />

Upton<br />

Regency<br />

Dawnadele<br />

Willow Bay<br />

Cottage Hill<br />

Cynthia<br />

Marilyn<br />

Mc Innis<br />

Winston<br />

Prytania<br />

St Regis<br />

Mayfair<br />

I-10<br />

Woodhaven<br />

Floynell<br />

Daradele<br />

Inniswold<br />

Dwyerwood<br />

Floynell<br />

Azrok<br />

Glen View<br />

Mint<br />

Woodhaven<br />

Runnymede<br />

Hillyard<br />

Kinglet<br />

Parkview<br />

Allyson<br />

Kenlee<br />

Browning<br />

Firelight<br />

Tudor<br />

Lebanon<br />

Cedarlane<br />

Cinquefoil<br />

Plaza Americana<br />

Tanager<br />

Ridgely<br />

Barry<br />

Oliphant<br />

Tanwood<br />

Groner<br />

Bunting<br />

Elaine<br />

Seracedar<br />

Major Oaks<br />

Rosebud<br />

Cedarcrest<br />

Sharp<br />

Rhus Fringe<br />

Mayfair<br />

Ann<br />

Oakline<br />

Sheraton<br />

Coursey<br />

Reiger<br />

Siegen<br />

Mead<br />

Southpark<br />

Toulon<br />

Industriplex<br />

Honore<br />

Sherwood Forest<br />

Harrells Ferry<br />

Alco<br />

Airline Hwy Service Road<br />

Landsbury<br />

Danbury<br />

Pinebrook<br />

Copperleaf<br />

Caroljack<br />

Stonegate<br />

Braeburn<br />

Burton<br />

Ericson<br />

Stanley Aubin<br />

Oak Bend<br />

Jeffrey<br />

Magellan<br />

Muriel<br />

Cavalier<br />

Ellsworth<br />

Bellrose<br />

Cherryhill<br />

Shoreline<br />

Leton<br />

Telesmar<br />

Ashbourne<br />

Paddock<br />

Crestmount<br />

Cedar Park<br />

Bluebonnet Blvd. - Jefferson Hwy.<br />

Phase II<br />

SGC-R-0001B<br />

Project Vicinity Map<br />

Figure 3-3b


Elm<br />

Paulson<br />

Topaz<br />

Waverly<br />

Guilford<br />

Whitter<br />

Juban<br />

Alello<br />

Monet<br />

Maribel<br />

Cyril<br />

Carter<br />

Shawn<br />

Airway<br />

Crescent<br />

Alameda<br />

Vega<br />

Monterrey<br />

Cora<br />

Marilyn<br />

Inniswold<br />

Aletha<br />

Fiesta<br />

Sharp<br />

Bea<br />

Gum<br />

Edgemont<br />

Tee<br />

Acorn<br />

Aubin<br />

Lassen<br />

Bellridge<br />

Gwen<br />

American<br />

Plaza Tower<br />

Sterling<br />

Beechwood<br />

Rhodes<br />

44th<br />

Ingleside<br />

Lee<br />

Charles<br />

Mission<br />

Mouton<br />

Wiltz<br />

Jean<br />

46th<br />

47th<br />

48th<br />

49th<br />

North<br />

Longwood<br />

Bawell<br />

Shelley<br />

Sherwood<br />

Mohican<br />

North<br />

Beck<br />

Frey<br />

Woodside<br />

Balis<br />

Ferrett<br />

Martin<br />

Brame<br />

Glasgow<br />

Conrad<br />

Osborne<br />

48th<br />

Moore<br />

Foster<br />

Voss<br />

Adams<br />

Fairfields<br />

Government<br />

Clay Cut<br />

College<br />

Pollard<br />

Linden<br />

Hermitage<br />

Melrose<br />

Afton<br />

Westdale<br />

Bennington<br />

Concord<br />

Belvedere<br />

Silliman<br />

Foster<br />

Caddo<br />

Blackwell<br />

Bankers<br />

Constitution<br />

Brookstown<br />

Brandywine<br />

Clayton<br />

Ruby<br />

Brookstown<br />

Dahlia<br />

Hibiscus<br />

Cloud<br />

Howell<br />

Choctaw<br />

Castile<br />

Ridge<br />

Ardenwood<br />

Congress<br />

Potomac<br />

Michelli<br />

Woodhill<br />

Energy<br />

Williamson<br />

Azam<br />

Trenton<br />

Perkins<br />

Sheldon<br />

Krista<br />

Marion<br />

Quail<br />

Winbourne<br />

Executive Park<br />

Carrollton<br />

Smiley<br />

Renoir<br />

Harry<br />

Esplanade<br />

Stratford<br />

Corporate<br />

Peggy<br />

Moss Side<br />

Orion<br />

Calumet<br />

Nellie<br />

Industrial<br />

Goya<br />

Carrollton<br />

Donmoor<br />

Conley<br />

Victoria<br />

Lobdell<br />

Audubon<br />

Keed<br />

Jefferson<br />

Burden<br />

Irene<br />

Prescott<br />

Sevenoaks<br />

Joliet<br />

Lasalle<br />

Woodstock<br />

Murphy<br />

Victoria<br />

Winthrop<br />

Pikes<br />

Industrial<br />

Exchange<br />

Finchley<br />

Fritchie<br />

Lanier<br />

Dallas<br />

Wooddale<br />

Goodwood<br />

Boyce<br />

Richards<br />

Dijon<br />

Reco<br />

Realtors<br />

Linda<br />

Linda<br />

Guy<br />

Bocage<br />

Oak View<br />

I-10<br />

Lone Oak<br />

Tom<br />

Essen<br />

Paris<br />

Landwood<br />

Albert<br />

Independence<br />

Brittany<br />

Dickens<br />

Harry<br />

Lasalle<br />

Oak<br />

Owen<br />

Sholar<br />

Gay<br />

Darryl<br />

Carter<br />

Fernwood<br />

Summa<br />

Airport<br />

Thurman<br />

Brandon<br />

Office Park<br />

Berlin<br />

Plaza<br />

Colonial<br />

Chevelle<br />

Oak Crest<br />

Kiowa<br />

Florline<br />

Kelwood<br />

One Calais<br />

Margaret Ann<br />

Southview<br />

Brentwood<br />

Greenwell Springs<br />

Joyce<br />

Tara<br />

Barnett<br />

Woodcrest<br />

Wakefield<br />

Scarlett<br />

Oakley<br />

Wartelle<br />

Stone's Throw<br />

Forest Hill<br />

United Plaza<br />

Chatawa<br />

Cypress Point<br />

Maiden<br />

Vine<br />

Fairway<br />

Fleet<br />

Joor<br />

Trinity<br />

Oak Villa<br />

Choctaw<br />

Cortana<br />

Florida<br />

Broadmoor<br />

Vista<br />

Carmen<br />

Strand<br />

Chelsea<br />

Drusilla<br />

Norfolk<br />

Frances Harriet<br />

Hill<br />

Tracy<br />

Kimberly<br />

Raton<br />

Gail<br />

Elain<br />

Syble<br />

Mammoth<br />

Ventura<br />

Riveroaks<br />

Parkview<br />

Interline<br />

Baker<br />

El Cajon<br />

Cuyhanga<br />

Pomona<br />

Donna<br />

Purvis<br />

Partridge<br />

Bluebonnet<br />

Cal<br />

Warren<br />

Coronado<br />

Delplaza<br />

Brookline<br />

Drew<br />

Castlewood<br />

Bluebonnet<br />

Mollylea<br />

Teddy<br />

Ridgetop<br />

Westerly<br />

Judi<br />

Byrd<br />

Platt<br />

Great Smokey<br />

Elizabeth<br />

Floynell<br />

Pasadena<br />

Perdue<br />

Presidio<br />

Lonita<br />

Big Bend<br />

Tams<br />

Florida<br />

Darryl<br />

Red Oak<br />

Old Hammond<br />

Ridgely<br />

Cletus<br />

Harvey<br />

Kenlee<br />

Cynthia<br />

Browning<br />

Regency<br />

Marilyn<br />

Willow Bay<br />

Woodhaven<br />

Silverest<br />

Daradele<br />

Mayfair<br />

Winston<br />

Ballina<br />

Cashel<br />

St Regis<br />

Gwenadele<br />

Idlewood<br />

Allyson<br />

Tudor<br />

Nelwyn<br />

Elaine<br />

Lebanon<br />

Oliphant<br />

Hillmont<br />

Seracedar<br />

Shermoor<br />

Heather<br />

Arnold<br />

Cedarcrest<br />

Voorhies<br />

Oakline<br />

Rainier<br />

Dual<br />

Waverland<br />

Marlbrook<br />

Braeburn<br />

Airline<br />

Redlands<br />

Sherwood Forest<br />

Toulon<br />

Stan<br />

Catalpa<br />

Tinley<br />

Mead<br />

Southpark<br />

Sarasota<br />

Flamingo<br />

Ocala<br />

Richcroft<br />

Bard<br />

Harrells Ferry<br />

Stanley Aubin<br />

Green Oak<br />

Lava Bed<br />

Ericson<br />

Del Cano<br />

E Heck<br />

Sylvan<br />

Little John<br />

Pamela<br />

Archery<br />

Sheraton<br />

Airline Hwy Service Road<br />

Bellfort<br />

Paddock<br />

Darryl<br />

Florida<br />

Sherbrook<br />

I-12<br />

Baylor<br />

Auburn<br />

Westfork<br />

Vickers<br />

Dabney<br />

Salem<br />

Kay<br />

King Richard<br />

Eastgate<br />

Coursey<br />

Superior<br />

East Baton Rouge Parish<br />

Legend<br />

Area Designated for<br />

Physical Inspection<br />

Phase I<br />

Area Designated for<br />

Physical Inspection<br />

Phase II<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002.MXD SGELPI 11/9/2010 11:07:39<br />

0 2,500 5,000 Feet<br />

q<br />

Airline Hwy. - Goodwood Blvd.<br />

Phase I and II<br />

SGC-R-0002A/B<br />

Project Vicinity Map<br />

Figure 3-4


48th<br />

49th<br />

Elm<br />

Topaz<br />

Garnet<br />

Waverly<br />

Whitter<br />

Juban<br />

Alello<br />

Monet<br />

Crown<br />

Cyril<br />

Carter<br />

Lasalle Parc<br />

Rome<br />

Shawn<br />

Airway<br />

Broadmoor<br />

Frances Harriet<br />

Vega<br />

Monterrey<br />

Cora<br />

Carolyn Sue<br />

Crestaire<br />

Charles<br />

Foster<br />

Brookstown<br />

Winbourne<br />

Calumet<br />

Maribel<br />

Lanier<br />

Gerlando<br />

Lone Oak<br />

Farrington<br />

Redwood<br />

Syble<br />

Graham<br />

Woodcrest<br />

Oak Crest<br />

Woodglynn<br />

Kimberly<br />

Marydon<br />

Joyce<br />

Conrad<br />

Victoria<br />

Conley<br />

46th<br />

Foster<br />

Harelson<br />

Jean<br />

47th<br />

Frey<br />

Madison<br />

Mouton<br />

Ritterman<br />

North<br />

Laurel<br />

Convention<br />

North<br />

Country Club<br />

Moore<br />

Balis<br />

Silliman<br />

Wells<br />

Bawell<br />

Rabey<br />

Adams<br />

Dougherty<br />

Leighton<br />

Fairfields<br />

College<br />

Greenwell Springs<br />

Afton<br />

Melrose<br />

Clay Cut<br />

Cloud<br />

Ardenwood<br />

I-10<br />

Michelli<br />

Government<br />

Elgin<br />

Osborne Mammoth<br />

Hermitage<br />

Parlange<br />

Capital Heights<br />

Greenside<br />

Avondale<br />

Woodside<br />

Bardwell<br />

Barber<br />

Voss<br />

Bootsie<br />

Kincaid<br />

Rebel<br />

Bahm<br />

Westdale<br />

Ormandy<br />

Bazaar<br />

Valcour<br />

Fairfax<br />

Choctaw<br />

Bankers<br />

Constitution<br />

Bel Air<br />

Hilton<br />

Ridge<br />

Howell<br />

Castile<br />

Pino<br />

Timberside<br />

Williamson<br />

Azam<br />

Glenwood<br />

Eastwood<br />

George<br />

Arden<br />

Evans<br />

Citiplace<br />

Winn<br />

Sheldon<br />

Marion<br />

Clinton<br />

Executive Park<br />

Marquette<br />

Smiley<br />

Carrollton<br />

Jefferson<br />

Renoir<br />

Esplanade<br />

Marquette<br />

Carrollton<br />

Gates<br />

Anita<br />

Nellie<br />

Industrial<br />

Rodin<br />

Cezanne<br />

Goya<br />

Harry<br />

Titian<br />

Audubon<br />

Corporate<br />

Kenwood<br />

Lobdell<br />

Van Gogh<br />

Cameron<br />

Donmoor<br />

Alden<br />

Keed<br />

Sheffield<br />

Croydon<br />

Sevenoaks<br />

Joliet<br />

Lasalle<br />

Annabelle<br />

Woodstock<br />

Murphy<br />

Torrance<br />

Industrial<br />

Bon Marche<br />

Pierce<br />

Svendson<br />

Scobell<br />

Lubbock<br />

Finchley<br />

Ocean<br />

Fritchie<br />

Riverlon<br />

Thibodeaux<br />

Linda<br />

Mc Connell<br />

Dallas<br />

Wooddale<br />

Exchange<br />

Bocage<br />

Beaumont<br />

Bishop Ott<br />

Linda<br />

Realtors<br />

Rienzi<br />

Boyce<br />

Gilbert<br />

Conway<br />

Reco<br />

Airline<br />

Franwood<br />

Wooddale<br />

Goodwood<br />

Guy<br />

Bocage<br />

Mc Carroll<br />

Tom<br />

Gladewood<br />

Albert<br />

Independence<br />

Lasalle<br />

Dove Hollow<br />

Harry<br />

Galloway<br />

Normandy<br />

Oak<br />

Wayside<br />

Owen<br />

Landwood<br />

Airport<br />

Athens<br />

Lils<br />

Madrid<br />

Fernwood<br />

Paris<br />

Commerce<br />

Thornwood<br />

Carter<br />

Argosy<br />

Nouvelle<br />

Colonial<br />

Berlin<br />

Harry<br />

Parkland<br />

Kelwood<br />

Charmaine<br />

Barnett<br />

Plaza<br />

Florline<br />

Chevelle<br />

Kiowa<br />

Southview<br />

Wrenwood<br />

Airway<br />

Souter<br />

Roseneath<br />

Shirley<br />

Shadows<br />

Brentwood<br />

Connells Park<br />

Tara<br />

Chatawa<br />

Trinity<br />

Cortana<br />

Florida<br />

Airline<br />

Wakefield<br />

Oakley<br />

Scarlett<br />

Vine<br />

Old Hammond<br />

Oak Villa<br />

Choctaw<br />

Florida<br />

Meadowood<br />

Fairway<br />

Broadmoor<br />

Crescent<br />

Trudeau<br />

Tallyho<br />

Vista<br />

Carmen<br />

Alameda<br />

Crater Lake<br />

Contour<br />

Great Smokey<br />

Delmar<br />

Belcaro<br />

San Lo<br />

Drusilla<br />

Darryl<br />

Tams<br />

Ventura<br />

Pomona<br />

Riveroaks<br />

Meredith<br />

Parkview<br />

Keaty<br />

Vega<br />

Berkeley<br />

Tampa<br />

Cuyhanga<br />

Mollylea<br />

Donna<br />

Woodbine<br />

Greenbriar<br />

Cammy<br />

Lindale<br />

El Cajon<br />

Florida<br />

Havana<br />

Cottondale<br />

Fenway<br />

Brookline<br />

Corinth<br />

Elite<br />

Purvis<br />

Chalma<br />

Donald<br />

Judi<br />

Interline<br />

I-12<br />

East Baton Rouge Parish<br />

Legend<br />

Area Designated for<br />

Physical Inspection<br />

Phase I<br />

0 1,600 3,200 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002A.MXD SGELPI 11/15/2010 11:24:18<br />

q<br />

Airline Hwy. - Goodwood Blvd.<br />

Phase I<br />

Figure 3-4a<br />

SGC-R-0002A<br />

Project Vicinity Map


Woodvine<br />

Whitter<br />

Juban<br />

Alello<br />

Monet<br />

Maribel<br />

Lobdell<br />

Cyril<br />

Carter<br />

Shawn<br />

Airway<br />

Frances Harriet<br />

Monterrey<br />

Cora<br />

Marilyn<br />

Elizabeth<br />

Aletha<br />

Lonita<br />

Milnor<br />

Sharp<br />

Bea<br />

Gum<br />

Sam<br />

Tee<br />

Cal<br />

Pioneer<br />

Aubin<br />

Gwen<br />

American<br />

Sterling<br />

Winbourne<br />

Ruby<br />

Waverly<br />

Brookstown<br />

Michelli<br />

Williamson<br />

Ardenwood<br />

Glenwood<br />

Bunker Hill<br />

Potomac<br />

Howell<br />

Pino<br />

Roselyn<br />

Foch<br />

Ridge<br />

Dahlia<br />

Azam<br />

Arden<br />

Government<br />

I-10<br />

Guilford<br />

Perkins<br />

Sheldon<br />

Winn<br />

Citiplace<br />

Executive Park<br />

Elgin<br />

Jefferson<br />

Stratford<br />

Marion<br />

Carrollton<br />

Smiley<br />

Renoir<br />

Congress<br />

Harry<br />

Corporate<br />

Peggy<br />

Moss Side<br />

Calumet<br />

Industrial<br />

Cezanne<br />

Goya<br />

Van Gogh<br />

Carrollton<br />

Conley<br />

Audubon<br />

Victoria<br />

Donmoor<br />

Burden<br />

Keed<br />

Croydon<br />

Sevenoaks<br />

Joliet<br />

Lasalle<br />

Woodstock<br />

Murphy<br />

Svendson<br />

Industrial<br />

Lubbock<br />

Bon Marche<br />

Exchange<br />

Finchley<br />

Mc Connell<br />

Ocean<br />

Lanier<br />

Dallas<br />

Wooddale<br />

Goodwood<br />

Thibodeaux<br />

Linda<br />

Reco<br />

Realtors<br />

Linda<br />

Rienzi<br />

Guy<br />

Bocage<br />

Boyce<br />

Richards<br />

Gerlando<br />

Lone Oak<br />

Oak View<br />

Tom<br />

Landwood<br />

Albert<br />

Independence<br />

Dove Hollow<br />

Harry<br />

Oak<br />

Owen<br />

Sholar<br />

Airport<br />

Paris<br />

Commerce<br />

Carter<br />

Lils<br />

Fernwood<br />

Thurman<br />

Nouvelle<br />

Office Park<br />

Essen<br />

Berlin<br />

Harry<br />

Kelwood<br />

Colonial<br />

Lasalle<br />

Argosy<br />

Plaza<br />

Rainbow<br />

Chevelle<br />

Oak Crest<br />

Kiowa<br />

Florline<br />

Southview<br />

Brentwood<br />

Greenwell Springs<br />

Joyce<br />

Tara<br />

Barnett<br />

Essen Heights<br />

Souter<br />

United Plaza<br />

Connells Park<br />

Chatawa<br />

Airline<br />

Scarlett<br />

I-12<br />

Oakley<br />

Wartelle<br />

Drusilla<br />

Woodcrest<br />

Wakefield<br />

Forest Hill<br />

Fairway<br />

Fleet<br />

Oak Villa<br />

Choctaw<br />

Cortana<br />

Trinity<br />

Downing<br />

Joor<br />

Crestaire<br />

Broadmoor<br />

Crescent<br />

Carmen<br />

Alameda<br />

Chelsea<br />

Kimberly<br />

Meadowood<br />

Vine<br />

Vista<br />

Riveroaks Alameda<br />

Strand<br />

Great Smokey<br />

San Lo<br />

Florida<br />

Contour<br />

Mammoth<br />

Ventura<br />

Pomona<br />

Donna<br />

Riveroaks<br />

Parkview<br />

Interline<br />

Baker<br />

Pine Park<br />

Syble<br />

Cuyhanga<br />

Mollylea<br />

Van<br />

Bluebonnet<br />

Big Bend<br />

Platt<br />

Perdue<br />

Elain<br />

Darryl<br />

Gerald<br />

Cletus<br />

Tams<br />

Harvey<br />

Kenlee<br />

Browning<br />

Cynthia<br />

Diane<br />

Judi<br />

Delcourt<br />

Cammy<br />

Singletary<br />

Purvis<br />

Partridge<br />

Warren<br />

Graham<br />

Grand Teton<br />

El Cajon<br />

Coronado<br />

Elite<br />

Brookline<br />

Bluebonnet<br />

Teddy<br />

Ridgetop<br />

Byrd<br />

Presidio<br />

Inniswold<br />

Patio<br />

Regency<br />

Marilyn<br />

Madeline<br />

Willow Bay<br />

Fiesta<br />

St Regis<br />

Daradele<br />

Floynell<br />

Jo Anne<br />

Tampa<br />

Mayfair<br />

Winston<br />

Ballina<br />

Cashel<br />

Woodhaven<br />

Silverest<br />

Gwenadele<br />

Allyson<br />

Tudor<br />

Elaine<br />

Florida<br />

Old Hammond<br />

Lebanon<br />

Ridgely<br />

Seracedar<br />

Cedarcrest<br />

Coursey<br />

Toledo Bend<br />

Acorn<br />

Red Oak<br />

Shermoor<br />

Arnold<br />

Sinclair<br />

Mayfair<br />

Voorhies<br />

Ann<br />

Dual<br />

Robin Hood<br />

Marlbrook<br />

Airline<br />

Tinley<br />

Major Oaks<br />

Aubinwood<br />

Lava Bed<br />

Ericson<br />

Stanley Aubin<br />

Jeffrey<br />

Braeburn<br />

Catalpa<br />

Burgess<br />

Mead<br />

Cavalier<br />

Redlands<br />

Chalice<br />

Bellfort<br />

Southpark<br />

Toulon<br />

Ocala<br />

Richcroft<br />

Stan<br />

Glenda<br />

Glenhaven<br />

Vieux<br />

E Heck<br />

Muriel<br />

Bard<br />

Pamela<br />

Boardwalk<br />

Sylvan<br />

Little John<br />

Archery<br />

Sheraton<br />

Westfork<br />

Paddock<br />

Jockey Club<br />

Fuller<br />

Big Bend<br />

Florida<br />

Darryl<br />

Catalina<br />

Sherwood Forest<br />

Nassau<br />

Kay<br />

Sherbrook<br />

Millburn<br />

King Richard<br />

Dabney<br />

Harrells Ferry<br />

Baylor<br />

Auburn<br />

Southfork<br />

Vickers<br />

Parkside<br />

Eastgate<br />

East Baton Rouge Parish<br />

Legend<br />

Area Designated for<br />

Physical Inspection<br />

Phase II<br />

0 2,100 4,200 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002B.MXD SGELPI 11/15/2010 11:25:57<br />

q<br />

Airline Hwy. - Goodwood Blvd.<br />

Phase II<br />

Figure 3-4b<br />

SGC-R-0002B<br />

Project Vicinity Map


Brookstown<br />

Topaz<br />

Garnet<br />

Juban<br />

Evangeline<br />

Shelley<br />

Clayton<br />

Sherwood<br />

Victory<br />

Hope<br />

Clayton<br />

Victoria<br />

Cyrus<br />

Beechwood<br />

Joseph<br />

Levera<br />

St Andrew<br />

Prescott<br />

Foster<br />

Dayton<br />

Hazelwood<br />

Linden<br />

Heidel<br />

Airline<br />

Eleanor<br />

Mohican<br />

Elm<br />

Fairwoods<br />

Conrad<br />

Charles<br />

Brookstown<br />

Calumet<br />

Winbourne<br />

Eaton<br />

Mission<br />

Addison<br />

Wilmot<br />

Frey<br />

Jean<br />

Ritterman<br />

Voss<br />

Underwood<br />

Osborne<br />

Kincaid<br />

Dougherty<br />

Bootsie<br />

Mc Clelland<br />

Shelley<br />

Clayton<br />

Cyrus<br />

Fairwoods<br />

Bicentennial<br />

Winnebago<br />

Linden<br />

Howell Park<br />

Hendricks<br />

Eaton<br />

Wyandotte<br />

Wyandotte<br />

Cleo<br />

Eleanor<br />

Ozark<br />

Conley<br />

Victoria Garden<br />

Bradley<br />

Bradley<br />

Wilmot<br />

Blackwell<br />

Ruby<br />

Ardenwood<br />

Howell<br />

Michelli<br />

Ritterman<br />

Underwood<br />

Nellie<br />

Osborne<br />

Kincaid<br />

Lambert<br />

Sheldon<br />

Elgin<br />

Clinton<br />

Anita<br />

Nellie<br />

Anita<br />

Conley<br />

Greenwell Springs<br />

Melon<br />

Victoria<br />

Choctaw<br />

Industrial<br />

Monroe<br />

Adams<br />

Madison<br />

Adams<br />

Pino<br />

Confidence<br />

Smiley<br />

Choctaw<br />

Augustus<br />

Sobers<br />

Rhodes<br />

Washington<br />

Mission<br />

Martin<br />

Harelson<br />

Jefferson<br />

Fairfields<br />

Jackson<br />

Washington<br />

Bahm<br />

Paulson<br />

Roselyn<br />

Blackberry<br />

Williamson<br />

Blueberry<br />

Callahan<br />

Lobdell<br />

44th<br />

46th<br />

49th<br />

Foster<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGC-R-0003.MXD SGELPI 10/21/2009 12:54:24<br />

Area Designated for<br />

Physical Inspection<br />

0 750 1,500 Feet<br />

q<br />

Ardenwood Dr.- Winbourne St.<br />

SGC-R-0003<br />

Project Vicinity Map<br />

Figure 3-5


48th<br />

49th<br />

Chippewa<br />

Iroquois<br />

Seneca<br />

Iroquois<br />

Delaware<br />

Bartlett<br />

Eaton<br />

Mission<br />

Osborne<br />

Kincaid<br />

Dougherty<br />

Foster<br />

Choctaw<br />

Monroe<br />

Monroe<br />

Adams<br />

37th<br />

Adams<br />

Adams<br />

Belfair<br />

Rhodes<br />

Adams<br />

Madison<br />

Madison<br />

39th<br />

Carleton<br />

Bateman<br />

Belfair<br />

Martin<br />

Fairfields<br />

Jackson<br />

Bahm<br />

Mission<br />

Jackson<br />

Barrow<br />

Rice<br />

Washington<br />

Harelson<br />

Jefferson<br />

Washington<br />

Jefferson<br />

41st<br />

Amos<br />

Noah<br />

Noah<br />

46th<br />

Greenwell Springs<br />

Paulson<br />

47th<br />

40th<br />

Noah<br />

43rd<br />

Gus Young<br />

Urban<br />

Cain<br />

38th<br />

Billops<br />

Provost<br />

Pitcher<br />

42nd<br />

43rd<br />

44th<br />

Hermitage<br />

37th<br />

Valcour<br />

36th<br />

Odell<br />

Odell<br />

Waverly<br />

Leighton<br />

Columbus Dunn<br />

35th<br />

Zion<br />

Rosedown<br />

Acadian<br />

39th<br />

Jonah<br />

Foster<br />

Parlange<br />

Jonah<br />

40th<br />

32nd<br />

Ruth<br />

Afton<br />

Melrose<br />

North<br />

48th<br />

Kernan<br />

Laurel<br />

Main<br />

Saguaro<br />

Main<br />

Maywood<br />

Wabash<br />

Wabash<br />

Bernardo<br />

Lofaso<br />

Live Oak<br />

Roselawn<br />

Laurel<br />

Tuscaloosa<br />

Beck<br />

49th<br />

Laurel<br />

Florida<br />

Asphodel<br />

Fairfax<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGC-R-0004.MXD SGELPI 10/21/2009 13:03:51<br />

Area Designated for<br />

Physical Inspection<br />

0 590 1,180 Feet<br />

q<br />

N. 38th St. - Gus Young Ave.<br />

SGC-R-0004<br />

Project Vicinity Map<br />

Figure 3-6


Burbank<br />

Wylie<br />

Kenilworth<br />

Kenilworth<br />

G S R I<br />

Menlo<br />

Amesbury<br />

Copperfield<br />

Rodney<br />

Hammatt<br />

Albert Hart<br />

Boone<br />

Baird<br />

Maxine<br />

Magnolia Wood<br />

Highland<br />

Menlo<br />

Castle Kirk<br />

Kimbro<br />

Staring<br />

Nolen<br />

Highpoint<br />

Halfway Tree<br />

Worth<br />

Kingcrest<br />

Worthington Lake<br />

Wild Valley<br />

Windward<br />

Elysian<br />

Southlawn<br />

Arcadia<br />

Flora<br />

Sabine<br />

Sabine<br />

Flatsway<br />

Roundhill<br />

Rhine<br />

Windingway<br />

Lila<br />

Tracy Lee<br />

Gulf South<br />

Hadley<br />

Meadow Bend<br />

Bayou Fountain<br />

Stoney Creek<br />

Fox Run<br />

Highland Creek<br />

Governor<br />

Heatherwood<br />

Renee<br />

Kevel<br />

Emerald<br />

Myrtle View<br />

Myrtle Hill<br />

Knox Hill<br />

River<br />

Nicholson<br />

Helm<br />

Keel<br />

Starwood<br />

Skysail<br />

Port<br />

Gardere<br />

Mast<br />

Mariner<br />

Longwood View<br />

Starboard<br />

Ned<br />

Amanda<br />

Leake<br />

Anne Marie<br />

Rush<br />

General Jackson<br />

Longwood <strong>Plan</strong>tation<br />

General Lee<br />

General Taylor<br />

Pascagoula<br />

Crosscreek<br />

Seabord<br />

Fountain<br />

Old Hermitage<br />

General Adams<br />

General Mouton<br />

Bimini<br />

Coy<br />

Jasper<br />

St Croix<br />

Elvin<br />

Glerma<br />

Jade<br />

Pecan Tree<br />

Parkway<br />

Springlake<br />

Springbrook<br />

Springwind<br />

Springdale<br />

Springhaven<br />

Westhaven<br />

Winterhaven<br />

Springcrest<br />

Springpark<br />

Hillmont<br />

Springvalley<br />

Springridge<br />

Hillglen<br />

Hillgate<br />

Bluebonnet<br />

Hillshire<br />

Hilltree<br />

Hillmont<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0001.MXD SGELPI 11/9/2010 11:19:41<br />

Area Designated for<br />

Physical Inspection<br />

0 1,250 2,500 Feet<br />

q<br />

Burbank Dr. - Gardere Ln.<br />

SGL-R-0001<br />

Project Vicinity Map<br />

Figure 3-7


Wylie<br />

Seyburn<br />

Daventry<br />

Menlo<br />

Highland Park<br />

Palmetto<br />

Sedley<br />

Boone<br />

Amesbury<br />

Beckenham<br />

Chippenham<br />

Leycester<br />

Rodney<br />

Watford<br />

Cardiff<br />

Copperfield<br />

Tipperary<br />

Bromley<br />

Stoneliegh<br />

Kenilworth<br />

Palmetto<br />

Louray<br />

Albert Hart<br />

Aries<br />

Maxine<br />

Delaville<br />

Chandler<br />

Harts Mill<br />

Baird<br />

Applewood<br />

Castle Kirk<br />

Thoreau<br />

Walden<br />

Chandler<br />

Staring<br />

Lake Calais<br />

Theron<br />

Leonard<br />

Avis<br />

Arcadia<br />

Savanna View<br />

Flora<br />

Kimbro<br />

Clear Lake<br />

Charleston<br />

Sharynwood<br />

Village Park<br />

Mayfair Hill<br />

Kings Hill<br />

Mary Evers<br />

Bellonia<br />

Doolittle<br />

Elysian<br />

Southlawn<br />

Chanadia<br />

Gurlie<br />

Balboa<br />

Thayer<br />

Hyacinth<br />

Sabine<br />

Roundhill<br />

Vienna<br />

Lansington<br />

Samoa<br />

Madeira<br />

Chanadia<br />

Perkins<br />

Burbank<br />

Hammatt<br />

Bontura<br />

Magnolia Wood<br />

Menlo<br />

Kimbro<br />

Nolen<br />

Highpoint<br />

Worth<br />

Halfway Tree<br />

Rustwood<br />

Wild Valley<br />

Worthington Lake<br />

Sabine<br />

Lake Donna<br />

Mohawk<br />

Flatsway<br />

Bookerline<br />

Rhine<br />

Windingway<br />

Hickorylake<br />

Myrtlelake<br />

Oak Hills<br />

Skysail<br />

Port<br />

Mast<br />

Stern<br />

Ned<br />

Starboard<br />

Hadley<br />

John Henry<br />

G S R I<br />

Meadow Bend<br />

Fountain View<br />

Stoney Creek<br />

Lochness<br />

Misty Creek<br />

Bayou Fountain<br />

Seabord<br />

Highland Creek<br />

Jade<br />

Heatherwood<br />

Fox Run<br />

Gardere<br />

Coy<br />

G S R I<br />

Elvin<br />

Onter<br />

Renee<br />

Kingcrest<br />

Rainford<br />

Kevel<br />

Westhaven<br />

Winterhaven<br />

Windward<br />

Emerald<br />

Springhaven<br />

Myrtle View<br />

Myrtle Hill<br />

Knox Hill<br />

Bluebonnet<br />

Kentshire<br />

Hidden Lake<br />

Highland<br />

Shady Lake<br />

High Lake<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0002.MXD SGELPI 11/9/2010 11:20:34<br />

Area Designated for<br />

Physical Inspection<br />

0 1,000 2,000 Feet<br />

q<br />

Staring Ln - Boone Dr.<br />

SGL-R-0002<br />

Project Vicinity Map<br />

Figure 3-8


Issac Cline<br />

Etta<br />

Campus<br />

Dean Lee<br />

Princeton<br />

Cornell<br />

L S U<br />

Lakeshore<br />

Yale<br />

Henry Adams<br />

Ben Hur<br />

Delgado<br />

Tulane<br />

Newcomb<br />

Clara<br />

Stanford<br />

Highland<br />

Ben Hur<br />

Lakeshore<br />

Nicholson<br />

Lee<br />

Burgin<br />

Stuart<br />

Bengal<br />

Loyola<br />

Carriage<br />

Chalet<br />

Lakeshore<br />

Heritage<br />

Ferndale<br />

Bancroft<br />

Marigold<br />

Morning Glory<br />

Floyd<br />

Palm<br />

Pickett<br />

Cloverdale<br />

Burbank<br />

Nelson<br />

Menlo<br />

Wylie<br />

Pollard<br />

Tipperary<br />

Boone<br />

Perkins<br />

Quail<br />

Kenilworth<br />

Louray<br />

Rodney<br />

Hood<br />

Whitehaven<br />

Aberdeen<br />

Carl<br />

Dubois<br />

Sunset<br />

Chandler<br />

Balis<br />

Orchid<br />

Arrowhead<br />

Mimosa<br />

Sweetbriar<br />

Woodstone<br />

College<br />

Tupello<br />

Edinburgh<br />

Woodgate<br />

Dentation<br />

Glasgow<br />

Bennington<br />

Columbine<br />

Highland Park<br />

Dahlia<br />

Chippenham<br />

Congress<br />

Beckenham<br />

Daventry<br />

Leycester<br />

Bromley<br />

Guilford<br />

Albert Hart<br />

Stoneliegh<br />

Trenton<br />

Stratford<br />

Moss Side<br />

Baird<br />

Maxine<br />

Castle Kirk<br />

Magnolia Wood<br />

Peggy<br />

Burden<br />

Pikes<br />

Kimbro<br />

Seyburn<br />

Hibiscus<br />

Tarrytown<br />

Orion<br />

I-10<br />

Irene<br />

Staring<br />

Cedardale<br />

Forge<br />

Cloverdale<br />

Bourbon<br />

Helvetia<br />

Hood<br />

Jolly<br />

Mc Donald<br />

Stephens<br />

Leeward<br />

University Highlands<br />

College Hill<br />

Menlo<br />

Guava<br />

Sassy<br />

Rubin<br />

Leeward<br />

Hyacinth<br />

Bennett<br />

Ryan<br />

Bluebell<br />

Boone<br />

Poplar<br />

Knollwood<br />

Woodruff<br />

Boone<br />

Brame<br />

Bluebell<br />

Millstone<br />

Millgate<br />

Kenilworth<br />

Concord<br />

Whitehaven<br />

Fieldgate<br />

Fieldgate<br />

Whitlow<br />

Jamestown<br />

Pointer<br />

Woodchase<br />

Rothmer<br />

Seyburn<br />

Revere<br />

Yorktown<br />

Elmcrest<br />

Brandywine<br />

Lexington<br />

Clematis<br />

Palmetto<br />

Saratoga<br />

Monmouth<br />

Potomac<br />

Forsythia<br />

Amesbury<br />

Cardiff<br />

Copperfield<br />

Columbine<br />

Chandler<br />

Hammatt<br />

Krista<br />

Stokes<br />

Quail Run<br />

Palmetto<br />

Blendon<br />

Overton<br />

Delaville<br />

Menlo<br />

Applewood<br />

Walden<br />

Harts Mill<br />

Thoreau<br />

Bella<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0003.MXD SGELPI 11/9/2010 11:23:44<br />

Area Designated for<br />

Physical Inspection<br />

0 1,400 2,800 Feet<br />

q<br />

Kenilworth Blvd. - Boone Dr.<br />

SGL-R-0003<br />

Project Vicinity Map<br />

Figure 3-9


Oakmoss<br />

Maribel<br />

Benson<br />

Kilona<br />

Lanier<br />

Fernwood<br />

Rome<br />

Airway<br />

Marydon<br />

Courtland<br />

Farrington<br />

Monterrey<br />

Redondo<br />

Cora<br />

Sunnybrook<br />

Warren<br />

Elmwood<br />

Palermo<br />

Aletha<br />

Palisades<br />

Sharp<br />

Pasadena<br />

Gum<br />

Sam<br />

Pin Oak<br />

Tee<br />

Hillmont<br />

Dual<br />

Bomer<br />

Dan<br />

Loring<br />

Hartford<br />

Clairmont<br />

Atlanta<br />

Percy<br />

Davlin<br />

Tioga<br />

Greenwell<br />

Phebus<br />

Riffel<br />

Charlene<br />

El Scott<br />

Astoria<br />

Savoy<br />

Bryant<br />

Hanks<br />

Dancy<br />

Videt Polk<br />

Ridgewood<br />

Dickens<br />

Ridgewood<br />

Evan Brooks<br />

Tree Trunk<br />

Monet<br />

Greenwell Spgs Rd Ra<br />

Bon Marche<br />

Industrial<br />

Scobell<br />

Lubbock<br />

Exchange<br />

Lobdell<br />

Harry<br />

Wooddale<br />

Prescott<br />

Greenwell Spgs<br />

Beaumont<br />

Dallas<br />

Bishop Ott<br />

Realtors<br />

Reco<br />

Oak View<br />

Gerlando<br />

Airline<br />

Franwood<br />

Lone Oak<br />

Albert<br />

Tom<br />

Gladewood<br />

Royalwood<br />

Harry<br />

Wooddale<br />

Greenway<br />

Landwood<br />

Bern<br />

Gay<br />

Greentree<br />

Athens<br />

Madrid<br />

Paris<br />

Commerce<br />

Berlin<br />

Harry<br />

Greenmoss<br />

Airway<br />

Dutsch<br />

Oak Crest<br />

Florline<br />

Souter<br />

Kiowa<br />

Joor<br />

Greenwell Springs<br />

Oak Villa<br />

Choctaw<br />

Tracy<br />

Great Smokey<br />

Mammoth<br />

Ventura<br />

Cuyhanga<br />

Elain<br />

Olympic<br />

Florida<br />

Big Bend<br />

Platt<br />

Ridgemont<br />

Edgemont<br />

CortanaJoyce<br />

Syble<br />

Woodcrest<br />

Chatawa<br />

Woodglynn<br />

Florida<br />

Centerway<br />

Crestaire<br />

Alameda<br />

Alameda<br />

Kimberly<br />

Fellsway<br />

Vega<br />

Delmar<br />

Belcaro<br />

San Lo<br />

Swingalong<br />

Redwood<br />

Syble<br />

Graham<br />

El Cajon<br />

Coronado<br />

Tampa<br />

Castlewood<br />

Pomona<br />

Westerly<br />

Grand Teton<br />

Mesa Verde<br />

Havana<br />

Jamaica<br />

Manitou<br />

Yosemite<br />

Orlando<br />

Byrd<br />

Vega<br />

Redondo<br />

Chalma<br />

Yellowstone<br />

Meeker<br />

Marilyn<br />

Presidio<br />

San Jauquin<br />

Patio<br />

Fiesta<br />

Alpha<br />

Beta<br />

Gamma<br />

Jo Anne<br />

San Clemente<br />

Perdue<br />

Coronado<br />

Tampa<br />

Ballina<br />

David<br />

Karen<br />

Cashel<br />

Harvey<br />

Florida<br />

Nelwyn<br />

Canyonland<br />

Darryl<br />

Gerald<br />

Cletus<br />

Tams<br />

White Oak<br />

Casa Grande<br />

Acorn<br />

Red Oak<br />

Mc Gehee<br />

Mollylea<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGU-R-0001.MXD SGELPI 11/9/2010 11:25:18<br />

Area Designated for<br />

Physical Inspection<br />

0 1,400 2,800 Feet<br />

q<br />

Oak Villa Blvd. - Choctaw St.<br />

SGU-R-0001<br />

Project Vicinity Map<br />

Figure 3-10


Frances Harriet<br />

Monterrey<br />

Redondo<br />

Carlsbad<br />

Cora<br />

Carolyn Sue<br />

Palermo<br />

Marilyn<br />

Elizabeth<br />

Brocade<br />

Madras<br />

Aletha<br />

Woodhaven<br />

Palisades<br />

Lonita<br />

Allyson<br />

Broadmoor<br />

Sharp<br />

Gum<br />

Sam<br />

Pin Oak<br />

Tee<br />

Eileen<br />

Sinclair<br />

Bellridge<br />

Stonegate<br />

Vieux<br />

Braeburn<br />

Bellfort<br />

Burgess<br />

Sherwood Forest<br />

Elbert<br />

Little John<br />

Mike<br />

Harco<br />

Hampton<br />

Raton<br />

Grand Teton<br />

Mesa Verde<br />

Great Smokey<br />

Chalma<br />

Yellowstone<br />

Mammoth<br />

Perdue<br />

Dual<br />

Richcroft<br />

Meeker<br />

Vega<br />

Vega<br />

Riveroaks<br />

Van<br />

Airline<br />

Donna<br />

Meredith<br />

Parkview<br />

Lindale<br />

Redondo<br />

Berkeley<br />

Choctaw<br />

Castlewood<br />

Woodbine<br />

Southmoor<br />

Greenbriar<br />

Cammy<br />

El Cajon<br />

Coronado<br />

Tampa<br />

Ventura<br />

Havana<br />

Jamaica<br />

Pomona<br />

Cottondale<br />

Elite<br />

Damuth<br />

Van<br />

Manitou<br />

Cuyhanga<br />

Broadmoor<br />

Van<br />

Judi<br />

Sierra Vista<br />

Damuth<br />

Diane<br />

East Baton Rouge Parish<br />

Summit Ridge<br />

Chateau<br />

Madeline<br />

Regency<br />

Presidio<br />

Coronado<br />

San Jauquin<br />

Patio<br />

Capri<br />

Woodhaven<br />

Fiesta<br />

Mollylea<br />

Legend<br />

Ballina<br />

Cashel<br />

San Clemente<br />

Tampa<br />

David<br />

Karen<br />

Barbara<br />

White Oak<br />

Tudor<br />

Harvey<br />

Allyson<br />

Kenlee<br />

Rhapsody<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGU-R-0002.MXD SGELPI 11/9/2010 11:28:16<br />

Woodhaven<br />

Firelight<br />

Gerald<br />

Parkview<br />

Grandeur<br />

Cletus<br />

Tams<br />

Red Oak<br />

Lynell<br />

Browning<br />

Elaine<br />

Melanie<br />

Classique<br />

Acorn<br />

Black Oak<br />

Florida<br />

Rondo<br />

Mc Gehee<br />

Shermoor<br />

Heather<br />

Area Designated for<br />

Physical Inspection<br />

Green Oak<br />

Ranchwood<br />

0 1,200 2,400 Feet<br />

Heatherview<br />

Hedgewood<br />

Bellglade<br />

Voorhies<br />

q<br />

Darryl<br />

Green Oak<br />

Florida<br />

Major Oaks<br />

Tinley<br />

Catalpa<br />

Robin Hood<br />

Marlbrook<br />

Tifton<br />

Burton<br />

Chalice<br />

Oak<br />

Marcia<br />

Glenhaven<br />

Charington<br />

Silverton<br />

Muriel<br />

Gwen<br />

Bellrose<br />

Dartmoor<br />

Darryl<br />

Glenda<br />

Ashbourne<br />

Stan<br />

Bard<br />

Blackoak<br />

Fairoak<br />

Willow Oak<br />

Florida<br />

Sylvan<br />

Parkwood<br />

Rosedale<br />

Dumont<br />

Pamela<br />

Archery<br />

Robinhood<br />

Fairhaven<br />

Millburn<br />

Sheraton<br />

King Richard<br />

Old Hammond<br />

Shady Oaks<br />

Twin Oak<br />

Fair Oak<br />

Nassau<br />

Sherbrook<br />

Westbrook<br />

Vickers<br />

Dabney<br />

Kay<br />

Erlanger<br />

Shannon<br />

Nile<br />

Dawn<br />

Tamari<br />

Wilton<br />

Havenwood<br />

Warfield<br />

Wingate<br />

Goodwood<br />

La Margie<br />

Stacy<br />

Cristy<br />

Glenhaven<br />

Stockton<br />

Millburn<br />

Warwick<br />

Lorna<br />

Cate<br />

Shay<br />

Parnell<br />

Fairhaven<br />

Sheraton<br />

Brookshire<br />

Queensbury<br />

Buckingham<br />

Beauverde<br />

Tams<br />

Boulevard de Province<br />

La Annie<br />

Shadydale<br />

Robbie<br />

Longbow<br />

Montgomery<br />

Lea Ann<br />

Marque Ann<br />

Duchess<br />

King John<br />

Arlingford<br />

Lockhaven<br />

Sherbrook<br />

Pelham<br />

Harco<br />

Robinhood<br />

Parnell<br />

Parkwood<br />

Bristol<br />

Elva<br />

Sharp Rd. - Florida Blvd.<br />

SGU-R-0002<br />

Project Vicinity Map<br />

Figure 3-11<br />

I-12


Aletha<br />

Fiesta<br />

Palisades<br />

Lonita<br />

Sharp<br />

Gum<br />

Edgemont<br />

Sam<br />

Tee<br />

Acorn<br />

Aubin<br />

Lassen<br />

Tinley<br />

Green Ridge<br />

Gwen<br />

Sterling<br />

Mike<br />

Harco<br />

Steffek<br />

Millerville<br />

Fountainbleau<br />

Laurie Lynne<br />

Boreas<br />

Balsawood<br />

Hammond Manor<br />

O'Neal<br />

Crossbow<br />

Godfrey<br />

Brillock<br />

Triple B<br />

Greenwell Springs<br />

Cherryl<br />

Winterset<br />

Goodland<br />

Mapleton<br />

Parkin<br />

Fryers<br />

Frenchtown<br />

Chanove<br />

Maison<br />

Bayonne<br />

Lesage<br />

Chambord<br />

Chinon<br />

Chaumont<br />

Dry Creek<br />

Bristle Cone<br />

Thibodeaux<br />

Morgan<br />

Erin<br />

Canterbury<br />

Shamrock<br />

Country<br />

<strong>Plan</strong>chet<br />

Coral<br />

Nelwyn<br />

Rainier<br />

Monticello<br />

Kilkenny<br />

Langer<br />

Catalina<br />

Langlois<br />

Sarasota<br />

Hillmont<br />

Pasadena<br />

Norwich<br />

Flamingo<br />

Platt<br />

Elain<br />

Perdue<br />

Jo Anne<br />

Cashel<br />

Riveroaks<br />

Woodhaven<br />

Silverest<br />

Allyson<br />

Big Bend<br />

Darryl<br />

Cletus<br />

Tams<br />

Red Oak<br />

Harvey<br />

Kenlee<br />

Browning<br />

Tudor<br />

Elaine<br />

Heather<br />

Old Hammond<br />

Lebanon<br />

Cedarcrest<br />

Mc Gehee<br />

Voorhies<br />

Lava Bed<br />

Dual<br />

Sherwood Forest<br />

Goodwood<br />

Major Oaks<br />

Braeburn<br />

Ericson<br />

Redlands<br />

Chalice<br />

Darius<br />

Stan<br />

Catalpa<br />

Bellfort<br />

Mead<br />

Fort Meyers<br />

Toulon<br />

Richcroft<br />

Bard<br />

Glenda<br />

Muriel<br />

Ocala<br />

Darryl<br />

Archery<br />

Mollylea<br />

Catalina<br />

Little John<br />

Sylvan<br />

Sheraton<br />

Boardwalk<br />

Florida<br />

Pamela<br />

Manorwood<br />

Kay<br />

Baylor<br />

Auburn<br />

Vickers<br />

Dabney<br />

Westbrook<br />

King Richard<br />

Merritt<br />

Eastgate<br />

Havenwood<br />

Mendenhal<br />

Warfield<br />

Nile<br />

Shay<br />

Tamari<br />

Wingate<br />

Stockton<br />

Choctaw<br />

Arlingford<br />

Robinhood<br />

Millburn<br />

Warwick<br />

Lancelot<br />

Britain<br />

Ireland<br />

La Margie<br />

Buckingham<br />

Province<br />

Galahad<br />

Tams<br />

Elva<br />

Woodland Ridge<br />

Woodcliff<br />

Windsor<br />

Kirkley<br />

Elwick<br />

Trammell<br />

Flannery<br />

Allan<br />

Holt<br />

Sunnyhill<br />

Rushmore<br />

Darilyn<br />

Ponderosa<br />

Parwood<br />

Tonya<br />

Astolat<br />

Mallory<br />

Kimmeridge<br />

Torrey Pine<br />

Franbill<br />

Damon<br />

Katherine<br />

Azalea Pk<br />

Foxlane<br />

Fairview<br />

Florida<br />

Lilac<br />

Woodbrook<br />

Holly<br />

Mora<br />

Birmingham<br />

Breton<br />

Avalon<br />

Palmwood<br />

Versailles<br />

Choctaw<br />

Bailey<br />

Chimneywood<br />

Firewood<br />

Lily<br />

Jester<br />

Stonewood<br />

General Prentiss<br />

Terrell<br />

Marjorie<br />

Gloria<br />

Rhonda<br />

Aspenwood<br />

Woodmoss<br />

Monica<br />

Lirocchi<br />

Woodvale<br />

O Neal<br />

Hamilton<br />

Hill<br />

Frontage<br />

Hewwood<br />

London<br />

Vermillion<br />

Amite<br />

Stevendale<br />

Coliseum<br />

Derby<br />

Strain<br />

Centurion<br />

Caesar<br />

Bristoe<br />

Ellis<br />

Harrells Ferry<br />

Blouin<br />

Riverview<br />

Deer Lake<br />

Lakepark<br />

Hoyt<br />

Riverside Park<br />

Chariot<br />

I-12<br />

Pompey<br />

Cicero<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGU-R-0003.MXD SGELPI 10/21/2009 12:57:32<br />

Area Designated for<br />

Physical Inspection<br />

0 2,300 4,600 Feet<br />

q<br />

Flannery Rd. - Florida St.<br />

SGU-R-0003<br />

Project Vicinity Map<br />

Figure 3-12


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2 South Gravity System Capacity Improvements Projects<br />

3.2.1 SGU-C-0001 (Multiple PSs - Florida Blvd - Sherwood Forest Blvd)<br />

The SGU-C-0001 (Multiple PSs – Florida Blvd – Sherwood Forest Blvd) project has been<br />

combined with SGC-C-0001 (Airline Highway-Florida Blvd – PS 30 Improvements and New<br />

Pump Station). The combined project has been designated SGC-C-0001 (Florida Blvd PS<br />

Improvements) and is described in Section 3.2.6.<br />

3.2.2 SGU-C-0002 (Airline Highway - Interstate 12)<br />

The SGU-C-0002 (Airline Highway – Interstate 12) project has been combined with SGC-C-<br />

0002 (Airline Highway-Jefferson Highway) and SGC-C-0003 (Essen Lane-Interstate 12)<br />

projects. The combined project has been designated SGC-C-0002 (Airline Highway Pipeline<br />

Improvements) project and is described in Section 3.2.7.<br />

3.2.3 SGU-C-0003 (Sherwood Forest Blvd- Goodwood Blvd Pipeline<br />

Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) project<br />

includes the upgrade of gravity sewers upstream of PS 13, PS 50, PS 21, PS 31, and PS 101 to<br />

alleviate SSOs.<br />

Location<br />

The gravity sewer replacements that comprise this project are located near the intersections<br />

of Florida Blvd and Sherwood Forest Drive, and are shown in Figure 3-13.<br />

Gravity segment 050-00619 to 050-00682 starts on Sharp Lane near the Tams Drive<br />

intersection. The gravity segment travels north and turns east at Tams Drive. The line<br />

continues east until reaching 050-00682, located on Tams Drive between the Gum Street and<br />

Pin Oak Street intersections.<br />

Gravity segment 050-00480 to 050-00924 starts near the Elizabeth Drive and South Riveroaks<br />

Drive intersection. The gravity segment travels east along a drainage to 050-00150, south<br />

along a drainage to 050-00168, and east parallel to Riveroaks Drive to 050-00909 where it<br />

then continues southeast along Sharp Road until reaching 050-00924.<br />

Gravity segment 050-00400A to 050-00837 starts on Goodwood Blvd near Westbrook Drive.<br />

The gravity line travels west along Goodwood Blvd until reaching 050-00837, located near<br />

Sherwood Forest Drive and Goodwood Blvd intersection.<br />

Gravity segment 050-00392 to 050-00280 starts on Pamela Drive. The gravity line travels<br />

southwest until reaching 050-00390, northwest until reaching 050-00388, and west until<br />

reaching 050-00280, located northwest of the Glenda Drive and Sherwood Forest Blvd<br />

intersection.<br />

Gravity segment 050-00280 to 050-00272 starts northwest of Glenda Drive and Sherwood<br />

Forest Blvd intersection. The gravity line travels south until reaching 050-00272, located<br />

northwest of the Florida Blvd and North Sherwood Forest Drive intersection.<br />

GNV31031158547.DOCX/103440004 3-23 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 013-00002 to 013-00001 starts north of the intersection of Elizabeth Drive<br />

with River Oaks Drive. The gravity line travels west until reaching 013-00001, located near<br />

PS 13.<br />

Gravity segment 013-00049 to PS 13 starts near the Marilyn Drive and Mollylea Drive<br />

intersection. The gravity segment travels south until reaching 013-00012 and then traveling<br />

east until reaching PS 13. PS 13 will be upgraded as part of SGC-C-0001 (Florida Blvd PS<br />

Projects).<br />

Gravity segment 021-00009 to PS 21 starts southwest of the Warfield Avenue and Windsor<br />

Drive intersection. The gravity segment travels southeast along Windsor Drive, crossing<br />

Florida Blvd until reaching 021-00001F. The gravity line continues west parallel to Florida<br />

Blvd until reaching PS 21, located near the Florida Blvd and Shelby Drive intersection.<br />

Gravity segment 101-00024 to PS 101 starts south of the Darwin Avenue and South Flannery<br />

Road intersection. The gravity segments travels west until reaching 101-00018, southeast<br />

until reaching 101-00016, east until reaching 101-00014, and then southeast along Brinwood<br />

Avenue until reaching PS 101. PS 101 is located northeast of the Goodwood Blvd and<br />

Brinwood Avenue intersection.<br />

Gravity segment 031-00035 to 031-00030 starts southwest of the Robinhood Drive and Little<br />

John Drive intersection. The gravity segment travels east until reaching 031-00033 and then<br />

southwest parallel to Little John Drive until reaching 031-00030. The segment ends<br />

northwest of the Little John Drive and Mollyea Drive intersection.<br />

Gravity segment 031-00030 to PS 31 starts northeast of Little John Drive and Mollyea Drive<br />

intersection. The gravity segment travels southeast until reaching 031-00006 and then travels<br />

south along the canal parallel to Westbrook Drive until reaching PS 31. PS 31 is located<br />

southeast of the Goodwood Blvd and Westbrook Drive intersection.<br />

Gravity segment 031-00378 to 031-00006 starts southwest of the East Glenhaven Drive and<br />

Wilton Drive intersection. The gravity line travels southwest until reaching 031-00006,<br />

located northeast of the Westbrook Drive and Mollylea Drive intersection.<br />

Gravity segment 031-00442 to 031-00435 starts northwest of the Goodwood Blvd and<br />

Brinwood Avenue intersection. The gravity line travels southwest until reaching 031-00435,<br />

located northeast of the Goodwood Blvd and South Flannery Road intersection.<br />

Gravity segment 031-00435 to 031-00237 starts northeast of South Flannery Road and<br />

Goodwood Blvd. The gravity line travels west until reaching 031-00434, south until reaching<br />

031-00433, and then northwest until reaching 031-00237, following Goodwood Blvd. The<br />

segment ends northeast of the Goodwood Blvd and Trammell Drive intersection.<br />

Gravity segment 031-00237 to 031-00132 starts northeast of the Trammell Drive and<br />

Goodwood Blvd intersection. The gravity line travels northwest along Goodwood Blvd until<br />

reaching 031-00132, located west of the Trammell Drive and Camelot Avenue intersection.<br />

Gravity segment 031-00132 to 031-00112 is located west of the Trammell Drive and Camelot<br />

Avenue intersection. The gravity line travels northwest until reaching 031-00131, north until<br />

reaching 031-00129, and west until reaching 031-00112. The gravity segment ends southeast<br />

of the Fairhaven Drive and Woodcliff Drive intersection.<br />

GNV31031158547.DOCX/103440004 3-24 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 031-00112 to PS 31 starts southeast of the Fairhaven Drive and Woodcliff<br />

Drive intersection. The gravity line travels west until reaching 031-00102, south until<br />

reaching 031-00102A, and then southwest until reaching PS 31. PS 31 is located southeast of<br />

the Westbrook Drive and Goodwood Blvd intersection.<br />

Gravity segment 031-00270 to 031-00112 starts northeast of the East Robinhood Drive and<br />

Woodcliff Drive intersection. The gravity segment travels south until reaching 031-00112,<br />

located southeast of the Fairhaven Drive and Woodcliff Drive intersection.<br />

Gravity segment 031-00299 to 031-00289 starts southeast of the Arlingford Avenue and<br />

Shelby Drive intersection The gravity line travels south until reaching 031-00289, located<br />

northeast of the Archery Drive and Woodcliff Drive intersection.<br />

Gravity segment 031-00330 to 031-00299 starts east of the Norma Court and Shelby Drive<br />

intersection. The gravity line travels south until reaching 031-00299, located southeast of the<br />

Arlingford Avenue and Shelby Drive intersection.<br />

Gravity segment 031-00330A to 031-00330 starts southeast of the Shelby Drive and Florida<br />

Blvd intersection. The gravity line travels south until reaching 031-00330, located east of the<br />

Norma Court and Shelby Drive intersection.<br />

Forcemain segment PS21FM to 031-00330A starts near Florida Boulevard. The forcemain<br />

segment travels south until reaching 031-00330A, located southeast of the Shelby Drive and<br />

Florida Blvd intersection.<br />

Scope<br />

The scope of this project is shown in Table 3-2. This project includes the construction of<br />

approximately 8,400 feet of 15-inch, 21-inch, 24-inch, and 36-inch gravity sewer upstream of<br />

PS 50, approximately 950 feet of 12-inch and 15-inch gravity sewer upstream of PS 13,<br />

approximately 2,100 feet of 18-inch gravity sewer upstream of PS 21, approximately 2,000<br />

feet of 10-inch gravity sewer upstream of PS 101, and approximately 13,800 feet of 10-inch,<br />

12-inch, 15-inch, 18-inch, 21-inch, 24-inch, and 36-inch gravity sewer and forcemain<br />

upstream of PS 31.<br />

TABLE 3-2<br />

SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

050-00619 050-00682 1,000 15 24<br />

050-00480 050-00924 2,000 8 and 12 15<br />

050-00400A 050-00837 2,800 18 36<br />

050-00392 050-00280 2,400 12 21<br />

050-00280 050-00272 1,200 15 or 18 24<br />

013-00002 013-00001 150 8 12<br />

Comments<br />

013-00049 PS13 800 8 and 10 15 PS Replacement under SGC-C-0001<br />

(Florida Blvd PS Improvements)<br />

021-00009 PS21 2,100 12 and 15 18 Crosses Florida Blvd; PS will be<br />

upgraded in SGC-C-0001 (Florida<br />

Blvd PS Improvements)<br />

GNV31031158547.DOCX/103440004 3-25 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-2<br />

SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

101-00024 PS101 2,000 8 10<br />

031-00035 031-00030 1,100 8 15<br />

Comments<br />

031-00030 PS 31 2,600 8 to 12 21 PS upgraded in SGC-C-0001 (Florida<br />

Blvd PS Improvements)<br />

031-00378 031-00006 80 8 12 Crosses drainage canal<br />

031-00442 031-00435 670 8 10<br />

031-00435 031-00237 930 8 and 12 12<br />

031-00237 031-00132 260 10 15<br />

031-00132 031-00112 550 10 to 12 18<br />

031-00112 PS31 3,400 21 36<br />

031-00270 031-00112 2,600 18 24<br />

031-00289 031-00270 740 8 18<br />

031-00299 031-00289 320 15 18<br />

031-00330 031-00299 670 15 18<br />

031-00330A 031-00330 340 15 18<br />

PS21FM 031-00330A 310 8 10 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $11,200,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction Not Started.<br />

GNV31031158547.DOCX/103440004 3-26 JANUARY 2011<br />

REV. 5


Marilyn<br />

Elizabeth<br />

Brocade<br />

Aletha<br />

Madras<br />

Sharp<br />

Gum<br />

Tinley<br />

Gwen<br />

Friar Tuck<br />

Bellfort<br />

Burgess<br />

#<br />

Harco<br />

Harco<br />

Big Bend<br />

#<br />

PS16<br />

#<br />

#<br />

PS293<br />

#<br />

Sierra Vista<br />

Capri<br />

Mammoth<br />

Perdue<br />

050-00619<br />

Darryl<br />

Gerald<br />

Cletus<br />

!R !R<br />

050-00682<br />

Dual<br />

Oak<br />

PS359<br />

#<br />

Chalice<br />

Tams<br />

Catalpa<br />

#<br />

#<br />

PS89<br />

#<br />

Tamari<br />

Vickers<br />

PS314<br />

Mike<br />

Stacy<br />

La Annie<br />

Warfield<br />

Cristy<br />

Choctaw<br />

Lorna<br />

#<br />

!R<br />

PS169<br />

021-00009<br />

Flannery<br />

PS295<br />

#<br />

Rushmore<br />

Orlando<br />

Van<br />

!R<br />

#<br />

#<br />

!R!R!R<br />

PS81<br />

Ballina<br />

013-00049<br />

PS13<br />

Riveroaks<br />

!R<br />

#<br />

PS51AA<br />

013-00001 050-00924<br />

Woodhaven<br />

Goodwood<br />

Allyson<br />

Firelight<br />

East Baton Rouge Parish<br />

Parkview<br />

Kenlee<br />

Browning<br />

Ranchwood<br />

#<br />

PS370<br />

Red Oak<br />

Major Oaks<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

Stonegate<br />

Tifton<br />

050-00272<br />

Tinley<br />

!R<br />

!R<br />

050-00837<br />

!R<br />

Bellrose<br />

#<br />

Muriel<br />

050-00280<br />

PS50<br />

Sherwood Forest<br />

Millburn<br />

Sheraton<br />

Archery<br />

Robinhood<br />

Manorwood<br />

!R<br />

#<br />

!R<br />

031-00030<br />

050-00392<br />

PS151<br />

031-00035<br />

Kay<br />

#<br />

#<br />

!R<br />

!R<br />

!R<br />

!R<br />

!R<br />

!R !R 031-00006<br />

050-00203<br />

!R<br />

#<br />

!R<br />

!R<br />

!R!R<br />

Parkwood<br />

PS31A<br />

Dabney<br />

Erlanger<br />

Wilton<br />

031-00378<br />

PS87<br />

Millburn<br />

PS21FM<br />

031-00330<br />

031-00299<br />

Robinhood<br />

Parnell<br />

Glenhaven<br />

Mollylea<br />

Parkwood<br />

Sherbrook<br />

Fairhaven<br />

Warwick<br />

Elva<br />

!R<br />

Woodcliff<br />

PS21<br />

031-00330A<br />

031-00289<br />

031-00270<br />

031-00435<br />

#<br />

!R<br />

!R<br />

031-00442<br />

031-00132 031-00237<br />

Elwick<br />

Parnell<br />

#<br />

PS227<br />

#!R<br />

!R<br />

PS448<br />

#<br />

PS163<br />

#<br />

101-00024<br />

§¨¦ I-12<br />

Holt<br />

PS101<br />

#<br />

Legend<br />

Sherwood Forest Blvd. - Goodwood Blvd.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Pipeline Projects<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SGU-C-0003<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-13<br />

0 1,000 2,000<br />

Feet


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.4 SGU-C-0004 (Goodwood Blvd - South Flannery Road)<br />

The SGU-C-004 (Goodwood Blvd – South Flannery Road) project has been combined with<br />

SGU-C-0003 (Florida Blvd-Sherwood Forest Blvd) from the October 2008 PDP. The<br />

combined project has been designated SGC-C-0003 (Sherwood Forest Blvd-Goodwood Blvd<br />

Pipeline Improvements) project and is described in Section 3.2.3.<br />

3.2.5 SGU-C-0005 (Oak Villa Blvd - Monterey Blvd Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) project includes<br />

the upsizing of the gravity sewer upstream of PS 16, PS 50, and PS 51 and the forcemain<br />

from PS 16, which is being upgraded as part of the SGC-C-0001 (Florida Blvd PS<br />

Improvements) project.<br />

Location<br />

The gravity sewer replacements that comprise the SGU-C-0005 project are located northeast<br />

of Airline Highway and Florida Blvd, and along Sherwood Forest Blvd, south of Florida<br />

Boulevard Road, and are shown in Figure 3-14.<br />

Gravity segment 051-00222 to 051-00196 starts southeast of the Kimberly Drive and<br />

Kimberly Way intersection. The gravity segment travels east until reaching 051-00196,<br />

located northwest of the Monterrey Drive and Great Smokey Avenue intersection.<br />

Gravity segment 016-00002 to PS 16 starts southwest of the Jo Anne Drive and Big Bend<br />

Avenue intersection. The gravity line travels south until reaching PS 16, located northeast of<br />

the Jo Anne Drive and Great Smokey Avenue intersection.<br />

Gravity segment 051-00467 to 051-00196 starts southeast of the Syble Drive and Monterrey<br />

Drive intersection. The gravity line travels south until reaching 051-00196, located northwest<br />

of the Great Smokey Avenue and Monterrey Drive intersection.<br />

Gravity segment 051-00196 to 051-00169 starts northwest of the Great Smokey Avenue and<br />

Monterrey Drive intersection. The gravity line travels south until reaching 051-00169,<br />

located northwest of the Great Smokey Avenue and Monterrey Drive intersection.<br />

Gravity segment 051-00169 to 051-00168 starts northwest of the Great Smokey Avenue and<br />

Monterrey Drive intersection. The gravity line travels south until reaching 051-00168,<br />

located northwest of the Mammoth Avenue and Monterrey Drive intersection.<br />

Gravity segment 051-00168 to 051-00070 starts northwest of the Mammoth Avenue and<br />

Monterrey Drive intersection. The gravity line travels south until reaching 051-00070, located<br />

near Mammoth Avenue between its intersections with Monterrey Drive and Needham Drive.<br />

Gravity segment 051-00070 to PS 51 starts near Mammoth Avenue between its intersections<br />

with Monterrey Drive and Needham Drive. The gravity line travels east along the north side<br />

of the drainage channel until reaching PS 51, located north of Cuyhanga Parkway and Sierra<br />

Vista Drive intersection.<br />

Gravity segment DS16 to 051-00169 starts at the intersection of Kings Canyon Drive and<br />

Great Smokey Avenue. The segment travels south behind the row of houses on the south side<br />

of Great Smokey Avenue, heading northeast behind four houses before it doubles back on<br />

its same path and goes southwest and then straight west behind the houses south of Great<br />

Smokey Avenue. It ends at manhole 051-00169 on Monterrey Drive, just northwest of its<br />

intersection with Great Smokey Avenue.<br />

GNV31031158547.DOCX/103440004 3-28 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 051-00364B to 051-00070 starts north of a drainage canal near Cortana<br />

Place. The gravity segment travels southeast until reaching 051-00077, and then east until<br />

reaching 051-00070. The gravity segment ends near Mammoth Avenue between its<br />

intersection with Monterrey Drive and Needham Drive.<br />

Gravity segment 051-00369 to 051-00364B starts above the drainage canal near Airway Drive.<br />

The gravity segment travels east until reaching 051-00364B, located north of Cortana Place.<br />

Gravity segment 050-00837 to 050-00300A starts near Sherwood Forest Blvd and Goodwood<br />

Blvd intersection. The gravity line travels south along Sherwood Forest Blvd until reaching<br />

051-00300, and then west until reaching 050-00300A. The segment ends northwest of the<br />

Sherwood Forest Blvd and Major Oaks Drive intersection.<br />

The SGU-C-0005 (Oak Villa Blvd – Monterey Blvd) project also includes the replacement of<br />

the PS 16 forcemain. This forcemain is located along Great Smokey Drive near JoAnne<br />

Drive. The forcemain travels southwest along Great Smokey Avenue until reaching DS16,<br />

located near the King Canyon Drive and Great Smokey Avenue intersection.<br />

Scope<br />

This project includes construction of approximately 380 feet of 18-inch gravity sewer<br />

upstream of PS 16, approximately 2,600 feet of 42-inch gravity sewer upstream of PS 50, and<br />

approximately 16,700 feet of 18-inch, 21-inch, 24-inch, 30-inch, and 42-inch gravity sewer<br />

upstream of PS 51. This project also includes approximately 950 feet of 8-inch forcemain<br />

from PS 16. The full scope of this project is shown in Table 3-3.<br />

TABLE 3-3<br />

SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) – Pipeline Information<br />

US Node DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

051-00222 051-00196 1,400 12 18<br />

016-00002 PS16 380 10 18 Influenced by the SGC-C-0001 (Florida Blvd PS<br />

Improvements) project in which PS 16 will be<br />

upgraded<br />

051-00467 051-00196 1,500 12 18<br />

051-00196 051-00169 260 15 21<br />

051-00169 051-00168 680 15 24<br />

051-00168 051-00070 3,300 15 30<br />

051-00070 PS51 1,500 18 42 Crosses Choctaw Drive and the railway just north<br />

of Choctaw Drive This segment will need to be<br />

coordinated with the PS51 upgrade as part of the<br />

NFW-C-0002 (Choctaw Storage and Pump<br />

Station Facility) Project<br />

DS16 051-00169 3,200 10 18<br />

051-00364B 051-00070 3,300 15 24<br />

051-00369 051-00364B 1,600 15 21<br />

050-00837 050-00300A 2,600 24 42<br />

PS16 DS16 950 6 8 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9,000,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction Not Started.<br />

GNV31031158547.DOCX/103440004 3-29 JANUARY 2011<br />

REV. 5


Rome<br />

Airway<br />

Oak Villa<br />

Courtland<br />

Vega<br />

Cora<br />

Marilyn<br />

Elizabeth<br />

Sharp<br />

Gum<br />

Tinley<br />

Burgess<br />

Greentree<br />

Athens<br />

Madrid<br />

#<br />

Paris<br />

Tom<br />

Harry<br />

Airline<br />

Dutsch<br />

Oak Crest<br />

Souter<br />

!R<br />

Joyce<br />

Kiowa<br />

Greenwell Springs<br />

051-00369<br />

Choctaw<br />

051-00364B<br />

!R<br />

Cortana<br />

Woodglynn<br />

Crestaire<br />

#<br />

#<br />

!R<br />

!R !R<br />

!R<br />

Alameda<br />

PS98<br />

051-00222<br />

Vega<br />

Monterrey<br />

!R<br />

Redondo<br />

PS18<br />

#<br />

051-00467<br />

Grand Teton<br />

051-00196<br />

051-00169<br />

Mammoth<br />

051-00168<br />

El Cajon<br />

Coronado<br />

Tampa<br />

051-00070<br />

!R !R<br />

#<br />

Havana<br />

Jamaica<br />

Big Bend<br />

Orlando<br />

PS51<br />

Capri<br />

#<br />

#<br />

DS16<br />

!R<br />

PS81<br />

PS25<br />

Perdue<br />

Ballina<br />

016-00002<br />

#<br />

!R PS16<br />

!R #<br />

#<br />

Darryl<br />

#<br />

PS51AA<br />

Elain<br />

Dual<br />

#<br />

PS359<br />

#<br />

Gerald<br />

Cletus<br />

Chalice<br />

Tams<br />

Oak<br />

Catalpa<br />

Red Oak<br />

#<br />

PS293<br />

Richcroft<br />

#<br />

PS89<br />

Archery<br />

Robinhood<br />

#<br />

Wynnewood<br />

Mollylea<br />

Donna<br />

Woodbine<br />

Bracewell<br />

Airway<br />

#<br />

Tifton<br />

Tinley<br />

Airport<br />

Colonial<br />

Tara<br />

#<br />

PS323<br />

Wakefield<br />

Riveroaks<br />

Riveroaks<br />

Meredith<br />

Parkview<br />

Van<br />

Goodwood<br />

Southmoor<br />

Greenbriar<br />

Cammy<br />

Damuth<br />

Van<br />

Parkview<br />

Kenlee<br />

Browning<br />

#<br />

PS370<br />

Major Oaks<br />

!R<br />

!R #<br />

050-00837<br />

Millburn<br />

Sheraton<br />

PS50 050-00300A<br />

#<br />

East Baton Rouge Parish<br />

Crescent<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

Diane<br />

Judi<br />

Firelight<br />

Legend<br />

Proposed<br />

Existing<br />

Oak Villa Blvd. - Monterrey Blvd.<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SGU-C-0005<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-14<br />

0 1,050 2,100<br />

Feet


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.6 SGC-C-0001 (Florida Blvd PS Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGC-C-0001 (Florida Blvd PS Improvements) project includes those improvements that<br />

were previously included in SGU-C-0001 (Multiple Pump Stations-Florida Blvd - Sherwood<br />

Forest Blvd) and SGC-C-0001 (Airline Highway - Florida Blvd PS 30 Improvements and new<br />

pump station). This combined project includes upgrades of PS 13, PS 16, PS 18, PS 21, PS 30,<br />

PS 31, PS 50, and PS 66, and the construction of a new pump station (PS 5xx) to alleviate<br />

SSOs in their upstream basins.<br />

PS 51 was originally part of the SGU-C-0001 (Multiple PSs – Florida Blvd – Sherwood Forest<br />

Blvd) project and was moved to the NFW-C-0002 (Choctaw Storage and Pump Station<br />

Facility) project.<br />

Location<br />

The locations for the pump stations are presented in Table 3-4 and are shown in Figure 3-15.<br />

Scope<br />

The scope of this project is described in Table 3-4. PS 13, PS 16, PS 18, PS 21, PS 30, PS 31, PS 50,<br />

and PS 66 will be replaced. The new pump station (PS 5xx) will be located at or near manhole 058-<br />

01106, conveying all flow from the gravity system upstream directly to PS 58 through a new 30-<br />

inch forcemain will be constructed as part of project SGC-C-0002 (Airline Highway Pipeline<br />

Improvements) project. This new pump station and forcemain will be constructed to alleviate<br />

peak wet weather flow exceedances in the gravity system downstream of the new pump station.<br />

TABLE 3-4<br />

SGC-C-0001 (Florida Blvd Pump Station Improvements) – Pump Station Information<br />

Future Peak<br />

Existing Max. Wet Weather<br />

Capacity (GPM) Flow (GPM)<br />

PS No.<br />

PS 13<br />

PS 16<br />

PS 18<br />

PS 21<br />

PS 31<br />

PS 50<br />

PS 66<br />

PS 30<br />

New PS<br />

(PS 5xx)<br />

Location<br />

Intersection of Elizabeth Drive and<br />

River Oaks Drive<br />

Intersection of Great Smokey<br />

Avenue and JoAnne Drive<br />

Intersection of Monterrey Avenue<br />

and Swingalong Avenue<br />

Near Florida Blvd. at intersection<br />

of Shelby Drive<br />

Goodwood Boulevard near<br />

Havenwood Boulevard<br />

Intersection Major Oaks Road and<br />

Sherwood Forest Boulevard<br />

Comal Drive, near intersection of<br />

Erlanger Drive<br />

Tom Drive near intersection of<br />

Dallas Drive<br />

North of Tara Boulevard and Old<br />

Hammond Highway<br />

Dry<br />

Weather<br />

Flow<br />

1,042 1,389 158<br />

972 1,249 187<br />

625 777 44.4<br />

1,389 2,249 619<br />

2,083 7,500 1,330<br />

7,291 21,375 4,190<br />

833 1,937 556<br />

624 1,096 273<br />

Comments<br />

New 19,543 3,145 Located at or near<br />

MH 058-01106<br />

Note: The existing maximum capacity for the existing pump stations was obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $ 14,500,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction Not Started.<br />

GNV31031158547.DOCX/103440004 3-31 JANUARY 2011<br />

REV. 5


Lobdell<br />

Cyril<br />

Cora<br />

Maribel<br />

#<br />

Lanier<br />

Gerlando<br />

#I<br />

#<br />

#<br />

#<br />

#<br />

Reco<br />

#<br />

PS55<br />

PS30<br />

Wooddale<br />

PS11<br />

#<br />

#<br />

PS30<br />

Independence<br />

Rienzi<br />

Goodwood<br />

Oak<br />

PS335<br />

Prescott<br />

Airport<br />

#<br />

Carter<br />

PS83<br />

Joor<br />

Oak Villa<br />

Cortana<br />

#<br />

#<br />

#<br />

#<br />

BPS503 # PS454<br />

#<br />

# #<br />

PS222<br />

# # # #<br />

PS281<br />

PS18 #<br />

#I<br />

#<br />

#<br />

#<br />

#<br />

PS16<br />

#I<br />

#<br />

PS16<br />

PS293<br />

# PS359<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#I<br />

#<br />

#<br />

PS81<br />

#<br />

#I<br />

#<br />

#<br />

#<br />

Wakefield<br />

PS17<br />

#<br />

#I<br />

#<br />

PS116<br />

PS5XX<br />

PS5XX<br />

Choctaw<br />

Cuyhanga<br />

Donald<br />

PS288<br />

PS13<br />

#<br />

#<br />

Sharp<br />

#<br />

#I<br />

#<br />

PS50<br />

#<br />

#<br />

Aubin<br />

Toulon<br />

PS328<br />

Bard<br />

Catalpa<br />

Archery<br />

#<br />

#I<br />

#<br />

PS50<br />

#I<br />

#<br />

Mike<br />

PS31<br />

#<br />

PS66<br />

Lancelot<br />

Stacy<br />

Langer<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS334<br />

PS169<br />

#<br />

PS380<br />

PS77<br />

#<br />

Flannery<br />

PS227<br />

PS121<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS21<br />

PS163<br />

§¨¦ I-12<br />

#<br />

#<br />

PS448<br />

PS156<br />

PS270<br />

#<br />

#<br />

#<br />

#<br />

#<br />

East Baton Rouge Parish<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

Legend<br />

#<br />

Proposed<br />

Existing<br />

Florida Blvd. PS Projects<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SGC-C-0001<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-15<br />

0 2,000 4,000<br />

Feet


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.7 SGC-C-0002 (Airline Highway Pipeline Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGC-C-0002 (Airline Highway Pipeline Improvements) project includes those segments<br />

previously included in SGC-C-0003 (Essen Lane - Interstate-12) and SGU-C-0002 (Airline<br />

Highway - Interstate 12) from the October 2008 PDP. The project includes the following:<br />

<br />

<br />

<br />

Upsizing of the gravity sewer upstream of PS 58 to alleviate SSOs in the vicinity of the<br />

gravity sewer and pump station.<br />

Upsizing of the gravity sewers upstream of PS 50 and PS 66 and construction of new<br />

forcemains at PS 66 and PS 50 to address upstream SSOs.<br />

Construction of a new forcemain from the new pump station (PS 5xx), described in SGC-<br />

C-0001 (Florida Blvd Pump Station Improvements project), to the manifold point with<br />

the new forcemain from PS 50.<br />

Construction of a new forcemain from the manifold point to PS 58.<br />

Location<br />

The gravity sewers to be replaced under the SGC-C-0002 project are located near the<br />

intersection of Interstates 10 and 12, Old Hammond Highway, and north toward Airline<br />

Highway, and are shown in Figure 3-16.<br />

Gravity segment 058-00036 to 058-00015 starts northeast of the intersection of McCarroll<br />

Drive and Claret Drive, north of Interstate 12. The gravity segment travels south crossing<br />

Interstate 12 until reaching 058-00029. The gravity segment then travels southeast until<br />

reaching 058-00021, and southwest along Essen Lane until reaching 058-00015, located<br />

northeast of the North Essen Heights Court and Essen Lane Intersection.<br />

Gravity segment 058-00586 to 058-00523 starts near the intersection of South Seracedar Street<br />

and Cedarcrest Avenue and travels south on Cedarcrest Avenue until reaching 058-00523. The<br />

gravity segment ends northeast of the Cedarcrest Avenue and Airline Highway intersection.<br />

Section 058-00523 to 058-00501 starts northeast of the Cedarcrest Avenue and Airline<br />

Highway intersection. The gravity segment travels southwest until reaching 058-00501,<br />

located west of the Airline Highway and Cedarcrest Avenue intersection.<br />

Section 058-00501 to 058-00479 starts west of the Airline Highway and Cedarcrest Avenue.<br />

intersection. The gravity segment travels southwest until reaching 058-00430, south along<br />

Bea Drive until reaching 058-00440 near Jefferson Highway, west until reaching 058-00446,<br />

and south until reaching 058-00479, located east of the Idlewood Drive and Ridgely Road<br />

intersection.<br />

Gravity segment PS250DS to 058-00479 starts east of the Landsbury Avenue and Hackberry<br />

Drive intersection. The gravity segment travels northwest until reaching 058-00479, located<br />

east of the Idlewood Drive and Ridgely Road intersection.<br />

Gravity segment 058-00479 to 058-00490 starts east of the Idlewood Drive and Ridgely Road<br />

intersection. The gravity line travels northwest along a drainage canal until reaching 058-<br />

00490, located south of the Inniswold Road and Jefferson Highway intersection.<br />

Segment 058-00490 to 058-00017 starts south of the Inniswold Road and Jefferson Highway<br />

intersection. The gravity line travels northwest crossing Bluebonnet Blvd and travels along<br />

GNV31031158547.DOCX/103440004 3-33 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

the canal. At 058-00499, the gravity segment travels southwest along Bluebonnet Road until<br />

reaching 058-00219. At the intersection of Oliphant Road and Bluebonnet Road, the segment<br />

travels west to the drainage canal west of Drusilla Drive. The segment then travels north<br />

along the canal, crosses the canal, and ends at 058-00017 near the North Essen Heights Court<br />

and East Essen Heights Court intersection.<br />

Gravity segment 058-01316 to 058-01310 starts west of North Donmore Avenue between<br />

intersections with Goya Avenue and Cezanne Avenue. The gravity segment travels south<br />

along Donmore Avenue until reaching 058-01310 located on Donmore Avenue between<br />

intersections with Rembrandt Avenue and Harry Avenue.<br />

Gravity segment 058-01318 to 058-01316 starts west of North Donmore Avenue between<br />

intersections with Renoir Avenue and Cezanne Avenue. The gravity segment travels south<br />

along Donmore until reaching 058-01316, located on Donmore Avenue between<br />

intersections with Goya Avenue and Cezanne Avenue.<br />

Gravity segment 058-03110 to 058-03116 starts near the Wooddale Blvd and Tom Drive<br />

intersection. The gravity segment travels southwest until reaching 058-03116, located east of<br />

the Tom Drive and Lobdell Blvd intersection.<br />

Gravity segment 058-03116 to 058-03117 starts east of the Tom Drive and Lobdell Blvd<br />

intersection. The gravity segment travels northwest until reaching 058-03117.<br />

Gravity segment 058-03117 to 058-03118 starts east of the Tom Drive and Lobdell Blvd<br />

intersection. The gravity segment travels west until reaching 058-03118.<br />

Gravity segment 058-03118 to 058-03124 starts at the Tom Drive and Lobdell Blvd<br />

intersection. The gravity segment travels west until reaching 058-03124, located west of Tom<br />

Drive and Lobdell Blvd intersection.<br />

Gravity segment 058-04039 to 058-04041A starts near the cul-de-sac of W E Heck Court and<br />

travels west through an industrial area to manhole 058-04041A, which is located near the<br />

intersection of Cedarcrest Avenue and Airline Highway.<br />

Gravity segment 058-00016E to 058-00011E starts at the end of the PS 66 forcemain and<br />

travels south until reaching 058-00014E. The segment travels west until reaching 058-00011E,<br />

located northeast of Sherwood Forest Blvd and North Harrells Ferry intersection.<br />

Segment 058-00011E to 058-02653 starts east of Sherwood Forest Blvd. The gravity segment<br />

travels west until reaching 058-00005E. The line travels north until reaching 058-00002E.The<br />

line travels west to 058-00001E and north until reaching 058-02653, located west of the<br />

Sherwood Forest Blvd and Old Hammond Highway intersection.<br />

Gravity segment 058-01868 to 058-01862 starts northeast of Airline Highway (North) and<br />

North Parkview Drive intersection. The gravity line travels southwest until reaching 058-<br />

01866, southeast until reaching 058-01865, and southwest crossing Airline Highway (North)<br />

until reaching 058-01864. The gravity line travels southeast until reaching 058-01862, located<br />

near the Airline Highway (North) and South Parkview Drive intersection.<br />

Gravity segment 058-02851 to 058-02833 starts northwest of the Parkview Drive and Cora<br />

Drive intersection, traveling south, parallel to Cora Drive, until reaching 058-02833. Segment<br />

058-02833 to 058-02677 starts northwest of Goodwood Blvd and Cora Drive. The gravity<br />

segment travels south, parallel to Cora Drive, and then travels east until reaching 058-02701.<br />

The line travels south until reaching 058-02677, located near the end of Carolyn Sue Drive.<br />

GNV31031158547.DOCX/103440004 3-34 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 058-02478 to 058-02475 starts on Airline Highway near the Gwenadele<br />

Avenue intersection. The gravity segment travels northwest along Airline Highway until<br />

reaching 058-02475, located near Airline Highway and Commonwealth Blvd intersection.<br />

Gravity segment 058-02571 to 058-01395 starts on Cedarcrest Avenue near Bronzebush<br />

Avenue. The segment travels north up to 058-001495 north of the intersection of Cedarcrest<br />

Avenue and Lebanon Drive and then turns west paralleling a drainage canal to manhole<br />

058-01395 on Old Hammond Highway east of Silverest Avenue.<br />

Gravity segment 058-01859 to 058-01851A starts on Airline Highway (North) between its<br />

intersections with South Parkview Drive and Goodwood Blvd. The gravity line travels<br />

southeast until reaching 058-1851A, located near Lindale Avenue and Airline Highway<br />

intersection.<br />

Gravity segment 058-01851A to 058-01850 starts near Lindale Avenue and Airline Highway<br />

intersection. The gravity line travels southeast until reaching 058-01850, located near the<br />

Delcourt Avenue and Airline Highway intersection.<br />

Gravity segment 058-01850 to 058-01850A starts northeast of the Delcourt Avenue and<br />

Airline Highway intersection. The gravity segment travels southeast, towards Delcourt Ave,<br />

until reaching 058-01850A.<br />

Gravity segment 058-01310 to 058-00935 starts at the Harry Drive and Donmoor Avenue<br />

intersection and travels south along Donmoor Avenue until reaching 058-00935 The gravity<br />

segment ends north of the Florida Blvd and Donmore Avenue intersection.<br />

Gravity segment 058-01830 to 058-01826 starts on the west side of Fernwood Avenue. The<br />

gravity line travels south along Fernwood Avenue until 058-01826, located near the Florida<br />

Blvd and Fernwood Avenue intersection.<br />

Gravity segment 058-01335 to 058-00890 starts north of Lils Court and Sevenoaks Avenue<br />

intersection. The gravity line travels north past the end of Lils Court at 058-01337, then<br />

travels southeast until reaching 058-00890, located near the north end of Carter Avenue.<br />

Gravity segment 058-00890 to 058-01132 starts south of Thurman Drive, just north of the<br />

drainage canal. The segment travels north on Thurman Drive until reaching 058-01132,<br />

located south of the Thurman Drive and Goodwood Blvd intersection.<br />

Gravity segment 058-05074 to 058-05006 starts on Murphy Drive north of the Murphy Drive<br />

and Richards Drive intersection. The gravity line travels south until reaching 058-05005,<br />

located south of the Murphy Drive and Richards Drive intersection.<br />

Gravity segment 058-05006 to 058-00349 starts south of Murphy Drive and Richards Drive<br />

intersection. The gravity line travels south until reaching 058-00349, located near the north<br />

side of Interstate 12.<br />

Gravity segment 058-00369 to 058-00004B starts northeast of the Marcel Avenue and Plaza<br />

Drive intersection. The segment travels east down Marcel Avenue, and then southeast across a<br />

golf course, terminating just east of Fairway Drive at 058-00004B.<br />

Gravity segment 058-01171 to 058-01159 starts on Brentwood Drive at the edge of a golf<br />

course. The gravity line travels east across a golf course and crossing Fairway Drive until<br />

reaching 058-01157. The line continues north until reaching 058-01159.<br />

GNV31031158547.DOCX/103440004 3-35 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 058-00497 to 058-00499 starts along Bluebonnet Road between intersections<br />

with Jefferson Highway and French Village Avenue. The gravity line travels south along<br />

Bluebonnet Road until reaching 058-00499.<br />

Gravity segment 058-00481 to 058-00483 starts near the Floynell Drive and Ridgely Road<br />

intersection. The gravity line travels north until reaching 058-00483 near the drainage canal.<br />

Gravity segment 058-00172 to 058-00173 starts south of the Florida Blvd and Marquette<br />

Avenue intersection. The gravity line travels west, parallel to Florida Blvd, until reaching<br />

058-00173.<br />

Gravity segment 058-00173 to 058-00940A starts southwest of the Florida Blvd and South<br />

Carrollton Avenue intersection. The gravity line travels north, crossing Florida Blvd, until<br />

reaching 058-00940A, located north of Florida Blvd between intersections with Marquette<br />

Avenue and South Carrollton Avenue.<br />

Gravity segment 250-00026 to PS250 starts on a drainage path southeast of the intersection<br />

of Jefferson Highway and Auto Plex Drive, near an apartment complex. The segment then<br />

parallels Jefferson Highway along the drainage path to PS 250, which is located just south of<br />

the intersection of Jefferson Highway and Cal Road.<br />

Gravity segment 066-00005 to PS 66 starts on the north side of Interstate 12, off of Harrells<br />

Ferry Road and travels north along the right-of-way of the road leading to PS66 near the<br />

Comal Drive and Erlanger Drive intersection. Gravity segment 066-00088 to PS 66 travels<br />

west from Boulevard de Providence to PS 66.<br />

Gravity segment 066-0087A to 066-00001A starts at Woodland Ridge Boulevard. The line<br />

travels north, crossing Interstate 12, and then west to Blvd de Providence. Segment 066-<br />

00088 to PS 66 travels west from Blvd de Providence to PS 66.<br />

The PS 66 forcemain runs from the upgraded PS 66, described in the SGC-C-0001 (Florida<br />

Blvd PS Improvements) project on Comal Drive travels westward to the termination of the<br />

forcemain at manhole 058-00016E on Sherwood Meadow Drive.<br />

This project includes the construction of a new forcemain from the upgraded PS 50,<br />

upgraded as described in Project SGC-C-0001 (Florida Boulevard PS Improvements). The<br />

segment of forcemain starts at the new location of PS 50 on Old Hammond Highway east of<br />

the intersection of Sherwood Boulevard and Old Hammond Highway, and travels west on<br />

Old Hammond Highway to the manifold point with the forcemain from PS 5XX on Old<br />

Hammond Highway, east of Tara Boulevard.<br />

The forcemain from the new pump station PS 5XX described in SGC-C-0001 (Florida<br />

Boulevard PS Improvements) project starts east of the intersection of Tara Boulevard and<br />

Old Hammond Highway at the BREC Park (PS 5XX location). The forcernain then manifolds<br />

with the forcemain from PS 50 on the south side of Old Hammond Highway and runs south<br />

down Fairway Drive to Interstate 12. The forcemain crosses Interstate 12 to Quarters Lake<br />

Road and follows Quarter Lake Road till it reaches Essen Lane. The forcemain then crosses<br />

Essen Lane and travels south down the ROW of Essen Lane to the wet well of PS58 on Essen<br />

Lane.<br />

The existing gravity line feeding into PS 50 will be relocated as part of this project to the<br />

new location of PS 50 on Old Hammond Highway, east of the intersection of Old Hammond<br />

Highway and Sherwood Boulevard.<br />

GNV31031158547.DOCX/103440004 3-36 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Scope<br />

This project involves replacing 51,360 LF of 10-inch, 12-inch, 15-inch, 18-inch, 21-inch, 24-inch,<br />

27-inch, 36-inch, 42-inch gravity sewer upstream of PS 58; approximately 2,500 LF of 15-inch<br />

and 18-inch gravity sewer upstream of PS 66; approximately 880 LF of 12-inch gravity sewer<br />

upstream of PS 250; approximately 1,860 LF of new 48-inch gravity sewer downstream of<br />

existing location of PS 50; and establishment of 1,280 LF of new 12-inch forcemain from PS 66<br />

to replace existing forcemain and approximately 23,720 LF of new 36-inch and 48-inch<br />

forcemain from PS 50 and PS 5XX to PS 58 in the South Gravity Central Basin.<br />

Additional project details are presented in Table 3-5.<br />

TABLE 3-5<br />

SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

058-00034 058-00015 6,300 18 24 Segment crosses<br />

Interstate 12<br />

058-00586 058-00523 1,900 12 18<br />

058-00523 058-00501 640 12 and 15 21<br />

058-00501 058-00479 2,700 15 27<br />

PS250DS 058-00479 1,100 8 and 15 18<br />

058-00479 058-00490 1,900 15 and 18 36<br />

058-00490 058-00017 8,200 18 and 24 42 Segment has a canal<br />

crossing near Drusilla<br />

Drive<br />

058-01316 058-01310 880 10 15<br />

058-01318 058-01316 350 10 15<br />

058-03110 058-03116 720 12 15<br />

058-03116 058-03117 120 12 15<br />

058-03117 058-03118 420 12 15<br />

058-03118 058-03124 75 12 15<br />

058-04039 058-04041A 550 12 15<br />

058-00011E 058-02653 1,400 12 and 15 24<br />

058-00016E 058-00011E 740 12 21<br />

058-01868 058-01862 840 8 12<br />

058-02851 058-02833 1,140 8 15<br />

058-02833 058-02677 3,870 15 21<br />

058-02478 058-02475 830 8 12<br />

058-02571 058-01395 3,520 8 15<br />

058-01850 058-01850A 80 15 18<br />

058-01851A 058-01850 800 15 18<br />

058-01859 058-01851A 2,230 15 18<br />

058-01310 058-00935 2,000 10 18<br />

058-01830 058-01826 530 10 and 15 21<br />

058-01335 058-00890 460 8 and 10 15<br />

GNV31031158547.DOCX/103440004 3-37 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-5<br />

SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

058-00890 058-01132 450 12 18 Includes a drainage<br />

cancel crossing<br />

058-05074 058-05006 370 8 15<br />

058-05006 058-00349 270 12 18<br />

058-00369 058-00004B 2,900 18 24 Portion of these gravity<br />

segments go through a<br />

golf course.<br />

058-01171 058-01159 1,800 8 12<br />

058-00497 058-00499 520 8 12<br />

058-00481 058-00483 290 8 12<br />

058-00172 058-00173 330 8 10<br />

058-00173 058-00940A 130 8 12 Includes a crossing under<br />

Florida Blvd<br />

250-00026 PS250 880 10 12<br />

066-00005 066-00002 730 8 15<br />

066-00002 PS66 660 8,10 & 12 18<br />

066-00087A 066-00001A 1,070 8,10 & 12 18<br />

PS 66 066-00005 1,280 8 12 Forcemain Replacement<br />

NEW FM (PS 50)<br />

New PS – PS 5xx<br />

(described in<br />

SGC-C-0001<br />

[Florida Blvd PS<br />

Improvements])<br />

Manifold Pt w/ new<br />

FM from PS 50<br />

Existing PS 50<br />

Manifold Pt<br />

w/ new PS<br />

5xx<br />

Manifold Pt<br />

w/ new FM<br />

from PS 50<br />

10,600 New 36 New forcemain<br />

100 New 36 Forcemain<br />

PS58 13,020 New 48 Forcemain; Crosses both<br />

Interstate 12 and<br />

Interstate 10<br />

New PS 50<br />

location 1858 New 48<br />

Extension of gravity line to<br />

New PS 50 location.<br />

Segment has a crossing<br />

on Old Hammond<br />

Highway<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $35,200,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-38 JANUARY 2011<br />

REV. 5


Whitter<br />

Monet<br />

Lobdell<br />

Lanier<br />

Cyril<br />

Shawn<br />

Airway<br />

Bea<br />

Aubin<br />

Mike<br />

#<br />

Waverly<br />

#<br />

Michelli<br />

#<br />

Smiley<br />

#<br />

Elgin<br />

Renoir<br />

Conley<br />

Goya<br />

Victoria<br />

!R<br />

!R<br />

Reco<br />

Beaumont<br />

#<br />

PS30<br />

Wooddale<br />

Tom<br />

#<br />

Paris<br />

Landwood<br />

Berlin<br />

Harry<br />

PS83<br />

Kiowa<br />

Choctaw<br />

Oak Villa<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS16<br />

PS293<br />

# Cuyhanga<br />

#<br />

Mammoth<br />

PS81<br />

Perdue<br />

#<br />

PS190<br />

Darryl<br />

#<br />

Harvey<br />

Cletus<br />

Dual<br />

PS359<br />

Tams<br />

Florida<br />

#<br />

Richcroft<br />

#<br />

#<br />

Stan<br />

Bard<br />

Catalpa<br />

Archery<br />

#<br />

#<br />

PS314<br />

Wilton<br />

Stacy<br />

Cristy<br />

Harco<br />

#<br />

#<br />

Woodcliff<br />

PS169<br />

Flannery<br />

#<br />

!R!R!R !R !R<br />

!R !R !R !R<br />

#<br />

#<br />

#<br />

I-10<br />

#<br />

!R!R<br />

#<br />

PS267<br />

Marion<br />

Quail<br />

Marquette<br />

Jefferson<br />

Corporate<br />

PS119<br />

#<br />

Peggy<br />

Orion<br />

PS97<br />

!R<br />

# #<br />

# # #<br />

Kenilworth<br />

Burden<br />

Irene<br />

Walden<br />

Keed<br />

Woodstock<br />

Murphy<br />

#<br />

#<br />

!R<br />

!R<br />

!R<br />

#<br />

#<br />

#<br />

!R<br />

!R<br />

!R !R #<br />

PS335<br />

!R<br />

Pikes<br />

Joliet<br />

East Baton Rouge Parish<br />

Ocean<br />

Dijon<br />

Rienzi<br />

Perkins<br />

Bocage<br />

Boyce<br />

Gilbert<br />

Conway<br />

Goodwood<br />

PS58<br />

PS58A<br />

Essen<br />

Picardy<br />

Proposed<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\RFQ\SGC-C-0002._mpj120610<br />

Airport<br />

!R<br />

#<br />

Anselmo<br />

New Gravity Main<br />

New Force Main<br />

!R<br />

#<br />

Wakefield<br />

PS317<br />

PS17<br />

!R<br />

Drusilla<br />

Summa<br />

!R<br />

!R<br />

!R<br />

#<br />

!R<br />

#<br />

Crescent<br />

Carmen<br />

Legend<br />

³<br />

#<br />

!R<br />

Gail<br />

PS299<br />

!R<br />

!R!R<br />

Hill<br />

#<br />

!R<br />

Donna<br />

#<br />

!R<br />

!R<br />

Interline<br />

Partridge<br />

!R<br />

!R<br />

!R<br />

Cal<br />

#<br />

Mollylea<br />

Bluebonnet<br />

#<br />

#<br />

#<br />

#<br />

#<br />

!R<br />

Sharp<br />

#<br />

!R<br />

!R !R<br />

Oliphant<br />

Reitz<br />

Judi<br />

Existing<br />

0 2,600 5,200<br />

Feet<br />

Hilltrace<br />

Upton<br />

Exist. Gravity<br />

!R<br />

#<br />

#<br />

#<br />

!R<br />

!R !R !R<br />

!R<br />

!R<br />

!R !R<br />

!R<br />

Azrok<br />

Exist. Forcemain<br />

Exist. Pump Station<br />

Manholes\Nodes<br />

Allyson<br />

Mayfair<br />

!R<br />

# # !R<br />

Major Oaks<br />

PS389<br />

#<br />

#<br />

Tinley<br />

Coursey<br />

#<br />

#<br />

#<br />

PS50<br />

#<br />

#<br />

!R<br />

!R !R !R!R !R<br />

Toulon<br />

PS328<br />

PS171<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

I-12<br />

#<br />

#<br />

#<br />

PS134<br />

#<br />

#<br />

Stumberg<br />

#<br />

PS77<br />

PS217<br />

#<br />

##<br />

#<br />

#<br />

#<br />

#<br />

PS147 #<br />

# # PS379<br />

#<br />

#<br />

# #<br />

Airline Highway Pipeline<br />

Improvements Projects<br />

Siegen<br />

King Richard<br />

McCann<br />

Baylor<br />

Havenwood<br />

Investor<br />

Figure 3-16<br />

Parkoaks<br />

Elva<br />

Pecue<br />

Harrells Ferry<br />

Deerpath<br />

Braxton<br />

SGC-C-0002<br />

Project Vicinity Map


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.8 SGC-C-0003 (Essen Lane - Interstate 12)<br />

The SGC-C-0003 (Essen Lan – Interstate 12) project has been combined with SGC-C-0002<br />

(Airline Highway - Jefferson Highway) project and SGU-C-0002 (Airline Highway -<br />

Interstate 12) project from the October 2008 PDP. The combined project has been designated<br />

SGC-C-0002 (Airline Highway Pipeline Improvements) project, and is described in Section<br />

3.2.7.<br />

3.2.9 SGC-C-PS58A (Pump Station 58 Replacement)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS58A (Pump Station 58 Replacement) project includes the construction of a<br />

new overflow pump station pump station (PS 58) that will handle the existing flow<br />

conditions and the predicted future wet weather peak flow. The design of a single pump<br />

station was selected as the best design option to meet the long-term needs of the C-P and the<br />

sensitive environmental and aesthetic concerns of the surrounding area. (<br />

The purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream<br />

and downstream basins. This project is related to SGC-C-PS58FM-A (Staring Lane FM Phase<br />

I – Burbank to Highland), SGC-C-PS58FM-B (Staring Lane FM - Phase II – Highland to<br />

Perkins), and SGC-C-PS58FM-C (Staring Lane FM - Phase III – Perkins to PS58) which<br />

involve the construction of the forcemain from PS 58 to the South WWTP.<br />

Location<br />

The project site and existing PS 58 are located at the entrance of the Louisiana State<br />

University Burden Center. The location of PS 58 is shown in Table 3-6 and in Figure 3-17.<br />

Scope<br />

The current PS 58 will not have enough pumping capacity to handle the predicted future<br />

wet weather peak flow. PS 58 shall be replaced with a pump station that will handle both<br />

the existing flow conditions and future wet weather peak flow conditions. The pump station<br />

will pump flow into the downstream gravity system when flows do not exceed 20,870 gpm.<br />

When flows exceed 20,870 gpm, the pump station will pump the excess flow directly to the<br />

South WWTP. The proposed scope is shown in Table 3-6.<br />

TABLE 3-6<br />

SGC-C-PS58A (Pump Station 58 Replacement) – Pump Station Information<br />

Existing Max.<br />

Capacity<br />

PS No.<br />

Location<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

Flow<br />

(GPM)<br />

PS58 Intersection of Essen Lane and Essen Park New 61,107 208,700<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $15,800,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is On-Going<br />

GNV31031158547.DOCX/103440004 3-40 JANUARY 2011<br />

REV. 5


I-10<br />

Essen Heights<br />

Essen Heights<br />

#I<br />

PS58<br />

One Calais<br />

Essen Park<br />

Franciscan<br />

Margaret Ann<br />

Essen<br />

Hennessy<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Pump Station 58 Replacement<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SGC-C-PS58A<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-17<br />

0 275<br />

550<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SGC-C-PS58A_mpj120610


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.10 SGC-C-PS58FM-A (Staring Lane FM - Phase I – Burbank Drive to Highland<br />

Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGC-C-PS58FM-A (Staring Lane FM-Phase I – Burbank Drive to Highland Road) project<br />

includes the construction of a portion of the new forcemain from the PS 58 overflow pump<br />

station to the South WWTP. The purpose of this project is to relieve SSOs at PS 58 as well as<br />

in the respective upstream basins. The construction of the direct forcemain between PS 58<br />

and the South WWTP alleviates the wet weather flows into existing downstream gravity<br />

pipe, and allows the capacity needed for future flows in the Staring Lane area.<br />

This portion of the new forcemain is being constructed as part of the Green Light <strong>Program</strong><br />

project for the Staring Lane Extension.<br />

Location<br />

This portion of the new forcemain runs along Staring Lane Extension from Burbank Drive to<br />

Highland Road (to the South WWTP), connecting into Staring Lane forcemain.<br />

Scope<br />

The scope of this project is shown in Table 3-7 and in Figure 3-18.<br />

TABLE 3-7<br />

SGC-C-PS58FM-A (Staring Lane FM - Phase I - Burbank Drive to Highland Road) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

Highland Road Burbank Road 2,960 New 64 To be constructed<br />

under Green Light<br />

<strong>Program</strong><br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is$4,616,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction Functionally Complete 2 nd Quarter 2010.<br />

GNV31031158547.DOCX/103440004 3-42 JANUARY 2011<br />

REV. 5


Burbank<br />

PS58_n6<br />

!R<br />

Lochness<br />

Clover Ridge<br />

Summer Grove<br />

#<br />

PS321<br />

Meadow Bend<br />

Stoney Creek<br />

Bonarbridge<br />

Staring Lane P<br />

Highland Creek<br />

Kilt Place<br />

Highland<br />

Heatherwood<br />

Hadley<br />

PS261<br />

#<br />

!R<br />

PS58_n7<br />

Fox Run<br />

John Henry<br />

Fountain View<br />

#<br />

PS279<br />

Gardere<br />

PS58_n8<br />

!R<br />

Bayou Fountain<br />

Governor<br />

Burbank Drive (Segment 1) A<br />

Proposed<br />

#I<br />

New Pump<br />

Stations<br />

New Gravity Main<br />

New Force Main<br />

Green Light Project<br />

Legend<br />

³<br />

#<br />

!R<br />

Existing<br />

Exist. Gravity<br />

Exist. Forcemain<br />

Exist. Pump Station<br />

Manholes\Nodes<br />

Staring Ln. FM - Phase I - Highland Rd.<br />

to Burbank Dr.<br />

SGC-C-PS58FM-A<br />

Project Vicinity Map<br />

Figure 3-18<br />

East Baton Rouge Parish<br />

0 300<br />

600<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.11 SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to Perkins<br />

Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road – Perkins Road) project<br />

includes the construction of a portion of the new forcemain from PS 58 to the South WWTP.<br />

The purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream<br />

and downstream basins. The construction of the direct forcemain between PS 58 and the<br />

South WWTP alleviates the wet weather flows into existing downstream gravity pipe, and<br />

allows the capacity needed for future flows in the Staring Lane area.<br />

This portion of the new forcemain will be constructed as part of the Green Light <strong>Program</strong><br />

project for improvements to Staring Lane. The project also includes the construction of a<br />

new 36-inch forcemain exiting PS 57 at Dawson Creek.<br />

Location<br />

This portion of the new forcemain from PS 58 to the South WWTP runs along Staring Lane<br />

from Dawson Creek to Highland Road. The new 36-inch forcemain runs along Staring Lane<br />

from Dawson Creek to Chandler Drive.<br />

Scope<br />

The scope of the project is shown in Table 3-8 and in Figure 3-19. The forcemain from PS 58<br />

increases in size at Boone Drive due to the addition of flow at this point from a new<br />

overflow pump station at PS 53, described in the SGL-C-0002 (Multiple Pump Stations –<br />

Highland Road – Kenilworth Parkway) project.<br />

TABLE 3-8<br />

SGC-C-PS58FM-B (Staring Lane FM-Phase II - Highland Road to Perkins Road) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

Boone Drive Highland Road 3,200 New 64 Constructed under Green<br />

Light <strong>Program</strong><br />

Dawson Creek Boone Drive 4,900 New 60 Constructed under Green<br />

Light <strong>Program</strong><br />

Dawson Creek Chandler Drive 2,200 36 36 Constructed under Green<br />

Light <strong>Program</strong><br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is$10,700,000.<br />

Design was appropriated in 2008 with the SGC-C-PS58FM-A (Staring Lane FM Phase I –<br />

Burbank Drive to Highland Road) project.<br />

Construction Appropriation Year was 2010.<br />

Construction is On-Going.<br />

GNV31031158547.DOCX/103440004 3-44 JANUARY 2011<br />

REV. 5


#<br />

Pollard<br />

Picardy<br />

Blair<br />

Summa<br />

#<br />

PS317<br />

Irene<br />

Seyburn<br />

Chandler<br />

#<br />

#<br />

PS267<br />

Shrensbury<br />

#<br />

PS214<br />

#<br />

Kenilworth<br />

PS178<br />

Walden<br />

Camelia Trace<br />

Ryder<br />

Silverside<br />

Alberta<br />

!R<br />

Essen<br />

Bles<br />

Mancuso<br />

Granada<br />

Pet<br />

Corsica<br />

Bermuda<br />

Tasmania<br />

Anselmo<br />

#<br />

Wylie<br />

Menlo<br />

Highland Park<br />

Amesbury<br />

Copperfield<br />

Beckenham<br />

Boone<br />

Chippenham<br />

Leycester<br />

Stoneliegh<br />

Daventry<br />

Rodney<br />

Bromley<br />

Watford<br />

Cardiff<br />

Coventry<br />

Sheringham<br />

Louray<br />

Albert Hart<br />

Aries<br />

Maxine<br />

Delaville<br />

Baird<br />

Applewood<br />

Harts Mill<br />

Castle Kirk<br />

!R<br />

Staring<br />

#<br />

#<br />

PS40<br />

Theron<br />

Leonard<br />

Elysian<br />

Avis<br />

Arcadia<br />

Flora<br />

#<br />

PS114<br />

Thayer<br />

Hyacinth<br />

Sabine<br />

Roundhill<br />

Samoa<br />

Vienna<br />

Chanadia<br />

Perkins<br />

PS1010<br />

#<br />

PS300<br />

Bluebonnet<br />

#<br />

Burbank<br />

Hadley<br />

Meadow Bend<br />

#<br />

PS321<br />

Magnolia Wood<br />

Highland<br />

#<br />

PS261<br />

PS279<br />

Kimbro<br />

!R<br />

Highpoint<br />

Kingcrest<br />

Kevel<br />

#<br />

#<br />

PS412<br />

PS257<br />

#<br />

Legend<br />

#<br />

Proposed<br />

Existing<br />

Staring Lane FM Phase II<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SGC-C-PS58FM-Ph II<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-19<br />

Gardere<br />

Nolen<br />

Worth<br />

Kimbro<br />

Sharynwood<br />

Town South<br />

Cedar Lake<br />

Southlawn<br />

Mayfair Hill<br />

Kings Hill<br />

Bellonia<br />

Gurlie<br />

Emmaline<br />

Balboa<br />

Rhine<br />

Macedonia<br />

Myrtle Grove<br />

John Henry<br />

East Baton Rouge Parish<br />

Menlo<br />

Lochness<br />

Misty Creek<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGC-C-PS58FM-B_mpj120610<br />

Onter<br />

Halfway Tree<br />

Renee<br />

Rainford<br />

Wild Valley<br />

Windward<br />

0 1,400<br />

2,800<br />

Feet<br />

PS131<br />

Lake Donna<br />

#<br />

Myrtle Hill<br />

Mohawk<br />

Blakemore<br />

Windingway<br />

Glenstone<br />

Myrtlelake<br />

PS301<br />

#<br />

High Lake<br />

High Plains<br />

Thistlewood<br />

Shady Lake


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.12 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) project involves<br />

the construction of a portion of the new forcemain from the PS 58 to the South WWTP. The<br />

purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream and<br />

downstream basins. The construction of the direct forcemain between PS 58 and the South<br />

WWTP alleviates the wet weather flows into existing downstream gravity pipe, and allows<br />

the capacity needed for future flows in the Staring Lane area.<br />

The project includes replacing an existing 36-inch aerial forcemain crossing of Ward’s Creek<br />

from PS 58. The purpose is to replace the aerial crossing with a subsurface crossing due to<br />

the condition of the forcemain.<br />

Location<br />

This portion of the new 60-inch forcemain starts approximately at the intersection of Essen<br />

Lane and Essen Park and proceeds in a southerly direction crossing Ward’s Creek. The<br />

forcemain then proceeds in an easterly direction along Ward’s Creek. The forcemain turns<br />

south and follows Mancuso Lane, crossing a Kansas City Southern Railroad at the<br />

intersection of Anselmo Lane. The forcemain continues south along Granada Drive until<br />

reaching Dawson’s Creek. At Dawson’s Creek, the forcemain turns in a westerly direction<br />

and continues to the intersection of Dawson’s Creek and Staring Lane near PS57.<br />

The 36-inch forcemain starts approximately at the intersection of Essen Lane and Essen Park<br />

and proceeds in a southerly direction crossing Ward’s Creek. The new forcemain will be<br />

connected to the existing forcemain on the south side of Ward’s Creek.<br />

Scope<br />

The scope of this project is shown in Table 3-9 and in Figure 3-20.<br />

TABLE 3-9<br />

SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS58 Dawson Creek 9,490 New 60<br />

PS58<br />

South Side of<br />

Ward’s Creek<br />

300 36 36<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-46 JANUARY 2011<br />

REV. 5


Samoa<br />

PS58A<br />

PS58<br />

#<br />

Essen Park<br />

One Calais<br />

Cypress Point<br />

I-10<br />

Margaret Ann<br />

Dijon<br />

O'Donovan<br />

Didesse<br />

Brittany<br />

Flanders<br />

Hennessy<br />

Essen<br />

#<br />

PS193<br />

Summa<br />

Keswick<br />

Pennth<br />

Perkins Place<br />

Payne<br />

Camelia Trace<br />

Mancuso<br />

Picardy<br />

Pet<br />

Everett<br />

Blair<br />

Butter Creek<br />

#<br />

Sasanqua<br />

Silverside<br />

Anselmo<br />

Camelia Way<br />

Southpointe<br />

Alberta<br />

Staring<br />

Corsica<br />

Bermuda<br />

Ryder<br />

Bles<br />

Granada<br />

Tasmania<br />

Town South<br />

Kings Hill<br />

Lake Calais<br />

Perkins<br />

Clear Lake<br />

PS57<br />

#<br />

Macedonia<br />

Cedar Lake<br />

Vienna<br />

Theron<br />

Thayer<br />

Leonard<br />

Madeira<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Existing<br />

Staring Lane FM Phase III<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SGC-C-PS58FM-Ph III<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-20<br />

0 750<br />

1,500<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGC-C-PS58FM-C_mpj120610


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.13 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) project<br />

includes the construction of both 8,100 feet of new 16-inch forcemain from PS 119 to PS 58<br />

and the upgrade of PS 119 due to the longer forcemain and the predicted increase in future<br />

peak wet weather flow.<br />

Location<br />

Figure 3-21 shows the scope of this project. PS 119 is located on the north side of Highway I-<br />

10 on the western side of the creek near the movie theater and Citiplace Drive.<br />

A new 16-inch forcemain will replace the existing 12-inch forcemain extending from PS 119<br />

to MH 058-00194T. From MH 058-00194T, an existing 16-inch forcemain will be utilized. The<br />

existing forcemain follows Ward’s Creek to MH 058-00129T. At MH 058-00129T, a new 16-<br />

inch forcemain will be connected to the existing forcemain and continue to follow Ward’s<br />

Creek until nearing the intersection of Essen Lane and Ward’s Creek. At this point, the<br />

forcemain will turn in a northerly direction and connect to PS 58.<br />

Scope<br />

The scope of the project is shown in Tables 3-10 (pump station scope) and 3-11 (forcemain<br />

scope).<br />

TABLE 3-10<br />

SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 119 Citiplace Drive near the Movie Theater 2,430 2,700 594<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

TABLE 3-11<br />

SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pipeline Information<br />

US<br />

Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS 119 PS58 8,100 New 16 New forcemain segments (PS 119 to<br />

058-00194T and 058-00129T to PS 58)<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $2,800,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Construction Appropriation Year was 2010.<br />

Construction is On-Going.<br />

GNV31031158547.DOCX/103440004 3-48 JANUARY 2011<br />

REV. 5


Corporate<br />

Woodstock<br />

Moniteau<br />

Bocage<br />

Brandon<br />

Nouvelle<br />

Boyce<br />

#I<br />

#<br />

PS119<br />

PS119<br />

Murphy<br />

Torrance<br />

Svendson<br />

Fritchie<br />

Mc Connell<br />

Gilbert<br />

Conway<br />

Mc Carroll<br />

Peebles<br />

Palm Park<br />

Owen<br />

#<br />

PS28<br />

Trenton<br />

#<br />

PS97<br />

#<br />

PS335<br />

Valley Forge<br />

Bennington<br />

Tarrytown<br />

Georgetown<br />

§¨¦ I-12<br />

Sholar<br />

Rainbow<br />

Stratford<br />

Guilford<br />

Peggy<br />

Overton<br />

Burden<br />

Moss Side<br />

Quail Oak<br />

Quail Run<br />

Quail<br />

Orion<br />

East Baton Rouge Parish<br />

Perkins<br />

Pikes<br />

Dijon<br />

Didesse<br />

Hennessy<br />

Legend<br />

Proposed<br />

Existing Citi Place - Essen Area PS119 and FM<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SGC-C-PS119<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-21<br />

0 500<br />

1,000<br />

Feet<br />

PS58<br />

#<br />

Essen<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.14 SGL-C-0001 (Essen/Staring Area PS 57 Improvements)<br />

Project Description<br />

This project has been deleted from the PDP.<br />

3.2.15 SGL-C-0002 (Multiple PSs – Highland Road – Kenilworth Parkway)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGL-C-0002 (Multiple Pump Stations – Highland Road – Kenilworth Parkway) project<br />

includes the replacement of PS 120, PS 329, PS 40, PS 56, PS 68, PS 102, PS 27, PS 74, and PS<br />

302, and the construction of a new PS 53A (overflow for the existing PS 53) and a new LSU PS.<br />

The new pump stations will work in conjunction with forcemain upgrades in other south<br />

lower basin projects to alleviate SSOs at and near the pump stations and in their respective<br />

upstream basins. The BTRSSO hydraulic model also predicts that these pump stations will<br />

exceed their existing capacities at the predicted future peak wet weather flows. PS 102 was<br />

originally slated as a master plan pump station but was added to this PDP project. PS 27, PS<br />

74, and PS 302 have been added to this project since the October 2008 PDP.<br />

Location<br />

The locations of the pump stations are shown in Table 3-12 and in Figure 3-22.<br />

Scope<br />

The scope of the project is shown in Table 3-12. All pump stations except PS 53A are<br />

replacements of existing pump stations. PS 53A is a new overflow pump station for PS 53,<br />

which will alleviate upstream overflows and not require PS 53 to be upsized. PS 53A will have<br />

a dedicated forcemain, described in the SGL-C-0003 (Highland Road Pipeline Improvements)<br />

project, through which it will pump to the manifold with the new forcemain from PS 58A,<br />

described in the SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to Perkins<br />

Road) project.<br />

TABLE 3-12<br />

SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 120<br />

PS 329<br />

PS 40<br />

PS 53A<br />

PS 56<br />

PS 68<br />

PS 102<br />

Helvetia Drive, near the intersection of<br />

Bancroft Way<br />

Kenilworth Parkway, near the intersection<br />

of Burbank Drive<br />

Southlawn Drive, near the intersection of<br />

Arcadia Drive<br />

Boone Avenue, near the intersection of<br />

Chippenham Drive<br />

Chandler Drive, near the intersection of<br />

Highland Park Drive<br />

Burbank Drive, near the intersection of<br />

Jennifer Jean Drive<br />

GSRI Avenue, near the intersection of<br />

Jasper Avenue<br />

200 511 92<br />

450 1,224 196<br />

400 802 117<br />

6,041 9,716 N/A<br />

600 4,740 573<br />

350 1,136 385<br />

430 897 356<br />

GNV31031158547.DOCX/103440004 3-50 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-12<br />

SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 27<br />

PS 74<br />

PS 302<br />

LSU PS<br />

Intersection of Ridgehaven Avenue and<br />

Burbank Drive<br />

Northeast of Pecan Tree Drive and Jade<br />

Avenue intersection<br />

Southwest of Bluebonnet Boulevard and<br />

Highland Road intersection<br />

Near Intersection of Stadium Dr. and<br />

Nicholson Dr.<br />

382 382 80<br />

568 568 167<br />

5,150 5,150 915<br />

N/A 6,940 4,000<br />

Note: Estimated total dynamic head (TDH) for PS 120, PS 329, PS 40, PS 53A, PS 56, PS 68, PS 102, and LSU PS<br />

based on the Pump Station Design Requirements Hazen-Williams “C” value, rather than InfoWorks model “C” value.<br />

The TDH for PS 302, PS 27, and PS 74 is based on these pump stations being manifolded together and their design<br />

flow. The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $8,900,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-51 JANUARY 2011<br />

REV. 5


Dalrymple<br />

Campus<br />

Line<br />

Boyd<br />

#<br />

#<br />

Doris<br />

Campus Lake<br />

Stadium<br />

Parker<br />

Jennifer Jean<br />

PS439<br />

Brightside<br />

Dean Lee<br />

Amherst<br />

#<br />

Ben Hur<br />

#<br />

Cornell<br />

L S U<br />

#<br />

Lakeshore<br />

PS401<br />

Yale<br />

#<br />

#I<br />

PS68<br />

#<br />

PS68<br />

Henry Adams<br />

Etta<br />

PS305<br />

BPS505<br />

Delgado<br />

BPS505A<br />

Tulane<br />

Clara<br />

<strong>Plan</strong>t Pth-Crp Phys<br />

East Baton Rouge Parish<br />

#<br />

PS1013 PS1014<br />

PS6<br />

Loyola<br />

Highland<br />

#<br />

Carriage<br />

Ben Hur<br />

#<br />

Nicholson<br />

Bella<br />

Stanford<br />

Cloverdale<br />

Forge<br />

PS120<br />

PS120<br />

# #<br />

#I<br />

Bourbon<br />

Bancroft<br />

Lee<br />

PS387<br />

Cloverdale<br />

Floyd<br />

Burgin<br />

River<br />

Hood<br />

Whitehaven<br />

Aberdeen<br />

Boston<br />

Carl<br />

Stuart<br />

Menlo<br />

College Hill<br />

Leeward<br />

Guava<br />

#<br />

PS70<br />

Sunset<br />

Pickett<br />

Bennett<br />

Dubois<br />

PS1009<br />

Leeward<br />

#<br />

Burbank<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2009UPDATE-SCOTT_102009.MXD SGELPI 10/20/2009 12:37:09<br />

Rubin<br />

Ryan<br />

Palm<br />

Hyacinth<br />

Nelson<br />

#<br />

#<br />

PS158<br />

PS34<br />

PS82<br />

PS329<br />

#I<br />

#<br />

Lila<br />

Bluebell<br />

Orchid<br />

Arrowhead<br />

Mimosa<br />

Boone<br />

Sweetbriar<br />

Knollwood<br />

Woodruff<br />

Woodstone<br />

Gulf South<br />

Tupello<br />

Glasgow<br />

Brame<br />

Bluebell<br />

PS329<br />

#<br />

Millstone<br />

Millgate<br />

Woodgate<br />

Dentation<br />

PS Glasgow<br />

#<br />

#<br />

#<br />

#<br />

PS56<br />

PS245<br />

#<br />

#I<br />

PS56<br />

PS214<br />

# #<br />

#<br />

# PS267<br />

PS37<br />

#<br />

Whitlow<br />

#I<br />

#<br />

PS53A PS53<br />

Keel<br />

Pointer<br />

Woodchase<br />

Fieldgate<br />

Rothmer<br />

Seyburn<br />

Kenilworth<br />

Helm<br />

Starwood<br />

#<br />

Pollard<br />

Wylie<br />

Menlo<br />

PS446<br />

Port<br />

Skysail<br />

#<br />

Concord<br />

Columbine<br />

Seyburn<br />

PS376<br />

PS294<br />

PS61<br />

Leake<br />

Hibiscus<br />

Dahlia<br />

Highland Park<br />

Palmetto<br />

Copperfield<br />

Mast<br />

Mariner<br />

Moss Point<br />

Ned<br />

Starboard<br />

Columbine<br />

Chandler<br />

Amesbury<br />

PS91<br />

PS375<br />

Chippenham<br />

Rush<br />

Potomac<br />

Forsythia<br />

Daventry<br />

Bromley<br />

Boone<br />

Hammatt<br />

Hadley<br />

G S R I<br />

Gardere<br />

Quail<br />

Stoneliegh<br />

Albert Hart<br />

#<br />

Meadow Bend<br />

General Lee<br />

Pascagoula<br />

Krista<br />

Stratford<br />

Brent<br />

Stokes<br />

Quail Run<br />

Shrensbury<br />

Menlo<br />

Stoney Creek<br />

PRIVATEPS<br />

Louray<br />

Maxine<br />

Rodney<br />

Magnolia Wood<br />

PS321<br />

#<br />

#<br />

#I<br />

PS102<br />

# #<br />

Seabord<br />

Old Hermitage<br />

#<br />

Peggy<br />

Overton<br />

Moss Side<br />

Orion<br />

Baird<br />

PS261<br />

PS279<br />

Bayou Fountain<br />

Gen Ewell<br />

Aries<br />

Coy<br />

Jasper<br />

PS237<br />

Kimbro<br />

Fountain<br />

Burden<br />

Irene<br />

Kenilworth<br />

PS178<br />

Applewood<br />

Fox Run<br />

Highland Creek<br />

Harts Mill<br />

St Croix<br />

Staring<br />

#<br />

Elvin<br />

Castle Kirk<br />

Pikes<br />

Walden<br />

Thoreau<br />

Chandler<br />

PS142<br />

Pecan Tree<br />

#<br />

#<br />

#<br />

PS40<br />

#I<br />

PS40<br />

# #<br />

#<br />

Highpoint<br />

Kingcrest<br />

Parkway<br />

Kevel<br />

PS74<br />

Dijon<br />

Ryder<br />

Worthington Lake<br />

Renee<br />

Perkins Place<br />

Camelia Trace<br />

Lake Calais<br />

Westhaven<br />

Springlake<br />

Springbrook<br />

Springdale<br />

Perkins<br />

#<br />

#<br />

PS27<br />

PS324<br />

Alberta<br />

Charleston<br />

Rickshire<br />

Didesse<br />

Picardy<br />

PS57<br />

Brittany<br />

Chanadia<br />

PS412<br />

PS257<br />

Hilltree<br />

I-10<br />

Hennessy<br />

Bles<br />

Kings Hill<br />

Theron<br />

Avis<br />

Arcadia<br />

Southlawn<br />

Hillglen<br />

Lake Donna<br />

Raintree<br />

Sabine<br />

Myrtle Hill<br />

Knox Hill<br />

Flora<br />

PS131<br />

#<br />

Essen<br />

PS58<br />

#<br />

PS302<br />

#<br />

PS58A<br />

#<br />

PS304<br />

PS386<br />

# PS374 #<br />

#<br />

#<br />

Legend<br />

Proposed<br />

Existing Multiple PS - Highland Rd. - Kenilworth Dr.<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SGL-C-0002<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-22<br />

0 2,375 4,750<br />

Feet<br />

Anselmo<br />

Balboa<br />

Sabine<br />

End<br />

Granada<br />

Thayer<br />

PS193<br />

Hyacinth<br />

PS114<br />

Roundhill<br />

Bluebonnet<br />

Vienna<br />

Windingway<br />

#<br />

#


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.16 SGL-C-0003 (Highland Road Pipeline Improvements)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGL-C-0003 (Highland Road Pipeline Improvements) project was originally called the<br />

SGL-C-0003 (Essen Lane-Highland Road) project in the October 2008 PDP, and has been<br />

combined with segments previously included in the SGL-C-0004 (Highland Road-Lee<br />

Drive) project also from the October 2008 PDP. The combined project is designated the SGL-<br />

C-0003 (Highland Road Pipeline Improvements) project and is described in this section.<br />

The following is a summary of the project: upsizing of gravity sewers upstream of PS 57, PS<br />

61, PS 302, PS 329, and PS 40; upsizing of the forcemain from PS 329; construction of a new<br />

forcemain from PS 53A, described in the SGL-C-0002 (Multiple Pump Stations – Highland<br />

Road – Kenilworth Parkway) project, to the manifold point with the new PS 58A forcemain,<br />

described in SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Rd to Perkins Rd)<br />

projects; upsizing of gravity sewers upstream of PS 53, which will assist with alleviating<br />

upstream SSOs; and upsizing of the forcemain from PS 56 to alleviate overflows. PS 56 is<br />

described in the SGL-C-0002 (Multiple Pump Stations – Highland Road – Kenilworth<br />

Parkway) project.<br />

Location<br />

The SGL-C-0003 project is roughly bound by I-10 in the north, Nicholson Drive in the south,<br />

Winterhue Drive in the east, and Wylie Drive in the west. It also includes upgrades of<br />

gravity sewers near Highland Road between Bromley Road in the east and Delgado Drive in<br />

the west. Project specifics are presented in Table 3-17 and are shown in Figure 3-23.<br />

Gravity segment 057-00117 to 057-00080 starts south of the Thoreau Drive and Baird Drive<br />

intersection, and goes north along Baird Drive and back over the water channel. This<br />

segment bends east along the water channel, then travels north, parallel to Walden Road.<br />

Gravity segment 057-00080 to 057-00003 starts southeast of the intersection of Walden Road<br />

and Applewood Road and travels in an easterly direction over a drainage canal toward<br />

Lake Calais Court. The gravity segment then runs parallel to Clear Lake Avenue south of<br />

the houses on that street and next travels in an easterly direction to the west side of Staring<br />

Lane. Segment 057-00003 to 057-00001 runs northerly along Staring Lane to PS 57.<br />

Gravity segment 057-00330 to 057-05069 starts east of Madeira Drive between Perkins Road<br />

and Vienna Avenue. The gravity segment travels southeast to the back of nearby houses<br />

that are along Madeira Drive. The segment then turns southwest and ends just north of<br />

Perkins Road. Segment 057-05069 to 057-00367 starts north of Perkins Road and travels<br />

southwest to the southern side of Perkins Road. Gravity segment 057-00367 to 057-00368 runs<br />

northwest from Perkins Road on the north side of a drainage canal. Gravity segments 057-<br />

00368 to 057-00495, 057-00495 to 057-00371D, 057-00371D to 057-00371E, and 057-00371E to<br />

057-00003 follow the northern side of the drainage canal west and north to Staring Lane.<br />

Gravity segment 040-00012 to PS 40 is located west of Elysian Drive and goes in a<br />

southwesterly direction past Southlawn Drive until reaching 040-00002. The segment then<br />

travels southeast to PS 40, located southwest of Southlawn Drive and Arcadia Drive<br />

intersection.<br />

GNV31031158547.DOCX/103440004 3-53 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segments 329-00016 to 329-00008 and 329-00008 to PS 329 are located in a wooded<br />

area off GSRI Avenue. 329-00016 to 329-00008 runs northerly from Tracy Lee Drive. Segment<br />

329-00008 to PS 329 runs northerly to PS 329.<br />

Gravity segment PS102DS to 061-00364 is located along GSRI Road, starting at Seaboard<br />

Drive and running northwesterly past Gardere Lane.<br />

Gravity segment 302-05073 to 302-05052 runs down Lakeview Drive and heads in a<br />

southeasterly direction to the corner of Lakeview Drive and Oak Hills Parkway. Segment<br />

302-05052 to 302-05031 starts at Lakeview Drive and Oak Hills Parkway and heads in a<br />

southerly direction down Oak Hills Parkway, cutting southwesterly to Pastureview Drive.<br />

The segment continues southeasterly past Pastureview Drive to Willow End Drive, which it<br />

follows easterly to Mossy Oak Avenue. It then turns southerly and ends at Highland Road.<br />

Segment 302-05031 to 302-05010 goes westerly along Highland Road to manhole 302-05010,<br />

which is halfway between Huntington Drive and Grand Lakes Drive. Segment 302-05010 to<br />

302-05007A runs along Highland Road to the intersection of highland Road and Rue de<br />

Laplace. Segment 302-05007A to 302-05004 starts at Rue de Laplace and heads up Highland<br />

Road westerly to Shady Lake Place. Segment 302-05004 to 302-05002 runs along Highland<br />

Road between Shady Lake Place and Bluebonnet Boulevard.<br />

Gravity segment 061-00102 to 061-00407 is located on Boone Avenue between the first<br />

manhole southeast of Daventry Drive and Staring Lane.<br />

Gravity segment 061-00351 to 061-00302 starts south of the cul-de-sac of Southlawn Drive<br />

and heads westward to Staring Lane.<br />

Gravity segment PS56DS to 053-00003 is located between Wylie Drive and Highland Park<br />

Drive. The northern boundary of this line is Chandler Avenue and the southern boundary is<br />

Boone Avenue.<br />

Gravity segments 053-00177 to 053-00168 and 053-00168 to 053-00144 start near the<br />

intersection of Leycster Drive and Kenilworth Parkway and run southwest behind houses<br />

between Kenilworth Parkway and Chippenham Drive to Boone Avenue.<br />

Gravity segment 053-00410 to 053-00407 starts on Highland Road between Lee Drive and<br />

Duplantier Boulevard and runs in a southeasterly direction down Highland Road to<br />

manhole 053-00407, which is just past Lee Drive. Segment 053-00407 to 053-00316 starts on<br />

Highland Road just past Lee Drive and runs in a southeasterly direction to Burgin Avenue.<br />

At Burgin Avenue, this segment goes in a northeasterly direction. At Boston Street, it turns<br />

southeasterly again. At McDonald Avenue, the line turns to go northeasterly, then turns<br />

again southeasterly onto Menlo Drive. The segment goes down Menlo Drive to manhole<br />

053-00316, which is halfway between Leeward Drive and Sunset Boulevard.<br />

Gravity segments 053-00316 to 053-00016 and gravity segment 053-00016 to 053-00014 starts<br />

on Menlo Drive halfway between Leeward Drive and Sunset Blvd and travels southeasterly<br />

along Menlo Drive past the intersection of Nelson Drive with Menlo Drive. The segment<br />

continues past the end of Menlo Drive behind a line of houses, and then the segment turns<br />

northerly to manhole 053-00014, which is northwest of Woodstone Drive.<br />

GNV31031158547.DOCX/103440004 3-54 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 053-00010A to 053-00003 starts northwest of the Woodgate Blvd and North<br />

Woodgate Court intersection and travels southeasterly direction along a drainage canal<br />

between Woodgate Court and Millgate Place to manhole 053-00003, which is located on<br />

Boone Avenue halfway between Wylie Drive and Highland Park Drive.<br />

Gravity segment 053-00429 to 053-00410 runs parallel to Bancroft Way, set off southeasterly<br />

half a block. The segment starts northeast of Timbercove Street and ends at Highland Road.<br />

Gravity segment 068-00050 to PS 68 begins near the cul-de-sac on the northern end of<br />

Jennifer Jean Drive and follows a servitude east in between Highland Road and Burbank<br />

Drive to PS 68, which is located just south of the intersection of Highland Road and Delgado<br />

Drive<br />

The forcemain from PS 56 begins at PS 56, which is roughly located at the intersection of<br />

Highland Park Drive with Chandler Drive, and continues along Highland Park Drive for<br />

approximately 540 feet.<br />

The PS 329 forcemain will be replaced under this project. This forcemain starts at PS 329,<br />

which is located in a wooded area in a northerly direction from GSRI Avenue, then runs<br />

south to GSRI Avenue, and turns easterly on GSRI Avenue to Gulf South Parkway.<br />

The PS 53A forcemain is a new forcemain from PS 53 to the manifold with the new PS 58A<br />

forcemain, as described above. This forcemain begins at PS 53A, which will be located near<br />

the intersection of Boone Avenue and Chippenham Drive, and runs southeasterly along<br />

Boone Avenue to Staring Lane.<br />

Scope<br />

This project includes construction of the following: approximately 6,800 feet of 15-inch, 18-<br />

inch, 21-inch, 27-inch, 30-inch, 36-inch, and 42-inch gravity sewer upstream of PS 57;<br />

approximately 1,200 feet of 15-inch gravity sewer upstream of PS 40; approximately 2,000<br />

feet of 15-inch and 18-inch gravity sewer upstream of PS 329; approximately 7,800 feet of 12-<br />

inch, 15-inch, 18-inch, 24-inch, and 27-inch gravity sewer upstream of PS 302; approximately<br />

2,400 feet of 15-inch and 18-inch gravity sewer upstream of PS 61; approximately 18,300 feet<br />

of 18-inch, 21-inch, 24-inch, 27-inch, 30-inch, and 36-inch gravity sewer upstream of PS 53;<br />

approximately 1,200 feet of 18-inch gravity sewer upstream of PS 68; approximately 4,300<br />

feet of 10-inch forcemain from PS 329 to replace the existing forcemain; approximately 6,200<br />

feet of new 24-inch forcemain from PS 53A; and approximately 540 feet of 18-inch forcemain<br />

from PS 56 to replace the existing forcemain.<br />

Table 3-13 shows the detailed scope of this project.<br />

GNV31031158547.DOCX/103440004 3-55 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-13<br />

SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

057-00117 057-00080 710 10 and 12 18 This segment goes underneath a<br />

water channel.<br />

057-00080 057-00003 2,200 12 21<br />

057-00003 057-00001 180 24 42 Segment includes crossing of a<br />

drainage canal.<br />

057-00330 057-05069 460 8 15<br />

057-05069 057-00367 170 10 15<br />

057-00367 057-00368 190 10 18<br />

057-00368 057-00495 700 10 21<br />

057-00495 057-00371D 1,345 12 27<br />

057-00371D 057-00371E 230 12 30<br />

057-00371E 057-00003 665 12 36<br />

040-00012 PS 40 1,200 8 15 PS 40 will be upgraded under SGL-C-<br />

0002 (Multiple PS – Highland Road –<br />

Kenilworth Parkway)<br />

329-00016 329-00008 1,700 10 15<br />

329-00008 PS 329 300 10 18 PS 329 will be upgraded under SGL-<br />

C-0002 (Multiple PS – Highland Road<br />

– Kenilworth Parkway) – forcemain<br />

replacement described below.<br />

302-05073 302-05052 660 8 12<br />

302-05052 302-05031 1,700 8 15<br />

302-05031 302-05010 1,800 15 to 18 18<br />

302-05010 302-05007A 950 18 24<br />

302-05007A 302-05004 1,200 18 24<br />

302-05004 302-05002 1,500 18 27<br />

PS102DS 061-00364 930 8 15<br />

061-00351 061-00302 1,500 12 18<br />

PS56DS 053-00003 2,900 18 24 This segment includes a canal<br />

crossing.<br />

053-00177 053-00168 325 10 18<br />

053-00168 053-00144 1,600 10 21<br />

053-00410 053-00407 715 12 18<br />

053-00407 053-00316 3,500 12 or 18 24<br />

053-00316 053-00016 1,800 18 27<br />

053-00016 053-00014 470 18 30<br />

GNV31031158547.DOCX/103440004 3-56 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-13<br />

SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

053-00010A 053-00003 2,400 24 36 This segment includes a canal<br />

crossing.<br />

053-00429 053-00410 1,800 12 18<br />

068-00050 PS68 1,200 10 18<br />

PS 329 PS329DS 4,300 8 10 Forcemain – PS 329 replacement is<br />

described in SGL-C-0002 (Multiple PS<br />

– Highland Road – Kenilworth<br />

Parkway)<br />

PS 53A<br />

Manifold point<br />

with Staring<br />

Lane FM (PS<br />

58A FM)<br />

6,220 New 24 New forcemain from new PS 53A,<br />

which is described in SGL-C-0002<br />

(Multiple PS – Highland Road –<br />

Kenilworth Parkway)<br />

PS56FM PS56DS 540 12 18 Forcemain from PS 56 (see Project<br />

SGL-C-0002 (Multiple PS – Highland<br />

Road – Kenilworth Parkway) for PS<br />

description)<br />

Note: The existing pipe sizes and lengths and new pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $17,800,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction has not Started.<br />

GNV31031158547.DOCX/103440004 3-57 JANUARY 2011<br />

REV. 5


#<br />

#<br />

Stadium<br />

!R<br />

PS439<br />

Ben Hur<br />

#<br />

#<br />

#!R<br />

#<br />

Lakeshore<br />

!R<br />

PS68<br />

PS68<br />

#<br />

#<br />

PS2<br />

PS6<br />

#<br />

#<br />

#<br />

!R<br />

!R<br />

!R<br />

!R<br />

!R !R<br />

PS120<br />

# PS70<br />

053-00429<br />

PS305053-00407 053-00343<br />

Lee<br />

Lakeshore<br />

Stanford<br />

068-00050<br />

053-00421<br />

Ben Hur<br />

Bella<br />

Forge<br />

Burgin<br />

Hood<br />

Carl<br />

#<br />

!R<br />

River<br />

Dubois<br />

053-00410<br />

053-00321<br />

053-00016<br />

#<br />

# #<br />

#<br />

Stuart<br />

Chandler<br />

!R<br />

!R<br />

Nelson<br />

#<br />

Burbank<br />

PS2005<br />

!R<br />

#<br />

Balis<br />

#<br />

#<br />

#<br />

#!R<br />

!R<br />

Nicholson<br />

Bluebell<br />

053-00316<br />

!R<br />

!R<br />

PS329<br />

College<br />

053-00014<br />

Menlo<br />

PS329<br />

329-00008<br />

329-00016<br />

#<br />

#<br />

#<br />

#<br />

PS245<br />

PS56 PS56FM<br />

# # # #<br />

PS56DS #!R<br />

#<br />

!R<br />

053-00010A<br />

PS329DS<br />

Helm<br />

!R<br />

#<br />

PS61<br />

#!R<br />

Port<br />

PS446<br />

#<br />

#<br />

Gardere<br />

Seyburn<br />

053-00003<br />

Highland<br />

Mast<br />

!R !R<br />

G S R I<br />

Ned<br />

Dahlia<br />

PS53WWDS<br />

PS267<br />

#<br />

#<br />

PS261 #<br />

#<br />

!R<br />

Quail<br />

Maxine<br />

Louray<br />

Rodney<br />

Albert Hart<br />

!R # #<br />

#<br />

#<br />

#<br />

Peggy<br />

Orion<br />

Baird<br />

Elvin<br />

Kimbro<br />

PS97<br />

Kenilworth<br />

#<br />

Burden<br />

Irene<br />

PS178<br />

Staring<br />

!R<br />

!R<br />

Castle Kirk<br />

Magnolia Wood<br />

Pikes<br />

Walden<br />

057-00117<br />

053-00177<br />

053-00168<br />

Hadley<br />

PS58_n5<br />

061-00364<br />

PS102DS<br />

Glerma<br />

PS374<br />

!R<br />

!R<br />

Worth<br />

PS142<br />

PS27<br />

#<br />

#<br />

Dijon<br />

#!R<br />

!R<br />

Highpoint<br />

PS40<br />

!R<br />

#!R<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

Didesse<br />

057-00080<br />

Springlake<br />

!R !R<br />

!R<br />

#<br />

PS335<br />

PS58<br />

PS58A<br />

#<br />

#<br />

#<br />

!R !R<br />

!R<br />

!R<br />

PS301<br />

#<br />

#<br />

#<br />

#<br />

#<br />

302-00003<br />

PS302 !R 302-05002<br />

PS417<br />

I-10<br />

Hennessy<br />

Bluebonnet<br />

Hilltree<br />

Flanders<br />

057-00003<br />

Essen<br />

Picardy<br />

057-00371E<br />

Hyacinth<br />

040-00012<br />

061-00351<br />

Anselmo<br />

057-00495<br />

Perkins<br />

Myrtlelake<br />

#<br />

#<br />

#<br />

#<br />

!R<br />

!R<br />

302-05073<br />

!R<br />

!R !R<br />

302-05007A<br />

!R<br />

PS409 !R<br />

302-05004<br />

057-00330<br />

057-00368<br />

PS437<br />

PS317<br />

PS1010<br />

I-12<br />

Drusilla<br />

Summa<br />

Paulet<br />

Houston<br />

PS300<br />

Obrien<br />

Villa<br />

Fleet<br />

Sharlane<br />

302-05010<br />

Hill<br />

Gail<br />

PS299<br />

PS223<br />

#<br />

#<br />

#<br />

Oakdale<br />

302-05052<br />

302-05031<br />

#<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Highland Rd. Pipeline Improvements<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SGL-C-0003<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-23<br />

0 3,625<br />

7,250<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGL-C-0003_mpj120510


SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.17 SGL-C-0004 (Highland Road – Lee Drive)<br />

This project has been combined with the SGL-C-0003 (Essen Lane-Highland Road) from the<br />

October 2008 PDP. The combined project has been designated the SGL-C-0003 (Highland<br />

Pipeline Improvements) project and is found in Section 3.2.16.<br />

3.2.18 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) project was originally<br />

designated SGL-C-0005 (Perkins Road – Dahlia Street) project in the October 2008 PDP. This<br />

project includes the upsizing of gravity sewer and forcemain upstream of PS 56 and PS 91 to<br />

alleviate upstream SSOs.<br />

Location<br />

The SGL-C-0005 project includes gravity sewer and forcemain replacements in the area of<br />

Perkins Road and Bayou Duplantier, and is shown in Figure 3-24.<br />

Gravity segment 056-00133H to 056-00153 is located in a wooded area, starting south of<br />

Belvedere Drive and progressing in an easterly direction through the woods south of<br />

Elmcrest Drive and Pollard Parkway.<br />

Gravity segment 056-00208 to 056-00133H starts at Lee Drive south of Bennett Drive. The<br />

segment travels in a northeasterly direction, then goes easterly on Bluebell Drive. This<br />

segment continues easterly beyond the end of Bluebell Drive through a wooded area to<br />

manhole 056-00133H, which is south of Belvedere Drive.<br />

Gravity segment 056-00148 to PS 56 starts in the wooded area north of Chandler Drive and<br />

heads in a southeasterly direction to PS 56, which is located off Chandler Drive west of its<br />

intersection with Highland Park Drive. Gravity segment 056-00153 to 056-00148 starts south<br />

of the Christian Life Academy off Quail Drive and continues in a southwesterly direction to<br />

manhole 056-00148 in a wooded area.<br />

Gravity segment PS70DS to 056-00208 is located along Lee Drive north of the drainage canal<br />

north of PS 70.<br />

Gravity segment 091-00004 to 091-00001 is located along Concord Avenue between<br />

Yorktown Drive and Brandywine Drive. Segment 091-00074 to 091-00006 begins on Valley<br />

Creek Drive and continues southeasterly through a wooded area to the intersection of<br />

Concord Avenue and Congress Boulevard.<br />

Forcemain segment PS70 to 056-00208 starts south of Bayou Duplantier on Lee Drive. The<br />

segment travels in a northwesterly direction crossing Bayou Duplantier to 056-00208.<br />

Scope<br />

This project includes the construction of approximately 10,500 feet of 18-inch, 21-inch,<br />

24-inch, 30-inch, and 36-inch gravity sewer upstream of PS 56 and approximately 2,000 feet<br />

of 15-inch and 18-inch gravity sewer upstream of PS 91. Table 3-14 shows the detailed scope<br />

of this project.<br />

GNV31031158547.DOCX/103440004 3-59 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-14<br />

SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) – Pipeline Information<br />

US Node DS Node Length (ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

056-00133H 056-00153 3,800 15 24<br />

056-00208 056-00133H 4,200 12 to 15 21 Includes a crossing of a<br />

drainage canal<br />

056-00148 PS56 970 18 36 PS 56 will be upgraded in the<br />

SGL-C-0002 (Multiple PS –<br />

Highland –Kenilworth) project<br />

056-00153 056-00148 700 15 or 18 30<br />

PS70DS 056-00208 790 12 18<br />

091-00004 091-00001 700 12 18<br />

091-00074 091-00006 1,300 10 15<br />

PS70 PS70DS 645 8 8 Forcemain segment was<br />

lengthened<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Estimated Construction is $4,400,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-60 JANUARY 2011<br />

REV. 5


Mimosa<br />

Orchid<br />

Poplar<br />

Tupello<br />

Perkins<br />

!R<br />

091-00074<br />

Revere<br />

Congress<br />

Yorktown<br />

091-00006<br />

Brandywine<br />

Lexington<br />

Saratoga<br />

Bennington<br />

Hood<br />

Carl<br />

Anglo<br />

Palm<br />

Rubin<br />

Arrowhead<br />

#<br />

PS Glasgow<br />

!R !R<br />

091-00004<br />

!R<br />

#<br />

PS91<br />

091-00001<br />

Ross<br />

Hyacinth<br />

Mimosa<br />

Boone<br />

Stephens<br />

Floyd<br />

Aberdeen<br />

Stuart<br />

PS70DS<br />

056-00208<br />

#<br />

!R<br />

Whitehaven<br />

PS70<br />

!R<br />

Cypress<br />

Pickett<br />

Lee<br />

Bennett<br />

PS34<br />

#<br />

Knollwood<br />

Brame<br />

Bluebell<br />

Sweetbriar<br />

Whitehaven<br />

Belvedere<br />

Meadow Lea<br />

Woodchase<br />

Pointer<br />

#<br />

Pollard<br />

Columbine<br />

PS375<br />

#<br />

Hibiscus<br />

Clematis<br />

Columbine<br />

Tamarix<br />

Hyacinth<br />

!R<br />

056-00133H<br />

Elmcrest<br />

Dahlia<br />

Quail<br />

Burgin<br />

#<br />

PS1009<br />

College Hill<br />

Menlo<br />

Leeward<br />

Dubois<br />

Guava<br />

Leeward<br />

Boone<br />

Sunset<br />

Chandler<br />

PS82<br />

#<br />

Woodruff<br />

#<br />

PS245<br />

056-00148<br />

Seyburn<br />

!R<br />

Chandler<br />

Wylie<br />

!R<br />

!R #<br />

056-00153<br />

PS56<br />

#<br />

PS267<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Bayou Duplantier Area Sewer Upgrades<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SGL-C-0005<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-24<br />

0 750<br />

1,500<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23


SECTION 3. SOUTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158547.DOCX/103440004 3-62 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

3.3 South Forced System Comprehensive Rehabilitation<br />

Projects<br />

3.3.1 SFL-R-0001, SFL-R-0002, SFL-R-0003, AND SFU-R-0001<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the sewer collection system to reduce the amount of rainwater and<br />

groundwater that leak into the system.<br />

Purpose<br />

The purpose of the comprehensive sewer rehabilitation is to correct defects in the system<br />

such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow<br />

sources. The water that enters the system through the defects can contribute to sanitary<br />

sewer overflows. Comprehensive rehabilitation of the collection system will contribute to<br />

alleviating sanitary sewer overflows by reducing I/I.<br />

Location<br />

There are four (4) projects located primarily within the South Forced Basin. The locations of<br />

the projects are shown on the attached maps, Figures 3-25 to 3-28.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including closed circuit television inspection of all pipes. Smoke<br />

testing may also be included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and based on that<br />

analysis, a listing of recommended repairs with associated construction costs will be<br />

generated.<br />

An engineering firm will then complete detailed design and preparation of construction<br />

documents for project bidding.<br />

The construction of rehabilitation projects will include the following components:<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place liners<br />

Rehabilitation or replacement of sewer manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction cost for each project is presented in Table 3-15. These costs are<br />

based on preliminary estimates of the amounts of each component of the system that will<br />

require repair or replacement. During the physical inspection phase, the actual condition of<br />

the components will be assessed and appropriate methods recommended. At that time, the<br />

cost estimate for each project will be revised. For those projects under construction, the bid<br />

amounts were included as construction costs in Table 3-15.<br />

GNV31031158547.DOCX/103440004 3-63 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-15<br />

Estimated Construction Costs for South Forced System Comprehensive Rehabilitation Projects<br />

Project Description<br />

Construction<br />

Cost<br />

Scheduled Design<br />

Appropriation Year<br />

Scheduled<br />

Construction<br />

Appropriation Year<br />

Status<br />

SFU-R-0001-Antioch<br />

Road-Chadsford Drive<br />

SFL-R-0001-Jefferson<br />

Highway-Hoo Shoo<br />

Too Road<br />

SFL-R-0002-Jones<br />

Creek Road-Tiger<br />

Road<br />

SFL-R-0003-Siegen<br />

Lane-Interstate 10<br />

$7,700,000 2010* 2011 Not Started<br />

$1,770,000 2008* 2008* Functionally<br />

Complete<br />

$5,200,000 2011 2011 Not Started<br />

$6,100,000 2011 2012 Not Started<br />

*Appropriations already made for these projects (design and/or construction, as marked).<br />

GNV31031158547.DOCX/103440004 3-64 JANUARY 2011<br />

REV. 5


Sassafras<br />

Antioch<br />

Shady Grove<br />

Vignes<br />

Alder<br />

La Louisiane<br />

Crepemyrtle<br />

Round Oak<br />

Smoke Rock<br />

Airline<br />

Castle Ridge<br />

Highland<br />

Kindletree<br />

Waterleaf<br />

Wenwood<br />

Shady Arbor<br />

Glen Forest<br />

Glen Knoll<br />

Preston<br />

Barrett<br />

Elliot<br />

Green Willow<br />

Poujeaux<br />

Vouvray<br />

Margeaux<br />

Beaujolaes<br />

Vignes<br />

Thad Cain<br />

Airline<br />

Umbehagen<br />

Brookfield<br />

Nine Oaks<br />

Morsewood<br />

Sugar Mill<br />

Beckfield<br />

Chasefield<br />

Dawnwood<br />

Jefferson Ridge<br />

Glen Park<br />

Glen Club<br />

Hoo Shoo Too<br />

Lake Camellia<br />

Lake Tulip<br />

Old World<br />

Vignes Lake<br />

Bryans Crossing<br />

Benjamins<br />

Kaitlyn<br />

Breman<br />

Paladin<br />

Diversion<br />

La Grange<br />

Bainbridge<br />

Bevan<br />

Brunswick<br />

Jefferson<br />

Moultrie<br />

Blanton<br />

Lake Myrtle<br />

Lake Orchid<br />

Garden Oaks<br />

Lake Azalea<br />

Cherry Oak<br />

Lake Terrace<br />

Lakefield<br />

Lake Indigo<br />

Lake Iris<br />

Bellerive<br />

Talton<br />

Macon<br />

Arcadian Shores<br />

Airline<br />

Manchac Landing<br />

Spyglass Hill<br />

Cape Hart<br />

Santa Maria<br />

Ferncrost<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SFL-R-0001.MXD SGELPI 11/9/2010 10:48:33<br />

Area Designated for<br />

Physical Inspection<br />

0 910 1,820 Feet<br />

q<br />

Jefferson Hwy - Hoo Shoo Too Rd.<br />

SFL-R-0001<br />

Project Vicinity Map<br />

Figure 3-25


Bea<br />

Arnold<br />

American<br />

Plaza Tower<br />

Parkhurst<br />

O'Neal<br />

Antioch<br />

Daradele<br />

Floynell<br />

Bunting<br />

Mint<br />

Cedarlane<br />

Cal<br />

Hillyard<br />

Groner<br />

Mullen<br />

Potwin<br />

Neil<br />

I-12<br />

Ridgely<br />

Kinglet<br />

Peck<br />

Potwin<br />

Seracedar<br />

Oliphant<br />

Cedarcrest<br />

Aubin<br />

Oakline<br />

Siegen<br />

Mead<br />

Stanley Aubin<br />

Landsbury<br />

Andrea<br />

Meadowpark<br />

Metairie<br />

Woodleigh<br />

Southland<br />

Michel Delving<br />

Gentilly<br />

Orleans<br />

Magellan<br />

E Heck<br />

Alco<br />

Woodland Oak<br />

Brookhollow<br />

Southpark<br />

Toulon<br />

Cloverland<br />

Industriplex<br />

Honore<br />

Reiger<br />

Mall<br />

Baylor<br />

I-10<br />

Coursey<br />

Sherwood Forest<br />

Cedar Park<br />

St Alban's<br />

Jean Lafitte<br />

Highland Oaks<br />

Paddock<br />

Baronne<br />

Telesmar<br />

Corsair<br />

Westfork<br />

Pennywood<br />

Campden<br />

Pecue<br />

Langley<br />

Complex<br />

Claiborne<br />

Eastgate<br />

Justice<br />

Newcastle<br />

Exchequer<br />

Lancelot<br />

Parkforest<br />

Perkins<br />

Galahad<br />

Parkmeadow<br />

Pecue<br />

Highland<br />

Harris<br />

Parkhaven<br />

Tartan<br />

Stumberg<br />

Woodland Ridge<br />

Doral<br />

Rose<br />

Briarwood<br />

Old Perkins<br />

Five Oaks<br />

Country Hill<br />

Tollway<br />

Saint Clare<br />

Airline<br />

Hickory Ridge<br />

Tennyson<br />

Kimbleton<br />

Castille<br />

Buckley<br />

Buzbee<br />

Highlandia<br />

Harrells Ferry<br />

Sessions<br />

Director<br />

Boulevard Louisiane<br />

Snowden<br />

Jones Creek<br />

Board<br />

Barringer<br />

Barringer Foreman<br />

Terrell<br />

George Oneal<br />

Profit<br />

Chairman<br />

Lirocchi<br />

Ferrell<br />

Shenandoah<br />

Debit<br />

Parkview Church<br />

Fulwar Skipwith<br />

Highland Bluff<br />

Reiger<br />

George Cain<br />

Pecan Meadow<br />

Philip Hickey<br />

Highland Crossing<br />

Lake Sherwood<br />

Parkciel<br />

Pecue<br />

Deerpath<br />

Hollyhill<br />

Mourning Dove<br />

Quinn<br />

Crossing<br />

Eaglewood<br />

Millwood<br />

Braxton<br />

Bayridge<br />

Pinehurst<br />

Lilian<br />

Cypress Ridge<br />

Dale<br />

Canterdale<br />

Chaucer<br />

Herridge<br />

Barringer<br />

Perkins<br />

Heidis<br />

Sotile<br />

Petroleum<br />

Allegheny<br />

Amen Corner<br />

Seven Pines<br />

Cocodrie<br />

Antler<br />

Jefferson<br />

Yorkfield<br />

Roster<br />

Spyglass Hill<br />

Santa Maria<br />

Chadsford<br />

Haynes Bluff<br />

Malvern Hill<br />

Confederate<br />

La Louisiane<br />

Alder<br />

Castle Ridge<br />

Point O' Woods<br />

Berryhill<br />

Thad Cain<br />

Morel<br />

Doyle<br />

Silver Sand<br />

Appomattox<br />

Round Oak<br />

Umbehagen<br />

Gray Moss<br />

Miller<br />

Pine Hill<br />

Stonewall<br />

Pine Moss<br />

Kaitlyn<br />

Talton<br />

Rapidan<br />

Monitor<br />

Culps Bluff<br />

General Forrest<br />

Wildflower<br />

Amaryliss<br />

Belle Helene<br />

Hendrick<br />

Airline<br />

Elliot<br />

Lake Azalea<br />

Moultrie<br />

Achord<br />

Barrett<br />

Palmer<br />

Shadow Creek<br />

Bull Run<br />

Grand Couteau<br />

Harness<br />

Hagerstown<br />

Woodlake<br />

Wildlife Way<br />

Green Willow<br />

Lake Harbour<br />

Bay Ridge<br />

Vouvray<br />

Babin<br />

Tiger Bend<br />

Vignes<br />

Hoo Shoo Too<br />

Lake Iris<br />

Westwind<br />

Lost Oak<br />

South Shore<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFL-R-0002.MXD SGELPI 10/21/2009 12:46:55<br />

Area Designated for<br />

Physical Inspection<br />

0 2,500 5,000 Feet<br />

q<br />

Jones Creek Rd. - Tiger Bend Rd.<br />

SFL-R-0002<br />

Project Vicinity Map<br />

Figure 3-26


Inniswold<br />

Idlewood<br />

Parkbriar<br />

Cypress Point<br />

Summa<br />

Fleet<br />

Norfolk<br />

Sharlane<br />

Field<br />

Houston<br />

Hill<br />

Cal<br />

Gail<br />

Upton<br />

Floynell<br />

Hillyard<br />

Ridgely<br />

Oliphant<br />

Tanwood<br />

Hackberry<br />

Danbury<br />

Oakline<br />

Airline Hwy Service Road<br />

McCann<br />

Parkforest<br />

Anselmo<br />

Bluebonnet<br />

Paulet<br />

Rue Crozat<br />

Oakdale<br />

Oak Hills<br />

Pastureview<br />

Barkley<br />

Highland<br />

I-10<br />

Azrok<br />

Mint<br />

Neil<br />

Kinglet<br />

Peck<br />

Mall<br />

Siegen<br />

Industriplex<br />

Honore<br />

Cloverland<br />

Jefferson<br />

Parkmeadow<br />

Shady Lake<br />

Myrtle Grove<br />

Corby<br />

Patrick<br />

Obrien<br />

Picardy<br />

Field<br />

Bluebonnet<br />

Oliphant<br />

Blue Cross<br />

Cottage Hill<br />

Dwyerwood<br />

Barry<br />

Landsbury<br />

Copperleaf<br />

Pinebrook<br />

Oak Bend<br />

Oakley Trace<br />

Telesmar<br />

Cozumel<br />

Sherwood Forest<br />

Galeria<br />

Parkview Church<br />

Superior<br />

Parkknoll<br />

High Plains<br />

Thistlewood<br />

Gatewood<br />

Rue de Laplace<br />

Rue de Tonti<br />

Rue Desiree<br />

Court<br />

Rod Laver<br />

Great Oak<br />

Ridgeland<br />

Lake Estates<br />

Wimbledon<br />

Verdun<br />

Lakeview<br />

Grand Lakes<br />

Don Budge<br />

John Newcombe<br />

Chester<br />

Oakcliff<br />

Wyatt<br />

Lazy K<br />

Reitz<br />

Oakbrook<br />

Briarrose<br />

Groner<br />

Mullen<br />

Thrush<br />

Denver<br />

Stafford<br />

Briarridge<br />

Bullrush<br />

Bunting<br />

Potwin<br />

Amiss<br />

Twisted Oak<br />

King James<br />

Mc Quaid<br />

Natchez<br />

Lombard<br />

Meadowpark<br />

Woodleigh<br />

Metairie<br />

Kathleen<br />

Southland<br />

Orleans<br />

Brookhollow<br />

Poydras<br />

Cedar Park<br />

Reiger<br />

St Alban's<br />

Fieldstone<br />

Pecue<br />

Lew Hoad<br />

Oakwilde<br />

Towering Oaks<br />

Rossmore<br />

Willows End<br />

Mirkwood<br />

Oak Creek<br />

Winterhue<br />

Carnforth<br />

Glen Cove<br />

Kentmere<br />

Tanglebriar<br />

Briarhurst<br />

Glen View<br />

Troutbeck Ymca Plaza<br />

Briar Hollow<br />

Westwood<br />

Autoplex<br />

Capital<br />

Diron<br />

Grand Lakes<br />

Greenbriar Hollow<br />

Rue Baton<br />

Roy Emerson<br />

Oak Manor<br />

White Cross<br />

Dunn<br />

Kimble<br />

Glen Arbor<br />

Tanager<br />

Honey<br />

Peck<br />

Potwin<br />

Fernbrook<br />

Andrea<br />

Meadowbrook<br />

Honey<br />

Kenner<br />

Michel Delving<br />

Woodview<br />

Woodmont<br />

Broad<br />

Conti<br />

Highland Oaks<br />

Gravier<br />

Baronne<br />

Paddington<br />

Shadow Oak<br />

Fieldstone<br />

Clarendon<br />

Highland<br />

Lichester<br />

Campden<br />

Hollyfield<br />

Boylan<br />

Benefit<br />

Sun Belt<br />

Dunlay<br />

Exchequer<br />

Airline<br />

Revenue<br />

Reiger<br />

Old Perkins<br />

Perkins<br />

Lakeland Park<br />

George Cain<br />

Hickory Knoll<br />

Pecue<br />

Pecue<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFL-R-0003.MXD SGELPI 10/21/2009 12:34:40<br />

Area Designated for<br />

Physical Inspection<br />

0 1,500 3,000 Feet<br />

q<br />

Siegen Ln. - Interstate 10<br />

SFL-R-0003<br />

Project Vicinity Map<br />

Figure 3-27


Millerville<br />

Mesbury<br />

O'Neal<br />

Antioch<br />

Cully<br />

Palmwood<br />

Sprucewood<br />

Firewood<br />

Elderwood<br />

Godfrey<br />

Bristoe<br />

Abshire<br />

Patton<br />

Ellis<br />

Bonham<br />

Hoyt<br />

Woodbrook<br />

Stonewood<br />

Shadowbrook<br />

Lirocchi<br />

Addington<br />

Bahin<br />

Sessions<br />

President Davis<br />

Millbrook<br />

Valentine<br />

Terrell<br />

Merritt Anne<br />

James Victor<br />

Windsong<br />

King Bradford<br />

Yorkfield<br />

Harrells Ferry<br />

Silver Sand<br />

<strong>Plan</strong>tation Key<br />

White Shadows<br />

Palmer<br />

Ferry Lane<br />

Lake Harbour<br />

Buckley<br />

Coursey<br />

Springwood<br />

Antler<br />

George Oneal<br />

Bankers<br />

White Oak Trace<br />

Monitor<br />

Brookcrest<br />

Gray Moss<br />

Woodlake<br />

Williamsburg<br />

Hickory Ridge<br />

Ridgemore<br />

Tennyson<br />

Shakespeare<br />

Eastridge<br />

Shenandoah<br />

Chaucer<br />

Herridge<br />

Snowden<br />

Heidis<br />

Jones Creek<br />

Ferrell<br />

Seven Pines<br />

Sleepy Hollow<br />

Vicksburg<br />

Bluewater<br />

Wilderness<br />

Chadsford<br />

Hogenville<br />

Malvern Hill<br />

Confederate<br />

Chantilly<br />

Antietam<br />

Kennesaw<br />

Antioch<br />

Port Hudson<br />

Mobile<br />

Pine Hill<br />

Front Royal<br />

Bay Ridge<br />

Beaconwoods<br />

Creek Round<br />

Overlook Point<br />

Spotsylvania<br />

Rapidan<br />

Chippendale<br />

Fern Ridge<br />

Canterdale<br />

Courtshire<br />

Celestial<br />

Macbeth<br />

Altus<br />

Springwater<br />

Memphis<br />

Carnifix<br />

Haynes Bluff<br />

Chattanooga<br />

Merrimac<br />

Harpers Ferry<br />

Fort Pulaski<br />

Ticonderoga<br />

Dahlgren<br />

Rock Bridge<br />

Stonewall<br />

Appomattox<br />

Tullahama<br />

Fleetwood<br />

Sweet Olive<br />

Sharpsburg<br />

Holly Springs<br />

Round Forrest<br />

Amaryliss<br />

Lantana<br />

Culps Bluff<br />

Wildflower<br />

Chancellorsville<br />

General Forrest<br />

Creek Hollow<br />

Achord<br />

Harness<br />

Bull Run<br />

Piney Point<br />

Hagerstown<br />

Weatherwood<br />

Little Poplar<br />

Wildlife Way<br />

Summer Lake<br />

Lost Oak<br />

North Shore<br />

Feather Nest<br />

Double Tree<br />

Deer Park<br />

Indian Ridge<br />

Babin<br />

Kimbleton<br />

Jefferson<br />

Commission<br />

Proxie<br />

Board<br />

Charter<br />

East Baton Rouge Parish<br />

Currency<br />

Director<br />

Barringer<br />

Cocodrie<br />

President<br />

Quorum<br />

Chairman<br />

Vice President<br />

Debit<br />

Legend<br />

Members<br />

Treasurer<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFU-R-0001.MXD SGELPI 10/21/2009 12:44:46<br />

Profit<br />

Council<br />

Woodlawn Acres<br />

Somersby<br />

Beekman<br />

Doyle<br />

Area Designated for<br />

Physical Inspection<br />

0 1,500 3,000 Feet<br />

Morel<br />

Batavia<br />

Polo<br />

qO'Neal<br />

Belle Helene<br />

Hendrick<br />

Elliot<br />

Tiger Bend<br />

Phillips<br />

Antioch Rd. - Chadsford Dr.<br />

SFU-R-0001<br />

Project Vicinity Map<br />

Figure 3-28


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4 South Forced System Capacity Improvements Projects<br />

3.4.1 SFL-C-0001 (Multiple PSs – Nicholson Drive – Brightside Drive)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The project includes replacement of PS 236, PS 336, PS 311, PS 107, Booster Pump Station<br />

(BPS) 505, and construction of new PS 503A and PS 236A. The new pump stations will work<br />

in conjunction with forcemain upgrades in other South Forced Lower Basin projects to<br />

alleviate chronic SSOs at and near these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations are shown in Table 3-16 and in Figure 3-29.<br />

Scope<br />

This project includes construction of the pump stations shown in Table 3-16. BPS 505 and PS<br />

505A are related, in that PS 505A is an overflow pump station for BPS 505. BPS 505 is an existing<br />

in-line booster pump station that will be converted to a wet well pump station, PS 505. Since<br />

BPS 505 will be converted to a wet well, it is possible that rather than building two new pump<br />

stations, PS 505 and PS 505A could share a divided wet well and pump in two directions, with<br />

one piped to the existing forcemain (BPS 505) and one piped to the new forcemain that will<br />

intersect with the PS 42 forcemain (PS 505A). The PS 42 forcemain is described in the Central<br />

Consolidation PS 42 Forcemain Project, as described in Section 4 of this plan.<br />

PS 236 and PS 236A will also share a divided wet well and pump in two direction, with one<br />

piped to the existing forcemain from PS 236 (dry weather) and one piped to the new PS 236A<br />

(wet weather).<br />

TABLE 3-16<br />

SFL-C-0001 (Multiple Pump Stations – Nicholson Drive – Brightside Drive) – Pump Station Information<br />

Existing Max. Future Peak Wet Dry<br />

Capacity Weather Flow Weather<br />

(GPM)<br />

(GPM) (GPM)<br />

PS No.<br />

PS 236<br />

PS 336<br />

PS 311<br />

PS 107<br />

BPS 505<br />

PS 505A<br />

PS 236A<br />

Location<br />

Brightside Road, near<br />

Riverbend Road<br />

Nicholson Road, near<br />

Riverbend Road<br />

Twelve Oaks Road, near<br />

Riverbend Road<br />

Brightside Road, near Earl<br />

Gross<br />

Intersection of Oleson Road<br />

and Brightside Road<br />

Intersection of Oleson Road<br />

and Brightside Road<br />

Brightside Road near<br />

Riverbend Road<br />

625 4,361 609<br />

417 978 153<br />

556 2,115 152<br />

833 965 375<br />

Comments<br />

5,000 5,782 2,014 Will be converted from<br />

in-line to wet well.<br />

New 2,761 0 Overflow PS for BPS<br />

505<br />

New 699 0<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $6,100,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-69 JANUARY 2011<br />

REV. 5


Gourrier<br />

Janet<br />

Line<br />

Swire<br />

Highland<br />

L S U<br />

Delgado<br />

Nicholson<br />

River<br />

Parker<br />

Paula<br />

Boyd<br />

Jennifer Jean<br />

Clara<br />

Burbank<br />

Bob Pettit<br />

Brightside<br />

Landing<br />

Tezcucco<br />

Belle Fountaine<br />

Dakin<br />

Valcour Aime<br />

Belle Cherie<br />

#I PS236A<br />

Harwich<br />

Moorstone<br />

Tigerland<br />

Y A Tittle<br />

Sharlo<br />

Alvin Dark<br />

Earl Gros<br />

#I<br />

PS107<br />

Doris<br />

Ward<br />

Oleson<br />

BPS505<br />

Etta<br />

#I#I<br />

Lee<br />

BPS505A<br />

Ben Hur<br />

Westervelt<br />

Riverbend Lakes<br />

Riverine<br />

Destrehan<br />

#I<br />

Belle Grove<br />

PS336<br />

Robillard<br />

Riverbend<br />

#I<br />

Nottaway<br />

Ormand<br />

Sarpy<br />

Calanne<br />

Three Oaks<br />

PS311<br />

Twelve Oaks<br />

Laurel Lakes<br />

Ben Hur<br />

Dean Lee<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Multiple PS - Nicholson Dr. - Brightside Dr.<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFL-C-0001<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-29<br />

0 1,200 2,400<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SFL-C-0001_mpj120510


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.2 SFL-C-0002 (Perkins/Old Perkins Area BPS 514 Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The purpose of this project is to upgrade BPS514 to handle revised flow and head<br />

requirements. The existing BPS 514 has a capacity that is less than the predicted future peak<br />

wet weather flow.<br />

Location<br />

The location of BPS 514 is given in Table 3-17 and shown in Figure 3-30.<br />

Scope<br />

The scope of the project is noted in Table 3-17. BPS 514 will be converted from an in-line<br />

booster pump station to a wet well pump station as part of this project.<br />

TABLE 3-17<br />

SFL-C-0002 (Perkins/Old Perkins Area BSP 514 Improvements) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

BPS 514<br />

Intersection of Pecue<br />

Lane and Old Perkins<br />

Road<br />

24,000 50,830 9,476 Will be converted<br />

from in-line to<br />

wet well.<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $10,400,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-71 JANUARY 2011<br />

REV. 5


§¨¦ I-10<br />

St Alban's<br />

Pecue<br />

BPS514<br />

#I<br />

#<br />

Old Perkins<br />

Pecue<br />

Perkins<br />

#<br />

PS394<br />

#<br />

PS416<br />

Highland<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Perkins - Old Perkins Area BPS514<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFL-C-0002<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-30<br />

0 400<br />

800<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.3 SFL-C-0003 (Multiple PSs - Burbank Drive – Siegen Lane)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The following pump stations will be replaced in this project: PS 118, PS 221, PS 358, BPS 999,<br />

PS 239, and PS 229. The new pump stations will work in conjunction with forcemain<br />

upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />

these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations are shown in Table 3-18 and in Figure 3-31.<br />

Scope<br />

The scope of the pump station replacements is shown in Table 3-18. BPS 999 will be<br />

converted from an in-line booster pump station to a wet well pump station.<br />

TABLE 3-18<br />

SFL-C-0003 (Multiple Pump Stations - Burbank Drive - Siegen Lane) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

PS 118<br />

Near Rue Crozat and Rue<br />

Desiree<br />

417 909 171<br />

PS 221 Near Barkley and Mirkwood 694 1,058 232<br />

PS 358<br />

BPS 999<br />

PS 239<br />

PS 229<br />

Old Perkins Road, near<br />

Oakbrook Road<br />

Siegen Road, near Quail<br />

Ridge<br />

Near Neil Avenue and<br />

Highland Knoll Court<br />

Near intersection of<br />

Rendale Avenue and<br />

Brookhollow Drive<br />

208 235 29<br />

6,250 8,855 1,962 Will be converted<br />

from in-line to wet<br />

well.<br />

69 168 48<br />

278 694 202<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,100,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction has not started.<br />

GNV31031158547.DOCX/103440004 3-73 JANUARY 2011<br />

REV. 5


#<br />

#<br />

#<br />

Corby<br />

PS300<br />

PS90<br />

Obrien<br />

Lakeside Oak<br />

Court<br />

Rod Laver<br />

Greenbriar Hollow<br />

Great Oak<br />

#<br />

PS118<br />

#I<br />

#<br />

Oak Hills<br />

Amiens<br />

Don Budge<br />

Wimbledon<br />

#<br />

#<br />

Lew Hoad<br />

PS117<br />

Oak Haven<br />

Towering Oaks<br />

PS180<br />

Oakwilde<br />

Oakshire<br />

Chester<br />

Highland<br />

Oakcliff<br />

Barkley<br />

PS447<br />

#<br />

#<br />

PS381<br />

PS358<br />

#I<br />

#<br />

#I<br />

# PS221<br />

#<br />

Wyatt<br />

Winterhue<br />

#<br />

PS330<br />

#<br />

#<br />

#<br />

#<br />

BPS999<br />

#I<br />

##<br />

<strong>Plan</strong>tation Ridge<br />

Oakbrook<br />

Carnforth<br />

Briarrose<br />

#<br />

Amiss<br />

Mint<br />

PS182<br />

Perkins<br />

Siegen<br />

Troutbeck Ymca Plaza<br />

Highland Trace<br />

PS12<br />

Mullen<br />

Lombard<br />

#<br />

Briarridge<br />

Siegen<br />

Honey<br />

Bullrush<br />

Denver<br />

Highland<br />

#<br />

#<br />

Potwin<br />

PS411<br />

PS262<br />

Neil<br />

Kinglet<br />

Peck<br />

Stafford<br />

BPS944<br />

#<br />

#<br />

PS239<br />

#I<br />

PS99<br />

# #<br />

#I<br />

# PS229<br />

#<br />

PS108<br />

Gamwich<br />

#<br />

PS235<br />

Hobbiton<br />

Woodview<br />

PS333<br />

Orleans<br />

Broad<br />

Oaks<br />

Mall<br />

Gravier<br />

Poydras<br />

Paddington<br />

Reiger<br />

§¨¦ I-10<br />

Baronne<br />

Bayswater<br />

Shadow Oak<br />

Mall<br />

Burbank<br />

East Baton Rouge Parish<br />

#<br />

Legend<br />

Proposed<br />

Multiple PS - Burbank - Siegen<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFL-C-0003<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-31<br />

0 1,000<br />

2,000<br />

Feet<br />

Jean Lafitte<br />

Corsair<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.4 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer<br />

Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The following pump stations will be replaced in this project: PS 182, PS 223, PS 327, PS 353,<br />

PS 278, PS 372, and PS 365. The new pump stations will work in conjunction with forcemain<br />

upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />

these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

Table 3-19 and Figure 3-32 show the locations of the pump stations in this project. These<br />

pump stations are generally located in the area of Jefferson Highway and Highland Road.<br />

Scope<br />

Table 3-19 shows the detailed scope of this project.<br />

TABLE 3-19<br />

SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer Upgrades) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak<br />

Wet Weather<br />

Flow (GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 182 Near YMCA Plaza Drive 208 417 148<br />

Comments<br />

PS 223<br />

PS 327<br />

PS 353<br />

Intersection of Don Budge<br />

Avenue and Backcourt Drive<br />

Intersection of Alder Drive and<br />

Crepe Myrtle Drive<br />

Intersection of Azalea Lakes<br />

Avenue and Lake Iris Avenue<br />

278 795 168<br />

278 369 44<br />

486 537 49<br />

PS 278 Near Bainbridge Avenue 347 764 174<br />

PS 372<br />

PS 365<br />

Intersection of West Lake<br />

Terrace Drive and Lake Tulip<br />

Avenue<br />

Intersection of Sugar Mill<br />

Avenue and Umbehagen Lane<br />

278 544 314<br />

1,528 4,155 762<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $3,476,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction is on-going.<br />

GNV31031158547.DOCX/103440004 3-75 JANUARY 2011<br />

REV. 5


Bea<br />

Arnold<br />

Hickory Ridge<br />

O'Neal<br />

Antioch<br />

Elliot<br />

#<br />

#<br />

Shirley<br />

#<br />

#<br />

#<br />

PS300<br />

#<br />

# #<br />

#<br />

PS5XX PS404<br />

#<br />

# #<br />

#<br />

PS156<br />

PS77<br />

PS174<br />

PS337 PS154<br />

PS380 #<br />

PS162 #<br />

# #<br />

#<br />

#<br />

PS402<br />

PS17<br />

PS168<br />

BPS889 PS283<br />

#<br />

#<br />

#<br />

#<br />

PS143<br />

PS392 PS427 PS442 PS391<br />

PS328 # PS136<br />

PS270 PS173<br />

PS403<br />

#<br />

# # #<br />

# #<br />

# PS135 # # PS346<br />

PS390<br />

PS134<br />

#<br />

#<br />

PS216<br />

#<br />

PS396 #<br />

PS217<br />

PS258<br />

#<br />

PS384<br />

#<br />

# #<br />

PS256<br />

#<br />

#<br />

PS95 PS171<br />

#<br />

# #<br />

# #<br />

PS428<br />

PS36<br />

#<br />

PS115<br />

PS177<br />

## PS148<br />

BPS777 PS308<br />

#<br />

PS296<br />

PS250<br />

#<br />

#<br />

PS251<br />

PS434 PS219 PS172<br />

PS85<br />

#<br />

##<br />

# #<br />

PS88 PS423<br />

PS338<br />

PS339<br />

#<br />

#<br />

#<br />

# #<br />

PS307<br />

PS232<br />

PS247 #<br />

#<br />

#<br />

#<br />

PS299<br />

PS395<br />

PS379 PS1003<br />

PS112<br />

# #<br />

#<br />

#<br />

PS389<br />

PS252 PS147<br />

PS274<br />

PS201<br />

PS111 #<br />

PS213<br />

# # # # # # # PS438 PS410<br />

#<br />

#<br />

PS355<br />

PRIVATEPS<br />

PS287<br />

BPS507<br />

PS170<br />

# #<br />

#<br />

#<br />

#<br />

#I<br />

PRIVATEPS PRIVATEPS<br />

PS266<br />

PS223<br />

PS184<br />

# # #<br />

#<br />

#<br />

PS157<br />

#<br />

#<br />

#I<br />

PS332<br />

PS182<br />

PS447<br />

#<br />

PS1005<br />

# #<br />

PS248<br />

#<br />

#<br />

PS411<br />

#<br />

#<br />

PS117<br />

PS331<br />

BPS944<br />

# PS358<br />

#<br />

PS108<br />

#<br />

#<br />

#I<br />

PS435<br />

PS327<br />

PS118<br />

PS393<br />

#<br />

#<br />

#<br />

PS259<br />

#<br />

PS221<br />

#<br />

PS309<br />

PS1002<br />

PS254#<br />

# # # # PS431<br />

PS330<br />

PS441<br />

PS12<br />

PS367<br />

#<br />

# #<br />

PS159<br />

PS180<br />

PS99<br />

PS400<br />

#<br />

#<br />

PS239<br />

BPS514<br />

PS405<br />

PS161<br />

# # #<br />

# #<br />

#<br />

PS365 #<br />

#I<br />

PS229<br />

#I<br />

#<br />

#<br />

PS372<br />

PS385 PS383<br />

PS394 PS416<br />

# PS235<br />

#<br />

# #<br />

PS378<br />

PS399<br />

PS333<br />

#<br />

PS413 #<br />

#<br />

#I #I<br />

#<br />

# PS353<br />

PS366<br />

PS398<br />

PS260<br />

#<br />

#<br />

#<br />

PS382 PS278<br />

# #<br />

PS344<br />

PS436<br />

#<br />

PS356<br />

#<br />

PS388<br />

#<br />

#<br />

# #<br />

PS343<br />

PS350<br />

PS349<br />

Fleet<br />

Summa<br />

Paulet<br />

Obrien<br />

PS90<br />

Rue Crozat<br />

PS409<br />

Burbank<br />

Tradition<br />

Fairway<br />

Drusilla<br />

Strand<br />

Maiden<br />

Great Oak<br />

Chelsea<br />

Gail<br />

Oakdale<br />

Hill<br />

I-12<br />

Baker<br />

Pine Park<br />

Pastureview<br />

Lake Estates<br />

Field<br />

Oakcliff<br />

Chester<br />

Brookline<br />

Interline<br />

Purvis<br />

Oliphant<br />

Barkley<br />

Jefferson<br />

Reitz<br />

Upton<br />

Carnforth<br />

Sundance<br />

Plaza Americana<br />

Bluebonnet<br />

Floynell<br />

Cal<br />

Tanglebriar<br />

Azrok<br />

Amiss<br />

Cedarlane<br />

Daradele<br />

Cedarcrest<br />

Ridgely<br />

Hillyard<br />

Mullen<br />

Neil<br />

Potwin<br />

Oakline<br />

Fernbrook<br />

Peck<br />

Perkins<br />

Caroljack<br />

Woodleigh<br />

Siegen<br />

Aubin<br />

Mead<br />

Ericson<br />

E Heck<br />

Southpark<br />

Industriplex<br />

Mall<br />

Toulon<br />

Honore<br />

Reiger<br />

Poydras<br />

Broad<br />

Brookhollow<br />

Jean Lafitte<br />

Highland Oaks<br />

Paddock<br />

Telesmar<br />

I-10<br />

Baylor<br />

Sherwood Forest<br />

Cloverland<br />

St Alban's<br />

Corsair<br />

Campden<br />

Claiborne<br />

Brakley<br />

Newcastle<br />

Exchequer<br />

Lancelot<br />

Wentling<br />

Sun Belt<br />

Parkmeadow<br />

Parkforest<br />

Parkhaven<br />

British<br />

Galahad<br />

Harris<br />

Pecue<br />

George Cain<br />

Coursey<br />

Pecue<br />

Woodland Ridge<br />

Stumberg<br />

Mourning Dove<br />

Rose<br />

La Crete<br />

Five Oaks<br />

Country Hill<br />

Millwood<br />

Quinn<br />

Crossing<br />

Gentry<br />

Airline<br />

Briarwood<br />

Saint Clare<br />

Westridge<br />

Kimbleton<br />

Greens<br />

Buckley<br />

Pinehurst<br />

Mission Hill<br />

Buzbee<br />

Highlandia<br />

Augusta<br />

Sessions<br />

Herridge<br />

Snowden<br />

Old Perkins<br />

Harrells Ferry<br />

Jones Creek<br />

Barringer<br />

Terrell<br />

Board<br />

Director<br />

Barringer Foreman<br />

Highland<br />

Elmhurst<br />

George Oneal<br />

Ferrell<br />

Profit<br />

Perkins<br />

Muirfield<br />

Windsong<br />

Debit<br />

Jefferson<br />

Malvern Hill<br />

Shenandoah<br />

Confederate<br />

Spyglass Hill<br />

Santa Maria<br />

Silver Sand<br />

Chantilly<br />

Morel<br />

Doyle<br />

Round Oak<br />

Gray Moss<br />

Chadsford<br />

Appomattox<br />

Miller<br />

Paladin<br />

Monitor<br />

Culps Bluff<br />

General Forrest<br />

Achord<br />

Amaryliss<br />

Belle Helene<br />

Hendrick<br />

Barrett<br />

Hoo Shoo Too<br />

Palmer<br />

Hagerstown<br />

Harness<br />

Vignes<br />

Woodlake<br />

Piney Point<br />

Wildlife Way<br />

Green Willow<br />

Beaujolaes<br />

PS316<br />

PS211<br />

PS360<br />

PS347<br />

Babin<br />

Bengal<br />

Phillips<br />

Tiger Bend<br />

1<br />

2<br />

4<br />

5<br />

107 6<br />

8<br />

12 11<br />

9<br />

3<br />

East Baton Rouge Parish<br />

Proposed<br />

#I<br />

")<br />

New Pump<br />

Stations<br />

New Gravity Main<br />

New Force Main<br />

New Storage Facility<br />

Legend<br />

³<br />

#<br />

!R<br />

0 0.5 1<br />

Miles<br />

Existing<br />

Exist. Gravity<br />

Exist. Forcemain<br />

Exist. Pump Station<br />

Manholes\Nodes<br />

Figure 3-32<br />

Group Project 2<br />

SFL-C-0004<br />

Project Vicinity Map<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0004.MXD SGELPI 10/22/2009 08:40:06


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.5 SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) project consists of<br />

forcemain upgrades in the South Forced Lower Basin. This project includes the upsizing of<br />

forcemain in an area that extends north to the intersection of Jefferson Highway and Tiger<br />

Bend Road and continues south to the Staring Lane extension and Burbank Drive intersection.<br />

The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />

forcemain capacity. The upgrades range in size from 48-inch to 60-inch diameter.<br />

Location<br />

The first segment of forcemain from node BPS 507 to BPS 514 begins at BPS 507 near the<br />

intersection of Kimbleton Avenue and Jefferson Highway. Upon leaving the pump station the<br />

forcemain travels south through a servitude along the east edge of the Briarwood Golf Club<br />

for approximately 2,800 feet before turning slightly east. At this point, the forcemain crosses<br />

the golf club for approximately 1,300 feet before crossing Airline Highway. After crossing<br />

Airline Highway, the forcemain continues south parallel to Pecue Lane. Approximately 1,200<br />

feet passed the Airline Hwy, new 48-inch forcemain connects to an existing 42-inch PCCP<br />

forcemain and 3,000 LF of existing forcemain is used for this alignment. Before I-10, the<br />

existing 42-inch PCCP forcemain crossing connects to a new 48-inch forcemain that then<br />

crosses I-10, Ward Creek, and the railroad, and continues south to BPS 514.The forcemain<br />

resumes downstream of BPS 514 and continues south to Highland Road, crosses, and follows<br />

the Entergy right-of-way to Buccaneer Avenue, then to Burbank Drive. It then follows<br />

Burbank Drive to the intersection of Burbank Drive and Staring Lane extension.<br />

Scope<br />

SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) includes<br />

construction of approximately 12,600 feet of 48-inch forcemain, approximately 23,800 feet of<br />

54-inch forcemain, and approximately 6,200 feet of 60-inch forcemain downstream of BPS<br />

507 and BPS 514. Table 3-20 and Figure 3-33 shows the detailed scope of this project.<br />

TABLE 3-20<br />

SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing Diameter<br />

(in)<br />

BPS 507 SS340 6,610 42 48<br />

SS340 SS364 3,780 42 48<br />

SS369 BPS514 2,200 42 48<br />

BPS514<br />

15,000 48 54<br />

Burbank Drive<br />

Intersection<br />

Bluebonnet Blvd<br />

Intersection<br />

Burbank Dr<br />

Intersection<br />

Bluebonnet Blvd<br />

Intersection<br />

Staring Lane<br />

Extension<br />

Proposed Diameter<br />

(in)<br />

8,800 48 54<br />

6,200 48 60<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Comments<br />

Total Construction Bid Amount is $20,700,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Construction Appropriation Year was 2010.<br />

Construction is on-going.<br />

GNV31031158547.DOCX/103440004 3-77 JANUARY 2011<br />

REV. 5


Bea<br />

# #<br />

#<br />

#<br />

#<br />

# ##<br />

# #<br />

#<br />

#<br />

PS446<br />

#<br />

G S R I<br />

Port<br />

#<br />

#<br />

Gardere<br />

Ned<br />

Quail<br />

#<br />

#<br />

#<br />

PS267<br />

Orion<br />

PS97<br />

# #<br />

Burden<br />

Irene<br />

Walden<br />

Pikes<br />

#<br />

#<br />

# #<br />

PS40<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

SS381<br />

!R<br />

# PS27 #<br />

#<br />

# #<br />

# !R<br />

#<br />

Highland<br />

PS374<br />

Staring<br />

Springlake<br />

#<br />

Hilltree<br />

PS417<br />

I-12<br />

PS58<br />

PS58A<br />

#<br />

Picardy<br />

Essen<br />

PS301<br />

#<br />

#<br />

PS302<br />

SS98<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS437<br />

PS317<br />

Anselmo<br />

PS409<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

Drusilla<br />

Summa<br />

PS300<br />

Obrien<br />

Villa<br />

#<br />

#<br />

# #<br />

#<br />

#<br />

Burbank<br />

Gail<br />

PS299<br />

PS223<br />

#<br />

Hill<br />

#<br />

Cal<br />

#<br />

#<br />

PS447<br />

Reitz<br />

Azrok<br />

Upton<br />

# # #<br />

#<br />

# #<br />

#<br />

#<br />

PS355<br />

#<br />

#<br />

PS411 #<br />

#<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

#<br />

#<br />

#<br />

#<br />

PS235 #<br />

Amiss<br />

Siegen<br />

PS389<br />

#<br />

#<br />

#<br />

PS108<br />

#<br />

Highland Oaks<br />

PS260<br />

#<br />

Honore<br />

Reiger<br />

Mall<br />

Corsair<br />

PS171<br />

PS331<br />

#<br />

#<br />

#<br />

#<br />

#<br />

Dunlay<br />

#<br />

#<br />

Reiger<br />

!R #<br />

PS416<br />

#<br />

PS134<br />

#<br />

#<br />

!R<br />

#<br />

PS147<br />

George Cain<br />

#<br />

BPS514<br />

Perkins<br />

British<br />

Fulwar Skipwith<br />

Pecue<br />

Stumberg<br />

#<br />

##<br />

#<br />

#<br />

# PS379<br />

#<br />

!R<br />

Pecue<br />

!R<br />

PS435<br />

#<br />

SS369<br />

Rose<br />

Old Perkins<br />

Colony<br />

#<br />

SS271<br />

SS340<br />

#<br />

Airline<br />

#<br />

#<br />

PS259<br />

PS378<br />

Westridge<br />

PS270<br />

#<br />

PS201<br />

#<br />

#<br />

PS1002<br />

#<br />

Coursey<br />

Buzbee<br />

PS184<br />

I-10<br />

#<br />

Nicholson<br />

#<br />

PS444<br />

Pentagon<br />

Tradition<br />

PS356<br />

#<br />

#<br />

PS350<br />

#<br />

PS344<br />

#<br />

#<br />

River<br />

University Club<br />

#<br />

PS408<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Existing<br />

Highland Rd. - Burbank Dr.<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

SFL-C-0005<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-33<br />

0 0.4 0.8<br />

³Miles<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES_2010\CAPACITY\SOUTH\SFL-C -0005_mpj111610.MXD


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.6 SFL-C-0006 (Nicholson Drive – Highland Road – Perkins Road Capacity<br />

Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFL-C-0006 (Nicholson Drive – Highland Road –Perkins Road Capacity Improvements)<br />

project consists of forcemain and gravity upgrades in the South Forced Lower Basin. The<br />

project has been divided into two phases during construction for ease of execution: Phase A<br />

- Willow Grove Capacity Improvements and Phase B – Nicholson Drive – Highland Road –<br />

Perkins Road Capacity Improvements.<br />

The Phase A (Willow Grove Capacity Improvements) project consists of forcemain and<br />

gravity upgrades in the South Forced Lower Basin. This project includes the upsizing of<br />

forcemain and gravity mains in an area that extends east to the intersection of Siegen Lane<br />

and South Mall Drive and also to south to Perkins Road. The upgrades are designed to<br />

alleviate chronic SSOs at the pump stations and increase the gravity main capacity. The<br />

upgrades range in size from 8 inches to 18 inches in diameter.<br />

The Phase B (Nicholson Drive – Highland Road – Perkins Road Capacity Improvements)<br />

project consists of forcemain and gravity upgrades in the South Forced Lower Basin. This<br />

project includes the upsizing of forcemain and gravity mains in an area that extends north<br />

to the intersection of Jefferson Highway and Tiger Bend Road and continues south to the<br />

South WWTP on Gardere Lane. The upgrades are designed to alleviate chronic SSOs at the<br />

pump stations and increase the gravity main capacity. The upgrades range in size from 6<br />

inches to 24 inches in diameter.<br />

Location – Phase A<br />

The Phase A (Willow Grove Capacity Improvements) project involves the replacement of<br />

portions of the South Forced Lower forcemain and gravity systems as shown in Figures 3-<br />

34A. The majority of the contributing flows are from residential areas. The upgrades can be<br />

broken into the following segments.<br />

Forcemain segment PS 223 to SS312 starts at PS 223, which is at the intersection of Roy<br />

Emerson Drive and Don Budge Avenue, and travels overland to node SS312, which is on the<br />

corner of Lew Hoad Avenue.<br />

Forcemain segment Willow Grove added to the PDP at the request of the DPW. Forcemain<br />

starts from Willow Grove forcemain connection to existing 10-inch forcemain at the north<br />

side of KCS railroad. New 12-inch forcemain follows KCS railroad easterly direction<br />

approximately 1,600 LF and then crosses to the north side of Ward Creek. Approximately<br />

600 LF runs parallels to Ward Creek and extends all the way to PS944. Crosses at south side<br />

of the Ward Creek near Siegen Lane overpass and connects to existing 18-inch forcemain.<br />

The existing 14-inch crossing will be abandoned.<br />

Gravity segment 944-01006 to PS 944 begins near the intersection of Mint Drive and<br />

Buttercup Drive and runs east along a drainage path to PS 944, located near the intersection<br />

of Andrea Drive and South Mall Drive.<br />

GNV31031158547.DOCX/103440004 3-79 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 108-00047 to 108-00008 starts at manhole 108-00047, which is at the corner<br />

of Meadowbrook Avenue and Meadowmere Drive, and travels in a southerly direction<br />

along Meadowbrook Avenue to the corner of Meadowbrook and Meadowlane Drive. The<br />

gravity line turns westerly along Meadowlane Drive to manhole 108-00008, which is<br />

between Meadowlane Drive and Perkins Road.<br />

Forcemain segment SS371 to SS385 begins at node SS371, which is at corner of Twisted Oak<br />

Lane and Oak Hills Parkway, and travels along Oak Hills Parkway to node SS385, which is<br />

at Siegen Lane.<br />

Location – Phase B<br />

The Phase B (Nicholson – Highland – Perkins Capacity Improvements) project involves the<br />

replacement of portions of the South Forced Lower forcemain and gravity systems as shown<br />

in Figures 3-34B and 3-34C. A majority of the contributing flows are from residential areas.<br />

The upgrades can be broken into the following segments.<br />

Forcemain segment PS 259 to SS340 starts at PS 435, near the intersection of Thistle Ridge<br />

Drive and Martin Ridge Drive. From PS 259, the forcemain continues in a northwesterly<br />

direction through the subdivision and through empty lots, following a servitude/drainage<br />

path to Pecue Lane, where node SS340 is located.<br />

Forcemain segment PS278FM to SS459 starts at the intersection of Brunswick Avenue and<br />

Macon Drive. The forcemain continues in a generally northeasterly direction through the<br />

subdivision to Jefferson Highway, intersecting with Jefferson Highway near Pecan Creek<br />

Lane. At Jefferson Highway, the forcemain follows the highway in a northwesterly direction<br />

to node SS459, which is on Jefferson Highway between Lake Iris Road and Lake Azalea<br />

Drive.<br />

Gravity segment 365-01007 to 365-00001Z starts at manhole 365-01007, which is on Jefferson<br />

Highway between Chasefield Avenue and Nine Oaks Avenue, and travels in a southerly<br />

direction between Beckfield Avenue and Sugar Mill Avenue to manhole 365-00001Z, which<br />

is next to PS365.<br />

Forcemain segment PS 365FM to SS 471 starts at PS 365, which is on Umbehagen Lane near<br />

Sugar Mill Avenue, follows Umbehagen Lane for approximately 600 feet, crosses Airline<br />

Highway, and continues in a southwesterly direction to node SS449. From node SS449, the<br />

forcemain travels in a southwesterly direction parallel to Highland Road to node SS471,<br />

which is north of a drainage path that is south of Bellerive Court.<br />

Forcemain segment PS 398 to SS502 starts at the cul-de-sac on Arcadian Shores Drive and<br />

continues in a southwesterly direction along Arcadian Shores Drive and Spyglass Hill Drive<br />

to node SS502, which is roughly located near the end of Spyglass Hill drive, near a drainage<br />

path.<br />

Forcemain segment SS502 to SS489 starts at SS502, which is at the intersection of Santa Marie<br />

Avenue and Trent Jones Drive. The forcemain continues in a northwesterly direction<br />

following Trent Jones Drive and paralleling Perkins Road to a servitude near Petroleum<br />

Drive connects to SS489.<br />

Forcemain segment PS378 to Old Perkins starts at PS378, which is between La Create Lane<br />

and 5 Oaks Drive at the south side of Perkins Road. The forcemain travels west to La Crete<br />

Lane and turn north to La Crete Lane. connects to Old Perkins road new alignment.<br />

GNV31031158547.DOCX/103440004 3-80 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Forcemain segment SS451A to Old Perkins starts at SS451A, which is between La Create<br />

Lane and Pecue Lane at the north side of Perkins Road. The forcemain trowels south from<br />

wooded area to old Perkins Road connects to new alignment.<br />

Forcemain segment SS489 to BPS514 starts at SS489, which is near Petroleum Drive goes<br />

west parallel to KCS railroad crosses Highland Road and follows Old Perkins Road Crosses<br />

Barringer Foreman Road. KCS railroad and I-10 stays at south sides of Old Perkins and<br />

connect to BPS514.<br />

Forcemain segment PS 253 to SS370 starts on Round Oak Drive, north of its intersection with<br />

Shady Grove Avenue. The forcemain travels southwest until reaching SS370, located<br />

northwest of Highland Road and Jefferson Highway.<br />

Forcemain segment PS 229FM to SS400 begins at PS 229, which is at the end of Brookhollow<br />

Drive and travels in a northwesterly direction to node SS400, which is at the end of Scotland<br />

Court.<br />

Forcemain segment PS 336 to PS 311 begins at PS 336, which is at intersection of Bon Sejour<br />

Avenue and Destrehan Drive travels east at Bon Sejour Avenue. turns south at Belle Grove<br />

Avenue turns east at 12 Oaks Avenue and connects with PS 311<br />

Forcemain segment PS 311 to 236-00085A begins at PS 311, which is at south side of 12 Oaks<br />

Avenue Between Durander Drive and Riverbend Blvd. travels east to Entergy Transmission<br />

OW. Turns north and connects to new gravity manhole 236-00085A.<br />

Gravity segment 236-00085A to 236-00073A starts at manhole 365-01007, which is on<br />

Jefferson Highway between Chasefield Avenue and Nine Oaks Avenue, and travels in a<br />

southerly direction between Beckfield Avenue and Sugar Mill Avenue to manhole 365-<br />

00001Z, which is next to PS365.<br />

Gravity segment 236-00002 to PS 236 starts southwest of the PS236. The gravity line travels<br />

northeast until reaching PS 236, which is between Brightside Drive and Valcour Aime<br />

Avenue.<br />

Gravity segment 236-00055 to 236-00002 starts east of Duncan Kenner Drive at inside GSU<br />

servitude and travels north until reaching 236-00002, located southeast of Dakin Avenue<br />

cul-de-sac.<br />

Gravity segment 236-00073A to 236-00055 starts at manhole 236-00073A east of Duncan<br />

Kenner Drive at inside GSU servitude and travels north until reaching 236-00055.<br />

Gravity segment 236-00085A to 236-00073A starts at manhole 236-00085A east of Duncan<br />

Kenner Drive at inside GSU servitude and travels north until reaching 236-00073A.<br />

Forcemain segment PS 236 to PS 505A begins at PS 236, which is between Brightside Drive<br />

and Valcour Aime Avenue. travels southeast at GSU ROW. to Dean Lee Drive until reaching<br />

PS505A and connects to junction box right before PS505A.<br />

Forcemain segment PS 505 to PS 505A begins at PS 505, which is at intersection of Nicholson<br />

Drive and Dean Lee Drive travels west at Dean Lee Drive and connects to PS 505A.<br />

Forcemain segment PS 505A to PS 505 begins at PS 505A, which is at Deen Lee drive travels<br />

east at Dean Lee Drive and connects to PS 505 at intersection of Nicholson Drive and Dean<br />

Lee Drive.<br />

GNV31031158547.DOCX/103440004 3-81 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Scope – Phase A<br />

The Phase A (Willow Lane Capacity Improvements) project includes construction of<br />

approximately 1,800 feet of 8-inch forcemain upstream of PS223, 1,900 feet of 10-inch gravity<br />

sewer upstream of PS 944, approximately 1,600 feet of 12-inch, 256 feet of 14-inch, 2,358 feet<br />

of 16-inch and 280 feet of 18-inch forcemain upstream of PS944, approximately 1,600 feet of<br />

12-inch gravity sewer upstream of PS 108 and approximately 1,953 feet of 12-inch forcemain<br />

upstream of SS385 in the South Forced Lower Basin. Table 3-21 shows the detailed scope of<br />

this project.<br />

TABLE 3-21A<br />

Sfl-C-0006 (Phase A - Willow Lane Capacity Improvements)<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

108-00047 108-00001 50 8 12 Gravity sewer<br />

108-00001 108-00003 510 8 12 Gravity sewer<br />

108-00003 108-00005 560 8 12 Gravity sewer<br />

108-00005 108-00008 440 8 12 Gravity sewer<br />

PS 223 SS312 1,800 6 8<br />

SS371 SS385 1,953 10 12<br />

944-01006 PS 944 1,920 8 10 Gravity sewer<br />

Willow Grove SS327 1,654 12<br />

SS327 SS323A 256 14<br />

SS323A 944FM 2,358 16<br />

944FM SS335 280 18<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Scope – Phase B<br />

The Phase B (Nicholson – Highland – Perkins Capacity Improvements) project includes<br />

construction of approximately 945 feet of 18-inch gravity sewer upstream of PS 236,<br />

approximately 1,980 feet of 21-inch and 2,200 feet of 24-inch gravity sewer upstream of PS<br />

365. The project also includes the construction of approximately 5,470 feet of 8-inch, 5,277<br />

feet of 10-inch, 4,611 feet of 12-inch, 50 feet of 14-inch, 11,827 feet of 16-inch, 860 feet of 20-<br />

inch and 11,400 feet of 24-inch forcemain in the South Forced Lower Basin. Table 3-21B<br />

shows the detailed scope of this project.<br />

GNV31031158547.DOCX/103440004 3-82 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-21B<br />

SFL-C-0006 (Phase B - Nicholson Drive – Highland Road – Perkins Road Capacity Improvements) –<br />

Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

PS 259 SS340 1,650 6 8<br />

PS 278FM SS459 2,600 5 8<br />

Comments<br />

365-01007 365-00001Z 2,200 18 24 Gravity sewer<br />

PS 365FM SS444 50 10 14<br />

SS444 SS471 4,700 14 16<br />

PS 398 SS502 3,100 8 10<br />

SS502 SS489 1,900 8 12<br />

PS378 Old Perkins 1,850 6<br />

SS451A Old Perkins 750 6<br />

SS489 BPS514 11,400 24<br />

PS 253 SS370 4000 6 8<br />

PS 229FM SS400 1,700 6 8<br />

PS336 PS311 2,177 10<br />

PS311 236-00085A 2,711 12<br />

236-00002 PS 236 260 12 21 Gravity sewer<br />

236-00055 236-00002 510 12 21 Gravity sewer<br />

236-00055 236-00073A 1,210 21 Gravity sewer<br />

236-00073A 236-00085A 945 18 Gravity sewer<br />

PS236 PS505A 7,127 16<br />

PS505 PS505A 469 20<br />

PS505A 50504 391 20<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount (Phase A and B) is $11,400,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-83 JANUARY 2011<br />

REV. 5


!R #<br />

PS223<br />

!R<br />

SS312<br />

#<br />

PS203<br />

Kinglet<br />

Buttercup<br />

I-10<br />

Don Budge<br />

John Newcombe<br />

Fred Perry<br />

Roy Emerson<br />

Lew Hoad<br />

#<br />

PS447<br />

Mint<br />

Hawthorne<br />

Thrush<br />

Bunting<br />

Mall<br />

Rod Laver<br />

Jack Kramer<br />

Wimbledon<br />

Oak Manor<br />

Oakchase<br />

#<br />

PS381<br />

#<br />

PS182<br />

!R<br />

944-01006<br />

Andrea<br />

!R #<br />

Mall<br />

PS944<br />

Oak Shadow<br />

Great Oak<br />

Ridgeland<br />

PS118<br />

#<br />

Rue Crozat<br />

<strong>Plan</strong>tation Oak<br />

Rue Desiree<br />

Oak Hills<br />

Amiens<br />

Lakeview<br />

#<br />

PS117<br />

Towering Oaks<br />

Verdun<br />

Lakeview<br />

Oak Haven<br />

Rossmore<br />

East Baton Rouge Parish<br />

Oakferd<br />

Oakwilde<br />

Oakshire<br />

!R<br />

Chester<br />

Beacon Tree<br />

Oakdale<br />

Oak Point<br />

Manor Oak<br />

SS371<br />

Oakcliff<br />

Mirkwood<br />

Twisted Oak<br />

Barkley<br />

Pastureview<br />

Oak Creek<br />

#<br />

PS221<br />

#<br />

Shireburk<br />

Masterson<br />

Thornberry<br />

PS358<br />

Perkins<br />

Wyatt<br />

Suffolk<br />

#<br />

PS393<br />

#<br />

PS254<br />

Wordsworth<br />

PS330<br />

PS159<br />

Oakbrook<br />

Carnforth<br />

King James<br />

Magnolia Chase<br />

#<br />

#!R<br />

Kentmere<br />

Troutbeck Ymca Plaza<br />

Wheatsheaf<br />

Legend<br />

#<br />

Phase A<br />

Proposed<br />

Existing<br />

³<br />

(Willow Grove Capacity Improvements) !R<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

SFL-C-0006<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34A_mpj111910.MXD<br />

SS385<br />

0 1,000<br />

2,000<br />

Feet<br />

Siegen<br />

Natchez<br />

Briargrove<br />

Mc Quaid<br />

Lombard<br />

#<br />

Mullen<br />

PS12<br />

Denver<br />

!R<br />

#<br />

Meadowpark<br />

Honey<br />

Potwin<br />

PS411<br />

Meadowview<br />

Stafford<br />

Meadowbrook<br />

108-00008<br />

Figure 3-34A<br />

Honey<br />

Peck<br />

!R #<br />

Metairie<br />

Gamwich<br />

108-00047<br />

Michel Delving<br />

Kenner<br />

Hobbiton<br />

Southland


Antioch<br />

#<br />

#<br />

PS287<br />

#<br />

Exchequer<br />

#<br />

PS332<br />

#<br />

PS147<br />

Pecue<br />

#<br />

#<br />

PS379<br />

#<br />

PS201<br />

Kimbleton<br />

Pennhill<br />

Tiger Bend<br />

#<br />

PS184<br />

Proxie<br />

Board<br />

#<br />

#<br />

#<br />

PS274<br />

Barringer<br />

PS111<br />

Cocodrie<br />

Quorum<br />

Profit<br />

#<br />

#<br />

Debit<br />

#<br />

PS266<br />

#<br />

#<br />

PS438<br />

Woodlawn Acres<br />

Doyle<br />

Morel<br />

Batavia<br />

O'Neal<br />

Miller<br />

#<br />

Achord<br />

PS157<br />

Sweet Olive<br />

Hendrick<br />

#<br />

#<br />

PS1005<br />

Elliot<br />

PS410<br />

#<br />

#<br />

#<br />

Reiger<br />

#<br />

!R<br />

SS426<br />

BPS514<br />

PS394<br />

PS416<br />

#<br />

Perkins<br />

Pecue<br />

Old Perkins<br />

British<br />

!R<br />

SS340<br />

PS435<br />

Rose<br />

#<br />

Briarlake<br />

!R #<br />

PS1002<br />

#<br />

PS309<br />

#<br />

PS431<br />

#<br />

#<br />

!R<br />

Airline<br />

#!R SS471<br />

# !R<br />

PS378<br />

PS413 !R<br />

#<br />

278-00029<br />

!R<br />

#!R<br />

!R<br />

PS398<br />

#<br />

SS502 !R #<br />

!R<br />

Five Oaks<br />

SS458<br />

Lilian<br />

PS259<br />

Castille<br />

Greens<br />

Buzbee<br />

Highlandia<br />

Perkins<br />

Barringer<br />

Highland<br />

Barringer Foreman<br />

Sotile<br />

Jefferson<br />

SS370<br />

#<br />

Umbehagen<br />

Round Oak<br />

PS365FM<br />

PS426<br />

!R #<br />

!R #<br />

PS253FM<br />

Nine Oaks<br />

!R<br />

365-00001Z<br />

Breman<br />

Paladin<br />

Airline<br />

Talton<br />

Preston<br />

365-01007<br />

Moultrie<br />

#<br />

Vignes<br />

Barrett<br />

#<br />

PS405<br />

Green Willow<br />

PS367<br />

#<br />

SS459<br />

Lake Iris<br />

PS400<br />

#<br />

278-00028<br />

PS278FM<br />

#<br />

PS353<br />

#<br />

Highland Crossing<br />

PS356<br />

#<br />

PS350<br />

#<br />

#<br />

PS344<br />

#<br />

#<br />

I-10<br />

Amen Corner<br />

Lakeway<br />

Elmhurst<br />

Muirfield<br />

#<br />

Trent Jones<br />

PS343<br />

#<br />

PS382<br />

#<br />

PS436<br />

East Baton Rouge Parish<br />

Legend<br />

Phase B1<br />

Proposed<br />

Existing (Nicholson Dr. - Highland Rd. - Perkins Rd.)<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Capacity Improvements<br />

Stations<br />

Exist. Forcemain<br />

New Gravity Main<br />

# SFL-C-0006<br />

Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-34B<br />

0 2,900<br />

5,800<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34B_mpj111910.MXD


Bob Pettit<br />

#<br />

PS107<br />

Brightside<br />

Tigerland<br />

Y A Tittle<br />

Alvin Dark<br />

#<br />

Earl Gros<br />

PS305<br />

#<br />

#<br />

PS373<br />

Landing<br />

Belle Fountaine<br />

Dakin<br />

Valcour Aime<br />

PS236 PS236A<br />

#<br />

!R<br />

!R<br />

236-00002<br />

#<br />

PS303<br />

#<br />

#<br />

PS445<br />

Harwich<br />

PS140<br />

Moorstone<br />

Sharlo<br />

#<br />

#!R<br />

PS310<br />

PS292<br />

SS286<br />

#<br />

PS1011<br />

PS439<br />

#<br />

Nicholson<br />

Ward<br />

Oleson<br />

BPS505A<br />

Etta<br />

#<br />

Lee<br />

Tezcucco<br />

Belle Cherie<br />

Destrehan<br />

Westervelt<br />

#<br />

Belle Grove<br />

!R<br />

Robillard<br />

Riverbend<br />

236-00032<br />

Durande<br />

!R #<br />

Nottaway<br />

!R<br />

Sarpy<br />

Calanne<br />

Three Oaks<br />

Rene Beauregard<br />

PS311FM<br />

Twelve Oaks<br />

Ormand<br />

PS311DS<br />

!R<br />

236-00091<br />

Laurel <strong>Plan</strong>tation<br />

Laurel Lakes<br />

PS1008 PS415<br />

#<br />

Dean Lee<br />

Ben Hur<br />

East Baton Rouge Parish<br />

Legend<br />

Phase B2<br />

Proposed<br />

Existing<br />

³<br />

(Nicholson Dr.-Highland Rd.-Perkins Rd.)<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Capacity Improvements<br />

Exist. Forcemain<br />

New Gravity Main<br />

#<br />

SFL-C-0006<br />

Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 3-34C<br />

0 1,000 2,000<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34C_mpj_111710.MXD


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.7 SFU-C-0001 (Multiple PSs – Jefferson Highway – Park Forest Drive)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The pump stations to be replaced in this project consist of the following: PS 111, PS 115, PS<br />

338, PS 379, PS 201, and the Woman’s Hospital PS. The upgrades will work in conjunction<br />

with forcemain upgrades in other South Forced Upper Basin projects to alleviate chronic<br />

SSOs at and near these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

The location of each PS is shown in Table 3-22 and in Figure 3-35.<br />

Scope<br />

Table 3-22 shows the detailed scope of this project, which includes the replacement of six<br />

pump stations in the South Forced Upper basin.<br />

TABLE 3-22<br />

SFU-C-0001 (Multiple PSs - Jefferson Highway - Park Forest Drive) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak<br />

Wet Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

PS 115<br />

PS 338<br />

PS 379<br />

PS 201<br />

PS 111<br />

Women’s<br />

Hospital PS<br />

Parkmeadow Avenue,<br />

near Parkhollow Drive<br />

Near intersection of<br />

Quail Meadow Drive<br />

and Golden Pheasant<br />

Court<br />

Jefferson Highway, near<br />

intersection of Tiger<br />

Bend<br />

Near the intersection of<br />

Tiger Bend and<br />

Jefferson Highway<br />

Near intersection of<br />

Tiger Bend Road and<br />

Green Trails Road<br />

Near intersection of<br />

Pecue Lane and Airline<br />

Highway<br />

556 556 58<br />

764 1,315 551<br />

208 361 39<br />

556 1,386 248<br />

1,575 2,323 241 Will be converted<br />

from in-line<br />

booster to wet well<br />

pump station<br />

New 4,800 Pump Station for<br />

new Women’s<br />

Hospital<br />

development<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $2,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-87 JANUARY 2011<br />

REV. 5


Parkside<br />

Parkbriar<br />

Millwood<br />

Antioch<br />

Sherwood Forest<br />

#<br />

Newcastle<br />

#<br />

#<br />

Wentling<br />

Investor<br />

#<br />

PS135<br />

PS252<br />

PS287<br />

Exchequer<br />

Superior<br />

Cloverland<br />

Benefit<br />

Sun Belt<br />

Parkridge<br />

Parkmount<br />

Parkbrook<br />

Market Place<br />

Galeria<br />

Lake Laberge<br />

#<br />

PS332<br />

#<br />

PS115<br />

#I<br />

#<br />

PS115<br />

#<br />

#<br />

Parkhill<br />

PS143<br />

#<br />

Industriplex<br />

Lake la Dare<br />

Parkoaks<br />

George Cain<br />

Parkforest<br />

PS134<br />

Shadeland<br />

PS148<br />

Parkknoll<br />

Parklake<br />

Parkvale<br />

Parkciel<br />

Parkvilla<br />

Parkrill<br />

Parktrail<br />

PRIVATEPS<br />

#<br />

#<br />

PS136<br />

Stumberg<br />

#<br />

#<br />

PS270<br />

PS434 PS338<br />

##I<br />

# PS338<br />

#<br />

#<br />

PS379<br />

#I<br />

PS232<br />

PS1003<br />

PS379<br />

#<br />

# PS201<br />

#I<br />

PS274 PS111<br />

#<br />

#I<br />

PS147<br />

# # PS201<br />

#<br />

BPS507<br />

Pecue<br />

Pecue<br />

Southwind<br />

Tartan<br />

Cyndal<br />

Stutgart<br />

Woodlyn<br />

Doral<br />

Oxley<br />

Airline<br />

Country Hill<br />

Quail Meadow<br />

Mourning Dove<br />

WH<br />

#I<br />

PS<br />

Country Way<br />

Tollway<br />

Angleton<br />

Legacy<br />

Braxton<br />

Gentry<br />

Westridge<br />

Bayridge<br />

Elm Ridge<br />

Foxridge<br />

Short Ridge<br />

Ridgeview<br />

Kimbleton<br />

Dale<br />

Buckley<br />

Ridgemore<br />

Tiger Bend<br />

#<br />

Tennyson<br />

PS173<br />

#<br />

Shakespeare<br />

PS184<br />

Chippendale<br />

Jefferson<br />

Sessions<br />

#<br />

Coursey<br />

Snowden<br />

Greenshire<br />

Chaucer<br />

Millbrook<br />

Canterdale<br />

Courtshire<br />

Celestial<br />

Herridge<br />

Proxie<br />

Trents<br />

Commission<br />

Board<br />

#<br />

#<br />

Currency<br />

PS428<br />

Heidis<br />

Jones Creek<br />

Director<br />

#<br />

PS403<br />

Shenandoah<br />

Seven Pines<br />

President<br />

Barringer<br />

Allegheny<br />

Profit<br />

#<br />

#<br />

BPS777<br />

PS258<br />

George Oneal<br />

Cocodrie<br />

Point Chenier<br />

Quorum<br />

Altus<br />

Barremore<br />

Vice President<br />

Windsong<br />

PS308<br />

#<br />

#<br />

Debit<br />

#<br />

Ferrell<br />

PS172<br />

Vicksburg<br />

Jefferson Park<br />

Antler<br />

PS111<br />

PS346<br />

Roster<br />

O'Neal<br />

Treasurer<br />

Bluewater<br />

Members<br />

Bankers<br />

Halls Ferry<br />

#<br />

Wilderness<br />

Confederate<br />

Council<br />

#<br />

Overlook Point<br />

Chadsford<br />

Chantilly<br />

Haynes Bluff<br />

Hogenville<br />

Malvern Hill<br />

Chickamauga<br />

Antietam<br />

PS266<br />

Morel<br />

Petersburg<br />

Batavia<br />

Somersby<br />

Doyle<br />

#<br />

PS438<br />

#<br />

#<br />

Reiger<br />

East Baton Rouge Parish<br />

Legend<br />

Multiple PS - Jefferson Hwy<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Park Forest Dr<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

SFU-C-0001<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-35<br />

0 1,900<br />

3,800<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SFU-C-0001_mpj120910


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.8 SFU-C-0002a (O’Neal Lane Pump Stations Group A)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFU-C-0002a (O’Neal Lane Pump Station Group A project includes segments<br />

previously included in SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger<br />

Bend Road), SFU-C-0003 (Multiple Pump Stations - O’Neal Lane) project, and SFU-C-0004<br />

(Multiple Pump Stations - O’Neal - S. Harrell’s Ferry) project. The combined project has<br />

then been split into two projects, Group A and Group B, since the November 2009 PDP.<br />

The project involves the upgrade of PS 112, PS 148, PS 157, PS 170, PS 172, PS 211, PS 232, PS<br />

247, PS 253, PS 274, PS 296, PS 316, PS 391, PS 428 and BPS 777. The upgrades will work in<br />

conjunction with forcemain upgrades in the SFU-C-0005 (O’Neal Lane Pipeline<br />

Improvements) project to alleviate chronic SSOs at and near these pump stations. The<br />

upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

modeling predicts will exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations included in this project are given in Table 3-23A and<br />

shown in Figure 3-36A.<br />

Scope<br />

Table 3-23A shows the detailed scope of this project, which includes replacing 15 pump<br />

stations; including converting BPS 777 from an in-line booster station to a wet well pump station.<br />

TABLE 3-23A<br />

O’Neal Lane Pump Stations Group A – Pump Station Information<br />

PS ID<br />

Existing Maximum<br />

Pump Station Capacity<br />

(gpm)<br />

Future Average Dry<br />

Weather Flow<br />

(gpm)<br />

Peak Future Wet<br />

Weather Design Flow<br />

(gpm)<br />

Estimated TDH<br />

(ft)<br />

PS 112 350 505 1,430 48<br />

PS 148 198 305 527 58<br />

PS 157 278 155 541 167<br />

PS 170 146 833 4,789 90<br />

PS 172 125 104 396 116<br />

PS 211 350 416 2,249 12<br />

PS 232 150 215 1,083 26<br />

PS 247 407 208 1,506 143<br />

PS 253 145 69 472 81<br />

PS 274 403 62 861 102<br />

PS 296 250 215 1,173 72<br />

PS 316 390 382 2,478 97<br />

PS 391 85 139 430 78<br />

PS 428 unknown 111 160 138<br />

PS 777 14,616 4,650 21,930 105<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $12,226,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-89 JANUARY 2011<br />

REV. 5


O'Neal<br />

Antioch<br />

#<br />

#<br />

#<br />

PS143<br />

#<br />

#<br />

Coursey<br />

#<br />

Parkoaks<br />

#I<br />

#<br />

George Cain<br />

PS134<br />

#<br />

PS147<br />

I-10<br />

#<br />

#<br />

#<br />

PS148<br />

Pecue<br />

Pecue<br />

Stumberg<br />

PS77<br />

Deerpath<br />

#<br />

#<br />

#<br />

#<br />

PS379<br />

#<br />

#<br />

#<br />

PS435<br />

Rose<br />

PS217<br />

Briarlake<br />

Quinn<br />

East Baton Rouge Parish<br />

#<br />

#<br />

Tollway<br />

Braxton<br />

PS338<br />

Westridge<br />

Lilian<br />

PS156<br />

PS270<br />

Bayridge<br />

PS259<br />

#<br />

#<br />

#<br />

PS201<br />

Kimbleton<br />

Castille<br />

#<br />

PS173<br />

Tiger Bend<br />

Buzbee<br />

PS1002<br />

#<br />

#<br />

#<br />

PS403<br />

#<br />

#<br />

PS174<br />

#<br />

#<br />

PS346<br />

PS258<br />

#<br />

#<br />

PS396<br />

PS428<br />

#<br />

#I<br />

#<br />

BPS777 #<br />

#I<br />

PS172<br />

#<br />

#<br />

#I<br />

#<br />

#<br />

PS232<br />

#I<br />

#<br />

#I<br />

#<br />

#I<br />

# PS112<br />

#<br />

PS274<br />

#<br />

PS438<br />

#<br />

#<br />

#I<br />

PS170<br />

#<br />

PS266<br />

#<br />

#I<br />

#<br />

PS157<br />

#<br />

#<br />

PS184<br />

Sessions<br />

Jefferson<br />

Snowden<br />

PS309<br />

PS162<br />

Barringer Foreman<br />

Terrell<br />

Airline<br />

Debit<br />

Profit<br />

#<br />

Antietam<br />

Confederate<br />

Doyle<br />

#<br />

#<br />

#<br />

PS253<br />

#I<br />

#<br />

#<br />

PS391<br />

#I<br />

#<br />

#I<br />

PS316 #<br />

#I<br />

PS256 #<br />

#<br />

PS211<br />

PS296<br />

#I<br />

#<br />

PS247<br />

#I<br />

#<br />

Legend<br />

#<br />

Proposed<br />

Existing<br />

O'Neal Ln. Group A PS Projects<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFU-C-0002A<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

Project Vicinity Map<br />

New Force Main<br />

!R Manholes\Nodes<br />

") New Storage Facility<br />

0 0.5<br />

1<br />

Miles<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\SOUTH\SOUTH MAPS\SFU-C-0002A.MXD SGELPI 11/15/2010 10:55:07<br />

Seven Pines<br />

Highland<br />

PS402<br />

PS392<br />

Antioch<br />

Batavia<br />

George Oneal<br />

Mobile<br />

#<br />

PS442<br />

PS427<br />

#<br />

Sweet Olive<br />

PS1005<br />

Coffee<br />

Elliot<br />

PS390<br />

Monitor<br />

Achord<br />

PS410<br />

Preston<br />

Barrett<br />

#<br />

PS367<br />

Harrells Ferry<br />

#<br />

Green Willow<br />

Figure 3-36A<br />

PS441<br />

#<br />

PS360<br />

Vignes<br />

#<br />

#<br />

Babin<br />

Bengal


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.9 SFU-C-0002b (O’Neal Lane Pump Stations Group B)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFU-C-0002b (O’Neal Lane Pump Station Group B) project includes segments<br />

previously included in SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger<br />

Bend Road) project, SFU-C-0003 (Multiple Pump Stations - O’Neal Lane) project, and SFU-<br />

C-0004 (Multiple Pump Stations - O’Neal - S. Harrell’s Ferry) project. The combined project<br />

has then been split into two projects, Group A and Group B, since the November 2009 PDP.<br />

The project involves the upgrade of PS 41, PS 77, PS101A, PS 139, PS 149, PS 153, PS 162, PS<br />

174, PS 175, PS 189, PS 191, PS 224, PS 227, PS 326, PS 345, and BPS 889. The upgrades will<br />

work in conjunction with forcemain upgrades in the SFU-C-0005 (O’Neal Lane Pipeline<br />

Improvements) project to alleviate chronic SSOs at and near these pump stations. The<br />

upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

modeling predicts will exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations included in this project are given in Table 3-23B and<br />

shown in Figure 3-36B.<br />

Scope<br />

Table 3-23B shows the detailed scope of this project, which includes replacing 27 pump<br />

stations; including converting BPS 889 from an in-line booster station to a wet well pump<br />

station. BPS 100A will be decommissioned after this project and the O’Neal Lane Pipeline<br />

project are completed.<br />

TABLE 3-23B<br />

O’Neal Lane Pump Stations Group B – Pump Station Information<br />

PS ID<br />

Existing Maximum<br />

Pump Station Capacity<br />

(gpm)<br />

Future Average Dry<br />

Weather Flow<br />

(gpm)<br />

Peak Future Wet<br />

Weather Design Flow<br />

(gpm)<br />

Estimated TDH<br />

(ft)<br />

PS 41 504 125 504 31<br />

PS 77 350 167 590 90<br />

PS 101A 174 125 465 145<br />

PS 139 209 104 305 143<br />

PS 149 485 153 722 85<br />

PS 153 88 118 618 63<br />

PS 162 310 333 888 81<br />

PS 174 353 118 353 29<br />

PS 175 236 250 965 92<br />

PS 189 360 139 1,103 121<br />

PS 191 367 111 1,298 96<br />

PS 224 770 458 1,663 44<br />

PS 227 165 132 361 46<br />

PS 326 215 118 382 110<br />

PS 345 390 257 403 45<br />

PS 889 11,569 3,616 17,815 81<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9,800,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-91 JANUARY 2011<br />

REV. 5


Harco<br />

Harco<br />

Dena Lynn<br />

Ponderosa<br />

Millerville<br />

Chalfont<br />

Bolivar<br />

Boreas<br />

Amir<br />

O'Neal<br />

Godfrey<br />

Fawn Lake<br />

#<br />

PS169<br />

Choctaw<br />

Windsor<br />

Chene<br />

#<br />

PS295<br />

Rushmore<br />

Sunnyhill<br />

Bywood<br />

Silverthorn<br />

Choctaw<br />

Elmbridge<br />

PS41<br />

#<br />

BPS508<br />

#I<br />

#<br />

#I<br />

#<br />

Woodvale<br />

Florida<br />

Park<br />

PS153<br />

#<br />

#<br />

Woodcliff<br />

Glenhaven<br />

Mollylea<br />

Parkwood<br />

Sherbrook<br />

Goodwood<br />

Millburn<br />

Elva<br />

#<br />

#<br />

Elwick<br />

PS380<br />

PS77<br />

PS21<br />

Kirkley<br />

Trammell<br />

Deerpath<br />

Todd<br />

#<br />

Flannery<br />

#<br />

PS227<br />

#I<br />

#<br />

Torrey Pine<br />

Harrells Ferry<br />

PS448<br />

#<br />

Damon<br />

Woodland Ridge<br />

Holt<br />

PS175 #<br />

#I<br />

#<br />

Darilyn<br />

Lafitte<br />

Azalea Pk<br />

#<br />

PS215<br />

#<br />

Holly<br />

Firethorn<br />

Locust<br />

Acacia<br />

Mora<br />

#<br />

PS226<br />

#<br />

PS451<br />

#<br />

#<br />

Florida<br />

PS62<br />

PS319<br />

Bailey<br />

Stoneberg<br />

Avalon<br />

Palmwood<br />

#I<br />

#<br />

PS162<br />

PS101A<br />

#I<br />

#<br />

#<br />

#<br />

#<br />

PS104<br />

#<br />

PS189<br />

#I<br />

#<br />

#<br />

PS224<br />

#<br />

#I #I #<br />

PS139<br />

PS407<br />

Colonel Allen<br />

Old Hammond<br />

Munal<br />

Lily<br />

Lakemont<br />

Jester<br />

Terrell<br />

Gloria<br />

PS315<br />

Schafer<br />

#<br />

PS174<br />

#I<br />

#<br />

BPS889 PS402<br />

#<br />

#<br />

#<br />

Jones Creek<br />

Lirocchi<br />

Woodway<br />

#I<br />

O Neal<br />

Frontage<br />

Strain<br />

Coliseum<br />

Brutus<br />

BPS100A<br />

Stevendale<br />

Caesar<br />

#I<br />

PS377<br />

Bristoe<br />

Abshire<br />

Ellis<br />

Bonham<br />

PS326<br />

#I<br />

#<br />

#I<br />

# PS191<br />

PS345<br />

#<br />

PS149<br />

#I<br />

#<br />

Patton<br />

PS392<br />

Deer Lake<br />

Centurion<br />

Hoyt<br />

Cicero<br />

I-12<br />

Chariot<br />

Pompey<br />

East Baton Rouge Parish<br />

Legend<br />

#<br />

Proposed<br />

Existing<br />

O'Neal Ln. Group B PS Projects<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFU-C-0002B<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

Project Vicinity Map<br />

New Force Main<br />

!R Manholes\Nodes<br />

") New Storage Facility<br />

0 2,000<br />

4,000<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\SOUTH\SOUTH MAPS\SFU-C-0002B.MXD SGELPI 11/15/2010 10:47:53<br />

Figure 3-36B


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.10 SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12)<br />

The SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12) project has been combined<br />

with SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger Bend Road) and SFU-<br />

C-0004 (Multiple Pump Station - O’Neal Lane-S. Harrell’s Ferry Road) from the October<br />

2008 PDP. The combined project has been designated SFU-C-0002 (O’Neal Lane PS Projects)<br />

and is described in Section 3.4.8.<br />

3.4.11 SFU-C-0004 (Multiple Pump Stations – O’Neal Lane – South Harrell’s Ferry<br />

Road)<br />

The SFU-C-0004 (Multiple Pump Stations –O’Neal Lane – South Harrell’s Ferry Road)<br />

project has been combined with SFU-C-0002 (Multiple Pump Station - Jones Creek Road -<br />

Tiger Bend Road) and SFU-C-0003 (Multiple Pump Station - O’Neal) from the October 2008<br />

PDP. The combined project has been designated SFU-C-0002 (O’Neal Lane Pump Station<br />

Improvements) project and is described in Section 3.4.8.<br />

3.4.12 SFU-C-0005 (O’Neal Lane Pipeline Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFU-C-0005 (O’Neal Lane Pipeline Improvements) project includes segments<br />

previously included in SFU-C-0005 (O’Neal Lane - Tiger Bend Road) and SFU-C-0006<br />

(O’Neal Lane - Jones Creek Road).<br />

The project involves upsizing of gravity main in an area that extends north of Florida Blvd<br />

to the Monticello Subdivision and continues south to include the Shenandoah and Old<br />

Jefferson areas of East Baton Rouge Parish. The upgrades are developed to alleviate chronic<br />

SSOs at pump stations and increase the gravity main capacity. The forcemain upgrades are<br />

in an area that extends north of Florida Blvd to the Monticello Subdivision and continues<br />

south to include the Shenandoah and Old Jefferson areas of East Baton Rouge Parish. The<br />

upgrades are developed to alleviate chronic SSOs at the pump stations and increase the<br />

forcemain capacity.<br />

Location<br />

This project involves the replacement of portions of the South Forced Upper gravity main<br />

and forcemain systems and is shown in Figure 3-37. A majority of the contributing flows are<br />

from residential areas.<br />

The gravity main upgrades are divided into the following segments.<br />

Gravity segment 189-00022 to PS 189 starts north of Rhonda Avenue at manhole 189-00022<br />

and travels west in a servitude that parallels Rhonda Avenue to PS 189, which is located<br />

north of Rhonda Avenue near Outrigger Avenue.<br />

Gravity segment 224-00091 to PS 224 starts at manhole 224-00091 and continues<br />

approximately 500 feet east to PS 224. This main is located west of the cul-de-sacs for<br />

Banyanwood Avenue and Westwood Court.<br />

Gravity segment 211-00048 to 211-00001 starts at manhole 211-00048, which is located near<br />

the intersection of Burnt Oak Drive and Woodlake Drive. From this location, the gravity<br />

main travels generally north before reaching manhole 211-00001. This gravity main acts as<br />

an overflow line to the existing gravity main.<br />

GNV31031158547.DOCX/103440004 3-93 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 177-00180 to 177-00010 starts at manhole 177-00180. From this location, it<br />

continues northerly along Kennesaw Drive, replacing existing gravity pipe, to Missionary<br />

Ridge Court, then northeast along Missionary Ridge Court to manhole 177-00010.<br />

Gravity segment 112-00013 to PS 112 starts southwest of the Antioch Blvd and Antietam<br />

Avenue intersection. The gravity line travels southwest until reaching PS 112, located<br />

northeast of the Confederate Avenue and Chattanooga Drive intersection.<br />

Gravity segment 110-00088 to 110-000001 starts at the intersection of Confederate Avenue<br />

and Tiger Bend Road. The gravity line travels west along Tiger Bend Road until reaching PS<br />

111, located at the intersection of Tiger Bend Road and Green Trails Boulevard.<br />

Gravity segment 170-00022 to 170-00015 begins at manhole 170-00022, which is located on<br />

the north side of Tiger Bend Road west of Jones Creek Road. From there, it continues west<br />

for approximately 1,100 feet to manhole 170-00015.<br />

Gravity segment 170-00015 to 170-00001 begins at manhole 170-00015, which is located near<br />

the south end of Chaucer Street. From there, it continues south for approximately 1,300 feet<br />

and crosses Tiger Bend Road before turning east near Kimbleton Avenue. After turning east,<br />

the gravity main travels approximately 1,550 feet east and south to manhole 170-00001 near<br />

PS 170.<br />

Gravity segment 170-00167 to 170-00001 begins at manhole 170-00167 near the north end of<br />

Board Road. From there, it continues approximately 750 feet north and east to node 170-<br />

00001 near PS 170.<br />

Gravity segment 170-00110 to PS 170 begins at manhole 170-00110 near the intersection of<br />

Vice President and Profit Avenue and continues west to 170-00023A. This gravity main acts<br />

as an overflow line to the existing gravity main. The gravity main from 170-00023A to PS<br />

170 will be replaced.<br />

Gravity segment 148-00037 to 148-00034 begins at manhole 148-00037. The gravity segment<br />

travels west to Parkforest Drive, then south to manhole 148-00034, which feeds into PS 148<br />

near the intersection of Parklawn Avenue and Parkforest Drive.<br />

The forcemain upgrades consist of the following segments.<br />

Forcemain segment PS 153 to SS11 starts outside the property boundary of PS 153. Upon<br />

leaving the pump station, the forcemain travels southwest for approximately 800 feet along<br />

Woodvale Drive to the intersection of Woodvale Drive and Mockingbird Lane where it then<br />

travels 545 feet to the west, where it enters a manifold intersection with an existing 12-inch<br />

forcemain at node SS11.<br />

Forcemain segment PS 101A to SS32 starts outside the property boundary of PS 101A. Upon<br />

leaving the pump station, the forcemain travels southeast until reaching SS32, located at Old<br />

Hammond Highway and O’Neal Lane.<br />

Forcemain segment SS24 to SS36 starts west of South Choctaw Drive, above Florida<br />

Boulevard. The forcemain travels southwest, crossing Florida Blvd near O’Neal Lane<br />

intersection and crossing O’Neal Lane. The forcemain segment ends at SS36 and is located<br />

near the O’Neal Lane and Strain Road intersection.<br />

GNV31031158547.DOCX/103440004 3-94 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Forcemain segment PS 104 to SS64 starts outside the property boundary of PS 104. Upon<br />

leaving the pump station, the forcemain travels south for approximately 200 feet to node<br />

SS68 and enters a servitude where it turns east and follows the servitude for approximately<br />

3,800 feet to node SS64, where it intersects a manifold forcemain at O’Neal Lane.<br />

Forcemain segment PS 224 to SS96 begins outside the property boundary of PS 224. Upon<br />

leaving PS 224, the forcemain travels south for approximately 900 feet before reaching<br />

Firewood Drive. At Firewood Drive, the forcemain turns east and follows the ROW for<br />

approximately 2,300 feet to the intersection of O’Neal Lane where it manifolds with node<br />

SS96.<br />

Forcemain segment PS 173 to PS 173DS starts outside the property boundary of PS 173, east<br />

of Sessions Drive. The forcemain travels west to PS 173FM, then north until reaching PS<br />

173DS, located southwest of Colonel Allen Court and General Prentiss Avenue intersection.<br />

Forcemain segment PS 162 to SS109 starts at PS 162, which is located at the intersection of<br />

General Prentiss Avenue and President Davis Drive. Upon leaving PS 162, the forcemain<br />

travels generally north for approximately 2,800 feet before reaching node SS130 where it<br />

continues approximately 300 feet north to PS 162. The forcemain upsize continues north of<br />

PS 162 and travels approximately 1500 feet north to the intersection of Harrell’s Ferry Road<br />

where it manifolds with node SS109.<br />

Forcemain segment PS 211 to 316-00001 starts outside the property boundary of PS 211.<br />

Upon leaving PS 211, the forcemain travels approximately 1,100 feet north along Woodlake<br />

Drive to manhole 316-00001 near PS 316.<br />

Forcemain segment PS 316 to SS147 outside the northern property boundary of PS 316.<br />

Upon leaving PS 316, the forcemain travels north along Woodlake Drive for approximately<br />

2,000 feet to node SS 173 and the intersection of South Harrell’s Ferry Road. At South Harrell’s<br />

Ferry Road, the forcemain turns west and continues for approximately 5,600 feet to node<br />

SS147 where it ties into a larger forcemain, which continues along South Harrell’s Ferry<br />

Road.<br />

Forcemain segment PS 296 to 211-00051 starts outside the property boundary of PS 296.<br />

Upon leaving PS 296, the forcemain travels approximately 400 feet north and east where it<br />

crosses West Piney Point Avenue. It then continues west along West Piney Point Avenue,<br />

then north along Burnt Oak Avenue, the east along Woodlake Drive to manhole 211-00048.<br />

Forcemain segment PS 347 to 247-00001 starts outside the property boundary of PS 347.<br />

Upon leaving PS 347, the forcemain travels approximately 500 feet west between South<br />

Shore Drive and Double Tree Drive and into a servitude. At this point, the forcemain<br />

continues approximately 500 feet along the servitude and then heads southwest toward the<br />

intersection of Double Tree Drive and Feather Nest Lane. The forcemain continues<br />

approximately 400 feet into another servitude located between Double Tree Drive and<br />

Wildlife Way Drive and then turns northwest. The forcemain follows the servitude for<br />

approximately 450 feet to a point located between Hagerstown Drive and Double Tree<br />

Drive. The forcemain then continues west in a servitude, crossing Hagerstown Drive, for<br />

approximately 2,400 feet to manhole 247-00001, which then ties into PS 247.<br />

Forcemain segment PS 247 to SS274 continues outside the property boundary of PS 247.<br />

Upon leaving PS 247, the forcemain travels approximately 800 feet west in a servitude to<br />

GNV31031158547.DOCX/103440004 3-95 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

East Achord Road. At East Achord Road, the forcemain turns south and travels<br />

approximately 2,100 feet to node SS274 where it ties into a larger manifolded forcemain,<br />

which continues along Tiger Bend Road.<br />

Forcemain segment PS 213 to SS274 begins outside the property boundary of PS 213. Upon<br />

leaving PS 213, the forcemain travels approximately 250 feet south to Tiger Bend Road<br />

where it then turns west and continues approximately 1,200 feet to node SS274.<br />

Forcemain segment SS274 to SS248 begins at node SS274 and continues west along Tiger<br />

Bend Road for approximately 1,500 feet to node SS282 where it receives flow from a 4-inch<br />

forcemain and increases in size. From node SS282, the forcemain continues west along Tiger<br />

Bend Road for approximately 6,200 feet to the intersection of Antioch Road where it turns<br />

south and then continues approximately 250 feet to node SS275. From SS275, the forcemain<br />

turns west again and continues approximately 1,800 feet in a servitude to node SS265 where<br />

it receives flow from a 10-inch forcemain and increases in size. From SS265 the forcemain<br />

continues approximately 1,900 feet west to node SS248 near PS 274.<br />

Forcemain segment PS 112 to 110-00088 begins at PS 112 and continues north to Antioch<br />

Boulevard before turning west and south along Confederate Avenue to Tiger Bend Road at<br />

manhole 10-00088.<br />

Forcemain segment SS196 to SS243 begins at node SS196 located at George O‘Neal Road and<br />

approximately 170 feet east of the intersection of Cumberland Cove Drive. The forcemain<br />

continues west for approximately 650 feet before turning south into a servitude. The<br />

forcemain then continues south for approximately 1,500 feet before entering the property<br />

boundary of BPS777. The forcemain continues along Sleepy Hollow Drive, then west along<br />

Ferrell Avenue to Jones Creek Road where it manifolds into the existing forcemain.<br />

Forcemain segment PS 258 to SS192 begins outside the property boundary of PS 258. Upon<br />

leaving the pump station, the forcemain travels along White Tail Court for approximately<br />

1,200 feet to node SS192 where it intersects a manifold forcemain at the corner of White Tail<br />

Court and Antler Drive.<br />

Forcemain segment PS 172 to PS 172DS begins outside the boundary of PS 172. Upon<br />

leaving the pump station, the forcemain travels west along Altus Avenue then north along<br />

Estelle Drive to PS 172DS where it joins a forcemain.<br />

Forcemain segment PS 170 to SS268 begins outside the property boundary of PS 170. Upon<br />

leaving the pump station, the forcemain travels west along Kimbleton Avenue until<br />

reaching SS268, located near the intersection of Kimbleton Avenue and Jefferson Highway.<br />

Forcemain segment PS 148FM to 147-00057A begins outside the boundary of PS 148 at node<br />

PS 148FM, east of the intersection of Parkview Church Road and Superior Drive. From that<br />

location, the forcemain travels approximately 1,500 feet south and east to node 147-00057A<br />

where it joins a manifold forcemain.<br />

Forcemain segment PS 147 to SS268 includes a forcemain that begins outside the property<br />

boundary of PS 147. Upon leaving the pump station, the forcemain travels approximately<br />

3,000 feet south and west to node SS268 where it joins a manifold forcemain near Jefferson<br />

Highway.<br />

PS 77 forcemain begins at PS 77, located northeast of the intersection of Deerpath Way and<br />

Woodland Ridge Blvd, and continues west along an existing servitude to Woodland Ridge<br />

GNV31031158547.DOCX/103440004 3-96 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

Blvd, where it then parallels Woodland Ridge Blvd north to SS102A, located near the<br />

intersection of South Harrells Ferry Road.<br />

PS 379 forcemain begins at PS 379, located near the intersection of Jefferson Highway and<br />

Tiger Bend Road and parallels Tiger Bend Road east to 201-00009, located east of the<br />

intersection of Tiger Bend road and Quinn Road. PS 139 forcemain begins at PS 139, located<br />

near the intersection of Firewood Drive and Stonewood Drive, and parallels Firewood Drive<br />

east, then turning north to 224-00001, located near the intersection of Balsawood Drive and<br />

Banyanwood Avenue.<br />

PS 189 forcemain begins at PS 189, located south of the intersection of Jester Avenue and<br />

Boreas Drive, and parallels Jester Avenue before turning north then east to intersection BPS<br />

100A.<br />

PS 191 forcemain begins at PS 191, located south of the intersection of Catline Drive and<br />

Caesar Avenue, and continues west within an Entergy transmission servitude to node SS60<br />

where it joins a manifold forcemain along O’Neal Lane.<br />

Scope<br />

This project includes construction of approximately 850 feet of 15-inchgravity sewer<br />

upstream of PS 62; approximately 210 feet of 18-inch gravity sewer upstream of PS 189;<br />

approximately 945 feet of 18-inch gravity sewer upstream of PS 224; approximately 2,400<br />

feet of 12-inch gravity sewer upstream of PS 211; approximately 1,000 feet of 12-inch gravity<br />

sewer upstream of PS 177; approximately 1,030 feet of 18-inch gravity sewer upstream of PS<br />

112; approximately 310 feet of 15-inch and 24-inch gravity sewer upstream of PS 110;<br />

approximately 6,710 feet of 12-inch, 15-inch, and 18-inchgravity sewer upstream of PS 170;<br />

approximately 600 feet of 8-inch sewer upstream of PS 148; and approximately 80,000 feet of<br />

6-inch, 8-inch, 10-inch, 12-inch, 14-inch, 16-inch, 18-inch, 20-inch, 24-inch, 30-inch, 36-inch,<br />

and 42-inch forcemain in the South Forced Upper Basin.<br />

Table 3-24 shows the detailed scope of this project.<br />

TABLE 3-24<br />

SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information<br />

Existing<br />

US Node DS Node<br />

Length<br />

(ft)<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

062-00048 062-00014 850 New 15<br />

189-00022 PS189 210 8 18<br />

224-00091 224-00057 500 8 12<br />

224-00057 224-00001 445 8 12<br />

211-00048 211-00001 2,400 New 12<br />

177-00180 177-00010 1,000 New 12<br />

112-00013 112-00002 830 10 18<br />

112-00002 PS112 200 10 18<br />

110-00088 110-00001 240 10 15<br />

110-00001 PS111 70 10 24<br />

170-00022 170-00015 1,100 10 12<br />

170-00015 170-00005 2,100 10 15<br />

170-00005 170-00001 750 10 15<br />

170-00167 170-00001 600 10 18<br />

170-00110 170-00023A 1,900 New 12<br />

Comments<br />

GNV31031158547.DOCX/103440004 3-97 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-24<br />

SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information<br />

Existing<br />

US Node DS Node<br />

Length<br />

(ft)<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

170-00023A 170-00001 200 10 21<br />

170-00001 PS170 60 15 21<br />

148-00037 148-00034 600 New 8<br />

PS 153 SS11 1,300 4 6<br />

PS 101A SS32 1,700 6 8<br />

SS24 SS32 3,220 14 18<br />

SS32 SS36 1,300 16 20<br />

PS 104 SS69 220 10 16<br />

SS69 SS64 3,800 16 24<br />

PS 224 SS96 3,300 10 12<br />

PS173 PS173DS 3,100 4 6<br />

PS162 SS109 1,500 6 8<br />

PS 211 316-00001 1,100 6 14<br />

PS 316 SS173 1,300 8 14<br />

SS173 SS147 6,300 10 14<br />

PS 296 211-00048 2,200 6 8<br />

PS 347 SS222 3,100 4 8<br />

SS222 247-00001 1,100 6 8<br />

PS 247 SS274 3,100 8 12<br />

PS 213 SS274 1,400 4 6<br />

SS274 SS282 1,600 10 12<br />

SS282 SS265 7,300 12 16<br />

SS265 SS248 1,900 16 24<br />

PS 112 110-00088 4,400 6 10<br />

SS196 BPS 777 2,100 30 36<br />

BPS 777 SS522 2,100 30 36<br />

PS 258 SS192 1,200 4 6<br />

PS 172 PS172DS 500 4 6<br />

PS 170 SS268 4,800 New 20<br />

PS148FM 147-00057A 1,500 4 6<br />

PS 147 SS268 3,000 8 10<br />

PS 77 PS77DS 1,200 New 10<br />

PS 379 201-00009 1,500 4 6<br />

PS 139 224-00001 1,900 New 4<br />

PS 189 BPS 100A 3,000 New 8<br />

PS 191 SS60 3,000 8 10<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $14,100,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

Comments<br />

GNV31031158547.DOCX/103440004 3-98 JANUARY 2011<br />

REV. 5


Mike<br />

O'Neal<br />

Elliot<br />

#<br />

#<br />

#<br />

Toulon<br />

#<br />

Richcroft<br />

#<br />

#<br />

Stan<br />

Bard<br />

Catalpa<br />

Archery<br />

PS50<br />

#<br />

PS171<br />

McCann<br />

#<br />

#<br />

#<br />

#<br />

Baylor<br />

Havenwood<br />

Investor<br />

PS314<br />

Wilton<br />

Stacy<br />

Airline<br />

#<br />

Choctaw<br />

Elva<br />

#<br />

#<br />

#<br />

#!R<br />

#<br />

Pecue<br />

Woodcliff<br />

PS169<br />

#<br />

SS102A<br />

Stumberg<br />

Chene<br />

PS77<br />

Flannery<br />

#<br />

Torrey Pine<br />

#<br />

#<br />

#<br />

PS295<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

!R<br />

#!R<br />

!R<br />

#<br />

#!R<br />

#!R<br />

#!R<br />

!R!R !R<br />

!R<br />

#<br />

#<br />

062-00002 PS62<br />

#<br />

062-00048<br />

!R<br />

#!R<br />

!R<br />

#<br />

#<br />

#<br />

#<br />

#<br />

SS11 #!R<br />

SS24<br />

191-00065 191-00001<br />

104-00050<br />

PS104<br />

SS69 SS64 !R !R<br />

# #<br />

!R<br />

SS75 # PS191<br />

#!R!R<br />

146-00018<br />

BPS100A<br />

!R 189-00022 PS189<br />

PS448<br />

PS156<br />

Tollway<br />

Westridge<br />

Sunnyhill<br />

Katherine<br />

PS215<br />

Florida<br />

Choctaw<br />

146-00031<br />

146-00015<br />

224-00001 PS224<br />

224-00057<br />

SS109<br />

PS173DS PS162<br />

Coursey<br />

PS162<br />

Canterdale<br />

Lily<br />

Terrell<br />

Jones Creek<br />

BPS508<br />

PS41<br />

224-00060<br />

Lirocchi<br />

!R<br />

!R<br />

!R<br />

Park<br />

SS32<br />

SS36<br />

PS225<br />

#<br />

SS96<br />

BPS889 SS148<br />

Antietam<br />

Strain<br />

Centurion<br />

PS377 PS345<br />

#<br />

# #<br />

#<br />

PS402<br />

PS392<br />

Deer Lake<br />

#<br />

PS173<br />

# # PS442<br />

#<br />

#<br />

#<br />

# #!R<br />

#<br />

PS427<br />

SS173<br />

PS270<br />

PS346<br />

!R<br />

PS403<br />

PS390<br />

#<br />

#<br />

PS211DS PS316<br />

PS134<br />

#!R<br />

#<br />

#<br />

PS258<br />

SS192<br />

#<br />

#<br />

#<br />

211-00001 PS211<br />

PS217<br />

PS256<br />

!R !R<br />

#<br />

!R<br />

#<br />

PS396 #<br />

SS196<br />

211-00038 211-00037<br />

# # !R<br />

#<br />

!R !R #<br />

#<br />

!R !R !R !R!R!R<br />

148-00038<br />

177-00021<br />

PS148<br />

BPS777 SS207 !R 177-00025<br />

PS296<br />

!R<br />

177-00179<br />

#<br />

!R #!R<br />

148-00034<br />

!R!R<br />

PS172 !R<br />

!R!R<br />

177-00180<br />

147-00057A # #<br />

#<br />

#!R<br />

PS360<br />

!R<br />

274-00009<br />

#<br />

#<br />

PS347<br />

SS222<br />

274-00005<br />

112-00013 247-00001 PS247 #!R<br />

#!R!R<br />

#<br />

!R<br />

#<br />

!R # !R !R !R<br />

!R<br />

!R<br />

PS347<br />

274-00002<br />

110-00107<br />

112-00002<br />

!R !R PS112<br />

!R<br />

SS241 !R #!R<br />

PS147 PS147<br />

SS248<br />

# # #<br />

!R<br />

110-00113<br />

#<br />

# !R<br />

SS268<br />

!R!R SS265<br />

PS213<br />

SS243#<br />

!R!R<br />

#!R<br />

!R<br />

!R<br />

170-00008 SS291 PS111<br />

# # SS282<br />

# #<br />

!R<br />

!R<br />

!R #<br />

!R !R !R<br />

170-00001<br />

!R<br />

!R PS170 170-00110 PS438<br />

SS274<br />

!R!R !R<br />

170-00002<br />

170-00037<br />

170-00039 #<br />

#<br />

PS157<br />

#<br />

#<br />

Legend<br />

Proposed<br />

O'Neal Ln. Pipeline Improvements<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

SFU-C-0005<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 3-37<br />

East Baton Rouge Parish<br />

!R<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2010_mpj112310<br />

0 2,750 5,500<br />

Feet<br />

George Oneal<br />

Hoyt<br />

!R<br />

#<br />

I-12<br />

PS149<br />

PS326<br />

SS147<br />

Monitor<br />

Achord<br />

PS391<br />

Tiger Bend<br />

Deer Park<br />

Babin


SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.13 SFU-C-0006 (O’Neal Lane – Tiger Bend Road)<br />

The SFU-C-0006 (O’Neal Lane – Tiger Bend Road) project has been combined with SFU-C-<br />

0005 (O’Neal Lane - Jones Creek Road) from the October 2008 PDP. The combined project<br />

has been designated SFU-C-0005 (O’Neal Lane Pipeline Improvements) project and is<br />

described in Section 3.4.11.<br />

GNV31031158547.DOCX/103440004 3-100 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

3.5 South WWTP Projects<br />

3.5.1 STP-C-0001 South WWTP – Phase 1<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The existing unit processes at the South WWTP have been designed and constructed to<br />

process a peak hydraulic capacity of 119 million gallons per day (MGD). Based on the 2-yr<br />

12-hr design storm, the predicted future peak hydraulic flow to this facility after<br />

improvements to collection and conveyance infrastructure is 273 MGD. The C-P is also<br />

going to consolidate the Central WWTP and the South WWTP, with all flow being diverted<br />

to the South WWTP for treatment. The predicted future peak wet weather flow from the<br />

Central WWTP is 93 MGD. Therefore, the total predicted wet weather peak flow to the<br />

South WWTP after the Central Consolidation is 366 MGD. To accept and treat this flow,<br />

several wet weather improvements must be constructed at the South WWTP. These<br />

improvements will be achieved in two projects, specifically the STP-C-0001 (South WWTP –<br />

Phase 1) project and the STP-C-0002 (South WWTP – Phase 2) project.<br />

Location<br />

The South WWTP is located at 2850 South Gardere Lane, and its outfall is located at<br />

geographical coordinates of latitude 30° 20’ 27” north and longitude 91° 08’ 52” west.<br />

Scope<br />

The South WWTP will be upgraded to process wet-weather flows up to 366 mgd. Influent<br />

flows will be equalized to allow not more than a 200 mgd maximum flow to the treatment<br />

facilities. Sixty-six (66) million gallons (MG)of equalization storage will be provided for this<br />

purpose.<br />

The existing gravity pump station at the South WWTP will be modified as part of this<br />

project to pump to a new preliminary treatment facility. An additional new raw<br />

wastewater/equalization pump station will also be constructed to convey flows from the<br />

forcemain system (existing South Suburban Transportation Network [STN]; new Pump<br />

Station 58A; and Central Consolidation). This pump station will have the capability to pump<br />

either to the preliminary treatment facility or to the storage facilities. This pump station will<br />

also accept flow from the storage facilities when flow is returned after a wet weather storage<br />

event. Raw sewage pumped from the modified gravity pump station and the new forcemain<br />

pump station to the process train will be directed into a new preliminary treatment facility<br />

sized to process 200 MGD. Both of the existing preliminary treatment facilities will be<br />

demolished and replaced by this single system. The proposed preliminary treatment facility<br />

will screen and degrit the influent wastewater.<br />

This project also includes odor control facilities for the influent pump stations, storage<br />

facilities, and preliminary treatment facility. A new electrical substation is also included in<br />

this project. The remainder of the South WWTP improvements are described in STP-C-0002<br />

(South WWTP – Phase 2). All of the proposed Phase 1 improvements are shown on the<br />

process flow diagram presented as Figure 3-38. Principal Phase 1 project elements are:<br />

<br />

<br />

Modify existing gravity pump station to pump 62 MGD to new headworks<br />

Construct a new raw wastewater (138 MGD)/equalization (166 mgd) pump station and<br />

force main system<br />

GNV31031158547.DOCX/103440004 3-101 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

<br />

<br />

<br />

<br />

<br />

Below-grade concrete dry well/wet well-type structure. No building.<br />

Dry-pit submersible pumps with variable frequency drives (VFDs)<br />

Electrical building to house electrical systems and controls<br />

Facility includes discharge flow meters<br />

Facility is covered and includes odor control provisions<br />

<br />

Construct covered storage for flows in excess of 200 mgd<br />

<br />

<br />

<br />

<br />

Circular lined above-ground tanks (3 at 20 MG and 1 at 6 MG)<br />

Return line with control valve and flowmeter to convey return flow to forcemain<br />

system raw wastewater pump station<br />

Mixers are provided for 6 MG tank that will receive initial flows. Hydrants will be<br />

provided for cleaning.<br />

Odor control facilities included<br />

<br />

Construct 200 MGD preliminary treatment facility<br />

<br />

<br />

<br />

<br />

<br />

<br />

Elevated facility, constructed of cast in place concrete<br />

Facility contains both screening and grit removal equipment<br />

Six screening channels<br />

Six gravity vortex grit units<br />

Odor control facilities included.<br />

A splitter box is constructed on the end of the facility to split plant flow between the<br />

dry-weather and wet-weather process trains during wet-weather events. Splitter box<br />

conveys 120 MGD to dry-weather train, and 80 MGD to wet-weather train.<br />

<br />

<br />

<br />

<br />

Construct new electrical substation and electrical building.<br />

Yard piping<br />

Site work<br />

Demolition<br />

Total Construction Bid Amount is $108,200,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction is On-Going.<br />

GNV31031158547.DOCX/103440004 3-102 JANUARY 2011<br />

REV. 5


N<br />

Feet<br />

0 50 100 150 200<br />

Legend<br />

IAP<br />

Phase 1<br />

Phase 2<br />

Preliminary<br />

Treatment<br />

Facility<br />

Screenings/Grit<br />

i i<br />

Building<br />

Odor<br />

Control<br />

Units<br />

Force Main<br />

RW/EQ<br />

Pump Station<br />

Standby<br />

Generators<br />

Staring Staring Lane Lane Extension Extension<br />

Odor<br />

Control<br />

Main Electrical<br />

Building<br />

Utility<br />

Substation<br />

Ferric Storage<br />

Thickened Sludge<br />

Mixing Tanks<br />

Flow Equalization Tanks<br />

Final<br />

l<br />

Settling<br />

Tanks<br />

9-12<br />

GBT Building<br />

Dewatering Building<br />

RSS/WSS<br />

Pump<br />

Station<br />

Odor Control<br />

Polymer Storage<br />

Flow Splitter Structure<br />

Anaerobic Digesters<br />

Solids Contact<br />

Basins<br />

RSS PS<br />

Blower-Electrical<br />

Sodium Hypochlorite<br />

Building<br />

Day Tank Facility<br />

Odor<br />

Control<br />

Trickling Filter<br />

Pump Station<br />

Electrical<br />

Building<br />

Polymer<br />

Storage<br />

Gravity<br />

Influent<br />

Pump<br />

Station<br />

GIPS<br />

Electrical/<br />

Control<br />

Building<br />

Administration<br />

m<br />

Building<br />

d<br />

Laboratory<br />

o<br />

Building<br />

d<br />

Chlorine Contact Basin<br />

Sodium Hypochlorite Storage Facility<br />

Effluent Pump Station<br />

FIGURE 3-38<br />

SWWTP IMPROVEMENT PROJECTS<br />

WBG110310211718GNV Fig3-38_dn00c503_350589_Rev11-04-10-01 LED


SECTION 3. SOUTH BASIN PROJECTS<br />

3.5.2 STP-C-0002 South WWTP – Phase 2<br />

Project Description<br />

Purpose of the Project/Background Information<br />

Existing unit processes at the South WWTP have been designed and constructed to process<br />

a peak hydraulic capacity of 119 MGD. Based on the 2-yr 12-hr design storm, the predicted<br />

future peak hydraulic flow to this facility after improvements to collection and conveyance<br />

infrastructure is 273 MGD. The C-P is also going to consolidate the Central WWTP and the<br />

South WWTP, with all flow being diverted to the South WWTP for treatment. The predicted<br />

future peak wet weather flow from the Central WWTP is 93 MGD. Therefore, the total<br />

predicted wet weather peak flow to the South WWTP after the Central consolidation is 366<br />

MGD. To accept and treat and this flow , several wet weather improvements must be<br />

constructed at the South WWTP. These improvements will be achieved in two projects,<br />

specifically the STP-C-0001 (South WWTP – Phase 1) project and STP-C-0002 (South WWTP<br />

– Phase 2) project.<br />

Location<br />

The South WWTP is located at 2850 South Gardere Lane, and its outfall is located at<br />

geographical coordinates of latitude 30° 20’ 27” north and longitude 91° 08’ 52” west.<br />

Scope<br />

The South WWTP will be upgraded to process wet-weather flows up to 366 MGD. The STP-<br />

C-0001 South WWTP Phase 1 project includes influent pumping, equalization storage, a<br />

preliminary treatment facility. This project begins downstream of the preliminary treatment<br />

facility and includes additional wet weather treatment improvements at the South WWTP.<br />

Some of the project improvements are required due to wet weather and some are required<br />

from the Draft Wastewater Master <strong>Plan</strong> (CH2M HILL, May 2008).<br />

Wet Weather Improvements<br />

From the preliminary treatment facility, wastewater up to 120 MGD will flow by gravity to<br />

the existing primary clarifiers. Flows in excess of 120 MGD (up to 80 MGD) will flow from<br />

the preliminary treatment facility to new solids contact basins (SCBs). Under this scenario,<br />

up to 120 MGD of preliminary treated wastewater will flow from the preliminary treatment<br />

facility through the existing primary clarifiers and the existing trickling filters (TFs). The<br />

upgraded secondary treatment process will contain both TFs and SCBs. Normally, flows up<br />

to 120 MGD will be pumped into the TFs and then be pumped into the SCBs. Trickling Filter<br />

recirculation is part of the ongoing IAP projects at the plant<br />

Additional final settling tanks must also be provided to manage the 200 MGD wet-weather<br />

flow condition. The existing disinfection system will be converted from gaseous chlorination<br />

to hypochlorite disinfection for excess flows above 120 MGD. A new effluent pump station<br />

and outfall piping will be added. These improvements are shown also on Figure 3-38.<br />

Principal project elements include the following:<br />

<br />

Construct Solids Contact Basins Return secondary and waste secondary sludge pump<br />

stations for sludge return from the final settling tanks to the solids contact basins, and<br />

for sludge wasting to the gravity belt thickeners<br />

GNV31031158547.DOCX/103440004 3-105 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

A splitter box is constructed on the end of the solids contact basins to distribute the<br />

flow between the existing and proposed final settling tanks<br />

Construct four additional final clarifiers at 134-foot diameter each<br />

Conversion of chlorine gas disinfection to hypochlorite disinfection and construction of<br />

an additional chlorine contact basin<br />

Construction of a new effluent PS (200 MGD)<br />

<br />

<br />

Existing PS will be abandoned<br />

New PS will consist of vertical turbine pumps mounted on a concrete slab. Discharge<br />

piping and flow metering will be above grade.<br />

Construction of parallel effluent pipeline and river outfall structure<br />

Construction of odor control for the primary clarifiers effluent weirs and the existing<br />

solids processing building.<br />

Yard piping<br />

Site work<br />

Demolition<br />

Methane storage/power conversion facilities<br />

Miscellaneous yard piping and electrical<br />

Preliminary Master <strong>Plan</strong> Improvements<br />

Several Master <strong>Plan</strong> improvements were outlined in the Draft Wastewater Master <strong>Plan</strong><br />

(CH2M HILL, May 2008). The following are the principal project elements as modified<br />

during the project design.<br />

<br />

<br />

<br />

<br />

<br />

<br />

Secondary electrical source consisting of on-site engine/generators<br />

Improvements to the existing solids thickening and dewatering facilities including new<br />

thickened sludge mixing tanks<br />

Repair and improvements to existing anaerobic digesters including a new sludge<br />

heating system utilizing digester gas and hot water boilers<br />

Rehabilitation of existing buildings<br />

Construction of a plant SCADA system<br />

Construction of new laboratory and administration buildings<br />

Total Construction Bid Amount for the Wet Weather Improvements is $92,200,000.<br />

Total Construction Bid Amount for the Preliminary Master <strong>Plan</strong> Improvements is<br />

$15,000,000.<br />

Total Construction Bid Amount for the entire project is $107,200,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-106 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

3.5.3 South WWTP Immediate Action Projects<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The South WWTP is under consent decree due to NPDES Permit violations related to total<br />

suspended solids (TSS) and biochemical oxygen demand (BOD). The WWTP is presently<br />

required to meet a 30-MG TSS/L and 30-MG BOD/L monthly average and 45-MG TSS/L<br />

and 45-MG BOD/L weekly average discharge standard.<br />

A number of improvement projects will be implemented to assist the plant in complying<br />

with its effluent permit limits. These improvements will be implemented early in the<br />

program to bring the plant into compliance as soon as possible under dry weather<br />

conditions.<br />

The screenings improvements project that was formerly in this project has been moved to<br />

STP-C-0001 (South WWTP Phase 1). The effluent pumping station stabilization project has<br />

been completed.<br />

Location<br />

The South WWTP is located at 2850 South Gardere Lane.<br />

Scope<br />

The improvement projects have been grouped together for their implementation. A<br />

description of each group of projects follows.<br />

Primary Treatment Improvements<br />

Primary treatment improvements will be implemented to improve the reliability of the<br />

primary settling tanks and consistently meet BOD and TSS effluent limits.<br />

The first project element includes the addition of ferric chloride and polymer injection<br />

systems for enhanced BOD/TSS removal. This element includes installation of chemical<br />

storage and feed systems on both the gravity and forcemain trains of the plant.<br />

The second project element includes various improvements to the primary settling tanks to<br />

improve their mechanical reliability. There are six existing tanks. Several of these tanks<br />

currently experience significant down time due to issues with mechanical reliability. DPW<br />

operations staff also experience difficulty in removing sludge from the clarifiers, which<br />

could be associated with issues such as improper collector mechanism speed, pump<br />

capacities, pump cycle times, or a combination thereof. The following improvements have<br />

been identified for enhanced operational reliability:<br />

<br />

<br />

Repair/Replace clarifier mechanisms and components. Improvements include<br />

replacement of boards, wear strips, sprockets, drives, and expansion joints. Some<br />

clarifiers will require new chain.<br />

Replace existing sludge pumps. The current piston pumps have significant<br />

maintenance problems. New pumps will be installed to ensure sludge removal design<br />

criteria are met.<br />

The third project element includes the addition of flow control/flow measurement devices<br />

at several splitter boxes. The plant has several structures designed to split the flow between<br />

process trains, and between discrete basins. These flow splits occur by gravity flow over<br />

GNV31031158547.DOCX/103440004 3-107 JANUARY 2011<br />

REV. 5


SECTION 3. SOUTH BASIN PROJECTS<br />

weir gates. Currently, there is no means to monitor or control the flow splits, or determine<br />

proper distribution to downstream facilities. To improve this, weir gate electric actuators<br />

and level (flow) elements will be installed at splitter boxes No. 1 and 2.<br />

Trickling Filter Improvements<br />

The secondary treatment process consists of two separate trickling filter, final settling tank,<br />

and effluent PS trains. An upstream splitter box receives flow from the primary clarifiers,<br />

and splits it to the two secondary trains. The following improvements will assist in<br />

achieving permit compliance.<br />

<br />

<br />

<br />

<br />

Construction of a new Trickling Filter Pump Station. This includes two independent<br />

sides, the Trickling Filter Recirculation Pump Station and the Trickling Filter Effluent<br />

Pump Station. The Recirculation Pump Station is needed to maintain proper wetting<br />

rates on the trickling filters.<br />

Construction of new Electrical Building.<br />

Construction of new flow splitting structure to divide the pump station effluent flow<br />

among existing clarifiers.<br />

Construction of new piping, valves, flow meters, pipe supports, concrete structures,<br />

piping tie-ins, and other work to deliver primary effluent flow to the new station, to<br />

pump primary effluent to the existing trickling filter splitter boxes at a controlled rate, to<br />

deliver return flow from the trickling filters to the new pump station, and to deliver<br />

trickling filter effluent at a controlled rate to the flow splitting structure and form there<br />

to the existing clarifiers.<br />

Sludge Handling Improvements<br />

Improvements to the sludge handling systems are as follows:<br />

<br />

<br />

Gravity Thickeners and Thickened Sludge Pump Station Rehabilitation. The gravity<br />

thickener complex has not been in service for many years. The complex will be<br />

rehabilitated so that primary and secondary sludge can be evacuated in a timely manner<br />

from process facilities, and allow for thickening prior to anaerobic digestion. The<br />

thickened sludge will enhance the digestion unit process. Improvements include<br />

replacing gravity thickeners, and rehabilitating/replacing sludge pump station<br />

components.<br />

Final Settling Tank Sludge Withdrawal Improvements. Sludge pumps from each<br />

settling tank complex discharge through a common header and do not provide adequate<br />

withdrawal. A new larger diameter pump discharge manifold will be installed to<br />

increase pumping capacity.<br />

Total Construction Bid Amount is $25,632,000.<br />

Construction is On-Going.<br />

GNV31031158547.DOCX/103440004 3-108 JANUARY 2011<br />

REV. 5


SECTION 4<br />

Central Basin Projects<br />

Section 4 presents summaries of the Central Gravity System Comprehensive Rehabilitation<br />

Projects, the Central Gravity System Capacity Improvement Projects, and the Central<br />

Consolidation Projects. These projects are shown on Figures 4-1 and 4-2. As of October 30,<br />

2010, there are approximately six projects under construction and eight projects under<br />

design in the Central Basin.<br />

The project summaries presented herein represent the information available during this<br />

annual update period. The PDP will be revisited on an annual basis and revised, as<br />

necessary, based on results of additional hydraulic wastewater modeling, immediate needs,<br />

DPW and public input, and other factors.<br />

GNV31031158548.DOCX/103440008 4-1 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158548.DOCX/103440008 4-2 JANUARY 2011<br />

REV. 5


3rd<br />

Lupine<br />

9th<br />

15th<br />

15th<br />

17th<br />

18th<br />

19th<br />

22nd<br />

25th<br />

26th<br />

31st<br />

32nd<br />

35th<br />

West<br />

39th<br />

39th<br />

East<br />

47th<br />

48th<br />

49th<br />

Elm<br />

Topaz<br />

Garnet<br />

Waverly<br />

Bank<br />

Whitter<br />

Juban<br />

Alello<br />

Monet<br />

³<br />

Rivermeadow<br />

Riverbend<br />

Dakin<br />

River<br />

Garfield<br />

3rd<br />

Stadium<br />

Gourrier<br />

Lafayette<br />

St Philip<br />

Emma<br />

Emma<br />

Haig<br />

Chimes<br />

Dort<br />

St Louis<br />

4th<br />

Iowa<br />

6th<br />

South<br />

Aster<br />

5th<br />

Europe<br />

Mayflower<br />

Iris<br />

St Ferdinand<br />

Oklahoma<br />

Wyoming<br />

Irby C Nichols<br />

Eiland<br />

Miller<br />

Capitol Lake<br />

4th<br />

Laurel<br />

North<br />

Garner<br />

Johnson<br />

Alaska<br />

Neosho<br />

State Capitol<br />

Lakeland<br />

5th<br />

Terrace<br />

Grant<br />

St Charles<br />

Royal<br />

Napoleon<br />

Taylor<br />

7th<br />

France<br />

Veta<br />

Chatsworth<br />

Iowa<br />

Azalea<br />

St Joseph<br />

Van Buren<br />

Maximillian<br />

Nicholson<br />

Sorrel<br />

§¨¦I-110<br />

Mc Kinley<br />

Arbutus<br />

8th<br />

Tyler<br />

Field House<br />

Tigerland<br />

Roosevelt<br />

Manda<br />

Pittsburg<br />

Joplin<br />

De Queen<br />

Mansfield<br />

Lakeridge<br />

Margaret<br />

Mary<br />

Polk<br />

Y A Tittle<br />

Campus<br />

Alvin Dark<br />

Alice<br />

10th<br />

Julia<br />

Terrace<br />

Swart<br />

Kansas<br />

Highway<br />

Howard<br />

Nebraska<br />

Harding<br />

Bob Pettit<br />

11th<br />

Thomas H Delpit<br />

Taft<br />

Grant<br />

State<br />

Scenic Hwy. - Spanish Town Rd. Sharlo PHASE 1<br />

Harwich<br />

Harrison<br />

Riverwood<br />

7th<br />

8th<br />

8th<br />

Rehabilitation Projects<br />

3Wastewater Treatment <strong>Plan</strong>t<br />

Project Name<br />

Foster Dr. - Government St.<br />

Acadian Thrwy. - Perkins Rd.<br />

Stanford Ave. - Morning Glory Rd.<br />

Acadian Thrwy. - Claycut Rd.<br />

Highland Rd. - Washington St.<br />

7th<br />

8th<br />

8th<br />

9th<br />

Dot<br />

Brightside View<br />

11th<br />

Infirmary<br />

Milford<br />

Hart<br />

13th<br />

Tower<br />

12th<br />

Boyd<br />

Brightside<br />

Lockwood<br />

Beaumont<br />

Dooley<br />

12th<br />

America<br />

Louisiana<br />

East<br />

10th<br />

Louise<br />

Scenic Hwy. - Spanish Town Rd. PHASE 2<br />

East Blvd. - Government St.<br />

Central Basins<br />

Iris<br />

12th<br />

Gsu<br />

17th<br />

16th<br />

18th<br />

Parker<br />

Cedar<br />

19th<br />

Bay<br />

Foss<br />

Spanish Town Road<br />

Eddie Robinson Sr<br />

14th<br />

Braddock<br />

13th<br />

Mc Calop<br />

Georgia<br />

Chimes<br />

Janet<br />

Jennifer Jean<br />

14th<br />

14th<br />

Grant<br />

Vicaro<br />

Iberville<br />

15th<br />

Washington<br />

14th<br />

Kentucky<br />

Doris<br />

15th<br />

Linwood<br />

Smith<br />

Louise<br />

Harrison<br />

Georgia<br />

15th<br />

Marcellious<br />

Fig<br />

Maryland<br />

Ivanhoe<br />

Campus Lake<br />

16th<br />

North<br />

Swire<br />

16th<br />

Oleson<br />

Ontario<br />

17th<br />

Gracie<br />

Gayosa<br />

Convention<br />

Missouri<br />

16th<br />

Brice<br />

Park<br />

Dalrymple<br />

Alamoster<br />

Lobelia<br />

Scenic<br />

Olive<br />

Pocahontas<br />

Burbank<br />

Hiawatha<br />

23rd<br />

Wisteria<br />

Oleander<br />

Lehmann<br />

June<br />

Amherst<br />

17th<br />

18th<br />

Fig<br />

Dean Lee<br />

17th<br />

Etta<br />

L S U<br />

20th<br />

Galvez<br />

Farrar<br />

Louisiana<br />

Cherokee<br />

Tulip<br />

May<br />

Lakeshore<br />

Pontiac<br />

21st<br />

Tecumseh<br />

Kleinert<br />

Iberia<br />

Uncas<br />

America<br />

Delgado<br />

Navajo<br />

Osceola<br />

Birch Birch<br />

Cherry<br />

April<br />

Cornell<br />

Cable<br />

Gordon<br />

Adams<br />

March<br />

Issac Cline<br />

Yale<br />

Baton Rouge<br />

Weller<br />

Tuscarora<br />

Calumet<br />

Pawnee<br />

Shawnee<br />

City Park<br />

Henry Adams<br />

19th<br />

Navajo<br />

Erie<br />

Monroe<br />

20th<br />

Spain<br />

Seminole<br />

Magnolia<br />

Willow<br />

Canonicus<br />

Iroquois<br />

Myrtle<br />

Highland<br />

Stanford<br />

Dayton<br />

<strong>Plan</strong>k<br />

Brady<br />

Chippewa<br />

Newton<br />

Fuqua<br />

Gracie<br />

Belmont<br />

Ben Hur<br />

Alliquippa<br />

Spain<br />

Virgil<br />

Tulane<br />

Clara<br />

Beech<br />

Winbourne<br />

Huron<br />

24th<br />

Pocasset<br />

Adella<br />

Fiero<br />

Geronimo<br />

Duke<br />

Lula<br />

Topeka<br />

Bogan<br />

26th<br />

27th<br />

Drehr<br />

Ovid<br />

Morning Glory<br />

St Rose<br />

Hillsdale<br />

Loyola<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG4-1_PDP2010.MXD SGELPI 11/15/2010 12:39:57<br />

Elissalde<br />

Christian<br />

Carriage<br />

29th<br />

28th<br />

Keokuk<br />

Ozark<br />

Huron<br />

Erie<br />

30th<br />

Atkinson<br />

Gottlieb<br />

Letitia<br />

Ogden<br />

Lee<br />

Progress<br />

Acadian<br />

Main<br />

Broussard<br />

Lydia<br />

Ferndale<br />

Bancroft<br />

Cedardale<br />

Glendale<br />

Eugene<br />

Byron<br />

Winnebago<br />

Myrtledale<br />

Kernan<br />

Floyd<br />

Ontario<br />

Burgin<br />

Charles<br />

Seneca<br />

Cherrydale<br />

Beech<br />

Central Basin Rehabilitation Projects<br />

Lakeshore<br />

23rd<br />

Lake Hills<br />

Douglas<br />

Sherwood<br />

Monroe<br />

Adams<br />

26th<br />

Lavinia<br />

Baywood<br />

Bengal<br />

Chalet<br />

25th<br />

Heritage<br />

Longfellow<br />

Pluskat<br />

28th<br />

Madison<br />

Jackson<br />

Jefferson<br />

28th<br />

Arlington<br />

Zeeland<br />

Hollydale<br />

Forge<br />

Bourbon<br />

Eugene<br />

30th<br />

30th<br />

30th<br />

Connell<br />

Anna<br />

Bedford<br />

Hearthstone<br />

Kenmore<br />

Reymond<br />

Tyrone<br />

33rd<br />

Lynn<br />

Oswego<br />

Ozark<br />

Dalton<br />

Zion<br />

Wilshire<br />

Goldenrod<br />

Greenwood<br />

Cloverdale<br />

Linden<br />

31st<br />

Parker<br />

Marigold<br />

Hood<br />

Jolly<br />

Cloverdale<br />

Ross<br />

Mc Donald<br />

36th<br />

Hood<br />

37th<br />

Stuart<br />

Menlo<br />

Maple<br />

Cain<br />

Carl<br />

Aberdeen<br />

Tunica<br />

Wyandotte<br />

Monroe<br />

Madison<br />

Jackson<br />

Saguaro<br />

Boone<br />

Phillips<br />

Carol<br />

Marwede<br />

Guava<br />

Iroquois<br />

Westmoreland<br />

Main<br />

38th<br />

40th<br />

Wabash<br />

Bernardo<br />

Cole<br />

Ira<br />

Sherwood<br />

Sunset<br />

Clay Cut<br />

Steele<br />

Webb<br />

Mohican<br />

Washington<br />

41st<br />

Odell<br />

Hundred Oaks<br />

Honeysuckle<br />

Delaware<br />

Barrow<br />

Bawell<br />

Palm<br />

Pickett<br />

Dubois<br />

Leeward<br />

Gus Young<br />

Billops<br />

Lofaso<br />

Richland<br />

Churchill<br />

Rubin<br />

Hyacinth<br />

Bennett<br />

Ryan<br />

Live Oak<br />

Jasmine<br />

Delaware<br />

Adams<br />

Edison<br />

Nelson<br />

Glenmore<br />

Bartlett<br />

Sycamore<br />

Shelley<br />

Clayton<br />

Mission<br />

Eaton<br />

Wiltz<br />

Valley<br />

Whitehaven<br />

Wayne<br />

Yaun<br />

Monroe<br />

Belfair<br />

Noah<br />

Tuscaloosa<br />

Edison<br />

Chatfield<br />

Richland<br />

Ramsey<br />

Tyrone<br />

Eugene<br />

Bluebell<br />

Leo<br />

Yazoo<br />

Rhodes<br />

Hanson<br />

44th<br />

Ingleside<br />

Nairn<br />

Orchid<br />

Arrowhead<br />

Mimosa<br />

43rd<br />

Sweetbriar<br />

Chandler<br />

Boone<br />

Eaton<br />

Beck<br />

Beechwood<br />

Dayton<br />

46th<br />

Evangeline<br />

Frey<br />

Florida<br />

North<br />

Glasgow<br />

Jean<br />

Madison<br />

Fairfields<br />

Capital Heights<br />

Woodside<br />

Poplar<br />

Winnebago<br />

Woodstone<br />

Cleo<br />

Woodruff<br />

Martin<br />

Odell<br />

Beck<br />

Knollwood<br />

Longwood<br />

Ferrett<br />

Balis<br />

Harelson<br />

Mouton<br />

Woodgate<br />

Levera<br />

Fairwoods<br />

Country Club<br />

Wells<br />

Balis<br />

Tupello<br />

Brame<br />

Dentation<br />

Moore<br />

Bluebell<br />

Millgate<br />

Urban<br />

Conrad<br />

Ritterman<br />

Silliman<br />

Rabey<br />

Millstone<br />

Foster<br />

Linden<br />

Laurel<br />

Foster<br />

Osborne<br />

Avondale<br />

Eleanor<br />

Charles<br />

Convention<br />

Caddo<br />

Barber<br />

Concord<br />

Whitlow<br />

Voss<br />

Kincaid<br />

Adams<br />

Dougherty<br />

Linden<br />

Jackson<br />

Hermitage<br />

Parlange<br />

Leighton<br />

Greenside<br />

Abelia<br />

Wylie<br />

Greenwell Springs<br />

Afton<br />

Melrose<br />

Westdale<br />

Ormandy<br />

Bazaar<br />

Valcour<br />

Acadia<br />

Fairfax<br />

Bankers<br />

Constitution<br />

Jamestown<br />

Pointer<br />

Woodchase<br />

Fieldgate<br />

Rothmer<br />

Byron<br />

Wyandotte<br />

Choctaw<br />

Rebel<br />

Yorktown<br />

Annette<br />

Howell Park<br />

Holloway<br />

Bootsie<br />

Bennington<br />

Boone<br />

Brookstown<br />

Pollard<br />

Seyburn<br />

Hilton<br />

Columbine<br />

Byron<br />

Bel Air<br />

Cloud<br />

Ardenwood<br />

College<br />

Corporate<br />

§¨¦I-10<br />

Dahlia<br />

Highland Park<br />

Victory<br />

Clayton<br />

Cyrus<br />

Franklin<br />

Leycester<br />

Brookstown<br />

Michelli<br />

Congress<br />

Bennington<br />

Hibiscus<br />

Beckenham<br />

Heidel<br />

Llanfair<br />

Castile<br />

Ridge<br />

Clematis<br />

Potomac<br />

Pino<br />

Forsythia<br />

Daventry<br />

Williamson<br />

Azam<br />

Glenwood<br />

Eastwood<br />

George<br />

Palmetto<br />

Saratoga<br />

Columbine<br />

Chandler<br />

Howell<br />

Timbercreek<br />

Arden<br />

Evans<br />

Prescott<br />

Hendricks<br />

Government<br />

Citiplace<br />

Coventry<br />

Goodwood<br />

Guilford<br />

Marion<br />

Quail<br />

Stoneliegh<br />

Sheldon<br />

Jefferson<br />

Louray<br />

Hanks<br />

Airline<br />

Winbourne<br />

Elgin<br />

Esplanade<br />

Trenton<br />

Clinton<br />

Executive Park<br />

Tarrytown<br />

Marquette<br />

Stratford<br />

Krista<br />

Brent<br />

Stokes<br />

Barford<br />

Quail Run<br />

Smiley<br />

Carrollton<br />

Aries<br />

Carrollton<br />

Rodney<br />

Bicentennial<br />

Renoir<br />

Rodin<br />

Moss Side<br />

Harry<br />

Audubon<br />

Lasalle<br />

Peggy<br />

Orion<br />

Anita<br />

Nellie<br />

Industrial<br />

Sheffield<br />

Gates<br />

Ozark<br />

Choctaw<br />

Goya<br />

Titian<br />

Overton<br />

Kenwood<br />

Perkins<br />

Victoria<br />

Lobdell<br />

Cezanne<br />

Van Gogh<br />

Sevenoaks<br />

Burden<br />

Irene<br />

Baird<br />

Donmoor<br />

Kenilworth<br />

Applewood<br />

Harts Mill<br />

Conley<br />

Melon<br />

Alden<br />

Walden<br />

Keed<br />

Joliet<br />

Annabelle<br />

Murphy<br />

Torrance<br />

Pikes<br />

Thoreau<br />

0 0.25 0.5 1<br />

Miles Figure 4-1<br />

Victoria<br />

Bon Marche<br />

Croydon<br />

Woodstock<br />

Boyce<br />

Chandler


3rd<br />

Lupine<br />

9th<br />

15th<br />

15th<br />

16th<br />

17th<br />

22nd<br />

25th<br />

26th<br />

31st<br />

32nd<br />

35th<br />

West<br />

39th<br />

39th<br />

East<br />

47th<br />

48th<br />

49th<br />

Topaz<br />

Garnet<br />

Waverly<br />

Whitter<br />

Juban<br />

Alello<br />

Monet<br />

³<br />

Rivermeadow<br />

Riverbend<br />

Dakin<br />

Belle Cherie<br />

Ormand<br />

#*<br />

#*<br />

#*<br />

River<br />

#*<br />

#*<br />

Garfield<br />

3rd<br />

Stadium<br />

Gourrier<br />

Lafayette<br />

St Philip<br />

Emma<br />

Chimes<br />

Emma<br />

#*<br />

Dort<br />

#*<br />

St Louis<br />

4th<br />

#*<br />

#*<br />

#*<br />

§¨¦I-110<br />

#*<br />

#*<br />

Terrace<br />

Swart<br />

Central WWTP<br />

Iowa<br />

6th<br />

South<br />

Aster<br />

5th<br />

Europe<br />

Mayflower<br />

Iris<br />

St Ferdinand<br />

Oklahoma<br />

Wyoming<br />

Irby C Nichols<br />

Eiland<br />

Miller<br />

Capitol Lake<br />

4th<br />

North<br />

Garner<br />

Grant<br />

Alaska<br />

Neosho<br />

State Capitol<br />

Lakeland<br />

5th<br />

Terrace<br />

St Charles<br />

Van Buren<br />

Johnson<br />

Royal<br />

Napoleon<br />

7th<br />

France<br />

Veta<br />

Chatsworth<br />

Azalea<br />

Maximillian<br />

Minnesota<br />

Mc Kinley<br />

Field House<br />

Tigerland<br />

St Joseph<br />

Arbutus<br />

Roosevelt<br />

Sorrel<br />

Manda<br />

Pittsburg<br />

Joplin<br />

De Queen<br />

Mansfield<br />

Lakeridge<br />

Margaret<br />

Harwich<br />

8th<br />

Mary<br />

Arizona<br />

Y A Tittle<br />

Campus<br />

Alvin Dark<br />

Alice<br />

10th<br />

#*<br />

#*<br />

#* #*<br />

Kansas<br />

Highway<br />

Bob Pettit<br />

Sharlo<br />

Riverwood<br />

7th<br />

8th<br />

7th<br />

8th<br />

8th<br />

Laurel<br />

9th<br />

Dot<br />

Howard<br />

Brightside View<br />

11th<br />

11th<br />

12th<br />

Grant<br />

State<br />

Tower<br />

Julia<br />

Thomas H Delpit<br />

Boyd<br />

#*<br />

#*<br />

#*<br />

Brightside<br />

Gsu<br />

17th<br />

Parker<br />

18th<br />

19th<br />

Bay<br />

Foss<br />

Spanish Town Road<br />

Buchanan<br />

Johnson<br />

Infirmary<br />

Milford<br />

Lockwood<br />

Beaumont<br />

Dooley<br />

12th<br />

Louisiana<br />

East<br />

10th<br />

10th<br />

Louise<br />

Capacity Improvement Projects<br />

¬ Waste Water Treatment <strong>Plan</strong>t<br />

PDP Projects - Central Basin<br />

#*<br />

WWTP<br />

Force Main<br />

Gravity Main<br />

PDP PS Projects<br />

Project Area<br />

Existing Force Main<br />

Existing Gravity Main<br />

#* Existing Pump Stations<br />

13th<br />

Iris<br />

Eddie Robinson Sr<br />

14th<br />

Braddock<br />

14th<br />

13th<br />

Mc Calop<br />

Georgia<br />

Vicaro<br />

Georgia<br />

Chimes<br />

Janet<br />

Jennifer Jean<br />

Iberville<br />

14th<br />

Kentucky<br />

Doris<br />

15th<br />

15th<br />

Marcellious<br />

Linwood<br />

Smith<br />

Louise<br />

16th<br />

Fig<br />

Ivanhoe<br />

Campus Lake<br />

16th<br />

Swire<br />

16th<br />

17th<br />

Oleson<br />

Cedar<br />

Gayosa<br />

Convention<br />

16th<br />

Polk<br />

18th<br />

Brice<br />

#*#*<br />

Dalrymple<br />

#*<br />

Park<br />

#*<br />

#*<br />

#*<br />

Scenic<br />

Olive<br />

Burbank<br />

Nicholson<br />

Pocahontas<br />

Hiawatha<br />

23rd<br />

Wisteria<br />

Oleander<br />

Lehmann<br />

Carolina<br />

June<br />

Amherst<br />

Dean Lee<br />

17th<br />

Etta<br />

20th<br />

Lobelia<br />

L S U<br />

20th<br />

Louisiana<br />

Cherokee<br />

Tulip<br />

May<br />

Kleinert<br />

#*<br />

Lakeshore<br />

21st<br />

20th<br />

Pontiac<br />

Tecumseh<br />

Uncas<br />

America<br />

Delgado<br />

Navajo<br />

Osceola<br />

Birch Birch<br />

Cherry<br />

March<br />

April<br />

Issac Cline<br />

Cornell<br />

Alamoster<br />

Gordon<br />

Baton Rouge<br />

Yale<br />

Weller<br />

Cable<br />

Tuscarora<br />

Calumet<br />

Pawnee<br />

Shawnee<br />

Seminole<br />

Gracie<br />

Spain<br />

Navajo<br />

Magnolia<br />

City Park<br />

Henry Adams<br />

Willow<br />

Lakeshore<br />

#*<br />

#*<br />

Canonicus<br />

Iroquois<br />

Myrtle<br />

#*<br />

Highland<br />

#*<br />

#*#*<br />

Stanford<br />

#*<br />

Evangeline<br />

<strong>Plan</strong>k<br />

#*<br />

Dayton<br />

Brady<br />

Chippewa<br />

Newton<br />

Fuqua<br />

Gracie<br />

Belmont<br />

Ben Hur<br />

Alliquippa<br />

Spain<br />

Virgil<br />

Tulane<br />

Clara<br />

Osceola<br />

24th<br />

Pocasset<br />

Adella<br />

Lake Hills<br />

23rd<br />

24th<br />

26th<br />

Fiero<br />

Geronimo<br />

Duke<br />

Lula<br />

Topeka<br />

Bogan<br />

26th<br />

27th<br />

Drehr<br />

Ovid<br />

Morning Glory<br />

St Rose<br />

Hillsdale<br />

Loyola<br />

Alliquippa<br />

Lavinia<br />

Christian<br />

29th<br />

28th<br />

Keokuk<br />

Ozark<br />

Erie<br />

30th<br />

Atkinson<br />

Gottlieb<br />

Baywood<br />

Elissalde<br />

Bengal<br />

Carriage<br />

Chalet<br />

25th<br />

28th<br />

Heritage<br />

Pluskat<br />

Huron<br />

Madison<br />

Arlington<br />

Letitia<br />

Ogden<br />

#*<br />

Lee<br />

Progress<br />

Zeeland<br />

Winnebago<br />

Ontario<br />

Acadian<br />

Main<br />

Broussard<br />

Lydia<br />

Hollydale<br />

Forge<br />

Ferndale<br />

Bourbon<br />

30th<br />

Bancroft<br />

Connell<br />

Bedford<br />

Kenmore<br />

Cedardale<br />

Linden<br />

Anna<br />

Glendale<br />

Myrtledale<br />

Kernan<br />

Hearthstone<br />

Reymond<br />

Tyrone<br />

33rd<br />

Floyd<br />

Eugene<br />

Burgin<br />

Charles<br />

Seneca<br />

Cherrydale<br />

Lynn<br />

Oswego<br />

Ozark<br />

Wilshire<br />

Goldenrod<br />

Greenwood<br />

Parker<br />

Marigold<br />

Hood<br />

Jolly<br />

Cloverdale<br />

Ross<br />

Mc Donald<br />

Dalton<br />

36th<br />

37th<br />

#* #*<br />

Hood<br />

Stuart<br />

Maple<br />

Cain<br />

Carl<br />

Aberdeen<br />

Tunica<br />

Wyandotte<br />

Monroe<br />

Saguaro<br />

Phillips<br />

Carol<br />

Marwede<br />

Westmoreland<br />

38th<br />

#*<br />

College Hill<br />

40th<br />

Cole<br />

#*<br />

Steele<br />

#*<br />

#*#*<br />

Sherwood<br />

Sunset<br />

Webb<br />

Mohican<br />

#*<br />

Noah<br />

Washington<br />

Odell<br />

Clay Cut<br />

Hundred Oaks<br />

Guava<br />

Wabash<br />

Bernardo<br />

Ira<br />

Honeysuckle<br />

Menlo<br />

Iroquois<br />

Delaware<br />

Barrow<br />

41st<br />

Bawell<br />

Palm<br />

Pickett<br />

Dubois<br />

Leeward<br />

Glenmore<br />

#*<br />

Nelson<br />

Bartlett<br />

Shelley<br />

Clayton<br />

Eaton<br />

#*<br />

Gus Young<br />

Billops<br />

Richland<br />

Churchill<br />

Rubin<br />

Lofaso<br />

Hyacinth<br />

Bennett<br />

Ryan<br />

Live Oak<br />

Jasmine<br />

Delaware<br />

Adams<br />

Edison<br />

Valley<br />

Whitehaven<br />

Wayne<br />

Yaun<br />

Monroe<br />

Belfair<br />

Tuscaloosa<br />

Chatfield<br />

Ramsey<br />

Tyrone<br />

Valley<br />

Edison<br />

Bluebell<br />

Leo<br />

Yazoo<br />

#*<br />

Wiltz<br />

Rhodes<br />

#*<br />

44th<br />

Ingleside<br />

Mission<br />

Nairn<br />

Orchid<br />

Arrowhead<br />

Mimosa<br />

Sweetbriar<br />

Chandler<br />

Boone<br />

43rd<br />

Hanson<br />

Beck<br />

Beechwood<br />

46th<br />

Frey<br />

#*<br />

Florida<br />

North<br />

Glasgow<br />

Jean<br />

#*<br />

#*<br />

Madison<br />

Fairfields<br />

Capital Heights<br />

Woodside<br />

Poplar<br />

Woodstone<br />

Winnebago<br />

Woodruff<br />

Martin<br />

Knollwood<br />

Longwood<br />

Ferrett<br />

Balis<br />

Cleo<br />

Harelson<br />

Mouton<br />

Woodgate<br />

Country Club<br />

Wells<br />

Balis<br />

Tupello<br />

Brame<br />

Dentation<br />

Levera<br />

Fairwoods<br />

Menlo<br />

Moore<br />

Bluebell<br />

Millgate<br />

Linden<br />

Urban<br />

Conrad<br />

Ritterman<br />

Foster<br />

#*<br />

Silliman<br />

Rabey<br />

Millstone<br />

Laurel<br />

Elm<br />

Osborne<br />

Avondale<br />

Eleanor<br />

Caddo<br />

Barber<br />

Concord<br />

Voss<br />

Kincaid<br />

Adams<br />

Dougherty<br />

Linden<br />

Jackson<br />

Hermitage<br />

Parlange<br />

Leighton<br />

Greenside<br />

Abelia<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#*<br />

#* #*<br />

#* #* #*<br />

#*<br />

Whitlow<br />

Eleanor<br />

Choctaw<br />

Convention<br />

Wylie<br />

#*<br />

Greenwell Springs<br />

Afton<br />

Melrose<br />

Westdale<br />

Ormandy<br />

Bazaar<br />

Valcour<br />

Acadia<br />

Fairfax<br />

Pollard<br />

Daventry<br />

Cloud<br />

Ardenwood<br />

Government<br />

Bankers<br />

Constitution<br />

Jamestown<br />

Pointer<br />

Woodchase<br />

Fieldgate<br />

Rothmer<br />

Seyburn<br />

Rebel<br />

Holloway<br />

Shelley<br />

Central Basin Capacity Improvement Projects<br />

12th<br />

12th<br />

14th<br />

14th<br />

Ontario<br />

North<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG4-2_PDP2010.MXD SGELPI 11/15/2010 14:48:28<br />

17th<br />

18th<br />

Fig<br />

19th<br />

Erie<br />

Huron<br />

Monroe<br />

Adams<br />

Sherwood<br />

Jefferson<br />

28th<br />

Jackson<br />

Eugene<br />

Cloverdale<br />

Madison<br />

Leeward<br />

Main<br />

0 0.25 0.5 1<br />

30th<br />

30th<br />

31st<br />

37th<br />

Richland<br />

Eaton<br />

Dayton<br />

Odell<br />

Beck<br />

Foster<br />

Charles<br />

Clayton<br />

Yorktown<br />

Bootsie<br />

Bennington<br />

Brookstown<br />

Seyburn<br />

Hilton<br />

Columbine<br />

Bel Air<br />

Dahlia<br />

Highland Park<br />

Boone<br />

Cyrus<br />

Heidel<br />

Brookstown<br />

College<br />

Corporate<br />

§¨¦I-10<br />

Congress<br />

Chippenham<br />

Leycester<br />

Victory<br />

Ridge<br />

Bromley<br />

Michelli<br />

Bennington<br />

Hibiscus<br />

Clematis<br />

Clayton<br />

Franklin<br />

Llanfair<br />

Castile<br />

Potomac<br />

Pino<br />

Forsythia<br />

Williamson<br />

Azam<br />

Glenwood<br />

Eastwood<br />

George<br />

Saratoga<br />

Columbine<br />

Chandler<br />

Howell<br />

Timbercreek<br />

Arden<br />

Evans<br />

Hendricks<br />

Winn<br />

Citiplace<br />

Guilford<br />

Prescott<br />

Winbourne<br />

Marion<br />

Sevenoaks<br />

Quail<br />

Stoneliegh<br />

Sheldon<br />

Jefferson<br />

Louray<br />

Elgin<br />

Esplanade<br />

Trenton<br />

Clinton<br />

Executive Park<br />

Marquette<br />

Stratford<br />

Krista<br />

Brent<br />

Stokes<br />

Barford<br />

Carrollton<br />

Rodney<br />

Moss Side<br />

Baird<br />

Airline<br />

Harry<br />

Goodwood<br />

Tarrytown<br />

Quail Run<br />

Albert Hart<br />

Smiley<br />

Carrollton<br />

Aries<br />

Gates<br />

Rodin<br />

Audubon<br />

Lasalle<br />

Peggy<br />

Orion<br />

Maxine<br />

Bicentennial<br />

Ozark<br />

Anita<br />

Nellie<br />

Industrial<br />

Choctaw<br />

Titian<br />

Overton<br />

Perkins<br />

Lobdell<br />

Renoir<br />

Cezanne<br />

Goya<br />

Van Gogh<br />

Kenwood<br />

Conley<br />

Burden<br />

Irene<br />

Donmoor<br />

Kenilworth<br />

Applewood<br />

Harts Mill<br />

Conley<br />

Victoria<br />

Melon<br />

Alden<br />

Keed<br />

Joliet<br />

Murphy<br />

Pikes<br />

Walden<br />

Thoreau<br />

Magnolia Wood<br />

Victoria<br />

Woodstock<br />

Miles Figure 4-2<br />

Torrance<br />

Castle Kirk


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.1 Central Gravity System Comprehensive Rehabilitation<br />

Projects<br />

4.1.1 CGS-R-0001, CGS-R-0002, CGS-R-0003, CGS-R-0004, CGS-R-0005, CGN-R-<br />

0001a, CGN-R-0001b, and CGN-R-0002<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the collection system to reduce the amount of infiltration and inflow<br />

that enter the system.<br />

Purpose<br />

The purpose of comprehensive rehabilitation is to correct defects in the system such as offset<br />

pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources. The water<br />

that enters the system through the defects is a major contributor to SSOs. Comprehensive<br />

rehabilitation of the collection system will contribute to alleviating SSOs.<br />

Location<br />

There are eight rehabilitation projects located within the Central Gravity Basin. The<br />

locations of the projects are shown in Figures 4-3 to 4-9.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will consist of the physical<br />

inspection of the pipes and manholes including CCTV inspection. Smoke testing may also<br />

be included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and, based on that<br />

analysis, a listing of recommended repairs with associated construction costs will be generated.<br />

An engineering firm will then complete detailed design and preparation of construction<br />

documents for project bidding.<br />

The construction of comprehensive rehabilitation projects will typically include the<br />

following components::<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place pipe liners<br />

Rehabilitation or replacement of manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction cost for each project is presented in Table 4-1. These costs are<br />

based on preliminary estimates of the amounts for each component of the system that will<br />

require repair or replacement. During the physical inspection phase, the actual condition of<br />

the components will be assessed and appropriate methods recommended. At that time, the<br />

cost estimate for each project will be revised. For those projects under construction, the bid<br />

amounts were included as construction costs in Table 4-1.<br />

GNV31031158548.DOCX/103440008 4-7 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-1<br />

Estimated Construction Costs for Central Gravity System Comprehensive Rehabilitation Projects<br />

Project Description<br />

Construction<br />

Cost<br />

Scheduled<br />

Design<br />

Appropriation<br />

Year<br />

Scheduled<br />

Construction<br />

Appropriation<br />

Year<br />

Status<br />

CGS-R-0001-Foster<br />

Drive-Government<br />

Street Phase A and B<br />

CGS-R-0002-Highland<br />

Road-Washington<br />

Street<br />

CGS-R-0003-Stanford<br />

Avenue-Morning Glory<br />

Road<br />

CGS-R-0004-Acadian<br />

Thruway-Claycut Road<br />

CGS-R-0005-Acadian<br />

Thruway-Perkins Road<br />

CGN-R-0001a-Scenic<br />

Highway-Spanish Town<br />

Road Phase I<br />

CGN-R-0001b-Scenic<br />

Highway-Spanish Town<br />

Road Phase II<br />

CGN-R-0002- East<br />

Boulevard-Government<br />

Street<br />

$7,683,000 2009* 2009* Construction<br />

On-Going<br />

$8,000,000 2010* 2011 Not Started<br />

$6,900,000 2010* 2010* Design On-<br />

Going<br />

$7,500,000 2010* 2011 Design On-<br />

Going<br />

$3,900,000 2010* 2010* Design On-<br />

Going<br />

$8,600,000 2011 2012 Not Started<br />

$8,600,000 2011 2012 Not Started<br />

$9,600,000 2012 2013 Not Started<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />

GNV31031158548.DOCX/103440008 4-8 JANUARY 2011<br />

REV. 5


East<br />

47th<br />

48th<br />

49th<br />

Whitter<br />

Alello<br />

Audubon<br />

Rembrandt<br />

39th<br />

40th<br />

44th<br />

Jonah<br />

46th<br />

Parlange<br />

Valcour<br />

Timbercreek<br />

Columbus Dunn<br />

North<br />

Melrose<br />

Afton<br />

Waverly<br />

Leighton<br />

Azam<br />

Villa Ashley<br />

Carrollton<br />

Harry<br />

Titian<br />

Van Gogh<br />

Ardenwood<br />

49th<br />

Bernardo<br />

Lofaso<br />

Live Oak<br />

Roselawn<br />

Tuscaloosa<br />

Beck<br />

48th<br />

Laurel<br />

Fairfax<br />

Asphodel<br />

Florida Blvd Service Road<br />

Florida<br />

Convention<br />

Steele<br />

Live Oak<br />

Richland<br />

Edison<br />

Blanchard<br />

Edison<br />

Leo<br />

Hatcher<br />

Hanson<br />

Keen<br />

Wiltz<br />

Capital Heights<br />

Longwood<br />

BeckLongwood<br />

Clay Cut<br />

Mouton<br />

North<br />

Hebert<br />

Moore<br />

Convention<br />

Bienville<br />

Garig<br />

Government<br />

Greenside<br />

Caddo<br />

St Tammany<br />

Acadia<br />

Foster<br />

St Landry<br />

Concordia<br />

Fairfax<br />

Cloud<br />

George<br />

Franklin<br />

Pershing<br />

Rapides<br />

Ardenwood<br />

Waverly<br />

Castile<br />

Convention<br />

Burgundy<br />

Glenwood<br />

Eastwood<br />

Arden<br />

Evans<br />

Winn<br />

Goodwood<br />

Marion<br />

Marion<br />

Marquette<br />

Marion<br />

Marquette<br />

Apartment Court<br />

Marquette<br />

Carrollton<br />

Esplanade<br />

Bellewood<br />

Sheffield<br />

Carrollton<br />

Kenwood<br />

Sevenoaks<br />

Donmoor<br />

Winthrop<br />

Alden<br />

Sheffield<br />

Richland<br />

Glenmore<br />

Jefferson<br />

Joliet<br />

Broussard<br />

Westdale<br />

Lasalle<br />

Ingleside<br />

Rosemont<br />

Ridge<br />

Berkshire<br />

Cameron<br />

Silliman<br />

Avondale<br />

Country Club<br />

Hundred Oaks<br />

Ormandy<br />

Marshall<br />

College<br />

Longwood<br />

Hillside<br />

Churchill<br />

Acadian<br />

Chatfield<br />

Bawell<br />

Delta<br />

Ramsey<br />

Yazoo<br />

Wells<br />

Yazoo<br />

Nairn<br />

Valley<br />

Woodside<br />

Wells<br />

Woodland<br />

Perth<br />

Balis<br />

Abelia<br />

Brownlee<br />

Barber<br />

Bardwell<br />

Holloway<br />

Bankers<br />

Corporate<br />

East Baton Rouge Parish<br />

Legend<br />

Area Designated for<br />

Physical Inspection<br />

0 880 1,760 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGS-R-0001.MXD SGELPI 11/9/2010 10:18:43<br />

q<br />

Foster Dr. - Government St.<br />

Phase A and B<br />

CGS-R-0001<br />

Project Vicinity Map<br />

Figure 4-3


10th<br />

Emma<br />

Brickyard<br />

Aztec<br />

Gila<br />

St Philip<br />

Terrace<br />

Monrovia<br />

Oklahoma<br />

Duane<br />

St Charles<br />

South<br />

Royal<br />

Ellwood<br />

Veta<br />

Margaret<br />

St Joseph<br />

Napoleon<br />

Maximillian<br />

10th<br />

Dot<br />

Burns<br />

Cotton<br />

I-110<br />

11th<br />

12th<br />

14th<br />

15th<br />

Julia<br />

Terrace<br />

Swart<br />

Burns<br />

Mc Calop<br />

Pecan<br />

Smith<br />

Orange<br />

Apple<br />

Louise<br />

Myrtle<br />

Bruce<br />

16th<br />

17th<br />

Lehmann<br />

18th<br />

Park<br />

Olive<br />

Perkins<br />

River<br />

Indiana<br />

Emma<br />

Garner<br />

Haig<br />

Illinois<br />

Irby C Nichols<br />

Nicholson<br />

Iris<br />

Violet<br />

Iowa<br />

Iowa<br />

Aster<br />

Geranium<br />

Chatsworth<br />

Van Buren<br />

Duncan<br />

Taylor<br />

Vermont<br />

Minnesota<br />

Roosevelt<br />

Tyler<br />

Mary<br />

Polk<br />

Alice<br />

Johnson<br />

Mc Kinley<br />

Grant<br />

Garfield<br />

Washington<br />

Alaska<br />

Infirmary Lake<br />

Cypress<br />

Stadium<br />

Field House<br />

Gov Claiborne<br />

Kansas<br />

Colorado<br />

Nebraska<br />

Arizona<br />

Howard<br />

Education<br />

Lettsworth<br />

Harding<br />

Taft<br />

Buchanan<br />

Thomas H Delpit<br />

Highland<br />

State<br />

Tower<br />

Utah<br />

Matilda<br />

Magnolia<br />

Coolidge<br />

Wyoming<br />

Aswell<br />

Easton<br />

Galvez<br />

Marigny<br />

Oregon<br />

Azalea<br />

Sonora<br />

Jeff Davis<br />

California<br />

Tinga<br />

Louise<br />

16th<br />

Olive<br />

Orange<br />

17th<br />

18th<br />

Daniel Webster<br />

Chimes<br />

Grant<br />

Garfield<br />

Wyoming<br />

Johnson<br />

Garfield<br />

Alice<br />

Harrison<br />

Howard<br />

Buchanan<br />

Donahue<br />

Harding<br />

Tinga<br />

Polk<br />

Johnson<br />

Tennessee<br />

Vicaro<br />

I-10<br />

Braddock<br />

Fig<br />

Georgia<br />

Mc Kinley<br />

Grant<br />

Garfield<br />

Roosevelt<br />

Tula<br />

Fraternity<br />

Willard<br />

Virginia<br />

Maryland<br />

Kentucky<br />

Chimes<br />

Raphael Semmes<br />

Campus<br />

Eddie Robinson Sr<br />

Pear<br />

Harrison<br />

Johnson<br />

Fig<br />

Virginia<br />

Carlotta<br />

Missouri<br />

Missouri<br />

Carolina<br />

Fig<br />

Lakeshore<br />

Arkansas<br />

Harrison<br />

July<br />

April<br />

June<br />

Issac Cline<br />

Dalrymple<br />

March<br />

City Park<br />

Lakeshore<br />

May<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0002.MXD SGELPI 10/26/2009 11:38:24<br />

Area Designated for<br />

Physical Inspection<br />

0 500 1,000 Feet<br />

q<br />

Highland Rd. - Washington St.<br />

CGS-R-0002<br />

Project Vicinity Map<br />

Figure 4-4


14th<br />

Arialo<br />

Trinity<br />

Twelve Oaks<br />

Westervelt<br />

Destrehan<br />

Belle Grove<br />

Riverway<br />

Tezcucco<br />

Riverbend<br />

Durande<br />

Sarpy<br />

Calanne<br />

River<br />

Stadium<br />

Gourrier<br />

Dakin<br />

Ormand<br />

Garfield<br />

Emma<br />

Haig<br />

Chimes<br />

Valcour Aime<br />

Irby C Nichols<br />

Terrace<br />

Oklahoma<br />

Garner<br />

Johnson<br />

Grant<br />

Chatsworth<br />

Iowa<br />

Iowa<br />

Iris<br />

Aster<br />

Azalea<br />

Taylor<br />

Alaska<br />

Harwich<br />

Royal<br />

Minnesota<br />

Alice<br />

Mc Kinley<br />

Julia<br />

Roosevelt<br />

Campus<br />

St Joseph<br />

Napoleon<br />

Polk<br />

Bob Pettit<br />

Y A Tittle<br />

Alvin Dark<br />

Sharlo<br />

Riverwood<br />

Nebraska<br />

Brightside View<br />

Terrace<br />

Swart<br />

Washington<br />

Kansas<br />

Infirmary<br />

Thomas H Delpit<br />

Grant<br />

Milford<br />

Taft<br />

State<br />

Tower<br />

11th<br />

Utah<br />

Iris<br />

I-10<br />

Georgia<br />

Chimes<br />

Janet<br />

Boyd<br />

Jennifer Jean<br />

Brightside<br />

15th<br />

Orange<br />

Louise<br />

Harrison<br />

Vicaro<br />

Kentucky<br />

Dean Lee<br />

Fig<br />

Johnson<br />

Grant<br />

Doris<br />

Ivanhoe<br />

Line<br />

Virginia<br />

Parker<br />

Oleson<br />

17th<br />

Fig<br />

Carolina<br />

July<br />

Dalrymple<br />

Park<br />

Issac Cline<br />

Amherst<br />

Etta<br />

Magnolia<br />

June<br />

L S U<br />

May<br />

Lakeshore<br />

Cornell<br />

Ben Hur<br />

City Park<br />

Yale<br />

Delgado<br />

Kleinert<br />

Lakeshore<br />

Myrtle<br />

Belmont<br />

Virgil<br />

Tulane<br />

Clara<br />

Fiero<br />

Bengal<br />

Glendale<br />

Stanford<br />

Highland<br />

Ben Hur<br />

Nicholson<br />

Drehr<br />

Ovid<br />

Elissalde<br />

Broussard<br />

St Rose<br />

Hillsdale<br />

Carriage<br />

Christian<br />

Lakeshore<br />

Loyola<br />

Letitia<br />

Elissalde<br />

Lydia<br />

Ferndale<br />

Forge<br />

Bancroft<br />

Lee<br />

Gladden<br />

Hundred Oaks<br />

Reymond<br />

Greenwood<br />

Cedardale<br />

Cloverdale<br />

Eugene<br />

Cherrydale<br />

Floyd<br />

Tyrone<br />

Marigold<br />

Jolly<br />

Helvetia<br />

Thalia<br />

Parker<br />

Burgin<br />

Cloverdale<br />

Perkins<br />

Hood<br />

Carl<br />

Aberdeen<br />

Boone<br />

Honeysuckle<br />

Stuart<br />

Acadian<br />

Menlo<br />

Guava<br />

Burbank<br />

Steele<br />

Churchill<br />

Sassy<br />

Sunset<br />

Rubin<br />

Richland<br />

Hyacinth<br />

Pickett<br />

Dubois<br />

Leeward<br />

Bawell<br />

Bennett<br />

Ryan<br />

Palm<br />

Nelson<br />

Glenmore<br />

Yazoo<br />

Eugene<br />

Valley<br />

Whitehaven<br />

Bluebell<br />

Ramsey<br />

Ingleside<br />

Nairn<br />

Mimosa<br />

Woodstone<br />

Balis<br />

Tupello<br />

Orchid<br />

Bluebell<br />

Chandler<br />

Boone<br />

Woodgate<br />

Longwood<br />

Edinburgh<br />

Glasgow<br />

Woodruff<br />

College<br />

<strong>Plan</strong>tation<br />

Laurel Lakes<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0003.MXD SGELPI 10/22/2009 08:21:41<br />

Area Designated for<br />

Physical Inspection<br />

0 1,800 3,600 Feet<br />

q<br />

Stanford Ave. - Morning Glory Rd.<br />

CGS-R-0003<br />

Project Vicinity Map<br />

Figure 4-5


21st<br />

22nd<br />

West<br />

East<br />

47th<br />

48th<br />

49th<br />

Gracie<br />

Hurst<br />

20th<br />

Convention<br />

Scenic<br />

Gayosa<br />

Fuqua<br />

23rd<br />

24th<br />

Adella<br />

23rd<br />

24th<br />

Gracie<br />

Boyd<br />

Edgewood<br />

25th<br />

25th<br />

26th<br />

26th<br />

Laurel<br />

26th<br />

25th<br />

27th<br />

28th<br />

29th<br />

Eugene<br />

Fuqua<br />

30th<br />

31st<br />

Gebelin<br />

Progress<br />

Fuqua<br />

Gayosa<br />

30th<br />

Fuqua<br />

Gracie<br />

Boyd<br />

Atkinson<br />

Gottlieb<br />

Greta<br />

Kernan<br />

Connell<br />

32nd<br />

Main<br />

Jonah<br />

35th<br />

Laurel<br />

36th<br />

Saguaro<br />

Phillips<br />

Zion<br />

37th<br />

Ruth<br />

Main<br />

Maywood<br />

Peachtree<br />

38th<br />

Wabash<br />

Wabash<br />

39th<br />

Bernardo<br />

40th<br />

North<br />

Live Oak<br />

Jasmine<br />

Lofaso<br />

North<br />

Live Oak<br />

Roselawn<br />

Tuscaloosa<br />

Convention<br />

44th<br />

Beck<br />

Beck<br />

Columbus Dunn<br />

Jonah<br />

46th<br />

48th<br />

Florida<br />

49th<br />

Laurel<br />

Convention<br />

Foster<br />

Parlange<br />

Leighton<br />

Afton<br />

Melrose<br />

Leo<br />

19th<br />

20th<br />

21st<br />

Wisteria<br />

Cherokee<br />

Tulip<br />

Olive<br />

Baxter<br />

24th<br />

Spain<br />

America<br />

Oleander<br />

Louisiana<br />

Cedar<br />

22nd<br />

Baxter<br />

23rd<br />

Spain<br />

Drehr<br />

Evergreen<br />

St Rose<br />

Myrtle<br />

Lavinia<br />

Belleview<br />

St Rose<br />

Cork<br />

Rittner<br />

Eugene<br />

Arlington<br />

Ogden<br />

Kenmore<br />

Bedford<br />

Hearthstone<br />

Hearthstone<br />

Beverly<br />

Acadian<br />

Wilshire<br />

Government<br />

Carol<br />

Carol Marie<br />

Lovers<br />

Terry<br />

Westmoreland<br />

Steele<br />

Cole<br />

Ira<br />

Florence<br />

Blanchard<br />

Richland<br />

Richland<br />

Edison<br />

Edison<br />

Glenmore<br />

Hanson<br />

Keen<br />

Hatcher<br />

Wiltz<br />

Capital Heights<br />

Longwood<br />

Mouton<br />

Clay Cut<br />

Moore<br />

Hebert<br />

Bienville<br />

Rebel<br />

Greenside<br />

Caddo<br />

St Tammany<br />

Hearthstone<br />

Marwede<br />

Kleinert<br />

Camelia<br />

Parker<br />

Park<br />

Terrace<br />

Magnolia<br />

Broussard<br />

Westdale<br />

Dalrymple<br />

Dalrymple<br />

City Park<br />

Lakeshore<br />

Blouin<br />

I-10<br />

Belmont<br />

Drehr<br />

Eola<br />

Lake Hills<br />

Virgil<br />

Horace<br />

Hillsdale<br />

Fairmont<br />

Homer<br />

Pericles<br />

Ovid<br />

Dogwood<br />

Baywood<br />

St Rose<br />

Letitia<br />

Zeeland<br />

Perkins<br />

Arlington<br />

Lydia<br />

Eastland<br />

Edward<br />

Kenmore<br />

Reymond<br />

Gladden<br />

Tyrone<br />

Eugene<br />

Daggett<br />

Goldenrod<br />

Moreland<br />

Eliza Beaumont<br />

Orpine<br />

Hundred Oaks<br />

Hillside<br />

Churchill<br />

Chatfield<br />

Woodside<br />

Bawell<br />

Delta<br />

Ramsey<br />

Malmaison<br />

Yazoo<br />

Ingleside<br />

Wells<br />

Yazoo<br />

Nairn<br />

Valley<br />

Longwood<br />

Country Club<br />

Wells<br />

Woodland<br />

Perth<br />

Silliman<br />

Balis<br />

Avondale<br />

Abelia<br />

Brownlee<br />

Barber<br />

Rosemont<br />

Ormandy<br />

Bardwell<br />

Marshall<br />

College<br />

Bankers<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0004.MXD SGELPI 10/22/2009 08:10:07<br />

Area Designated for<br />

Physical Inspection<br />

0 850 1,700 Feet<br />

q<br />

Acadian Thruway - Claycut Rd.<br />

CGS-R-0004<br />

Project Vicinity Map<br />

Figure 4-6


10th<br />

10th<br />

12th<br />

15th<br />

21st<br />

Arlington<br />

West<br />

East<br />

Florida<br />

East<br />

10th<br />

Nebraska<br />

Kansas<br />

Alice<br />

11th<br />

France<br />

Howard<br />

America<br />

I-110<br />

Thomas H Delpit<br />

Burbank<br />

Polk<br />

Tower<br />

Julia<br />

Washington<br />

Taft<br />

Mc Kinley<br />

Grant<br />

Roosevelt<br />

Infirmary<br />

Hart<br />

State<br />

Nicholson<br />

Gourrier<br />

12th<br />

12th<br />

Tennessee<br />

Eddie Robinson Sr<br />

Highland<br />

14th<br />

Iberville<br />

Smith<br />

Swart<br />

Braddock<br />

Mc Calop<br />

Georgia<br />

Buchanan<br />

Garfield<br />

Vicaro<br />

13th<br />

Janet<br />

14th<br />

Chimes<br />

Boyd<br />

Louise<br />

Harrison<br />

Mc Kinley<br />

Kentucky<br />

Campus<br />

15th<br />

Convention<br />

North<br />

16th<br />

Parker<br />

July<br />

Park<br />

Dalrymple<br />

19th<br />

Wisteria<br />

Oleander<br />

Pruyn<br />

Cherokee<br />

Tulip<br />

South<br />

Fig<br />

Missouri<br />

Stadium<br />

Ag Center<br />

Swire<br />

Wisteria<br />

15th<br />

Ivanhoe<br />

Campus Lake<br />

15th<br />

Virginia<br />

17th<br />

Lehmann<br />

16th<br />

17th<br />

Fig<br />

Carolina<br />

Lakeshore<br />

Arkansas<br />

Brice<br />

Amherst<br />

17th<br />

18th<br />

June<br />

Olive<br />

L S U<br />

20th<br />

March<br />

April<br />

Issac Cline<br />

18th<br />

Cornell<br />

Spain<br />

Magnolia<br />

May<br />

Lakeshore<br />

Yale<br />

Henry Adams<br />

21st<br />

Camelia<br />

City Park<br />

Delgado<br />

22nd<br />

Louisiana<br />

Spain<br />

Virgil<br />

Tulane<br />

Newcomb<br />

Clara<br />

23rd<br />

Cedar<br />

22nd<br />

Lake Hills<br />

Drehr<br />

Drehr<br />

St Rose<br />

Myrtle<br />

Terrace<br />

Hillsdale<br />

Fiero<br />

Stanford<br />

25th<br />

Ovid<br />

Elissalde<br />

Lavinia<br />

Belleview<br />

Pericles<br />

Baywood<br />

Bengal<br />

Loyola<br />

St Rose<br />

Carriage<br />

Chalet<br />

Rittner<br />

Christian<br />

Lakeshore<br />

Lakeshore<br />

Eugene<br />

Eugene<br />

Letitia<br />

Gottlieb<br />

Ogden<br />

Arlington<br />

Kleinert<br />

Belmont<br />

Zeeland<br />

Lydia<br />

Hollydale<br />

Forge<br />

Ferndale<br />

Bourbon<br />

Kenmore<br />

Edward<br />

Wilshire<br />

Reymond<br />

Kalurah<br />

Hearthstone<br />

Eugene<br />

Cedardale<br />

Glendale<br />

Floyd<br />

Acadian<br />

Government<br />

Gladden<br />

Greenwood<br />

Cloverdale<br />

Greta<br />

Tyrone<br />

Marigold<br />

Morning Glory<br />

Helvetia<br />

Hearthstone<br />

Hood<br />

Phillips<br />

Kernan<br />

Jolly<br />

Goldenrod<br />

Parker<br />

Cloverdale<br />

Carl<br />

Stuart<br />

Hood<br />

Whitehaven<br />

Stephens<br />

Carol Marie<br />

Marwede<br />

Moreland<br />

Rhododendron<br />

Aberdeen<br />

Westmoreland<br />

Lee<br />

Steele<br />

Cole<br />

Richland<br />

Edison<br />

Glenmore<br />

Pickett<br />

Broussard<br />

Hundred Oaks<br />

Honeysuckle<br />

Wabash<br />

Florence<br />

Ramsey<br />

Mimosa<br />

Rubin<br />

Jasmine<br />

Richland<br />

Blanchard<br />

Chatfield<br />

Bawell<br />

Delta<br />

Sassy<br />

Palm<br />

Churchill<br />

Hyacinth<br />

Bennett<br />

Convention<br />

Edison<br />

Mississippi<br />

Valley<br />

Wiltz<br />

Clay Cut<br />

Ingleside<br />

Nairn<br />

Orchid<br />

Arrowhead<br />

Leo<br />

Yazoo<br />

Para<br />

Tyrone<br />

Eugene<br />

Balis<br />

Bluebell<br />

Mimosa<br />

Hanson<br />

Keen<br />

Longwood<br />

Capital Heights<br />

Woodside<br />

Poplar<br />

Beck<br />

Wells<br />

Sweetbriar<br />

Yazoo<br />

Ferrett<br />

Knollwood<br />

Country Club<br />

Wells<br />

Balis<br />

Tupello<br />

Edinburgh<br />

Brame<br />

Moore<br />

Rabey<br />

Glasgow<br />

Bluebell<br />

Woodland<br />

Perth<br />

Silliman<br />

Aldrich<br />

Barber<br />

Perkins<br />

Avondale<br />

Foster<br />

Greenside<br />

Abelia<br />

Bennington<br />

Concord<br />

Whitehaven<br />

Caddo<br />

Rosemont<br />

Bazaar<br />

Westdale<br />

Ormandy<br />

Bardwell<br />

Acadia<br />

College<br />

Constitution<br />

Pointer<br />

Woodchase<br />

St Tammany<br />

Holloway<br />

Trust<br />

Yorktown<br />

Congress<br />

St Landry<br />

Bankers<br />

Corporate<br />

Hilton<br />

Jamestown<br />

Brandywine<br />

Pollard<br />

Columbine<br />

Fairfax<br />

I-10<br />

Moss Side<br />

Franklin<br />

Hibiscus<br />

Cloud<br />

George<br />

Lexington<br />

Ridge<br />

Clematis<br />

Dahlia<br />

Jefferson<br />

Castile<br />

Bunker Hill<br />

Energy<br />

Ardenwood<br />

Waverly<br />

Burgundy<br />

Saratoga<br />

Sandalwood<br />

Potomac<br />

Forsythia<br />

Columbine<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0005.MXD SGELPI 10/22/2009 08:10:40<br />

Area Designated for<br />

Physical Inspection<br />

0 1,300 2,600 Feet<br />

q<br />

Acadian Thruway - Perkins Rd.<br />

CGS-R-0005<br />

Project Vicinity Map<br />

Figure 4-7


I-110<br />

28th<br />

Brookstown<br />

Topaz<br />

Garnet<br />

Greenwell<br />

Amarillo<br />

Comish<br />

Saurage<br />

Comish<br />

Alexander<br />

Denham<br />

Douglas<br />

Henderson<br />

Henagen<br />

Hollywood<br />

Greenwell<br />

Vaughn<br />

Lakewood<br />

Quivera<br />

Lemonwood<br />

Dutton<br />

Robertson<br />

Wood<br />

Hollywood<br />

Woodlawn<br />

Lancaster<br />

Winchester<br />

Airline<br />

Greenwell<br />

St Dorothy<br />

Breckenridge<br />

Gsu<br />

Cedar<br />

Riley<br />

Lobelia<br />

Scenic<br />

Alamoster<br />

Powhatan<br />

Ontario<br />

Kelvin<br />

Lorraine<br />

Iberia<br />

Shelley<br />

Cable<br />

Sherwood<br />

Gordon<br />

Pontiac<br />

Galvez<br />

Nokomis<br />

Farrar<br />

Tecumseh<br />

Hiawatha<br />

Osceola<br />

Uncas<br />

Navajo Navajo<br />

Calumet<br />

Baton Rouge<br />

Winbourne<br />

Tuscarora<br />

Baton Rouge<br />

Osceola<br />

Beech<br />

Sherman<br />

Huron<br />

Erie Erie<br />

Osage<br />

Wenonah<br />

Cable<br />

Wenonah<br />

Alliquippa<br />

Pocasset<br />

Alliquippa<br />

Canonicus<br />

Douglas<br />

Weller<br />

Geronimo<br />

Erie<br />

Iroquois<br />

Duke<br />

Keokuk<br />

Beech<br />

Sherwood<br />

Topeka<br />

Dayton<br />

Wyandotte<br />

<strong>Plan</strong>k<br />

Huron<br />

Brady<br />

Dalton<br />

Longfellow<br />

Pluskat<br />

Pawtucket<br />

Ozark<br />

Midway<br />

Erie<br />

Chippewa<br />

31st<br />

Riley<br />

Kelvin<br />

Lorraine<br />

Beech<br />

Byron<br />

Clayton<br />

Myrtlelawn<br />

Roppolo<br />

Weller<br />

Anna<br />

Spedale<br />

Calumet<br />

Linden<br />

Wyandotte<br />

Oswego<br />

30th<br />

33rd<br />

Accardo<br />

Lynn<br />

38th<br />

Maple<br />

Delaware<br />

Winnebago<br />

Wyandotte<br />

Charles<br />

Oswego<br />

Ozark<br />

Ontario<br />

Seneca<br />

Tunica<br />

Wildwood<br />

Webb<br />

St Katherine<br />

Mohican<br />

Wayne<br />

Mission<br />

Eaton<br />

Bartlett<br />

Yaun<br />

St Gerard<br />

Sycamore<br />

Shelley<br />

Mohican-Prescott Crossover<br />

Delaware<br />

Wildwood<br />

Iroquois<br />

Delaware<br />

Lorraine<br />

Lemonwood<br />

Eaton<br />

Addison<br />

Beechwood<br />

Dayton<br />

Winnebago<br />

Wyandotte<br />

Joseph<br />

Evangeline<br />

Frey<br />

Levera<br />

Hazelwood<br />

Fairwoods<br />

Bradley<br />

Onter<br />

Wilmot<br />

Jean<br />

Foster<br />

Linden<br />

Eleanor<br />

Conrad<br />

Ritterman<br />

Choctaw<br />

Sherwood<br />

Cleo<br />

Charles<br />

Eleanor<br />

Byron<br />

Wyandotte<br />

Bradley<br />

Wilmot<br />

Elm<br />

Underwood<br />

Osborne<br />

McClelland<br />

Mc Clelland<br />

Prescott<br />

Dougherty<br />

Linden<br />

Winbourne<br />

Voss<br />

Bootsie<br />

Kincaid<br />

Blackwell<br />

Annette<br />

Annette<br />

Howell Park<br />

St Gerard<br />

Beech<br />

Enterprise<br />

Broadway<br />

Victory<br />

Cyrus<br />

Heidel<br />

28th<br />

Pocahontas<br />

19th<br />

Monroe<br />

20th<br />

Pawnee<br />

Monroe<br />

Adams<br />

East Baton Rouge Parish<br />

26th<br />

Legend<br />

30th<br />

Monroe<br />

Adams<br />

Madison<br />

Acadian<br />

37th<br />

Area Designated for<br />

Physical Inspection<br />

PHASE I<br />

Monroe<br />

0 880 1,760 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGN-R-0001A.MXD SGELPI 11/15/2010 11:43:09<br />

39th<br />

q<br />

Adams<br />

Barrow<br />

Monroe<br />

Belfair<br />

Belfair<br />

Rice<br />

Rhodes<br />

Mission<br />

Martin<br />

Harelson<br />

Fairfields<br />

Jackson<br />

Foster<br />

Adams<br />

Madison<br />

Bahm<br />

Paulson<br />

Washington<br />

Scenic Hwy. - Spanish Town Rd.<br />

Phase I<br />

Figure 4-8a<br />

CGN-R-0001A<br />

Project Vicinity Map<br />

Sobers


3rd<br />

Lupine<br />

9th<br />

11th<br />

15th<br />

16th<br />

17th<br />

18th<br />

18th<br />

19th<br />

I-110<br />

Hiawatha<br />

21st<br />

22nd<br />

26th<br />

West<br />

East<br />

River<br />

Lafayette<br />

Dort<br />

Woodrow<br />

Spain<br />

3rd<br />

St James<br />

Eiland<br />

South<br />

4th<br />

Miller<br />

St Philip<br />

St Ferdinand<br />

Spanish Town Road<br />

St Louis<br />

Capitol Lake<br />

State Capitol<br />

Lakeland<br />

St Philip<br />

4th<br />

University<br />

5th<br />

5th<br />

6th<br />

North<br />

France<br />

East Baton Rouge Parish<br />

St Charles<br />

7th<br />

Europe<br />

Daisy<br />

Ted Dunham<br />

Napoleon<br />

7th<br />

Mayflower<br />

Arbutus<br />

8th<br />

7th<br />

Ontario<br />

8th<br />

America<br />

8th<br />

St Joseph<br />

8th<br />

Sorrel 10th<br />

Manda<br />

Neosho<br />

Maximillian<br />

Phlox<br />

Pittsburg<br />

Joplin<br />

De Queen<br />

Lakeridge<br />

8th<br />

Mansfield<br />

9th<br />

Highway<br />

Capitol Access<br />

East<br />

Canal<br />

Louisiana<br />

10th<br />

Legend<br />

11th<br />

11th<br />

10th<br />

11th<br />

12th<br />

12th<br />

Beaumont<br />

Dooley<br />

12th<br />

12th<br />

11th<br />

11th<br />

South<br />

13th<br />

13th<br />

Spain<br />

Peach<br />

13th<br />

14th<br />

Eddie Robinson Sr<br />

Purslane<br />

Iberville<br />

15th<br />

15th<br />

14th<br />

Lockwood<br />

Bay<br />

17th<br />

Gracie<br />

14th<br />

Gayosa<br />

15th<br />

15th<br />

Pimpernel<br />

Marcellious<br />

Linwood<br />

16th<br />

Frisco<br />

16th<br />

17th<br />

North<br />

Spain<br />

Area Designated for<br />

Physical Inspection<br />

PHASE II<br />

0 980 1,960 Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGN-R-0001B.MXD SGELPI 11/15/2010 11:46:13<br />

16th<br />

17th<br />

18th<br />

Foss<br />

Laurel<br />

Cedar<br />

Jessamine<br />

19th<br />

Convention<br />

17th<br />

17th<br />

Ontario<br />

Brice<br />

Chestnut<br />

Scenic<br />

<strong>Plan</strong>k<br />

Pocahontas<br />

Florida<br />

Louisiana<br />

Wisteria<br />

Blanche<br />

Pruyn<br />

Bynum<br />

Lobelia<br />

Monroe<br />

Mulberry<br />

Birch<br />

Ellerslie<br />

19th<br />

18th<br />

Walnut<br />

Park<br />

Erie<br />

Adams<br />

18th<br />

q<br />

20th<br />

21st<br />

Hiawatha<br />

Cherry<br />

Gracie<br />

20th<br />

Spain<br />

Baton Rouge<br />

Cherokee<br />

Tecumseh<br />

Pawnee<br />

Shawnee<br />

Seminole<br />

Osceola<br />

Winbourne<br />

Huron<br />

Erie<br />

Seneca<br />

23rd<br />

America<br />

Oleander<br />

Osceola<br />

Tulip<br />

Wenonah<br />

Monroe<br />

Adams<br />

Birch<br />

Willow<br />

Irene<br />

24th<br />

Inez<br />

Madison<br />

Iroquois<br />

Duke<br />

Lula<br />

Bogan<br />

Boyd<br />

Edgewood<br />

Adella<br />

23rd<br />

24th<br />

24th<br />

Cedar<br />

24th<br />

23rd<br />

Delphine<br />

Canonicus<br />

Spain<br />

Drehr<br />

Alliquippa<br />

Osage<br />

25th<br />

Gracie<br />

24th<br />

25th<br />

St Rose<br />

Wyandotte<br />

Navajo<br />

26th<br />

26th<br />

25th<br />

Lavinia<br />

Geronimo<br />

Adams<br />

Fuqua<br />

27th<br />

St Rose<br />

Belleview<br />

Midway<br />

Chippewa<br />

29th<br />

28th<br />

Brady<br />

Dalton<br />

Washington<br />

Eugene<br />

St Rose<br />

28th<br />

29th<br />

30th<br />

Ozark<br />

Huron<br />

Erie<br />

Monroe<br />

Jackson<br />

Jefferson<br />

Newton<br />

Atkinson<br />

Eugene<br />

Mc Grath<br />

28th<br />

Gayosa<br />

Calumet<br />

Progress<br />

Gottlieb<br />

Wyandotte<br />

Oswego<br />

Ogden<br />

Kenmore<br />

Arlington<br />

30th<br />

30th<br />

Laurel<br />

Slate<br />

30th<br />

31st<br />

Gebelin<br />

Bedford<br />

33rd<br />

31st<br />

Fairfields<br />

Bond<br />

32nd<br />

Connell<br />

Acadian<br />

Greta<br />

Hearthstone<br />

Wyandotte<br />

Main<br />

Kernan<br />

Charles<br />

Oswego<br />

Ozark<br />

Winbourne<br />

Ontario<br />

Seneca<br />

Monroe<br />

37th<br />

Jackson<br />

Cain<br />

Jonah<br />

North<br />

Laurel<br />

Wilshire<br />

Government<br />

35th<br />

36th<br />

Saguaro<br />

Phillips<br />

Carol<br />

Choctaw<br />

Zion<br />

37th<br />

Ruth<br />

Main<br />

Peachtree<br />

Iroquois<br />

Terry<br />

Washington<br />

Jefferson<br />

Noah<br />

38th<br />

Wabash<br />

Wabash<br />

40th<br />

39th<br />

Steele<br />

Cole<br />

Capital Heights<br />

Ira<br />

Delaware<br />

Monroe<br />

Barrow<br />

41st<br />

Marie<br />

Clay Cut<br />

39th<br />

Webb<br />

Gus Young<br />

Billops<br />

Provost<br />

Bernardo<br />

Odell<br />

Jasmine<br />

Lofaso<br />

Blanchard<br />

Delaware<br />

Roselawn<br />

Belfair<br />

Rice<br />

42nd<br />

Live Oak<br />

Richland<br />

Scenic Hwy. - Spanish Town Rd.<br />

Phase II<br />

Figure 4-8b<br />

CGN-R-0001B<br />

Richland<br />

Amos<br />

Edison<br />

Project Vicinity Map


9th<br />

10th<br />

15th<br />

17th<br />

18th<br />

19th<br />

21st<br />

22nd<br />

River<br />

Lafayette<br />

St Philip<br />

3rd<br />

Spain<br />

Emma<br />

Aztec<br />

Gila<br />

Emma<br />

Wyoming<br />

Capitol Lake<br />

State Capitol<br />

Peabody<br />

Nicholson<br />

4th<br />

St Philip<br />

Garner<br />

Spanish Town Road<br />

St Ferdinand<br />

5th<br />

6th<br />

7th<br />

North<br />

Spain<br />

Government<br />

France<br />

St Charles<br />

Oklahoma<br />

Duane<br />

5th<br />

Lakeland<br />

University<br />

St James<br />

St Louis<br />

Royal<br />

Brickyard<br />

Terrace<br />

Monrovia<br />

Oregon<br />

St Charles<br />

State Capitol<br />

6th<br />

Royal<br />

Europe<br />

South<br />

Royal<br />

Napoleon<br />

Highland<br />

7th<br />

St Joseph<br />

Mayflower<br />

Veta<br />

Minnesota<br />

Sonora<br />

America<br />

Napoleon<br />

7th<br />

7th<br />

8th<br />

8th<br />

Beauregard<br />

Van Buren<br />

8th<br />

8th<br />

8th<br />

Louise<br />

Howard<br />

Mary<br />

8th<br />

I-110<br />

13th<br />

9th<br />

Maximillian<br />

East<br />

10th<br />

Alice<br />

California<br />

Dot<br />

10th<br />

Florida<br />

Convention<br />

Cotton<br />

Highway<br />

Capitol Access<br />

Howard<br />

Washington<br />

Arizona<br />

Canal<br />

Louisiana<br />

Education<br />

Tinga<br />

Nebraska<br />

11th<br />

Canal<br />

11th<br />

10th<br />

11th<br />

Terrace<br />

Swart<br />

Colorado<br />

11th<br />

Thomas H Delpit<br />

Kansas<br />

12th<br />

11th<br />

12th<br />

11th<br />

Hart<br />

Utah<br />

Alabama<br />

Peach<br />

14th<br />

14th<br />

13th<br />

Dooley<br />

12th<br />

12th<br />

13th<br />

14th<br />

12th<br />

11th<br />

Larkins<br />

Eddie Robinson Sr<br />

Iberville<br />

12th<br />

15th<br />

Mc Calop<br />

Braddock<br />

Fig<br />

I-10<br />

14th<br />

17th<br />

Julia<br />

Smith<br />

Orange<br />

Pecan<br />

Tennessee<br />

Georgia<br />

Gracie<br />

Kentucky<br />

15th<br />

Marcellious<br />

Apple<br />

Louise<br />

Pear<br />

Fig<br />

16th<br />

Laurel<br />

Myrtle<br />

Bruce<br />

Frisco<br />

Foss<br />

Brice<br />

Pruyn<br />

Lehmann<br />

Park<br />

18th<br />

19th<br />

Louisiana<br />

Spain<br />

Wisteria<br />

Dalrymple<br />

20th<br />

<strong>Plan</strong>k<br />

Olive<br />

Perkins<br />

Scenic<br />

21st<br />

Inez<br />

Fuqua<br />

Cherokee<br />

Tulip<br />

Camelia<br />

America<br />

24th<br />

Oleander<br />

Kleinert<br />

Boyd<br />

Spain<br />

Belmont<br />

Blouin<br />

Virgil<br />

26th<br />

26th<br />

Belleview<br />

Eugene<br />

27th<br />

Main<br />

Matilda<br />

Broussard<br />

Arkansas<br />

Hurst<br />

Edgewood<br />

Bridge<br />

Gayosa<br />

Adella<br />

15th<br />

14th<br />

15th<br />

Wisteria<br />

North<br />

16th<br />

North<br />

Virginia<br />

15th<br />

Missouri<br />

17th<br />

16th<br />

Spain<br />

St Vincent de Paul<br />

17th<br />

Brice<br />

18th<br />

Blanche<br />

16th<br />

17th<br />

Bynum<br />

Olive<br />

17th<br />

17th<br />

Fig<br />

18th<br />

18th<br />

Gracie<br />

Gass<br />

20th<br />

City Park<br />

Lakeshore<br />

23rd<br />

24th<br />

25th<br />

23rd<br />

Baxter<br />

Cedar<br />

23rd<br />

Drehr<br />

Delphine<br />

Evergreen<br />

26th<br />

25th<br />

Ovid<br />

Pericles<br />

Lavinia<br />

22nd<br />

Rittner<br />

Eola<br />

24th<br />

Drehr<br />

Laurel<br />

24th<br />

25th<br />

Horace<br />

Gracie<br />

Fairmont<br />

Homer<br />

St Rose<br />

St Rose<br />

Cork<br />

St Rose<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGN-R-0002.MXD SGELPI 10/22/2009 08:07:53<br />

Area Designated for<br />

Physical Inspection<br />

0 800 1,600 Feet<br />

q<br />

East Blvd. - Government St.<br />

CGN-R-0002<br />

Project Vicinity Map<br />

Figure 4-9


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2 Central Gravity System Capacity Improvements Projects<br />

4.2.1 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />

Improvements)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The purpose of this project is to re-route flow from PS 15 and PS 19 so that they directly<br />

pump through a common forcemain and manifold with the forcemain from PS 60 to<br />

increase the capacity of the system. The forcemain then discharges wastewater into the<br />

gravity system at the existing manhole (MH# 059-05885) located at the intersection of River<br />

Road and Capital Drive. The October 2009 version of the PDP add the construction of those<br />

gravity segments originating at the intersection of North Acadian Thruway and Ontario<br />

Street, and the intersection of Washington Avenue and West Belfair Drive, both terminating<br />

at PS 15, that were originally part of CGN-C-0002 (25 th Street-North Acadian) project to<br />

improve constructability and scheduling issues. Information about those segments has been<br />

included in this section.<br />

Location<br />

The locations of forcemains and gravity sewers in this project are shown in Figure 4-10.<br />

Forcemain segment PS 15FM to PS 15DS (manifold point of PS19 and PS15 forcemain) starts<br />

south of the Washington Ave and West Belfair Drive intersection. The forcemain travels<br />

west until reaching North Acadian Thruway. The forcemain then turns in a northerly<br />

direction until reaching the intersection of North Acadian Thruway West and Madison<br />

Avenue where the forcemain turns in a westerly direction, and continues until reaching<br />

Eiland Street. On Eiland Street, the PS 15 forcemain will be manifolded at PS 15DS with the<br />

forcemain exiting PS 19.<br />

Forcemain segment PS 15DS to PS 60 travels west along Eiland Street until reaching 3 rd<br />

Street and then travels south to PS 60 along River Road where it is manifolded with the PS60<br />

forcemain at PS60DS<br />

Forcemain segment PS 60DS to 059-05885 travels south from PS 60 on River Road to<br />

manhole 059-05885, which is located on River Road at the intersection of State Capitol Drive<br />

and River Road.<br />

Gravity segment 060-07642 to 060-07619 starts at the North Acadian Thruway West and<br />

Ontario Street intersection. The gravity segment travels south until reaching 060-07619, near<br />

the North Acadian Thruway West and Baron Street intersection.<br />

Gravity segment 060-07619 to 060-07544 travels south until reaching 060-07544 located near<br />

the North Acadian Thruway West and Fairfields Avenue intersection.<br />

Gravity segment 060-07544 to 060-07529 travels south until reaching 060-07529 located near<br />

the North Acadian Thruway and Washington Avenue intersection. Gravity segment 060-<br />

07529 to PS15 travels east until reaching PS15.<br />

Gravity segment 060-07529 to PS 15 travels east along Washington Avenue until reaching PS<br />

15, located south of the Washington Avenue and Belfair Drive intersection.<br />

GNV31031158548.DOCX/103440008 4-17 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

Gravity segment 015-05119 to PS 15 starts northwest of the Washington Avenue and Belfair<br />

Drive intersection. The gravity segment travels southwest until reaching 015-05117. At 015-<br />

05117, the gravity segment travels south east until reaching the intersection of Rice Drive<br />

and Washington Avenue. The gravity segment then turns in an easterly direction until<br />

reaching PS 15.<br />

Scope<br />

The entire CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity Improvements)<br />

project consists of approximately 7,150 feet of 10-inch, 18-inch, 21-inch, and 24-inch gravity<br />

sewer and approximately 19,340 feet of 18-inch, 20-inch, and 30-inch forcemain, as outlined<br />

below in Table 4-2<br />

TABLE 4-2<br />

CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

PS15FM PS15DS 14,600 New 18<br />

PS15DS PS60 3,600 New 20<br />

PS 60FM 059-05885 1,140 24 30<br />

060-07642 060-07619 950 10 to 12 18<br />

060-07619 060-07544 2,100 12, 15, 18 21<br />

060-07544 PS 15 3,600 18, New 24<br />

015-05119 PS 15 500 18 10<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $10,498,000.<br />

Design was appropriated in 2007.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Construction is On-Going.<br />

GNV31031158548.DOCX/103440008 4-18 JANUARY 2011<br />

REV. 5


4th<br />

15th<br />

22nd<br />

28th<br />

West<br />

East<br />

Wiltz<br />

Lynn<br />

Mohican<br />

Scenic<br />

#<br />

Charles<br />

Ozark<br />

Oswego<br />

Erie<br />

38th<br />

!R<br />

060-07642<br />

Brady<br />

Mission<br />

#<br />

PS1012<br />

Chippewa<br />

#<br />

Iroquois<br />

060-07619<br />

!R<br />

Choctaw<br />

Bartlett<br />

Eaton<br />

#<br />

3rd<br />

4th<br />

#I<br />

#!R<br />

PS19<br />

Joplin<br />

Pittsburg<br />

#<br />

Mansfield<br />

18th<br />

060-07741<br />

!R<br />

060-07544<br />

!R<br />

015-05119<br />

!R!R<br />

#I!R<br />

PS15<br />

#I<br />

!R #<br />

PS60<br />

River<br />

3rd<br />

6th<br />

7th<br />

10th<br />

9th<br />

17th<br />

060-07729<br />

!R<br />

060-06953A 060-07931<br />

!R<br />

!R<br />

060-07038<br />

!R<br />

060-06935 060-06987<br />

!R !R<br />

!R<br />

060-07736<br />

060-07735I 060-07735<br />

!R !R !R<br />

060-07735J !R 060-07734<br />

Main<br />

23rd<br />

Fuqua<br />

North<br />

44th<br />

Beck<br />

#<br />

Kernan<br />

Steele<br />

5th<br />

Tunica<br />

Eaton<br />

Dort<br />

17th<br />

43rd<br />

Capitol Lake<br />

Highway<br />

23rd<br />

7th<br />

North<br />

Leo<br />

Eugene<br />

14th<br />

16th<br />

Richland<br />

Hanson<br />

059-06282<br />

!R !R<br />

059-06287<br />

PS59<br />

#<br />

South<br />

Kleinert<br />

Myrtle<br />

Clay Cut<br />

Ingleside<br />

Richland<br />

#<br />

Proposed Projects<br />

Existing<br />

!R Manholes<br />

# Pump Stations<br />

#I PumpStations Force Main<br />

CGN-C-0001 "Capital lake Drive - Gayosa Street"<br />

Gravity Main<br />

¯<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\CGN_PROJECT_CONSOLIDATION_060909.MXD GBOQUIN 6/9/2009 14:06:40<br />

CGN-C-0002 "25th Street - North Acadian Thruway"<br />

To be constructed with:<br />

CGN-C-0001<br />

0 20 40<br />

Miles<br />

Capital Lake Drive - Gayosa Street<br />

CGN-C-0001<br />

Project Vicinity Map<br />

Figure 4-10


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.2 CGN-C-0002 (25 th Street – North Acadian Thruway)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The original purpose of the CGN-C-0002 (25th Street – North Acadian Thruway) project was<br />

to increase the capacity of the gravity trunk sewer upstream of PS 60, PS 15, and PS 59 to<br />

alleviate SSOs. This project now consists of designing approximately 9,500 linear feet of<br />

gravity sanitary sewer pipeline replacement with pipelines ranging in diameter from 15 to<br />

24 inches, and installing approximately 3,000 lf of new gravity sanitary sewer pipeline with<br />

diameters of 21 to 24 inches.<br />

For constructability and schedule alignment, those segments originating near North<br />

Acadian Thruway to PS 15 will be constructed as project CGN-C-0001 (Capital Lake Drive-<br />

Gayosa Street), while those segments originating north of I-110 near Memorial Stadium and<br />

east of I-110 between Spanish Town Road and Main Street will be constructed in the vicinity<br />

of project CGN-C-0003 (South Boulevard-St. Joseph Street). The location descriptions and<br />

maps of those projects include the scope that is being designed under this project.<br />

Total Estimated Design Cost is $521,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Design has been Completed.<br />

GNV31031158548.DOCX/103440008 4-20 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The purpose of this project is to increase the capacity of the gravity sewers upstream PS 59<br />

and PS 60. Nearly 3,000 feet of gravity sewer and the forcemain from PS 10 were deleted<br />

from this project due to hydraulic modeling updates. This October 2009 version of the PDP<br />

also adds construction of gravity segments that were part of CGN-C-0002 (25 th Street - North<br />

Acadian Thruway) to improve constructability and scheduling issues. This section includes<br />

information about those segments.<br />

Location<br />

The locations of the gravity sewers in this project are shown in Figure 4-11. Gravity segment<br />

059-06088 to new MH #C-3 starts at the intersection of St Philip Street and South Blvd. The<br />

gravity segment travels west until reaching new MH #C-3 at the intersection of South<br />

Boulevard and River Road<br />

The gravity segment C-3 to C-1 travels in a southerly direction until reaching new MH#C-1.<br />

Gravity segment 059-06445 to 059-06532 starts at the Camellia Avenue and Tulip Street<br />

intersection. The gravity segment travels west, turning south at 059-06575A. The gravity<br />

segment turns west at 059-06574, continuing until reaching 059-06532.<br />

Gravity segment 059-06532 to 059-06045 starts at the South 15 th Street and South Street<br />

intersection. The gravity segment travels west along South Street, crossing the KCS railroad<br />

tracks and under I-110 ramps and overpass. The line travels north at the intersection of<br />

South Street and Maximillian Street to 059-06613. The line travels north, turning west at 059-<br />

06614. The line continues west until reaching 059-06045 located northwest of the St Joseph<br />

Street and South Blvd intersection.<br />

Gravity segment 059-06140 to 059-06236 starts near the North Blvd and N 6th Street<br />

intersection. The gravity segment travels south until reaching 059-06139. The line travels<br />

east until reaching 059-06229. The gravity segment travels south until reaching 059-06230.<br />

The line travels east until reaching 059-06236, located near the America Street and St Joseph<br />

Street intersection.<br />

Gravity segment 059-6236 to 059-06128 starts at the America Street and St. Joseph Street<br />

intersection. The gravity segment travels south until reaching 059-06128, located at the<br />

Government Street and St. Joseph Street intersection.<br />

Gravity segment 059-06128 to 059-06045 starts at the Government Street and St. Joseph<br />

Street intersection. The gravity segment travels south until reaching 059-06045, located near<br />

the South Boulevard and St. Joseph Street intersection.<br />

Gravity segment 059-05878 to 059-05868 starts south of North St and River Road<br />

intersection. The gravity segment travels south until reaching 059-05868, located near the<br />

River Road and North Boulevard intersection.<br />

Gravity segment 059-06287 to 059-06128 starts northwest of the Government Street and 11th<br />

Street intersection. The gravity segment travels west, running parallel to Government Street,<br />

until reaching 059-06128 near Government and St. Joseph Street.<br />

GNV31031158548.DOCX/103440008 4-21 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

Gravity segment 060-06987 to 060-06935 starts west of Main Street and N 12th Street<br />

intersection. The gravity segment travels southwest until reaching 060-06935 located east of<br />

the Main Street and North 11th Street intersection.<br />

Gravity segment 060-07038 to 060-06953A starts north of North Street between Canal Street<br />

and N 11th Street. The gravity segment travels north until reaching 060-06953A near<br />

Spanish Town Road.<br />

Gravity segment 060-7741 to 060-07736 starts west of Scenic Highway between Bay Street<br />

and Ellerslie Drive. The gravity segment travels southeast until reaching 060-07737 near<br />

Ellerslie Drive, where it then travels southwest along a drainage canal towards Foss Street to<br />

060-07736. Gravity segment 060-07736 to 060-07735 travels southwest ending at 060-07735<br />

near Foss Street.<br />

Gravity segment 060-07735 to 060-07735I starts northeast of Foss Street and North 19th<br />

Street intersection. The gravity segment travels southwest along Foss Street until reaching<br />

060-07735I.<br />

Gravity segment 060-07735I to 060-07735J travels west, parallel to Foss Street, until reaching<br />

060-07735J, located at the intersection of Foss Street and North 19 th Street.<br />

Gravity segment 060-07735J to 060-07734 travels southeast parallel to North 19 th Street until<br />

reaching 060-07734, located northwest of the intersection of North 19th Street and North 17 th<br />

Street.<br />

Gravity segment 060-7734 to 060-07729 starts northwest of the intersection of North 19 th<br />

Street and North 17 th Street and travels over land in a southwesterly direction near the<br />

Memorial Stadium to 060-07739, which is west of the interchange of I-110 and North 19 th<br />

Street.<br />

Gravity segment 060-7729 to 060-07931 travels south from 060-07729, crosses I-110, and<br />

parallels Frisco Street to 060-07931, which is located near the intersection of North 16 th Street<br />

and Spanish Town Road.<br />

Scope<br />

The entire CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) project<br />

consists of approximately 16,600 feet of gravity sewer upstream of PS 59 and PS 60. Table 4-<br />

3 shows the scope of this project.<br />

TABLE 4-3<br />

CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

059-06088 New MH #C-3 570 24 36<br />

New MH #C-3 New MH #C-1 30 39 48<br />

059-06445 059-06532 2,195 10 & 12 21<br />

059-06532 059-06045 2,920 10 & 12 24<br />

059-06140 059-06236 1,100 10 15<br />

059-06236 059-06128 940 18 24<br />

GNV31031158548.DOCX/103440008 4-22 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-3<br />

CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

059-06128 059-06045 1,330 15 & 21 27<br />

059-05878 059-05868 1,961 8, 27, 30, & 36 42<br />

059-06287 059-06128 1,530 10 15<br />

060-06987 060-06935 280 10 15<br />

060-07038 060-06953A 360 18 24<br />

060-07741 060-07736 400 18 24<br />

060-07736 060-07735 345 18 24<br />

060-07735 060-07735I 80 18 24<br />

060-07735I 060-07735J 70 18 24<br />

060-07735J 060-07734 170 18 24<br />

060-07734 060-07729 1,300 18 24<br />

060-07729 060-07931 1,000 18 24<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $17,970,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Construction is On-Going.<br />

GNV31031158548.DOCX/103440008 4-23 JANUARY 2011<br />

REV. 5


3rd<br />

5th<br />

Royal<br />

9th<br />

15th<br />

17th<br />

18th<br />

18th<br />

19th<br />

21st<br />

22nd<br />

4th<br />

De Queen<br />

#<br />

Chestnut<br />

Walnut<br />

16th<br />

19th<br />

Dort<br />

Mansfield<br />

15th<br />

Birch<br />

<strong>Plan</strong>k<br />

Woodrow<br />

PS60<br />

#<br />

Miller<br />

Capitol Lake<br />

Lakeridge<br />

Sorrel<br />

Capitol Access<br />

Highway<br />

Foss<br />

Bay<br />

060-07741<br />

!R<br />

!R 060-07736<br />

060-07735I<br />

!R !R !R 060-07735<br />

060-07735J !R<br />

060-07734<br />

17th<br />

Ellerslie<br />

Fuqua<br />

River<br />

Lafayette<br />

3rd<br />

State Capitol<br />

4th<br />

!R<br />

059-05878<br />

059-05875<br />

!R!R 059-05873<br />

!R 059-05872<br />

059-05872A !R<br />

!R<br />

059-05871<br />

!R<br />

059-05870<br />

5th<br />

Laurel<br />

6th<br />

7th<br />

7th<br />

6th<br />

I-110<br />

7th<br />

Bungalow<br />

8th<br />

8th<br />

!R<br />

060-07038<br />

059-06140<br />

!R<br />

!R 059-06236<br />

8th<br />

8th<br />

10th<br />

060-06953A<br />

!R<br />

Canal<br />

060-06987<br />

!R !R<br />

060-06935<br />

Florida<br />

11th<br />

10th<br />

11th<br />

11th<br />

12th<br />

12th<br />

17th<br />

12th<br />

14th<br />

13th<br />

Bridge<br />

13th<br />

15th<br />

12th<br />

12th<br />

13th<br />

14th<br />

14th<br />

14th<br />

Gracie<br />

North<br />

15th<br />

!R<br />

15th<br />

16th<br />

North<br />

060-07931<br />

16th<br />

17th<br />

16th<br />

Main<br />

17th<br />

17th<br />

Brice<br />

18th<br />

Gracie<br />

19th<br />

Hurst<br />

Gayosa<br />

20th<br />

Convention<br />

Gass<br />

Meyer<br />

18th<br />

20th<br />

21st<br />

Scenic<br />

Eddie Robinson Sr<br />

St Louis<br />

Royal<br />

I-10<br />

059-05858<br />

#<br />

059-05857<br />

059-05864<br />

059-06089<br />

059-06088<br />

!R !R<br />

059-06128<br />

059-06282<br />

Royal<br />

East<br />

10th<br />

South<br />

Spain<br />

059-06287<br />

!R<br />

059-06045<br />

059-06532<br />

!R !R<br />

Hart<br />

10th<br />

12th<br />

11th<br />

Peach<br />

Eddie Robinson Sr<br />

Julia<br />

Iberville<br />

Marcellious<br />

14th<br />

15th<br />

15th<br />

Olive<br />

Bruce<br />

16th 16th<br />

Oleander<br />

17th<br />

Brice<br />

Myrtle<br />

17th<br />

18th<br />

059-06445<br />

!R<br />

Dare<br />

Park<br />

Spain<br />

Wisteria<br />

Oleander<br />

Olive<br />

Kleinert<br />

Tulip<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

South Blvd - St. Joseph St.<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Sewer Area Upgrades<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

CGN-C-0003<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 4-11<br />

0 1,150<br />

2,300<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDAT ES2010\CAPACITY\CENTRAL\CGN-C-0003_mpj012011.MXD


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.4 CGN-C-0004 (Downtown Area –PS 59 Improvements)<br />

The CGN-C-0004 project has been combined with CGN-C-0005 (Downtown Area - PS 15, PS<br />

19, PS 59, and PS 60 Improvements) from the October 2008 PDP. The combined project has<br />

been designated CGN-C-0005 (Downtown Area Pump Station Improvements) and is<br />

described in Section 4.2.5.<br />

4.2.5 CGN-C-0005 (Downtown Area Pump Station Improvements)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CGN-C-0005 (Downtown Area Improvements) project includes the upgrade of PS 15, PS<br />

19, and PS 59 to alleviate SSOs at and near the PSs as well as in their respective upstream<br />

basins. This project is the combination of CGN-C-0005 (Downtown Area – PS515, PS519, and<br />

PS 59 Improvements) and CGN-C-0004 (Downtown Area – PS 59 Improvements) from the<br />

October 2008 PDP. The combined project has been designated CGN-C-005 (Downtown Area<br />

Pump Stations) and is described in the rest of this section.<br />

The BTRSSO hydraulic model also predicts a PS capacity exceedance for the future peak wet<br />

weather flow. PS 15, PS 19, and the existing PS 60 will utilize the new forcemains outlined in<br />

the project CGN-C-0001 (Capital Lake Drive – Gayosa Street). PS 59 was added to this<br />

project in 2009 because of the similarity of the project and proximity to the other pump<br />

stations included in this project. During design, it was discovered that PS 59 could be<br />

rehabilitated by installing new pumps rather than completely replacing the entire pump<br />

station.<br />

Location<br />

The locations of PS 15, PS 19, and PS 59 are given in Table 4-4 and in Figure 4-12.<br />

Scope<br />

The scope of this project is shown in Table 4-4.<br />

TABLE 4-4<br />

CGN-C-0005 (Downtown Area Pump Station Improvements) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

PS No.<br />

PS 15<br />

PS 19<br />

PS 59<br />

(rehab)<br />

Location<br />

Washington Street, near intersection of<br />

West Belfair Drive<br />

Eiland Drive, near intersection of 4th<br />

Street<br />

Near the intersection of River Road and<br />

South Blvd.<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

694 4,014 799<br />

417 1,493 193<br />

7,777 26,665 4,570<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,841,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Construction Underway.<br />

GNV31031158548.DOCX/103440008 4-25 JANUARY 2011<br />

REV. 5


3rd<br />

9th<br />

12th<br />

22nd<br />

28th<br />

29th<br />

West<br />

East<br />

Edison<br />

46th<br />

Mouton<br />

PS1012<br />

#<br />

Chippewa<br />

#<br />

#I<br />

#<br />

#<br />

#I<br />

#<br />

Birch<br />

4th<br />

Daisy<br />

PS19<br />

Pittsburg<br />

Joplin<br />

Phlox<br />

Neosho<br />

De Queen<br />

Mansfield<br />

Lockwood<br />

Beaumont<br />

Purslane<br />

15th<br />

16th<br />

17th<br />

18th<br />

19th<br />

Madison<br />

Walnut<br />

Bay<br />

Erie<br />

#<br />

26th<br />

Iroquois<br />

29th<br />

28th<br />

Calumet<br />

Ozark<br />

Erie<br />

Brady<br />

Dalton<br />

Monroe<br />

Adams<br />

Oswego<br />

Ozark<br />

Winbourne<br />

Ontario<br />

Seneca<br />

Monroe<br />

38th<br />

37th<br />

Choctaw<br />

39th<br />

39th<br />

Barrow<br />

Webb<br />

Gus Young<br />

Mission<br />

Eaton<br />

Bartlett<br />

#<br />

Monroe<br />

Belfair<br />

Eaton<br />

Yaun<br />

Martin<br />

Mission<br />

Bradley<br />

Jean<br />

Wilmot<br />

Frey<br />

Ritterman<br />

Adams<br />

Madison<br />

Fairfields<br />

PS15<br />

Foster<br />

Jackson<br />

49th<br />

Foster<br />

#<br />

Conrad<br />

44th<br />

Scenic<br />

PS60<br />

#<br />

I-110<br />

#<br />

Sorrel 10th<br />

25th<br />

27th<br />

Highway<br />

43rd<br />

Capitol Lake<br />

17th<br />

Foss<br />

24th<br />

Fuqua<br />

36th<br />

7th<br />

11th<br />

48th<br />

3rd<br />

Main<br />

35th<br />

Florida<br />

6th<br />

23rd<br />

30th<br />

6th<br />

5th<br />

8th<br />

8th<br />

19th<br />

30th<br />

Connell<br />

Main<br />

North<br />

Beck<br />

48th<br />

49th<br />

4th<br />

Leo<br />

Phillips<br />

5th<br />

7th<br />

8th<br />

North<br />

8th<br />

12th<br />

PS59<br />

#I<br />

#<br />

#<br />

Terrace<br />

South<br />

11th<br />

10th<br />

10th<br />

11th<br />

14th<br />

15th<br />

16th<br />

16th<br />

17th<br />

Tulip<br />

Olive<br />

Terrace<br />

Myrtle<br />

Acadian<br />

Steele<br />

Government<br />

#<br />

River<br />

#<br />

PS7A PS7<br />

#<br />

I-10<br />

#<br />

PS10<br />

#<br />

PS3<br />

#<br />

#<br />

Perkins<br />

Kleinert<br />

Eugene<br />

Clay Cut<br />

Broussard<br />

Parker<br />

Richland<br />

Glenmore<br />

Edison<br />

Wiltz<br />

Nicholson<br />

Alice<br />

Dalrymple<br />

Lakeshore<br />

Ingleside<br />

Valley<br />

Longwood<br />

Wells<br />

Bawell<br />

Balis<br />

Avondale<br />

St Rose<br />

Letitia<br />

Eugene<br />

Ogden<br />

Lovers<br />

Cole<br />

Richland<br />

Hanson<br />

Moore<br />

Hebert<br />

Westdale<br />

Emma<br />

Haig<br />

East Baton Rouge Parish<br />

Iowa<br />

Mary<br />

Polk<br />

Harding<br />

Fig<br />

Fig<br />

July<br />

June<br />

Hillsdale<br />

Greenwood<br />

Legend<br />

Proposed<br />

Existing<br />

Downtown Area PS Improvements<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

CGN-C-0005<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 4-12<br />

0 0.5<br />

1<br />

Miles<br />

Goldenrod<br />

Delta<br />

Yazoo<br />

17th<br />

Country Club<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\CENTRAL\CENTRAL MAPS\CGN-C-0005.MXD SGELPI 11/9/2010 09:49:50


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.6 CGS-C-0001 (Roosevelt Street Area – PS 1 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation, as PS 1 no longer required<br />

improvements due to consolidation.<br />

4.2.7 CGS-C-0002 (University Lake Area – PS2, PS5, and PS6 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation. PS 2, PS 5, and PS 6 will all be<br />

part of the CC-EAST-PS (Central Consolidated Pump Station) project.<br />

4.2.8 CGS-C-0003 (Acadian/Claycut Area – PS3 and PS4 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation. PS 3 and PS 4 will be part of the<br />

CC-EAST-PS (Central Consolidated Pump Station) project.<br />

4.2.9 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The purpose of this project is to upgrade gravity sewers upstream of PS 1, PS 2, and PS 5to<br />

alleviate SSOs in the Central Gravity South basin. The project also includes new forcemain<br />

from PS 6, PS 91, and the new Glasgow PS, which will all be constructed as part of the<br />

Central Consolidated Pump Stations project. The original project from the January 2008 PDP<br />

had several hundred feet of gravity sewer deleted from it with several hundred feet of<br />

forcemain added to it due to Central Consolidation, and was combined with the CGS-C-<br />

0005 (Stanford Avenue – Ferndale Avenue) project. The combined project has been<br />

designated the CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />

described in this section.<br />

Location<br />

The forcemains and gravity segments in this project are shown in Figure 4-13.<br />

Gravity segment 001-00425A to 001-00425 starts on East Polk Street between Colorado Street<br />

and Nebraska Street. The gravity segment travels west until reaching 001-00425 located on<br />

East Polk Street between Nebraska Street and Highland Road.<br />

Gravity segment 001-00425 to 001-00293 starts on East Polk Street between Nebraska Street<br />

and Highland Road. The gravity segment travels west on Polk Street, then southeasterly<br />

along Highland Road, ending at Johnson Street.<br />

Gravity segment 002-01393 to 002-01390 starts northeast of the Stanford Avenue and West<br />

Lakeshore Drive intersection. The gravity segment travels northeast until reaching 002-<br />

01391. The line travels north until reaching 002-01390 near the Stanford Avenue and South<br />

Lakeshore Drive intersection.<br />

Gravity segment 002-01390 to 002-01361 starts near the Stanford Avenue and South<br />

Lakeshore Drive intersection. The gravity segment travels northeast along Stanford Ave<br />

until reaching 002-01361, located southwest of the Stanford Avenue and East Lakeshore<br />

Drive intersection.<br />

GNV31031158548.DOCX/103440008 4-27 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

Gravity segment 005-03915 to 005-03914 starts southwest of the Eugene Street and Valley<br />

Street intersection. The gravity segment travels southeast until reaching 005-03914, located<br />

near the railroad crossing at Valley Street.<br />

Gravity segment 005-03808 to JM001 starts at the Nairn Drive and Valley Street intersection.<br />

The gravity segment travels southwest until reaching 005-03802. The line travels southeast<br />

until reaching 005-03801. The gravity line travels southwest until reaching JM001 , located<br />

near Valley St and Pump Station 5.<br />

Gravity segment JM001 to 005-03800 will travel in a southwesterly direction until reaching<br />

005-03800 near Valley Street and PS 5.<br />

Gravity segment 006-04250 to PS 6 starts southeast of the West Lakeshore Drive and<br />

Stanford Drive intersection. The gravity segment travels northwest until reaching PS 6.<br />

The new forcemain segment PS 91 FM to DUM 001 will start from PS 91 located near the<br />

intersection of Concord Avenue and Lexington Drive, and travels south then southwest<br />

along Moss Side Lane until reaching the railroad right-of-way on the north side of the<br />

railroad. The forcemain will then travel in a northwesterly direction within the railroad<br />

right-of-way until it intersects (DUM 001) with a new forcemain near the intersection of<br />

Glasgow Avenue and Perkins Road.<br />

The new forcemain segment Glasgow PS to DUM 0001 will start near the intersection of<br />

Tupelo Street and Glasgow Avenue, and follow Glasgow Avenue crossing Perkins Road<br />

and the railroad to intersection (DUM 001) with the forcemain segment from PS 91.<br />

The new forcemain segment DUM 001 to JM001 will begin at the intersection point of<br />

segments PS 91 forcemain to DUM 001 and DUM DS to DUM 001. The forcemain will then<br />

travel in a northwesterly direction mostly within the railroad right-of-way until reaching JM<br />

001.<br />

Forcemain segment PS6 to PS6DS starts southeast of West Lakeshore Drive and Stanford<br />

Drive intersection. The forcemain travels northeast, parallel to Stanford Drive until reaching<br />

PS6DS near the South Lakeshore Drive and Stanford Drive intersection.<br />

Scope<br />

Project CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) includes<br />

approximately 1,100 feet of 10-inch and 15-inch gravity sewer upstream of PS 1,<br />

approximately 2,000 feet of 21-inch and 24-inch gravity sewer upstream of PS 2,<br />

approximately 1,100 feet of 12-inch, 18-inch, and 42-inch gravity sewer upstream of PS 5,<br />

approximately 40 feet of 21-inch gravity sewer upstream of PS 6,approximately 1,400 feet of<br />

12-inch forcemain downstream of PS 6, and approximately 7,000 feet of 10-inch, 12-inch, and<br />

15-inch forcemain downstream of PS 91 and Glasgow PS, as shown in Table 4-5.<br />

GNV31031158548.DOCX/103440008 4-28 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-5<br />

CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

001-00425A 001-00425 15 8 10<br />

Comments<br />

001-00425 001-00293 1,100 8 & 10 15<br />

002-01393 002-01390 1,200 15 & 18 21<br />

002-01390 002-01361 800 18 24<br />

005-03915 005-03914 400 8 12<br />

005-03808 JM 0001 560 10 18<br />

JM 001 005-03800 110 New 42<br />

PS 91 FM DUM 001 2,750 New 12 Forcemain<br />

Glasgow PS DUM 001 960 New 10 Forcemain<br />

DUM 001 JM 001 3,280 New 15 Forcemain<br />

006-04250 PS6 40 10 21<br />

PS6 PS6DS 1,400 8 12 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $4,326,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction is On-Going.<br />

GNV31031158548.DOCX/103440008 4-29 JANUARY 2011<br />

REV. 5


South<br />

§¨¦ I-110<br />

Terrace<br />

Myrtle<br />

Clay Cut<br />

Steele<br />

Richland<br />

Greenside<br />

Foster<br />

Westdale<br />

Castile<br />

College<br />

Avondale<br />

Silliman<br />

Fig<br />

17th<br />

Parker<br />

Longwood<br />

Ingleside<br />

Glenmore<br />

Woodside<br />

001-00425<br />

Alaska<br />

!R!R<br />

!R<br />

001-00425A<br />

001-00293<br />

Dalrymple<br />

May<br />

Hillsdale<br />

Christian<br />

Hollydale<br />

Bawell<br />

!R<br />

!R<br />

!R!R<br />

005-03915<br />

005-03800<br />

Nairn<br />

005-03808<br />

Balis<br />

Balis<br />

Bankers<br />

Hilton<br />

§¨¦ I-10<br />

002-01390<br />

!R<br />

!R<br />

002-01361<br />

Hood<br />

Carl<br />

Hood<br />

Mimosa<br />

Yorktown<br />

Campus<br />

Nicholson<br />

Gourrier<br />

Tower<br />

Stadium<br />

Lakeshore<br />

002-01393<br />

!R !R<br />

PS6DS<br />

!R<br />

Stanford<br />

006-04250<br />

Forge<br />

Aberdeen<br />

Stuart<br />

Bluebell<br />

Sweetbriar<br />

Hyacinth<br />

Perkins<br />

Y A Tittle<br />

Earl Gros<br />

Parker<br />

East Baton Rouge Parish<br />

Jennifer Jean<br />

Nicholson<br />

Boyd<br />

Burbank<br />

Proposed<br />

#I<br />

")<br />

New Pump<br />

Stations<br />

New Gravity Main<br />

New Force Main<br />

New Storage Facility<br />

Highland<br />

Legend<br />

³<br />

Ben Hur<br />

#<br />

Lee<br />

0 2,000<br />

4,000<br />

Feet<br />

!R<br />

Existing<br />

Burgin<br />

Dubois<br />

Leeward<br />

Sunset<br />

Exist. Gravity<br />

Exist. Forcemain<br />

Exist. Pump Station<br />

Manholes\Nodes<br />

Nelson<br />

Chandler<br />

Woodstone<br />

Woodgate<br />

Elmcrest<br />

Wylie<br />

Seyburn<br />

Dahlia<br />

Pollard<br />

Chandler<br />

CGS-C-0004<br />

Project Vicinity Map<br />

Figure 4-14<br />

Quail<br />

Highland Rd. - Buchanan St.<br />

Sewer Area Updates<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_060909.MXD SGELPI 10/19/2009 11:10:59


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.10 CGS-C-0005 (Stanford Avenue – Ferndale Avenue)<br />

Project Description<br />

This project was combined with project CGS-C-0004 (Highland Road – Buchanan Street) due<br />

to deletion of large gravity sewer because of the Central Consolidation projects and has been<br />

designated CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />

described in Section 4.2.9<br />

4.2.11 CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area<br />

Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

Project CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades)<br />

includes the upgrade of gravity sewers upstream of PS 3 and PS 4 to alleviate SSOs in the<br />

vicinity. Sections of gravity sewer that were to be upgraded as part of this project in the<br />

January 2008 PDP have been deleted due to hydraulic modeling improvements.<br />

Location<br />

The gravity segments in this project are shown in Figure 4-14.<br />

The project begins near the intersection of Westdale Drive and College Drive. The new<br />

gravity line follows College Drive until reaching Ward’s Creek. The gravity line turns<br />

northwest, paralleling Wards Creek along the edge of Webb Golf Course (BREC) and<br />

continues to Claycut Drive. The gravity line turns northeast and continues along Claycut<br />

Drive to PS 4.<br />

Segment 2 begins north of Government Street and parallels the eastside of Ward’s Creek for<br />

approximately 300 feet. The gravity line crosses Government Street, and follows along<br />

Mouton Street to Capital Heights Ave. The line then turns east along Capital Heights until<br />

the intersection with Hebert Street. The line turns south following Hebert Street and then<br />

paralleling Ward’s Creek. The gravity line crosses Ward’s Creek and terminates at PS 4.<br />

Segment 3 starts near Florida Blvd and Kernan Avenue intersection. The gravity line travels<br />

south along Beverly Drive, crosses Government Street and routes through the<br />

Westmoreland Shopping Center. The line then crosses Dawson’s Creek and parallels<br />

Dawson’s Creek along the east side of Catholic High School. The line crosses Dawson’s<br />

Creek on the north side of Claycut Drive and terminates on the east side of the creek.<br />

Segment 4 starts near the Government Street and Beverly Drive intersection. The gravity<br />

line travels west east along Government Street terminating at the intersection of<br />

Westmoreland Drive and Government Street.<br />

Segment 5 starts north of the Myrtle Avenue and Marwede Avenue intersection. The gravity<br />

line travels north until reaching Claycut Drive. The gravity line travels east tying into<br />

Segment 3.<br />

Scope<br />

The project includes approximately 12,000 feet of new gravity sewer pipe ranging in<br />

diameter from 8 inches to 27 inches.<br />

GNV31031158548.DOCX/103440008 4-31 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

Project CGS-C-0006 (Government St – South Acadian Thruway Sewer Area Upgrades)<br />

includes approximately 5,800 feet of 21-inch, 24-inch, and 27-inch gravity sewer construction<br />

upstream of PS 4 and approximately 5,200 feet of 12-inch, 15-inch, 18-inch, 24-inch, and 27-<br />

inch gravity sewer construction upstream of PS 3, as shown in Table 4-6.<br />

TABLE 4-6<br />

CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Proposed<br />

Diameter<br />

(in)<br />

004-03027 004-02967A 1,210 21<br />

004-02967D 004-03004 20 15<br />

004-02967A 004-02951 1,230 24<br />

004-02951 004-02950 110 27<br />

004-3201 004-02980B 3,730 24<br />

003-02286 003-02203 2,240 15<br />

003-02203 003-02039 340 18<br />

003-02039 003-01927B 1,410 21<br />

003-01927B 003-01927A 90 24<br />

003-01929 003-01927B 300 12<br />

003-02203B 003-02235 700 15<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Comments<br />

Total Construction Bid Amount is $4,700,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-32 JANUARY 2011<br />

REV. 5


West<br />

East<br />

46th<br />

49th<br />

Columbus Dunn<br />

36th<br />

38th<br />

44th<br />

Parlange<br />

47th<br />

31st<br />

32nd<br />

40th<br />

29th<br />

35th<br />

30th<br />

30th<br />

37th<br />

Ruth<br />

39th<br />

48th<br />

North<br />

Melrose<br />

Afton<br />

Leighton<br />

Waverly<br />

48th<br />

Main<br />

49th<br />

Roselawn<br />

Main<br />

Maywood<br />

Laurel<br />

Asphodel<br />

Live Oak<br />

Beck<br />

Gottlieb<br />

Ogden<br />

Gebelin<br />

Convention<br />

Bedford<br />

Connell<br />

Kernan<br />

!R<br />

Hearthstone Greta<br />

Beverly<br />

Acadian<br />

003-02286<br />

Phillips<br />

Peachtree<br />

Lovers<br />

North<br />

Steele<br />

Lofaso<br />

Florida<br />

Richland<br />

Tuscaloosa<br />

Fairfax<br />

Wabash<br />

Wabash<br />

Park Hills<br />

Edison<br />

Leo<br />

Convention<br />

Ray<br />

004-03027<br />

Beck<br />

Beck<br />

Hatcher<br />

!R<br />

Convention<br />

Fairfax<br />

Cloud<br />

Waverly<br />

Ardenwood<br />

Rebel<br />

003-02084<br />

!R !R<br />

!R<br />

003-02203<br />

!R<br />

003-02039<br />

003-02203B<br />

004-03006<br />

Wiltz<br />

!R<br />

Government<br />

Mouton<br />

Moore<br />

Hebert<br />

Bienville<br />

Caddo<br />

St Tammany<br />

Acadia<br />

St Landry<br />

Concordia<br />

Franklin<br />

Rapides<br />

Jefferson<br />

Eugene<br />

Arlington<br />

Kenmore<br />

Myrtle<br />

Kleinert<br />

003-01928<br />

003-01929<br />

!R<br />

!R!R<br />

!R<br />

003-02035<br />

003-01927<br />

Blanchard<br />

Edison<br />

PS4<br />

PS4<br />

#!R !R<br />

004-02951<br />

004-03279<br />

Greenside<br />

Foster<br />

Castile<br />

Glenmore<br />

Westmoreland<br />

Ira<br />

Longwood<br />

Burgundy<br />

Foch<br />

Eugene<br />

Arlington<br />

Kenmore<br />

Belmont<br />

Parker<br />

Broussard<br />

Goldenrod<br />

Moreland<br />

Silliman<br />

Avondale<br />

Rosemont<br />

!R<br />

!R<br />

!R<br />

004-03269 004-03199<br />

Westdale<br />

004-03201<br />

#<br />

PS22<br />

Country Club<br />

Longwood<br />

Ormandy<br />

Ridge<br />

Ingleside<br />

College<br />

Ramsey<br />

Zeeland<br />

Chatfield<br />

Lydia<br />

Edward<br />

Reymond<br />

#<br />

PS3<br />

Churchill<br />

Ramsey<br />

Yazoo<br />

Woodside<br />

Wells<br />

Wells<br />

Balis<br />

Abelia<br />

Bardwell<br />

Perth<br />

East Baton Rouge Parish<br />

# Legend<br />

Government St. - South Acadian Thrwy.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Sewer Upgrades<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

CGS-C-0006<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 4-14<br />

0 1,125<br />

2,250<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\CENTRAL\C GS-C-0006_mpj120810


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.12 CGS-C-0007 (Central Storage/Equalization)<br />

Project Description<br />

This project has been deleted from the PDP due to the Central Consolidation. The storage at<br />

the Central WWTP is no longer needed, although the storage volume required at the South<br />

WWTP has been increased due to the consolidation of the Central WWTP with the South<br />

WWTP operations.<br />

4.2.13 CC-WWTP-PS (PS 42)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CC-WWTP-PS (PS 42) Project includes the design and construction of one 48 MGD<br />

(33,300 gal/min) pump station facility (PS 42), vapor phase biotower-type odor control, and<br />

associated yard piping and valves to pump the flow from PS 1, PS 59, and the LSU pump<br />

station to the South WWTP. The Central WWTP pump station will be located near the<br />

current site of the Central WWTP, and will pump through the new forcemain described in<br />

the project entitled CC-WWTP-PS (PS 42 FM). Once this project is completed, the Central<br />

WWTP will be decommissioned and demolished.<br />

Location<br />

The Central Pump Station Project is located adjacent to the existing Central WWTP property<br />

at 2443 River Road, south of the downtown Baton Rouge area. The proposed location of the<br />

pump station is on existing property owned by the C-P and is shown in Figure 4-15.<br />

Scope<br />

The scope of this project is shown in Table 4-7.<br />

TABLE 4-7<br />

CC-WWTP-PS (PS 42) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

PS NO.<br />

LOCATION<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 42 2443 River Bend New 40,000 6,144<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $6,700,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-34 JANUARY 2011<br />

REV. 5


River<br />

Central WWTP<br />

3Q<br />

Johnson<br />

Mc Kinley<br />

#I<br />

PS42<br />

PS42<br />

Grant<br />

Nicholson<br />

Indiana<br />

Illinois<br />

Garfield<br />

Garfield<br />

Roosevelt<br />

Wyoming<br />

Daniel Webster<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed Existing<br />

PS 42<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

Wastewater Treatment <strong>Plan</strong>t<br />

Figure 4-15<br />

#I<br />

") WTP<br />

0 170<br />

340<br />

Feet<br />

CC-WWTP-PS<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2009UPDATE-SCOTT_102009.MXD SGELPI 10/20/2009 12:37:09


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.14 CC-EAST-PS (Central Consolidated PSs)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CC-EAST-PS (Central Consolidated Pump Stations) Project involves the design and<br />

construction of nine pump stations (PS 2, PS 3, PS 4, PS 5, PS 6, PS 7, PS 10, PS 91, and the<br />

Glasgow Pump Station). Three pump stations (PS 2, PS 7, and PS 10) are to be interconnected<br />

in a network that will discharge into PS 5. PS 5 will pump directly to the South WWTP via a<br />

new large forcemain following completion of construction of the South WWTP – Phase I<br />

project, which is currently in the design phase. PS 3, PS 91, and the Glasgow Pump Station<br />

will each pump independently to PS 5 through two separate new forcemains. PS 4 pumps to<br />

PS 3 through an existing forcemain. PS 6 will pump through a new 12–inch forcemain that<br />

will replace the existing forcemain from PS 6 along Stanford Avenue northeast to node PS 6DS<br />

(MH 002-01393), located near the intersection of South Lakeshore Drive and Stanford Avenue.<br />

The forcemains from PS 2, PS 3, PS 5, PS 7, and PS 10 will be constructed as part of the<br />

CC-EAST-FM (Central Consolidated Forcemains) project. The forcemains from PS 6, PS 91,<br />

and the Glasgow Pump Station will be constructed as part of the CGS-C-0004 (Highland<br />

Road – Buchanan Street Sewer Area Upgrades) project.<br />

Location<br />

The CC-EAST-PS (Consolidated Pump Stations) project is primarily located in the Central<br />

Baton Rouge area. Detailed location descriptions of the required capacity improvements are<br />

presented in Table 4-10and are shown in Figure 4-16.<br />

Scope<br />

The scope of this project is shown in Table 4-8.<br />

TABLE 4-8<br />

CC-EAST-PS (Central Consolidated PSs) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 2 Claycut Bayou 3,819 6,458 1,481<br />

PS 3 Acadian Thruway, near Bawell Street 3,958 16,436 2,094<br />

PS 4<br />

Claycut Road near the intersection at<br />

3,819 8,055 1,042<br />

Bienville Street<br />

PS 5 Valley Street and Perkins Road 903 29,720 5,589<br />

PS 6 Stanford Ave and Lakeshore Drive 347 1,805 351<br />

PS 7<br />

Dalrymple Drive, near the intersection at E 720 1,180 140<br />

Washington Street<br />

PS10<br />

East Lakeshore Drive, near southeastern 500 1,479 92<br />

corner of City Park<br />

PS 91<br />

Concord Drive near the intersection with<br />

500 1,517 294<br />

Lexington Drive<br />

Southdowns<br />

Pump Station<br />

Glasgow Avenue near the intersection with<br />

Tupelo Drive<br />

New 1,800 N/A<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $16,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-36 JANUARY 2011<br />

REV. 5


15th<br />

Park<br />

20th<br />

Arlington<br />

West<br />

East<br />

Whitter<br />

14th<br />

14th<br />

Pear<br />

Chimes<br />

15th<br />

Virginia<br />

16th<br />

State<br />

Stadium<br />

Ag Center<br />

Swire<br />

Burbank<br />

15th<br />

17th<br />

16th<br />

17th<br />

Parker<br />

#I<br />

#<br />

July<br />

17th<br />

March<br />

June<br />

Dalrymple<br />

#<br />

#<br />

Olive<br />

PS7<br />

PS68<br />

Kleinert<br />

Terrace<br />

#I<br />

#<br />

May<br />

Lakeshore<br />

L S U<br />

Delgado<br />

East Baton Rouge Parish<br />

21st<br />

Tulip<br />

Lakeshore<br />

#<br />

#I<br />

#<br />

#I<br />

#<br />

Clara<br />

Highland<br />

Spain<br />

Blouin<br />

PS10<br />

Fiero<br />

Hillsdale<br />

Carriage<br />

Elissalde<br />

PS2<br />

Stanford<br />

Ursuline<br />

Christian<br />

#<br />

PS6<br />

St Rose<br />

Letitia<br />

Lydia<br />

Hollydale<br />

PS1014<br />

PS1013<br />

Forge<br />

Bourbon<br />

Barrosa<br />

Ogden<br />

Myrtle<br />

Ferndale<br />

#<br />

Broussard<br />

Reymond<br />

Tyrone<br />

Eugene<br />

Greenwood<br />

Bedford<br />

Cedardale<br />

Cloverdale<br />

Floyd<br />

Glendale<br />

PS120<br />

Beverly<br />

Clay Cut<br />

Myrtledale<br />

Hood<br />

Jolly<br />

Goldenrod<br />

#I<br />

#<br />

#<br />

Lee<br />

Parker<br />

Stephens<br />

Acadian<br />

Perkins<br />

Aberdeen<br />

Lovers<br />

PS3<br />

Ross<br />

Burgin<br />

Carl<br />

Stuart<br />

Hood<br />

#<br />

Cole<br />

Palm<br />

Hyacinth<br />

Florence<br />

Mimosa<br />

PS70<br />

#<br />

Pickett<br />

PS1009<br />

Steele<br />

Churchill<br />

Rubin<br />

Richland<br />

Bawell<br />

Delta<br />

Bennett<br />

Richland<br />

Edison<br />

Edison<br />

#I<br />

#<br />

Bluebell<br />

PS34<br />

Glenmore<br />

Yazoo<br />

Tupello<br />

Orchid<br />

Hanson<br />

Poplar<br />

Whitehaven<br />

#<br />

Glasgow<br />

Wiltz<br />

Ingleside<br />

Wells<br />

Valley<br />

PS5<br />

Yazoo<br />

Mimosa<br />

Longwood<br />

Balis<br />

Mouton<br />

Country Club<br />

Wells<br />

Moore<br />

#I<br />

#<br />

Balis<br />

PS Southdowns<br />

Bluebell<br />

Rabey<br />

#I<br />

Sweetbriar<br />

Silliman<br />

Hebert<br />

Avondale<br />

Abelia<br />

Barber<br />

Concord<br />

Whitehaven<br />

Caddo<br />

PS4<br />

Greenside<br />

Rosemont<br />

Government<br />

Foster<br />

Westdale<br />

Ormandy<br />

Bardwell<br />

Bazaar<br />

Pointer<br />

Trust<br />

Revere<br />

Acadia<br />

College<br />

PS375<br />

#<br />

Bankers<br />

Pollard<br />

Franklin<br />

Hilton<br />

#<br />

#<br />

PS22<br />

#I<br />

#<br />

Bunker Hill<br />

Dahlia<br />

Jefferson<br />

Castile<br />

Berkshire<br />

Energy<br />

Corporate<br />

I-10<br />

Evans<br />

Winn<br />

Congress<br />

Valley Forge<br />

Stratford<br />

Esplanade<br />

Marion<br />

PS91<br />

Legend<br />

Proposed<br />

Central Consolidated Pump Stations<br />

Existing<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

CC-EAST-PS<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 4-16<br />

0 1,600 3,200<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\CENTRAL\CENTRAL MAPS\CC-EAST-PS.MXD SGELPI 11/9/2010 09:51:52<br />

Krista<br />

#<br />

Quail<br />

Marion<br />

PS119<br />

Marion<br />

#<br />

Trenton<br />

Peggy


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.15 CC–WWTP-FM (PS 42 FM)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CC–WWTP-FM (PS 42 FM) project includes the design and construction of the<br />

forcemain to convey flow from PS 42 FM to the South WWTP. In addition, forcemains will<br />

be constructed from the proposed LSU pump station to PS 42 and from PS 505 to the PS42<br />

FM. This project also includes segments of two other separate forcemains that are part of the<br />

SFL-C-0006 (Highland Road – Burbank Drive Capacity Improvements) project and the SGC-<br />

C-PS58A (Pump Station 58 Replacement) project.<br />

The project purpose is to redirect flows within the Central Basin to the South WWTP and<br />

accommodate upgrades within the South Basin following completion of construction of the<br />

South WWTP – Phase I project, which is currently in the design phase.<br />

Location<br />

The location of this project is shown in Figure 4-17. The forcemain will start out as a 42-inch<br />

pipe from the new PS 42 and will parallel the west side of the railroad tracks, west of<br />

Nicholson Drive. The forcemain turns west and follows Aster Street to West Chimes Street.<br />

The forcemain then follows West Chimes Street onto the LSU campus. The forcemain parallels<br />

the west side of Upper Bayou Fountain, crossing Skip Bertman Drive, and turns east just<br />

south of the LSU Football practice facilities. The forcemain crosses the railroad tracks at<br />

Nicholson Drive and parallels the east side of Nicholson Drive to Gourrier Avenue. The<br />

forcemain follows Gourrier Avenue, crosses Parker Boulevard then turns south on Dodson<br />

Avenue, and then crosses East Boyd and continues to Jennifer Jean Drive. At the rear of<br />

Jennifer Jean Drive, the forcemain follows Jennifer Jean Drive to Burbank Drive. The<br />

forcemain continues along the east side of Burbank Drive to the intersection of Lee Drive. At<br />

Burbank Drive and Lee Drive, the forcemain will increase in size to 54-inch due to the<br />

forcemain from the CC-East-FM (Central Consolidated Forcemains) project joining this<br />

forcemain at that point. The 54-inch forcemain will run from Burbank Drive east to Gardere<br />

Lane, where it will follow the right-of-way that parallels Gardere Lane roughly south to the<br />

South WWTP. At Burbank Drive, the 64-inch forcemain from the SGC-C-PS58A (PS 58<br />

Replacement) project and the 60-inch forcemain from the SFL-C-0005 (Highland Road -<br />

Burbank Drive Capacity Improvements) project will also be constructed all of the way to the<br />

South WWTP in the right-of-way parallel to the Staring Lane extension.<br />

This project also includes the construction of a 20-inch forcemain from the new LSU pump<br />

station being constructed as a part of the Master <strong>Plan</strong> SGL-C-0002 (Multiple PS – Highland<br />

Road – Kenilworth Parkway – LSU Pump Station) project to PS 42. This forcemain will<br />

parallel the 48 inch forcemain alignment. In addition, a new 16-inch forcemain will be<br />

constructed from PS505A along the new Ben Hur Road to Burbank Drive, where it will tie in<br />

to the 54-inch forcemain.<br />

Scope<br />

The scope of this project is shown in Table 4-9.<br />

The project includes approximately 49,400 feet of new forcemain sewer pipe ranging in<br />

diameter from 16 inches to 64 inches.<br />

GNV31031158548.DOCX/103440008 4-38 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-9<br />

CC-WWTP-FM (PS42 FM) – Pipeline Information<br />

US Node<br />

PS505A<br />

DS Node<br />

Ben Hur/<br />

Burbank<br />

Length<br />

(ft)<br />

Existing Diameter<br />

(in)<br />

Proposed Diameter<br />

(in)<br />

3,400 New 16<br />

LSU PS PS 42 6,900 New 20<br />

PS 42 Lee/Burbank 18,000 New 48<br />

Lee/Burbank SWWTP 18,000 New 54<br />

Staring Lane/<br />

Burbank<br />

SWWTP 6,300 New 60<br />

Staring Lane<br />

/Burbank<br />

SWWTP 3,700 New 64<br />

Comments<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $25,000,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-39 JANUARY 2011<br />

REV. 5


Aster<br />

#<br />

Stadium<br />

Iowa<br />

Iowa<br />

#<br />

PS1<br />

State<br />

July<br />

May<br />

#<br />

#<br />

#<br />

PS2<br />

Christian<br />

Hollydale<br />

# #<br />

Hood<br />

Carl<br />

#<br />

Stuart<br />

Balis<br />

Balis<br />

College<br />

#<br />

Barber<br />

Concord<br />

Perkins<br />

Bankers<br />

Hilton<br />

Corporate<br />

I-10<br />

PS119<br />

#<br />

#<br />

#<br />

Lakeshore<br />

Campus<br />

#<br />

#<br />

PS165<br />

PS373<br />

#<br />

Westervelt<br />

River<br />

#<br />

#<br />

Sarpy<br />

Gourrier<br />

#<br />

#<br />

PS140<br />

#<br />

# # #<br />

PS445<br />

#<br />

PS236<br />

Tigerland<br />

Bob Pettit<br />

Alvin Dark<br />

Parker<br />

PS292<br />

Boyd<br />

PS1011<br />

#<br />

#<br />

Brightside<br />

PS439<br />

Etta<br />

#<br />

#<br />

#<br />

#<br />

PS68<br />

PS305<br />

#<br />

Ben Hur<br />

Stanford<br />

PS6<br />

#<br />

Highland<br />

Forge<br />

#<br />

Lee<br />

# 2N-1<br />

!R<br />

PS120<br />

Burgin<br />

#<br />

PS70<br />

#<br />

Dubois<br />

Chandler<br />

Nelson<br />

#<br />

Burbank<br />

#<br />

Bluebell<br />

#<br />

Menlo<br />

#<br />

#<br />

#<br />

PS245<br />

#<br />

PS56#<br />

# # #<br />

#<br />

#<br />

Seyburn<br />

Dahlia<br />

Pollard<br />

PS267<br />

Rodney<br />

Quail<br />

Baird<br />

Maxine<br />

Louray<br />

Albert Hart<br />

#<br />

PS1008<br />

Laurel Lakes<br />

PS415<br />

PS329<br />

#<br />

!R<br />

PS2N_2<br />

Bella<br />

Ben Hur<br />

#<br />

PS446<br />

Hadley<br />

#<br />

#<br />

#<br />

PS261<br />

Nicholson<br />

Helm<br />

Port<br />

Mast<br />

#<br />

G S R I<br />

Ned<br />

#<br />

Seabord<br />

River<br />

PS61<br />

Gardere<br />

#<br />

#<br />

#<br />

East Baton Rouge Parish<br />

Legend<br />

Proposed<br />

Existing<br />

PS 42 Forcemain<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

CC-WWTP-FM<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 4-17<br />

0 3,250<br />

6,500<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\CENTRAL\C C-WWTP-FM_mpj120810


SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.16 CC-EAST-FM (Central Consolidated FM)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CC-EAST-FM (Central Consolidated Forcemain) project will work in conjunction with<br />

the CC-EAST-PS (Central Consolidated Pump Stations) project which includes design and<br />

construction of nine new pump stations (PS 2, PS 3, PS 4, PS 5, PS 6, PS 7, PS 10, PS 91, and<br />

Glasgow). This project includes the design and construction of a manifolded forcemain to<br />

convey flow to PS 5 from PS 2, PS 7, and PS 10. The project also includes a new individual<br />

forcemain separate from the aforementioned manifolded forcemain to convey flow from PS<br />

3 directly to PS 5. In addition, a forcemain will be constructed to convey flow from PS 5 to a<br />

new manifolded forcemain that will be constructed as part of the CC-WWTP-FM (PS 42 FM)<br />

project.<br />

The project purpose is to redirect flows within the Central Basin to the South WWTP<br />

following completion of construction of the South WWTP Wet Weather Improvements<br />

Project, Phase I, which is currently in the design phase.<br />

Location<br />

Figure 4-18 shows the location of the gravity sewer and forcemain in this project.<br />

Gravity segment 010-04925 to PS 10 begins near the intersection of Hillsdale Drive and<br />

Cottonwood Avenue, and terminates at PS 10, which is located on East Lakeshore Drive,<br />

near Dalrymple Drive.<br />

The project begins at PS 7, where the 8-inch forcemain runs east, crossing Dalrymple Drive<br />

and the City Park Golf Course (BREC). At Lakeshore Drive, the 12-inch forcemain from PS<br />

10 ties into the 8 inch forcemain and the forcemain becomes a 14-inch pipe. The line<br />

continues east along Hillsdale Drive, turns south on Ebony Avenue, and east on Baywood<br />

Avenue. The line continues along Baywood Avenue and turns south on Elissalde Street,<br />

where it crosses Interstate 10. The forcemain continues down Elissalde Street and turns east<br />

on Morning Glory Avenue. The line continues down Morning Glory Avenue, where it picks<br />

up the 16-inch forcemain from PS 2 at the intersection with Christian Street. At this junction,<br />

the line increases to 24 inches and continues down Morning Glory Avenue. The line crosses<br />

Stanford Avenue, turns north on Cloverdale Avenue, crosses Perkins Road and continues<br />

until it terminates at PS 5.<br />

Segment 2 begins at PS 3 where the 36-inch forcemain follows South Acadian Thruway to<br />

Bawell Street, turns east on Bawell Street, then south on Delta Street. The forcemain turns<br />

east on Malmaison Drive and continues until it turns north on Valley Street. The line turns<br />

east on Aldrich Drive and south on Nairn Drive, where it crosses Interstate 10 and<br />

terminates at a manhole just north of PS 5.<br />

Segment 3 begins as a 42-inch forcemain leaving PS 5 and following the railroad tracks to<br />

Balis Drive. The line follows Balis Drive and crosses Perkins Road, turns east on Poplar Street<br />

and south on Pickett to Lee High School. At Lee High School, the pipeline turns east to Lee<br />

Drive, turns south on Lee Drive and runs to the tie-in with PS 42 FM near Burbank Drive.<br />

Scope<br />

The scope of this project is shown in Table 4-10.<br />

GNV31031158548.DOCX/103440008 4-41 JANUARY 2011<br />

REV. 5


SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-10<br />

CC-EAST-FM (Central Consolidated FM ) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

010-04925 PS 10 520 10 18 Gravity sewer<br />

PS 7 PS10DS 1,900 New 8<br />

PS 10DS PS2DS 3,500 New 12 Includes 500 feet of<br />

tunneling under I-10<br />

PS 2 PS2DS 3,400 New 16<br />

PS 2DS PS3DS 1,800 New 24<br />

PS 3 PS3DS 3,500 New 36 Includes 500 feet of<br />

tunneling under I-10<br />

PS 3DS PS5US 1,800 New 42<br />

PS 5US 2N-1 13,000 New 42<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $10,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-42 JANUARY 2011<br />

REV. 5


Kansas<br />

Steele<br />

#<br />

#<br />

Grant<br />

Garfield<br />

Roosevelt<br />

Alvin Dark<br />

PS1<br />

Harding<br />

#<br />

Taft<br />

State<br />

Tower<br />

Nicholson<br />

Gourrier<br />

Bob Pettit<br />

Earl Gros<br />

Alabama<br />

Paula<br />

PS107<br />

Braddock<br />

Fig<br />

Boyd<br />

#<br />

Georgia<br />

Vicaro<br />

Jennifer Jean<br />

Nicholson<br />

PS7DS1<br />

Chimes<br />

Janet<br />

Kentucky<br />

Campus<br />

Ag Center<br />

Maryland<br />

Swire<br />

East Baton Rouge Parish<br />

Virginia<br />

Stadium<br />

Parker<br />

Fig<br />

#!R<br />

#<br />

#<br />

#<br />

PS7FM<br />

!R<br />

PS10FM<br />

July<br />

Amherst<br />

Dalrymple<br />

Etta<br />

March<br />

June<br />

PS68<br />

Burbank<br />

PS305<br />

May<br />

!R<br />

#!R<br />

!R<br />

Lakeshore<br />

L S U<br />

Delgado<br />

Lakeshore<br />

PS2FM<br />

Clara<br />

Blouin<br />

Fiero<br />

#<br />

PS10DS1<br />

Hillsdale<br />

010-04925<br />

#!R<br />

Stanford<br />

PS6<br />

Polytech<br />

Elissalde<br />

Ursuline<br />

PS2<br />

#<br />

PS8<br />

Christian<br />

PS2FM<br />

#<br />

Highland<br />

Ben Hur<br />

Carriage<br />

PS387<br />

#<br />

!R<br />

Letitia<br />

PS1014<br />

PS1013<br />

Bancroft<br />

Hollydale<br />

Forge<br />

Bourbon<br />

Barrosa<br />

Lydia<br />

Ferndale<br />

#<br />

2N-1<br />

Reymond<br />

Lee<br />

Tyrone<br />

Eugene<br />

Greenwood<br />

Cedardale<br />

Cloverdale<br />

Floyd<br />

Glendale<br />

PS120<br />

Thalia<br />

Parker<br />

Myrtledale<br />

Hood<br />

Jolly<br />

Goldenrod<br />

Mc Donald<br />

Cherrydale<br />

Ross<br />

Stephens<br />

PS3<br />

#!R<br />

Aberdeen<br />

Leeward<br />

Orpine<br />

Burgin<br />

Carl<br />

Stuart<br />

Acadian<br />

PS3FM<br />

Hood<br />

#<br />

Guava<br />

#<br />

Mimosa<br />

Palm<br />

PS70<br />

#<br />

Sunset<br />

Rubin<br />

Cypress<br />

Pickett<br />

PS1009<br />

Dubois<br />

Leeward<br />

Boone<br />

Bennett<br />

Menlo<br />

Bawell<br />

Delta<br />

PS5<br />

Richland<br />

!R #<br />

Bluebell<br />

Nelson<br />

Yazoo<br />

Tupello<br />

Orchid<br />

PS34<br />

PS82<br />

PS5FM<br />

Hyacinth<br />

Whitehaven<br />

Boone<br />

Ramsey<br />

Poplar<br />

#<br />

Glasgow<br />

Chandler<br />

#<br />

Ingleside<br />

Wells<br />

Yazoo<br />

Valley<br />

Mimosa<br />

Longwood<br />

Nairn<br />

I-10<br />

Bluebell<br />

Woodruff<br />

Woodstone<br />

Balis<br />

Country Club<br />

Wells<br />

Brame<br />

Millgate<br />

Balis<br />

Rabey<br />

Perkins<br />

#<br />

Sweetbriar<br />

Perth<br />

Silliman<br />

#<br />

PS37<br />

PS Southdowns<br />

PS245<br />

#<br />

Abelia<br />

Barber<br />

Concord<br />

Whitehaven<br />

Meadow Lea<br />

Woodchase<br />

Fieldgate<br />

Ormandy<br />

Bardwell<br />

Bazaar<br />

Pointer<br />

Congress<br />

College<br />

Corporate<br />

Bankers<br />

Legend<br />

PS50504<br />

Proposed<br />

Existing<br />

PS505FM<br />

Central Consolidated Forcemain<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

CC-EAST-FM<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 4-18<br />

0 1,600<br />

3,200<br />

Feet<br />

Trust<br />

Revere<br />

Yorktown<br />

#<br />

Pollard<br />

Hilton<br />

Seyburn<br />

Wylie<br />

#<br />

Glenmore<br />

Avondale<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\CENTRAL\CC-EAST-FM_mpj120810


SECTION 4. CENTRAL BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158548.DOCX/103440008 4-44 JANUARY 2011<br />

REV. 5


SECTION 5<br />

North Basin Projects<br />

Section 5 presents summaries of the North Gravity System Comprehensive Rehabilitation<br />

Projects, the North Gravity System Capacity Improvements, the North Forced System<br />

Rehabilitations Projects, and the North Forced Capacity Improvement Projects. These<br />

projects are shown on Figures 5-1 and 5-2. As of October 2010, there are approximately two<br />

projects functionally completed, 11 projects under construction, and eight projects under<br />

design in the North Basin.<br />

The project summaries presented herein represent the information available during this<br />

annual update period. The PDP will be revisited on an annual basis and revised as<br />

necessary based on results of additional hydraulic wastewater modeling, immediate needs,<br />

DPW and public input, and other factors.<br />

GNV31031158552.DOCX/103470004 5-1 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158552.DOCX/103470004 5-2 JANUARY 2011<br />

REV. 5


F<br />

3rd<br />

3rd<br />

6th<br />

Lupine<br />

9th<br />

15th<br />

Acadian<br />

Alba<br />

East<br />

Sunshine<br />

Waverly<br />

Whitter<br />

McHost<br />

Juban<br />

Charlton<br />

Carter<br />

Shawn<br />

Monterrey<br />

Cora<br />

Marilyn<br />

Blackwater<br />

Aletha<br />

Sharp<br />

Acres<br />

Sam<br />

Black<br />

Aubin<br />

Tinley<br />

Burrel<br />

Devall<br />

Hubbs<br />

Anderson<br />

Sullivan<br />

Reames<br />

Millerville<br />

Hunt<br />

O'Neal<br />

North Basin Rehabilitation Projects<br />

Lemon<br />

Cook<br />

Scott Barr<br />

Robinson<br />

Lemon B<br />

Port Hudson Plains<br />

Ligon<br />

Brian<br />

Shellmire<br />

Pony<br />

Munson<br />

Vernon<br />

Zachary-Slaughter<br />

Graves<br />

Jacock<br />

Port Hudson-Pride<br />

Zeb Chaney<br />

Mills<br />

Della<br />

Tucker<br />

Jackson<br />

Edwards<br />

Williams<br />

Tom Drehr<br />

Liberty<br />

McKee<br />

Flonacher<br />

Mount Pleasant Zachary<br />

Barnett<br />

Carney<br />

Job<br />

Zimmerman<br />

Old Scenic<br />

Martin<br />

Par<br />

Heck Young<br />

Fennwood<br />

Meadow Glen<br />

Newell<br />

July<br />

Faith<br />

Rollins<br />

Rita<br />

Church<br />

Wisdom<br />

Cedar<br />

Maple<br />

Old Baker Zachary<br />

39th<br />

40th<br />

Pope<br />

Shaffett<br />

David<br />

Baker<br />

Ada<br />

Scotlandville-Zachary<br />

Lee<br />

Avenue K<br />

New Weis<br />

Hillcrest<br />

Mae<br />

Old Slaughter<br />

McHugh<br />

Park<br />

Main<br />

Angus<br />

Lower Zachary<br />

Eric<br />

J Wicker<br />

Jodie<br />

Watson<br />

Buck Horn<br />

Wagner<br />

Arleen<br />

Fawn<br />

Peairs<br />

Greenwell Spg Pt Hudson<br />

Pinta<br />

Neff<br />

Joor<br />

Chaney<br />

Lavell<br />

Milldale<br />

Liberty<br />

Alphonse Forbes<br />

Samuels<br />

Springfield<br />

McCastle<br />

Dotson<br />

Edgar<br />

Barge Canal<br />

³<br />

Glynn<br />

Groom<br />

Thomas<br />

North WWTP<br />

K<br />

E<br />

I<br />

H<br />

Rehabilitation Projects<br />

Hovey<br />

Harding<br />

River<br />

Nicholson<br />

Chamberlain<br />

Swan<br />

Mengel<br />

Day<br />

New Rafe Meyer<br />

St John<br />

Merganzer<br />

Wastewater Treatment <strong>Plan</strong>t<br />

3<br />

Project Name<br />

Oak Villa Blvd. - Choctaw St.<br />

Flannery Rd. - Florida St.<br />

Scotland Ave. - Progress Rd.<br />

4th<br />

Central<br />

Chippewa<br />

Sorrel<br />

Convention<br />

France<br />

Landry<br />

Leisure<br />

Magnolia<br />

Stilt<br />

Capitol Lake<br />

Elm Grove Garden Rd. - Harding Blvd.<br />

Julia<br />

Scotland<br />

10th<br />

Main<br />

79th<br />

72nd<br />

68th<br />

Terrace<br />

§¨¦I-110<br />

Central WWTP<br />

Highland<br />

Cypress<br />

Rosenwald<br />

Mason<br />

Gsu<br />

17th<br />

Gayosa<br />

Scenic<br />

Fuqua<br />

18th<br />

D<br />

Fairchild<br />

13th<br />

Brookstown Rd. - Evangeline St. PHASE 1<br />

Brookstown Rd. - Evangeline St. PHASE 2<br />

Silverleaf Rd. - Ford St.<br />

Interstate 110 - Hollywood St.<br />

North Basin<br />

Texas<br />

June<br />

Polk<br />

Epperson<br />

Gibbens<br />

Palmyra<br />

Pryce<br />

Wilbur<br />

77th<br />

22nd<br />

23rd<br />

Gore<br />

North<br />

Baker<br />

Jefferson<br />

Dayton<br />

Ozark<br />

Gibbens<br />

Blount<br />

Sycamore<br />

28th<br />

Shelley<br />

Myrtle<br />

Broussard<br />

Lakeshore<br />

Wimbish<br />

Hollywood<br />

Iberia<br />

Farrar<br />

Olive<br />

Daniels<br />

Winnebago<br />

Madison<br />

21st<br />

Myrtle<br />

Lavey<br />

Progress<br />

Erie<br />

29th<br />

Edwin<br />

Eugene<br />

Lavey<br />

31st<br />

Ferndale<br />

Ashland<br />

Husband<br />

Algoa<br />

Mohican<br />

Winbourne<br />

Brady<br />

Parker<br />

36th<br />

38th<br />

Sinbad<br />

Chuck Yeager<br />

Greenwell<br />

Kernan<br />

Middlewood<br />

Scott<br />

Cannon<br />

Choctaw<br />

Perkins<br />

<strong>Plan</strong>k<br />

Ford<br />

Glen Oaks<br />

Greenwell<br />

Evangeline<br />

Fairfields<br />

Steele<br />

44th<br />

Clark<br />

Beech<br />

Sherwood<br />

Leo<br />

Eaton<br />

Ingleside<br />

Bawell<br />

Dutton<br />

Frey<br />

49th<br />

Bentley<br />

Peerless<br />

Charles<br />

Foster<br />

College<br />

Rolling Acres<br />

Elm<br />

Ellen<br />

Osborne<br />

Adams<br />

Myrtle<br />

Greenwell Springs<br />

Ardenwood<br />

Government<br />

Clay Cut<br />

Brookstown<br />

§¨¦I-10<br />

Comite<br />

Celia<br />

St Ann<br />

Corlett<br />

San Juan<br />

Bank<br />

Westdale<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG5-1_PDP2010.MXD SGELPI 11/15/2010 12:26:12<br />

Moon<br />

Arena<br />

Chemin<br />

Hollier<br />

Beck<br />

Troy<br />

Chipley<br />

Holden<br />

Hope<br />

White<br />

Furr<br />

Stoneview<br />

Guynell<br />

Maplewood<br />

Ruby<br />

Kent<br />

Silverleaf<br />

Sumrall<br />

Rio<br />

Callahan<br />

Ruston<br />

Jupiter<br />

Hanks<br />

Renoir<br />

Harry<br />

Donmoor<br />

Prescott<br />

Lobdell<br />

Hall<br />

North Ridge<br />

Landis<br />

Airline<br />

Pettit<br />

Lanier<br />

Wooddale<br />

Tom<br />

Goodwood<br />

Sevenoaks<br />

Lasalle<br />

Murphy<br />

Flag<br />

Baja<br />

Corporate<br />

Boyce<br />

Dalark<br />

Richards<br />

Cline<br />

Price<br />

Breeden<br />

Wright<br />

Reco<br />

Rienzi<br />

Meadow<br />

Phebus<br />

Ocean<br />

Waters Edge<br />

Anderson<br />

Foster<br />

Watts<br />

Cody<br />

Oak View<br />

Paris<br />

Airway<br />

Airport<br />

Brown<br />

Mickens<br />

Colonial<br />

Bliss<br />

Cortana<br />

Brentwood<br />

Joyce<br />

Vail<br />

Loudon<br />

Tara<br />

Fairway<br />

Woodcrest<br />

Ardoon<br />

Oak Villa<br />

Airline<br />

Wartelle<br />

Drusilla<br />

Dyer<br />

Shady Bluff<br />

Tracy<br />

Choctaw<br />

Riveroaks<br />

Carmel<br />

El Scott<br />

Dancy<br />

Crescent<br />

Carney<br />

Ventura<br />

Vega<br />

Mollylea<br />

Interline<br />

Smith<br />

Judi<br />

Old Settlement<br />

Tallowwood<br />

Beta<br />

Elain<br />

Ida<br />

Darryl<br />

Tams<br />

Red Oak<br />

Parkview<br />

Kenlee<br />

0 1 2 4<br />

Oak Forest<br />

Capri<br />

Daradele<br />

Tudor<br />

Bramble<br />

Cook<br />

Lovett<br />

Lassen<br />

Sherwood Forest<br />

Dual<br />

Core<br />

Gurney<br />

Landfair<br />

Hillmont<br />

Rondo<br />

Sherry<br />

Browning<br />

Brillock<br />

Mc Gehee<br />

Joor<br />

McCullough<br />

Tinley<br />

Bellfort<br />

Pecos<br />

Toulon<br />

Sarasota<br />

Little John<br />

Monticello<br />

Archery<br />

Sylvan<br />

Shoe Creek<br />

Frontier<br />

Lariat<br />

Richcroft<br />

Dabney<br />

Baylor<br />

Triple B<br />

Erin<br />

Catalina<br />

Warfield<br />

Shay<br />

Elva<br />

Cherryl<br />

Flannery<br />

Arlingford<br />

Millburn<br />

Warwick<br />

Newcastle<br />

Oak Berry<br />

Dorset<br />

Britain<br />

La Margie<br />

Justice<br />

Parnell<br />

Woodcliff<br />

Elwick<br />

Woodland Ridge<br />

Hubbs Acres<br />

Hooper<br />

Florida<br />

Fairview<br />

Pinewood<br />

Forest View<br />

Huntley<br />

Roundsaville<br />

Kohler<br />

Sage<br />

Brent<br />

Trey<br />

Mapleton<br />

Sunnyhill<br />

Holt<br />

Ponderosa<br />

Glenn<br />

Russett<br />

Denham<br />

Beaver<br />

Silverthorn<br />

Damon<br />

Breton<br />

Crystal<br />

Libra<br />

Brookside<br />

Firewood<br />

Shetland<br />

Paint<br />

Wax<br />

Chanove<br />

Stevendale<br />

Old Hammond<br />

Jester<br />

Alford<br />

Boreas<br />

Terrell<br />

Chaumont<br />

Stonewood<br />

El Ranchitos<br />

Pernecia<br />

Droze<br />

Hill<br />

Fir<br />

Magnolia Bridge<br />

Donnybrook<br />

Woodvale<br />

Norway Pine<br />

Four Oaks<br />

Hewwood<br />

J L Fairchild<br />

Thibodeaux<br />

Hamilton<br />

Frenchtown<br />

Strain<br />

Centurion<br />

Bristoe<br />

Ellis<br />

Durmast<br />

Blouin<br />

§¨¦I-12<br />

Hoyt<br />

Ashford<br />

Ronson<br />

Will<br />

Magnolia Bend<br />

Landmor<br />

Riverview<br />

Deer Lake<br />

Cicero<br />

Ednie<br />

Beachview<br />

Keystone<br />

Morgan<br />

<strong>Plan</strong>chet<br />

Harrells Ferry<br />

Miles Figure 5-1


F<br />

3rd<br />

3rd<br />

Lupine<br />

Truth<br />

Alba<br />

East<br />

Sunshine<br />

Elm<br />

Waverly<br />

Whitter<br />

McHost<br />

Juban<br />

Cora<br />

Marilyn<br />

Blackwater<br />

Aletha<br />

Sharp<br />

Bea<br />

Acres<br />

Sam<br />

Black<br />

Aubin<br />

Little John<br />

Burrel<br />

Devall<br />

Hubbs<br />

Anderson<br />

Sullivan<br />

Reames<br />

Millerville<br />

Hunt<br />

O'Neal<br />

North Basin Capacity Improvement Projects<br />

Lemon<br />

Cook<br />

Scott Barr<br />

Robinson<br />

Lemon B<br />

Portwood<br />

Sunnyside<br />

Port Hudson Plains<br />

Ligon<br />

Brian<br />

Shellmire<br />

Pony<br />

Munson<br />

Vernon<br />

Zachary-Slaughter<br />

Graves<br />

Jacock<br />

Port Hudson-Pride<br />

Zeb Chaney<br />

Mills<br />

Della<br />

Tucker<br />

Jackson<br />

Edwards<br />

Williams<br />

Tom Drehr<br />

Liberty<br />

Chaney<br />

Irene<br />

Barnett<br />

McKee<br />

Old Scenic<br />

Red Mud Lakes 20 MG<br />

Samuels<br />

Flonacher<br />

Mount Pleasant Zachary<br />

Irene<br />

Barnett<br />

Carney<br />

Springfield<br />

Zimmerman<br />

McCastle<br />

Dotson<br />

Scenic<br />

Heck Young<br />

River<br />

Groom<br />

Glynn<br />

Thomas<br />

Elmer<br />

K<br />

E<br />

Tee<br />

Woodpecker<br />

I<br />

H<br />

Blount<br />

Harding<br />

Mengel<br />

Nicholson<br />

Hovey<br />

Swan<br />

6th<br />

Day<br />

New Rafe Meyer<br />

Lafayette<br />

Martin<br />

Fennwood<br />

Merganzer<br />

Newell<br />

Lake Pointe<br />

Meadow Glen<br />

Hillcrest<br />

Magnolia<br />

St John<br />

³<br />

Capacity Improvement Project<br />

Waste Water Treatment <strong>Plan</strong>t<br />

¬<br />

")<br />

New Storage Facilities<br />

PDP Projects<br />

WWTP<br />

- North Basin<br />

Force Main<br />

Gravity Main<br />

PDP PS Projects<br />

#*<br />

Project Area<br />

Existing Force Main<br />

#*<br />

Existing Gravity Main<br />

Existing Pump Stations<br />

St Philip<br />

Stadium<br />

Emma<br />

Royal<br />

4th<br />

Alaska<br />

Rollins<br />

Central<br />

Stilt<br />

Sorrel<br />

9th<br />

Church<br />

Main<br />

72nd<br />

Convention<br />

North<br />

10th<br />

July<br />

Julia<br />

Rita<br />

Faith<br />

Landry<br />

Scotland<br />

Progress<br />

Rosenwald<br />

13th<br />

Highland<br />

Gsu<br />

39th<br />

79th<br />

68th<br />

22nd<br />

Gore<br />

77th<br />

§¨¦I-110<br />

Chippewa<br />

Terrace<br />

Dalrymple<br />

Tower<br />

Cedar<br />

Twin Oaks<br />

Texas<br />

Snipe<br />

11th<br />

Pimpernel<br />

Mason<br />

17th<br />

Gayosa<br />

Pope<br />

Beech<br />

Fuqua<br />

18th<br />

South<br />

Maple<br />

Old Baker Zachary<br />

Allen<br />

Epperson<br />

D<br />

Wilbur<br />

Washington<br />

Polk<br />

40th<br />

Baker<br />

Palmyra<br />

Pryce<br />

Scotlandville-Zachary<br />

23rd<br />

Lee<br />

Stanford<br />

Baker<br />

Jefferson<br />

Dayton<br />

Ozark<br />

Olive<br />

Wimbish<br />

Daniels<br />

Gibbens<br />

Hollywood<br />

Sycamore<br />

28th<br />

Shelley<br />

Winnebago<br />

Madison<br />

Oleander<br />

May<br />

Lavey<br />

Gibbens<br />

Progress<br />

Erie<br />

29th<br />

Edwin<br />

Ada<br />

Acadian<br />

Myrtle<br />

Broussard<br />

Fiero<br />

Avenue K<br />

31st<br />

Mohican<br />

38th<br />

McHugh<br />

Winbourne<br />

Brady<br />

Fairfields<br />

Parker<br />

36th<br />

Sinbad<br />

Steele<br />

Paige<br />

<strong>Plan</strong>k<br />

Greenwell<br />

Foster<br />

Ford<br />

Glen Oaks<br />

Evangeline<br />

44th<br />

Comite<br />

Hooper Storage Tank Facility 10 MG<br />

Greenwell Springs<br />

Government<br />

Clay Cut<br />

Dyer<br />

Goodwood<br />

§¨¦I-10<br />

0 1.25 2.5 5<br />

Hood<br />

Mae<br />

New Weis<br />

Ovid<br />

Ashland<br />

Husband<br />

Lavey<br />

Algoa<br />

Glendale<br />

Wedgewood<br />

Devall<br />

Ronnie<br />

Old Slaughter<br />

Scott<br />

Stuart<br />

Clark<br />

Chuck Yeager<br />

Choctaw<br />

Lee<br />

Arena<br />

Crown<br />

Sherwood<br />

Leo<br />

Eaton<br />

Ingleside<br />

Bawell<br />

Dutton<br />

Palm<br />

Chemin<br />

Hollier<br />

North<br />

Orchid<br />

Chipley<br />

College<br />

Bentley<br />

Frey<br />

Rolling Acres<br />

Ellen<br />

Adams<br />

Ormandy<br />

Park<br />

Myrtle<br />

Hope<br />

Brookstown<br />

Ardenwood<br />

Perkins<br />

Lower Zachary<br />

Celia<br />

St Ann<br />

Kent<br />

Stoneview<br />

San Juan<br />

Maplewood<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG5-2_PDP2010.MXD SGELPI 11/15/2010 14:58:04<br />

Troy<br />

Furr<br />

Bank<br />

Ruby<br />

Silverleaf<br />

Sumrall<br />

Rio<br />

Callahan<br />

Hanks<br />

Renoir<br />

Harry<br />

Donmoor<br />

Main<br />

Angus<br />

Ruston<br />

Jupiter<br />

Charlton<br />

Foster<br />

Prescott<br />

Victoria<br />

Lobdell<br />

Pettit<br />

Lanier<br />

Wooddale<br />

Sevenoaks<br />

Corporate<br />

Burden<br />

Hall<br />

North Ridge<br />

Landis<br />

Baja<br />

Boyce<br />

Dalark<br />

Richards<br />

Cline<br />

Price<br />

Wright<br />

Tom<br />

J Wicker<br />

Meadow<br />

Phebus<br />

Annabelle<br />

Murphy<br />

Flag<br />

Ocean<br />

Waters Edge<br />

Anderson<br />

Cody<br />

Oak View<br />

Reco<br />

Rienzi<br />

Lasalle<br />

Sholar<br />

Airway<br />

Lils<br />

Essen<br />

Brown<br />

Mickens<br />

Peairs<br />

Choctaw Storage Tank Facility 26 GM<br />

Airport<br />

Cortana<br />

Brentwood<br />

Cypress<br />

Choctaw<br />

Oak Villa<br />

Tara<br />

Fairway<br />

Watson<br />

Vail<br />

Loudon<br />

Monhegan<br />

Riveroaks<br />

Wartelle<br />

Buck Horn<br />

Carney<br />

Shady Bluff<br />

Monterrey<br />

Drusilla<br />

Airline<br />

Fleet<br />

Arleen<br />

Carmel<br />

El Scott<br />

Dancy<br />

Tracy<br />

Redbud<br />

Mollylea<br />

Interline<br />

Fawn<br />

Ventura<br />

Old Settlement<br />

Lonita<br />

Woodhaven<br />

Tallowwood<br />

Elain<br />

Darryl<br />

Daradele<br />

Allyson<br />

Tams<br />

Tudor<br />

Cedarcrest<br />

Ida<br />

Greenwell Spg Pt Hudson<br />

Cook<br />

Lassen<br />

Red Oak<br />

Core<br />

Gurney<br />

Landfair<br />

Hillmont<br />

Voorhies<br />

Joor<br />

McCullough<br />

Tinley<br />

Toulon<br />

Alco<br />

Explorer<br />

Neff<br />

Pecos<br />

Collins<br />

Major Oaks<br />

Muriel<br />

Cherryhill<br />

Stan<br />

Sylvan<br />

Shoe Creek<br />

Lovett<br />

Frontier<br />

Lariat<br />

Coral<br />

Dabney<br />

Baylor<br />

Joor<br />

Triple B<br />

Erin<br />

Catalina<br />

Warfield<br />

Shay<br />

Archery<br />

Millburn<br />

Warwick<br />

Justice<br />

Elva<br />

Cherryl<br />

Woodcliff<br />

Elwick<br />

Woodland Ridge<br />

Newcastle<br />

Oak Berry<br />

Dorset<br />

Langer<br />

Britain<br />

Hooper<br />

Flannery<br />

Coursey<br />

Wyndy<br />

Hubbs Acres<br />

Pinewood<br />

Forest View<br />

Huntley<br />

Florida<br />

Dena Lynn<br />

Roundsaville<br />

Kohler<br />

Holt<br />

Sage<br />

Brent<br />

Trey<br />

Mapleton<br />

Ponderosa<br />

Buckley<br />

Glenn<br />

Russett<br />

Denham<br />

Beaver<br />

Bywood<br />

Breton<br />

Firewood<br />

Sessions<br />

Crystal<br />

Brookside<br />

Shetland<br />

Paint<br />

Wax<br />

Chanove<br />

Frenchtown<br />

Stevendale<br />

Old Hammond<br />

Jester<br />

Jones Creek<br />

Aspenwood<br />

Alford<br />

Boreas<br />

Terrell<br />

El Ranchitos<br />

Chivre<br />

Choctaw<br />

Geraldine<br />

Pernecia<br />

Droze<br />

Fir<br />

Roble<br />

Magnolia Bridge<br />

Donnybrook<br />

Four Oaks<br />

Hamilton<br />

Black<br />

Thibodeaux<br />

Strain<br />

Bristoe<br />

Ellis<br />

George Oneal<br />

Lavell<br />

Lawnside<br />

Morgan<br />

Blouin<br />

Riverview<br />

Centurion<br />

§¨¦I-12<br />

Hoyt<br />

Milldale<br />

Ashford<br />

Deer Lake<br />

Will<br />

Gottlieb<br />

Cicero<br />

Liberty<br />

Landmor<br />

<strong>Plan</strong>chet<br />

Harrells Ferry<br />

Monitor<br />

Jon Michelle<br />

Beachview<br />

Miles Figure 5-2


SECTION 5. NORTH BASIN PROJECTS<br />

5.1 North Gravity System Comprehensive Rehabilitation<br />

Projects<br />

5.1.1 NGS-R-0001 and NGS-R-0002<br />

Project Description<br />

The comprehensive sewer rehabilitation projects consist of improvements to various<br />

components of the sewer collection system to reduce the amount of rainwater and<br />

groundwater that leak into the system.<br />

Purpose<br />

The purpose of the comprehensive sewer rehabilitation projects is to correct defects in the<br />

system such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct<br />

inflow sources. The water that enters the system through the defects is a major contributor<br />

to SSOs. Comprehensive rehabilitation of the collection system will alleviate SSOs.<br />

Location<br />

There are two projects located within the North Gravity Basin. The attached maps show the<br />

project locations in Figures 5-3 to 5-4 in Figures 5-3 to 5-4.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including CCTV inspection. Smoke testing may also included in the<br />

physical inspection phase. The data collected by the physical inspection contractor will be<br />

analyzed. Based on that analysis, a listing of recommended repairs with associated<br />

construction costs will be generated. An engineering firm will then complete detailed design<br />

and preparation of construction documents for project bidding. The construction of<br />

rehabilitation projects will typically include the following components:<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place pipe liners<br />

Rehabilitation or replacement of manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction costs for each project are presented in Table 5-1. The cost for NGS-<br />

R-0001 is based on a preliminary estimate of the amounts of each component of the system<br />

that will require repair or replacement. During the physical inspection phase, the actual<br />

condition of the components will be assessed and appropriate methods recommended. At that<br />

time, the cost estimate for each project will be revised. Since both of these projects have<br />

already bid for construction, the construction costs in Table 5-1 are the bid amounts.<br />

TABLE 5-1<br />

Estimated Construction Costs for the North Gravity System Comprehensive Rehabilitation Projects<br />

Construction<br />

Project Description<br />

Cost<br />

NGS-R-0001 –Elm Grove Garden<br />

Road-Harding Boulevard<br />

NGS-R-0002 –Scotland Avenue-<br />

Progress Road<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />

Scheduled Design Scheduled Construction<br />

Appropriation Year Appropriation Year<br />

Status<br />

$12,989,000 2009* 2009* Construction<br />

On-Going<br />

$9,208,000 2009* 2009* Construction<br />

On-Going<br />

GNV31031158552.DOCX/103470004 5-7 JANUARY 2011<br />

REV. 5


Chinn<br />

Helene<br />

Sussex<br />

Golden<br />

Muse<br />

Elmer<br />

Egret<br />

Flicker<br />

Mills<br />

Avocet<br />

Bittern<br />

Merganzer<br />

Airline<br />

Tallow<br />

Almond<br />

Livestock<br />

Mengel<br />

Bowman<br />

Blount<br />

Kitty<br />

Bayberry<br />

Kingfisher<br />

Balsam<br />

Mayhaw<br />

Silverwood<br />

Marsh<br />

Lee<br />

Southern<br />

Lewis<br />

Booker<br />

East Baton Rouge Parish<br />

Scotland<br />

Oriole<br />

Zerlee<br />

Central<br />

King<br />

Wall<br />

Jordan<br />

Cardinal<br />

Teal<br />

Tern<br />

Stilt<br />

Scenic<br />

Monte Sano<br />

Snipe<br />

Stanicola<br />

Killdeer<br />

Success<br />

Robin<br />

Swan<br />

Sora<br />

Fairchild<br />

Helene<br />

Sanchez<br />

Thelma<br />

Legend<br />

Curtis<br />

Burt<br />

Kaufman<br />

Rosenwald<br />

Somerset<br />

Sara<br />

Snipe<br />

Goudchaux<br />

Rawlins<br />

Progress<br />

74th<br />

78th<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NGS-R-0001.MXD SGELPI 11/9/2010 09:54:13<br />

Somerset<br />

Somerset<br />

73rd<br />

Elm Grove Garden<br />

77th<br />

Goode<br />

71st<br />

79th<br />

69th<br />

Goudchaux<br />

Midland<br />

Jenkins<br />

Jones<br />

Bacon<br />

Elm Grove<br />

Sharon<br />

Alamoster<br />

Pembroke<br />

Kaufman<br />

Pryce<br />

Crockett<br />

D<br />

Mason<br />

Greenwell<br />

Iberia<br />

Area Designated for<br />

Physical Inspection<br />

Heath<br />

Pembroke<br />

Pembroke<br />

Barksdale<br />

Plover<br />

Wilbur<br />

Tanner<br />

75th<br />

68th<br />

Casper<br />

Amarillo<br />

Riley<br />

Beech<br />

0 1,300 2,600 Feet<br />

Kennedy<br />

Middlesex<br />

Baton Rouge<br />

Lark<br />

Badley<br />

73rd<br />

70th<br />

Shada<br />

Veterans Memorial<br />

Hollywood<br />

Breckenridge<br />

Progress<br />

Varsity<br />

Wren<br />

Jay<br />

Nottingham<br />

qNottingham<br />

Dorrie Miller<br />

B<br />

Rosenwald<br />

74th<br />

Bourgeois<br />

Saurage<br />

Emile<br />

Iris<br />

Kerr<br />

Edwin<br />

Alexander<br />

Emile<br />

Cambridge<br />

General Chennault<br />

Douglas<br />

Village<br />

Liberty<br />

Harriet Quimby<br />

Sally Ride<br />

Louis Wiles<br />

Fritz Maizer<br />

J D Hair Sr<br />

Village<br />

I-110<br />

Longfellow<br />

Jackie Cochran<br />

Greenwell<br />

Beech<br />

Yancy<br />

Gibbens<br />

Monte Sano<br />

I- 110 Serice<br />

Henagen<br />

Henderson<br />

Riley<br />

Kelvin<br />

Lorraine<br />

Ridgecrest<br />

Smiley<br />

Harding<br />

72nd<br />

Beech<br />

Chuck Yeager<br />

T B Hearndon<br />

Mason<br />

Harriet<br />

St Dorothy<br />

Cannon<br />

Dawson<br />

Denham<br />

Greenwell<br />

Quivera<br />

Beachwood<br />

Lemonwood<br />

Dutton<br />

Cadillac<br />

Peerless<br />

St Katherine<br />

Lorraine<br />

Sycamore<br />

Hollier<br />

Ford<br />

Monarch<br />

Glen Oaks<br />

Beechwood<br />

Blount<br />

St Gerard<br />

Velie<br />

<strong>Plan</strong>k<br />

Blanche Noyes<br />

Beechwood<br />

Robique<br />

Martin<br />

Hooper<br />

Stearns<br />

Paige<br />

Crown<br />

Sumrall<br />

Oaklan<br />

Robertson<br />

Vida<br />

Hollywood<br />

Elm Grove Rd. - Harding Blvd.<br />

NGS-R-0001<br />

Project Vicinity Map<br />

Figure 5-3<br />

Foster<br />

Onter<br />

Winchester<br />

Stutz<br />

Lancaster


F<br />

E<br />

Chinn<br />

Helene<br />

Goode<br />

Palmyra<br />

Sussex<br />

Golden<br />

Gibbens<br />

Amerest<br />

Ronaldson<br />

Avenue M<br />

Avenue K<br />

Sapsucker<br />

Bon Crest<br />

Lakecrest<br />

Rivercrest<br />

Hillcrest<br />

Avenue I<br />

Woodcock<br />

Woodpecker<br />

Elmer<br />

Mills Mills<br />

College<br />

Avenue G<br />

I<br />

Avenue E<br />

Avenue F<br />

K<br />

Swan<br />

D<br />

C Harrison<br />

St John<br />

Dillard<br />

Scenic<br />

Avenue C<br />

F<br />

Coot<br />

H<br />

Farm<br />

Avenue A<br />

St Irma Lee<br />

Bertha<br />

Dove<br />

Catherine<br />

Almond<br />

Williams<br />

Merganzer<br />

Harding<br />

Pintail<br />

Leisure<br />

Bayberry<br />

Kingfisher<br />

Balsam<br />

Mayhaw<br />

Almond<br />

Lewis<br />

Lee<br />

Rail<br />

Southern<br />

Oriole<br />

Teal<br />

Zerlee<br />

Central<br />

Stilt<br />

Sora<br />

Tern<br />

King<br />

Fairchild<br />

Robin<br />

Swan<br />

79th<br />

Scotland<br />

Stanicola<br />

Killdeer<br />

Success<br />

Allendale<br />

Thelma<br />

Curtis<br />

78th<br />

Thomas<br />

Bradfield<br />

Sparta<br />

Cunard<br />

Gore<br />

Progress<br />

Progress<br />

Rosenwald<br />

Sara<br />

Snipe<br />

Somerset<br />

Jones<br />

Brock<br />

Elm Grove Garden<br />

77th<br />

<strong>Plan</strong>tation<br />

Elm Grove Sharon<br />

Candace<br />

Pryce<br />

Leonidas<br />

Crockett<br />

Heath<br />

Desoto<br />

1st<br />

Kennedy<br />

Key<br />

Wilbur<br />

Hallmark<br />

Queens<br />

Dorrie Miller<br />

Varsity<br />

I-110<br />

Badley<br />

75th<br />

Blount<br />

Veterans Memorial<br />

B<br />

Plover<br />

Fairchild<br />

Turnley<br />

Kingston<br />

Layton<br />

Emile<br />

Jolson<br />

Kingston<br />

General Chennault<br />

Liberty<br />

Yancy<br />

Jackie Cochran<br />

Gibbens<br />

Sachet<br />

Hickory Wood<br />

Ashworth<br />

Devall<br />

Middlewood<br />

Wedgewood<br />

Chuck Yeager<br />

T B Hearndon<br />

Engleswood<br />

Clark<br />

<strong>Plan</strong>k<br />

Pembroke<br />

Hunt<br />

East Baton Rouge Parish<br />

Legend<br />

Mengel<br />

Monte Sano<br />

Area Designated for<br />

Physical Inspection<br />

0 1,500 3,000 Feet<br />

74th<br />

Kaufman<br />

Laramie<br />

q<br />

71st<br />

69th<br />

73rd<br />

Goudchaux<br />

Pembroke<br />

68th<br />

73rd<br />

70th<br />

Nottingham<br />

Cambridge<br />

Monte Sano<br />

I- 110 Serice<br />

72nd<br />

Mason<br />

Oaklan<br />

Airline<br />

Crown<br />

Sumrall<br />

Scotland Ave. - Progress Rd.<br />

NGS-R-0002<br />

Project Vicinity Map<br />

Figure 5-4<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NGS-R-0002.MXD SGELPI 11/9/2010 09:58:58


SECTION 5. NORTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158552.DOCX/103470004 5-10 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

5.2 North Gravity System Capacity Improvements Projects<br />

5.2.1 NGS-C-0001 (Progress Road – Baton Rouge Metro Airport)<br />

Project Description<br />

Purpose of the Project / Background Information<br />

This project has been deleted and consolidated with Group Project 1A and Group Project 1B,<br />

which are described in the North Forced System section.<br />

5.2.2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The purpose of the NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) is to<br />

upsize gravity sewers upstream of PS 45, PS 127, PS 44, and PS 244 as well as forcemains<br />

exiting PS 38, PS 244, and PS 63, which will alleviate chronic SSOs in the gravity system.<br />

Location<br />

The locations of the gravity sewers and forcemains in this project are shown in Figure 5-5.<br />

Gravity segment 045-00039 to 045-00026 begins on Kleinpeter Road between its intersections<br />

with St. Peter Avenue and St. Claude Avenue and travels west along Kleinpeter Road to<br />

045-00026, located near the intersection of Newsom Drive and Kleinpeter Road.<br />

Gravity segment 045-00026 to PS 45 begins near the intersection of Newsom Drive and<br />

Kleinpeter Road and travels west along Kleinpeter Road to its intersection with Nimitz<br />

Street. The segment then turns south and follows Nimitz Street to its intersection with Clark<br />

Street. The segment then turns west and follows Clark Street to PS 45, which is near the<br />

intersection of Clark Street and Granberry Drive.<br />

Gravity segment 045-00043 to 045-00020 begins at manhole 045-00043, located near the<br />

intersection of <strong>Plan</strong>k Road and Brownfields Drive, and follows <strong>Plan</strong>k Road southwest to<br />

manhole 045-00020, located near the intersection of <strong>Plan</strong>k Road and Kleinpeter Road.<br />

Gravity segment (044-00338 to 044-00156 and 044-00325 to 044-00156) starts at 044-00338 ,<br />

located north of the intersection of 78 th Avenue and Pembroke Street, and connects west to<br />

the existing 36-inch sewer line on Pembroke street (between manholes 044-00277 and 044-<br />

00276). The next connection is located north of the intersection of 79 th Avenue and Pembroke<br />

Street. The connection starts at manhole 044-00274 and connects west to the existing 36-inch<br />

sewer line on Pembroke (between manholes 044-00276 and 044-00156). The third connection<br />

is at the intersection of Pembroke Street and Harding Boulevard at manhole 044-00328 and<br />

connects between manholes 044-00273 and 044-00156. On Harding Boulevard, the segment<br />

begins at manhole 044-00325, located at the intersection of Nottingham Street and Harding<br />

Boulevard, where it then follows Harding Boulevard west to manhole 044-00156, located<br />

near the intersection of Harding Boulevard and Pembroke Street.<br />

Gravity segment 244-00029 to 244-00004 begins at manhole 244-00029, located near the<br />

intersection of Brig. Gen. Isaac Smith and Veterans Memorial Boulevard and follows Brig.<br />

Gen. Isaac Smith (turns into Louis Wiles Ave.) east to General Chennault Drive. The<br />

segment then runs south, along General Chennault Drive to manhole 244-00002. The<br />

Segment then turns east and terminates in PS 244 located on General Chennault drive.<br />

GNV31031158552.DOCX/103470004 5-11 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

Gravity segment 080-00011 to PS 80 begins at Manhole 080-00011, which is located in a<br />

drainage path north of Kleinpeter Road between its intersections with St. Peter Avenue and<br />

St. Claude Avenue. The segment travels south to PS 80, which is on Kleinpeter Avenue.<br />

Forcemain segment PS 38 to PS 38DS runs from PS 38, located at the south end of Constance<br />

Street, in an easterly direction through a servitude that parallels Desoto Drive to manhole PS<br />

38DS, located near the intersection of Rebecca Lynn Avenue and Hallmark Drive.<br />

Forcemain segment PS 244FM to PS 244DS begins at PS 244, located on General Chennault<br />

Drive, near the Baton Rouge Metropolitan Airport, and follows General Chennault Drive<br />

south for approximately 1,195 feet. At this location, the forcemain turns west and runs<br />

through an open field, crosses Veterans Memorial Blvd, and continues west through an open<br />

field to Edwin Street. The force main runs south on Edwin Street until it is just south of North<br />

Lark street where it runs west underneath I-110 and continues west midway between North<br />

Lark Street and Lark Street crossing Wilbur street. At the end of Lark street the force main<br />

turns south and crosses Scotlandville Lateral and continues along the south side of<br />

Scotlandville lateral in a northwest direction until the west side of the Chevron gas pipeline<br />

ROW. At the west side of the gas pipeline ROW the force main runs south for approximately<br />

434 ft. The force main then turns west and terminates at manhole 044-00118, located near the<br />

intersection of Jones Street and Robin Drive.<br />

Forcemain segment PS 63FM to PS 63DS starts at PS 63, located on Georgia Street, in between<br />

Groom Road and Harding Street, and runs south along Georgia Street for approximately 115<br />

feet to its termination point at manhole PS 63DS.<br />

Scope<br />

This project includes approximately 9,400 feet of 12-inch, 24-inch, 27-inch, 30-inch, and 42-<br />

inch gravity sewer upstream of PS 45, approximately 2,600 feet of 12-inch, 15-inch, and 21-<br />

inch gravity sewer upstream of PS 127, approximately 2,300 feet of 12-inch, 18-inch, and 24-<br />

inch gravity sewer upstream of PS 44, approximately 1,500 feet of 12-inch, and 15-inch<br />

gravity sewer upstream of PS 244, and approximately 330 feet of 15-inch gravity sewer<br />

upstream of PS 80. This project also includes replacement of forcemains from PS 38, PS 244,<br />

and PS 63. Table 5-2 shows the detailed scope of this project.<br />

TABLE 5-2<br />

NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

045-00039 045-0026 3,160 12 24<br />

045-00026 045-00020 840 12 & 18 24<br />

045-00020 045-00007 2,600 18 27<br />

045-00007 045-00001 1,500 18 30<br />

045-00001 PS 45 65 18 42<br />

045-00043 045-00020 1,200 8 12<br />

PS38DS 127-00020 100 8 12<br />

127-00020 127-00015A 970 8 & 12 15<br />

GNV31031158552.DOCX/103470004 5-12 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-2<br />

NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

127-00015A PS 127 1,500 12 21<br />

044-00342 044-00274 560 8 12<br />

044-00274 044-00325 1,070 10 18<br />

044-00325 044-00323 340 18 24<br />

044-00323 044-00322 320 18 24<br />

244-00029 244-00006 1,260 10 12<br />

244-00006 244-00004 265 10 15<br />

080-00011 PS 80 330 8 15<br />

PS 38 PS38DS 1,700 6 8 Forcemain<br />

PS244FM PS244DS 5,570 8 12 Forcemain<br />

PS63FM PS63DS 115 18 24 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $7,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-13 JANUARY 2011<br />

REV. 5


See Inset


SECTION 5. NORTH BASIN PROJECTS<br />

5.2.3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) Project includes the<br />

replacement of PS 127, PS 129, PS 38, PS 63, PS 64, PS 244, PS 44, PS 75, and PS 80. This<br />

project is the combination of NGS-C-0003 (Multiple PS – <strong>Plan</strong>k Road – Thomas Road) and<br />

NGS-C-0004 (Multiple PS-<strong>Plan</strong>k Road-Harding Boulevard) from the October 2008 PDP. The<br />

combined project has been designated NGS-C-0003 (<strong>Plan</strong>k Road Pump Station<br />

Improvements) project and is described in this section.<br />

The pump station replacements will work in conjunction with the forcemain and gravity<br />

sewer upgrades in the North Gravity Basin projects to alleviate chronic SSOs at the pump<br />

stations and in the gravity basins upstream of the pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

modeling predicts will equal or exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations are given in Table 5-3 and in Figure 5-6.<br />

Scope<br />

This project includes the replacement of the nine pump stations shown in Table 5-3.<br />

TABLE 5-3<br />

NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

Future Peak Wet<br />

Weather Flow<br />

Dry<br />

Weather<br />

PS No.<br />

Location<br />

(GPM) (GPM) (GPM)<br />

PS 127 Gibbens Road, near intersection of Gore Road 1,805 1,805 308<br />

PS 129<br />

Near the intersection of Wynell Drive and Lebrent<br />

Avenue<br />

417 417 68<br />

PS 38 Desoto Drive, near Clifford Seymour Senior Park 1,389 1,389 186<br />

PS 63 Near the intersection of Groom Road and Georgia 7,152 12,492 2,586<br />

Street<br />

PS 64 Near the intersection of Cypress Street and South 1,319 1,640 567<br />

Street<br />

PS 244 Near the intersection of Captain Ryan Drive and 972 3,865 181<br />

General Chennault Drive<br />

PS 44 Near the intersection of Oriole Street and Thelma 11,180 11,180 1,558<br />

Street<br />

PS 75 Near the intersection of 72nd Avenue and<br />

278 278 49<br />

Yorkshire Street<br />

PS 80 Near the intersection of St. Peter Avenue and<br />

Kleinpeter Road<br />

417 694 0<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flows were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9, 300,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation year is 2012.<br />

Design and Construction has Not Started.<br />

GNV31031158552.DOCX/103470004 5-15 JANUARY 2011<br />

REV. 5


F<br />

Chinn<br />

Golden<br />

Sunshine<br />

Troy<br />

#<br />

Avenue F<br />

St John<br />

Dillard<br />

#<br />

Thomas<br />

Hovey<br />

PS276<br />

Blount<br />

#<br />

Magnolia<br />

Leland<br />

Ray Weiland<br />

New Rafe Meyer<br />

Leisure<br />

Day<br />

Landry<br />

PRIVATEPS<br />

Ronaldson<br />

Scotland<br />

#I<br />

# PS64<br />

Cypress<br />

Main<br />

Texas<br />

#<br />

PS109<br />

BPS513<br />

Jefferson<br />

#I<br />

PS63<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#I<br />

PS129<br />

#<br />

PS241<br />

# #<br />

#I<br />

PS38<br />

#<br />

#I<br />

PS127<br />

#I<br />

#<br />

PS80<br />

#<br />

PS45<br />

#<br />

PS79<br />

Ashworth<br />

#<br />

Devall Lane<br />

PS210<br />

#<br />

#<br />

PS126<br />

#<br />

#<br />

Pryce<br />

Gibbens<br />

Baker<br />

Gore<br />

Liberty<br />

Plaza<br />

Debra<br />

Patricia<br />

Ector<br />

Gibbens<br />

Husband<br />

Lavey<br />

Alba<br />

Amerest<br />

Devall<br />

Charles<br />

Arena<br />

Lavey<br />

#<br />

PS268<br />

PS29<br />

Clark<br />

PS240<br />

Groom<br />

<strong>Plan</strong>k<br />

Myrtle<br />

Ellen<br />

Bentley<br />

PS242<br />

Comite<br />

Felicity<br />

Celia<br />

Roman<br />

Brownfields<br />

Ruston<br />

Colfax<br />

Kent<br />

PS312<br />

PS141<br />

Hall<br />

PS105<br />

PS150<br />

#<br />

PS291<br />

#<br />

Pettit<br />

Greencrest<br />

PS246<br />

Anderson<br />

Fieldcrest<br />

#<br />

Foster<br />

Progress<br />

Progress<br />

#<br />

I<br />

K<br />

Swan<br />

D<br />

E<br />

H<br />

#<br />

Airline<br />

Scenic<br />

Central<br />

Mengel<br />

East Baton Rouge Parish<br />

#I<br />

PS44<br />

#I<br />

# # PS244<br />

Monte Sano<br />

Jones<br />

75th<br />

Mason<br />

79th<br />

74th<br />

#I<br />

#<br />

PS75<br />

Harding<br />

72nd<br />

PS78<br />

#<br />

# #<br />

# #<br />

#<br />

Legend<br />

Proposed<br />

Existing<br />

<strong>Plan</strong>k Rd. PS Improvements<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NGS-C-0003<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-6<br />

Shada<br />

Edwin<br />

Monte Sano<br />

0 0.5<br />

1<br />

Miles<br />

Yancy<br />

Chuck Yeager<br />

Denham<br />

Dutton<br />

#<br />

Martin<br />

Crown<br />

Foster<br />

PS179<br />

#<br />

Ford<br />

Sumrall<br />

Mable<br />

PS429<br />

#<br />

#<br />

St Gabriel<br />

Cadillac<br />

Guynell<br />

Buckeye<br />

#<br />

PS432<br />

Gov Pleasant<br />

#<br />

PS433<br />

Belvin<br />

Carlene<br />

PS92<br />

#<br />

#<br />

#<br />

Hooper<br />

PS313<br />

Dalark<br />

#<br />

Mickens<br />

Wright<br />

#<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NGS-C-0003.MXD SGELPI 11/9/2010 09:45:10


SECTION 5. NORTH BASIN PROJECTS<br />

5.2.4 NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding Boulevard)<br />

The NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding Boulevard) project was<br />

combined with NGS-C-0003, (Multiple PS-<strong>Plan</strong>k Road-Thomas Road) from the October 2008<br />

PDP. The combined project has been designated NGS-C-0003 (<strong>Plan</strong>k Road Pump Station<br />

Improvements), and is described in Section 5.2.3.<br />

GNV31031158552.DOCX/103470004 5-17 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158552.DOCX/103470004 5-18 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

5.3 North Forced System Comprehensive Rehabilitation<br />

Projects<br />

5.3.1 NFW-R-0001, NFW-R-0002, and NFE-R-0001<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the sewer collection system to reduce the amount of rainwater and<br />

groundwater that leak into the system.<br />

Purpose<br />

The purpose of the comprehensive sewer rehabilitation is to correct defects in the system<br />

such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow<br />

sources. The water that enters the system through the defects is a major contributor to SSOs.<br />

Comprehensive rehabilitation of the collection system will contribute to alleviating SSOs.<br />

Location<br />

There are four projects located within the North Forced Basin. The attached maps show the<br />

locations of the projects, shown in Figure 5-7 to 5-9.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including CCTV inspection of pipes. Smoke testing may also be<br />

included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and based on that<br />

analysis a listing of recommended repairs with associated construction costs will be generated.<br />

An engineering firm will then complete detailed design and preparation of construction<br />

documents for project bidding.<br />

The construction of rehabilitation projects will typically include the following components.<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place pipe liners<br />

Rehabilitation or replacement of manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated costs for each project are presented in Table 5-4. These costs are based on<br />

preliminary estimates of the amounts of each component of the system that will require<br />

repair or replacement. During the physical inspection phase, the actual condition of the<br />

components will be assessed and appropriate methods recommended. At that time, the cost<br />

estimate for each project will be revised. For those projects under construction, the actual<br />

bid amounts are included as construction costs in Table 5-4.<br />

GNV31031158552.DOCX/103470004 5-19 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-4<br />

Estimated Construction Costs for North Forced System Comprehensive Rehabilitation Projects<br />

Project Descriptions<br />

Construction<br />

Cost<br />

Scheduled Design<br />

Appropriation Year<br />

Scheduled<br />

Construction<br />

Appropriation Year<br />

Status<br />

NFW-R-0001a-<br />

Brookstown Road-<br />

Evangeline Street,<br />

Phase I<br />

NFW-R-0001b-<br />

Brookstown Road –<br />

Evangeline Street,<br />

Phase II<br />

NFW-R-0002-Interstate<br />

110-Hollywood Street<br />

NFE-R-0001-Silverleaf<br />

Road-Ford Street<br />

$12,100.000 2009* 2010* Construction<br />

On-Going<br />

$11,000,000 2009* 2010* Design On-<br />

Going<br />

$6,000,000 2011 2012 Not Started<br />

$10,500,000 2009* 2010* Design On-<br />

Going<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />

GNV31031158552.DOCX/103470004 5-20 JANUARY 2011<br />

REV. 5


F<br />

3rd<br />

Alba<br />

Sunshine<br />

Elm<br />

McHost<br />

Blackwater<br />

Aletha<br />

Acres<br />

Black<br />

Burrel<br />

Anderson<br />

Reames<br />

Hunt<br />

Chaney<br />

Lea<br />

Ligon<br />

Brian<br />

Shellmire<br />

Pony<br />

Zachary-Slaughter<br />

Safer<br />

Vernon<br />

Rush<br />

Lemon<br />

Jacock<br />

Port Hudson-Pride<br />

<strong>Plan</strong>k<br />

Della<br />

Edwards<br />

Jackson<br />

Tom Drehr<br />

Riley<br />

Mahoney<br />

Carson<br />

Zeb Chaney<br />

Flonacher<br />

Old Scenic<br />

Dotson<br />

Avenue M<br />

Groom<br />

Thomas<br />

Elmer<br />

K<br />

I<br />

H<br />

Fennwood<br />

Heck Young<br />

Hovey<br />

Merganzer<br />

Newell<br />

Lake Pointe<br />

Meadow Glen<br />

New Rafe Meyer<br />

D<br />

Magnolia<br />

St John<br />

Farm<br />

Scotland<br />

Blount<br />

Mengel<br />

Rollins<br />

Harding<br />

Church<br />

Main<br />

Chippewa<br />

Sorrel<br />

Rita<br />

Faith<br />

Landry<br />

Day<br />

Central<br />

Stilt<br />

Old Baker Zachary<br />

39th<br />

79th<br />

70th<br />

72nd<br />

Mason<br />

Scenic I-110<br />

Gore<br />

Shelley<br />

17th<br />

Wilbur<br />

Foss<br />

East Baton Rouge Parish<br />

4th<br />

Ash<br />

Pope<br />

Baker<br />

Polk<br />

Beech<br />

Lee<br />

Wimbish<br />

Scotlandville-Zachary<br />

Daniels<br />

Lavey<br />

Gibbens<br />

Pryce<br />

Liberty<br />

Acadian<br />

38th<br />

McHugh<br />

Baker Bentley<br />

Gibbens<br />

Hollywood<br />

St Louis<br />

Mae<br />

Devall<br />

Evangeline<br />

Mohican<br />

Winbourne<br />

Brady<br />

Hillcrest<br />

Sinbad<br />

Clark<br />

Chuck Yeager<br />

Monte Sano<br />

Cannon<br />

Eaton<br />

Odell<br />

Hollier<br />

Lower Zachary<br />

Rolling Acres<br />

Chipley<br />

Velie<br />

Park<br />

Ford<br />

Pettit<br />

Comite<br />

Sumrall<br />

Greenwell<br />

Frey<br />

Hope<br />

Devore<br />

Byron<br />

Celia<br />

St Ann<br />

Hanks<br />

Prescott<br />

Greenwell Springs<br />

Charlton<br />

Kent<br />

Stoneview<br />

Mable<br />

Laca<br />

Corlett<br />

Cyrus<br />

Foster<br />

Glen Oaks<br />

Rio<br />

Main<br />

Lobdell<br />

Hall<br />

North Ridge<br />

Caprice<br />

Angus<br />

Airline<br />

Dyer<br />

J Wicker<br />

Cline<br />

Mickens<br />

Lanier<br />

Cody<br />

Paris<br />

Tom<br />

Tucker<br />

Brown<br />

Carney<br />

Bliss<br />

Harry<br />

Legend<br />

Area Designated for<br />

Physical Inspection<br />

Phase I<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NFW-R-0001.MXD SGELPI 11/9/2010 10:05:21<br />

Area Designated for<br />

Physical Inspection<br />

Phase II<br />

0 1 2 Miles<br />

Oak Villa<br />

Airway<br />

Watson<br />

Vail<br />

Loudon<br />

Ardoon<br />

Buck Horn<br />

Shady Bluff<br />

Arleen<br />

Carmel<br />

El Scott<br />

Dancy<br />

Tracy<br />

Choctaw<br />

Ventura<br />

Pomona<br />

q<br />

Fawn<br />

Elain<br />

Darryl<br />

Tams<br />

Lovett<br />

Peairs<br />

Greenwell Spg Pt Hudson<br />

Old Settlement<br />

Smith<br />

Ida<br />

Red Oak<br />

Core<br />

Gurney<br />

Tallowwood<br />

Bramble<br />

Joor<br />

McCullough<br />

Haven<br />

Landfair<br />

Lassen<br />

Sherwood Forest<br />

Neff<br />

Shoe Creek<br />

Pecos<br />

Coral<br />

Joor<br />

Frontier<br />

Devall Hubbs<br />

Denham<br />

Hooper<br />

Catalina<br />

Warfield<br />

Triple B<br />

Cherryl<br />

Erin<br />

Ireland<br />

Florida<br />

Hubbs Acres<br />

Flannery<br />

Sullivan<br />

Pinewood<br />

Huntley<br />

Brent<br />

Trey<br />

Mapleton<br />

Locust<br />

Glenn<br />

Roundsaville<br />

Alamo<br />

Crystal<br />

Paint<br />

Florida<br />

Wax<br />

Pernecia<br />

Alford<br />

Chanove<br />

Choctaw<br />

Four Oaks<br />

Frenchtown<br />

Norway Pine<br />

Droze<br />

Bristle Cone<br />

Stevendale<br />

Lavell<br />

Fir<br />

Milldale<br />

Will<br />

Magnolia Bridge<br />

Blouin<br />

Gottlieb<br />

Morgan<br />

<strong>Plan</strong>chet<br />

Liberty<br />

Stubbs<br />

Alphonse Forbes<br />

Brookstown Rd. - Evangeline St.<br />

Phase I and II<br />

NFW-R-0001<br />

Project Vicinity Map<br />

Figure 5-7


Hiawatha<br />

Mengel<br />

Sanchez<br />

Goudchaux<br />

Kaufman<br />

74th<br />

Monte Sano<br />

Rawlins<br />

Somerset<br />

Gsu<br />

Midland<br />

Goode<br />

Bacon<br />

73rd<br />

71st<br />

69th<br />

Goudchaux<br />

Kaufman<br />

Laramie<br />

Rhoderick<br />

Mason<br />

Amarillo<br />

Alamoster<br />

Pembroke<br />

Pembroke<br />

Pembroke<br />

Greenwell<br />

Riley<br />

Kelvin<br />

Iberia<br />

Middlesex<br />

68th<br />

Ralph<br />

Lorraine<br />

74th<br />

Casper<br />

Comish<br />

Saurage<br />

Baton Rouge<br />

Comish<br />

Galvez<br />

Farrar<br />

73rd<br />

70th<br />

Bourgeois<br />

Shada<br />

Breckenridge<br />

Nottingham<br />

Beech<br />

Cambridge<br />

Kerr<br />

Douglas<br />

Alexander<br />

Village<br />

Bamboo<br />

Village<br />

Denham<br />

Douglas<br />

Beech<br />

I-110<br />

Longfellow<br />

Airline<br />

I- 110 Serice<br />

Greenwell<br />

Hollywood<br />

Riley<br />

Kelvin<br />

Henagen<br />

Henderson<br />

Hilltop<br />

Smiley<br />

72nd<br />

<strong>Plan</strong>k<br />

Lorraine<br />

Beech<br />

Byron<br />

Vaughn<br />

Evangeline<br />

Monte Sano<br />

Mason<br />

Harriet<br />

St Dorothy<br />

Cannon<br />

Denham<br />

Lakewood<br />

Wildwood<br />

Quivera<br />

Beachwood<br />

Gurney<br />

Dawson<br />

Lemonwood<br />

Dutton<br />

Greenwell<br />

St Katherine<br />

Lorraine<br />

Lemonwood<br />

St Gerard<br />

Sycamore<br />

Shelley<br />

Monarch<br />

Beechwood<br />

Beechwood<br />

Robertson<br />

Crown<br />

Sumrall<br />

Oaklan<br />

Glen Oaks<br />

Wood<br />

Hollywood<br />

Byron<br />

Foster<br />

Woodlawn<br />

Greenwell<br />

Onter<br />

Winchester<br />

Denham<br />

Lancaster<br />

Winchester<br />

Winchester<br />

Wildwood<br />

Powhatan<br />

Scenic<br />

Pocahontas<br />

Shelley<br />

Cable<br />

Sherwood<br />

Gordon<br />

Pontiac<br />

Nokomis<br />

Tuscarora<br />

Baton Rouge<br />

Tecumseh<br />

Uncas<br />

Sherman<br />

Osceola<br />

Cable<br />

Wenonah<br />

Pocasset<br />

Sherwood<br />

Alliquippa<br />

Geronimo<br />

Wyandotte<br />

Huron<br />

Topeka<br />

Navajo<br />

Keokuk<br />

Dayton<br />

Weller<br />

Weller<br />

Anna<br />

Calumet<br />

Huron<br />

Pluskat<br />

Pawtucket<br />

Pampas<br />

Calumet<br />

Ozark<br />

Midway<br />

Myrtlelawn<br />

Roppolo<br />

Linden<br />

Wyandotte<br />

Oswego<br />

Winnebago<br />

33rd<br />

Clayton<br />

Sherwood<br />

Accardo<br />

Wyandotte<br />

Lynn<br />

38th<br />

Maple<br />

Delaware<br />

Charles<br />

Oswego<br />

Ozark<br />

Winbourne<br />

Tunica<br />

Webb<br />

Prescott<br />

Mohican-Prescott Crossover<br />

Delaware<br />

Mohican<br />

Winnebago<br />

Wyandotte<br />

Cleo<br />

Wayne<br />

Yaun<br />

Eaton<br />

Charles<br />

Eaton<br />

Mission<br />

Beechwood<br />

Dayton<br />

Joseph<br />

Levera<br />

Hazelwood<br />

Fairwoods<br />

Bradley<br />

Jean<br />

Linden<br />

Eleanor<br />

Conrad<br />

Eleanor<br />

Wyandotte<br />

Bradley<br />

Elm<br />

Addison<br />

Bartlett<br />

East Baton Rouge Parish<br />

Legend<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\NORTH\NFW-R-0002.MXD SGELPI 10/22/2009 08:13:14<br />

Area Designated for<br />

Physical Inspection<br />

0 1,000 2,000 Feet<br />

q<br />

Interstate 110 - Hollywood St.<br />

NFW-R-0002<br />

Project Vicinity Map<br />

Figure 5-8


F<br />

E<br />

Chinn<br />

Golden<br />

Alba<br />

Sunshine<br />

Foster<br />

Buckeye<br />

Lacey<br />

Lanier<br />

Old Scenic<br />

Dotson<br />

Cheatham<br />

McCastle<br />

Edgar<br />

Scenic<br />

Groom<br />

New Rafe Meyer<br />

Avenue M<br />

Avenue K<br />

Glynn<br />

Sapsucker<br />

I<br />

Avenue F<br />

Elmer<br />

K<br />

D<br />

St John<br />

Woodcock<br />

Woodpecker<br />

East Baton Rouge Parish<br />

Greely<br />

Dillard<br />

Kingfisher<br />

Mills<br />

H<br />

Farm<br />

Hovey<br />

Catherine<br />

Egret<br />

Merganzer<br />

Airline<br />

College<br />

Blount<br />

Almond<br />

Livestock<br />

Mengel<br />

Legend<br />

Magnolia<br />

Leisure<br />

Grebe<br />

Leland<br />

Ray Weiland<br />

Day<br />

Zerlee<br />

Central<br />

Oriole<br />

Stilt<br />

Swan<br />

Landry<br />

Center<br />

Robin<br />

Scotland<br />

Success<br />

King<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NFE-R-0001.MXD SGELPI 11/9/2010 10:08:46<br />

Curtis<br />

78th<br />

Cypress<br />

Main<br />

Rosenwald<br />

Thelma<br />

Sora<br />

South<br />

Elm Grove Garden<br />

74th<br />

Texas<br />

Camelia<br />

Cunard<br />

Snipe<br />

Kaufman<br />

Sanchez<br />

Parkway<br />

69th<br />

79th<br />

Mason<br />

Midland<br />

77th<br />

71st<br />

Alabama<br />

<strong>Plan</strong>tation<br />

Jones<br />

Allen<br />

68th<br />

Coolidge<br />

Wilbur<br />

Shada<br />

Grant<br />

Progress<br />

D<br />

Heath<br />

Kelvin<br />

Nichols<br />

75th<br />

70th<br />

Iberia<br />

Mc Vea<br />

Van Buren<br />

Hallmark<br />

Jefferson<br />

Daniels<br />

Epperson<br />

Veterans Memorial<br />

Jay<br />

Emile<br />

Monte Sano<br />

Area Designated for<br />

Physical Inspection<br />

0 0.5 1 Miles<br />

Gibbens<br />

73rd<br />

Alexander<br />

Galvez<br />

Emile<br />

Turnley<br />

Gore<br />

Village<br />

Liberty<br />

Ector<br />

I-110<br />

Hollywood<br />

q<br />

Yancy<br />

Debra<br />

Patricia<br />

Rabel<br />

Gibbens<br />

Jackie Cochran<br />

Lavey<br />

Baker<br />

Thomas<br />

Harding<br />

72nd<br />

Amarillo<br />

Riley<br />

Lorraine<br />

Husband<br />

Morvant<br />

McHugh<br />

Fourchon<br />

Algoa<br />

Ridgecrest<br />

Greenwell<br />

Devall<br />

Georgia<br />

Sherron<br />

Amerest<br />

Middlewood<br />

Sinbad<br />

Sandra<br />

Chuck Yeager<br />

Monte Sano<br />

Gurney<br />

Cannon<br />

Quivera<br />

Dutton<br />

St Gerard<br />

Engleswood<br />

Beech<br />

Shilo<br />

Shilo<br />

Lavey<br />

Arena<br />

Hollier<br />

Chemin<br />

O'Callagham<br />

Clark<br />

Robique<br />

Martin<br />

Cadillac<br />

Monarch<br />

Sumrall<br />

Ford<br />

Paige<br />

<strong>Plan</strong>k<br />

Glen Oaks<br />

Denham<br />

Sycamore<br />

Troy<br />

Troy<br />

Chipley<br />

Lancaster<br />

Holden<br />

Oak Bend<br />

Balm<br />

Bentley<br />

Stearns<br />

Greenwell<br />

Byron<br />

Hope<br />

Oaklan<br />

McClelland<br />

Comite<br />

Brownfields<br />

Guice<br />

Laredo<br />

San Juan<br />

Crown<br />

Myrtle<br />

Sharon Hills<br />

Kleinpeter<br />

Ellen<br />

Blue Grass<br />

Bank<br />

Lake Mary<br />

Furr<br />

Stoneview<br />

Guynell<br />

Junelise<br />

Byron<br />

Corlett<br />

Hooper<br />

St Pius<br />

Silverleaf<br />

Felicity<br />

Celia<br />

D'Juanna<br />

Grand<br />

Brookstown<br />

Roman<br />

St Ann<br />

Monarch<br />

Rio<br />

Ruston<br />

Colfax<br />

Kent<br />

Juno<br />

Jupiter<br />

Perimeter<br />

Myrtlewood<br />

Juniper<br />

Satinwood<br />

Winter<br />

Vineyard<br />

Landis<br />

Hall<br />

St Francis<br />

Flintwood<br />

Gov Nichols<br />

Belvin<br />

North Park<br />

Angles<br />

Oakside<br />

Matthews<br />

Pettit<br />

Foster<br />

Caprice<br />

Mickens<br />

Maplewood<br />

Astoria<br />

Sutton<br />

Atlanta<br />

Dalark<br />

Hanks<br />

Lazy Oaks<br />

Greencrest<br />

Gov Davis<br />

Davlin<br />

Tioga<br />

Pettit<br />

Silverleaf Rd. - Ford St.<br />

NFE-R-0001<br />

Project Vicinity Map<br />

Figure 5-9<br />

Ingram


SECTION 5. NORTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158552.DOCX/103470004 5-24 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

5.4 North Forced System Capacity Improvements Projects<br />

5.4.1 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/ Project Background<br />

The purpose of the NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) project is<br />

to replace PS176 to alleviate SSOs at and near the pump station. The forcemains exiting PS<br />

176 and PS 284 will also be upsized. In addition, the future wet weather peak flow at PS 176<br />

is predicted by the BTRSSO model to be greater than the existing maximum capacity of the<br />

pump station.<br />

Location<br />

The location of PS 176 is described in Table 5-5 and shown along with the forcemain<br />

locations in Figure 5-10.<br />

Forcemain segment PS 176 to NS 6157 begins at PS 176, located on Tallowwood Avenue,<br />

between Pheasantwood Drive and Partridgewood Drive, travels north on Partridgewood<br />

Drive to Gurney Road, follows Gurney Road east, and terminates at node NS6157, near the<br />

intersection of Gurney Road with Sullivan Road.<br />

Gravity segment 176-00001 to PS 176 begins at manhole 176-00001, which is located near the<br />

pump station, which is on Tallowwood Avenue between Pheasantwood Drive and<br />

Partridgewood Drive, and travels to PS 176.<br />

Forcemain segment PS 284 to NS6156 begins at PS 284, located at the cul-de-sac on Fairmead<br />

Drive, travels down a servitude that parallels to the north of Arrowood Avenue, proceeds<br />

up Joor Road and terminates at node NS 6156, which is located at the intersection of Joor<br />

Road and Gurney Road.<br />

Scope<br />

This project includes replacement of one pump station as well as approximately 14,500 feet<br />

of 8-inch, 10-inch, 12-inch, and 14-inch forcemain and approximately 100 feet of 15-inch<br />

gravity sewer. Tables 5-5 and 5-6 show the detailed scope of the project.<br />

TABLE 5-5<br />

NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak<br />

Wet Weather<br />

Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comment<br />

s<br />

PS 176 Tallowwood Ave, between the<br />

417 1,187 79<br />

intersection of Pheasantwood<br />

Drive and Patridgewood Drive<br />

Note: The existing maximum capacity for the pump station was obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

GNV31031158552.DOCX/103470004 5-25 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-6<br />

NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS 176 NS6172 1,800 6 10<br />

NS6172 NS6158 75 8 10<br />

NS6158 NS6156 3,400 10 12<br />

NS6156 NS6157 2,500 10 14<br />

176-00001 PS176 100 8 15 Gravity segment<br />

PS 284 NS6156 6,700 6 8<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Bid Amount is $1,550,000.<br />

Design was appropriated in 2007.<br />

Scheduled Construction Appropriation Year was 2008.<br />

Construction was Functionally Completed in 4 th Quarter 2009.<br />

GNV31031158552.DOCX/103470004 5-26 JANUARY 2011<br />

REV. 5


Wild Rose<br />

Core<br />

Blackwater<br />

Welcome Heights<br />

Dorset<br />

York<br />

Virgil Jackson<br />

#<br />

PS125<br />

Joor<br />

Centerra<br />

Gurney<br />

NS6158<br />

!R<br />

!R<br />

NS6156<br />

!R<br />

NS6157<br />

Ouachita<br />

Sullivan<br />

Pheasantwood<br />

BPS501<br />

#!R<br />

NS6172<br />

Candletree<br />

#I<br />

!R PS176 PS176<br />

!R # 176-00001<br />

!R #<br />

PS176<br />

Ribbonwood<br />

Tallowwood<br />

Lancewood<br />

Willowmore<br />

PS284<br />

PS284<br />

Milstead<br />

Arrowood<br />

Wickwood<br />

Morganfield<br />

Morgan Hill<br />

#<br />

Shoe Creek<br />

Glen Watts<br />

Ida<br />

PS406<br />

#<br />

Stoneway<br />

PS103<br />

#<br />

#<br />

#<br />

PS86<br />

Hooper<br />

East Baton Rouge Parish<br />

Gate Way<br />

Morgan Meadow<br />

Legend<br />

Proposed<br />

Existing<br />

Gurney Rd. Sewer Area Upgrades<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NFE-C-0001<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-10<br />

0 1,000<br />

2,000<br />

Feet<br />

Sagefield<br />

#<br />

PS230<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\NORTH\NFE-C-0001.MXD GBOQUIN 10/25/2009 14:23:14


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.2 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The purpose of NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades)<br />

project is to replace PS 230, PS 282, and PS 187 to alleviate SSOs at and near the pump stations.<br />

This project also includes the upsizing of the forcemains from the three (3) pump stations as<br />

well as the gravity sewer that feeds PS 230. This project was originally designated as the NFE-<br />

C-0002 (Multiple Pump Stations – Lovett Road Area) project in the October 2008 PDP.<br />

Location<br />

The locations of the pump stations is described in Table 5-7 and shown along with the<br />

forcemain locations in Figure 5-11.<br />

Gravity segment 230-00009 to PS 230 begins at manhole 230-00009, which is located near the<br />

intersection of Stoneway Place and Shoe Creek Drive, and travels south along Shoe Creek<br />

Drive to Morgan Meadow Avenue, where it then parallels Morgan Meadow Avenue in a<br />

westerly direction to PS 230, which is located on Morgan Meadow Avenue in between its<br />

intersection with Shoe Creek Drive and Sagefield Drive.<br />

Forcemain segment PS 230 to 230-00015 begins at PS 230, describe above, and follows<br />

Morgan Meadow Avenue in a westerly direction to its intersection with Sagefield Drive,<br />

where it then parallels Sagefield Drive in a southerly direction to its termination point at<br />

manhole 230-00015, which is located on Sagefield Drive, approximately halfway in between<br />

Morgan Meadow Avenue and Conwood Avenue.<br />

Forcemain segment PS 187 to NS6402 begins at PS 187, located near the intersection of Clear<br />

Oak Avenue and Oak Meadow Drive, goes east down Clear Oak Avenue then turns north<br />

on Woods Edge Drive and terminates at node NS6402, located near the intersection of<br />

Woods Edge Drive and Sullivan Road.<br />

Forcemain segment PS 282 to NS6305 begins at PS 282, located at the end of Regent Avenue<br />

near the intersection of Regent Avenue and Trendale Drive, goes west through a wooded<br />

area crossing Beaver Bayou, and connects to the existing forcemain.<br />

Scope<br />

The scope of this project includes three pump station replacements, approximately 4,200 feet<br />

of 6-inch and 8-inch forcemain, and approximately 2,100 feet of 12-inch gravity sewer. The<br />

detailed scope is shown in Tables 5-7 and 5-8.<br />

TABLE 5-7<br />

NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades) - Pump Station Information<br />

Existing Max Future Peak Wet Dry<br />

Capacity Weather Flow Weather<br />

(GPM) (GPM) (GPM)<br />

PS No.<br />

PS 230<br />

PS 282<br />

PS 187<br />

Location<br />

Morgan Meadow Ave, near the<br />

intersection of Shoe Creek Drive<br />

Regent Ave, near the intersection<br />

of Trendale Drive<br />

Clear Oak Ave, near the<br />

intersection of Oak Meadow Drive<br />

417 1,229 146<br />

127 924 42<br />

139 382 87<br />

Comments<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

GNV31031158552.DOCX/103470004 5-28 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-8<br />

NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

230-00009 PS230 2,100 8 12 Gravity segment<br />

PS230 230-00015 1,200 6 8<br />

PS187 NS6402 1,100 4 6<br />

PS282 NS6305 1,900 4 8<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Bid Amount is $2,200,000.<br />

Design was appropriated in 2007.<br />

Construction Appropriation Year was 2008.<br />

Construction is On-Going.<br />

GNV31031158552.DOCX/103470004 5-29 JANUARY 2011<br />

REV. 5


Sullivan<br />

Shoe Creek<br />

Lazy Lake<br />

Hooper<br />

Bon Dickey<br />

Stoneway<br />

!R<br />

230-00009<br />

#<br />

PS103<br />

#<br />

PS167<br />

Rifle<br />

Marlin<br />

Huntley<br />

Central Woods<br />

Forestgrove<br />

#<br />

PS271<br />

Magnolia Blossom<br />

Central Pine<br />

Wax<br />

Sagefield<br />

!R<br />

#I<br />

PS230<br />

!R #<br />

PS230<br />

PS230<br />

PS230DS<br />

Lawndale<br />

Brent<br />

Republic<br />

Ridgeside<br />

Jenson<br />

Roanoke<br />

Brookside<br />

#<br />

BPS601<br />

Brookside<br />

Cloudland<br />

Banway<br />

Trendale<br />

#<br />

PS231<br />

Leeanne<br />

Sully<br />

Sparkle<br />

NS6305<br />

!R<br />

#I<br />

PS282<br />

!R #<br />

PS282<br />

PS282<br />

##<br />

PS510AA<br />

Lovett<br />

Summers<br />

#<br />

PS450<br />

Washington<br />

#<br />

Frontier<br />

Prairie<br />

!R<br />

#I !R #<br />

PS187<br />

PS187<br />

NS6402<br />

PS187<br />

Woodsedge<br />

Woodlett<br />

Trey<br />

BPS510<br />

Brett<br />

#<br />

Greenwell Springs<br />

Alford<br />

Shady Park<br />

Greenmeadow<br />

Lariat<br />

Kohler<br />

Chaparral<br />

#<br />

East Baton Rouge Parish<br />

Triple B<br />

PS113<br />

#<br />

Legend<br />

Sullivan Rd. /Lovett Rd. /Wax Rd.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Sewer Area Upgrades<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

NFE-C-0002<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-11<br />

Triple B<br />

0 1,500<br />

3,000<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\NORTH\NF E-C-0002_mpj120610


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.3 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades - Phase I)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The purpose of the NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades - Phase<br />

I) project is to replace PS 291, PS 246, and PS 94 to alleviate SSOs at and near the PS. The<br />

forcemains exiting these pump stations will also be upsized. In addition, the future peak wet<br />

weather flow at the pump stations is predicted by the BTRSSO model to exceed the existing<br />

maximum capacity.<br />

Location<br />

The locations of the pump stations is given in Table 5-9 and shown along with the forcemain<br />

locations in Figure 5-12.<br />

Forcemain segment PS 291 to NS6393 begins at PS 291R, located on Comite Rd 953’ north of<br />

Misty Oaks, and goes South 953’ to Misty Oaks; then East on Misty Oaks Avenue to Lazy<br />

Oak Drive, where it then follows Laky Oak Drive south to its cul-de-sac, and then continues<br />

south over-land to node NS6393, which is located just downstream of PS 246, located near<br />

the intersection of Green Gate Drive and Holly Fern Avenue.<br />

Forcemain segment NS6193 to NS6251 begins at node NS6193, located near the intersection<br />

of Green Gate Drive and Holly Fern Avenue, runs southeast along Green Gate Drive to<br />

Foster Road, where it then follows Foster Road south to its termination at node NS6251,<br />

located at the intersection of North Park Ave and Foster Road.<br />

Forcemain segment PS 94 to NS6193 begins at PS 94, located at the westerly cul-de-sac on<br />

Anderson Drive and proceeds aligning Anderson to the easterly cul-de-sac, then runs<br />

northerly overland to node NS6193.<br />

Scope<br />

This project includes the replacement of three pump stations and the upsizing of<br />

approximately 12,000 feet of 6-inch and 8-inch forcemain. The detailed scope of the project is<br />

presented in Tables 5-9 and 5-10.<br />

TABLE 5-9<br />

NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

PS 291<br />

PS 246<br />

PS 94<br />

Misty Oaks Ave, near the<br />

intersection of Lazy Oak<br />

Drive<br />

Holly Fern Ave, near the<br />

intersection of Green Gate<br />

Drive<br />

Fieldcrest Dr. near the<br />

intersection of Meadow Ave<br />

69 208 92<br />

69 278 21<br />

278 764 62<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

GNV31031158552.DOCX/103470004 5-31 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-10<br />

NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) – Pipeline Information<br />

US<br />

Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS291 NS6193 3,340 4 8 New routing of existing<br />

FM to PS 246<br />

NS6193 NS6251 5,600 4 10<br />

PS94 NS6193 3,140 6 8<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Bid Amount is $1,925,000.<br />

Design was appropriated in 2007.<br />

Construction Appropriation Year was 2008.<br />

Construction was Functionally Completed 2 nd Quarter 2010.<br />

GNV31031158552.DOCX/103470004 5-32 JANUARY 2011<br />

REV. 5


Comite<br />

#I<br />

!R #<br />

PS291<br />

Misty Oaks<br />

Whispering Oaks<br />

Comite<br />

PS291<br />

Lazy Oaks<br />

Cline<br />

Celia<br />

Sleepy Oaks<br />

Holly Fern<br />

St Francis<br />

Barbara Cohn<br />

Green Gate<br />

Oak Fern<br />

#I<br />

!R #<br />

NS6193<br />

PS246<br />

St Mary<br />

St Ann<br />

Anderson<br />

Northampton<br />

Timberlane<br />

North Park<br />

North Ridge<br />

Greencrest<br />

Meadow<br />

Fieldcrest<br />

#I<br />

!R #<br />

PS94<br />

PS94<br />

#<br />

PS150<br />

Northdale<br />

Willowood<br />

Banbury<br />

Foster<br />

Tidecrest<br />

Dawncrest<br />

Malcolm<br />

Price<br />

NS6251<br />

!R<br />

Windcrest<br />

East Baton Rouge Parish<br />

Legend<br />

Comite Dr. - Foster Rd.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Sewer Area Upgrades Phase I<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

NFE-C-0003<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-12<br />

0 1,000<br />

2,000<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFE-C-0003.MXD SGELPI 11/9/2010 09:48:51


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.4 NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The purpose of Project NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) is to<br />

increase the capacity of the STN forcemain system and the manifold forcemains along Foster<br />

Road and Hooper Road to assist in transferring high flows to the main STN forcemain along<br />

Hooper Road.<br />

Location<br />

The location of the forcemains in this project are shown in Figure 5-13.<br />

Forcemain segment PS 255 to NS6289 begins at PS 255, which is located at the end of the culde-sac<br />

at Loch Fyne Avenue, and goes east on Loch Fyne Avenue to Ardoon Drive, turns<br />

north/northwest on Ardoon Drive to Monhegan Avenue, turns northeast on Monhegan<br />

Avenue to Blackwater Road, turns south onto Blackwater Road and terminates at node<br />

NS6289, located at the intersection of Blackwater Road and Hooper Road.<br />

Forcemain segment PS 196 to NS 6281 begins at PS 196, which is located near the intersection<br />

of Shady Bluff Drive and Shady Knoll Place, and goes north along Shady Bluff Drive to node<br />

NS 6281, which is located at the intersection of Shady Bluff Dive and Hooper Road.<br />

Forcemain segment BPS 509 to NS 6247 begins at BPS 509, located near the intersection of Hooper<br />

Road and Lazy Lake Drive, and follows Hooper Road southwest until it reaches node NS 6247,<br />

located approximately 600 feet east of the intersection of Hooper Road and Lovett Road.<br />

Forcemain segment BPS 511 to NS6334 starts at BPS 511, located in between Hooper Road and<br />

Blackwater Road, and travels west along Hooper Road to node NS 6334, located near the<br />

intersection of Hooper Road and Foster Road.<br />

Forcemain segment NS6306 to NS6334 starts at node NS 6306, located on Foster Road south of<br />

its intersection with Summer Place Avenue and goes south along Foster Road to node NS6334,<br />

located near the intersection of Hooper Road and Foster Road.<br />

Scope<br />

This project includes the construction of approximately 26,000 feet of 6-inch, 8-inch, 14-inch,<br />

24-inch, and 36-inch forcemain in the North Forced Basin. The detailed scope of this project is<br />

presented in Table 5-11.<br />

TABLE 5-11<br />

NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) – Pipeline Information<br />

US Node DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter (in)<br />

Proposed<br />

Diameter (in) Comments<br />

PS 255 NS6289 7,600 6 8<br />

PS 196 NS6281 5,200 4 6<br />

BPS 509 NS6247 6,500 20 24<br />

BPS 511 NS6326 2,700 24 36<br />

NS6326 NS6334 3,000 30 36<br />

NS6306 NS6334 1,200 12 14<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Bid Amount is $8,762,000.<br />

Design was appropriated in 2007.<br />

Construction Appropriation Year was 2008.<br />

Construction is On-Going.<br />

GNV31031158552.DOCX/103470004 5-34 JANUARY 2011<br />

REV. 5


Brown<br />

Acres<br />

Devall<br />

#<br />

Hubbs<br />

Pettit<br />

Core<br />

Northeast<br />

#<br />

Denham<br />

PS263<br />

#<br />

PS198<br />

Crystal<br />

#<br />

# #<br />

PS192<br />

PS155<br />

PS265<br />

#<br />

#<br />

Foster<br />

#<br />

# # #<br />

BPS509 PS509 #<br />

PS246<br />

!R #<br />

#<br />

PS94<br />

PS255<br />

!R #<br />

NS6289<br />

NS6306<br />

# !R # NS6326<br />

!R<br />

PS313#<br />

!R !R #<br />

!R<br />

PS511<br />

NS6334<br />

Carlene<br />

PS291<br />

Greencrest<br />

Fieldcrest<br />

Cline<br />

Hickcock<br />

#<br />

PS130<br />

Carney<br />

Comite<br />

Loudon<br />

Blackwater<br />

Monhegan<br />

PS196<br />

PS144<br />

!R<br />

Big Sur<br />

Santa Monica<br />

#<br />

PS196<br />

!R #<br />

Pheasantwood<br />

NS6247 #<br />

!R<br />

NS6281<br />

PS69<br />

#<br />

Gurney<br />

BPS501<br />

PS418<br />

#<br />

PS125<br />

#<br />

Glen Watts<br />

Joor<br />

Lovett<br />

PS284<br />

Pecos<br />

#<br />

#<br />

Sagefield<br />

PS152<br />

#<br />

PS202<br />

Hooper<br />

Shoe Creek<br />

#<br />

#<br />

#<br />

PS231<br />

Prairie<br />

Sullivan<br />

PS230<br />

PS510AA<br />

Dorset<br />

PS103<br />

#<br />

#<br />

PS187<br />

PS234<br />

#<br />

#<br />

PS167<br />

Reed<br />

#<br />

Huntley<br />

Sully<br />

PS72<br />

Roundsaville<br />

Sage<br />

Brent<br />

#<br />

#<br />

NS6268a<br />

PS282<br />

!R !R #<br />

NS6305<br />

#<br />

#<br />

PS233<br />

Republic<br />

Summers<br />

Brett<br />

PS271<br />

Brookside<br />

PS450<br />

BPS510<br />

Paint<br />

Bridlewood<br />

Wax<br />

Alford<br />

#<br />

Frontier<br />

#<br />

# #<br />

#<br />

Hanks<br />

Dalark<br />

PS39<br />

#<br />

Lanier<br />

Wright<br />

PS277<br />

Greenwell<br />

#<br />

Dickens<br />

PS11<br />

East Baton Rouge Parish<br />

Mickens<br />

#<br />

Prescott<br />

PS453<br />

PS116<br />

Ridgewood<br />

#<br />

PS288<br />

Suncrest<br />

#<br />

PS195<br />

Lariat<br />

PS138<br />

#<br />

Triple B<br />

Langer<br />

PS113<br />

#<br />

Greenwell Springs<br />

Cherryl<br />

#<br />

PS121<br />

PS1006<br />

#<br />

#<br />

PS121 #<br />

PS197<br />

#<br />

#<br />

BPS503 # PS454<br />

PS207<br />

# #<br />

#<br />

# # # #<br />

Legend<br />

Foster Rd. - Hooper Rd.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Sewer Area Upgrades<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

New Gravity Main<br />

NFE-C-0004<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-13<br />

0 0.5 1<br />

Miles<br />

Bayonne<br />

Chanove<br />

#<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\NORTH\NFE-C-0004_mpj120610


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.5 NFE-C-0005 (Hooper Road Pump Station Improvements)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

This project NFE-C-0005 (Hooper Road Pump Station Improvements) project is a combination<br />

of NFE-C-0005 (Multiple PS – Hooper Road- Greenwell Springs Road) and NFE-C-0007<br />

(Multiple BPS - Hooper Road - Lovett Road) from the October 2008 PDP. The combined<br />

project has been designated NFE-C-0005 (Hooper Road Pump Station Improvements) project<br />

and is described in this section. The purpose of the NFE-C-0005 (Hooper Road Pump Station<br />

Improvements) project is the following:<br />

Replace PS 113, PS 313, PS 144, PS 86, PS 234, PS 218, PS 271, PS 249, PS 164, PS 285, PS 196,<br />

PS 231, PS 207, BPS 509, BPS 510 and BPS 511 to alleviate SSOs. BPS 510 will be replaced<br />

with a new PS 510AA, located downstream of the existing BPS 510. The three in-line booster<br />

pump stations being replaced in this project will be replaced with wet well pump stations.<br />

Location<br />

The locations of the pump stations are described in Table 5-12 and shown in Figure 5-14. PS<br />

510AA will replace the existing BPS 510, which is currently located at the end of Lovett<br />

Road east of Sullivan Road. The exact location of PS 510AA has not yet been determined.<br />

Scope<br />

The detailed scope of this project is given in Table 5-12.<br />

TABLE 5-12<br />

NFE-C-0005 (Hooper Road Pump Station Improvements) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

PS No.<br />

Location<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 313 Summer Place Avenue off Foster Road 58 109 4<br />

PS 144 La Jolla Court off Carmel Drive 440 601 104<br />

PS 86 Hooper Road between Lovett Road and Allena Drive 337 544 112<br />

PS 234 Dorset Avenue off Farnham Avenue 101 489 65<br />

PS 218 Weyanoke Drive off Solitude Lane 221 424 53<br />

PS 271 Central Place Drive off Central Woods Avenue 244 482 129<br />

PS 249 Durmast Drive off Way Road 612 1,124 247<br />

PS 164 Stoneridge Drive off Donnybrook Avenue 261 685 88<br />

PS 285 Bristle Cone Court off Evergreen Hills Avenue 84 399 52<br />

PS 196 Shady Bluff Drive off Hooper Road 115 409 56<br />

PS 231 Shoe Creek Drive off Morgan Creek Avenue 240 1,596 222<br />

PS 207 Red Maple Drive off West Post Oak Court 101 394 136<br />

PS 509 Hooper Road between Sullivan Road and Lazy Lake Drive 2,424 7,592 951<br />

PS 511 Hooper Road between Hickcock Drive and Blackwater Road 1,781 20,404 2,970<br />

PS 510AA To be determined 5,326 8,106 1,194<br />

PS 113 13308 Triple B. Rd. Hgts. 190 596 42<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $11,900,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-36 JANUARY 2011<br />

REV. 5


Maribel<br />

Lanier<br />

Charlton<br />

Oak Villa<br />

Brown<br />

Blackwater<br />

Acres<br />

Devall<br />

Hubbs<br />

Rolling Acres<br />

BPS513<br />

#<br />

Bentley<br />

#<br />

#<br />

# #<br />

#<br />

PS129<br />

<strong>Plan</strong>k<br />

Dyer<br />

PS312<br />

PS141<br />

PS318<br />

#<br />

PS125<br />

#<br />

#I<br />

# PS218 #<br />

#<br />

#I<br />

#<br />

#<br />

#<br />

#<br />

PS234<br />

# #<br />

PS72<br />

#<br />

#<br />

#<br />

# # # #<br />

#I<br />

PS233<br />

PS509 #<br />

PS246<br />

#<br />

PS325<br />

PS176 PS284<br />

# #<br />

#<br />

#<br />

#<br />

##<br />

# #<br />

#<br />

#I #I #I #I<br />

PS79<br />

PS249<br />

# PS86 PS103<br />

PS144<br />

PS150<br />

#<br />

#<br />

#<br />

PS313<br />

#<br />

#<br />

# # # #I<br />

PS271<br />

#I<br />

PS255<br />

# PS231<br />

PS432<br />

#I<br />

# PS282<br />

# # PS511<br />

# # #<br />

#I<br />

#<br />

#<br />

#<br />

#<br />

PS130<br />

#I<br />

PS418<br />

#<br />

#<br />

# #<br />

PS280<br />

#<br />

##<br />

PS272<br />

PS510AA #<br />

PS202<br />

PS196<br />

#I<br />

# # #<br />

#<br />

# # #<br />

#I#I<br />

PS164<br />

#<br />

PS453<br />

PS138<br />

#<br />

## # # # #<br />

PS195<br />

PS277<br />

#<br />

PS113<br />

#<br />

PS288<br />

# PS285<br />

#<br />

#<br />

#<br />

# # PS160<br />

PS116<br />

#<br />

#I<br />

PS11<br />

#<br />

PS121 #<br />

BPS503<br />

# #<br />

# #<br />

##<br />

# # # #<br />

PS55<br />

PS281<br />

#<br />

PS207<br />

#<br />

#<br />

PS334<br />

# #<br />

# PS289<br />

# PS16 PS359<br />

#<br />

#<br />

#<br />

#<br />

PS314<br />

PS169 PS295 PS41<br />

# #<br />

#<br />

#<br />

#<br />

# #<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

#<br />

Legend<br />

Proposed<br />

Existing<br />

Hooper Rd. PS Projects<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NFE-C-0005<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 2-1<br />

Comite<br />

Brownfields<br />

Victoria<br />

Landis<br />

Lobdell<br />

Foster<br />

Pettit<br />

Choctaw<br />

Airline<br />

East Baton Rouge Parish<br />

Dickens<br />

Cline<br />

Mickens<br />

Greenwell<br />

Ski Stone<br />

Bliss<br />

Prescott<br />

Airway<br />

Loudon<br />

Carney<br />

Gurney<br />

Joor<br />

Dual<br />

McCullough<br />

Core<br />

Lovett<br />

Richcroft<br />

0 1<br />

2<br />

Miles<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFE-C-0005.MXD SGELPI 11/9/2010 09:47:55<br />

BPS500<br />

Denham<br />

Flannery<br />

Sullivan<br />

Pinewood<br />

PS192<br />

Sage<br />

Brett<br />

Choctaw<br />

Florida<br />

PS155<br />

#<br />

PS93<br />

#<br />

PS265<br />

Paint<br />

Four Oaks<br />

Alford<br />

BPS504<br />

#<br />

Hooper<br />

Droze<br />

Lavell<br />

Liberty<br />

Blouin<br />

#<br />

PS443<br />

Will<br />

Wax<br />

<strong>Plan</strong>chet<br />

Frenchtown<br />

Morgan


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.6 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project / Background Information<br />

The purpose of the NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area<br />

Upgrades) project is to increase the capacity of the forcemain system in the North East<br />

Forcemain Basin to assist in transferring peak flows to the main STN sewer along Hooper<br />

Road and to increase the capacity of the gravity sewer systems upstream of PS 155, PS 195,<br />

PS 200, and PS 231. The gravity sewer and forcemain upgrades will work to alleviate chronic<br />

SSOs at the upstream or downstream locations of PS 69, 106, 113, 152, 155, 160, 164, 181, 195,<br />

200, 207, 231, 233 234, 249, 285, and 510.<br />

Location<br />

The gravity sewers and forcemains in this project are shown in Figure 5-15.<br />

Gravity segment 155-00037 to PS 155 begins at manhole 155-00037, located near the<br />

intersection of Crystal Drive and Libra Avenue and heads north along Crystal Drive to its<br />

termination point at PS 155, located near the intersection of Crystal Drive and Taurus<br />

Avenue.<br />

Gravity segment 195-00004 to PS 195 begins at manhole 195-00004, located east of the<br />

intersection of Suncrest Avenue and Bretshire Drive, and heads generally east through a<br />

servitude in a forested area to PS 195, which is located just south of the south end of<br />

Stoneshire Drive.<br />

Gravity segment 200-00011 to PS 200 starts at manhole 200-00011, located east of the<br />

intersection of Keystone Avenue and Bridgeport Drive, and heads east along Keystone<br />

Avenue to PS 200, located on Keystone Avenue, in between Teah Drive and Tarrora Drive.<br />

Gravity segment 231-00015 to PS 231 begins at manhole 231-00015, located on Sagefield<br />

Drive, in between Cornwood Avenue and Morgan Meadow Avenue, and heads south along<br />

Sagefield Drive to PS 231, located near the intersection of Sagefield Avenue and Cornwood<br />

Avenue.<br />

Forcemain segment PS 181 to NS6088 starts at PS 181, located off of Pinewood Drive, in<br />

between Arceneaux Avenue and Denham Avenue, and follows the access road from the<br />

pump station to Pinewood Drive, and then follows Pinewood Drive south to node NS6088,<br />

located near the intersection of Pinewood Drive and Denham Avenue.<br />

Forcemain segment PS 155 to NS6103 begins at PS 155, located near the intersection of<br />

Crystal Drive and Taurus Avenue, and follows Taurus Avenue west to node NS6103,<br />

located near the intersection of Taurus Avenue and West Beaver Drive.<br />

Forcemain segment PS 106 to NS6128 begins at PS 106, located near the intersection of<br />

Palomino Drive and Paint Avenue, heads north along Palomino Drive, turns west on<br />

Shetland Avenue, and terminates at node NS6128, which is located in an open area, just<br />

south of the intersection of Libra Avenue and Crystal Drive.<br />

Forcemain segment PS 233 to NS6189 begins at PS 233, located at the south end of Sage<br />

Drive, heads north along Sage Drive and Cimmaron Drive, turns southwest at Hooper<br />

Road, and terminates at node NS6189, located at the intersection of Hooper Road and<br />

Sullivan Road.<br />

GNV31031158552.DOCX/103470004 5-38 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

Forcemain segment PS 234 to NS 6189 starts at PS 234, located at the intersection of Dorset<br />

Avenue and York Road, heads west on Dorset Avenue, turns southeast on Sullivan Road,<br />

and terminates at node NS6189, located at the intersection of Hooper Road and Sullivan<br />

Road.<br />

Forcemain segment PS 249 to NS 6239 starts at PS 249, located near the intersection of<br />

Durmast Drive and Roble Avenue, heads south along Durmast Drive, turns west on Wax<br />

Road, and terminates at node NS6239, located near the intersection of Wax Road and<br />

Brookside Road.<br />

Forcemain segment NS 6268A to NS 6393 begins at new node NS 6268A, located just<br />

southwest of the intersection of Regent Avenue and Overwood Drive, and follows a<br />

drainage path roughly south to node NS6393, located on Greenwell Springs Road, in<br />

between Greenmeadow Drive and Sullivan Road.<br />

Forcemain segment PS 200 to NS 6391 starts at PS 200, located on Keystone Avenue, in<br />

between Teah Drive and Tarrora Drive, follows Gottlieb Road and a drainage path generally<br />

northwest, turns southwest on Greenwell Springs Road, and follows Greenwell Springs<br />

Road to NS6391, located on Greenwell Springs Road in between Greenmeadow Drive and<br />

Sullivan Road.<br />

Forcemain segment PS 285 to NS 6406 begins at PS 285, located on Bristlecone Court, just<br />

north of its intersection with Evergreen Hills Avenue, and follows a servitude to the<br />

northwest to PS 164, located at the eastern end of Stoneridge Drive. From PS 164, the<br />

forcemain follows Stoneridge Drive west, turns north at Donnybrook Avenue, and<br />

terminates at node NS6406, located near the intersection of Donnybrook Avenue and<br />

Greenwell Springs Road.<br />

Forcemain segment PS 113 to NS 6431 starts at PS 113, located near the intersection of Triple<br />

B Road and Chapparal Place, heads east along Triple B Road, and terminates at node<br />

NS6431, located near the intersection of Triple B Road and Sullivan Road.<br />

Forcemain segment PS 160 to NS 6419, begins at PS 160, located near the intersection of<br />

Chambord Drive and Chaumont Avenue, heads southwest along Chaumont Avenue, turns<br />

northwest on Frenchtown Road, turns northeast on Greenwell Springs Road, and follows<br />

Greenwell Springs Road to node NS6419, located near the drainage path that is in between<br />

Sullivan Road and Greenmeadow Drive.<br />

Forcemain segment PS 207 to NS 6489 begins at PS 207, located near the intersection of Red<br />

Maple Place and Post Oak Court, heads north along Post Oak Court, turn east on Country<br />

Road, turns northwest on Frenchtown Road, and terminates at node NS 6489, located near<br />

the intersection of Frenchtown Road and Chaumont Road.<br />

Forcemain segment PS 152 to NS 6377 starts at PS 152, located just southwest of the<br />

intersection of Pecos Avenue and Prairie Drive, heads east to Prairie Drive, turns north on<br />

Prairie Drive, and terminates at node NS 6377, located near the intersection of Prairie Drive<br />

and Lovett Road.<br />

Forcemain segment PS 231 to NS 6328 begins at PS 231, located near the intersection of<br />

Sagefield Avenue and Cornwood Avenue, heads south through a wooded area, and<br />

terminates at node NS 6328, located on Lovett Road, approximately 3,500 feet east of its<br />

intersection with Joor Road. Forcemain segment PS 195 to NS 6308 begins at PS 195, located<br />

GNV31031158552.DOCX/103470004 5-39 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

just south of the south end of Stoneshire Drive, goes north along Stoneshire Road, turns<br />

west on Landfair Road, turns north on Burtcliff Drive, turns west on Tynwood Avenue,<br />

turns north on Joor Road, and terminates at node NS 6308, located at the intersection of Joor<br />

Road and Lovett Road.<br />

Forcemain segment PS 69 to NS 6257 starts at PS 69, located in between the eastern ends of<br />

Tanglewood Drive and Rustling Oaks Drive, heads north on Tanglewood Road, and<br />

terminates at node NS 6257, located near the intersection of Tanglewood Drive and Lovett<br />

Road.<br />

Forcemain segment BPS 510 to NS 6252 begins at BPS 510, which will be abandoned as part<br />

of project NFE-C-0005 (Hooper Road Pump Station Projects), located near the intersection of<br />

Sullivan Road and Lovett Road. From BPS 510, the forcemain follows Lovett Road west and<br />

north to node NS 6252, located near the intersection of Lovett Road and Hooper Road.<br />

Scope<br />

This project includes construction of approximately 5,200 feet of 10-inch, 12-inch, and 15-<br />

inch gravity sewer upstream of PS 155, PS 195, PS 200, and PS 231. This project also includes<br />

construction of approximately 115,000 feet of 6-inch, 8-inch, 10-inch, 12-inch, 14-inch, 16-<br />

inch, 18-inch, 24-inch, and 30-inch forcemain in the North Forced East Basin. The detailed<br />

scope of the project is shown in Table 5-13.<br />

TABLE 5-13<br />

NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

155-00037 155-00031 710 8 10 Gravity segment<br />

155-00031 155-00013 1,230 8 12 Gravity segment<br />

155-00013 PS155 420 10 15 Gravity segment<br />

195-00004 PS 195 940 8 12 Gravity segment<br />

200-00011 PS 200 370 8 12 Gravity segment<br />

231-00015 231-00013 500 8 12 Gravity segment<br />

231-00013 PS 231 1,040 8 15 Gravity segment<br />

PS181 NS6088 1,840 6 10<br />

PS155 NS6103 1,900 8 10<br />

PS106 NS6134 2,460 6 10<br />

NS6134 NS6128 3,100 8 10<br />

PS233 NS6165 2,060 4 6<br />

NS6165 NS6183 3,000 18 24<br />

NS6183 NS6189 1,450 18 24<br />

PS234 NS6150 3,400 4 8<br />

NS6150 NS6157 2,320 10 16<br />

NS6157 NS6189 3,040 14 24<br />

PS249 NS6239 9,100 8 10<br />

NS6268A NS6393 4,410 12 16<br />

GNV31031158552.DOCX/103470004 5-40 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-13<br />

NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS200 NS6404 4,260 8 10<br />

NS6404 NS6395 970 8 10<br />

NS6395 NS6406 3,600 10 12<br />

NS6406 NS6419 5,950 12 16<br />

NS6419 NS6393 1,750 14 18<br />

NS6393 NS6391 380 18 30<br />

PS285 PS164 1,300 6 8<br />

PS164 NS6406 3,960 6 8<br />

PS113 NS6419 3,170 6 8<br />

NS6419 NS6431 2,680 12 14<br />

PS160 NS6489 2,510 6 10<br />

NS6489 NS6472 2,540 8 12<br />

NS6472 NS6419 6,110 10 14<br />

PS207 NS6489 1,600 4 6<br />

PS152 NS6381 500 4 6<br />

NS6381 NS6377 500 4 6<br />

PS231 NS6328 1,720 6 12<br />

PS195 NS6575 7,840 8 14<br />

NS6575 NS6308 2,920 8 14<br />

PS69 NS6257 1,510 6 8<br />

PS510 NS6402 4,280 10 30<br />

NS6402 NS6351 4,890 20 30<br />

NS6351 NS6328 2,200 20 30<br />

NS6328 NS6308 2,930 20 30<br />

NS6308 NS6257 4,340 24 30<br />

NS6257 NS6252 600 24 30<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $18,200,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-41 JANUARY 2011<br />

REV. 5


Blackwater<br />

Acres<br />

Hubbs<br />

Sullivan<br />

Carney<br />

#<br />

PS263<br />

!R # #<br />

NS6088<br />

!R<br />

155-00013<br />

#<br />

PS155<br />

!R !R !R #<br />

!R<br />

NS6128<br />

# !R #<br />

!R !R<br />

NS6103 PS198<br />

155-00031<br />

PS265<br />

NS6134<br />

BPS504<br />

PS234 PS234<br />

!R #<br />

NS6150 !R #<br />

PS106<br />

PS125 !R<br />

#<br />

NS6157 NS6165<br />

!R<br />

#<br />

PS72 !R<br />

NS6183 #<br />

!R<br />

# #<br />

BPS509 !R #<br />

#<br />

NS6189 !R<br />

PS176<br />

PS233<br />

PS284<br />

PS325<br />

# #<br />

PS103<br />

#<br />

PS249<br />

# PS271<br />

# !R #<br />

PS86<br />

NS6239<br />

#<br />

!R<br />

PS144 NS6252<br />

NS6257<br />

# !R #<br />

!R #<br />

#<br />

!R !R<br />

231-00015 PS230<br />

PS69<br />

!R<br />

PS231<br />

231-00013<br />

NS6268a<br />

NS6308 !R #<br />

PS282<br />

!R<br />

!R #<br />

!R<br />

NS6328 PS510AA NS6351<br />

#<br />

NS6575 PS418 !R #<br />

!R # PS152<br />

PS196<br />

!R<br />

#<br />

# !R<br />

NS6391 NS6393<br />

NS6395<br />

PS202 NS6381<br />

PS280<br />

#<br />

!R!R #<br />

!R<br />

!R #<br />

PS187<br />

PS510<br />

NS6406<br />

NS6404<br />

#<br />

# NS6419<br />

!R !R<br />

NS6402<br />

!R<br />

#<br />

PS200<br />

NS6431<br />

# !R !R #<br />

195-00004<br />

!R # !R # !R<br />

200-00011<br />

PS195<br />

PS164<br />

!R #<br />

PS113<br />

PS138<br />

!R #<br />

#<br />

# !R #<br />

PS1007 PS285<br />

#<br />

NS6472 PS160<br />

PS288<br />

!R #<br />

#<br />

!R<br />

#<br />

#<br />

PS121#<br />

NS6489 !R<br />

PS197<br />

#<br />

!R #<br />

BPS503 #<br />

PS207<br />

# #<br />

#<br />

## # #<br />

PS281<br />

#<br />

PS334<br />

#<br />

#<br />

#<br />

# Legend<br />

Proposed<br />

Existing Lovett Rd. - Greenwell Springs Rd.<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NFE-C-0006<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-15<br />

Smith<br />

Joor<br />

East Baton Rouge Parish<br />

Core<br />

Northeast<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

Joor<br />

Denham<br />

0 0.375 0.75<br />

Mile<br />

Sully<br />

Pinewood<br />

PS181<br />

PS155<br />

Chanove<br />

Wax<br />

Droze<br />

Willow Creek<br />

Thibodeaux<br />

#<br />

PS443<br />

Wax<br />

Morgan<br />

<strong>Plan</strong>chet


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.7 NFE-C-0007 (Multiple BPS – Hooper Road – Lovett Road)<br />

The NFE-C-007 (Multiple BPS – Hooper Road – Lovett Road) project has been combined<br />

with NFE-C-0005 (Multiple PS-Hooper Road-Greenwell Springs Road) from the October<br />

2008 PDP. The combined project has been designated NFE-C-0005 (Hooper Road Pump<br />

Station Improvements) project and is described in Section 5.4.5.<br />

GNV31031158552.DOCX/103470004 5-43 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.8 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The NFW-C-0001 (Joor Road –Greenwell Springs Road Sewer Area Upgrades) project<br />

involves the design and construction of forcemain upgrades in the North Forced West Basin.<br />

The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />

forcemain capacity. The upgrades range in size from 6 to 24 inch diameter.<br />

Location<br />

This project involves the replacement of portions of the North Forced West manifold<br />

forcemain system as well as replacement of some gravity segments in the same area as the<br />

forcemain segments. The locations of the gravity sewer and forcemains in this project are<br />

shown in Figure 5-16.<br />

Forcemain segment PS 183 to NS 6485 begins outside the property boundary of PS 183.<br />

Upon leaving the pump station, the forcemain travels north for approximately 50 feet before<br />

reaching Canterbury Drive. At Canterbury Drive, the forcemain turns east and follows the<br />

road for approximately 225 feet to the intersection of Canterbury Drive and Greenforrest<br />

Drive. At Greenforrest Drive, the forcemain turns northward and follows the road for<br />

approximately 1,500 feet to the intersection of Greenforrest Drive and Greenwell Springs<br />

Road. At this point, the forcemain travels under Greenwell Springs Road and manifolds into<br />

a larger forcemain at node NS 6485.<br />

Forcemain segment PS 119N to NS 6509 begins outside the property boundary of PS 119.<br />

Upon leaving the pump station, the forcemain travels west for approximately 50 feet before<br />

reaching Sarasota Drive. At Sarasota Drive, the forcemain turns north and follows the road<br />

for approximately 1,000 feet to the intersection of Sarasota Drive and Coral Drive. At Coral<br />

Drive, the forcemain turns northward and follows the road for approximately 500 feet to the<br />

intersection of Coral Drive and Greenwell Springs Road. At this point, the forcemain travels<br />

under Greenwell Springs Road and manifolds into a larger forcemain at node NS 6509.<br />

Forcemain segment BPS 503 to NS 6438 begins outside the property boundary of BPS 503<br />

and travels south for approximately 150 feet before reaching Greenwell Springs Road. At<br />

Greenwell Springs Road, the forcemain turns west and follows the north ROW for<br />

approximately 6,000 feet to the intersection of Greenwell Springs Road and Joor Road. At<br />

Joor Road, the forcemain turns north and follows the east ROW for approximately 7,600 feet<br />

to the intersection of Joor Road and Mickins Road. At the intersection of Joor Road and<br />

Mickens Road (node NS6438), the forcemain travels northwest along Mickens Road for<br />

approximately 7,000 feet to node NS6438, located at the intersection of Mickens Road and<br />

Lanier Drive.<br />

Forcemain segment PS 288 to NS 6461 begins outside the property boundary of PS 288.<br />

Upon leaving PS 288, the forcemain travels northwest along an electrical servitude for<br />

approximately 2,650 feet to its intersection with Joor Road. At Joor road, the forcemain turns<br />

south for approximately 250 feet to node NS 6461, located near the intersection of Mickens<br />

Road and Joor Road.<br />

Forcemain segment NS 6499 to NS 6500 begins at node NS 6499, located near the end of the<br />

cul-de-sac on Dancy Avenue, and follows Dancy Avenue west to node NS6500, located near<br />

the intersection of Dancy Avenue and Joor Road.<br />

GNV31031158552.DOCX/103470004 5-44 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

Gravity segment 119N-00039 to PS 119N starts at manhole 119-00039, located near the<br />

intersection of Daytona Avenue and Flamingo Drive, runs northeast along Flamingo Drive,<br />

and turns north on Sarasota Drive to PS 119N, located on Sarasota Drive in between<br />

Flamingo Drive and Biscayne Drive.<br />

Gravity segment 183-00009 to 183-00001Z begins at manhole 183-00009, located near the<br />

intersection of Cardigan Avenue and Kilkenny Drive, and follows Kilkenny Drive north to<br />

manhole 183-00001Z, which is located near the intersection of Kilkenny Drive and N. Salem<br />

Drive.<br />

Gravity segment 128-00041A to PS 128 starts at manhole 128-00041A, located near the<br />

intersection of Toledo Bend Avenue and Redlands Drive, and heads south to PS 128, located<br />

on Redlands Drive, in between Cedar Bend Avenue and Elaine Drive.<br />

Scope<br />

The scope of this project includes construction of approximately 1,750 feet of 10-inch and 12-<br />

inch gravity sewer upstream of PS 119N and PS 128 and approximately 2,600 feet of 21-inch<br />

gravity sewer upstream of PS 183. This project also includes construction of 29,800 feet of 4-<br />

inch, 6-inch, 10-inch, 16-inch, and 24-inch forcemain in the North Forced West basin. The<br />

detailed scope of this project is given in Table 5-14.<br />

TABLE 5-14<br />

NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter (in)<br />

Proposed<br />

Diameter (in)<br />

PS 183 NS6512 160 14 16<br />

Comments<br />

NS6512 NS6485 1,600 14 16<br />

PS 119N NS6509 2,150 8 10<br />

BPS503 NS6550 8,500 14 24<br />

NS6550 NS6500 2,300 18 24<br />

NS6500 NS6438 10,200 14 24<br />

PS288 NS6461 3,400 4 6<br />

NS6499 NS6500 1,500 3 4<br />

119N-00039 PS119N 990 8 10 Gravity segment<br />

183-00009 183-00001Z 2,600 12, 15, & 16 21 Gravity segment<br />

128-00041A 128-00040A 360 10 12 Gravity segment<br />

128-00040A 128-00001Z 320 10 12 Gravity segment<br />

128-00001Z PS128 85 10 12 Gravity segment<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $6,900,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction has Not Started.<br />

GNV31031158552.DOCX/103470004 5-45 JANUARY 2011<br />

REV. 5


Greenway<br />

Rome<br />

Airway<br />

Vega<br />

Monterrey<br />

Platt<br />

Aletha<br />

Ridgemont<br />

Hillmont<br />

Lassen<br />

Mike<br />

Erin<br />

Harco<br />

#<br />

Watts<br />

Hickcock<br />

Cody<br />

#<br />

Hooper<br />

PS130<br />

#<br />

Blackwater<br />

BPS511<br />

Shady Bluff<br />

#<br />

PS196<br />

PS418<br />

Joor<br />

#<br />

Cook<br />

Haven<br />

Conestoga<br />

Pecos<br />

#<br />

PS202<br />

PS152<br />

#<br />

#<br />

#<br />

Prairie<br />

PS510AA<br />

Lovett<br />

PS187<br />

#<br />

!R<br />

NS6438<br />

Suncrest<br />

Brillock<br />

Burtcliff<br />

Landfair<br />

#<br />

PS195<br />

Frontier<br />

Lariat<br />

PS113<br />

PS138<br />

# #<br />

#<br />

#<br />

#<br />

Wright<br />

#<br />

PS277<br />

#<br />

Hanks<br />

Airline<br />

Greenwell<br />

Dickens<br />

Riffel<br />

Oak View<br />

PS11<br />

Tom<br />

Prescott<br />

Gay<br />

Greentree<br />

Athens<br />

Madrid<br />

#<br />

Paris<br />

Kiowa<br />

East Baton Rouge Parish<br />

Berlin<br />

Oak Crest<br />

Joyce<br />

Mickens<br />

#<br />

PS453<br />

NS6500<br />

Choctaw<br />

!R<br />

!R<br />

Oak Villa<br />

Crestaire<br />

!R<br />

Dancy<br />

NS6550<br />

#<br />

NS6461<br />

!R<br />

Ridgewood<br />

Ridgewood<br />

PS222<br />

Greenwell Springs<br />

#<br />

El Scott<br />

NS6499<br />

#<br />

PS281<br />

PS18<br />

Syble<br />

Ventura<br />

#<br />

Grand Teton<br />

El Cajon<br />

Tampa<br />

!R #<br />

Westerly<br />

PS288<br />

PS288<br />

BPS503<br />

#<br />

!R #<br />

Beta<br />

Elain<br />

Mammoth<br />

Perdue<br />

PS503<br />

Edgemont<br />

#<br />

#<br />

128-00001Z<br />

!R<br />

!R<br />

!R #<br />

#<br />

PS16<br />

# PS190<br />

Darryl<br />

Gerald<br />

Tams<br />

Cletus<br />

#<br />

!R!R #<br />

!R<br />

# PS119N<br />

PS119NFM<br />

#<br />

!R<br />

183-00009 #<br />

!R<br />

#<br />

Legend<br />

Joor Rd. - Greenwell Springs Rd.<br />

Proposed<br />

Existing<br />

#I<br />

³<br />

Sewer Area upgrades<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

NFW-C-0001<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-16<br />

0 0.5<br />

1<br />

Miles<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFW-C-0001.MXD SGELPI 11/9/2010 09:46:31<br />

Capri<br />

#<br />

119N-00039<br />

Dual<br />

NS6509<br />

PS454<br />

PS128<br />

#<br />

!R<br />

128-00041A<br />

PS359<br />

Chalice<br />

Catalpa<br />

128-00040A<br />

PS89<br />

Sarasota<br />

PS293<br />

Richcroft<br />

Darryl<br />

#<br />

Bard<br />

Ocala<br />

Coral<br />

!R<br />

PS183<br />

PS183<br />

Stan<br />

Vickers<br />

#<br />

NS6485<br />

Salem<br />

PS314<br />

Warfield<br />

NS6512<br />

183-00001Z<br />

Wendover<br />

Stacy<br />

La Annie<br />

#<br />

Linstrom<br />

Cherryl<br />

Kerry<br />

#<br />

PS169<br />

Windsor


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.9 NFW-C-0002 (Choctaw Storage and Pump Station Facility)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The NFW-C-0002 (Choctaw Storage and Pump Station Facility) project is a project that was a<br />

combination of the NFW-C-0002 (Choctaw Storage, PS52A, PS 51A, PS 51AA, and<br />

Forcemains) project and the NFW-C-0003 (Choctaw Storage Pump Station) project from the<br />

October 2008 PDP. The combined project has been designated NFW-C-0002 (Choctaw Storage<br />

and Pump Station Facility) project and is described in this section.<br />

This project involves the design and construction of a 26-million gallon (MG) storage facility<br />

(Choctaw Storage Facility) in west-central Baton Rouge Parish. This project also includes the<br />

construction of an overflow pump station for Pump Station 52 (PS 52A), an overflow pump<br />

station for PS 51 (PS 51A), a gravity trunk line overflow pump station (PS 51AA), and the<br />

forcemains to convey the flow from the pump stations to the storage facility. One of the<br />

forcemains will also serve as the return line for flow from the Choctaw Storage Facility to PS<br />

52. The purpose of this facility is to detain peak wet weather flows during a storm event, and<br />

release them back into the collection system when demand is lower.<br />

Construction of the storage facility will eliminate approximately 6.5 miles of pipe<br />

replacement, reduce the overall pipe diameter for the remaining sewer projects, and eliminate<br />

the need to increase the capacity of the North WWTP.<br />

Location<br />

The location of the 26 MG storage facility is near the northeast corner of the intersection of<br />

Airline Highway and South Choctaw Drive. The C-P already owns the parcel of land. The<br />

locations of the pump stations are given in Table 5-15.<br />

The force main from PS 52A to the storage facility will lead south along E. Brookstown Drive<br />

to Winbourne Avenue It will then head east along Winbourne Avenue to the intersection with<br />

Victoria Drive. From Victoria Drive, the main will cross Greenwell Springs Road and follow<br />

the frontage road at the intersection of Airline Highway and Greenwell Springs Road. The<br />

main will then cross Airline Highway and run parallel to Reco Avenue to the storage facility.<br />

The forcemain from PS 51A to the storage facility will run south along Sierra Vista Drive to<br />

Cuyhanga Parkway. It then travels west along Cuyhanga Parkway to the end of Cuyhanga<br />

Parkway and cross open field to Tom Drive. The main will run west along Tom Drive to<br />

Airway Drive where it will head north to W. El Cajon Drive. It will run west along W. El<br />

Cajon Drive north on Commerce Avenue and across Choctaw Drive to the storage facility.<br />

The forcemain from PS 51AA to the manifold point with the forcemain from PS 51A will begin<br />

near the intersection of Red Oak Drive and Sharp Lane and head north along Sharp Lane to<br />

the intersection with Cuyhanga Parkway. From this point, the force main will head west along<br />

Cuyhanga Parkway to the intersection with Sierra Vista Drive, where it will intersect with the<br />

force main from PS 51A.<br />

Scope<br />

This project includes the construction of one, 20 million gallon (MG) storage tank and one 6<br />

MG storage tank at the Choctaw Storage Facility and their associated piping, valving,<br />

controls, and appurtenances. The pump stations and forcemains are detailed in Table 5-15 and<br />

Table 5-16 and are shown in Figure 5-17.<br />

GNV31031158552.DOCX/103470004 5-47 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-15<br />

NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS51A<br />

PS51AA<br />

Sierra Vista Drive north of the intersection with<br />

Cuyhanga Parkway<br />

Near the intersection of Red Oak Drive and<br />

Sharp Lane<br />

New 8,333 0<br />

New 3,125 0<br />

PS 52A<br />

NE of Brookstown Drive intersection with<br />

Winbourne<br />

New 31,924 0<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

TABLE 5-16<br />

NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Forcemain Information<br />

US No.<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

PS52A Choctaw Storage 10,100 New 42<br />

PS51A PS51WW1 130 New 30<br />

PS51WW1 Choctaw Storage 10,780 New 30<br />

PS51AA PS51WW1 3,100 New 14<br />

Note: The new pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $55,000,000.<br />

Total Storage Facility Land Acquisition Cost is $1,218,720 (already acquired).<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-48 JANUARY 2011<br />

REV. 5


Anita<br />

Alello<br />

Maribel<br />

Airway<br />

Cora<br />

Sharp<br />

#<br />

#<br />

Greenwell<br />

El Scott<br />

Cyrus<br />

Merrydale<br />

Airline<br />

Dover<br />

Hanks<br />

Prescott<br />

#<br />

PS11<br />

PS39<br />

#<br />

Ridgewood<br />

#<br />

PS222<br />

PS116<br />

#<br />

#<br />

PS288<br />

#<br />

BPS503<br />

#<br />

Heidel<br />

PS52<br />

!R#I<br />

PS52WW_3<br />

#<br />

PS52A<br />

Calumet<br />

Victoria<br />

#<br />

PS55<br />

Joor<br />

Greenwell Springs<br />

#<br />

PS18<br />

#<br />

PS281<br />

#<br />

Elain<br />

Greenway<br />

Gerlando<br />

Lone Oak<br />

Oak Crest<br />

Joyce<br />

Winbourne<br />

Grand Teton<br />

# #<br />

PS16<br />

Victoria<br />

#<br />

PS49<br />

#<br />

Renoir<br />

Lobdell<br />

#<br />

PS30<br />

Choctaw # Storage Tank Facility<br />

# #<br />

Carrollton<br />

Rodin<br />

Industrial<br />

Cezanne<br />

Goya<br />

Donmoor<br />

Harry<br />

Dallas<br />

Wooddale<br />

Florida<br />

")<br />

Fernwood<br />

Athens<br />

Tom<br />

Harry<br />

Florline<br />

Kiowa<br />

Choctaw<br />

Cortana<br />

Oak Villa<br />

Monterrey<br />

Mollylea<br />

Darryl<br />

PS51WW3<br />

Cuyhanga<br />

Donna<br />

PS51A<br />

#I<br />

!R<br />

!R!R #<br />

#I<br />

#<br />

PS81<br />

#<br />

Marilyn<br />

#<br />

Perdue<br />

Riveroaks<br />

Gerald<br />

Cletus<br />

PS51WW2<br />

Ocean<br />

Ship<br />

Marion<br />

Marquette<br />

Independence<br />

Airport<br />

Colonial<br />

#<br />

PS323<br />

Meredith<br />

Parkview<br />

Keed<br />

East Baton Rouge Parish<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

# Legend<br />

³<br />

Choctaw Storage, PS52A, PS51A,<br />

Proposed<br />

Existing<br />

PS51AA, FM<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

NFW-C-0002<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility<br />

0 1,500 3,000<br />

Feet<br />

Figure 5-17


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.10 NFW-C-0003 (Choctaw Storage Pump Station)<br />

Project Description<br />

This project has been deleted and combined with NFW-C-0002 (Choctaw Storage, PS 52A, PS<br />

51A, PS 51AA, and Forcemains) from the October 2008 PDP and the combined project has<br />

been designated as the NFW-C-0002 (Choctaw Storage and Pump Station Facility) and is<br />

described in Section 5.4.9.<br />

5.4.11 NFW-C-0004 (Hooper Storage Facility)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The NFW-C-0004 (Hooper Storage Facility) project involves the design and construction of a<br />

10-MG storage facility (Hooper Storage Facility) in northwest Baton Rouge Parish as well as<br />

the replacement of BPS 897 with a wet well pump station. The purpose of this facility is to<br />

detain peak wet weather flows during a storm event, and release them back into the collection<br />

system when demand is lower.<br />

Construction of the storage facility will eliminate the need for approximately 13,200 feet of<br />

pipe replacement, reduce the overall pipe diameter for the remaining sewer projects, and<br />

eliminate the need to increase the capacity of the North WWTP.<br />

Location<br />

The proposed location of the storage facility is near the northwest corner of the intersection<br />

of Hooper Drive (Highway 408) and Mickens Road and is shown in Figure 5-18.<br />

Scope<br />

The project scope includes the design and construction of the storage facility and associated<br />

pumping systems to transfer flows in and out of the facility. A new PS 897 will be built on<br />

the same site as the storage facility to transfer flows in and out of the facility. Once the<br />

storage facility and pump station are operational, BPS 897 will be abandoned.<br />

Total Construction Bid Amount is $19,100,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-50 JANUARY 2011<br />

REV. 5


Mable<br />

Sharon Hills<br />

Cefalu<br />

Junelise<br />

Hooper Storage Tank Facility<br />

") #I<br />

New PS897<br />

Marionette<br />

Cedar Glen<br />

Corlett<br />

#<br />

Hooper<br />

#<br />

BPS897<br />

Mickens<br />

Laredo<br />

St Gabriel<br />

Juarez<br />

St Pius<br />

Mc Clelland<br />

Santa Cruz<br />

Toria<br />

San Juan<br />

East Baton Rouge Parish<br />

Legend<br />

³<br />

Existing<br />

Exist. Gravity<br />

Hooper Storage Facility<br />

Exist. Forcemain<br />

# Exist. Pump Station<br />

!R<br />

Project Vicinity Map<br />

Figure 5-18<br />

0 300 600<br />

Feet<br />

Proposed<br />

#I<br />

New Pump<br />

Stations<br />

New Gravity Main<br />

New Force Main<br />

Manholes\Nodes<br />

") New Storage Facility<br />

NFW-C-0004<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFW-C-0004.MXD SGELPI 11/9/2010 09:45:53


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.12 Group Project 1A (Metro Airport Sewer Upgrades)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The Group Project 1A (Metro Airport Sewer Upgrades) project involves the design and<br />

construction of upgrades to the collection system in the North Forced West Basin and the<br />

North Gravity Basin. This project includes upgrading portions of the gravity collection<br />

system located in the areas served by PS 46, PS 55, PS 39, PS 52, PS47, PS 54, PS 24, and PS<br />

43. The upgrades are designed to alleviate chronic SSOs in the collection system and at the<br />

pump stations, as well as increase the system capacity. This project includes gravity sewers<br />

from the following projects in the January 2008 PDP: NGS-C-0001 (Progress Road – Baton<br />

Rouge Metro Airport), NFW-C-0005 (Airline Highway – Victoria Drive), and NFW-C-0006<br />

(McClelland Drive). Some line segments, or portions of these projects, from the January 2008<br />

PDP are being executed as part of the C-P Green Light <strong>Program</strong> Ford Street Project.<br />

Location<br />

This project involves the replacement of portions of the gravity collection system, which are<br />

shown in Figure 5-19.<br />

Gravity segment 054-00027 to 054-00001A begins at manhole 054-00027, located on Dutton<br />

Street, south of the intersection of Dutton Street and Cannon street. From this point, the<br />

gravity line travels south for approximately 1,200-feet to manhole 054-00009, located near<br />

intersection of Dutton Street and Greenwell Street. At manhole 054-00009, the gravity line<br />

turns east and follows Greenwell Street to manhole 054-00001A, which is adjacent to PS 54.<br />

The inverts along this segment are approximately 10 feet to 15 feet deep.<br />

Gravity segment 052-00700 to 052-00521 begins at manhole 052-00700, located on Greenwell<br />

Street, and travels east along Greenwell Street to manhole 052-000710, located near the<br />

intersection of Greenwell Street and Winchester Avenue. At manhole 054-00710, the gravity<br />

line turns south and follows Winchester Avenue to the intersection of Winchester Avenue<br />

and Hollywood Street. At this point, the gravity turns east and travels along Hollywood<br />

Street for approximately 950 feet before joining a larger trunk line at manhole 052-00521.<br />

The inverts along this segment are approximately 15 feet to 20 feet deep.<br />

Gravity segment 024-00186 to 024-00011 begins at manhole 024-00186, which is located east<br />

of the intersection of <strong>Plan</strong>k Road and Lorraine Street. At this point, the gravity line travels<br />

east along Lorraine Street for approximately 1,380 feet to manhole 024-000182, located near<br />

Lorraine Street. At manhole 24-000182, the gravity line turns south and travels to manhole<br />

024-00088 and then follows Wildwood Parkway for approximately 1,400 feet to manhole<br />

024-00011. The inverts along this segment are approximately 15 feet to 20 feet deep.<br />

Gravity segment 024-00192 to 024-00182 begins at manhole 024-00192 which is located west<br />

of the intersection of Lorraine Street and Lemonwood Drive. At this point, the gravity line<br />

travels west along Lorraine Street for approximately 850 feet to manhole 24-000182, located<br />

near Lorraine Street. The inverts along this segment are approximately 15 feet to 20 feet<br />

deep.<br />

Gravity segment 039-00035 to PS 39 begins at manhole 039-00035 located near Phebus Drive.<br />

From this point, the gravity line travels east for approximately 850 feet to manhole 039-<br />

00008. At manhole 039-00008, the gravity line connects with a larger trunk line. The trunk<br />

GNV31031158552.DOCX/103470004 5-52 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

line runs south for approximately 2,600 feet to PS 39. The inverts along this segment are<br />

approximately 10 feet to 15 feet deep.<br />

Gravity segment 052-00214 to 052-00204 begins near the intersection of Videt Polk Drive and<br />

Lanier Drive and travels south along Lanier Drive to the intersection of Lanier Drive and<br />

Prescott Road.<br />

Gravity segment 043-00095 to 043-00073 begins north of Interstate 110, near Baton Rouge<br />

Avenue. The gravity line travels north along Baton Rouge Avenue to the intersection of<br />

Baton Rouge Avenue and Hollywood Street.<br />

Gravity segment 052-00882 to 052-00768 begins at manhole 052-00882 which is located at the<br />

intersection of <strong>Plan</strong>k Road and Crown Avenue. From this point, the gravity line travels east<br />

along Crown Avenue approximately 1,100 feet to manhole 052-00451, located at the<br />

intersection of Crown Avenue and Beachwood Drive. Gravity segment 052-00451 to PS 47<br />

begins at manhole 052-00451, located at the intersection of Crown Avenue and Beachwood<br />

Drive. From this point, the gravity line travels east until reaching 052-00583B located near<br />

the intersection of Crown Avenue and Winchester Avenue. The gravity segment travels<br />

south until reaching 052-00556JA, located near the intersection of Winchester Avenue and<br />

Glenn Oaks Drive, continuing east until reaching 052-00556D. After leaving 052-00556D, the<br />

gravity line travels south along McClelland Drive until reaching 052-00556DA, located at the<br />

intersection of Crestway Avenue and McClelland Drive. The gravity line continues east<br />

along Crestway Avenue until reaching 047-00008, located east of the Crestway Avenue and<br />

Buckeye Drive intersection. The gravity segment travels south until reaching PS 47, located<br />

near the intersection of Vineyard Drive and W Rio Drive.<br />

Gravity segment 052-00583A to 052-00583B begins at manhole 052-00583A, located near<br />

Monarch Avenue and Winchester Avenue intersection. The gravity line travels south until<br />

reaching 052-00583B, located near the intersection of Crown Avenue and Winchester<br />

Avenue.<br />

Gravity segment 047-00014 to 047-00008 begins at manhole 047-00014, located near Glen<br />

Oaks Drive and Buttonwood Drive intersection. The gravity line travels south until reaching<br />

047-00008, located east of the Crestway Avenue and Buckeye Drive intersection.<br />

Gravity segment PS92DS to 047-00003 begins at PS92DS, located north of Glen Oaks Drive<br />

and Landis Drive intersection. The gravity line travels southwest until reaching 047-00556,<br />

then travels south, crossing Glen Oaks Drive until reaching 047-00557. The gravity line<br />

travels south until reaching Maplewood Drive and then travels northwest along<br />

Maplewood Drive until reaching 047-00474, located near Maplewood Drive and Cedar<br />

Grove Drive intersection. After leaving 047-00474, the gravity line travels southwest until<br />

reaching 047-00472. The gravity segment travels west along the north side of the drainage<br />

canal until reaching 047-00003.<br />

Gravity segment 052-00144 to 052-00001 begins at 052-00144, located south of the Evangeline<br />

Street and East Brookstown Drive intersection. The gravity line travels south down East<br />

Brookstown Drive until reaching 052-00400. The gravity line continues east until reaching<br />

052-00001.<br />

Gravity segment PS 35 DS to PS 52 begins at PS35DS, located near Maplewood Drive and<br />

Shiloh Street intersection. The gravity line travels southwest along the drainage canal until<br />

reaching 052-00295 (PS47DS). The gravity line travels south, from 052-00295 until reaching<br />

GNV31031158552.DOCX/103470004 5-53 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

052-00269A located on Greenwell Street between its intersections with Landis Drive and<br />

Loring Drive. The gravity line continues east on Greenwell Street for 268 ft until reaching<br />

052-00280A and then continues south. The gravity segment continues to travel south along<br />

Victoria Drive until reaching 052-00100, locates south of Victoria Drive and Prescott Road<br />

intersection. The gravity line travels southwest, crossing Airline Highway and traveling<br />

parallel to Bicentennial Place for 1,390 feet. The gravity line continues south until reaching<br />

052-00006A and then travels west for 1600 feet until reaching 052-00001. The gravity<br />

segments travels southwest until reaching PS52, located near the intersection of East<br />

Brookstown Drive and Hendricks Avenue.<br />

Gravity segment 052-00168 to 052-00161 begins at 052-00168, located at Prescott Road and<br />

Maribel Drive intersection. The gravity line travels west until reaching 052-00161, located at<br />

the intersection of Prescott Road and Victoria Drive.<br />

Scope<br />

The detailed scope of this project is shown in Table 5-17.<br />

TABLE 5-17<br />

Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

047-00428 047-00418 221 10 18<br />

047-00418 047-00417 313 12 21<br />

047-00417 047-00029 1602 12 18<br />

047-00264 047-00043 507 8 15<br />

054-00027 054-00026 246 8 18<br />

054-00026 054-00009 966 15 21<br />

054-00009 054-00008 233 15 24<br />

054-00008 054-00006 530 15 24<br />

054-00006 054-00001A 177 15 24<br />

054-00001A PS54 77 15 24<br />

052-00755 052-00521 499 18 27<br />

052-00745 052-00755 235 18 27<br />

052-00716 052-00745 816 18 27<br />

052-00710 052-00716 289 18 27<br />

052-00700 052-00710 1277 18 27<br />

024-00192 024-00182 673 8 21<br />

024-00186 024-00182 1373 10 21<br />

024-00182 024-00110 323 15 21<br />

024-00110 024-00101 301 15 21<br />

024-00101 024-00088 332 18 21<br />

024-00088 024-00067 349 18 24<br />

024-00067 024-00064 365 18 27<br />

024-00064 024-00030 338 21 27<br />

024-00030 024-00011 347 21 27<br />

052-00214 052-00209 1173 12 15<br />

GNV31031158552.DOCX/103470004 5-54 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-17<br />

Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

052-00209 052-00205 586 12 18<br />

052-00205 052-00204 301 15 18<br />

039-00035 039-00008 847 10 15<br />

039-00008 039-00007 299 10 18<br />

039-00007 039-00006 268 10 18<br />

039-00006 039-00003 1436 10 21<br />

039-00003 PS39 599 12 21<br />

043-00095 043-00093 357 15 24<br />

043-00093 043-00085 1198 15 24<br />

043-00085 043-00076 1311 15 24<br />

043-00076 043-00075 339 15 24<br />

043-00075 043-00073 315 15 24<br />

PS 23DS 043-00135 451 12 15<br />

052-00014 052-00012 754 15 18<br />

052-00882 052-00880 416 8 12<br />

052-00880 052-00792 298 8 12<br />

052-00792 052-00451 438 8 12<br />

052-00451 052-00768 455 8 12<br />

052-00583B 052-00556JA 1329 New 18<br />

052-00556JA 052-00556D 990 15 21<br />

052-00556DA 047-00192 1680 New 30<br />

052-00556D 052-00556DA 342 18 30<br />

052-00451 052-00583B 1627 New 12<br />

047-00192 047-00191 320 8 30<br />

047-00191 047-00009 375 8 30<br />

047-00009 047-00008 257 10 30<br />

047-00008 047-00005 896 24 36<br />

047-00005 047-00004 352 24 36<br />

047-00004 047-00003 154 24 42<br />

047-00003 PS47 209 24 42<br />

052-00583A 052-00583B 496 New 18<br />

047-00014 047-00012 146 24 36<br />

047-00012 047-00011 243 24 36<br />

047-00011 047-00008 273 24 36<br />

PS92DS 047-00556 129 8 12<br />

047-00557 047-00474 1957 8 18<br />

047-00556 047-00557 135 8 15<br />

047-00474 047-00472 150 8 18<br />

047-00472 047-00466 785 New 18<br />

GNV31031158552.DOCX/103470004 5-55 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-17<br />

Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

047-00466 047-00003 764 New 18<br />

052-00400 052-00001 105 36 42<br />

052-00152A 052-00152 118 30 42<br />

052-00152 052-00115 959 30 42<br />

052-00144 052-00143 306 30 42<br />

052-00143 052-00152A 441 30 42<br />

052-00115 052-00113 700 30 42<br />

052-00113 052-00107 311 30 42<br />

052-00107 052-00106 261 30 42<br />

052-00106 052-00400 98 36 42<br />

PS35DS 052-00299 27 8 15<br />

052-00299 052-00295<br />

634 8 21<br />

(PS47DS)<br />

052-00295 052-00292 262.4 8 42<br />

(PS47DS)<br />

052-00292 052-00284 469 8 42<br />

052-00284 052-00280 414 8 42<br />

052-00280A 052-00245 2007 New 42<br />

052-00280 052-00280A 268 New 42<br />

052-00245 052-00240 1452 30 48<br />

052-00240 052-00239 361 30 48<br />

052-00239 052-00163 399 30 48<br />

052-00163 052-00161 404 30 48<br />

052-00161 052-00105 290 30 48<br />

052-00105 052-00100 367 30 48<br />

052-00100 052-00067B 675 New 48<br />

052-00067B 052-00006A 1253 New 48<br />

052-00006A 052-00004 483 36 54<br />

052-00004 052-00003 435 36 54<br />

052-00003 052-00001 712 36 54<br />

052-00001 PS52 69 48 66<br />

052-00168 052-00161 1673 24 36<br />

Note The existing pipe sizes and all pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $26,800,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-56 JANUARY 2011<br />

REV. 5


#<br />

PS244<br />

#<br />

PS179<br />

PS429<br />

#<br />

#<br />

St Gabriel<br />

#<br />

BPS897<br />

PS432<br />

#<br />

PS433<br />

#<br />

PS313<br />

PSPRVT<br />

#<br />

#<br />

PS341<br />

Rosewood<br />

#<br />

#<br />

047-00003 !R<br />

PS47 PS35 PS35DS<br />

054-00027<br />

#<br />

!R!R #<br />

#<br />

#<br />

#<br />

!R<br />

!R<br />

!R !R<br />

PS122<br />

054-00026<br />

!R<br />

047-00004<br />

052-00299<br />

PS43<br />

PS78<br />

047-00472<br />

!R #<br />

Comish<br />

054-00008 054-00009<br />

PS26<br />

052-00268<br />

#<br />

!R!R !R!R<br />

# !R<br />

!R<br />

!R!R<br />

!R<br />

039-00008<br />

052-00521<br />

054-00006 052-00710<br />

!R!R !R<br />

!R !R<br />

!R<br />

043-00075<br />

052-00280 039-00035 !R<br />

!R 052-00755<br />

!R #<br />

!R<br />

043-00073<br />

052-00745<br />

024-00186<br />

052-00245<br />

!R !R !R<br />

!R !R<br />

!R !R!R !R 043-00076 024-00101<br />

052-00214 PS39<br />

024-00088<br />

052-00144<br />

#<br />

!R<br />

043-00085<br />

!R<br />

!R<br />

024-00064<br />

!R<br />

052-00240 PS39<br />

EOPP 024-00030<br />

#<br />

!R<br />

052-00152 !R<br />

!R<br />

!R<br />

!R 024-00011<br />

!R!R<br />

!R<br />

!R<br />

043-00095<br />

052-00163<br />

!R !R #<br />

!R<br />

052-00168<br />

052-00115<br />

!R<br />

043-00093<br />

PS24<br />

PS24A<br />

052-00105<br />

!R<br />

!R!R !R !R<br />

Lynn<br />

052-00100<br />

!R<br />

!R<br />

052-00106<br />

# PS55<br />

Eaton<br />

!R PS52<br />

!R!R !R!R<br />

# !R!R<br />

#<br />

PS75<br />

PS23<br />

East Baton Rouge Parish<br />

Yancy<br />

Merle Gustafson<br />

052-00451<br />

!R!R!R!R !R<br />

052-00792<br />

Delaware<br />

Carleton<br />

Beechwood<br />

#<br />

PS20<br />

Harelson<br />

052-00768<br />

052-00556D<br />

#<br />

047-00417<br />

PS84<br />

PS71<br />

!R<br />

Dougherty<br />

Voss<br />

Bahm<br />

Jewel<br />

!R !R<br />

047-00008<br />

#<br />

!R<br />

047-00428<br />

047-00418<br />

Garnet<br />

Topaz<br />

Sobers<br />

!R!R<br />

!R<br />

052-00003<br />

PS49<br />

!R<br />

!R<br />

047-00029<br />

047-00011<br />

!R!R<br />

047-00012<br />

Lambert<br />

Anita<br />

Anita<br />

Anita<br />

047-00043<br />

052-00004<br />

#<br />

Baja<br />

#<br />

Sutton<br />

PS92DS<br />

PS272<br />

PS92<br />

Palomar<br />

Maribel<br />

Beaumont<br />

Dallas<br />

Gerlando<br />

PS277<br />

039-00006<br />

039-00003<br />

052-00204<br />

052-00205<br />

Greenway<br />

#<br />

Legend<br />

Metro Airport Area<br />

Proposed<br />

Existing<br />

³<br />

Sewer Upgrades<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

Group Project 1A<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-19<br />

0 2,950<br />

5,900<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\C APACITY\GROUP_PROJECTS1AB\GROUP_PROJECT1_A.MXD_mpj121610<br />

Bern<br />

#


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.13 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />

Upgrades)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) is a<br />

combination of two individual projects identified in the January 2008 PDP, specifically the<br />

NFW-C-0008 (Multiple Pump Stations – Airline Highway – Greenwell Street) and portions<br />

of NFW-C-0005 (Airline Highway – Victoria Drive). The combined project has been<br />

designated Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />

Upgrades) project and is described in this section.<br />

This project includes the upgrades of forcemain segments and pump stations in the North<br />

Gravity and North Forced West Basins. The Group Project 1B consists of the replacement of<br />

nine pump stations, replacement of 8,000 linear feet of 8 to 15-inch sanitary sewer forcemain<br />

pipeline, and 26,060 linear feet of new 30 sanitary sewer forcemain.<br />

The pump station and forcemain upgrades will work in conjunction with the Group Project<br />

1A gravity sewer upgrades in the North Gravity and North Forced West Basin projects to<br />

alleviate chronic sanitary sewer overflows (SSOs) at the pump stations and in the gravity<br />

basins upstream of the pump stations.<br />

Location<br />

The locations of the pump stations are given in Table 5-18 and shown in Figure 5-20.<br />

Group Project 1B is primarily located in the north Baton Rouge area. Detailed location<br />

descriptions of the required capacity improvements follow.<br />

Forcemain segment PS45FM to North WWTP begins at PS 45 located near Clark Street and<br />

Granberry Drive. Upon leaving the pump station, the forcemain travel west and then south,<br />

traveling south down Devall Lane. After reaching Devall Lane and Blount Road, the<br />

forcemain travels west until reaching Liberty Drive. The forcemain travels south until the<br />

end of Liberty Drive and travels southwest near the airport runway until reaching Progress<br />

Road. The forcemain travels west down Progress Road until reaching intersection with Elm<br />

Grove Garden Drive. The forcemain travels south down Elm Grove Garden Drive. The<br />

forcmain turns west near I-110 and travels west down Central Road. The forcemain travels<br />

southwest down Scotland Avenue and then travels west until reaching Mills Avenue. The<br />

forcemain continues west along Mills Avenue until reaching North WWTP.<br />

Forcemain segment PS277FM to NS6438 begins near PS 277 located at the end of Wright<br />

Drive. The forcemain travels north, parallel to Wright Drive until reaching NS6438, located<br />

on Mickens Road.<br />

Forcemain segment PS275FM to NS6140AA (new node) begins at PS275, located at Glynn<br />

Road and Old Rafe Meyer Road. Upon leaving the pump station, the forcemain travels west<br />

along Old Rafe Meyer Road to a new node, NS6140AA, located at the intersection of Old<br />

Rafe Meyer Road and Highway 61.<br />

Forcemain segment PS54FM to PS54DS begins at PS 54, located at Greenwell Street and<br />

Robertson Avenue. The forcemain travels north until reaching PS54DS.<br />

GNV31031158552.DOCX/103470004 5-58 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

Forcemain segment PS 47FM to PS 47DS begins at PS 47, located on Vineyard Drive between<br />

Grand Drive and West Rio Drive, travels northeast towards Maplewood Drive. The<br />

forcemain segment then travels east and then southeast until reaching PS47DS located near<br />

W Fairlane Court.<br />

Forcemain segment PS35FM to PS35DS begins at PS 35, located on Maplewood Drive<br />

between East Fairlane Court and Flag Street. The forcemain segment travels southwest until<br />

reaching PS 35DS, located near the intersection of Maplewood Drive and Shiloh Street.<br />

Forcemain segment PS39FM to PS39DS starts at PS 35, located on Lanier Drive between<br />

Hanks Drive and Prescott Drive, and follows Lanier Drive south for approximately 35 feet<br />

to manhole PS39DS.<br />

Scope<br />

This project includes the replacement of PS 45, PS47, PS 35, PS 39, PS 54, PS 23, PS 275, and<br />

PS 277. This project also includes the replacement of the forcemains PS277, PS 275, PS 54, PS<br />

47, PS 35, PS 39 and an extension of PS45 forcemain. Tables 5-18 and 5-19 show the detailed<br />

scope of this project.<br />

TABLE 5-18<br />

Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak<br />

Wet Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

PS45<br />

PS47<br />

PS35<br />

PS39<br />

PS54<br />

PS23<br />

Near intersection of 72nd Avenue<br />

and Yorkshire Street<br />

Vineyard Drive between Grand<br />

Drive and West Rio Drive<br />

Maplewood Drive between East<br />

Fairlane Court and Flag Street<br />

Lanier Drive between Hanks Drive<br />

and Prescott Drive<br />

Greenwell Street between North<br />

Foster Drive and Beechwood<br />

Drive<br />

Canonicus Street between<br />

Calumet Street and Navajo Street<br />

9,652 16,558 1,917 Moved from<br />

NGS-C-<br />

0004<br />

7,152 13,698 1,202<br />

694 1,687 323<br />

625 2,083 256<br />

1,042 3,715 201<br />

1,528 1,590 418<br />

PS275<br />

Intersection of Old Rafe Meyer<br />

Road and Glynn Road<br />

694 1,574 0<br />

PS277 End of Wright Drive 208 661 134<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

GNV31031158552.DOCX/103470004 5-59 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-19<br />

Group Project 1B (Metro Airport Area Forcemain Upgrades) – Forcemain Information<br />

US<br />

DS<br />

Length<br />

(ft)<br />

Existing<br />

(in)<br />

Proposed<br />

(in)<br />

PS45FM North WWTP 23,256 New 30<br />

PS277FM NS6438 3,124 6 8<br />

PS55FM PS55DS 1,100 8 10<br />

PS275FM NS6140AA (new node) 3,400 8 & 10 12<br />

PS54FM PS54DS 60 8 15<br />

PS47FM PS47DS 2,803 16 30<br />

PS35FM PS35DS 240 6 8<br />

PS39FM PS39DS 35 8 10<br />

Note: The existing pipe sizes and all pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is$19,300,000.<br />

Scheduled Design Appropriation Year was 2008<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-60 JANUARY 2011<br />

REV. 5


NS6145A<br />

!R<br />

#I !R<br />

PS275FM<br />

PS275<br />

#I<br />

PS45<br />

3Q<br />

North WWTP<br />

!R<br />

Vet Mem PS DS<br />

PS23<br />

#I<br />

PS54FM<br />

PS54<br />

PS35<br />

!R<br />

#I #I #I<br />

PS47<br />

#I !R<br />

!R!R<br />

#I !R<br />

PS54DS<br />

PS39DS<br />

NS6438<br />

PS277FM<br />

PS277<br />

PS39<br />

East Baton Rouge Parish<br />

Legend<br />

Metro Airport Area Sewer Pump Station<br />

Proposed<br />

Existing<br />

³<br />

and Forcemain Upgrades<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

Group Project 1B<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-20<br />

0 5,000<br />

10,000<br />

Feet<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\GROUP_PROJECTS1AB\GROUP_PROJECT1_B.MXD GBOQUIN 10/21/2009 11:20:56


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.14 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades)<br />

Project Description<br />

Purpose of the Project / Background Information<br />

The NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) project<br />

involves the design and construction of forcemain upgrades in the North Forced West Basin.<br />

The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />

forcemain capacity.<br />

Location<br />

This project involves the replacement of portions of the North Forced West manifold<br />

forcemain system and locations are shown in Figure 5-21.<br />

Forcemain segment BPS 513 to NS 6087 starts outside the property boundary of BPS 513.<br />

Upon leaving the pump station, the forcemain travels east for approximately 400 feet along<br />

Bentley Drive to the intersection of Bentley Drive and <strong>Plan</strong>k Road At <strong>Plan</strong>k Road, the<br />

forcemain turns southwest and follows the road for approximately 1,800 feet to node NS<br />

6087, located near the intersection of <strong>Plan</strong>k Road and Kent Drive.<br />

Forcemain segment PS 371 to NS 6049 starts outside the property boundary of PS371. Upon<br />

leaving the pump station, the forcemain travels north for approximately 50 feet west before<br />

reaching Danielle Avenue. At Danielle Avenue, the forcemain turns west and follows the<br />

road for approximately 1,000 feet to the intersection of Danielle Avenue and Eric Drive. At<br />

Eric Drive, the forcemain turns northward and follows the road for approximate 50 feet to<br />

the intersection of Eric Drive and an existing servitude. At this point the forcemain travels<br />

west for approximately 500 feet to manhole NS6049, located on the west side of <strong>Plan</strong>k Road,<br />

and manifolds into the larger forcemain, which runs along <strong>Plan</strong>k Road.<br />

Forcemain segment PS OXLF to NS 6037 starts at PS OXLF, located near the intersection of<br />

Hereford Avenue and Little Farms Drive, and travels east along a servitude to node NS6307,<br />

which is located on <strong>Plan</strong>k Road.<br />

Forcemain segment PS 123 to NS 6033 starts outside the property boundary of PS 123. Upon<br />

leaving the PS, the forcemain travels west for approximately 50 feet before reaching Tucker<br />

Road. At Tucker Road, the forcemain turns north and follows the road for approximately<br />

5,600 feet to node NS6033, located near the intersection of Tucker Road and Zachary<br />

Deerford Road.<br />

Forcemain segment PS 124 to NS 6025 starts outside the property boundary of PS 124. Upon<br />

leaving PS 124, the forcemain travels south for approximately 50 feet before reaching Port<br />

Hudson Pride Road. At Port Hudson Pride Road, the forcemain turns east and follows the<br />

roadway for approximately 6,600 feet to node NS 6015, which is located south of the<br />

intersection of Port Hudson Pride Road and WJ Wicker Road. At WJ Wicker Road the<br />

forcemain turns southeast and follows the roadway for approximately 8,500 feet to node<br />

NS6022, located near the intersection of WJ Wicker Road and <strong>Plan</strong>k Road. At node NS 6022,<br />

the forcemain turns south and follows <strong>Plan</strong>k Road to node NS 6025, located near the<br />

intersection of <strong>Plan</strong>k Road and Main Street/Zachary Deerford Road.<br />

Forcemain segment PS 320 to NS 6035 begins outside the property boundary of PS 320.<br />

Upon leaving PS 320, the forcemain travels west for approximately 50 feet before reaching<br />

Buckhorn Drive. At Buckhorn Drive forcemain turns south and follows the roadway for<br />

approximately 1,600 feet as Buckhorn Drive turns to the west and intersects with Deercreek<br />

GNV31031158552.DOCX/103470004 5-62 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

Drive. At Deercreek Drive, the forcemain turns south and follows roadway for<br />

approximately 1,000 feet to the intersection of Deercreek Drive and Greenwell Spring Point<br />

Road. At Greenwell Spring Point Road the forcemain turns west and follows the road for<br />

approximately 2,000 feet to manhole NS 6035, located near the intersection of Tucker Road<br />

and Greenwell Spring Point Road.<br />

Forcemain segment PS 243FM to NS6140 starts at PS 243, located at the northern end of<br />

Northgate Drive, and travels south along Northgate Drive to node NS6140, located at the<br />

intersection of Northgate Drive and Old Rafe Meyer Road. This forcemain will tie into the<br />

forcemain from PS 275, which is part of Group Project 1B (Metro Airport Area Sewer Pump<br />

Station and Forcemain Upgrades).<br />

Scope<br />

The detailed scope of this project, which includes construction of forcemains in the North<br />

Forced West Basin, is shown in Table 5-20.<br />

TABLE 5-20<br />

NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) – Pipeline<br />

Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

BPS 513 NS6087 2,500 18 20<br />

PS 371 NS6049 1,600 4 6<br />

PS OXLF NS6037 1,500 6 10<br />

PS123 NS6033 3,000 6 8<br />

PS124 NS6011 30 6 8<br />

NS6011 NS6022 15,000 10 12<br />

NS6022 NS6025 5,800 10 14<br />

PS320FM NS6035 3,000 6 8<br />

PS243FM NS6140 3,340 8 12<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $4,800,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction have Not Started.<br />

GNV31031158552.DOCX/103470004 5-63 JANUARY 2011<br />

REV. 5


#<br />

PRIVATETMT<br />

#<br />

Port Hudson-Pride<br />

!R #<br />

PS124<br />

NS6011<br />

Jackson<br />

Samuels<br />

Irene<br />

Barnett<br />

Samuels<br />

East Baton Rouge Parish<br />

PS452 !R<br />

#<br />

NS6022 #<br />

#<br />

NS6025 PS320FM<br />

PS430<br />

!R !R #<br />

#<br />

PSOXLF NS6033<br />

## !R !R !R !R NS6035<br />

#<br />

NS6037<br />

#<br />

PS361<br />

#<br />

PS123<br />

NS6049 PS371<br />

!R #<br />

!R !R #<br />

#<br />

PS205 #<br />

PS318<br />

#<br />

PS65A<br />

PS14<br />

#<br />

#<br />

#<br />

PS513 Dyer<br />

!R #<br />

NS6087<br />

!R<br />

#<br />

PS243FM #<br />

#<br />

#<br />

#<br />

PS312 PS105<br />

!R<br />

#<br />

#<br />

# # # #<br />

!R NS6145A<br />

!R<br />

PS268 PS242<br />

# #<br />

#<br />

#<br />

PS109<br />

PS125#<br />

#<br />

# # PS240<br />

# #<br />

#<br />

NS6204<br />

!R # #<br />

# # PS176# # #<br />

#<br />

PS210 # #<br />

#<br />

# #<br />

PS86<br />

##<br />

# PS79 #<br />

#<br />

# #<br />

#<br />

PS46<br />

#<br />

#<br />

#<br />

PS230<br />

PS244 # #<br />

#<br />

#<br />

#<br />

# #<br />

#<br />

PS231<br />

#<br />

##<br />

# PS313 PS341<br />

PSPRVT BPS511 PS196<br />

#<br />

#<br />

#<br />

#<br />

# # #<br />

PSSU2<br />

PSSU1<br />

#<br />

#<br />

#§¨¦ I-110<br />

#<br />

# # #<br />

PS47FM PS35FM PS453<br />

#<br />

#<br />

# #<br />

# # #<br />

PS195 PS138 PS113<br />

!R !R!R<br />

#<br />

# #<br />

PS39DS<br />

# # PS39FM<br />

PS11 # PS454<br />

#<br />

#<br />

#<br />

!R!R<br />

# #<br />

# # #<br />

#<br />

#<br />

# # # #<br />

# # PS18<br />

#<br />

#<br />

# #<br />

#<br />

#<br />

#<br />

# PS16 PS190 PS293<br />

PS289<br />

PS1012<br />

# #<br />

#<br />

# PS169<br />

#<br />

#<br />

# #<br />

# #<br />

#<br />

# #<br />

# #<br />

Legend<br />

# # #<br />

Proposed<br />

Existing<br />

<strong>Plan</strong>k Rd. - Port Hudson Pride Rd.<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NFW-C-0007<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-21<br />

Barnett<br />

Carney<br />

NS6140<br />

Flonacher<br />

Groom<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

Rollins<br />

Gsu<br />

Scenic<br />

72nd<br />

0 1<br />

2<br />

Miles<br />

<strong>Plan</strong>k<br />

Tucker<br />

Milldale<br />

Core<br />

Peairs<br />

Joor<br />

Joor


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

Project NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) includes the<br />

upgrade of PS 243, PS 105, BPS 513, PS OXLF, PS 123, PS 124, PS 429, and PS 43. These<br />

upgrades are required to alleviate SSOs at and near the pump stations as well as in their<br />

respective upstream basins.<br />

Location<br />

The locations of the pump stations are given in Table 5-21 and is shown in Figure 5-22.<br />

Scope<br />

This project includes the replacement of the pump stations shown in Table 5-21. BPS 513 is<br />

being replaced so that it becomes a wet well pump station, rather than an in-line booster<br />

station.<br />

TABLE 5-21<br />

NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 243 Northgate Drive 625 1,145 184<br />

PS 105 Jupiter Drive off Roman Drive 833 833 94<br />

BPS 513 Bentley Drive off <strong>Plan</strong>k Road 7,430 3,125 235<br />

PS OXLF<br />

Int of Little Farms Drive and<br />

Jersey Drive<br />

Not Available 1,416 112<br />

PS 123 Arleen Ave 139 403 31<br />

PS 124<br />

Int of Hudson Pride Road and<br />

Hagen Drive<br />

208 1,055 120<br />

PS 429 Hooper Ridge Blvd Not Available 412 22<br />

PS 43 Int of Ralph Street and Shada Ave 7,083 9,841 1,937<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $6,000,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction have Not Started.<br />

GNV31031158552.DOCX/103470004 5-65 JANUARY 2011<br />

REV. 5


Burrel<br />

#<br />

PRIVATETMT<br />

PS357<br />

#<br />

Port Hudson-Pride<br />

#I<br />

#<br />

PS124<br />

PS124<br />

#<br />

Tucker<br />

Jackson<br />

Rollins<br />

McHost<br />

Irene<br />

Flonacher<br />

Samuels<br />

Barnett<br />

Barnett<br />

Zimmerman<br />

Carney<br />

East Baton Rouge Parish<br />

#<br />

# PS452<br />

#<br />

PS430<br />

PSOXLF #<br />

#<br />

#I<br />

PS320<br />

## PSOXLF<br />

PS361<br />

#<br />

#<br />

PS123<br />

#<br />

#I<br />

PS123<br />

PS371 #<br />

#<br />

PS205<br />

#<br />

#<br />

PS318<br />

#<br />

PS65A<br />

PS14<br />

#<br />

#<br />

BPS513<br />

#<br />

#I<br />

#<br />

BPS513 PS105<br />

PS243<br />

#<br />

#I<br />

PS243 #<br />

#<br />

PS312 PS105<br />

# PS275<br />

# #<br />

#I<br />

#<br />

# # # #<br />

PS268 PS129<br />

# #<br />

#<br />

#<br />

PS109<br />

PS125#<br />

#<br />

# #<br />

PS240<br />

# #<br />

PS176<br />

#<br />

PRIVATEPS # # PS45 # # # # #<br />

#<br />

# #<br />

#<br />

# #<br />

PS86<br />

##<br />

#<br />

PS79<br />

#<br />

#<br />

# #<br />

#<br />

PS46<br />

PS179<br />

PS230<br />

#<br />

#<br />

#<br />

PS255<br />

BPS897 PS429 # # #<br />

#<br />

# #<br />

#I#I<br />

#<br />

PS231<br />

#<br />

#<br />

##<br />

#<br />

PS313 PS341<br />

PS196<br />

#<br />

#<br />

#<br />

#<br />

#<br />

# # #<br />

PSSU2<br />

PSSU1<br />

#<br />

#<br />

#<br />

PS43 #<br />

# # #<br />

#I<br />

PS453<br />

PS138<br />

#<br />

#<br />

# #<br />

#<br />

PS113<br />

# #<br />

PS195<br />

#<br />

# #<br />

# # PS11 # PS288<br />

#<br />

#<br />

# #<br />

# # #<br />

Legend<br />

#<br />

# #<br />

Proposed<br />

#<br />

Existing<br />

Multiple PS - HWY 61 - <strong>Plan</strong>k Rd.<br />

#I<br />

³<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

NFW-C-0009<br />

Exist. Forcemain<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

Project Vicinity Map<br />

!R Manholes\Nodes<br />

") New Storage Facility Figure 5-22<br />

#I<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

McHugh<br />

0 1<br />

2<br />

Miles<br />

Main<br />

Pettit<br />

Comite<br />

Dyer<br />

Blackwater<br />

Core<br />

Neff<br />

Peairs<br />

Joor<br />

Joor<br />

Milldale<br />

Dorset


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs<br />

Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road)<br />

project includes the upgrade of PS 24, PS 24A, PS 503, PS 119N, and PS 183. These upgrades<br />

are required to alleviate SSOs at and near the pump stations as well as in their respective<br />

upstream basins.<br />

Location<br />

The locations of the pump stations are shown in Table 5-22 and in Figure 5-23.<br />

Scope<br />

This project includes the replacement of pump stations as outlined in Table 5-22.<br />

TABLE 5-22<br />

NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 24<br />

PS 24A<br />

PS 503<br />

PS 119N<br />

PS 183<br />

Sherwood Street between Wildwood<br />

Parkway and Lemonwood Drive<br />

Sherwood Street between Wildwood<br />

Parkway and Lemonwood Drive<br />

Greenwell Springs Road between the<br />

intersection of Aletha Drive and Pasadena<br />

Drive<br />

Sarasota Drive between Biscayne Drive and<br />

Flamingo Drive<br />

Canterbury Drive between the intersection of<br />

Greenforest Drive and Monticello Blvd<br />

4,028 3,867 1,733<br />

5,902 3,692 165<br />

2,847 4,095 736<br />

417 968 108<br />

1,528 2,204 443<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,800,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction have Not Started.<br />

GNV31031158552.DOCX/103470004 5-67 JANUARY 2011<br />

REV. 5


Foster<br />

Cora<br />

#<br />

#<br />

Yancy<br />

#<br />

PS78<br />

#<br />

#<br />

PS127<br />

#<br />

#<br />

72nd<br />

#<br />

#<br />

#I#I<br />

#<br />

#<br />

#<br />

#<br />

PS45<br />

PS126<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS179<br />

PS24A PS24<br />

North<br />

East Baton Rouge Parish<br />

44th<br />

#<br />

#<br />

#<br />

PS49<br />

PS79<br />

PS52A<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS52<br />

#<br />

PS432<br />

PS76<br />

Prescott<br />

Renoir<br />

Lobdell<br />

#<br />

#<br />

PS150<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

#<br />

# # #<br />

PS246<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

PS313 PS341<br />

# #<br />

#<br />

#I<br />

PS11<br />

#<br />

#<br />

#<br />

Choctaw<br />

Legend<br />

³<br />

PS55<br />

Tom<br />

Wooddale<br />

PS94<br />

Goodwood<br />

#<br />

#<br />

#<br />

PS83<br />

#<br />

PS255<br />

PS130<br />

#<br />

PS453<br />

#<br />

#<br />

PS277<br />

PS98<br />

BPS511<br />

#<br />

PS144<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

PS222<br />

#<br />

Smith<br />

PS196<br />

# #<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#I<br />

PS281<br />

PS81<br />

PS86<br />

PS288<br />

#<br />

##<br />

#<br />

#<br />

#<br />

#<br />

# PS190<br />

PS16<br />

#<br />

#<br />

PS176<br />

BPS503<br />

#<br />

PS284<br />

Joor<br />

PS418<br />

#<br />

#<br />

PS195<br />

BPS503<br />

Sharp<br />

#<br />

PS202<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

#I<br />

#I<br />

#<br />

#<br />

# #<br />

PS293<br />

PS359<br />

#<br />

#<br />

PS50<br />

PS406<br />

#<br />

#<br />

PS231<br />

#<br />

PS230<br />

#<br />

PS113<br />

PS183<br />

PS119N<br />

Archery<br />

Multiple PS - Prescott Rd. -<br />

Proposed<br />

Existing<br />

Greenwell Springs Rd.<br />

New Pump<br />

Exist. Gravity<br />

#I Stations<br />

Exist. Forcemain<br />

NFW-C-0010<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility<br />

0 0.5 1<br />

Mile<br />

Figure 5-23<br />

PS169<br />

#<br />

#<br />

# #<br />

#<br />

#<br />

#<br />

#


SECTION 5. NORTH BASIN PROJECTS<br />

5.4.17 NFW-HWY61 (Zachary Area Transmission Network Improvement Project –<br />

Phases I, II, III, and IV)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The purpose of the NFW-C-HWY61 (Zachary Area Transmission Network Improvements)<br />

project is to address inadequate capacity in the Baker/Zachary contributing area and to<br />

divert flow from the Zachary contributing area around the Comite Diversion Canal to the<br />

North WWTP. This project also includes conversion of the Red Mud Lakes facility into a<br />

permanent storage facility, which will reduce the peak flows to the North WWTP from the<br />

Zachary area.<br />

Scope<br />

The NFW-C-HWY61 project consists of construction of pump stations, forcemains, and an<br />

equalization basin/storage facility to serve the Zachary area north of the Comite Diversion<br />

Canal. The project will re-route Zachary flows directly to the NWWTP, freeing up currently<br />

utilized capacity in the Baker system. The forcemains, shown in Figure 5-24, begin at the<br />

northern border of East Baton Rouge Parish and follow Highway 964 southward to its<br />

intersection with the Entergy transmission main right-of-way. This forcemain will increase<br />

in size as it runs southward, from a 16-inch to a 30-inch, since it will receive flow from this<br />

area as it develops. The existing Copper Mill pump station (PS 430) will pump through its<br />

existing 16-inch forcemain to the Hwy 964 PS located at the intersection of the Entergy rightof-way<br />

and Highway 964. A new pump station (Old Baker Road PS), located north of the<br />

intersection of Old Baker Road with the Entergy right-of-way, will capture all sewage from<br />

the Old Baker Road gravity main and pump through a 24-inch forcemain westward to<br />

Highway 964. The Hwy 964 PS will collect the flow from the 30-inch forcemain from the<br />

north, the existing 16-inch Copper Mill forcemain, and the new 24-inch Old Baker Road<br />

forcemain. This pump station will pump through a 48-inch forcemain westward along the<br />

Entergy right-of-way. The 48-inch forcemain will then follow Barnett Road, and cross<br />

Highway 61, to the Red Mud Lakes Equalization Facility.<br />

The 20 million gallon (MG) equalization facility will be built inside the existing Red Mud<br />

Lakes facility that the C-P purchased from Kaiser Aluminum in 2004. The equalization basin<br />

will be utilized for storage during wet weather when flows in the forcemain exceed 20 mgd. A<br />

pump station with a capacity of 20 MGD, constructed on the Red Mud Lakes site, will pump<br />

the flow from the equalization facility to the North WWTP through a 30-inch forcemain that<br />

travels southeasterly along an existing servitude that is located to the west of Highway 61.<br />

Table 5-23 below shows the capacities of each of the pump stations. Table 5-24 shows the<br />

sizes and lengths of the forcemains.<br />

TABLE 5-23<br />

NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

PS No.<br />

Location<br />

(GPM)<br />

Old Baker West of the intersection of <strong>Plan</strong>k Road with Entergy<br />

New 10,188<br />

Road PS Right-of-Way<br />

Hwy 964 PS Intersection of Highway 964 and Entergy Right-of-Way New 27,257<br />

New 13,899<br />

Red Mud<br />

Lakes PS<br />

Red Mud Lakes Equalization Facility, near East Baton<br />

Rouge Parish Landfill<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

GNV31031158552.DOCX/103470004 5-69 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-24<br />

NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) - Forcemains<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Old Baker PS Hwy 964 PS 10,500 New 24<br />

Northern Parish<br />

Boundary<br />

Northern Parish<br />

Boundary<br />

Northern Parish<br />

Boundary<br />

Northern Parish<br />

Boundary<br />

Hwy 964 PS 3,100 New 16<br />

Hwy 964 PS 8,850 New 20<br />

Hwy 964 PS 2,000 New 24<br />

Hwy 964 PS 11,630 New 30<br />

Hwy 964 PS<br />

Red Mud Lakes<br />

EQ Facility<br />

33,900 New 48<br />

Red Mud Lakes<br />

EQ Facility<br />

North WWTP 32,750 New 30<br />

Note: The pipe sizes and pipe lengths were obtained from the BTRSSO hydraulic model.<br />

The project was separated into four (4) construction contracts for ease of management and<br />

execution, as follows:<br />

<br />

ZATNIP Phase I - 3 Pump Station Sites and Equalization Basin - 3 pump stations, 14 to<br />

40 MGD and a 20 MG Equalization Basin<br />

ZATNIP Phase II - Red Mud Lakes Force Main to NWWTP - 31,000 l.f. 30” to 42”<br />

ZATNIP Phase III - Force Main from Highway 964 to the Red Mud Lakes - 32,000 l.f. 48”<br />

to 66”<br />

<br />

ZATNIP Phase IV – Zachary Interceptor, Old Baker Road and Highway 964 Force Mains<br />

- 42,500 l.f. 14” to 36”<br />

Total Construction Bid Amount $58,600,000.<br />

Scheduled Design Appropriation Year is 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Phases I, III, and IV are Under Construction. Phase II Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-70 JANUARY 2011<br />

REV. 5


Charlton<br />

Adams<br />

Safer<br />

Jacock<br />

Portwood<br />

PS357<br />

#<br />

Vernon<br />

Sutter<br />

#<br />

PRIVATETMT<br />

Ligon<br />

Port Hudson-Pride<br />

#<br />

PS124<br />

J Wicker<br />

Rollins<br />

Port Hickey<br />

State Route 3113<br />

Mount Pleasant Zachary<br />

East Baton Rouge Parish<br />

Irene<br />

Samuels<br />

Flonacher<br />

")<br />

Barnett<br />

Irene<br />

#<br />

#<br />

#<br />

#I #I<br />

#<br />

PS361<br />

# #<br />

Old Baker Rd PS<br />

Hwy 964 PS<br />

#<br />

Red Mud Lakes Storage Facility 20 MG<br />

Samuels<br />

\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />

PRIVATETMT<br />

Carney<br />

Zimmerman<br />

PS46<br />

PS243<br />

#<br />

#<br />

#<br />

#<br />

PRIVATEPS<br />

I<br />

Hovey<br />

H<br />

Leland<br />

PS430<br />

#<br />

PS205<br />

PS65A<br />

#<br />

#<br />

#<br />

§¨¦ I-110<br />

#<br />

PS210<br />

#<br />

PS109<br />

#<br />

PS14<br />

PS45<br />

#<br />

#<br />

# #<br />

# #<br />

#<br />

# #<br />

PS268 PS129<br />

#<br />

#<br />

#<br />

#<br />

PS126<br />

PS179<br />

Main<br />

Rolling Acres<br />

#<br />

BPS513<br />

PS240<br />

#<br />

PS79<br />

PSLF2<br />

<strong>Plan</strong>k<br />

#<br />

#<br />

##<br />

Dyer<br />

#<br />

#<br />

#<br />

PS452<br />

#<br />

PS312 PS105<br />

#<br />

#<br />

PS432<br />

# # #<br />

#<br />

# #<br />

PS313 PS341<br />

#<br />

# # #<br />

Legend #<br />

#<br />

Proposed<br />

Zachary Area Transmission Network<br />

Existing<br />

#I<br />

³<br />

Improvement Project<br />

New Pump<br />

Exist. Gravity<br />

Stations<br />

Exist. Forcemain<br />

NFW-C-HWY61<br />

New Gravity Main<br />

# Exist. Pump Station<br />

New Force Main<br />

!R Manholes\Nodes<br />

Project Vicinity Map<br />

") New Storage Facility Figure 5-24<br />

0 1<br />

2<br />

Miles<br />

Pettit<br />

#<br />

#


SECTION 5. NORTH BASIN PROJECTS<br />

This page intentionally left blank.<br />

GNV31031158552.DOCX/103470004 5-72 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

5.5 North WWTP Master <strong>Plan</strong> Improvements<br />

5.5.1 Background<br />

Capacity improvements are not required at the North WWTP, so there are no wet weather<br />

projects at the North WWTP. However, the treatment plant is more than 30 years old, so<br />

several improvements are needed to keep the plant running for years to come. The Draft<br />

Master <strong>Plan</strong> (CH2M HILL, 2008) outlined the needed improvements in two priorities:<br />

Priority One and Priority Two.<br />

5.5.2 Priority One Improvements<br />

Priority One improvements are urgent needs, which include health and safety, code<br />

compliance, and regulatory compliance. Health and safety needs include improvements that<br />

are required to mitigate endangerment to human health and safety, such as chlorine gas<br />

storage, missing/damaged handrails, and equipment in deteriorated conditions. Code<br />

compliance needs include improvements that are required to meet building codes, such as<br />

those outlined in the Master <strong>Plan</strong> – Wastewater Treatment <strong>Plan</strong>t Building Condition Assessment<br />

TM ( refer to Draft Master <strong>Plan</strong>; CH2M HILL, 2008). Regulatory compliance issues include<br />

improvements that are required to meet regulations, such as discharge limits. No additional<br />

facilities are needed at the North WWTP for regulatory compliance.<br />

The improvements included in Priority One include building improvements, equipment<br />

improvements, alternate disinfection, and standby power.<br />

Building Improvements<br />

The Master <strong>Plan</strong> – Wastewater Treatment <strong>Plan</strong>t Building Condition Assessment TM<br />

(CH2M HILL, 2008) recommends improvements to be made to at the buildings that are<br />

located at the North WWTP. The Draft Master <strong>Plan</strong> recommends that the following building<br />

components be repaired or replaced:<br />

<br />

<br />

<br />

<br />

Metal windows<br />

Roofing<br />

Damaged walls and floors<br />

Ventilation systems<br />

Improvements Due to Equipment Condition<br />

The Master <strong>Plan</strong> – Existing Wastewater Treatment <strong>Plan</strong>t Descriptions and Infrastructure Condition<br />

Assessment (CH2M HILL, 2008) recommends the following modifications at the North<br />

WWTP due to the condition assessment for priority one.<br />

<br />

<br />

Process Equipment – 71 mechanical/electrical items to be replaced<br />

Handrail replacement/reconditioning<br />

Alternate Disinfection<br />

The C-P currently utilizes gaseous chlorine for wastewater disinfection, which poses a<br />

significant health and safety hazard for plant staff and the surrounding community.<br />

Therefore, the Draft Master <strong>Plan</strong> (CH2M HILL, 2008) recommends that gas chlorine<br />

disinfection be abandoned at the North WWTP for a less hazardous alternative. A<br />

disinfection technology alternative analysis was performed and is outlined in Master <strong>Plan</strong> –<br />

Disinfection Assessment for the Baton Rouge North, Central, and South Wastewater Treatment<br />

GNV31031158552.DOCX/103470004 5-73 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

<strong>Plan</strong>ts (CH2M HILL, 2008). The technologies that were evaluated included purchased<br />

sodium hypochlorite, on-site generation of sodium hypochlorite, ultraviolet (UV)<br />

disinfection, and a combination of UV disinfection and purchased sodium hypochlorite.<br />

At the North WWTP, use of purchased 12.5% sodium hypochlorite is the least-costly<br />

alternative, given a 20-year present worth basis. UV was found to be considerably more<br />

expensive on a present worth basis than sodium hypochlorite, primarily because it would<br />

also require upgrading the North WWTP to a trickling filter/solids contact (TF/SC) process.<br />

Trickling filter effluents are considered unsuitable for UV disinfection.<br />

Standby Power<br />

Standby power for the North WWTP is discussed in the Emergency Generators section of<br />

this PDP.<br />

5.5.3 Priority Two Improvements<br />

Priority Two improvements include operations and maintenance needs that include asset<br />

preservation, cost efficiency needs, and environmental needs. Asset preservation needs<br />

include improvements that are required to preserve existing assets, such as screening and<br />

grit removal. Cost efficiency needs include improvements that are required to increase the<br />

efficiency of operations and maintenance, such as SCADA. Environmental needs include<br />

improvements that are required to improve the overall environment of the North WWTP,<br />

such as odor control.<br />

The improvements included in Priority Two are new preliminary treatment, new influent<br />

pump station, odor control, digester gas utilization, and SCADA.<br />

New Preliminary Treatment and Influent Pump Station<br />

The Master <strong>Plan</strong> – Existing Wastewater Treatment <strong>Plan</strong>t Descriptions and Infrastructure Condition<br />

Assessment (CH2M HILL, 2008) recommends the following modifications at the North<br />

WWTP due to the condition assessment for Priority Two.<br />

<br />

<br />

New Preliminary Treatment (screenings and grit removal)<br />

New Influent Pump Station<br />

These facilities will allow the North WWTP to continue to operate into the future.<br />

Odor Control<br />

Odor issues were evaluated at each of the three large WWTPs. This evaluation included<br />

conducting air sampling to determine where odors are experienced at each WWTP. Once<br />

the odor issues were identified, several odor control technologies were evaluated. Biotowers<br />

are recommended as the primary odor control technology, with some other<br />

technologies being used for specific odor issues, such as those at dewatering facilities. Refer<br />

to Master <strong>Plan</strong> – Odor Control Analysis and Facility <strong>Plan</strong> Recommendations (CH2M HILL, 2008)<br />

for more information.<br />

The North WWTP has the highest odor emissions, which are creating a nuisance for nearby<br />

residents. Given resident complaints at the North WWTP, the North WWTP Odor Control<br />

Project, which includes chemical feed at five pump stations feeding into the treatment plant<br />

and biotowers at the headworks, was given a high priority and is expected to remediate the<br />

GNV31031158552.DOCX/103470004 5-74 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

problem. This project is currently nearing construction completion. Other odor control<br />

improvements recommended at the North WWTP include:<br />

<br />

<br />

<br />

Install flat covers on the primary effluent weir and launder portions of the primary<br />

clarifiers with biotower odor treatment.<br />

Rehabilitate the existing carbon scrubbers on the dewatering building and add a firststage<br />

wet scrubber.<br />

Provide scrubbers and covers at the new influent pump station and headworks.<br />

Digester Gas Utilization<br />

An evaluation of the potential to utilize biogas that it a by-product of the anaerobic<br />

digestion process was discussed in the Master <strong>Plan</strong> – Biogas Storage and Utilization TM<br />

(CH2M HILL, 2008). The feasibility to capture the biogas and utilize it as an alternative fuel<br />

for heating the anaerobic digesters, rather than flaring the biogas and utilizing natural gas<br />

for heating (the current practice at all three large WWTPs) was evaluated. During the<br />

evaluation, it was found that most of the gas storage equipment, gas compressors, and<br />

engine generators that are necessary to utilize biogas were present but not in use at any of<br />

the three large WWTPs. Based on the evaluation, it is recommended to install biogas storage<br />

at the North WWTP. The stored biogas would be used for heating the anaerobic digesters.<br />

SCADA<br />

The North WWTP SCADA system is discussed in the SCADA section of this PDP.<br />

5.5.4 Estimated Costs<br />

The Draft Master <strong>Plan</strong> outlines the estimated construction cost of the Priority One and<br />

Priority Two improvements. The costs for standby power and SCADA are included in the<br />

Emergency Generators and SCADA sections of this document, although they are also shown<br />

in Table 5-25 below. The table outlines the estimated construction costs of the North WWTP<br />

Master <strong>Plan</strong> improvements. Even though costs are presented separately for Priority One,<br />

Priority Two, Standby Power, and SCADA, it is likely that one project would be designed<br />

and constructed to implement all improvements at once. The Total Construction Bid<br />

Amount, assuming that sales tax will be waived on materials, for the North WWTP Master<br />

<strong>Plan</strong> Improvements is $34,349,000.<br />

TABLE 5-25<br />

Summary of Estimated Construction Costs for the North WWTP<br />

Item<br />

Estimated Cost<br />

Priority One<br />

Building Condition Assessment $3,000,000<br />

Equipment Condition Assessment $4,200,000<br />

Handrail Rehabilitation/Replacement $800,000<br />

Alternate Disinfection (Sodium Hypochlorite) $2,500,000<br />

Priority One Sub-Total Construction Bid Amount $10,500,000<br />

Estimated Sales Tax Waiver -$312,000<br />

GNV31031158552.DOCX/103470004 5-75 JANUARY 2011<br />

REV. 5


SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-25<br />

Summary of Estimated Construction Costs for the North WWTP<br />

Item<br />

Estimated Cost<br />

Priority One Total Construction Bid Amount $10,188,000<br />

Standby Power (including estimated sales tax waiver) $5,337,000<br />

Priority Two<br />

New Screenings/Grit Removal $6,500,000<br />

New Influent Pump Station $2,100,000<br />

Odor Control $6,800,000<br />

Digester Gas Utilization $1,700,000<br />

Priority Two Sub-Total Construction Bid Amount $17,100,000<br />

Estimated Sales Tax Waiver -$508,000<br />

Priority Two Total Construction Bid Amount $16,592,000<br />

SCADA (including estimated sales tax waiver) $2,232,000<br />

Total Construction Bid Amount for North WWTP Master <strong>Plan</strong> $34,349,000<br />

GNV31031158552.DOCX/103470004 5-76 JANUARY 2011<br />

REV. 5


SECTION 6<br />

Emergency Generators<br />

6.1 Background<br />

The C-P does not currently have emergency/standby power generators at the majority of its<br />

pump stations in the collection system or at the WWTPs. Hurricane Gustav caused power<br />

outages throughout much of the C-P for the majority of a week. During this time, the<br />

collection system was not able to convey flows to the WWTPs due to lack of power at the<br />

pump stations in the system, and the WWTPs were not able to operate. There were a total<br />

of34 pump stations in the C-P that overflowed during and/or following Hurricane Gustav.<br />

To address this issue, the C-P will install emergency generators at the combined<br />

South/Central WWTP, the North WWTP, and all the pump stations in the collection system.<br />

The wastewater projected flows and loads for the combined South/Central and North<br />

WWTP were used to determine the projected electrical demands for each plant. The<br />

treatment facilities at the North WWTP identified for upgrade during development of the C-<br />

P Draft Master <strong>Plan</strong> (CH2M HILL, 2008) are not included in this updated PDP. However, the<br />

costs for the generators needed at the North WWTP (and identified in the Draft Master <strong>Plan</strong>)<br />

are included in this updated PDP.<br />

6.2 Collection System Pump Stations<br />

To determine how many and what size of generators will be needed at each of the collection<br />

system pump stations, the stations were first divided into existing (non-PDP impacted) and<br />

PDP pump stations. For the PDP stations, each station’s pumped flow and head were then<br />

determined or assumed with the resulting hydraulic horsepower calculated. The<br />

horsepower of the motors were then determined and ultimately generator units were<br />

selected and installed costs were determined. Each of the existing pump stations were<br />

visited by a field crew, and the horsepower requirement for the pumps were recorded. A<br />

generator sizing software program was used to select the appropriate generator sizes.<br />

A list of 294 existing (non-PDP impacted) operational pump stations were developed based<br />

on C-P information (see Table 6-1). These stations will not be modified as part of the<br />

<strong>Program</strong>.<br />

TABLE 6-1<br />

Summary of Generator Units<br />

Existing Pump Stations (not impacted by the PDP)<br />

Generator Unit<br />

Size (KW)<br />

Number of<br />

Units Unit Installed Cost<br />

Total Installed Cost<br />

2007<br />

10 70 $ 25,000 $ 1,750,000<br />

20 64 $ 28,000 $ 1,792,000<br />

40 52 $ 45,000 $ 2,340,000<br />

60 44 $ 48,000 $ 2,112,000<br />

80 27 $ 53,000 $ 1,431,000<br />

100 15 $ 56,000 $ 840,000<br />

125 6 $ 62,000 $ 372,000<br />

GNV31031158554.DOCX/103470007 6-1 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-1<br />

Summary of Generator Units<br />

Existing Pump Stations (not impacted by the PDP)<br />

Generator Unit<br />

Size (KW)<br />

Number of<br />

Units<br />

Unit Installed Cost<br />

Total Installed Cost<br />

2007<br />

150 5 $ 68,000 $ 340,000<br />

250 3 $ 84,000 $ 252,000<br />

600 1 $ 193,000 $ 193,000<br />

TOTAL 287 $ 11,422,000<br />

Total Estimate: $11,422,000 Existing Stations (non-PDP impacted)<br />

Note 1: For each category, a diesel generator, automatic transfer switch, enclosure equipment pad, and other<br />

accessories were sized to estimate an installed construction cost.<br />

Note 2: See Appendix A for detailed information on each of the existing stations and their respective generator<br />

requirements.<br />

The 144 C-P pump stations that are to be added or modified as part of the <strong>Program</strong> are<br />

identified in Table 6-2.<br />

TABLE 6-2<br />

Summary of Generator Units<br />

PDP Pump Stations<br />

Generator Unit<br />

Size<br />

Number of<br />

Units Unit Installed Cost Total Installed Cost<br />

10 4 $ 25,000 $ 100,000<br />

20 11 $ 28,000 $ 308,000<br />

40 34 $ 45,000 $ 1,530,000<br />

60 19 $ 48,000 $ 912,000<br />

80 18 $ 53,000 $ 954,000<br />

100 8 $ 56,000 $ 448,000<br />

125 11 $ 62,000 $ 682,000<br />

150 6 $ 68,000 $ 408,000<br />

200 2 $ 75,000 $ 150,000<br />

250 5 $ 84,000 $ 420,000<br />

300 2 $ 98,000 $ 196,000<br />

400 6 $ 115,000 $ 690,000<br />

500 3 $ 154,000 $ 462,000<br />

600 6 $ 193,000 $ 1,158,000<br />

800 4 $ 266,000 $ 1,064,000<br />

1000 2 $ 339,000 $ 678,000<br />

2500 3 $ 1,260,000 $ 3,780,000<br />

TOTAL 141 $ 13,364,000<br />

Total Estimate: $15,556,000 Existing Stations (not expanded)<br />

Note 1: Some of the large pump stations require more than one installed generator unit.<br />

Note 2: See Appendix B for detailed information on each of the PDP stations and their respective generator<br />

requirements.<br />

Note 3: For each category, a diesel generator, automatic transfer switch, enclosure equipment pad, and other<br />

accessories were sized with a resulting estimated installed construction cost.<br />

GNV31031158554.DOCX/103470007 6-2 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

6.3 Wastewater Treatment <strong>Plan</strong>ts<br />

For the North and South/Central WWTPs, the generation capacity needed was estimated<br />

based on the future estimated total flows and current loads seen at each of the plants.<br />

Natural gas generators were selected due to operator preference for natural gas. Cost<br />

estimates were developed for both the stand alone generators, and for the installed<br />

generator systems including automatic transfer switches, equipment pads, enclosures, and<br />

other site specific equipment necessary to integrate the generators into the facility’s<br />

electrical system<br />

The North WWTP estimated generator installed cost is $5.3 M (including estimated sales tax<br />

waiver) for 7.5 MW of generation capacity. This cost for standby power at the North WWTP<br />

is also listed in Section 5.5 North Master <strong>Plan</strong> Improvements Table 5-25 – Summary of<br />

Estimated Construction Costs for the North WWTP.<br />

The South/Central WWTP estimated installed cost is $9.3 M, for 12.5 MW of generation<br />

capacity. This cost is already included in the estimated construction cost for the Phase 2<br />

expansion project (STP-C-0002, South WWTP Phase 2 – Master <strong>Plan</strong> Portion).<br />

6.4 Generator Project <strong>Delivery</strong> <strong>Plan</strong><br />

In order to install generators in a timely manner at all pump stations and the North and<br />

South/Central WWTPs, a project delivery plan was developed. The first step in developing<br />

the project delivery plan was to prioritize the pump stations that were to get generators<br />

using the following criteria:<br />

1) Pump stations to be replaced as a part of PDP<br />

2) Existing pump stations (not impacted by this PDP) that overflowed during Hurricane<br />

Gustav<br />

3) Existing pump stations (not impacted by this PDP) that were on DPW staff’s list of<br />

critical pump stations<br />

4) Existing pump stations (not impacted by this PDP) that were not on any of the previous<br />

lists (with larger pump stations receiving higher priority than smaller pump stations)<br />

The WWTPs were prioritized based on the PDP and Draft Master <strong>Plan</strong> projects. As<br />

mentioned above, the South/Central WWTP generators will be installed as part of the South<br />

WWTP – Phase 2 project, with the generators funded as part of the overall project. The<br />

North WWTP generators will be installed as part of the North WWTP Master <strong>Plan</strong> project.<br />

The existing Central WWTP will not receive emergency generators, since current plans call<br />

for it to be decommissioned.<br />

The schedule of the project delivery is based on this prioritization as well as available<br />

budget. The available budget for generators is estimated to be $10 million in 2009, $10<br />

million in 2010, and $13 million in 2011. Therefore, for each of these three years, the first<br />

priority was the budget for generators at the PDP pump stations. After that, the second,<br />

third, and fourth priorities were considered in the order noted above. Table 6-3 shows the<br />

cost summary- for generator installation.<br />

GNV31031158554.DOCX/103470007 6-3 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-3<br />

Emergency Generators Cost Summary<br />

Item<br />

Generator Purchase (including maintenance)<br />

Generator Installation (non-PDP pump stations)<br />

North WWTP<br />

Land Acquisition<br />

Total<br />

$19.1M<br />

$7.1M<br />

$5.3M<br />

$0.5M<br />

$32.2M<br />

In order to deliver these projects in a timely manner, the following criteria were used to<br />

develop the project delivery plan.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

All pump stations will have installed generators (no temporary generators, unless site<br />

constraints dictate).<br />

A 5-year renewable maintenance contract is required for the service of all generators.<br />

Pump stations will be designed as generator-ready.<br />

Generators will be provided by a generator vendor and installed by a general contractor.<br />

For PDP pump stations and WWTPs, the general contractor will be the general<br />

contractor for the entire project.<br />

The generator vendor will be selected by a bidding process. A 5-year maintenance<br />

contract will be part of this contract. The contract will be based on the number of<br />

generators needed per year, with a unit price given for each type of unit for each year.<br />

The generators will be delivered to a local warehouse, kept by the vendor, to be picked<br />

up and installed by the general contractors.<br />

The South WWTP generators will be delivered on the <strong>Program</strong> schedule by 2014, when<br />

the South WWTP – Phase 2 project is scheduled to be completed.<br />

The delivery plan included two contracts, one for purchase and maintenance of the<br />

generators and one for installation of the non-PDP units. The purchase and maintenance<br />

contract was awarded to Arcco Power Systems in October 2009. The project to install the<br />

non-PDP generators was bid in July 2010. As of November 2010, a notice to proceed had not<br />

been issued for this project. The installation project will consist of work orders issued over a<br />

three year period.<br />

With this project delivery plan, each pump station and WWTP will have emergency power<br />

by the end of the <strong>Program</strong> (December 31, 2014). A list of the pump stations are provided in<br />

Table 6-4.<br />

GNV31031158554.DOCX/103470007 6-4 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

Generator<br />

KW<br />

8 2 500 1 50 9 10 10 10 10<br />

11 AIR 40 AIR - - 5 5 5 10<br />

12 2 727 1 50 13 15 15 15 20<br />

14 2 400 1 50 7 10 10 10 10<br />

17 2 100 1 50 2 3 3 3 10<br />

20 2 125 1 50 2 3 3 3 10<br />

22 2 115 1 50 2 3 3 3 10<br />

25 AIR 100 AIR - - 5 5 5 10<br />

26 2 200 1 50 4 5 5 5 10<br />

28 2 300 1 50 5 5 5 5 10<br />

29 2 300 1 50 5 5 5 5 10<br />

34 AIR 60 AIR - - 5 5 5 10<br />

36 2 500 1 50 9 10 10 10 10<br />

37 2 100 1 50 2 3 3 3 10<br />

48 3 2380 2 75 64 75 150 146 150<br />

49 4 2380 3 100 86 100 300 293 325<br />

57 5 6325 4 125 285 300 1200 1170 1250<br />

60 5 2300 4 55 50 50 50 250 250<br />

62 2 781 1 50 14 15 15 15 20<br />

69 2 282 1 50 5 5 5 5 10<br />

70 2 350 1 50 6 7.5 7.5 7 10<br />

71 2 300 1 50 5 5 5 5 10<br />

72 3 332 2 75 9 10 20 20 20<br />

73 2 150 1 50 3 3 3 3 10<br />

78 2 200 1 50 4 5 5 5 10<br />

79 2 200 1 50 4 5 5 5 10<br />

81 2 100 1 50 2 3 3 3 10<br />

82 2 100 1 50 2 3 3 3 10<br />

83 AIR 65 AIR - - 5 5 5 10<br />

84 2 450 1 50 8 10 10 10 10<br />

85 3 500 2 75 14 15 30 29 35<br />

87 AIR 150 AIR - - 5 5 5 10<br />

88 2 250 1 50 5 5 5 5 10<br />

89 AIR 150 AIR - - 5 5 5 10<br />

GNV31031158554.DOCX/103470007 6-5 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

90 2 292 1 50 5 5 5 5 10<br />

92 2 250 1 28 5 5 5 40 40<br />

93 2 438 1 50 8 10 10 10 10<br />

94 2 283 1 106 20 20 20 80 80<br />

95 2 100 1 50 2 3 3 3 10<br />

96 2 150 1 50 3 3 3 3 10<br />

97 AIR 100 AIR - - 5 5 5 10<br />

98 2 500 1 50 9 10 10 10 10<br />

99 AIR 70 AIR - - 5 5 5 10<br />

100 2 200 1 50 4 5 5 5 10<br />

101 2 200 1 50 4 5 5 5 10<br />

103 2 176 1 50 3 3 3 3 10<br />

104 2 664 1 50 12 15 15 15 20<br />

106 2 287 1 50 5 5 5 5 10<br />

108 2 1140 1 50 21 25 25 24 35<br />

109 2 200 1 50 4 5 5 5 10<br />

114 2 260 1 50 5 5 5 5 10<br />

116 3 33 2 75 1 2 4 4 10<br />

117 2 100 1 50 2 3 3 3 10<br />

121 2 184 1 50 3 3 3 3 10<br />

122 2 122 1 50 2 3 3 3 10<br />

125 2 65 1 55 5.5 5.5 5.5 20 20<br />

126 2 300 1 50 5 5 5 5 10<br />

128 2 631 1 50 11 15 15 15 20<br />

130 2 109 1 50 2 3 3 3 10<br />

131 2 100 1 50 2 3 3 3 10<br />

132 2 202 1 50 4 5 5 5 10<br />

133 2 13 1 50 0 1 1 1 10<br />

134 2 600 1 50 11 15 15 15 20<br />

138 2 70 1 50 1 2 2 2 10<br />

140 2 369 1 50 7 7.5 7.5 7 10<br />

141 2 139 1 50 3 3 3 3 10<br />

142 2 250 1 50 5 5 5 5 10<br />

145 2 524 1 50 9 10 10 10 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-6 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

147 2 613 1 50 11 15 15 15 20<br />

150 2 436 1 50 8 10 10 10 10<br />

151 2 175 1 50 3 3 3 3 10<br />

154 2 763 1 50 14 15 15 15 20<br />

155 2 663 1 50 12 15 15 15 20<br />

156 2 306 1 79 20 20 20 40 40<br />

158 AIR 80 AIR - - 5 5 5 10<br />

159 2 144 1 50 3 3 3 3 10<br />

160 2 300 1 50 5 5 5 5 10<br />

161 2 594 1 50 11 15 15 15 20<br />

163 AIR 125 AIR - 5 5 5 10<br />

165 2 1 - - 0 0 10 10<br />

166 2 400 1 50 7 7.5 7.5 7 10<br />

168 2 344 1 50 6 7.5 7.5 7 10<br />

169 2 100 1 50 2 3 3 3 10<br />

171 2 300 1 50 5 5 5 5 10<br />

173 2 150 1 50 3 3 3 3 10<br />

176 2 395 1 38.5 10 10 10 80 80<br />

177 2+2 1000 3 100 36 40 120 117 125<br />

178 AIR 20 AIR - - 5 5 5 10<br />

179 2 100 1 50 2 3 3 3 10<br />

180 2 83.8 1 50 2 3 3 3 10<br />

181 2 274 1 50 5 5 5 5 10<br />

184 2 142 1 50 3 3 3 3 10<br />

185 2 178 1 50 3 3 3 3 10<br />

187 2 1 20 20<br />

189 2 360 1 50 6 7.5 7.5 7 10<br />

190 2 160 1 50 3 3 3 3 10<br />

191 2 367 1 50 7 7.5 7.5 7 10<br />

192 2 100 1 50 2 3 3 3 10<br />

193 2 110 1 50 2 3 3 3 10<br />

194 2 170 1 50 3 3 3 3 10<br />

195 2 395 1 50 7 7.5 7.5 7 10<br />

197 2 329 1 50 6 7.5 7.5 7 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-7 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

198 2 263 1 50 5 5 5 5 10<br />

200 2 481 1 50 9 10 10 10 10<br />

202 AIR 30 AIR - - 5 5 5 10<br />

203 2 187 1 50 3 3 3 3 10<br />

204 2 183 1 50 3 3 3 3 10<br />

205 2 154 1 50 3 3 3 3 10<br />

206 2 641 1 50 12 15 15 15 20<br />

210 2 150 1 50 3 3 3 3 10<br />

213 2 85 1 50 2 3 3 3 10<br />

214 2 80 1 50 1 2 2 2 10<br />

215 2 160 1 50 3 3 3 3 10<br />

216 AIR 70 AIR - - 5 5 5 10<br />

217 AIR 80 AIR - - 5 5 5 10<br />

219 2 275 1 50 5 5 5 5 10<br />

220 2 150 1 50 3 3 3 3 10<br />

222 2 103 1 50 2 3 3 3 10<br />

225 2 519 1 50 9 10 10 10 10<br />

226 2 429 1 50 8 10 10 10 10<br />

228 2 270 1 27 5 5 5 40 40<br />

230 2 135 1 43 5 5 5 80 80<br />

232 2 150 1 50 3 3 3 3 10<br />

233 2 85 1 50 2 3 3 3 10<br />

235 2 80 1 50 1 2 2 2 10<br />

237 2 150 1 50 3 3 3 3 10<br />

240 2 500 1 25 7.5 7.5 7.5 100 100<br />

242 2 200 1 50 4 5 5 5 10<br />

245 AIR 82 AIR - - 5 5 5 10<br />

246 2 1 7.5 7.5 7.5 40 40<br />

248 2 100 1 50 2 3 3 3 10<br />

250 2 450 1 50 8 10 10 10 10<br />

251 2 300 1 50 5 5 5 5 10<br />

254 AIR 40 AIR - - 5 5 5 10<br />

255 2 147 1 50 3 3 3 3 10<br />

256 AIR 70 AIR - - 5 5 5 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-8 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

257 AIR 40 AIR - - 5 5 5 10<br />

258 2 156 1 50 3 3 3 3 10<br />

259 2 227 1 50 4 5 5 5 10<br />

260 2 91 1 50 2 3 3 3 10<br />

261 2 150 1 50 3 3 3 3 10<br />

262 2 295 1 50 5 4 4 4 10<br />

263 2 184 1 50 3 3 3 3 10<br />

264 2 333 1 50 6 7.5 7.5 7 10<br />

265 2 169 1 50 3 3 3 3 10<br />

266 2 120 1 50 2 3 3 3 10<br />

267 AIR 70 AIR - - 5 5 5 10<br />

268 2 200 1 50 4 5 5 5 10<br />

272 2 200 1 50 4 5 5 5 10<br />

276 2 100 1 50 2 3 3 3 10<br />

279 2 131 1 50 2 3 3 3 10<br />

280 2 127 1 50 2 3 3 3 10<br />

281 2 230 1 50 4 5 5 5 10<br />

282 2 127 1 50 2 3 3 3 10<br />

284 2 246 1 50 4 5 5 5 10<br />

286 AIR 40 AIR - - 5 5 5 10<br />

288 2 119 1 134 20 20 20 60 60<br />

289 2 320 1 50 6 7.5 7.5 7 10<br />

290 2 180 1 50 3 3 3 3 10<br />

291 2 1 7.5 7.5 7.5 80 80<br />

292 2 100 1 50 2 3 3 3 10<br />

293 2 225 1 50 4 5 5 5 10<br />

294 2 225 1 50 4 5 5 5 10<br />

295 2 266 1 50 5 5 5 5 10<br />

298 2 240 1 50 4 5 5 5 10<br />

299 2 640 1 50 12 15 15 15 20<br />

300 3 1650 2 75 45 50 100 98 100<br />

301 3 1750 2 75 47 50 100 98 100<br />

303 2 80 1 50 1 2 2 2 10<br />

304 2 520 1 50 9 10 10 10 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-9 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

305 2 494 1 50 9 10 10 10 10<br />

307 2 160 1 50 3 3 3 3 10<br />

310 2 424 1 50 8 10 10 10 10<br />

312 2 240 1 50 4 5 5 5 10<br />

314 2 300 1 50 5 5 5 5 10<br />

315 2 86 1 50 2 3 3 3 10<br />

317 2 350 1 50 6 7.5 7.5 7 10<br />

319 2 250 1 50 5 5 5 5 10<br />

320 2 222 1 50 4 5 5 5 10<br />

321 2 200 1 50 4 5 5 5 10<br />

322 2 265 1 50 5 5 5 5 10<br />

323 2 265 1 50 5 5 5 5 10<br />

324 2 360 1 50 6 7.5 7.5 7 10<br />

325 2 159 1 50 3 3 3 3 10<br />

328 2 735 1 50 13 15 15 15 20<br />

330 2 100 1 50 2 3 3 3 10<br />

334 2 225 1 50 4 5 5 5 10<br />

335 2 410 1 50 7 7.5 7.5 7 10<br />

337 2 250 1 50 5 5 5 5 10<br />

339 2 150 1 50 3 3 3 3 10<br />

341 2 80 1 50 1 2 2 2 10<br />

343 2 750 1 50 14 15 15 15 20<br />

344 2 700 1 50 13 15 15 15 20<br />

346 2 650 1 50 12 15 15 15 20<br />

347 2 450 1 50 8 10 10 10 10<br />

349 2 100 1 50 2 3 3 3 10<br />

350 2 100 1 50 2 3 3 3 10<br />

356 2 108 1 50 2 3 3 3 10<br />

357 OXID POND OXID POND - - 0 0 0 0<br />

359 2 125 1 50 2 3 3 3 10<br />

360 2 100 1 50 2 3 3 3 10<br />

361 2 93 1 50 2 3 3 3 10<br />

362 2 100 1 50 2 3 3 3 10<br />

366 2 425 1 50 8 10 10 10 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-10 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

367 2 1 40 40<br />

371 2 170 1 50 3 3 3 3 10<br />

373 2 240 1 50 4 5 5 5 10<br />

374 1 150 1 50 3 3 3 3 10<br />

375 2 100 1 50 2 3 3 3 10<br />

376 2 150 1 50 3 3 3 3 10<br />

377 2 150 1 50 3 3 3 3 10<br />

378 2 262 1 50 5 5 5 5 10<br />

380 2 185 1 50 3 3 3 3 10<br />

381 2 100 1 50 2 3 3 3 10<br />

382 2 48 1 50 1 2 2 2 10<br />

383 2 100 1 50 2 3 3 3 10<br />

384 2 100 1 50 2 3 3 3 10<br />

385 2 100 1 50 2 3 3 3 10<br />

386 2 400 1 50 7 7.5 7.5 7 10<br />

387 2 100 1 50 2 3 3 3 10<br />

388 2 100 1 50 2 3 3 3 10<br />

389 2 588 1 50 11 15 15 15 20<br />

390 2 100 1 50 2 3 3 3 10<br />

392 2 64 1 50 1 2 2 2 10<br />

393 2 199 1 50 4 5 5 5 10<br />

394 2 30 1 50 1 2 2 2 10<br />

395 2 127 1 50 2 3 3 3 10<br />

396 2 100 1 50 2 3 3 3 10<br />

398 2 389 1 50 7 7.5 7.5 7 10<br />

399 2 100 1 50 2 3 3 3 10<br />

400 2 161 1 50 3 3 3 3 10<br />

401 2 60 1 50 1 2 2 2 10<br />

402 2 800 1 68 20 20 20 20 20<br />

403 1 50 0 1 1 1 10<br />

404 2 161 1 50 3 3 3 3 10<br />

405 2 138 1 50 2 3 3 3 10<br />

406 2 200 1 50 4 4 4 4 10<br />

407 2 100 1 50 2 3 3 3 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-11 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

408 2 70 1 50 1 2 2 2 10<br />

410 2 100 1 50 2 3 3 3 10<br />

411 1 50 0 1 1 1 10<br />

412 2 125 1 50 2 3 3 3 10<br />

413 2 100 1 50 2 3 3 3 10<br />

415 2 100 1 50 2 3 3 3 10<br />

416 2 343 1 50 6 7.5 7.5 7 10<br />

417 2 240 1 50 4 5 5 5 10<br />

418 1 50 0 1 1 1 10<br />

422 1 50 0 1 1 1 10<br />

423 2 179 1 50 3 5 5 5 10<br />

425 1 50 0 1 1 1 10<br />

426 1 50 0 1 1 1 10<br />

427 1 50 0 1 1 1 10<br />

428 1 50 0 1 1 1 10<br />

430 1 50 0 1 1 1 10<br />

431 2 1 20 20<br />

432 2 1 20 20<br />

433 2 1 20 20<br />

434 2 1 10 10<br />

435 2 1 60 60<br />

436 2 1 80 80<br />

437 2 1 80 80<br />

438 2 1 20 20<br />

439 2 1 40 40<br />

441 2 1 10 10<br />

442 2 1 60 60<br />

443 2 1 80 80<br />

444 2 1 100 100<br />

445 2 1 60 60<br />

446 2 1 80 80<br />

447 3 2 100 100<br />

448 2 1 20 20<br />

449 2 1 60 60<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-12 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

TABLE 6-4<br />

Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />

Pump Station<br />

Number<br />

Number of<br />

Pumps<br />

Capacity of<br />

Each Pump<br />

(gpm)<br />

No. of<br />

Pumps for<br />

Des. Cap.<br />

Pump TDH<br />

(ft)<br />

HP per Duty<br />

Pump<br />

Motor HP per<br />

Duty Pump<br />

Operating<br />

HP<br />

Station KW<br />

required<br />

450 2 1 40 40<br />

451 2 1 20 20<br />

452 2 1 80 80<br />

453 2 1 80 80<br />

454 2 1 40 40<br />

455 2 1 60 60<br />

456 2 1 60 60<br />

457 2 1 40 40<br />

458 2 1 20 20<br />

460 2 1 60 60<br />

500 2 617 1 50 11 15 15 15 20<br />

504 2 1012 1 50 18 20 20 20 20<br />

508 3 1077 2 75 29 30 60 59 60<br />

601 3 1450 2 75 39 40 80 78 85<br />

944 3 1177 2 75 32 40 80 78 85<br />

1001(367) 2 154 1 50 3 3 3 3 10<br />

1003(353) 2 292 1 50 5 5 5 5 10<br />

101A 2 174 1 50 3 3 3 3 10<br />

22A 2 115 1 50 2 3 3 3 10<br />

31A 2 2060 1 50 37 40 40 39 42<br />

353 (1003) 2 292 1 50 5 5 5 5 10<br />

365 (676) 3 771 2 75 21 25 50 49 60<br />

367(1001) 2 154 1 50 3 3 3 3 10<br />

65A 3 1736 2 75 47 50 100 98 100<br />

676(365) 3 770 2 75 21 25 50 49 60<br />

7A 2 800 1 50 14 15 15 15 20<br />

PARISH PRISON 1 50 0 1 1 1 10<br />

Generator<br />

KW<br />

GNV31031158554.DOCX/103470007 6-13 JANUARY 2011<br />

REV. 5


SECTION 6. EMERGENCY GENERATORS<br />

This page intentionally left blank.<br />

GNV31031158554.DOCX/103470007 6-14 JANUARY 2011<br />

REV. 5


Appendix A<br />

Existing Pump Stations and Generator Requirements


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

8 2 3 10 60 3/240 10<br />

11 2 3 5 18 121 1/240 40<br />

12 2 20 44 258 3/240 60<br />

14 2 5 22 3/240 20<br />

17 2 1.5 6.1 22.7 3/240 10<br />

20 2 5 9 50 3/240 20<br />

22 2 5 5 11 58 3/240 20<br />

25 2 5 5 9 58 3/240 20<br />

26 2 2 9 48 3/240 10<br />

28 2 2 3/240 10<br />

29 2 3 15 3/240 10<br />

34 1 1 14 1/240 40<br />

36 2 7.5 16 117 3/240 40<br />

37 2 5 5 9 59 3/240 20<br />

48 3 15 18 121 3/480 60<br />

49 4 25 32 3/480 125<br />

57 5 150 183 3/480 600<br />

60 5 185 3/480 250<br />

62 2 50/60 50 50 347 3/480 100<br />

69 2 15 46 273 3/240 60<br />

70 2 5 14 87 3/240 20<br />

71 2 5 3 14 56 3/240 20<br />

72 2 20 15 36 205 3/240 60<br />

73 2 5 12 58 3/240 20<br />

78 2 5 5 12 64 3/240 20<br />

79 2 3 7.7 56.1 3/240 10<br />

81 2 5 5 11 64 3/240 20<br />

82 2 3 7 61 3/240 10<br />

83 2 3 2 6 50 3/240 10<br />

84 2 7.5 16 92 3/240 40<br />

85 2 25 24 177 3/480 80<br />

87 2 5 14 82 3/240 20<br />

88 2 5 11 93 3/240 20<br />

89 2 3 3/240 10<br />

90 2 10 29 159 3/240 40<br />

92 1 7.5 18 80 3/240 40<br />

93 2 7.5 18.1 130 3/240 40<br />

95 2 3, 5 8 3/240 20<br />

96 2 7.5 6 66 3/480 20<br />

97 2 3 7 34 3/240 10<br />

98 2 7.5 18 125 3/240 40<br />

99 2 5 3/240 20<br />

GNV31031158554.DOCX/103470007 A-1 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

100 2 2 6 34 3/240 10<br />

101 2 3 7 38 3/240 10<br />

103 2 20 35 363 3/240 60<br />

104 2 29 31 224 3/480 80<br />

106 2 25 40 28 283 3/480 80<br />

108 2 50 52 399 3/480 100<br />

109 2 10 20.1 3/208 40<br />

114 2 3 9 56 3/240 10<br />

116 3 5 5 3/480 20<br />

117 2 2.2 5 14 74 3/240 20<br />

121 2 25, 30 30 3/480 80<br />

122 2 3 5 19 3/240 10<br />

125 5 20<br />

126 2 7.5 25 3/240 40<br />

128 2 50 44 277 3/480 100<br />

130 2 10 18 141 3/240 40<br />

131 2 3 10 57 3/240 10<br />

132 2 20 39 382 3/240 60<br />

133 2 2 7 21 3/240 10<br />

134 1 10 3/480 20<br />

138 2 3 7.8 19 3/240 10<br />

140 2 20 25 188 3/480 60<br />

141 2 25 65 355 3/240 100<br />

142 2 7.5 12 140 3/480 20<br />

145 2 15 35 208 3/240 60<br />

147 2 50 39 372 3/480 100<br />

150 2 20 45 309 3/240 60<br />

151 2 3 7 30 3/240 10<br />

154 2 15 38 169 3/240 60<br />

155 2 60 65 356 3/480 150<br />

156 1 10 3/240 40<br />

158 2 5 3/240 20<br />

159 2 5, 15 3/240 60<br />

160 2 60 60 45 413 3/480 125<br />

161 2 15 14 110 3/480 60<br />

163 2 3 7 33 3/240 10<br />

165 2 3 3/240 10<br />

166 2 5 15 83 3/240 20<br />

168 2 30 80<br />

169 2 2 10 46 3/240 10<br />

171 2 3 11 46 3/240 10<br />

173 2 15 20 162 3/240 60<br />

GNV31031158554.DOCX/103470007 A-2 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

176 1 30 3/480 80<br />

177 4 75 3/480 250<br />

178 2 5 8 3/240 20<br />

179 3 40 3/240 100<br />

180 2 2 5 28 3/240 10<br />

181 2 40 36.5 338 3/480 80<br />

184 2 20 34 237 3/240 60<br />

185 2 15 29 214 3/240 60<br />

187 1 5 3/240 20<br />

189 2 7.5 18 148 3/240 40<br />

190 2 3 2 5 39 3/240 10<br />

191 2 10 15 17 115 3/480 40<br />

192 2 3 6 3/240 10<br />

193 2 5 18 82 3/240 20<br />

194 2 5 3 11 53 3/240 20<br />

195 2 40 52 267 3/480 80<br />

197 2 40 50 49 381 3/480 100<br />

198 2 10 24 160 3/240 40<br />

200 2 60 46 423 3/480 150<br />

202 2 5 8 47.6 3/240 20<br />

203 2 5 12 96 3/240 20<br />

204 2 3, 5 3/240 20<br />

205 2 7.5 15 3/240 40<br />

206 2 20 24 188 3/480 60<br />

210 2 2 3.5 19.8 3/240 10<br />

213 2 20 20 173 3/480 60<br />

214 2 1.5 5 31 3/240 10<br />

215 2 5 2 12 49 3/240 20<br />

216 1 5 3/480 20<br />

217 1 5 3/480 20<br />

219 2 3 1/240 10<br />

220 2 5 16 3/240 20<br />

222 2 25 36 280 3/480 80<br />

225 2 29 30 40 3/480 80<br />

226 2 20 26 142 3/480 60<br />

228 1 7.5 40<br />

230 1 40 3/480 80<br />

232 2 3 17 1/240 10<br />

233 2 10 15 5 1/240 40<br />

235 2 3 7 55 3/240 10<br />

237 2 3 7 45 3/240 10<br />

242 2 5 12 3/240 20<br />

GNV31031158554.DOCX/103470007 A-3 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

245 2 3 102 1/240 10<br />

246 2 15 3/240 40<br />

248 2 5 3 14 16 3/240 20<br />

250 2 7.5 21 107 3/240 40<br />

251 2 5, 10 3/240 40<br />

254 2 5 1/240 30<br />

255 2 7.5 20.6 136 3/240 40<br />

256 2 3 7 1/240 10<br />

257 2 2 3 16 51 1/240 10<br />

258 2 20 28 168 3/480 60<br />

259 2 20 35 307 3/240 60<br />

260 2 25 25 89 451 3/240 100<br />

261 2 5 13 67 3/240 20<br />

262 2 15 20 31 243 3/240 60<br />

263 2 25 20 201 3/480 80<br />

264 2 5 14 95 1/240 30<br />

265 2 10 25 23 215 3/480 80<br />

266 2 10 16 146 3/240 40<br />

267 2 2 7 50 3/240 10<br />

268 2 7.5 15 3/240 40<br />

272 2 5 12 84 3/240 20<br />

276 2 7.5 10.5 54 3/480 20<br />

279 2 7.5 3/240 40<br />

280 2 30 28 239 3/480 80<br />

281 2 3 9 29 3/240 10<br />

282 1 30 3/480 80<br />

284 2 25 53 305 3/240 60<br />

286 2 2 2 11 1/240 10<br />

288 2 20 14 131 3/480 60<br />

289 2 3 14.6 54 3/240 10<br />

290 3 8 3/240 10<br />

291 1 40 3/480 80<br />

292 2 3 10 50 3/240 10<br />

293 2 5 13 90 3/240 20<br />

294 2 3 12 3/240 10<br />

295 2 10 11 67 3/480 40<br />

298 2 3 8 3/240 10<br />

299 2 5 13 63 3/240 20<br />

300 3 25 30 34 152 3/480 80<br />

301 3 25 28 165 3/480 100<br />

303 2 2 5 29 3/240 10<br />

304 1 10 17 188 3/240 40<br />

305 2 20 31 255 3/240 60<br />

GNV31031158554.DOCX/103470007 A-4 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

307 2 5 14 81 3/240 20<br />

310 2 15 13 136 3/480 60<br />

312 2 3 10 ? 3/240 10<br />

314 2 5 16 67 3/240 20<br />

315 2 10 25 211 3/240 40<br />

317 2 7.5 18 116 3/240 40<br />

319 2 3 8 51 3/240 10<br />

320 20 3/480 60<br />

321 2 3 8 37 3/240 10<br />

322 2 3 8 45 3/240 10<br />

323 2 3 12 56 3/240 10<br />

324 2 5 12 89 3/240 20<br />

325 2 5 12 87 1/240 60<br />

328 2 40 55 299 3/480 100<br />

330 2 3 5.86 39 3/240 10<br />

334 2 5 12 86 3/240 20<br />

335 2 7.5 29 148 3/240 40<br />

337 2 3 9.3 62.8 3/240 10<br />

339 2 3 7 42 3/240 10<br />

341 2 10 40<br />

343 2 150 3/480 80<br />

344 2 7.5 21 145 3/480 40<br />

346 2 20 24 185 3/480 60<br />

347 2 20 18 176 3/480 60<br />

349 2 3 9 61 3/240 10<br />

350 2 3 8 51 3/240 10<br />

356 2 5 8.3 68 3/240 20<br />

357 2 3 9 48 3/240 20<br />

359 2 5 12 91 3/240 20<br />

360 2 3 10 59 3/240 10<br />

361 2 25 27.5 182.5 3/480 80<br />

362 2 2 7.4 24.3 3/208 10<br />

366 2 5 13.8 96 3/240 20<br />

367 2 7.5 14 124 3/240 40<br />

371 2 20 16.5 3/480 60<br />

373 2 3 12 56 3/240 10<br />

374 2 3 9 54 3/240 10<br />

375 2 3 10 53 3/240 10<br />

376 2 2 5 29 3/240 10<br />

377 2 7.5 15 113 3/240 40<br />

378 2 10 31 223 3/240 40<br />

380 2 5 9 64 3/240 20<br />

381 2 2 7.1 50 3/240 10<br />

GNV31031158554.DOCX/103470007 A-5 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

383 2 5 10 85 3/240 20<br />

384 2 7.5 17 111 3/240 40<br />

385 2 2 16 46 1/240 10<br />

386 2 20 42 294 3/240 60<br />

387 2 5 10 93 3/240 20<br />

388 2 3 1/240 10<br />

389 2 40 34 232 3/480 100<br />

390 2 10 30 158 3/240 40<br />

392 2 5 14 70 3/240 20<br />

393 2 3 8 43 3/240 10<br />

394 2 3 8 59 3/240 10<br />

395 2 10 19 189 3/240 40<br />

396 2 5 20 96 3/240 20<br />

398 2 40 78 502 3/240 100<br />

399 2 5 14 102 3/240 20<br />

400 2 15 31 235 3/240 60<br />

401 2 5 10 76 3/240 20<br />

403 2 10 3/208 40<br />

404 2 3 6 49 3/240 10<br />

405 2 10 11 75 3/480 40<br />

406 2 20 21.5 140.5 3/480 60<br />

407 2 3 7.5 50 3/240 10<br />

408 2 20 21 167 3/480 60<br />

410 2 10 18 147 3/240 40<br />

412 2 7.5 15 118 3/240 40<br />

413 2 15 23 94 3/480 60<br />

415 2 5 10 3/240 20<br />

416 2 5 10 15 146 3/240 40<br />

417 2 20 21 179 3/480 60<br />

418 2 20 24.5 190 3/480 60<br />

422 2 40 37 289 3/480 80<br />

423 2 5 11 90 3/240 20<br />

425 2 3 10 53 3/240 10<br />

426 2 30 56 298 3/208 80<br />

427 2 7.5 17 146 3/240 40<br />

428 2 10 32 197 3/240 40<br />

430 3 100 95 3/480 250<br />

431 2 5 13.6 70 3/240 20<br />

432 2 5 10 70 3/240 20<br />

433 2 5 22 134 3/240 20<br />

434 2 1 4.3 20 3/208 10<br />

435 2 15 7.5 14.7 111 3/480 60<br />

436 2 40 20 33 259 3/480 80<br />

GNV31031158554.DOCX/103470007 A-6 JANUARY 2011<br />

REV. 5


APPENDIX A<br />

Existing Pump Stations and Generator Requirements<br />

Field Data<br />

Nameplate<br />

Horsepower<br />

Horsepower<br />

Based On<br />

Inrush Amps<br />

Pump Station<br />

# of<br />

Pumps<br />

F/L<br />

Amps<br />

Inrush<br />

Amps<br />

Phase/<br />

Volts<br />

Gen Size<br />

(KW)<br />

437 2 40 20 30 287 3/480 80<br />

438 2 5 9.5 86 3/480 20<br />

439 2 7.5 22 107 3/240 40<br />

441 2 2 5 47 3/240 10<br />

442 2 15 10 15.2 148 3/480 60<br />

443 2 20 34.5 61 3/480 80<br />

444 2 50 62 386 3/480 100<br />

445 2 10 31 260 3/240 60<br />

446 2 30 20 31 199 3/480 80<br />

447 3 15 26 120 3/480 100<br />

448 2 5 16 113 3/240 20<br />

449 2 15 28 206 3/480 60<br />

450 2 10 16 199 3/480 40<br />

451 2 5 17 79 3/240 20<br />

452 2 30 20 31 214 3/480 80<br />

453 2 20 36.7 202 3/480 80<br />

454 2 7.5 14 120 3/480 40<br />

455 2 50? 20 37 258 3/480 60<br />

456 2 20 12 70 3/240 60<br />

457 2 10 8 22 138 3/240 40<br />

458 2 3 8 50 3/240 20<br />

460 2 20 38 254 3/480 60<br />

500 2 50 60 351 3/480 100<br />

504 2 60 70 433 3/480 125<br />

508 3 50 56 376 3/480 125<br />

601 3 75? 60 53 393 3/480 125<br />

676 3 60 55 418 3/480 125<br />

944 3 75 52 3/480 150<br />

101A 2 10 27 161 3/240 40<br />

332A 2 70 3/480 150<br />

65A 3 77 84.0 3/480 150<br />

Parish Prison 2 2 6.6 34.9 3/240 10<br />

Total No. Generators 287<br />

Notes:<br />

If motors were accessible, motor nameplate data was obtained.<br />

If motors were not accessible, motor running and starting current was measured.<br />

For non-PDP pump stations the number of pumps listed is the number of installed pumps.<br />

It is not clear whether or not 1 pump less than listed is sufficient for the peak wet weather flow.<br />

Generators were sized based on running one pump less than the number listed, except that for pumps 20 hp<br />

and smaller, the generator was sized to run a minimum of 2 pumps.<br />

If the data indicated two different motor sizes, the generator was selected based on the larger motor size.<br />

GNV31031158554.DOCX/103470007 A-7 JANUARY 2011<br />

REV. 5


This page intentionally left blank.<br />

GNV31031158554.DOCX/103470007 A-8 JANUARY 2011<br />

REV. 5


Appendix B<br />

PDP Lift Stations


APPENDIX B<br />

PDP Lift Stations; Baton Rouge <strong>Program</strong><br />

PS number<br />

Number of<br />

Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />

1 5 3/480 600 CGN-C-0005<br />

2 3 3/480 500 CC-EAST-PS<br />

3 3 3/480 400 CC-EAST-PS<br />

4 3 3/480 1000 CC-EAST-PS<br />

5 5 3/480 (2) 2MW CC-EAST-PS<br />

6 1 3/480 60 CC-EAST-PS<br />

10 1 3/480 125 CC-EAST-PS<br />

13 1 3/480 80 SGC-C-0001<br />

15 2 3/480 400 CGN-C-0005<br />

16 1 3/480 60 SGC-C-0001<br />

18 1 3/240 35 SGC-C-0001<br />

19 1 3/480 125 CGN-C-0005<br />

21 1 3/480 80 SGC-C-0001<br />

23 1 3/480 150 Group Project 1B<br />

27 2 3/240 40<br />

30 1 3/480 80 SGC-C-0001<br />

31 2 3/480 150 SGC-C-0001<br />

35 2 3/480 60 Group Project 1B<br />

38 1 3/240 35 NGS-C-0003<br />

39 2 3/480 60 Group Project 1B<br />

40 1 3/480 40 SGL-C-0002<br />

41 1 3/240 35 SFU-C-0002B<br />

42 6 3/480 3000 CC-WWTP-PS<br />

43 3 3/480 500 NFW-C-0009<br />

44 2 3/480 125 NGS-C-0003<br />

45 4 3/480 2500 Group Project 1B<br />

47 3 3/480 300 Group Project 1B<br />

50 3 3/480 400 SGC-C-0001<br />

54 2 3/480 60 Group Project 1B<br />

55 3 3/240 40 Group Project 1B<br />

56 2 3/480 125 SGL-C-0002<br />

59 5 3/480 600 CGN-C-0005<br />

63 2 3/480 100 NGS-C-0003<br />

64 1 3/480 80 NGS-C-0003<br />

66 2 3/480 80 SGC-C-0001<br />

GNV31031158554.DOCX/103470007 B-1 JANUARY 2011<br />

REV. 5


APPENDIX B<br />

PDP Lift Stations; Baton Rouge <strong>Program</strong><br />

PS number<br />

Number of<br />

Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />

68 1 3/480 80 SGL-C-0002<br />

74 2 3/240 40<br />

75 1 3/240 10 NGS-C-0003<br />

77 1 3/240 20 SFU-C-002B<br />

80 1 3/480 40 NGS-C-0003<br />

86 1 3/480 40 NFE-C-0005<br />

91 1 3/240 125 CC-EAST-PS<br />

94 1 3/480 80 NFE-C-0003<br />

102 1 3/240 40 SGL-C-0002<br />

105 1 3/480 40 NFW-C-0009<br />

107 1 3/480 60 SFL-C-0001<br />

111 2 3/480 125 SFU-C-0001<br />

112 2 3/240 35 SFU-C-0002A<br />

113 1 3/240 100<br />

115 1 3/240 60 SFU-C-0001<br />

118 1 3/240 35 SFL-C-0003<br />

119 2 3/480 125 SGC-C-PS119<br />

120 1 3/240 35 SGL-C-0002<br />

123 1 3/240 35 NFW-C-0009<br />

124 1 3/480 80 NFW-C-0009<br />

127 1 3/240 35 NGS-C-0003<br />

129 1 3/240 35 NGS-C-0003<br />

136 2 3/480 400 CGN-C-0005<br />

139 1 3/240 10 SFU-C-0002B<br />

144 1 3/240 35 NFE-C-0005<br />

148 1 3/240 35 SFU-C-0002A<br />

149 2 3/480 60 SFU-C-0002B<br />

153 1 3/480 40 SFU-C-0002B<br />

157 1 3/240 60 SFU-C-0002A<br />

162 1 3/480 60 SFU-C-0002B<br />

164 1 3/480 60 NFE-C-0005<br />

170 2 3/480 150 SFU-C-0002A<br />

172 1 3/240 20 SFU-C-0002A<br />

174 1 3/240 20 SFU-C-0002B<br />

GNV31031158554.DOCX/103470007 B-2 JANUARY 2011<br />

REV. 5


APPENDIX B<br />

PDP Lift Stations; Baton Rouge <strong>Program</strong><br />

PS number<br />

Number of<br />

Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />

175 2 3/480 80 SFU-C-0002B<br />

182 1 3/480 40 SFL-C-0004<br />

183 2 3/480 150 NFW-C-0010<br />

196 1 3/480 40 NFE-C-0005<br />

201 1 3/240 60 SFU-C-0001<br />

207 1 3/480 40 NFE-C-0005<br />

211 2 3/240 35 SFU-C-0002A<br />

218 1 3/240 35 NFE-C-0005<br />

221 2 3/480 100 SFL-C-0003<br />

223 1 3/480 60 SFL-C-0004<br />

224 2 3/480 80 SFU-C-0002B<br />

227 1 3/240 35 SFU-C-0002B<br />

229 1 3/480 60 SFL-C-0003<br />

231 2 3/480 80 NFE-C-0005<br />

234 1 3/480 40 NFE-C-0005<br />

236 5 3/480 400 SFL-C-0001<br />

239 1 3/240 10 SFL-C-0003<br />

240 1 3/480 100<br />

243 2 3/480 100 NFW-C-0009<br />

244 1 3/480 80 NGS-C-0003<br />

247 2 3/480 125 SFU-C-0002A<br />

249 2 3/480 100 NFE-C-0005<br />

253 1 3/480 20 SFU-C-0002A<br />

271 1 3/240 20 NFE-C-0005<br />

274 2 3/480 60 SFU-C-0002A<br />

275 2 3/480 250 Group Project 1B<br />

277 2 3/480 60 Group Project 1B<br />

278 1 3/240 80 SFL-C-0004<br />

285 1 3/240 20 NFE-C-0005<br />

296 2 3/480 40 SFU-C-0002A<br />

302 3 3/480 100<br />

311 1 3/480 60 SFL-C-0001<br />

313 1 3/240 20 NFE-C-0005<br />

316 2 3/480 150 SFU-C-0002A<br />

GNV31031158554.DOCX/103470007 B-3 JANUARY 2011<br />

REV. 5


APPENDIX B<br />

PDP Lift Stations; Baton Rouge <strong>Program</strong><br />

PS number<br />

Number of<br />

Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />

326 1 3/240 35 SFU-C-0002B<br />

327 1 3/480 40 SFL-C-0004<br />

329 1 3/480 80 SGL-C-0002<br />

336 1 3/480 60 SFL-C-0001<br />

338 1 3/240 60 SFU-C-0001<br />

345 1 3/240 35 SFU-C-0002B<br />

353 1 3/480 40 SFL-C-0004<br />

358 1 3/240 35 SFL-C-0003<br />

365 2 3/480 200 SFL-C-0004<br />

372 1 3/480 80 SFL-C-0004<br />

379 1 3/240 20 SFU-C-0001<br />

382 2 3/480 80 03-RMP-S14<br />

391 1 3/240 20 SFU-C-0002A<br />

402 2 3/240 20 SFU-C-0002A<br />

429 1 3/240 10 NFW-C-0009<br />

503 2 3/480 125 NFW-C-0010<br />

505 3 3/480 800 SFL-C-0001<br />

509 3 3/480 200 NFE-C-0005<br />

511 5 3/480 800 NFE-C-0005<br />

513 2 3/480 250 NFW-C-0009<br />

514 5 3/480 (1) - 1000 ; (1) - 2500 SFL-C-0002<br />

777 2 3/480 300 SFU-C-0002<br />

889 2 3/480 800 SFU-C-0002<br />

897 3 3/480 (2) - 600 kW NFW-C-0004<br />

999 2 3/480 250 SFL-C-0003<br />

100A 2 3/480 250 SFU-C-0002<br />

119N 1 3/480 100 NFW-C-0010<br />

24/24A 4 3/480 400 NFW-C-0010<br />

505A 3 3/480 125 SFL-C-0001<br />

510AA 3 3/480 225 NFE-C-0005<br />

51A 3 3/480 1000 NFW-C-0002<br />

51AA 2 3/480 600 NFW-C-0002<br />

52A 5 3/480 3000 NFW-C-0002<br />

53A 6 3/480 500 SGL-C-0002<br />

GNV31031158554.DOCX/103470007 B-4 JANUARY 2011<br />

REV. 5


APPENDIX B<br />

PDP Lift Stations; Baton Rouge <strong>Program</strong><br />

PS number<br />

Number of<br />

Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />

58A 9 3/480 (3) - 1000 SGC-C-PS58A<br />

5XX 2 3/480 800 SGC-C-0001<br />

7/7A 1 3/480 125 CC-EAST-PS<br />

Choctaw Storage 3 3/480 150 NFW-C-0002<br />

Comite Dr 1 1 3/480 40 NFE-C-0003<br />

Comite Dr 2 1 3/480 20 NFE-C-0003<br />

OXLF (Little Farms) 1 3/480 80 NFW-C-0009<br />

Southdowns 1 3/480 80 CC-EAST-PS<br />

Womens Hospital 2 3/480 SFU-C-0001<br />

Total Number of PS = 147<br />

GNV31031158554.DOCX/103470007 B-5 JANUARY 2011<br />

REV. 5


This page intentionally left blank.<br />

GNV31031158554.DOCX/103470007 B-6 JANUARY 2011<br />

REV. 5


SECTION 7<br />

Supervisory Control and Data Acquisition<br />

(SCADA)<br />

7.1 Background<br />

The C-P currently has a very limited SCADA capability at few of its pump stations in the<br />

collection system and at the WWTPs. Without a comprehensive fully integrated SCADA<br />

system, collection system and WWTP operators have to physically change settings and<br />

check each pump station or piece of equipment on a daily to weekly basis, depending on the<br />

criticality of the piece of equipment. If a comprehensive and integrated SCADA system is<br />

put into place, operations of the collection system pump stations and the WWTPs will<br />

become more automated and streamlined and save operator time so that preventive, rather<br />

than reactive, maintenance can be performed. Also, a SCADA system will allow the<br />

collection system pump station operations to be optimized during wet weather to maximize<br />

storage and decrease the peak flows to the WWTPs. The SCADA system will allow quick<br />

overview of the WWTPs and the collection systems at a central location to afford systemwide<br />

efficient operation.<br />

To address this issue, the C-P will install a SCADA system at the South WWTP, the North<br />

WWTP, and all the pump stations in the collection system. The SCADA system for the South<br />

WWTP is being designed as part of the South WWTP – Phase 2 project and is not<br />

summarized in this chapter. The SCADA system for the collection system and the North<br />

WWTP are described in this chapter.<br />

7.2 SCADA Operations Data/Control Center<br />

The SCADA Operations Data/Control Center, as outlined in the SCADA Master <strong>Plan</strong><br />

(CH2M HILL, June 2008), is required to provide central collection, storage, and processing of<br />

data from WWTPs and the collection system. The Operations Data/Control Center will<br />

collect, reduce, and archive measurements, alarms and, status information for use by<br />

operators, managers, and engineers. The data center will include centralized information<br />

servers that allows managers and engineers to view process graphics and to generate<br />

reports using visualization application software installed on their business network<br />

workstations.<br />

The centralized information servers provide easy access to data for managers and engineers<br />

to support a number of activities, including regulatory reporting, management oversight,<br />

collection system and treatment capacity and quality analysis, and improvements planning.<br />

In the future, centralized control of the collection system and WWTPs can be accomplished<br />

via the centralized information servers.<br />

The SCADA Operations Data/Control Center will be located at a location to be determined,<br />

with a downtown location preferred. The Baton Rouge Emergency Operations Center will<br />

also house servers and workstations that will allow for monitoring and control of the<br />

GNV31031158555.DOCX/103470008 7-1 JANUARY 2011<br />

REV. 5


SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

WWTPs and collection systems during an emergency. A data monitoring center will be<br />

provided at the Choctaw Collection System Maintenance Facility that is currently being<br />

planned. This data center will allow monitoring (but not control) of the South and North<br />

Collection System pump stations.<br />

The SCADA Operations Data/Control Center is expected to include centralized information<br />

servers integrating the data from the South WWTP SCADA server node (located at the<br />

South WWTP), the future North WWTP SCADA server node (located at the North WWTP),<br />

and the South and North Collection System pump station programmable logic controllers<br />

(PLCs).. Note that the South Collection System includes both the Central Basin pump<br />

stations and South Basin pump stations, since the Central Basin stations will pump to the<br />

South WWTP. The type of data link between the WWTP servers and the centralized<br />

information servers at the SCADA Operations Data/Control Center will be either dedicated<br />

Ethernet “T1” phone lines or fiber optic lines.<br />

As the design of each SCADA subsystem progresses, the requirements noted above will be<br />

further refined based on discussions with the C-P staff.<br />

7.3 Collection System SCADA System<br />

The collection system SCADA system will be used by collection system operators to monitor<br />

and exercise control of collection pump stations in accordance with pump station design<br />

criteria. The overall collection system pump stations will be split in to two groups, namely<br />

the North and the South collection system pump stations. The North collection system<br />

pump stations will report to the North Collection System SCADA servers, located at the<br />

SCADA Operations Data/Control Center, whereas the South Collection System Pump<br />

Stations will report to the South Collection System SCADA servers, located at the SCADA<br />

Operations Data/Control Center. The North and the South Collection System SCADA<br />

servers will then report to the centralized information servers, located at the SCADA<br />

Operations Data/Control Center. Each Collection System monitoring and control system<br />

includes the following major components:<br />

<br />

<br />

<br />

PLCs at each pump station to provide local automatic control and to communicate with<br />

their respective Collection System servers.<br />

The PLCs will communicate with servers located at the SCADA Operations<br />

Data/Control Center in an air conditioned environment with security measures that<br />

limit access to servers and network components. Redundant servers will be provided for<br />

reliability. The process control network collects collection system data and allows mobile<br />

collection system operators to monitor and exercise control of collection system pump<br />

stations without having to visit each pump station. Additionally, diagnostic information<br />

presented to operators can be used to prioritize maintenance activities and to plan<br />

preventive maintenance. An example of where control can be used is to pump down<br />

certain collection system pump stations in advance of a significant wet weather event to<br />

reduce the peak flows that will be experienced at the WWTPs during the wet weather<br />

event.<br />

A wireless communications network to provide reliable communications between the<br />

local pump station PLCs and the servers located at the SCADA Operations<br />

GNV31031158555.DOCX/103470008 7-2 JANUARY 2011<br />

REV. 5


SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

Data/Control Center. It is recommended that wireless communications be accomplished<br />

by a digital cellular network. The collection system pump stations presently under<br />

design will accommodate a future Cellular Radio Modem to be installed in the local<br />

control panel. Details of the Collection System SCADA design will be worked out<br />

during design .<br />

7.4 North Wastewater Treatment <strong>Plan</strong>t<br />

The North WWTP Process Control Network will be used by WWTP operators to monitor<br />

and control North WWTP process equipment in accordance with operations procedures.<br />

The North WWTP network will be designed similar to the SWWTP SCADA System and<br />

include the following major components:<br />

<br />

A WWTP Process Control Network housed in an air conditioned environment in the<br />

North WWTP Control room with security measures that limit access to network<br />

components, servers, and workstation computers. The process control network connects<br />

control system components, collects WWTP data and allows WWTP operators to<br />

monitor and control WWTP process equipment. Additionally, diagnostic information<br />

presented to operators can be used to prioritize maintenance activities and to plan<br />

preventive maintenance.<br />

<br />

A fiber optic Fast Ethernet local area network (LAN) to provide reliable communications<br />

between the North WWTP PLCs, located in several strategic areas in the plant, and the<br />

North WWTP redundant servers in the control room. A reliable data communication<br />

link (either T1 line or fiber optic) between the North WWTP servers and the centralized<br />

information servers located at the SCADA Operations Data/Control Center, to allow<br />

monitoring of the North WWTP from the control center.<br />

7.5 SCADA Project <strong>Delivery</strong> <strong>Plan</strong><br />

In order to install a SCADA system in a timely manner at all pump stations as well as the<br />

North WWTP, a project delivery plan was developed. The first step in developing the<br />

project delivery plan was to prioritize the pump stations that were to get a SCADA system<br />

using the following criteria:<br />

1) Pump stations to be replaced as a part of PDP<br />

2) Existing pump stations (not impacted by this PDP) that were on DPW staff’s list of<br />

critical pump stations<br />

3) Existing pump stations (not impacted by this PDP) that were not on any of the previous<br />

lists (with larger pump stations getting higher priority than smaller pump stations).<br />

The WWTPs were prioritized based on the PDP and Draft Master <strong>Plan</strong> projects. As<br />

mentioned above, the South WWTP SCADA system will be installed as part of the South<br />

WWTP – Phase 2 project, with the system funded as part of the overall project. The North<br />

WWTP SCADA system will be designed and installed as part of the North WWTP Master<br />

<strong>Plan</strong> project, and associated costs are presented below and also in Section 5.5 North WWTP<br />

Master <strong>Plan</strong> Improvements Table 5-25. The existing Central WWTP will not receive a<br />

SCADA system, since current plans call for it to be decommissioned.<br />

GNV31031158555.DOCX/103470008 7-3 JANUARY 2011<br />

REV. 5


SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

The schedule of the project delivery is based on this prioritization. The project delivery plan<br />

involves design of the system components in three projects in 2010 and 2011. Construction<br />

will then commence in 2011 and continue throughout the program duration. Table 7-1<br />

shows the cost summary for the projects.<br />

TABLE 7-1<br />

SCADA Cost Summary<br />

Item<br />

North WWTP SCADA – construction $2,302,000<br />

Collection System SCADA – construction $12,902,000<br />

SCADA Operations Data/Control Center – construction $1,214,000<br />

Total $16,418,000<br />

In order to deliver these projects in a timely manner, the following criteria were used to<br />

develop the project delivery plan.<br />

<br />

<br />

<br />

<br />

<br />

A 5-year renewable maintenance contract is required for the service of the entire SCADA<br />

system.<br />

PDP Pump stations will be designed SCADA-ready.<br />

SCADA components (antenna modem, and PLC, where needed) will be provided by a<br />

SCADA vendor (systems integrator) and installed by a general contractor. For PDP<br />

pump stations and the North WWTP, the general contractor will be the general<br />

contractor for the entire project.<br />

The collection system SCADA will be separated by North and South, so that the North<br />

Collection System will communicate with the North WWTP and the South Collection<br />

System (consisting of both South and Central Basin pump stations) will communicate<br />

with the South WWTP.<br />

The SCADA vendor will be selected by a bidding process. The contract will be based on<br />

the number of pump stations to receive SCADA per year, with a unit price given for<br />

each type of unit for each year. The North WWTP SCADA system will be designed and<br />

bid separately from the collection system SCADA.<br />

The South WWTP SCADA system will be delivered on the <strong>Program</strong> schedule by 2014,<br />

when the South WWTP – Phase 2 project is scheduled to be completed.<br />

<br />

The North WWTP SCADA system will be delivered when the Master <strong>Plan</strong> project is<br />

implemented in 2015 or beyond.<br />

With these criteria in mind, the following project delivery plan was developed.<br />

1) C-P will finalize a location for SCADA Operations Data/Control Center, preferably in a<br />

downtown location.<br />

2) PM will develop a plan to remodel roughly 300 existing pump stations that are not being<br />

upgraded in the <strong>Program</strong>. Each pump station will need new SCADA equipment, with<br />

GNV31031158555.DOCX/103470008 7-4 JANUARY 2011<br />

REV. 5


SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

some pump stations also requiring new controllers to be able to communicate with the<br />

SCADA equipment.<br />

3) PM will develop a plan to connect pump stations being replaced/added in the <strong>Program</strong><br />

to the SCADA system. Instructions will be provided to the design engineers for PDP<br />

projects to allow for connection of these stations to the SCADA system in the future by<br />

4 th quarter 2010.<br />

4) PM will develop a project definition to implement a SCADA system at the North<br />

WWTP. This project definition will be completed in 2014 in conjunction with the overall<br />

North WWTP Master <strong>Plan</strong> project.<br />

5) PM will prepare plans and specifications for the SCADA Operations Data/Control<br />

Center and collection system SCADA components (both PDP and non-PDP stations) in<br />

2010. This project will be ready to bid for construction in early 2011.<br />

6) PM or a design engineer will prepare plans and specifications for the North WWTP<br />

SCADA at a date to be determined.<br />

With this project delivery plan, the collection system and the South WWTP will have a<br />

SCADA system by the end of the <strong>Program</strong> (December 31, 2014). The North WWTP SCADA<br />

system will not be implemented prior to the end of the <strong>Program</strong>, since it is a Master <strong>Plan</strong><br />

issue, not a wet weather issue. The timeline for construction of the North WWTP SCADA<br />

system will be dependent on the available funding.<br />

GNV31031158555.DOCX/103470008 7-5 JANUARY 2011<br />

REV. 5


SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

This page intentionally left blank.<br />

GNV31031158555.DOCX/103470008 7-6 JANUARY 2011<br />

REV. 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!