Program Delivery Plan
Program Delivery Plan - Baton Rouge Department of Public Works ...
Program Delivery Plan - Baton Rouge Department of Public Works ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Sanitary Sewer Overflow (SSO)<br />
Control and Wastewater Facilities <strong>Program</strong><br />
Prepared for<br />
City of Baton Rouge/East Baton Rouge Parish<br />
Department of Public Works<br />
Prepared by<br />
In association with<br />
SIGMA Consulting Group, Inc.<br />
ILSI Engineering<br />
WBG121410141812GNV<br />
January 2011 • Revision 5
Contents<br />
Section<br />
Page<br />
Executive Summary ...................................................................................................................... ES-1<br />
1BOverview ......................................................................................................................... ES-1<br />
<strong>Program</strong> Description ........................................................................................................ ES-2<br />
3BCComprehensive Rehabilitation Projects ........................................................... ES-2<br />
4BCapacity Improvement Projects ........................................................................ ES-2<br />
Wastewater Treatment Improvements/Storage Projects .............................. ES-7<br />
Preliminary Master <strong>Plan</strong> Projects ...................................................................... ES-8<br />
List of Completed Project, Active Projects, and Projects to be Appropriated<br />
in 2011 .............................................................................................................................. ES-11<br />
Functionally Completed Projects .................................................................... ES-11<br />
Active Projects .................................................................................................... ES-11<br />
Projects for 2011 ................................................................................................. ES-13<br />
1 Overview .............................................................................................................................. 1-1<br />
1.1 Background ............................................................................................................. 1-1<br />
1.2 Major <strong>Program</strong> Goals ............................................................................................. 1-1<br />
1.3 <strong>Program</strong> Description .............................................................................................. 1-2<br />
1.3.1 Comprehensive Rehabilitation Projects .................................................. 1-2<br />
1.3.2 Capacity Improvement Projects ............................................................... 1-3<br />
1.3.3 Wastewater Treatment Improvement/Storage Projects ....................... 1-3<br />
1.4 Project <strong>Delivery</strong> Summary .................................................................................... 1-3<br />
1.5 Report Contents ...................................................................................................... 1-4<br />
2 <strong>Plan</strong>ning Description ......................................................................................................... 2-1<br />
2.1 <strong>Plan</strong>ning Overview ................................................................................................ 2-1<br />
2.2 Comprehensive Rehabilitation <strong>Plan</strong>ning ............................................................ 2-1<br />
2.3 Capacity Improvement <strong>Plan</strong>ning ......................................................................... 2-1<br />
2.4 Wastewater Treatment/Storage <strong>Plan</strong>ning .......................................................... 2-2<br />
3 South Basin Projects .......................................................................................................... 3-1<br />
3.1 South Gravity System Comprehensive Rehabilitation Projects ....................... 3-7<br />
3.1.1 SGC-R-0001a, SCG-R-001b, SGC-R-0002a, SGC-R-0002b,<br />
SGC-R-0003, SGC-R-0004, SGL-R-0001, SGL-R-0002, SGL-R-0003,<br />
SGU-R-0001, SGU-R-0002, SGU-R-0003 ................................................. 3-7<br />
3.2 South Gravity System Capacity Improvements Projects ................................... 23<br />
3.2.1 SGU-C-0001 (Multiple PSs - Florida Blvd - Sherwood Forest<br />
Blvd) .......................................................................................................... 3-23<br />
3.2.2 SGU-C-0002 (Airline Highway - Interstate 12) .................................... 3-23<br />
3.2.3 SGU-C-0003 (Sherwood Forest Blvd- Goodwood Blvd Pipeline<br />
Improvements) ......................................................................................... 3-23<br />
3.2.4 SGU-C-0004 (Goodwood Blvd - South Flannery Road) ..................... 3-28<br />
GNV31031158642.DOCX/110310007 III JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Section<br />
Page<br />
3.2.5 SGU-C-0005 (Oak Villa Blvd - Monterey Blvd Sewer Area<br />
Upgrades) ................................................................................................. 3-28<br />
3.2.6 SGC-C-0001 (Florida Blvd PS Improvements) .................................... 3-31<br />
3.2.7 SGC-C-0002 (Airline Highway Pipeline Improvements) .................. 3-33<br />
3.2.8 SGC-C-0003 (Essen Lane - Interstate 12) .............................................. 3-40<br />
3.2.9 SGC-C-PS58A (Pump Station 58 Replacement) .................................. 3-40<br />
3.2.10 SGC-C-PS58FM-A (Staring Lane FM - Phase I – Burbank Drive to<br />
Highland Road) ....................................................................................... 3-42<br />
3.2.11 SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to<br />
Perkins Road) ........................................................................................... 3-44<br />
3.2.12 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to<br />
PS 58) ......................................................................................................... 3-46<br />
3.2.13 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain<br />
Improvements) ......................................................................................... 3-48<br />
3.2.14 SGL-C-0001 (Essen/Staring Area PS 57 Improvements) ................... 3-50<br />
3.2.15 SGL-C-0002 (Multiple PSs – Highland Road – Kenilworth<br />
Parkway) ................................................................................................... 3-50<br />
3.2.16 SGL-C-0003 (Highland Road Pipeline Improvements) ...................... 3-53<br />
3.2.17 SGL-C-0004 (Highland Road – Lee Drive) ........................................... 3-59<br />
3.2.18 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) .................... 3-59<br />
3.3 South Forced System Comprehensive Rehabilitation Projects ...................... 3-63<br />
3.3.1 SFL-R-0001, SFL-R-0002, SFL-R-0003, AND SFU-R-0001................... 3-63<br />
3.4 South Forced System Capacity Improvements Projects ................................. 3-69<br />
3.4.1 SFL-C-0001 (Multiple PSs – Nicholson Drive – Brightside Drive) ... 3-69<br />
3.4.2 SFL-C-0002 (Perkins/Old Perkins Area BPS 514 Improvements) .... 3-71<br />
3.4.3 SFL-C-0003 (Multiple PSs - Burbank Drive – Siegen Lane) ............... 3-73<br />
3.4.4 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road<br />
Area Sewer Upgrades) ............................................................................ 3-75<br />
3.4.5 SFL-C-0005 (Highland Road – Burbank Drive Capacity<br />
Improvements) ......................................................................................... 3-77<br />
3.4.6 SFL-C-0006 (Nicholson Drive – Highland Road – Perkins Road<br />
Capacity Improvements) ........................................................................ 3-79<br />
3.4.7 SFU-C-0001 (Multiple PSs – Jefferson Highway – Park Forest<br />
Drive) ........................................................................................................ 3-87<br />
3.4.8 SFU-C-0002a (O’Neal Lane Pump Stations Group A) ........................ 3-89<br />
3.4.9 SFU-C-0002b (O’Neal Lane Pump Stations Group B) ........................ 3-91<br />
3.4.10 SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12) ................. 3-93<br />
3.4.11 SFU-C-0004 (Multiple Pump Stations – O’Neal Lane – South<br />
Harrell’s Ferry Road) .............................................................................. 3-93<br />
3.4.12 SFU-C-0005 (O’Neal Lane Pipeline Improvements) ........................... 3-93<br />
3.4.13 SFU-C-0006 (O’Neal Lane – Tiger Bend Road) ................................. 3-100<br />
3.5 South WWTP Projects ........................................................................................ 3-101<br />
3.5.1 STP-C-0001 South WWTP – Phase 1 ................................................... 3-101<br />
3.5.2 STP-C-0002 South WWTP – Phase 2 ................................................... 3-105<br />
3.5.3 South WWTP Immediate Action Projects .......................................... 3-107<br />
GNV31031158642.DOCX/110310007 IV JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Section<br />
Page<br />
4 Central Basin Projects ........................................................................................................ 4-1<br />
4.1 Central Gravity System Comprehensive Rehabilitation Projects .................... 4-7<br />
4.1.1 CGS-R-0001, CGS-R-0002, CGS-R-0003, CGS-R-0004, CGS-R-0005,<br />
CGN-R-0001a, CGN-R-0001b, and CGN-R-0002 .................................. 4-7<br />
4.2 Central Gravity System Capacity Improvements Projects ............................. 4-17<br />
4.2.1 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />
Improvements) ......................................................................................... 4-17<br />
4.2.2 CGN-C-0002 (25 th Street – North Acadian Thruway).......................... 4-20<br />
4.2.3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area<br />
Upgrades) ................................................................................................. 4-21<br />
4.2.4 CGN-C-0004 (Downtown Area –PS 59 Improvements) ...................... 4-25<br />
4.2.5 CGN-C-0005 (Downtown Area Pump Station Improvements) ......... 4-25<br />
4.2.6 CGS-C-0001 (Roosevelt Street Area – PS 1 Improvements) ................ 4-27<br />
4.2.7 CGS-C-0002 (University Lake Area – PS2, PS5, and PS6<br />
Improvements) ......................................................................................... 4-27<br />
4.2.8 CGS-C-0003 (Acadian/Claycut Area – PS3 and PS4<br />
Improvements) ......................................................................................... 4-27<br />
4.2.9 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer<br />
Upgrades) ................................................................................................. 4-27<br />
4.2.10 CGS-C-0005 (Stanford Avenue – Ferndale Avenue) .......................... 4-31<br />
4.2.11 CGS-C-0006 (Government Street – South Acadian Thruway<br />
Sewer Area Upgrades) ........................................................................... 4-31<br />
4.2.12 CGS-C-0007 (Central Storage/Equalization) ....................................... 4-34<br />
4.2.13 CC-WWTP-PS (PS 42) ............................................................................. 4-34<br />
4.2.14 CC-EAST-PS (Central Consolidated PSs) ............................................ 4-36<br />
4.2.15 CC–WWTP-FM (PS 42 FM) .................................................................... 4-38<br />
4.2.16 CC-EAST-FM (Central Consolidated FM) ........................................... 4-41<br />
5 North Basin Projects .......................................................................................................... 5-1<br />
5.1 North Gravity System Comprehensive Rehabilitation Projects ...................... 5-7<br />
5.1.1 NGS-R-0001 and NGS-R-0002 ................................................................... 5-7<br />
5.2 North Gravity System Capacity Improvements Projects ................................ 5-11<br />
5.2.1 NGS-C-0001 (Progress Road – Baton Rouge Metro Airport) ............. 5-11<br />
5.2.2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area<br />
Upgrades) ................................................................................................. 5-11<br />
5.2.3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) ................... 5-15<br />
5.2.4 NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding<br />
Boulevard) ................................................................................................ 5-17<br />
5.3 North Forced System Comprehensive Rehabilitation Projects ...................... 5-19<br />
5.3.1 NFW-R-0001, NFW-R-0002, and NFE-R-0001 ...................................... 5-19<br />
5.4 North Forced System Capacity Improvements Projects ................................. 5-25<br />
5.4.1 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) ....... 5-25<br />
5.4.2 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer<br />
Area Upgrades) ........................................................................................ 5-28<br />
5.4.3 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades -<br />
Phase I) ...................................................................................................... 5-31<br />
GNV31031158642.DOCX/110310007 V JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Section<br />
Page<br />
5.4.4 NFE-C-0004 (Foster Road – Hooper Road Sewer Area<br />
Upgrades) ................................................................................................. 5-34<br />
5.4.5 NFE-C-0005 (Hooper Road Pump Station Improvements) ................ 5-36<br />
5.4.6 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer<br />
Area Upgrades) ........................................................................................ 5-38<br />
5.4.7 NFE-C-0007 (Multiple BPS – Hooper Road – Lovett Road) ............... 5-43<br />
5.4.8 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area<br />
Upgrades) ................................................................................................. 5-44<br />
5.4.9 NFW-C-0002 (Choctaw Storage and Pump Station Facility).............. 5-47<br />
5.4.10 NFW-C-0003 (Choctaw Storage Pump Station) .................................. 5-50<br />
5.4.11 NFW-C-0004 (Hooper Storage Facility) ............................................... 5-50<br />
5.4.12 Group Project 1A (Metro Airport Sewer Upgrades) .......................... 5-52<br />
5.4.13 Group Project 1B (Metro Airport Sewer Area Pump Station and<br />
Forcemain Upgrades).............................................................................. 5-58<br />
5.4.14 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer<br />
Area Upgrades) ........................................................................................ 5-62<br />
5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 –<br />
<strong>Plan</strong>k Road) .............................................................................................. 5-65<br />
5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road –<br />
Greenwell Springs Road) ....................................................................... 5-67<br />
5.4.17 NFW-HWY61 (Zachary Area Transmission Network<br />
Improvement Project – Phases I, II, III, and IV) .................................. 5-69<br />
5.5 North WWTP Master <strong>Plan</strong> Improvements ....................................................... 5-73<br />
5.5.1 Background ............................................................................................... 5-73<br />
5.5.2 Priority One Improvements .................................................................... 5-73<br />
5.5.3 Priority Two Improvements ................................................................... 5-74<br />
5.5.4 Estimated Costs ........................................................................................ 5-75<br />
6 Emergency Generators ....................................................................................................... 6-1<br />
6.1 Background ............................................................................................................. 6-1<br />
6.2 Collection System Pump Stations ........................................................................ 6-1<br />
6.3 Wastewater Treatment <strong>Plan</strong>ts ............................................................................... 6-3<br />
6.4 Generator Project <strong>Delivery</strong> <strong>Plan</strong> ........................................................................... 6-3<br />
7 Supervisory Control and Data Acquisition (SCADA) ................................................ 7-1<br />
7.1 Background ............................................................................................................. 7-1<br />
7.2 SCADA Operations Data/Control Center .......................................................... 7-1<br />
7.3 Collection System SCADA System ...................................................................... 7-2<br />
7.4 North Wastewater Treatment <strong>Plan</strong>t ..................................................................... 7-3<br />
7.5 SCADA Project <strong>Delivery</strong> <strong>Plan</strong> .............................................................................. 7-3<br />
GNV31031158642.DOCX/110310007 VI JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Tables<br />
ES-1<br />
ES-2<br />
ES-3<br />
ES-4<br />
Page<br />
Reservoir Storage and Repumping Projects ................................................................. ES-7<br />
List of Completed Projects ............................................................................................ ES-11<br />
List of Active Projects ..................................................................................................... ES-11<br />
List of Projects for 2010 .................................................................................................. ES-13<br />
1-1 Project Funding Schedule ................................................................................................... 1-5<br />
3-1 Estimated Construction Costs for South Gravity System Comprehensive<br />
Rehabilitation Projects ........................................................................................................ 3-8<br />
3-2 SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) –<br />
Pipeline Information ......................................................................................................... 3-25<br />
3-3 SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) –<br />
Pipeline Information ......................................................................................................... 3-29<br />
3-4 SGC-C-0001 (Florida Blvd Pump Station Improvements) – Pump Station<br />
Information ......................................................................................................................... 3-31<br />
3-5 SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information .... 3-37<br />
3-6 SGC-C-PS58A (Pump Station 58 Replacement) - Pump Station Information ........... 3-40<br />
3-7 SGC-C-PS58FM-A (Staring Lane FM-Phase I - Burbank Drive to Highland<br />
Road) – Pipeline Information ........................................................................................... 3-42<br />
3-8 SGC-C-PS58FM-B (Staring Lane FM-Phase II - Highland Road to Perkins<br />
Road) – Pipeline Information ........................................................................................... 3-44<br />
3-9 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) –<br />
Pipeline Information ......................................................................................................... 3-46<br />
3-10 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) –<br />
Pump Station Information ................................................................................................ 3-48<br />
3-11 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) –<br />
Pipeline Information ......................................................................................................... 3-48<br />
3-12 SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) –<br />
Pump Station Information ................................................................................................ 3-50<br />
3-13 SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information ....... 3-56<br />
3-14 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) – Pipeline Information ..... 3-60<br />
3-15 Estimated Construction Costs for South Forced System Comprehensive<br />
Rehabilitation Projects ...................................................................................................... 3-64<br />
3-16 SFL-C-0001 (Multiple Pump Stations – Nicholson Drive – Brightside Drive) –<br />
Pump Station Information ................................................................................................ 3-69<br />
3-17 SFL-C-0002 (Perkins/Old Perkins Area BSP 514 Improvements) – Pump Station<br />
Information ......................................................................................................................... 3-71<br />
3-18 SFL-C-0003 (Multiple Pump Stations - Burbank Drive - Siegen Lane) – Pump<br />
Station Information ........................................................................................................... 3-73<br />
3-19 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer<br />
Upgrades) – Pump Station Information ......................................................................... 3-75<br />
3-20 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) –<br />
Pipeline Information ......................................................................................................... 3-77<br />
3-21A SFL-C-0006 (Phase A - Willow Lane Capacity Improvements) .................................. 3-82<br />
3-21B SFL-C-0006 (Phase B - Nicholson Drive – Highland Road – Perkins Road<br />
Capacity Improvements) – Pipeline Information ......................................................... 3-83<br />
GNV31031158642.DOCX/110310007 VII JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Tables<br />
Page<br />
3-22 SFU-C-0001 (Multiple PSs - Jefferson Highway - Park Forest Drive) – Pump<br />
Station Information ........................................................................................................... 3-87<br />
3-23A O’Neal Lane Pump Stations Group A – Pump Station Information .......................... 3-89<br />
3-23B O’Neal Lane Pump Stations Group B – Pump Station Information ........................... 3-91<br />
3-24 SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information ............ 3-97<br />
4-1 Estimated Construction Costs for Central Gravity System Comprehensive<br />
Rehabilitation Projects ........................................................................................................ 4-8<br />
4-2 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />
Improvements) – Pipeline Information .......................................................................... 4-18<br />
4-3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) –<br />
Pipeline Information ......................................................................................................... 4-22<br />
4-4 CGN-C-0005 (Downtown Area Pump Station Improvements) – Pump Station<br />
Information ......................................................................................................................... 4-25<br />
4-5 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) –<br />
Pipeline Information ......................................................................................................... 4-29<br />
4-6 CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area<br />
Upgrades) – Pipeline Information ................................................................................... 4-32<br />
4-7 CC-WWTP-PS (PS 42) – Pump Station Information ..................................................... 4-34<br />
4-8 CC-EAST-PS (Central Consolidated PSs) – Pump Station Information .................... 4-36<br />
4-9 CC-WWTP-FM (PS42 FM) – Pipeline Information ....................................................... 4-39<br />
4-10 CC-EAST-FM (Central Consolidated FM ) – Pipeline Information ............................ 4-42<br />
5-1 Estimated Construction Costs for the North Gravity System Comprehensive<br />
Rehabilitation Projects ........................................................................................................ 5-7<br />
5-2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline<br />
Information ......................................................................................................................... 5-12<br />
5-3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) – Pump Station<br />
Information ......................................................................................................................... 5-15<br />
5-4 Estimated Construction Costs for North Forced System Comprehensive<br />
Rehabilitation Projects ...................................................................................................... 5-20<br />
5-5 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pump Station<br />
Information ......................................................................................................................... 5-25<br />
5-6 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pipeline<br />
Information ......................................................................................................................... 5-26<br />
5-7 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades) -<br />
Pump Station Information ............................................................................................... 5-28<br />
5-8 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road) – Pipeline Information ....... 5-29<br />
5-9 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) –<br />
Pump Station Information ................................................................................................ 5-31<br />
5-10 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) –<br />
Pipeline Information ......................................................................................................... 5-32<br />
5-11 NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) – Pipeline<br />
Information ......................................................................................................................... 5-34<br />
5-12 NFE-C-0005 (Hooper Road Pump Station Improvements) – Pump Station<br />
Information ......................................................................................................................... 5-36<br />
GNV31031158642.DOCX/110310007 VIII JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Tables<br />
Page<br />
5-13 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) –<br />
Pipeline Information ......................................................................................................... 5-40<br />
5-14 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades) –<br />
Pipeline Information ......................................................................................................... 5-45<br />
5-15 NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Pump Station<br />
Information ......................................................................................................................... 5-48<br />
5-16 NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Forcemain<br />
Information ......................................................................................................................... 5-48<br />
5-17 Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information ............ 5-54<br />
5-18 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />
Upgrades) – Pump Station Information ......................................................................... 5-59<br />
5-19 Group Project 1B (Metro Airport Area Forcemain Upgrades) – Forcemain<br />
Information ......................................................................................................................... 5-60<br />
5-20 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) –<br />
Pipeline Information ......................................................................................................... 5-63<br />
5-21 NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) – Pump<br />
Station Information ........................................................................................................... 5-65<br />
5-22 NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs<br />
Road) – Pump Station Information ................................................................................. 5-67<br />
5-23 NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) –<br />
Pump Station Information ................................................................................................ 5-69<br />
5-24 NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) -<br />
Forcemains .......................................................................................................................... 5-70<br />
5-25 Summary of Estimated Construction Costs for the North WWTP ............................. 5-75<br />
6-1 Summary of Generator Units Existing Pump Stations (not impacted by the PDP) ... 6-1<br />
6-2 Summary of Generator Units PDP Pump Stations ......................................................... 6-2<br />
6-3 Emergency Generators Cost Summary ............................................................................ 6-4<br />
6-4 Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong> ... 6-5<br />
7-1 SCADA Cost Summary ...................................................................................................... 7-4<br />
GNV31031158642.DOCX/110310007 IX JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Figures<br />
Page<br />
ES-1<br />
ES-2<br />
ES-3<br />
Geographic Orientation of the Hydraulic Basins ......................................................... ES-3<br />
Rehabilitation Project Areas ............................................................................................ ES-5<br />
Capacity and Wet Weather Treatment Projects ........................................................... ES-9<br />
1-1 <strong>Program</strong> Funding Schedule ............................................................................................. 1-27<br />
1-2 <strong>Program</strong> Schedule ............................................................................................................. 1-29<br />
3-1 South Basin Rehabilitation Projects .................................................................................. 3-3<br />
3-2 South Basin Capacity Improvement Projects .................................................................. 3-4<br />
3-3 Bluebonnet Boulevard – Jefferson Highway, Phase I and II ......................................... 3-9<br />
3-3a Bluebonnet Boulevard – Jefferson Highway, Phase I .................................................. 3-10<br />
3-3b Bluebonnet Boulevard – Jefferson Highway, Phase I I ................................................ 3-11<br />
3-4 Airline Highway – Goodwood Boulevard Phase I and II ............................................ 3-12<br />
3-4a Airline Highway – Goodwood Boulevard Phase I ....................................................... 3-13<br />
3-4b Airline Highway – Goodwood Boulevard Phase II ...................................................... 3-14<br />
3-5 Ardenwood Drive – Winborune Street .......................................................................... 3-15<br />
3-6 N. 38 th Street – Gus Young Avenue ................................................................................ 3-16<br />
3-7 Burbank Road – Gardere Lane ........................................................................................ 3-17<br />
3-8 Staring Lane – Boone Drive .............................................................................................. 3-18<br />
3-9 Kenilworth Boulevard – Boone Drive ............................................................................ 3-19<br />
3-10 Oak Villa Boulevard – Choctaw Street ........................................................................... 3-20<br />
3-11 Sharp Road – Florida Boulevard ..................................................................................... 3-21<br />
3-12 Flannery Road – Florida Street ........................................................................................ 3-22<br />
3-13 Sherwood Forest Boulevard – Goodwood Boulevard Pipeline Projects ................... 3-27<br />
3-14 Oak Villa Boulevard – Monterrey Boulevard ................................................................ 3-30<br />
3-15 Florida Boulevard PS Projects .......................................................................................... 3-32<br />
3-16 Airline Highway Pipeline Improvements Projects ....................................................... 3-39<br />
3-17 Pump Station 58 Replacement ......................................................................................... 3-41<br />
3-18 Staring Lane FM Phase I – Highland Road to Burbank Drive .................................... 3-43<br />
3-19 Staring Lane FM Phase II .................................................................................................. 3-45<br />
3-20 Staring Lane FM Phase III ................................................................................................ 3-47<br />
3-21 Citi Place/Essen Area PS 119 & FM ................................................................................ 3-49<br />
3-22 Multiple PS – Highland Road – Kenilworth Drive ....................................................... 3-52<br />
3-23 Highland Road Pipeline Improvements ........................................................................ 3-58<br />
3-24 Bayou Duplantier Area Sewer Upgrades ....................................................................... 3-61<br />
3-25 Jefferson Highway – Hoo Shoo Too Road ..................................................................... 3-65<br />
3-26 Jones Creek Road – Tiger Bend Road ............................................................................. 3-66<br />
3-27 Siegen Lane – Interstate 10 ............................................................................................... 3-67<br />
3-28 Antioch Road – Chadsford Drive .................................................................................... 3-68<br />
3-29 Multiple PS – Nicholson Drive – Brightside Drive ....................................................... 6-70<br />
3-30 Perkins – Old Perkins Area BPS514 ................................................................................ 3-72<br />
3-31 Multiple PS – Burbank Drive – Siegen Lane .................................................................. 3-74<br />
3-32 Group Project 2 .................................................................................................................. 3-76<br />
3-33 Highland Road – Burbank Drive ..................................................................................... 3-78<br />
3-34A Phase A (Willow Grove Capacity Improvements) ....................................................... 3-84<br />
GNV31031158642.DOCX/110310007 X JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Figures<br />
Page<br />
3-34B Phase B1 (Nicholson Drive – Highland Road – Perkins Road) Capacity<br />
Improvements .................................................................................................................... 3-85<br />
3-34C Phase B2 (Nicholson Drive – Highland Road – Perkins Road) Capacity<br />
Improvements .................................................................................................................... 3-86<br />
3-35 Multiple PS – Jefferson Highway - Park Forest Drive .................................................. 3-88<br />
3-36A O’Neal Lane Group A PS Projects ................................................................................... 3-90<br />
3-36B O’Neal Lane Group B PS Projects ................................................................................... 3-92<br />
3-37 O’Neal Lane Pipeline Projects ......................................................................................... 3-99<br />
3-38 SWWTP Improvement Projects ..................................................................................... 3-103<br />
4-1 Central Basin Rehabilitation Projects ................................................................................ 4-3<br />
4-2 Central Basin Capacity Improvement Projects ................................................................ 4-5<br />
4-3 Foster Drive – Government Street Phase A and B .......................................................... 4-9<br />
4-4 Highland Road – Washington Street. ............................................................................. 4-10<br />
4-5 Stanford Avenue – Morning Glory Road. ...................................................................... 4-11<br />
4-6 Acadian Thruway – Claycut Road .................................................................................. 4-12<br />
4-7 Acadian Thruway – Perkins Road. ................................................................................. 4-13<br />
4-8a Scenic Highway – Spanish Town Road Phase I ............................................................ 4-14<br />
4-8b Scenic Highway – Spanish Town Road Phase II ........................................................... 4-15<br />
4-9 East Boulevard – Government Street. ............................................................................. 4-16<br />
4-10 Capital Lake Drive – Gayosa Street ................................................................................ 4-19<br />
4-11 South Boulevard – St. Joseph Street Sewer Area Upgrades ........................................ 4-24<br />
4-12 Downtown Area PS Improvements ................................................................................ 4-26<br />
4-13 Highland Road – Buchanan Street Sewer Area Upgrades .......................................... 4-30<br />
4-14 Government Street – South Acadian Thruway Sewer Upgrades ............................... 4-33<br />
4-15 PS 42 .................................................................................................................................... 4-35<br />
4-16 Central Consolidated Pump Stations ............................................................................. 4-37<br />
4-17 Central Consolidation – PS 42 Forcemain ...................................................................... 4-40<br />
4-18 Central Consolidated Forcemain ..................................................................................... 4-43<br />
5-1 North Basin Rehabilitation Projects .................................................................................. 5-3<br />
5-2 North Basin Capacity Improvement Projects .................................................................. 5-5<br />
5-3 Elm Grove Road – Harding Boulevard ............................................................................ 5-8<br />
5-4 Scotland Avenue – Progress Road .................................................................................... 5-9<br />
5-5 <strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades ................................................. 5-14<br />
5-6 <strong>Plan</strong>k Road PS Projects ..................................................................................................... 5-16<br />
5-7 Brookstown Road – Evangeline Street, Phase I and Phase II ...................................... 5-21<br />
5-8 Interstate 110 – Hollywood Street. .................................................................................. 5-22<br />
5-9 Silverleaf Road – Ford Street. ........................................................................................... 5-23<br />
5-10 Gurney Road Sewer Area Upgrades .............................................................................. 5-27<br />
5-11 Sullivan Road/Lovett Road/ Wax Road Sewer Area Upgrades ................................ 5-30<br />
5-12 Comite Drive – Foster Road Sewer Area Upgrades Phase I ........................................ 5-33<br />
5-13 Foster Road – Hopper Road Sewer Area Upgrades ..................................................... 5-35<br />
5-14 Hooper Road PS Projects .................................................................................................. 5-37<br />
5-15 Lovett Road – Greenwell Springs Road ......................................................................... 5-42<br />
5-16 Joor Road – Greenwell Springs Road Sewer Area Upgrades ...................................... 5-46<br />
GNV31031158642.DOCX/110310007 XI JANUARY 2011<br />
REV. 5
CONTENTS, CONTINUED<br />
Figures<br />
Page<br />
5-17 ChoctawStorage, PS52A, PS51A, PS51AA, FM ............................................................. 5-49<br />
5-18 Hooper Street Facility ....................................................................................................... 5-51<br />
5-19 Metro Airport Area Sewer Upgrades (Group Project 1A) ........................................... 5-57<br />
5-20 Metro Airport Area Sewer Pump Station and Forcemain Upgrades ......................... 5-61<br />
5-21 <strong>Plan</strong>k Road – Port Hudson Pride Road .......................................................................... 5-64<br />
5-22 Multiple PS Highway 61 – <strong>Plan</strong>k Road .......................................................................... 5-66<br />
5-23 Multiple PS Road – Greenwell Springs Road ................................................................ 5-68<br />
5-24 Zachary Area Transmission Network Improvement Project ...................................... 5-71<br />
GNV31031158642.DOCX/110310007 XII JANUARY 2011<br />
REV. 5
Acronyms and Abbreviations<br />
BOD Biochemical Oxygen Demand<br />
BPS Booster Pump Station<br />
BTRSSO Baton Rouge Sanitary Sewer Overflow<br />
CCTV Closed Circuit Television<br />
C-P City of Baton Rouge, Parish of East Baton Rouge<br />
DPW Department of Public Works<br />
IAP Immediate Action Projects<br />
I/I<br />
inflow and infiltration<br />
MG Millions Gallons<br />
mgd million gallons per day<br />
MH manhole<br />
NPDES National Pollutant Discharge Elimination System<br />
OandPA Outreach and Public Awareness <strong>Program</strong><br />
PDP <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
PHF peak hourly flow<br />
PM<br />
Project Manager<br />
PMT <strong>Program</strong> Management Team<br />
PS<br />
Pump Station<br />
RDI Rainfall Dependent Infiltration<br />
RDII Rain Dependent Inflow and Infiltration<br />
RMAP1 Remedial Measures Action <strong>Plan</strong> 1<br />
RMAP2 Remedial Measures Action <strong>Plan</strong> 2<br />
SEP Supplementary Environmental Projects<br />
SSO Sewer System Overflow<br />
TF/SC trickling filter/solids contact<br />
TSS Total Suspended Solids<br />
VFD Variable Frequency Drive<br />
WWTP Wastewater Treatment <strong>Plan</strong>t<br />
GNV31031158642.DOCX/110310007 XIII JANUARY 2011<br />
REV. 5
This page intentionally left blank.<br />
GNV31031158642.DOCX/110310007 XIV JANUARY 2011<br />
REV. 5
Executive Summary<br />
1BOverview<br />
The City of Baton Rouge, Parish of East Baton Rouge (C-P) has contracted CH2M HILL to<br />
prepare a <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong> (PDP) that summarizes the Sewer System Overflow (SSO)<br />
Control and Wastewater Facilities <strong>Program</strong>. This document is the third annual update of the<br />
original PDP published in January 2008.<br />
This updated PDP incorporates several changes from the second annual update (published<br />
in November 2009) and reflects the extensive design and construction progress made since<br />
the onset of the program. As of the October 2010, seven projects have completed<br />
construction, 26 projects have begun construction, and 31 projects have begun design,<br />
including both first and second Remedial Measures Action <strong>Plan</strong> (RMAP1 and RMAP2)<br />
projects.<br />
During 2010, construction sequencing issues were once again re-evaluated which has lead to<br />
some splitting-up of capacity projects as they neared construction. Therefore, overall the<br />
total number of RMAP2 projects has increased from 82 to 87 (not including the three<br />
RMAP1 projects). The updated PDP schedule reflects the latest schedule for all active<br />
projects.<br />
The <strong>Program</strong> is divided into the following three wet weather components:<br />
<br />
<br />
<br />
Comprehensive rehabilitation projects<br />
Capacity improvement projects<br />
Wastewater treatment and storage improvements<br />
This PDP describes a total of 87 RMAP2 wet weather projects to be constructed by January<br />
1, 2015 at an estimated total program cost of $1.3 billion in September 2007 dollars. These<br />
costs include construction, design engineering, construction engineering and management,<br />
and program management. <strong>Program</strong> management and construction management has an<br />
estimated cost of $115 million. Costs stated herein do not include costs of city staff<br />
participation and projects previously undertaken by the C-P, such as RMAP1 projects.<br />
This PDP also describes 10 preliminary Master <strong>Plan</strong> projects that have an estimated total<br />
program cost of $115 million. The preliminary Master <strong>Plan</strong> projects include the master plan<br />
portion of the South Wastewater Treatment <strong>Plan</strong>t (WWTP) improvements, two emergency<br />
generator installation projects, Choctaw Maintenance Facility project, the LSU Pump Station<br />
portion of the SGL-C-0002 (Multiple PS – Highland Road – Kenilworth Parkway) project,<br />
two North WWTP priority projects, and three projects to implement a Supervisory Control<br />
and Data Acquisition (SCADA) system for the wastewater collection and treatment system.<br />
The goals of the SSO program are to:<br />
<br />
<br />
<br />
Reduce excess wet weather flows that cause SSOs<br />
Rehabilitate the collection system<br />
Increase the hydraulic capacity of the collection system<br />
GNV31031158570.DOCX/110050012 ES-1 JANUARY 2011<br />
REV. 5
EXECUTIVE SUMMARY<br />
<br />
<br />
<br />
Accommodate growth in project areas<br />
Comply with wastewater treatment plant National Pollutant Discharge Elimination<br />
System (NPDES) permits<br />
Comply with the terms of the Consent Decree<br />
The Consent Decree (Civil Action 01-978-B-M3 United States of America and State of<br />
Louisiana versus City of Baton Rouge, Parish of East Baton Rouge) states that the Collection<br />
System Remedial <strong>Program</strong> projects shall be completed by January 1, 2015.<br />
In preparing this PDP, the locations of known overflows are given highest priority in order<br />
to reduce the frequency of these overflows. Areas of the collection system that were found<br />
to have excessive levels of infiltration or inflow are also identified for rehabilitation.<br />
Hydraulic capacity improvement projects are sized to accommodate the predicted designed<br />
peak wet weather flows and anticipated growth in the project areas. Peak wet weather flows<br />
were predicted based on the previously selected 2-year frequency, 12-hour duration design<br />
storm. Figure ES-1 shows the ten hydraulic basins used in the evaluation of the program.<br />
<strong>Program</strong> Description<br />
3BCoComprehensive Rehabilitation Projects<br />
Sewer system comprehensive rehabilitation projects will be implemented to repair or<br />
replace components of the system that are defective and permit excessive infiltration and<br />
inflow.<br />
The comprehensive rehabilitation portion of the program consists of 30 construction projects<br />
located throughout the C-P. The first projects began in 2008, and the last project is scheduled<br />
for completion in late 2014. Approximately, four to six projects will begin construction each<br />
year. Design and construction will be continuous through 2014. Approximately 5 million<br />
feet of the gravity sewer will be inspected through execution of these rehabilitation projects.<br />
The areas selected for comprehensive rehabilitation are shown on Figure ES-2. Projects<br />
within these areas are described in detail in the body of this plan. The estimated total<br />
program cost of the comprehensive rehabilitation projects is approximately $260 million in<br />
September 2007 dollars.<br />
4BCapacity Improvement Projects<br />
Capacity improvement projects have been defined based on three factors:<br />
1. Computer “InfoWorks Model” comparison of existing capacity to predicted peak wet<br />
weather flows<br />
2. Physical evidence of inadequate capacity based on C-P Department of Public Works<br />
(DPW) records<br />
3. Predicted growth in demand for wastewater capacity<br />
Capacity projects include replacement of inadequately sized gravity sewers and force mains<br />
as well as rehabilitation or replacement of pump stations.<br />
Those projects located nearest to the wastewater treatment plants are in general, scheduled<br />
in the earlier years in the program.<br />
GNV31031158570.DOCX/110050012 ES-2 JANUARY 2011<br />
REV. 5
F<br />
3rd<br />
Lupine<br />
3rd<br />
22nd<br />
26th<br />
30th<br />
Golden<br />
Alba<br />
Sunshine<br />
Elm<br />
Whitter<br />
McHost<br />
Cora<br />
Marilyn<br />
Blackwater<br />
Aletha<br />
Sharp<br />
Bea<br />
Acres<br />
Black<br />
Aubin<br />
Tinley<br />
Burrel<br />
Devall<br />
Hubbs<br />
Anderson<br />
Sullivan<br />
Reames<br />
Millerville<br />
Beaver<br />
Hunt<br />
O'Neal<br />
Antioch<br />
Elliot<br />
Adams<br />
Sandy Springs<br />
Renee<br />
Treakle<br />
Port Hudson Plains<br />
Sutter<br />
Portwood<br />
Sunnyside<br />
Ligon<br />
Brian<br />
Shellmire<br />
Pony<br />
Safer<br />
Piper<br />
Vernon<br />
Hydraulic Basins<br />
Zachary-Slaughter<br />
Rush<br />
Lemon<br />
Jacock<br />
Port Hudson-Pride<br />
Zeb Chaney<br />
J Wicker<br />
Lemon B<br />
Mills<br />
Della<br />
Cook<br />
Scott Barr<br />
Edwards<br />
Jackson<br />
Williams<br />
Robinson<br />
Tom Drehr<br />
Chaney<br />
Riley<br />
Mount Pleasant Zachary<br />
Irene<br />
³<br />
Barnett<br />
Barsket<br />
Zimmerman<br />
Irene<br />
Samuels<br />
Carney<br />
Springfield<br />
Flonacher<br />
Zimmerman<br />
Old Scenic<br />
Dotson<br />
Scenic<br />
Groom<br />
Thomas<br />
North WWTP<br />
I<br />
H<br />
Brightside<br />
Riverbend<br />
Hovey<br />
Harding<br />
Stadium<br />
Swan<br />
Gourrier<br />
6th<br />
Rollins<br />
Church<br />
Main<br />
72nd<br />
North<br />
§¨¦I-110<br />
Central WWTP<br />
Ben Hur<br />
39th<br />
Heck Young<br />
Day<br />
New Rafe Meyer<br />
Lafayette<br />
Martin<br />
Fennwood<br />
Newell<br />
Lake Pointe<br />
Meadow Glen<br />
Magnolia<br />
St John<br />
Mengel<br />
France<br />
Emma<br />
4th<br />
Sorrel<br />
10th<br />
Julia<br />
Rita<br />
Scotland<br />
Central<br />
Stilt<br />
Cypress<br />
Rosenwald<br />
North<br />
Faith<br />
Landry<br />
Gsu<br />
17th<br />
Taft<br />
79th<br />
Shelley<br />
Gore<br />
Chippewa<br />
Terrace<br />
Dalrymple<br />
Laurel Lakes<br />
Legend<br />
3 Wastewater Treatment <strong>Plan</strong>t<br />
Hydraulic Basins<br />
East Baton Rouge<br />
0 1 2 4<br />
Miles<br />
Alvin Dark<br />
Mason<br />
Parker<br />
Doris<br />
14th<br />
15th<br />
18th<br />
Pope<br />
Nelson<br />
Epperson<br />
Wilbur<br />
Beech<br />
23rd<br />
Scotlandville-Zachary<br />
Stanford<br />
Wimbish<br />
Daniels<br />
Lavey<br />
Nicholson<br />
Baker<br />
Gibbens<br />
Hollywood<br />
Ozark<br />
Oleander<br />
May<br />
Ash<br />
Baker<br />
Spur<br />
Polk<br />
Gibbens<br />
Palmyra<br />
Veterans Memorial<br />
Monroe<br />
Mohican<br />
Acadian<br />
Kleinert<br />
Fiero<br />
Carriage<br />
Bella<br />
Ada<br />
Main<br />
Ben Hur<br />
Avenue A<br />
Husband<br />
Lee<br />
Highland<br />
River<br />
38th<br />
McHugh<br />
Evangeline<br />
Brady<br />
Burbank<br />
<strong>Plan</strong>k<br />
Winbourne<br />
Fairfields<br />
31st<br />
Hood<br />
Glendale<br />
Old Weis<br />
Wedgewood<br />
Devall<br />
36th<br />
Sinbad<br />
Steele<br />
Stuart<br />
Clark<br />
Chuck Yeager<br />
Central Gravity,<br />
North<br />
Hillcrest<br />
Paige<br />
Oaklan<br />
Lorraine<br />
Leo<br />
Dubois<br />
Tristian<br />
44th<br />
Greenwell<br />
Greenwell Springs<br />
Valcour<br />
Foster<br />
G S R I<br />
Bentley<br />
Frey<br />
Ford<br />
Sumrall<br />
Comite<br />
Government<br />
Clay Cut<br />
Bawell<br />
Eaton<br />
Dutton<br />
Hollier<br />
Beck<br />
Glasgow<br />
Chipley<br />
College<br />
Pollard<br />
Park<br />
Lower Zachary<br />
Rolling Acres<br />
Byron<br />
Ardenwood<br />
Boone<br />
Menlo<br />
Ned<br />
Myrtle<br />
Hope<br />
Ellen<br />
Sharon Hills<br />
Westdale<br />
Laca<br />
Brookstown<br />
Furr<br />
North Gravity<br />
Central Gravity,<br />
South<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIGUREES-1_PDP2010.MXD SGELPI 11/15/2010 12:49:20<br />
Troy<br />
Boone<br />
Celia<br />
St Ann<br />
Baird<br />
Glen Oaks<br />
Prescott<br />
Lobdell<br />
Dyer<br />
Pettit<br />
Goodwood<br />
Mickens<br />
South WWTP<br />
Elvin<br />
Kent<br />
Stoneview<br />
Corlett<br />
Ruby<br />
Rio<br />
Charlton<br />
Hanks<br />
Renoir<br />
Congress<br />
Quail<br />
Harry<br />
Donmoor<br />
Corporate<br />
Stratford<br />
Main<br />
Jupiter<br />
Caprice<br />
Burden<br />
Kenilworth<br />
Staring<br />
Keed<br />
Hall<br />
Cline<br />
Lanier<br />
Tom<br />
Wooddale<br />
Boyce<br />
Richards<br />
Chandler<br />
University Club<br />
Millwood Creek<br />
Kevel<br />
Angus<br />
Price<br />
Avis<br />
Airway<br />
Lasalle<br />
Airport<br />
Essen<br />
Brentwood<br />
Anselmo<br />
Tucker<br />
North Forced, West<br />
Foster<br />
Dan<br />
Ocean<br />
Atlanta<br />
Waters Edge<br />
Meadow<br />
Breeden<br />
North Forced, West<br />
Calumet<br />
Cody<br />
Oak View<br />
Reco<br />
Rienzi<br />
Brittany<br />
Bles<br />
Flora<br />
Hilltree<br />
Windingway<br />
Brown<br />
Tara<br />
Fleet<br />
Bluebonnet<br />
Tradition<br />
Berlin<br />
Carney<br />
Bliss<br />
Watson<br />
Vail<br />
Loudon<br />
Fairway<br />
Summa<br />
Obrien<br />
Ardoon<br />
Syble<br />
Shady Bluff<br />
Choctaw<br />
Monterrey<br />
Drusilla<br />
Hill<br />
Oakdale<br />
Arleen<br />
Mollylea<br />
Interline<br />
Gail<br />
Oak Hills<br />
Buck Horn<br />
El Scott<br />
Dancy<br />
Tracy<br />
Carmel<br />
Great Smokey<br />
Crescent<br />
Wartelle<br />
Strand<br />
Lakeview<br />
Smith<br />
Oakbrook<br />
Fawn<br />
Old Settlement<br />
Elain<br />
Cal<br />
Azrok<br />
Mint<br />
Darryl<br />
Tams<br />
Perkins<br />
Amiss<br />
Neil<br />
Siegen<br />
Lovett<br />
Peairs<br />
Greenwell Spg Pt Hudson<br />
Tallowwood<br />
Kenlee<br />
Daradele<br />
Hillyard<br />
Kathleen<br />
Briarhurst<br />
Ida<br />
Nelwyn<br />
Tudor<br />
Sherwood Forest<br />
Mall<br />
Core<br />
Gurney<br />
Landfair<br />
Mc Gehee<br />
Woodleigh<br />
Cook<br />
Lassen<br />
Hillsbury<br />
Reiger<br />
Joor<br />
McCullough<br />
Tinley<br />
Southpark<br />
Stan<br />
Archery<br />
Toulon<br />
Neff<br />
Frontier<br />
Sylvan<br />
Shoe Creek<br />
Pecos<br />
Bellfort<br />
Poydras<br />
Corsair<br />
Lariat<br />
Baylor<br />
Triple B<br />
Canterbury<br />
Ocala<br />
Parkside<br />
Hollyfield<br />
Pecue<br />
Joor<br />
Catalina<br />
Warfield<br />
Stockton<br />
Parkforest<br />
Elva<br />
Pecue<br />
Stumberg<br />
Old Perkins<br />
Cherryl<br />
Flannery<br />
Woodcliff<br />
Hooper<br />
Florida<br />
Arlingford<br />
Elwick<br />
Newcastle<br />
Oak Berry<br />
Dorset<br />
Woodland Ridge<br />
Rose<br />
Five Oaks<br />
Coursey<br />
Airline<br />
Pinewood<br />
Huntley<br />
North Forced, East<br />
South Gravity, Upper<br />
South Gravity, Central<br />
South Gravity, Lower<br />
Comal<br />
Pecue<br />
Stutgart<br />
Hickory Ridge<br />
Greens<br />
Denham<br />
Brent<br />
Trey<br />
Glenn<br />
Roundsaville<br />
Kohler<br />
Bluefield<br />
Bywood<br />
Holt<br />
Buzbee<br />
Sage<br />
Crystal<br />
§¨¦ I-10<br />
Wax<br />
Frenchtown<br />
Mora<br />
Breton<br />
Augusta<br />
Jones Creek<br />
Paint<br />
Alford<br />
Old Hammond<br />
Boreas<br />
Terrell<br />
Director<br />
Profit<br />
Barringer Foreman<br />
Lesage<br />
Lynbrook<br />
Sotile<br />
Pernecia<br />
Woodvale<br />
Droze<br />
Four Oaks<br />
Bristle Cone<br />
Stevendale<br />
Fir<br />
Roble<br />
Thibodeaux<br />
Strain<br />
Centurion<br />
Bristoe<br />
Chadsford<br />
Malvern Hill<br />
Antietam<br />
Morel<br />
Doyle<br />
Round Oak<br />
Spyglass Hill<br />
Trent Jones<br />
Norway Pine<br />
Black<br />
Lavell<br />
§¨¦ I-12<br />
Milldale<br />
Will<br />
Magnolia Bridge<br />
Bonham<br />
Gottlieb<br />
Riverview<br />
Beckfield<br />
Morgan<br />
Cicero<br />
<strong>Plan</strong>chet<br />
Jefferson<br />
Liberty<br />
Harrells Ferry<br />
Monitor<br />
South Forced, Upper<br />
South Forced, Lower<br />
Achord<br />
Talton<br />
Creek Hollow<br />
Stubbs<br />
Alphonse Forbes<br />
Vignes<br />
Lake Iris<br />
Babin<br />
Bengal<br />
Tiger Bend<br />
Figure ES-1
Avenue K<br />
F<br />
3rd<br />
3rd<br />
6th<br />
Lupine<br />
9th<br />
15th<br />
Village<br />
30th<br />
Alba<br />
East<br />
36th<br />
Wedgewood<br />
Sunshine<br />
Arena<br />
44th<br />
Troy<br />
Elm<br />
Waverly<br />
Whitter<br />
McHost<br />
Juban<br />
Lanier<br />
Charlton<br />
Carter<br />
Shawn<br />
Monterrey<br />
Cora<br />
Marilyn<br />
Fawn<br />
Blackwater<br />
Aletha<br />
Sharp<br />
Bea<br />
Acres<br />
Sam<br />
Arnold<br />
Black<br />
Aubin<br />
Tinley<br />
Sherwood Forest<br />
Burrel<br />
Devall<br />
Hubbs<br />
Anderson<br />
Lafitte<br />
Reames<br />
Sullivan<br />
Millerville<br />
Hunt<br />
O'Neal<br />
Antioch<br />
Norway Pine<br />
Round Oak<br />
Elliot<br />
Woodlake<br />
Rehabilitation Project Areas<br />
State Route 68<br />
Treakle<br />
Adams<br />
Sutter<br />
Port Hudson Plains<br />
Portwood<br />
Sunnyside<br />
Ligon<br />
Gen Gardner<br />
Brian<br />
Shellmire<br />
Pony<br />
Munson<br />
Vernon<br />
Zachary-Slaughter<br />
Graves<br />
Lemon<br />
Jacock<br />
Port Hudson-Pride<br />
Zeb Chaney<br />
Lemon B<br />
Mills<br />
Della<br />
Tucker<br />
Cook<br />
Scott Barr<br />
Jackson<br />
Edwards<br />
Williams<br />
Robinson<br />
Tom Drehr<br />
Riley<br />
Port Hickey<br />
Legend<br />
State Route 3113<br />
³<br />
Mount Pleasant Zachary<br />
3Wastewater Treatment <strong>Plan</strong>t<br />
WWTP Basins<br />
Project Name<br />
Jefferson Hwy. - Hoo Shoo Too Rd.<br />
Burbank Dr. - Gardere Ln.<br />
Staring Ln. - Boone Dr.<br />
Oak Villa Blvd. - Choctaw St.<br />
Scotland Ave. - Progress Rd.<br />
Elm Grove Garden Rd. - Harding Blvd.<br />
Sharp Rd. - Florida Blvd.<br />
Kenilworth Blvd. - Boone Dr.<br />
Foster Dr. - Government St. PHASE A & B<br />
Brookstown Rd. - Evangeline St. PHASE 1<br />
Brookstown Rd. - Evangeline St. PHASE 2<br />
Silverleaf Rd. - Ford St.<br />
Bluebonnet Blvd. - Jefferson Hwy. PHASE 1<br />
Bluebonnet Blvd. - Jefferson Hwy. PHASE 2<br />
Acadian Thrwy. - Perkins Rd.<br />
Stanford Ave. - Morning Glory Rd.<br />
Acadian Thrwy. - Claycut Rd.<br />
Highland Rd. - Washington St.<br />
Airline Hwy. - Goodwood Blvd. PHASE 1<br />
Airline Hwy. - Goodwood Blvd. PHASE 2<br />
Antioch Rd. - Chadsford Dr.<br />
Jones Creek Rd. - Tiger Bend Rd.<br />
Scenic Hwy. - Spanish Town Rd. PHASE 1<br />
Scenic Hwy. - Spanish Town Rd. PHASE 2<br />
Siegen Lan. - Interstate 10<br />
Interstate 110 - Hollywood St.<br />
Ardenwood Dr. - Winbourne St.<br />
Flannery Rd. - Florida St.<br />
East Blvd. - Government St.<br />
N. 38th St. - Gus Young Ave.<br />
East Baton Rouge<br />
Flonacher<br />
Irene<br />
Barnett<br />
McKee<br />
Irene<br />
Samuels<br />
Barsket<br />
Barnett<br />
Carney<br />
Springfield<br />
Zimmerman<br />
McCastle<br />
Dotson<br />
Edgar<br />
Barge Canal<br />
North WWTP<br />
Old Scenic<br />
Heck Young<br />
Glynn<br />
Groom<br />
E<br />
Thomas<br />
I<br />
H<br />
Brightside<br />
Riverbend<br />
Saul<br />
K<br />
Martin<br />
Hovey<br />
Elmer<br />
Fennwood<br />
Meadow Glen<br />
Central WWTP<br />
Riverbrook<br />
Avenue F<br />
Harding<br />
Gourrier<br />
Chamberlain<br />
Blount<br />
Scotland<br />
Swan<br />
Mengel<br />
Day<br />
Rollins<br />
New Rafe Meyer<br />
St John<br />
Merganzer<br />
Iowa<br />
Stadium<br />
Emma<br />
4th<br />
Newell<br />
Sorrel<br />
Church<br />
75th<br />
Convention<br />
France<br />
Faith<br />
Landry<br />
Leisure<br />
Magnolia<br />
Julia<br />
Grant<br />
Laurel Lakes<br />
10th<br />
Rita<br />
Central<br />
Gsu<br />
Ben Hur<br />
39th<br />
Main<br />
79th<br />
72nd<br />
77th<br />
Chippewa<br />
Terrace<br />
Dalrymple<br />
Tower<br />
Cypress<br />
17th<br />
68th<br />
Mason<br />
Gayosa<br />
Parker<br />
Cedar<br />
Texas<br />
18th<br />
July<br />
State<br />
Maple<br />
Old Baker Zachary<br />
Fairchild<br />
Foss<br />
Washington<br />
Taylor<br />
Alvin Dark<br />
July<br />
Mayhaw<br />
Capitol Lake<br />
13th<br />
Pimpernel<br />
Wisdom<br />
Polk<br />
Allen<br />
Epperson<br />
Brock<br />
Kaufman<br />
Louise<br />
Teal<br />
Doris<br />
Wilbur<br />
Scenic<br />
Pope<br />
40th<br />
<strong>Plan</strong>tation<br />
Pryce<br />
I-110<br />
22nd<br />
Scotlandville-Zachary<br />
Gore<br />
Ozark<br />
North<br />
Stanford<br />
Highland<br />
Nicholson<br />
Baker<br />
Gibbens<br />
Dayton<br />
Olive<br />
Wimbish<br />
Daniels<br />
Progress<br />
Roosevelt<br />
Hollywood<br />
Iberia<br />
Sycamore<br />
28th<br />
Shelley<br />
Winnebago<br />
Oleander<br />
May<br />
Dean Lee<br />
Baker<br />
Lavey<br />
Gibbens<br />
Farrar<br />
Erie<br />
Spain<br />
Virgil<br />
Acadian<br />
Myrtle<br />
Broussard<br />
Fiero<br />
25th<br />
Edwin<br />
Carriage<br />
Ben Hur<br />
Bella<br />
Turnley<br />
Central<br />
Ada<br />
Eugene<br />
31st<br />
Lee<br />
Avenue A<br />
Louise<br />
Mae<br />
Lee<br />
Whitehaven<br />
Ferndale<br />
Ashland<br />
Jefferson<br />
Myrtle<br />
Lavey<br />
Mohican<br />
Burbank<br />
River<br />
38th<br />
McHugh<br />
Winbourne<br />
Brady<br />
Hood<br />
Fairfields<br />
Steele<br />
Stuart<br />
Sinbad<br />
Chuck Yeager<br />
Monte Sano<br />
Cherrydale<br />
Ross<br />
Husband<br />
Algoa<br />
Devall<br />
Cannon<br />
Choctaw<br />
Valley<br />
Clark<br />
<strong>Plan</strong>k<br />
Ford<br />
Glen Oaks<br />
Dutton<br />
Beech<br />
Greenwell<br />
Evangeline<br />
Sherwood<br />
Leo<br />
Dubois<br />
Lila<br />
Hillcrest<br />
Scott<br />
Ingleside<br />
Bawell<br />
Palm<br />
Nelson<br />
Eaton<br />
Chemin<br />
Hollier<br />
Frey<br />
49th<br />
Foster<br />
College<br />
Wylie<br />
Bentley<br />
Peerless<br />
Charles<br />
Orchid<br />
Beck<br />
Park<br />
Chipley<br />
Bluebell<br />
South WWTP<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIGES-2_PDP2010.MXD SGELPI 11/15/2010 14:25:17<br />
G S R I<br />
Rolling Acres<br />
Comite<br />
Sumrall<br />
Greenwell Springs<br />
Ardenwood<br />
Government<br />
Clay Cut<br />
Pollard<br />
Dahlia<br />
Menlo<br />
Ned<br />
Myrtle<br />
Hope<br />
Ellen<br />
Brookstown<br />
Boone<br />
Baird<br />
Lower Zachary<br />
Celia<br />
St Ann<br />
Corlett<br />
San Juan<br />
Congress<br />
Moss Side<br />
Chippenham<br />
Leake<br />
Bank<br />
Silverleaf<br />
Quail<br />
Gardere<br />
Elvin<br />
Hanks<br />
Harry<br />
Prescott<br />
Lobdell<br />
Corporate<br />
Kenilworth<br />
Rodney<br />
Kent<br />
Stoneview<br />
Guynell<br />
Maplewood<br />
Kincaid<br />
Westdale<br />
White<br />
Ruby<br />
Hilton<br />
Meadow Bend<br />
Furr<br />
Rio<br />
Callahan<br />
Pascagoula<br />
Ruston<br />
Jupiter<br />
Renoir<br />
Donmoor<br />
Landis<br />
Staring<br />
Pettit<br />
Wooddale<br />
Tom<br />
Goodwood<br />
Sevenoaks<br />
University Club<br />
Victoria<br />
Lasalle<br />
Murphy<br />
Main<br />
Burden<br />
Castle Kirk<br />
Eric<br />
Hall<br />
North Ridge<br />
Flag<br />
Boyce<br />
Dalark<br />
Richards<br />
Picardy<br />
Flora<br />
Kingcrest<br />
Parkway<br />
Baja<br />
Angus<br />
Avis<br />
Tradition<br />
Cline<br />
Price<br />
Wright<br />
J Wicker<br />
Meadow<br />
Breeden<br />
Phebus<br />
Ocean<br />
Cody<br />
Oak View<br />
Reco<br />
Rienzi<br />
Ryder<br />
Waters Edge<br />
Anderson<br />
Guy<br />
Airway<br />
Airport<br />
Essen<br />
Hennessy<br />
Bles<br />
Hilltree<br />
Paris<br />
Anselmo<br />
Vienna<br />
Windingway<br />
Brown<br />
Mickens<br />
Colonial<br />
Bliss<br />
Cortana<br />
Brentwood<br />
Joyce<br />
Oak Villa<br />
Tara<br />
Fairway<br />
Downing<br />
Shady Lake<br />
Jodie<br />
Watson<br />
Vail<br />
Loudon<br />
Wartelle<br />
Summa<br />
Bluebonnet<br />
Villa<br />
Dyer<br />
Choctaw<br />
Riveroaks<br />
Drusilla<br />
Gail<br />
Buck Horn<br />
Shady Bluff<br />
Fleet<br />
Arleen<br />
Carmel<br />
El Scott<br />
Dancy<br />
Tracy<br />
Crescent<br />
Wimbledon<br />
Ventura<br />
Oakdale<br />
Lakeview<br />
Lake Estates<br />
0 1 2 4<br />
Miles<br />
Foster<br />
Campanile<br />
Watts<br />
Airline<br />
Ardoon<br />
Wagner<br />
Carney<br />
Vega<br />
Mollylea<br />
Interline<br />
Oak Forest<br />
Judi<br />
Floynell<br />
Oak Hills<br />
Reitz<br />
Smith<br />
Florida<br />
Bluebonnet<br />
Oakbrook<br />
Lazy K<br />
Old Settlement<br />
Elain<br />
Darryl<br />
Cal<br />
Mint<br />
Perkins<br />
Tams<br />
Red Oak<br />
Cedarcrest<br />
Ridgely<br />
Kinglet<br />
Peck<br />
Neil<br />
Ida<br />
Parkview<br />
Daradele<br />
King James<br />
Amiss<br />
Tallowwood<br />
Beta<br />
Kenlee<br />
Tudor<br />
Bramble<br />
Woodleigh<br />
Siegen<br />
Lovett<br />
Peairs<br />
Greenwell Spg Pt Hudson<br />
Cook<br />
Lassen<br />
Dual<br />
Mall<br />
Core<br />
Gurney<br />
Landfair<br />
Hillmont<br />
Rondo<br />
Browning<br />
Brillock<br />
Mc Gehee<br />
Southpark<br />
Reiger<br />
I-10<br />
Joor<br />
McCullough<br />
Tinley<br />
Pinta<br />
Oak Bend<br />
Bellfort<br />
Toulon<br />
Neff<br />
Pecos<br />
Little John<br />
Honore<br />
Poydras<br />
Conti<br />
St Alban's<br />
Corsair<br />
Monticello<br />
Archery<br />
Sylvan<br />
Shoe Creek<br />
Frontier<br />
Lariat<br />
Daytona<br />
Richcroft<br />
Dabney<br />
Baylor<br />
Triple B<br />
Catalina<br />
Industriplex<br />
Flannery<br />
Harrells Ferry<br />
Parkforest<br />
Cloverland<br />
Pecue<br />
Claiborne<br />
Parkside<br />
Joor<br />
Warfield<br />
Pecue<br />
Erin<br />
Shay<br />
Elva<br />
Cherryl<br />
Arlingford<br />
Millburn<br />
Warwick<br />
Newcastle<br />
Oak Berry<br />
Dorset<br />
Britain<br />
La Margie<br />
Justice<br />
Parnell<br />
Pecue<br />
British<br />
Coursey<br />
Stumberg<br />
Woodcliff<br />
Elwick<br />
Wyndy<br />
Briarwood<br />
Hooper<br />
Rushmore<br />
Airline<br />
Pinewood<br />
Huntley<br />
Hickory Ridge<br />
Old Perkins<br />
Five Oaks<br />
Quinn<br />
Saint Clare<br />
Hubbs Acres<br />
Forest View<br />
Oxley<br />
Holt<br />
Roundsaville<br />
Kohler<br />
Brent<br />
Trey<br />
Mapleton<br />
Florida<br />
Ponderosa<br />
Buckley<br />
Denham<br />
Crystal<br />
Firewood<br />
Kimbleton<br />
Pinehurst<br />
Castille<br />
Buzbee<br />
Glenn<br />
Libra<br />
Breton<br />
Jones Creek<br />
Paint<br />
Wax<br />
Old Hammond<br />
Jester<br />
Board<br />
Barringer<br />
Boulevard Louisiane<br />
Augusta<br />
Sage<br />
Russett<br />
Beaver<br />
Sessions<br />
Herridge<br />
Brookside<br />
Choctaw<br />
Perkins<br />
Shetland<br />
Chanove<br />
Alford<br />
Boreas<br />
Terrell<br />
Chaumont<br />
Stonewood<br />
El Ranchitos<br />
Profit<br />
Droze<br />
Stevendale<br />
Shenandoah<br />
Chaney<br />
Fir<br />
Magnolia Bridge<br />
Thibodeaux<br />
Morgan<br />
Frenchtown<br />
Strain<br />
Centurion<br />
Bristoe<br />
Ellis<br />
George Oneal<br />
Ferrell<br />
Broker<br />
Pernecia<br />
Donnybrook<br />
Woodvale<br />
Four Oaks<br />
Hamilton<br />
Hewwood<br />
Chadsford<br />
Alder<br />
Morel<br />
Doyle<br />
Spyglass Hill<br />
Trent Jones<br />
Umbehagen<br />
Lavell<br />
J L Fairchild<br />
Silver Sand<br />
Durmast<br />
Blouin<br />
Riverview<br />
I-12<br />
Hoyt<br />
Ronson<br />
Milldale<br />
Ashford<br />
Deer Lake<br />
Will<br />
Cicero<br />
Pine Hill<br />
Jefferson<br />
Talton<br />
Ednie<br />
Gottlieb<br />
Landmor<br />
<strong>Plan</strong>chet<br />
Monitor<br />
Coffee<br />
General Forrest<br />
Achord<br />
Barrett<br />
Jon Michelle<br />
Beachview<br />
Palmer<br />
Vignes<br />
Liberty<br />
Alphonse Forbes<br />
Hagerstown<br />
Stubbs<br />
Lake Iris<br />
Babin<br />
Bengal<br />
Tiger Bend<br />
Carson<br />
Phillips<br />
Figure ES-2
EXECUTIVE SUMMARY<br />
The capacity improvements portion of the program consists of 51 projects located<br />
throughout the C-P. The first projects started in 2007, and the last project is scheduled for<br />
completion in late 2014. Approximately, six to ten projects will begin construction every<br />
year from 2008 through 2013, and design and construction will be continuous through 2014.<br />
Approximately 350,000 linear feet of gravity sewer, 670,000 linear feet of forcemain, and 140<br />
pump stations (PSs) will be upgraded as a part of the capacity projects.<br />
Figure ES-3 shows the location of the capacity improvement projects. Projects within these<br />
areas are also described in detail in the body of this plan. The estimated total program cost<br />
of the capacity improvement projects is approximately $610 million in September 2007<br />
dollars.<br />
Wastewater Treatment Improvements/Storage Projects<br />
The PDP includes four reservoir storage and repumping projects, as noted in Table ES-1.<br />
The cost of the Zachary Area Transmission Network Improvements Project (ZATNIP)<br />
storage facility at Red Mud Lakes is included in a project that also includes collection system<br />
capacity improvements and therefore it is included in the aforementioned capacity projects.<br />
TABLE ES-1<br />
Reservoir Storage and Repumping Projects<br />
Location<br />
Storage Volume<br />
Choctaw Drive<br />
Hooper Road<br />
Red Mud Lakes (ZATNIP)<br />
South WWTP<br />
26 MG<br />
10 MG<br />
20 MG<br />
66 MG<br />
The PDP also includes three wastewater treatment capacity and/or compliance projects. The<br />
wet weather treatment capacity of the South WWTP will be expanded to accommodate the<br />
predicted peak flow of 200 million gallons per day (mgd) after peak shaving storage and to<br />
accommodate wet weather flows from the Central WWTP, which will be consolidated with<br />
the South WWTP, per the technical memorandum entitled Consolidation of South and Central<br />
Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge (CH2M HILL, 2008). The wet weather treatment<br />
capacity improvements will be accomplished in two projects. The South WWTP Phase 1<br />
project includes wet weather storage, influent pumping, and preliminary treatment. The<br />
South WWTP Phase 2 project (PDP portion) includes wet weather improvements within the<br />
treatment process<br />
In addition to the wet weather improvement and storage projects, five Immediate Action<br />
<strong>Plan</strong> (IAP) projects have been undertaken at the South WWTP. The purpose of these projects<br />
is to bring the plant in compliance with current discharge limits. These projects are<br />
described throughout the body of this report. Two of these Immediate Action Projects were<br />
either moved into another project (screenings improvements was moved to South WWTP<br />
Phase 1) or completed (Effluent Pumping Station project). The remaining three projects are<br />
being constructed as one construction project called SWWTP IAP (therefore, it has been<br />
counted and described as one project throughout this report).<br />
Design of the South WWTP IAP projects began in 2007. These projects are now under<br />
construction. The South WWTP – Phase 1 project and the Choctaw Storage and Pump<br />
GNV31031158570.DOCX/110050012 ES-7 JANUARY 2011<br />
REV. 5
EXECUTIVE SUMMARY<br />
Station Facility project are also under construction The Hooper Storage project and South<br />
WWTP – Phase 2 project are both under design, with construction commencing in 2011. The<br />
Red Mud Lakes (ZATNIP) storage project is under construction..<br />
Storage and treatment locations are shown on Figure ES-3. The total estimated program cost<br />
for the PDP portion of wastewater treatment and storage projects (excluding Red Mud<br />
Lakes) is $335 million in September 2007 dollars.<br />
Preliminary Master <strong>Plan</strong> Projects<br />
There are several additional projects that the C-P is already executing to continue to enhance<br />
performance of their wastewater treatment plants and collection systems, and also improve<br />
compliance as well. The Draft Master <strong>Plan</strong> (CH2M HILL, 2008) outlined several<br />
improvements to the existing South WWTP facilities that are necessary to keep the plant in<br />
operation. These improvements are included in the South WWTP Phase 2 project (master<br />
plan portion).<br />
In addition, due to the extended power outages experienced after Hurricane Gustav, the C-P<br />
desires to install emergency generators at each of the collection system pump stations and at<br />
each of the WWTPs as part of the preliminary master plan.<br />
The Draft Master <strong>Plan</strong> (CH2M HILL, 2008) also outlined the need for a SCADA system. The<br />
design of the SCADA system is scheduled to begin in 2010, with construction beginning in<br />
2011. SCADA components will be installed at all pump stations in the collection system as<br />
well as at the North WWTP. A SCADA system is already being designed for the South<br />
WWTP as part of the South WWTP – Phase 2 project.<br />
The planned closure of the Central WWTP has lead to a need to relocate the field pump<br />
maintenance staff and their warehouse, which are currently located at the Central WWTP.<br />
Since enough land was available at the Choctaw Storage site and it is somewhat centrally<br />
located in the C-P, the Choctaw site was selected as the new location for this facility. A new<br />
preliminary master plan project was added to this PDP for the Choctaw Maintenance<br />
Facility.<br />
The SGL-C-0002 (Multiple PS – Highland Road – Kenilworth Pkwy) project includes a new<br />
7,000 gpm (10 MGD) pump station for LSU. This pump station will be designed as part of<br />
the overall SGL-C-0002 project, but it’s construction is dependent on the schedule for the<br />
construction of the gravity system that is needed to convey flow to the LSU pump station.<br />
Therefore, the construction cost for the LSU pump station was counted as a preliminary<br />
master plan, since it may or may not be constructed separately from the rest of the project.<br />
The North WWTP priority one and priority two projects are outlined in the Draft Master<br />
<strong>Plan</strong> (CH2M HILL, 2008). The SCADA and secondary power are described in this PDP with<br />
the SCADA and generator chapters, respectively. The remaining portions of these projects<br />
are outlined in the North chapter of this PDP. While the projects are described as two<br />
projects (Priority One, Urgent Needs, and Priority Two, Operations and Maintenance<br />
Needs), it is likely that the construction will occur as one project. The construction of the<br />
North WWTP project(s) will occur in 2015, after the SSO <strong>Program</strong> has been completed.<br />
The total estimated program cost for the preliminary master plan is $115 million in<br />
September 2007 dollars.<br />
GNV31031158570.DOCX/110050012 ES-8 JANUARY 2011<br />
REV. 5
F<br />
3rd<br />
Iowa<br />
Lupine<br />
3rd<br />
10th<br />
15th<br />
16th<br />
22nd<br />
Acadian<br />
East<br />
Elm<br />
Whitter<br />
McHost<br />
Monterrey<br />
Cora<br />
Marilyn<br />
Blackwater<br />
Sharp<br />
Bea<br />
Acres<br />
Black<br />
Aubin<br />
Burrel<br />
Anderson<br />
Sullivan<br />
Reames<br />
Millerville<br />
Beaver<br />
Hunt<br />
O'Neal<br />
Antioch<br />
Elliot<br />
Lea<br />
Adams<br />
Sandy Springs<br />
Renee<br />
Bickham<br />
Irene<br />
Portwood<br />
Port Hudson Plains<br />
")<br />
Sunnyside<br />
Barnett<br />
McKee<br />
Samuels<br />
Ligon<br />
North WWTP<br />
River<br />
Flonacher<br />
Old Scenic<br />
Scenic<br />
Brian<br />
Mount Pleasant Zachary<br />
Irene<br />
Carney<br />
Springfield<br />
Capacity and Wet Weather Treatment Projects<br />
Zimmerman<br />
Groom<br />
Thomas<br />
I<br />
H<br />
Brightside<br />
Riverbend<br />
Glynn<br />
Shellmire<br />
Red Mud Lakes<br />
(20 MG)<br />
Northgate<br />
Fennwood<br />
Hovey<br />
Merganzer<br />
Newell<br />
Lake Pointe<br />
Meadow Glen<br />
Greely<br />
Dillard<br />
D<br />
Lafayette<br />
Farm<br />
Main<br />
Hooper Storage Tank<br />
(10 MG)<br />
Mengel<br />
Gourrier<br />
Rollins<br />
Harding<br />
6th<br />
France<br />
Stadium<br />
4th<br />
Church<br />
Ben Hur<br />
39th<br />
Heck Young<br />
Sorrel<br />
Rita<br />
Faith<br />
Landry<br />
72nd<br />
Chippewa<br />
Terrace<br />
Tyler<br />
Dalrymple<br />
Alvin Dark<br />
Pony<br />
Day<br />
Stilt<br />
79th<br />
Mason<br />
17th<br />
Fig<br />
Grant<br />
Laurel Lakes<br />
Polk<br />
Parker<br />
Cypress<br />
Wilbur<br />
Shelley<br />
Vernon<br />
Pope<br />
§¨¦I-110<br />
North<br />
23rd<br />
Central<br />
Beech<br />
18th<br />
Ozark<br />
Central<br />
Stanford<br />
Nicholson<br />
Zachary-Slaughter<br />
Scotlandville-Zachary<br />
Wimbish<br />
Daniels<br />
Baker<br />
Hollywood<br />
Madison<br />
Safer<br />
Lavey<br />
Oleander<br />
May<br />
Ash<br />
Baker<br />
Spur<br />
Main<br />
Carriage<br />
Ben Hur<br />
Bella<br />
Avenue A<br />
Husband<br />
Stuart<br />
Lee<br />
Highland<br />
38th<br />
Port Hudson-Pride<br />
McHugh<br />
Evangeline<br />
Mohican<br />
Winbourne<br />
31st<br />
36th<br />
Convention<br />
Eugene<br />
Sinbad<br />
Rush<br />
Chuck Yeager<br />
Marigold<br />
Hillcrest<br />
Paige<br />
Oaklan<br />
Lorraine<br />
Bawell<br />
Dubois<br />
44th<br />
Ingleside<br />
Burbank<br />
Lemon<br />
")<br />
Greenwell<br />
Prescott<br />
Lobdell<br />
Greenwell Springs<br />
Foster<br />
Ford<br />
Jacock<br />
Comite<br />
Government<br />
College<br />
G S R I<br />
Lower Zachary<br />
Bentley<br />
Chipley<br />
Orchid<br />
Frey<br />
Pollard<br />
Park<br />
Rolling Acres<br />
Myrtle<br />
Hope<br />
Mable<br />
Choctaw<br />
North<br />
Sumrall<br />
Laca<br />
Byron<br />
Ardenwood<br />
Boone<br />
Brookstown<br />
Baird<br />
Glen Oaks<br />
Dyer<br />
")<br />
Goodwood<br />
South WWTP<br />
Elvin<br />
Kent<br />
Garland<br />
Celia<br />
St Ann<br />
Corlett<br />
Rio<br />
Charlton<br />
Hanks<br />
Harry<br />
Congress<br />
Corporate<br />
Stratford<br />
Kenwood<br />
Quail<br />
Kenilworth<br />
Keed<br />
Staring<br />
Hall<br />
Caprice<br />
Burden<br />
Lanier<br />
Zeb Chaney<br />
Main<br />
Jupiter<br />
Foster<br />
Calumet<br />
Pettit<br />
Mickens<br />
Tom<br />
Wooddale<br />
Boyce<br />
Richards<br />
Kevel<br />
Angus<br />
Kilona<br />
Chandler<br />
Ocean<br />
J Wicker<br />
Cline<br />
Price<br />
Breeden<br />
Rienzi<br />
Flora<br />
Lasalle<br />
Bles<br />
Avis<br />
Cody<br />
Essen<br />
Lemon B<br />
Waters Edge<br />
Meadow<br />
Brittany<br />
Hilltree<br />
Airport<br />
Plaza<br />
Airway<br />
Anselmo<br />
Bliss<br />
Cortana<br />
<strong>Plan</strong>k<br />
Tucker<br />
Brown<br />
Carney<br />
Watson<br />
Vail<br />
Loudon<br />
North<br />
Tara<br />
Fairway<br />
Summa<br />
Bluebonnet<br />
Obrien<br />
Ardoon<br />
Drusilla<br />
Fleet<br />
Arleen<br />
Joor<br />
Choctaw Storage Tank<br />
(25 MG)<br />
Darryl<br />
HillGail<br />
Oakdale<br />
Oak Hills<br />
Buck Horn<br />
Mollylea<br />
Interline<br />
Baker<br />
Della<br />
Fawn<br />
Old Settlement<br />
Carmel<br />
Smith<br />
Oakbrook<br />
Daradele<br />
Choctaw<br />
Cal<br />
Azrok<br />
Mint<br />
Perkins<br />
Amiss<br />
Neil<br />
Tams<br />
Peairs<br />
Greenwell Spg Pt Hudson<br />
Ida<br />
Florida<br />
South<br />
Siegen<br />
McCullough<br />
Core<br />
Gurney<br />
Tallowwood<br />
Bramble<br />
Lovett<br />
Landfair<br />
Red Oak<br />
Tudor<br />
Voorhies<br />
Browning<br />
Briarhurst<br />
Mall<br />
Toulon<br />
Neff<br />
Stan<br />
Sylvan<br />
Reiger<br />
Shoe Creek<br />
Pecos<br />
Richcroft<br />
Tinley<br />
Bellfort<br />
Alco<br />
Pecue<br />
Brookhollow<br />
Prairie<br />
Warfield<br />
Stockton<br />
Baylor<br />
Cloverland<br />
Corsair<br />
Joor<br />
Elva<br />
Pecue<br />
Cook<br />
Stumberg<br />
Old Perkins<br />
Flannery<br />
Woodcliff<br />
Newcastle<br />
Oak Berry<br />
Devall Hubbs<br />
Elwick<br />
Hooper<br />
Rushmore<br />
Coursey<br />
Airline<br />
Jackson<br />
Denham<br />
Woodland Ridge<br />
Rose<br />
Five Oaks<br />
Huntley<br />
Hickory Ridge<br />
Brent<br />
Trey<br />
Mapleton<br />
Holly<br />
Glenn<br />
Roundsaville<br />
Kohler<br />
Holt<br />
Greens<br />
Mora<br />
Pinehurst<br />
Choctaw<br />
Buzbee<br />
Breton<br />
Crystal<br />
Jones Creek<br />
Edwards<br />
Paint<br />
Wax<br />
Chanove<br />
Alford<br />
Old Hammond<br />
Boreas<br />
Profit<br />
Barringer Foreman<br />
Chaumont<br />
Stonewood<br />
Pernecia<br />
Droze<br />
Stevendale<br />
Four Oaks<br />
Fir<br />
Roble<br />
Frenchtown<br />
Strain<br />
Bristoe<br />
§¨¦I-12<br />
Chadsford<br />
Shenandoah<br />
Morel<br />
Round Oak<br />
Spyglass Hill<br />
Trent Jones<br />
Norway Pine<br />
Robinson<br />
Lavell<br />
Chaney<br />
Milldale<br />
Will<br />
Gottlieb<br />
Jefferson<br />
Riley<br />
Magnolia Bridge<br />
Bristle Cone<br />
Riverview<br />
Bonham<br />
Tom Drehr<br />
Cicero<br />
Morgan<br />
<strong>Plan</strong>chet<br />
Liberty<br />
Harrells Ferry<br />
Monitor<br />
Achord<br />
Beckfield<br />
Talton<br />
Creek Hollow<br />
Stubbs<br />
Alphonse Forbes<br />
Vignes<br />
Lake Iris<br />
Babin<br />
Tiger Bend<br />
Phillips<br />
Bengal<br />
Mahoney<br />
Carson<br />
³<br />
Phillips<br />
Hoo Shoo Too<br />
Legend<br />
3<br />
WWTP Wastewater Treatment <strong>Plan</strong>t<br />
#* New Pump Stations<br />
")<br />
New Storage Facilities<br />
New Gravity Sewer / Force Main<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\FIGES-3_102009.MXD GBOQUIN 10/26/2009 09:07:59<br />
University Club<br />
South WWTP<br />
Wet Weather<br />
Improvements<br />
Tradition<br />
0 0.5 1 2 3 4<br />
Miles<br />
§¨¦I-10<br />
Figure ES-3
EXECUTIVE SUMMARY<br />
List of Completed Project, Active Projects, and Projects to be<br />
Appropriated in 2011<br />
Functionally Completed Projects<br />
Table ES-2 shows the list of completed projects. These projects have been functionally<br />
completed as of the dates as shown in Table ES-2.<br />
TABLE ES-2<br />
List of Completed Projects<br />
Project Number/Name<br />
Status<br />
(November 2010)<br />
Date<br />
SFL-R-0001 (Jefferson Hwy - HooShooToo Road) Functionally Complete 3 rd Quarter 2009<br />
03-RMP-S14 (RMAP1 – Kleinpeter Area Upgrades) Functionally Complete 2 nd Quarter 2009<br />
NFE-C-0001 (Gurney Road - Joor Road) Functionally Complete 4 th Quarter 2009<br />
SGC-C-PS58FM-A (Staring Lane FM Phase I - Burbank to Functionally Complete 2 nd Quarter 2010<br />
Highland)<br />
99-RMP)-S16 (RMAP1 – PS 136 Upgrades) Functionally Complete 3 rd Quarter 2010<br />
NFE-C-0003 (Comite Drive - Foster Road - Phase 1) Functionally Complete 2 nd Quarter 2010<br />
SGL-R-0002 (Staring Lane - Boone Drive) Functionally Complete 2 nd Quarter 2010<br />
Active Projects<br />
Table ES-3 shows the list of active projects, which includes projects currently under design<br />
and/or construction. These projects have already been appropriated for design and/or<br />
construction as shown in the table.<br />
TABLE ES-3<br />
List of Active Projects<br />
Project Number/Name<br />
Status<br />
(November 2010) Appropriations<br />
SGL-R-0001 (Burbank Drive – Gardere Lane) Construction Design & Construction<br />
SGU-R-0001 (Oak Villa Blvd - Choctaw Street) Construction Design & Construction<br />
NGS-R-0002 (Scotland Avenue - Progress Road) Construction Design & Construction<br />
NGS-R-0001 (Elm Grove Garden Road - Harding Blvd) Construction Design & Construction<br />
SGU-R-0002 (Sharp Road - Florida Blvd) Construction Design & Construction<br />
SGL-R-0003 (Kenilworth Blvd - Boone Drive) Design Design & Construction<br />
CGS-R-0001 (Foster Drive - Government Street) Construction Design & Construction<br />
NFE-R-0001 (Silverleaf Road - Ford Street) Design Design & Construction<br />
NFW-R-0001a (Brookstown Road - Evangeline Street - Phase 1) Construction Design & Construction<br />
NFW-R-0001b (Brookstown Road - Evangeline Street - Phase 2) Design Design & Construction<br />
SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy- Phase 1) Design Design & Construction<br />
SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy- Phase 2) Design Design & Construction<br />
CGS-R-0005 (Acadian Thruway - Perkins Road) Design Design<br />
CGS-R-0003 (Stanford Avenue - Morning Glory Road) Design Design<br />
CGS-R-0004 (Acadian Thruway - Claycut Road) Design Design<br />
CGS-R-0002 (Highland Road – Washington Street) Project Definition Design<br />
SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase 1) Project Definition Design<br />
SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase 2) Project Definition Design<br />
GNV31031158570.DOCX/110050012 ES-11 JANUARY 2011<br />
REV. 5
EXECUTIVE SUMMARY<br />
TABLE ES-3<br />
List of Active Projects<br />
Project Number/Name<br />
Status<br />
(November 2010)<br />
Appropriations<br />
CGN-C-0001 (Capital Lake Drive - Gayosa Street) Construction Design & Construction<br />
NFE-C-0001 (Gurney Road - Joor Road) Construction Design & Construction<br />
NFE-C-0002 (Sullivan Road - Lovett Road - Wax Road) Construction Design & Construction<br />
NFE-C-0004 (Foster Road - Hooper Road) Construction Design & Construction<br />
NFW-C-HWY61-I (ZATNIP, Phase I) Construction Design & Construction<br />
NFW-C-HWY61-II (ZATNIP, Phase II) Design Design & Construction<br />
NFW-C-HWY61-III (ZATNIP, Phase III) Construction Design & Construction<br />
NFW-C-HWY61-IV (ZATNIP, Phase IV) Construction Design & Construction<br />
CGN-C-0003 (South Boulevard - St. Joseph Street) Construction Design & Construction<br />
CGN-C-0005 (Downtown Area - PS 15, PS 19, &PS 59<br />
Construction Design & Construction<br />
Improvements)<br />
CGS-C-0004 (Highland Road - Buchanan Street) Construction Design & Construction<br />
SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain<br />
Improvements)<br />
Construction<br />
Design & Construction<br />
Group Project 1A (Metro Airport Area Sewer Upgrades) Construction Design & Construction<br />
Group Project 1B (Metro Airport Area PS and FM Upgrades) Design Design & Construction<br />
SFL-C-0004 (Group Project 2 - Highland Rd Area Sewer<br />
Upgrades)<br />
Construction Design & Construction<br />
SFL-C-0005 (Highland Road - Burbank Drive) Construction Design & Construction<br />
SGC-C-PS58A (Pump Station 58 Replacement) Design Design & Construction<br />
SGC-C-PS58FM-I (Staring Lane FM Phase I - Burbank to<br />
Highland)<br />
SGC-C-PS58FM-II (Staring Lane FM Phase II - Highland to<br />
Perkins)<br />
Construction<br />
Construction<br />
SGC-C-PS58FM-III (Staring Lane FM Phase III - Perkins to PS<br />
58) Design<br />
SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station<br />
514 Improvements) Design<br />
SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd) Design Design<br />
SGL-C-0005 (Bayou Duplantier Area Improvements Project) Design Design<br />
CGN-C-0002 (25th Street - North Acadian Thruway) Design Design*<br />
CGS-C-0006 (Government St - South Acadian Thruway) Design Design<br />
NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road) Design Design<br />
SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) Design Design<br />
Design & Construction<br />
Design & Construction<br />
Design & Construction<br />
Design & Construction<br />
SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) Design Design & Construction<br />
SFU-C-0005 (O’Neal Lane Pipeline Improvements) Design Design<br />
SGC-C-0002 (Airline Highway Pipeline Improvements) Design Design<br />
SGL-C-0002 (Multiple PS – Highland Rd – Kenilworth Pkwy) Design Design<br />
NFE-C-0005 ( Hooper Road Pump Station Improvements) Design Design<br />
NFE-C-0006 (Lovett Road – Greenwell Springs Road) Design Design<br />
GNV31031158570.DOCX/110050012 ES-12 JANUARY 2011<br />
REV. 5
EXECUTIVE SUMMARY<br />
TABLE ES-3<br />
List of Active Projects<br />
Project Number/Name<br />
SFU-C-0002a (O’Neal Lane Pump Station Improvements –<br />
Group A)<br />
SFU-C-0002b (O’Neal Lane Pump Station Improvements –<br />
Group B)<br />
Status<br />
(November 2010)<br />
Design<br />
Design<br />
Appropriations<br />
Design<br />
Design<br />
SGC-C-0001 (Florida Blvd Pump Station Improvements) Project Definition Design<br />
SGL-C-0003 (Highland Road Pipeline Improvements) Project Definition Design<br />
SGU-C-0003 (Sherwood Forest Blvd – Goodwood Blvd Pipeline<br />
Improvements)<br />
Project Definition Design<br />
CC-WWTP-PS (PS-42) Design Design & Construction<br />
CC-EAST-FM (Central Consolidated FM) Design Design & Construction<br />
CC-EAST-PS (Central Consolidated Pump Stations) Design Design & Construction<br />
CC-WWTP-FM (PS-42 FM) Design Design & Construction<br />
NFW-C-0002 (Choctaw Storage, Pump Stations and<br />
Construction Design & Construction<br />
Forcemains)<br />
NFW-C-0004 (Hooper Storage) Design Design & Construction<br />
STP-C-0001 (South WWTP - Phase 1) Construction Design & Construction<br />
STP-C-0002 (South WWTP - Phase 2) Design Design<br />
SSO Odor Control NWWTP (07-TP-BD-0030) Construction Design & Construction<br />
SWWTP IAP (08-TP-BD-0031) Construction Design & Construction<br />
RMAP1 – PS 136 Construction Design & Construction<br />
*Construction for 25th Street - North Acadian Thruway project has been split between Capital Lake-Gayosa<br />
Street and South Blvd - St. Joseph Street projects<br />
Projects for 2011<br />
Table ES-4 shows the list of projects that are to be appropriated for design and/or<br />
construction in 2011. Some projects in Table ES-3 above will be active in 2011 (going from<br />
design to construction), so if they are appropriated for design & construction in Table ES-3,<br />
they are not included in Table ES-4 below, although they will be active in 2011. For instance,<br />
The Group Project 1B (Metro Airport Area PS and FM Upgrades) project is under design in<br />
2010 and will begin construction in 2011, but it is fully appropriated for design and<br />
construction, so it is included in Table ES-3 only.<br />
TABLE ES-4<br />
List of Projects for 2011<br />
Project Number/Name Appropriations Needed for 2011<br />
CGS-R-0005 (Acadian Thruway - Perkins Road)<br />
Construction<br />
CGS-R-0003 (Stanford Avenue - Morning Glory Road)<br />
Construction<br />
CGS-R-0004 (Acadian Thruway - Claycut Road)<br />
Construction<br />
CGS-R-0002 (Highland Road - Washington Street)<br />
Construction<br />
SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase 1)<br />
Construction<br />
SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase 2)<br />
Construction<br />
SFU-R-0001 (Antioch Road – Chadsford Drive)<br />
Design & Construction*<br />
SFL-R-0002 (Jones Creek Road – Tiger Bend Road)<br />
Design & Construction*<br />
GNV31031158570.DOCX/110050012 ES-13 JANUARY 2011<br />
REV. 5
EXECUTIVE SUMMARY<br />
TABLE ES-4<br />
List of Projects for 2011<br />
Project Number/Name Appropriations Needed for 2011<br />
CGN-R-0001a (Scenic Highway – Spanish Town Road – Phase 1)<br />
CGN-R-0001b (Scenic Highway – Spanish Town Road – Phase 2)<br />
NFW-R-0002 (Interstate 110 – Hollywood Street)<br />
SFL-R-0003 (Siegen Lane – Interstate 10)<br />
SGC-R-0003 (Ardenwood Drive – Winbourne Street)<br />
SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd)<br />
SGL-C-0005 (Bayou Duplantier Area Improvements Project)<br />
CGS-C-0006 (Government St - South Acadian Thruway)<br />
NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road)<br />
SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr)<br />
SFU-C-0005 (O’Neal Lane Pipeline Improvements)<br />
SGC-C-0002 (Airline Highway Pipeline Improvements)<br />
NFE-C-0005 ( Hooper Road Pump Station Improvements)<br />
SGU-C-0005 (Oak Villa Blvd – Monterey Blvd)<br />
SFL-C-0003 (Multiple PS – Burbank Drive – Siegen Lane)<br />
NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />
NFW-C-0001 (Joor Road – Greenwell Springs Rd)<br />
NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road)<br />
NFW-C-0009 (Multiple PS – Highway 61 – <strong>Plan</strong>k Road)<br />
NFW-C-0010 (Multiple PS – Prescott Rd – Greenwell Springs Rd)<br />
NFE-C-0005 (Hooper Road PS Projects)<br />
STP-C-0002 (South WWTP - Phase 2 - PDP & MP)<br />
Sewer System Backup Power <strong>Program</strong><br />
Collection System SCADA<br />
SCADA Operations Data/Control Center<br />
Design*<br />
Design*<br />
Design<br />
Design<br />
Design<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Design<br />
Design<br />
Design<br />
Design<br />
Design<br />
Design<br />
Design<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
Construction<br />
GNV31031158570.DOCX/110050012 ES-14 JANUARY 2011<br />
REV. 5
SECTION 1<br />
Overview<br />
1.1 Background<br />
The purpose of the Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities<br />
<strong>Program</strong> is to reduce sanitary sewer overflows while also planning for the future. The City<br />
of Baton Rouge, East Baton Rouge Parish (C-P) entered into a Consent Decree (Civil Action<br />
01-978-B-M3) with the United States Environmental Protection Agency (EPA) and the State<br />
of Louisiana to take remedial actions in the collection system to reduce SSOs, and also to<br />
meet National Pollution Discharge Elimination System (NPDES) permit requirements at the<br />
wastewater treatment plants (WWTPs) by January 1, 2015. The Consent Decree details<br />
requirements for several components, including the following:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Cross Connections<br />
Preventive Maintenance (Collection System and WWTPs)<br />
SSO Responses and Reporting<br />
Remedial Measures Action <strong>Plan</strong> 1 (RMAP1)<br />
Remedial Measures Action <strong>Plan</strong> 2 (RMAP2)<br />
Wastewater Treatment Facility Assessment<br />
Environmental Results Monitoring<br />
Outreach and Public Awareness (O&PA) Quarterly and Annual Reporting<br />
Supplemental Environmental Projects (SEPs)<br />
Recordkeeping<br />
This document constitutes the RMAP2. Other portions of the Consent Decree are addressed<br />
in other documents. This document is the third annual update of the <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
(PDP) that was initially published in January 2008.<br />
1.2 Major <strong>Program</strong> Goals<br />
The major goals of the program are to:<br />
<br />
<br />
<br />
<br />
<br />
<br />
Reduce excess wet weather flows that cause SSOs<br />
Rehabilitate the collection system<br />
Increase the hydraulic capacity of the collection system<br />
Accommodate growth in project areas<br />
Comply with wastewater treatment plant National Pollutant Discharge Elimination<br />
System (NPDES) permit<br />
Comply with the terms of the Consent Decree<br />
GNV31031158568.DOCX/110050008 1-1 JANUARY 2011<br />
REV. 5
SECTION 1. OVERVIEW<br />
The preparation of the PDP considered the locations of known overflows to assure that the<br />
projects defined would reduce the frequency of these overflows. Areas of the collection<br />
system found to have defects were also identified for rehabilitation.<br />
1.3 <strong>Program</strong> Description<br />
The three types of projects identified for implementation are designated comprehensive<br />
rehabilitation projects, capacity improvement projects, and wastewater treatment<br />
improvement/storage projects. The following paragraphs define each project type.<br />
1.3.1 Comprehensive Rehabilitation Projects<br />
Areas targeted for sewer pipe rehabilitation work are those in which flow monitoring has<br />
indicated the highest levels of inflow and infiltration (I/I). Comprehensive rehabilitation<br />
projects are being implemented using a process developed and implemented by the<br />
<strong>Program</strong> Manager (PM) in association with Department of Public Works (DPW) technical<br />
staff. The I/I reduction plan for these projects has the following goals:<br />
<br />
<br />
<br />
<br />
<br />
Identify and reduce stormwater inflow sources into sanitary sewers<br />
Identify and reduce Rainfall Dependent Infiltration (RDI) sources in sanitary sewers<br />
Reduce overflow events<br />
Increase the sewer system useful life<br />
Minimize public inconvenience<br />
The process chosen for rehabilitation and/or reconstruction is generally referred to as “Find<br />
and Fix.” As the process description suggests, there are two phases to the process. The first<br />
is to find or identify areas that require rehabilitation or reconstruction, and the second is to<br />
determine the best engineering solution to fix the problem. After the “Find” phase, some<br />
portions of the system may not require rehabilitation. In those portions of the system, the<br />
Engineer will recommend No Action. The overall approach to the comprehensive<br />
rehabilitation portion of program is to complete the following tasks:<br />
1. Obtain basin data and perform basin field observations<br />
2. Perform I/I testing and inspection, including<br />
Flow monitoring assessment<br />
Smoke testing<br />
Manhole inspection<br />
Closed circuit television inspection<br />
3. Prepare I/I reduction plan<br />
4. Prepare plans, specifications, and cost estimates<br />
5. Implement I/I reduction construction<br />
6. Evaluate I/I reduction results. Compare to pre-rehabilitation flow monitoring<br />
7. Implement additional I/I reduction, if goals are not met<br />
Flow monitoring is an integral part of the overall rehabilitation and reconstruction portion<br />
of the program and will be an ongoing process. Pre-construction flow monitoring is<br />
required to establish existing conditions. Post-construction flow monitoring will gauge the<br />
effectiveness of the rehabilitation and reconstruction. Flow monitoring will continue for the<br />
duration of the program to calibrate the rehabilitation progress.<br />
GNV31031158568.DOCX/110050008 1-2 JANUARY 2011<br />
REV. 5
SECTION 1. OVERVIEW<br />
1.3.2 Capacity Improvement Projects<br />
Capacity improvement projects will reduce hydraulic bottlenecks in the system and convey<br />
wet weather flows to new upstream storage facilities and ultimately to the wastewater<br />
treatment plants (WWTPs). These projects will include installation of larger pipes or<br />
constructing parallel pipes to increase conveyance capacity, as well as replacement of pump<br />
stations to handle future wet weather peak flows.<br />
1.3.3 Wastewater Treatment Improvement/Storage Projects<br />
Design and construction of WWTP wet weather improvement projects will occur early in<br />
the program to store and treat wet weather flows. Wastewater treatment projects at the<br />
South WWTP include the following:<br />
<br />
<br />
<br />
<br />
Immediate Action Projects (IAPs) for dry weather permit compliance<br />
Consolidation with the Central WWTP (Refer to the Consolidation of South and Central<br />
Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge TM (CH2M HILL, 2008)<br />
Wet weather flow capacity increases to 200 million gallons per day (mgd) with hydraulic<br />
peak shaving<br />
Master <strong>Plan</strong> improvements<br />
The South WWTP immediate action projects and other South WWTP projects are included<br />
in this document and are part of the RMAP2 projects. However, the South WWTP Phase 2<br />
Master <strong>Plan</strong> project is described in a separate document (Draft Master <strong>Plan</strong>; CH2M HILL,<br />
2008), though its construction cost estimate is included in the Preliminary Master <strong>Plan</strong><br />
Section of Table 1-1. There are not any capacity improvements required at the North WWTP,<br />
so there are no wet weather (RMAP2) projects included in this report at the North WWTP.<br />
However, there are several improvements needed due to the age of the treatment plant<br />
which are briefly described in the Section 5 - North Basin chapter of this report. The Draft<br />
Master <strong>Plan</strong> (CH2M HILL, 2008) also describes in detail the needed improvements in two<br />
priorities at the North WWTP.<br />
Storage projects will be designed and constructed early in the program to store wet weather<br />
flows upstream in the basins and then release flows back into the system after the wet weather<br />
event has passed. Storage facilities will be sized to store the peak flow from a 2 year<br />
frequency, 12-hour duration storm event, assuming rehabilitation projects are complete.<br />
1.4 Project <strong>Delivery</strong> Summary<br />
The projects have been scheduled for both design and construction activities based on<br />
funding considerations, and placed into a resource-loaded schedule shown in Table 1-1 and<br />
depicted graphically as Figure 1-1. Figure 1-2 presents the schedule for pre-construction and<br />
construction activities for all the program projects.<br />
Note: Financial analysis and funding schedules are prepared by the C-P DPW and are not<br />
a part of this document.<br />
GNV31031158568.DOCX/110050008 1-3 JANUARY 2011<br />
REV. 5
SECTION 1. OVERVIEW<br />
1.5 Report Contents<br />
The content of this report includes the following.<br />
<br />
<br />
<br />
<br />
<br />
<br />
Section 2, <strong>Plan</strong>ning Description, presents the process used to define the projects in this<br />
document.<br />
Section 3, South Basin Projects, describes the projects located in the South Basin. GIS<br />
maps that show locations of the work included in each project are located at the end of<br />
each project summary. The South Basin is the collection system that collects and conveys<br />
flow to the South WWTP.<br />
Section 4, Central Basin Projects, describes projects that are located in the Central Basin<br />
and collect and convey flow to the Central WWTP and will be conveyed in the future to<br />
the South WWTP.<br />
Section 5, North Basin Projects, details projects that are located in the North Basin and<br />
collect and convey flow to the North WWTP.<br />
Section 6, Emergency Generators, describes the stand-by engine generators that are to be<br />
located at each C-P pump station and the two WWTPs.<br />
Section 7, SCADA, describes the SCADA system that is to be implemented in the<br />
collection system and at the North WWTP. The SCADA system for the South WWTP is<br />
being implemented as part of the South WWTP – Phase 2 project.<br />
GNV31031158568.DOCX/110050008 1-4 JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Comprehensive Rehabilitation Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 1,769,540<br />
$<br />
1,769,540<br />
Estimated SDC $ 75,960 $ -<br />
$<br />
75,960<br />
Project Sub-Total $ - $ 1,845,500 $ - $ - $ - $ - $ - $ - $<br />
1,845,500<br />
SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 5,427,000<br />
$<br />
5,427,000<br />
Estimated SDC $ - $ 279,720 $ 53,280<br />
$<br />
333,000<br />
Project Sub-Total $ - $ 5,427,000 $ 279,720 $ 53,280 $ - $ - $ - $ - $<br />
5,760,000<br />
SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 6,127,000<br />
$<br />
6,127,000<br />
Estimated SDC $ - $ 273,230 $ 33,770<br />
$<br />
307,000<br />
Project Sub-Total $ - $ 6,127,000 $ 273,230 $ 33,770 $ - $ - $ - $ - $<br />
6,434,000<br />
SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 8,997,000<br />
$<br />
8,997,000<br />
Estimated SDC $ - $ 9,990 $ 273,060 $ 49,950<br />
$<br />
333,000<br />
Project Sub-Total $ - $ 8,997,000 $ 9,990 $ 273,060 $ 49,950 $ - $ - $ - $<br />
9,330,000<br />
NGS-R-0002 (Scotland Avenue - Progress Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 9,208,000<br />
$<br />
9,208,000<br />
Estimated SDC $ - $ 424,650 $ 22,350<br />
$<br />
447,000<br />
Project Sub-Total $ - $ - $ 9,208,000 $ 424,650 $ 22,350 $ - $ - $ - $<br />
9,655,000<br />
NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 12,989,000<br />
$<br />
12,989,000<br />
Estimated SDC $ - $ 466,830 $ 46,170<br />
$<br />
513,000<br />
Project Sub-Total $ - $ - $ 12,989,000 $ 466,830 $ 46,170 $ - $ - $ - $<br />
13,502,000<br />
SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 17,493,000<br />
$<br />
17,493,000<br />
Estimated SDC $ - $ 345,600 $ 134,400<br />
$<br />
480,000<br />
Project Sub-Total $ - $ - $ 17,493,000 $ 345,600 $ 134,400 $ - $ - $ - $<br />
17,973,000<br />
SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 5,168,000<br />
$<br />
5,168,000<br />
Estimated SDC $ - $ 163,500 $ 163,500<br />
$<br />
327,000<br />
Project Sub-Total $ - $ - $ 5,168,000 $ 163,500 $ 163,500 $ - $ - $ - $<br />
5,495,000<br />
GNV31031158160.xlsx/110050009 1-5<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Comprehensive Rehabilitation Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
CGS-R-0001 (Foster Drive - Government Street Phase A & Phase B Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 7,683,000<br />
$<br />
7,683,000<br />
Estimated SDC $ - $ 136,290 $ 276,710<br />
$<br />
413,000<br />
Project Sub-Total $ - $ - $ 7,683,000 $ 136,290 $ 276,710 $ - $ - $ - $<br />
8,096,000<br />
NFW-R-0001a (Brookstown Road - Evangeline Street -Phase I Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 10,309,000<br />
$<br />
10,309,000<br />
Estimated SDC $ 20,010 $ 540,270 $ 106,720<br />
$<br />
667,000<br />
Project Sub-Total $ - $ - $ - $ 10,329,010 $ 540,270 $ 106,720 $ - $ - $<br />
10,976,000<br />
NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 5,468,000<br />
$<br />
5,468,000<br />
Estimated SDC $ - $ 533,600 $ 133,400<br />
$<br />
667,000<br />
Project Sub-Total $ - $ - $ - $ 5,468,000 $ 533,600 $ 133,400 $ - $ - $<br />
6,135,000<br />
NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 12,170,000<br />
$<br />
12,170,000<br />
Estimated SDC $ - $ 600,600 $ 59,400<br />
$<br />
660,000<br />
Project Sub-Total $ - $ - $ - $ 12,170,000 $ 600,600 $ 59,400 $ - $ - $<br />
12,830,000<br />
SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 4,850,000<br />
$<br />
4,850,000<br />
Estimated SDC $ - $ 332,000 $ 68,000<br />
$<br />
400,000<br />
Project Sub-Total $ - $ - $ - $ 4,850,000 $ 332,000 $ 68,000 $ - $ - $<br />
5,250,000<br />
SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 6,770,000<br />
$<br />
6,770,000<br />
Estimated SDC $ - $ 236,000 $ 164,000<br />
$<br />
400,000<br />
Project Sub-Total $ - $ - $ - $ 6,770,000 $ 236,000 $ 164,000 $ - $ - $<br />
7,170,000<br />
CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 3,915,500<br />
$<br />
3,915,500<br />
Estimated SDC $ - $ 74,100 $ 172,900<br />
$<br />
247,000<br />
Project Sub-Total $ - $ - $ - $ 3,915,500 $ 74,100 $ 172,900 $ - $ - $<br />
4,162,500<br />
CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 6,876,000<br />
$<br />
6,876,000<br />
Estimated SDC $ - $ 73,610 $ 359,390<br />
$<br />
433,000<br />
Project Sub-Total $ - $ - $ - $ 6,876,000 $ 73,610 $ 359,390 $ - $ - $<br />
7,309,000<br />
GNV31031158160.xlsx/110050009 1-7<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Comprehensive Rehabilitation Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 7,449,000<br />
$<br />
7,449,000<br />
Estimated SDC $ 23,350 $ 443,650<br />
$<br />
467,000<br />
Project Sub-Total $ - $ - $ - $ - $ 7,472,350 $ 443,650 $ - $ - $<br />
7,916,000<br />
CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 8,022,000<br />
$<br />
8,022,000<br />
Estimated SDC $ - $ 507,000<br />
$<br />
507,000<br />
Project Sub-Total $ - $ - $ - $ - $ 8,022,000 $ 507,000 $ - $ - $<br />
8,529,000<br />
SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 11,937,500<br />
$<br />
11,937,500<br />
Estimated SDC $ - $ 461,790 $ 271,210<br />
$<br />
733,000<br />
Project Sub-Total $ - $ - $ - $ - $ 11,937,500 $ 461,790 $ 271,210 $ - $<br />
12,670,500<br />
SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 11,937,500<br />
$<br />
11,937,500<br />
Estimated SDC $ - $ 278,540 $ 454,460<br />
$<br />
733,000<br />
Project Sub-Total $ - $ - $ - $ - $ 11,937,500 $ 278,540 $ 454,460 $ - $<br />
12,670,500<br />
SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 7,735,500<br />
$<br />
7,735,500<br />
Estimated SDC $ - $ 355,510 $ 131,490<br />
$<br />
487,000<br />
Project Sub-Total $ - $ - $ - $ - $ 7,735,500 $ 355,510 $ 131,490 $ - $<br />
8,222,500<br />
SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 5,157,000<br />
$<br />
5,157,000<br />
Estimated SDC $ - $ 179,850 $ 147,150<br />
$<br />
327,000<br />
Project Sub-Total $ - $ - $ - $ - $ 5,157,000 $ 179,850 $ 147,150 $ - $<br />
5,484,000<br />
CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 8,595,000<br />
$<br />
8,595,000<br />
Estimated SDC $ - $ 421,070 $ 111,930 $<br />
533,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 8,595,000 $ 421,070 $ 111,930 $<br />
9,128,000<br />
CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project)<br />
Estimated Find Work $ -<br />
$<br />
-<br />
Estimated Survey $ -<br />
$<br />
-<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 8,595,000<br />
$<br />
8,595,000<br />
Estimated SDC $ - $ 383,760 $ 149,240 $<br />
533,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 8,595,000 $ 383,760 $ 149,240 $<br />
9,128,000<br />
GNV31031158160.xlsx/110050009 1-9<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Comprehenisve Rehabilitation Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project)<br />
Estimated Find Work $ 530,000<br />
$<br />
530,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 360,000<br />
$<br />
360,000<br />
Estimated Construction $ 6,016,500<br />
$<br />
6,016,500<br />
Estimated SDC $ - $ 380,000<br />
$<br />
380,000<br />
Project Sub-Total $ - $ - $ - $ - $ 928,000 $ 6,016,500 $ 380,000 $ - $<br />
7,324,500<br />
SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project)<br />
Estimated Find Work $ 530,000<br />
$<br />
530,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 360,000<br />
$<br />
360,000<br />
Estimated Construction $ 6,112,000<br />
$<br />
6,112,000<br />
Estimated SDC $ - $ 367,650 $ 19,350 $<br />
387,000<br />
Project Sub-Total $ - $ - $ - $ - $ 928,000 $ 6,112,000 $ 367,650 $ 19,350 $<br />
7,427,000<br />
SGC-R-0003 (Ardenwood Drive - Winboume Street Area Rehabilitation Project)<br />
Estimated Find Work $ 410,000<br />
$<br />
410,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 280,000<br />
$<br />
280,000<br />
Estimated Construction $ 4,679,500<br />
$<br />
4,679,500<br />
Estimated SDC $ - $ 269,560 $ 23,440 $<br />
293,000<br />
Project Sub-Total $ - $ - $ - $ - $ 728,000 $ 4,679,500 $ 269,560 $ 23,440 $<br />
5,700,500<br />
SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project)<br />
Estimated Find Work $ 690,000<br />
$<br />
690,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 470,000<br />
$<br />
470,000<br />
Estimated Construction $ 7,926,500<br />
$<br />
7,926,500<br />
Estimated SDC $ 260,000 $ 240,000 $<br />
500,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 1,198,000 $ 8,186,500 $ 240,000 $<br />
9,624,500<br />
CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project)<br />
Estimated Find Work $ 870,000<br />
$<br />
870,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 600,000<br />
$<br />
600,000<br />
Estimated Construction $ 9,550,000<br />
$<br />
9,550,000<br />
Estimated SDC $ 48,000 $ 552,000 $<br />
600,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 1,508,000 $ 9,598,000 $ 552,000 $<br />
11,658,000<br />
SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project)<br />
Estimated Find Work $ 320,000<br />
$<br />
320,000<br />
Estimated Survey $ 38,000<br />
$<br />
38,000<br />
Estimated Design Engineering $ 220,000<br />
$<br />
220,000<br />
Estimated Construction $ 3,629,000<br />
$<br />
3,629,000<br />
Estimated SDC $ - $ 227,000 $<br />
227,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 578,000 $ 3,629,000 $ 227,000 $<br />
4,434,000<br />
Rehab Engineering Retainer Contracts<br />
Estimated Design Engineering $ 1,500,000 $ 1,000,000 $ 1,500,000 $ 1,000,000<br />
$<br />
5,000,000<br />
Estimated Construction $<br />
-<br />
Estimated SDC $<br />
-<br />
Project Sub-Total $ - $ 1,500,000 $ 1,000,000 $ 1,500,000 $ 1,000,000 $ - $ - $ - $<br />
5,000,000<br />
WWCS Evaluation & Management Project (06-WC-AR-0064)<br />
Estimated Design Engineering $<br />
-<br />
Estimated Construction $ 2,056,430<br />
$<br />
2,056,430<br />
Estimated SDC $ -<br />
$<br />
-<br />
Project Sub-Total $ - $ 2,056,430 $ - $ - $ - $ - $ - $ - $<br />
2,056,430<br />
Comprehensive Rehabilitation Estimated Total Project Cost $ - $ 26,000,000 $ 54,100,000 $ 53,800,000 $ 58,900,000 $ 40,600,000 $ 24,200,000 $ 1,300,000 $ 258,900,000<br />
GNV31031158160.xlsx/110050009 1-11<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Capacity Improvement Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements)<br />
Estimated Design Engineering $ 789,000<br />
$<br />
789,000<br />
Estimated Construction $ 10,498,000<br />
$<br />
10,498,000<br />
Estimated Land $ 58,000<br />
$<br />
58,000<br />
Estimated SDC $ 18,900 $ 296,100<br />
$<br />
315,000<br />
Project Sub-Total $ 789,000 $ -<br />
$ 10,574,900 $ 296,100 $ - $ - $ - $<br />
11,660,000<br />
NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 360,700<br />
$<br />
360,700<br />
Estimated Construction $ 1,550,300<br />
$<br />
1,550,300<br />
Estimated SDC $ 45,000<br />
$<br />
45,000<br />
Project Sub-Total $ 360,700 $ 1,595,300 $ - $ - $ - $ - $ - $ - $<br />
1,956,000<br />
NFE-C-0002 (Sullivan Rd./Lovett Rd./Wax Rd. Sewer Area Upgrades)<br />
Estimated Design Engineering $ 486,000<br />
$<br />
486,000<br />
Estimated Construction $ 2,200,000<br />
$<br />
2,200,000<br />
Estimated SDC $ - $ 24,700 $ 40,300<br />
$<br />
65,000<br />
Project Sub-Total $ 486,000 $ 2,200,000 $ 24,700 $ 40,300 $ - $ - $ - $ - $<br />
2,751,000<br />
NFE-C-0003 (Comite Road - Foster Road Sewer Area Upgrades - Phase I)<br />
Estimated Design Engineering $ 471,000<br />
$<br />
471,000<br />
Estimated Construction $ 1,925,000<br />
$<br />
1,925,000<br />
Estimated SDC $ - $ 9,000 $ 46,800 $ 4,200<br />
$<br />
60,000<br />
Project Sub-Total $ 471,000 $ 1,925,000 $ 9,000 $ 46,800 $ 4,200 $ - $ - $ - $<br />
2,456,000<br />
NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 367,000<br />
$<br />
367,000<br />
Estimated Construction $ 8,762,000<br />
$<br />
8,762,000<br />
Estimated SDC $ - $ 63,600 $ 201,400<br />
$<br />
265,000<br />
Project Sub-Total $ 367,000 $ 8,762,000 $ 63,600 $ 201,400 $ - $ - $ - $ - $<br />
9,394,000<br />
NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - general)<br />
Estimated Design Engineering $ 4,510,000<br />
$<br />
4,510,000<br />
Estimated Construction $ -<br />
$<br />
-<br />
Estimated Land $ 40,000 $ 68,587 $ 849,240<br />
$<br />
958,000<br />
Estimated SDC $ -<br />
$<br />
-<br />
Project Sub-Total $ - $ 4,550,000 $ 68,587 $ 849,240 $ - $ - $ - $ - $<br />
5,468,000<br />
NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - Ph I)<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 18,487,000<br />
$<br />
18,487,000<br />
Estimated Land $<br />
-<br />
Estimated SDC $ - $ 88,000 $ 363,000 $ 99,000<br />
$<br />
550,000<br />
Project Sub-Total $ - $ - $ - $ 18,487,000 $ 88,000 $ 363,000 $ 99,000 $ - $<br />
19,037,000<br />
NFW-C-HWY61-II (Zachary Area Transmission Network Improvements - Ph II)<br />
Estimated Design Engineering $<br />
-<br />
Estimated Construction $ 14,584,000<br />
$<br />
14,584,000<br />
Estimated Land $ 1,425,000<br />
$<br />
1,425,000<br />
Estimated SDC $ - $ 306,680 $ 144,320<br />
$<br />
451,000<br />
Project Sub-Total $ - $ - $ - $ 16,009,000 $ 306,680 $ 144,320 $ - $ - $<br />
16,460,000<br />
NFW-C-HWY61-III (Zachary Area Transmission Network Improvements - Ph III)<br />
Estimated Design Engineering $<br />
-<br />
Estimated Construction $ 8,948,000<br />
$<br />
8,948,000<br />
Estimated SDC $ - $ 42,880 $ 176,880 $ 48,240<br />
$<br />
268,000<br />
Project Sub-Total $ - $ - $ - $ 8,948,000 $ 42,880 $ 176,880 $ 48,240 $ - $<br />
9,216,000<br />
NFW-C-HWY61-IV (Zachary Area Transmission Network Improvements - Ph IV)<br />
Estimated Design Engineering $<br />
-<br />
Estimated Construction $ 7,091,000<br />
$<br />
7,091,000<br />
Estimated SDC $ - $ 31,800 $ 139,920 $ 40,280<br />
$<br />
212,000<br />
Project Sub-Total $ - $ - $ - $ 7,091,000 $ 31,800 $ 139,920 $ 40,280 $ - $<br />
7,303,000<br />
CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades)<br />
Estimated Design Engineering $ 809,000<br />
$<br />
809,000<br />
Estimated Construction $ 17,970,000<br />
$<br />
17,970,000<br />
Estimated SDC $ 91,800 $ 437,400 $ 10,800<br />
$<br />
540,000<br />
Project Sub-Total $ - $ 809,000<br />
$ 18,061,800 $ 437,400 $ 10,800 $ - $ - $<br />
19,319,000<br />
CGN-C-0005 (Downtown Area Pump Station Improvements)<br />
Estimated Design Engineering $ 900,000<br />
$<br />
900,000<br />
Estimated Construction $ 4,841,000<br />
$<br />
4,841,000<br />
Estimated SDC $ 2,900 $ 104,400 $ 37,700<br />
$<br />
145,000<br />
Project Sub-Total $ - $ 900,000<br />
$ 4,843,900 $ 104,400 $ 37,700 $ - $ - $<br />
5,886,000<br />
GNV31031158160.xlsx/110050009 1-13<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Capacity Improvement Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades)<br />
Estimated Design Engineering $ 532,000<br />
$<br />
532,000<br />
Estimated Construction $ 4,326,000<br />
$<br />
4,326,000<br />
Estimated SDC $ - $ 120,900 $ 9,100<br />
$<br />
130,000<br />
Project Sub-Total $ - $ 532,000 $ 4,326,000 $ 120,900 $ 9,100 $ - $ - $ - $<br />
4,988,000<br />
SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements)<br />
Estimated Design Engineering $ 480,000<br />
$<br />
480,000<br />
Estimated Construction $ 2,802,000<br />
$<br />
2,802,000<br />
Estimated SDC $ 31,450 $ 53,550<br />
$<br />
85,000<br />
Project Sub-Total $ - $ 480,000<br />
$ 2,833,450 $ 53,550 $ - $ - $ - $<br />
3,367,000<br />
Group Project 1A (Metro Airport Area Sewer Upgrades)<br />
Estimated Design Engineering $ 3,237,000<br />
$<br />
3,237,000<br />
Estimated Construction $ 19,581,000<br />
$<br />
19,581,000<br />
Estimated Land $ 840,000<br />
$<br />
840,000<br />
Estimated SDC $ - $ 70,200 $ 391,950 $ 122,850<br />
$<br />
585,000<br />
Project Sub-Total $ - $ 3,237,000 $ - $ 20,421,000 $ 70,200 $ 391,950 $ 122,850 $ - $<br />
24,243,000<br />
Group Project 1B (Metro AirportSewer Area PS and FM Upgrades)<br />
Estimated Design Engineering $ 2,561,000<br />
$<br />
2,561,000<br />
Estimated Construction $ 19,309,000<br />
$<br />
19,309,000<br />
Estimated Land $ 635,000<br />
$<br />
635,000<br />
Estimated SDC $ - $ 71,400 $ 398,650 $ 124,950<br />
$<br />
595,000<br />
Project Sub-Total $ - $ 2,561,000 $ - $ 19,944,000 $ 71,400 $ 398,650 $ 124,950 $ - $<br />
23,100,000<br />
SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements)<br />
Estimated Design Engineering $ 1,233,000<br />
$<br />
1,233,000<br />
Estimated Construction $ 7,730,000<br />
$<br />
7,730,000<br />
Estimated Land $ 203,000<br />
$<br />
203,000<br />
Estimated SDC $ - $ 88,800 $ 151,200<br />
$<br />
240,000<br />
Project Sub-Total $ - $ - $ 1,233,000 $ 7,933,000 $ 88,800 $ 151,200 $ - $ - $<br />
9,406,000<br />
SFL-C-0004 (Group Project 2 - Old Perkins - Highland Road Area Sewer Upgrades)<br />
Estimated Design Engineering $ 525,000<br />
$<br />
525,000<br />
Estimated Construction $ 3,476,000<br />
$<br />
3,476,000<br />
Estimated SDC $ - $ 7,350 $ 75,600 $ 22,050<br />
$<br />
105,000<br />
Project Sub-Total $ - $ 525,000 $ 3,476,000 $ 7,350 $ 75,600 $ 22,050 $ - $ - $<br />
4,106,000<br />
SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements)<br />
Estimated Design Engineering $ 1,574,000<br />
$<br />
1,574,000<br />
Estimated Construction $ 20,591,000<br />
$<br />
20,591,000<br />
Estimated Land $ 430,000<br />
$<br />
430,000<br />
Estimated SDC $ 18,600 $ 539,400 $ 62,000<br />
$<br />
620,000<br />
Project Sub-Total $ - $ 1,574,000<br />
$ 21,039,600 $ 539,400 $ 62,000 $ - $ - $<br />
23,215,000<br />
SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements)<br />
Estimated Design Engineering $ 1,127,000<br />
$<br />
1,127,000<br />
Estimated Construction $ 11,365,000<br />
$<br />
11,365,000<br />
Estimated Land $ 575,000<br />
$<br />
575,000<br />
Estimated SDC $ - $ 177,500 $ 177,500<br />
$<br />
355,000<br />
Project Sub-Total $ - $ - $ 1,127,000 $ - $ 11,940,000 $ 177,500 $ 177,500 $ - $<br />
13,422,000<br />
SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades)<br />
Estimated Design Engineering $ 534,000<br />
$<br />
534,000<br />
Estimated Construction $ 5,300,000<br />
$<br />
5,300,000<br />
Estimated Land $ 285,000<br />
$<br />
285,000<br />
Estimated SDC $ - $ 82,500 $ 82,500<br />
$<br />
165,000<br />
Project Sub-Total $ - $ - $ 534,000 $ - $ 5,585,000 $ 82,500 $ 82,500 $ - $<br />
6,284,000<br />
CGN-C-0002 (25th Street - North Acadian Thruway Capacity Improvements)<br />
Estimated Design Engineering $ 521,000<br />
$<br />
521,000<br />
Estimated Construction $ -<br />
$<br />
-<br />
Estimated SDC $ -<br />
$<br />
-<br />
Project Sub-Total $ - $ - $ 521,000 $ - $ - $ - $ - $ - $<br />
521,000<br />
GNV31031158160.xlsx/110050009 1-15<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Capacity Improvement Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades)<br />
Estimated Design Engineering $ 434,000<br />
$<br />
434,000<br />
Estimated Construction $ 4,680,000<br />
$<br />
4,680,000<br />
Estimated Land $ 190,000<br />
$<br />
190,000<br />
Estimated SDC $ - $ 72,500 $ 72,500<br />
$<br />
145,000<br />
Project Sub-Total $ - $ - $ 434,000 $ - $ 4,870,000 $ 72,500 $ 72,500 $ - $<br />
5,449,000<br />
NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 768,000<br />
$<br />
768,000<br />
Estimated Construction $ 8,000,000<br />
$<br />
8,000,000<br />
Estimated Land $ 490,000<br />
$<br />
490,000<br />
Estimated SDC $ - $ 125,000 $ 125,000<br />
$<br />
250,000<br />
Project Sub-Total $ - $ - $ 768,000 $ - $ 8,490,000 $ 125,000 $ 125,000 $ - $<br />
9,508,000<br />
SFU-C-0005 (O'Neal Lane Pipeline Improvements)<br />
Estimated Design Engineering $ 2,989,000<br />
$<br />
2,989,000<br />
Estimated Construction $ 17,286,000<br />
$<br />
17,286,000<br />
Estimated Land $ 1,035,000<br />
$<br />
1,035,000<br />
Estimated SDC $ - $ 272,500 $ 272,500<br />
$<br />
545,000<br />
Project Sub-Total $ - $ - $ - $ 2,989,000 $ 18,321,000 $ 272,500 $ 272,500 $ - $<br />
21,855,000<br />
SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr)<br />
Estimated Design Engineering $ 940,000<br />
$<br />
940,000<br />
Estimated Construction $ 5,950,000<br />
$<br />
5,950,000<br />
Estimated Land $ 175,000<br />
$<br />
175,000<br />
Estimated SDC $ 3,700 $ 144,300 $ 37,000<br />
$<br />
185,000<br />
Project Sub-Total $ - $ - $ 940,000 $ - $ 6,128,700 $ 144,300 $ 37,000 $ - $<br />
7,250,000<br />
SGC-C-PS58A (Pump Station 58 Replacement)<br />
Estimated Design Engineering $ 1,548,000<br />
$<br />
1,548,000<br />
Estimated Construction $ 15,750,000<br />
$<br />
15,750,000<br />
Estimated SDC $ - $ 121,250 $ 344,350 $ 19,400<br />
$<br />
485,000<br />
Project Sub-Total $ - $ - $ 1,548,000 $ 15,750,000 $ 121,250 $ 344,350 $ 19,400 $ - $<br />
17,783,000<br />
SGC-C-PS58FM-A (Staring Lane FM (Phase I - Burbank Dr to Highland Rd))<br />
Estimated Design Engineering $ 1,607,000<br />
$<br />
1,607,000<br />
Estimated Construction $ 4,616,000<br />
$<br />
4,616,000<br />
Estimated SDC $ 105,000 $ 35,000<br />
$<br />
140,000<br />
Project Sub-Total $ - $ 1,607,000 $ 4,721,000 $ 35,000 $ - $ - $ - $ - $<br />
6,363,000<br />
SGC-C-PS58FM-B (Staring Lane FM (Phase II - Highland Rd to Perkins Rd))<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 10,715,000<br />
$<br />
10,715,000<br />
Estimated SDC $ - $ 25,600 $ 265,600 $ 28,800<br />
$<br />
320,000<br />
Project Sub-Total $ - $ - $ - $ 10,715,000 $ 25,600 $ 265,600 $ 28,800 $ - $<br />
11,035,000<br />
SGC-C-PS58FM-C (Staring Lane FM (Phase III - Perkins Rd to PS 58))<br />
Estimated Design Engineering $ 471,000<br />
$<br />
471,000<br />
Estimated Construction $ 8,390,000<br />
$<br />
8,390,000<br />
Estimated Land $ 150,000<br />
$<br />
150,000<br />
Estimated SDC $ - $ 7,950 $ 235,850 $ 21,200<br />
$<br />
265,000<br />
Project Sub-Total $ - $ - $ 471,000 $ 8,540,000 $ 7,950 $ 235,850 $ 21,200 $ - $<br />
9,276,000<br />
SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr)<br />
Estimated Design Engineering $ 385,000<br />
$<br />
385,000<br />
Estimated Construction $ 2,560,000 $ -<br />
$<br />
2,560,000<br />
Estimated Land $ 175,000 $ -<br />
$<br />
175,000<br />
Estimated SDC $ 1,600 $ 43,200 $ 35,200<br />
$<br />
80,000<br />
Project Sub-Total $ - $ - $ 385,000 $ 2,735,000 $ 1,600 $ 43,200 $ 35,200 $ - $<br />
3,200,000<br />
SGC-C-0002 (Airline Highway Pipeline Improvements)<br />
Estimated Design Engineering $ 2,984,000<br />
$<br />
2,984,000<br />
Estimated Construction $ 35,240,000<br />
$<br />
35,240,000<br />
Estimated Land $ 575,000<br />
$<br />
575,000<br />
Estimated SDC $ - $ 629,850 $ 475,150<br />
$<br />
1,105,000<br />
Project Sub-Total $ - $ - $ 2,984,000 $ - $ 35,815,000 $ 629,850 $ 475,150 $ - $<br />
39,904,000<br />
GNV31031158160.xlsx/110050009 1-17<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Capacity Improvement Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road)<br />
Estimated Design Engineering $ 915,000<br />
$<br />
915,000<br />
Estimated Construction $ 5,919,000<br />
$<br />
5,919,000<br />
Estimated Land $ 183,000<br />
$<br />
183,000<br />
Estimated SDC $ 11,100 $ 173,900 $<br />
185,000<br />
Project Sub-Total $ - $ - $ - $ - $ 915,000 $ - $ 6,113,100 $ 173,900 $<br />
7,202,000<br />
SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - excluding LSU PS<br />
Estimated Design Engineering $ 1,720,000<br />
$<br />
1,720,000<br />
Estimated Construction $ 8,926,760<br />
$<br />
8,926,760<br />
Estimated Land $ 275,000<br />
$<br />
275,000<br />
Estimated SDC $ 5,500 $ 184,250 $ 85,250 $<br />
275,000<br />
Project Sub-Total $ - $ - $ - $ 1,720,000 $ - $ 9,207,260 $ 184,250 $ 85,250 $<br />
11,196,760<br />
SGC-C-0001 (Florida Blvd Pump Station Improvements)<br />
Estimated Design Engineering $ 2,235,000<br />
$<br />
2,235,000<br />
Estimated Construction $ 14,457,000<br />
$<br />
14,457,000<br />
Estimated Land $ 447,000<br />
$<br />
447,000<br />
Estimated SDC $ 22,250 $ 373,800 $ 48,950 $<br />
445,000<br />
Project Sub-Total $ - $ - $ - $ 2,235,000 $ - $ 14,926,250 $ 373,800 $ 48,950 $<br />
17,584,000<br />
NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />
Estimated Design Engineering $ 1,440,000<br />
$<br />
1,440,000<br />
Estimated Construction $ 9,315,000<br />
$<br />
9,315,000<br />
Estimated Land $ 288,000<br />
$<br />
288,000<br />
Estimated SDC $ - $ 162,400 $ 127,600 $<br />
290,000<br />
Project Sub-Total $ - $ - $ - $ - $ 1,440,000 $ 9,603,000 $ 162,400 $ 127,600 $<br />
11,333,000<br />
SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements)<br />
Estimated Design Engineering $ 925,000<br />
$<br />
925,000<br />
Estimated Construction $ 11,174,000<br />
$<br />
11,174,000<br />
Estimated Land $ 351,000<br />
$<br />
351,000<br />
Estimated SDC $ 21,000 $ 329,000 $<br />
350,000<br />
Project Sub-Total $ - $ - $ - $ 925,000 $ - $ - $ 11,546,000 $ 329,000 $<br />
12,800,000<br />
NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 1,100,000<br />
$<br />
1,100,000<br />
Estimated Construction $ 6,876,000<br />
$<br />
6,876,000<br />
Estimated Land $ 216,000<br />
$<br />
216,000<br />
Estimated SDC $ - $ 215,000 $<br />
215,000<br />
Project Sub-Total $ - $ - $ - $ - $ 1,100,000 $ - $ 7,092,000 $ 215,000 $<br />
8,407,000<br />
NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 1,200,000<br />
$<br />
1,200,000<br />
Estimated Construction $ 4,775,000<br />
$<br />
4,775,000<br />
Estimated Land $ 150,000<br />
$<br />
150,000<br />
Estimated SDC $ - $ 150,000 $<br />
150,000<br />
Project Sub-Total $ - $ - $ - $ - $ 1,200,000 $ - $ 4,925,000 $ 150,000 $<br />
6,275,000<br />
SGL-C-0003 (Highland Road Pipeline Improvements)<br />
Estimated Design Engineering $ 1,600,000<br />
$<br />
1,600,000<br />
Estimated Construction $ 17,763,000<br />
$<br />
17,763,000<br />
Estimated Land $ 558,000<br />
$<br />
558,000<br />
Estimated SDC $ - $ 224,000 $ 336,000 $<br />
560,000<br />
Project Sub-Total $ - $ - $ - $ 1,600,000 $ - $ 18,321,000 $ 224,000 $ 336,000 $<br />
20,481,000<br />
SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades)<br />
Estimated Design Engineering $ 740,000<br />
$<br />
740,000<br />
Estimated Construction $ 8,977,000<br />
$<br />
8,977,000<br />
Estimated Land $ 282,000<br />
$<br />
282,000<br />
Estimated SDC $ 16,800 $ 263,200 $<br />
280,000<br />
Project Sub-Total $ - $ - $ - $ 740,000 $ - $ - $ 9,275,800 $ 263,200 $<br />
10,279,000<br />
GNV31031158160.xlsx/110050009 1-19<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Capacity Improvement Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades)<br />
Estimated Design Engineering $ 3,508,000<br />
$<br />
3,508,000<br />
Estimated Construction $ 18,145,000<br />
$<br />
18,145,000<br />
Estimated Land $ 950,000<br />
$<br />
950,000<br />
Estimated SDC $ - $ 188,100 $ 381,900 $<br />
570,000<br />
Project Sub-Total $ - $ - $ - $ 3,508,000 $ - $ 19,095,000 $ 188,100 $ 381,900 $<br />
23,173,000<br />
NFE-C-0005 (Hooper Road Pump Station Improvements)<br />
Estimated Design Engineering $ 1,845,000<br />
$<br />
1,845,000<br />
Estimated Construction $ 11,935,000<br />
$<br />
11,935,000<br />
Estimated Land $ 650,000<br />
$<br />
650,000<br />
Estimated SDC $ - $ 99,900 $ 270,100<br />
$<br />
370,000<br />
Project Sub-Total $ - $ - $ - $ 1,845,000 $ 12,585,000 $ 99,900 $ 270,100 $ - $<br />
14,800,000<br />
NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd)<br />
Estimated Design Engineering $ 735,000<br />
$<br />
735,000<br />
Estimated Construction $ - $ 4,754,000<br />
$<br />
4,754,000<br />
Estimated Land $ - $ 147,000<br />
$<br />
147,000<br />
Estimated SDC $ - $ 31,900 $ 113,100 $<br />
145,000<br />
Project Sub-Total $ - $ - $ - $ - $ 735,000 $ - $ 4,932,900 $ 113,100 $<br />
5,781,000<br />
SFU-C-0002A (O'Neal Lane Pump Station Improvements - Group A)<br />
Estimated Design Engineering $ 1,890,000<br />
$<br />
1,890,000<br />
Estimated Construction $ 12,226,000<br />
$<br />
12,226,000<br />
Estimated Land $ 378,000<br />
$<br />
378,000<br />
Estimated SDC $ 19,000 $ 319,200 $ 41,800 $<br />
380,000<br />
Project Sub-Total $ - $ - $ - $ 1,890,000 $ - $ 12,623,000 $ 319,200 $ 41,800 $<br />
14,874,000<br />
SFU-C-0002B (O'Neal Lane Pump Station Improvements - Group B)<br />
Estimated Design Engineering $ 1,515,000<br />
$<br />
1,515,000<br />
Estimated Construction $ 9,800,000<br />
$<br />
9,800,000<br />
Estimated Land $ 303,000<br />
$<br />
303,000<br />
Estimated SDC $ 15,250 $ 256,200 $ 33,550 $<br />
305,000<br />
Project Sub-Total $ - $ - $ - $ 1,515,000 $ - $ 10,118,250 $ 256,200 $ 33,550 $<br />
11,923,000<br />
SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane)<br />
Estimated Design Engineering $ 630,000<br />
$<br />
630,000<br />
Estimated Construction $ 4,075,000<br />
$<br />
4,075,000<br />
Estimated Land $ 126,000<br />
$<br />
126,000<br />
Estimated SDC $ - $ 41,250 $ 83,750 $<br />
125,000<br />
Project Sub-Total $ - $ - $ - $ - $ 630,000 $ 4,201,000 $ 41,250 $ 83,750 $<br />
4,956,000<br />
CC-WWTP-PS (Pump Station 42)<br />
Estimated Design Engineering $ 1,447,000<br />
$<br />
1,447,000<br />
Estimated Construction $ 6,695,070<br />
$<br />
6,695,070<br />
Estimated SDC $ - $ 90,200 $ 114,800<br />
$<br />
205,000<br />
Project Sub-Total $ - $ - $ 1,447,000 $ 6,695,070 $ 90,200 $ 114,800 $ - $ - $<br />
8,347,070<br />
CC-East-PS (Central Consolidated Pump Stations)<br />
Estimated Design Engineering $ 1,804,000<br />
$<br />
1,804,000<br />
Estimated Construction $ 15,240,000<br />
$<br />
15,240,000<br />
Estimated Land $ 335,000<br />
$<br />
335,000<br />
Estimated SDC $ - $ 272,600 $ 197,400<br />
$<br />
470,000<br />
Project Sub-Total $ - $ - $ 1,804,000 $ 15,575,000 $ 272,600 $ 197,400 $ - $ - $<br />
17,849,000<br />
CC-WWTP-FM (Pump Station 42 Forcemain)<br />
Estimated Design Engineering $ 1,608,000<br />
$<br />
1,608,000<br />
Estimated Construction $ 25,021,000<br />
$<br />
25,021,000<br />
Estimated Land $ 375,000<br />
$<br />
375,000<br />
Estimated SDC $ - $ 243,350 $ 541,650<br />
$<br />
785,000<br />
Project Sub-Total $ - $ - $ 1,608,000 $ 25,396,000 $ 243,350 $ 541,650 $ - $ - $<br />
27,789,000<br />
CC-East-FM (Central Consolidated Forcemain)<br />
Estimated Design Engineering $ 1,387,000<br />
$<br />
1,387,000<br />
Estimated Construction $ 14,570,000<br />
$<br />
14,570,000<br />
Estimated Land $ 435,000<br />
$<br />
435,000<br />
Estimated SDC $ - $ 262,200 $ 197,800<br />
$<br />
460,000<br />
Project Sub-Total $ - $ - $ 1,387,000 $ 15,005,000 $ 262,200 $ 197,800 $ - $ - $<br />
16,852,000<br />
Capacity Improvement Estimated Total Project Cost $ 2,500,000 $ 31,300,000 $ 29,900,000 $ 276,900,000 $ 113,000,000 $ 103,500,000 $ 47,700,000 $ 2,400,000 $ 607,100,000<br />
GNV31031158160.xlsx/110050009 1-21<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
Wastewater Treatment/Storage Projects<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
NFW-C-0002 (Choctaw Storage and Pump Station Facility)<br />
Estimated Design Engineering $ 4,227,000<br />
$<br />
4,227,000<br />
Estimated Construction $ 43,237,000<br />
$<br />
43,237,000<br />
Estimated Land $ 1,218,720<br />
$ 285,280<br />
$<br />
1,504,000<br />
Estimated SDC $ -<br />
$ 1,185,000 $ 315,000<br />
$<br />
1,500,000<br />
Project Sub-Total $ 1,218,720 $ 4,227,000 $ - $ 43,522,280 $ 1,185,000 $ 315,000 $ - $ - $<br />
50,468,000<br />
NFW-C-0004 (Hooper Storage Facility)<br />
Estimated Design Engineering $ 1,555,000<br />
$<br />
1,555,000<br />
Estimated Construction $ 19,115,000<br />
$<br />
19,115,000<br />
Estimated Land $ 195,000<br />
$<br />
195,000<br />
Estimated SDC $ - $ 483,800 $ 106,200<br />
$<br />
590,000<br />
Project Sub-Total $ - $ - $ 1,555,000 $ 19,310,000 $ 483,800 $ 106,200 $ - $ - $<br />
21,455,000<br />
STP-C-0001 (South WWTP - Phase 1)<br />
Estimated Design Engineering $ 8,200,000<br />
$<br />
8,200,000<br />
Estimated Construction $ 108,200,000<br />
$ 108,200,000<br />
Estimated Land $ 6,400,000<br />
$<br />
6,400,000<br />
Estimated SDC $ - $ 81,000 $ 1,269,000 $ 1,269,000 $ 81,000<br />
$<br />
2,700,000<br />
Project Sub-Total $ - $ 8,200,000 $ 114,600,000 $ 81,000 $ 1,269,000 $ 1,269,000 $ 81,000 $ - $ 125,500,000<br />
STP-C-0002 (South WWTP - Phase 2-PDP)<br />
Estimated Design Engineering $ 9,560,000<br />
$<br />
9,560,000<br />
Estimated Construction $ 92,179,000<br />
$<br />
92,179,000<br />
Estimated Land $ 65,000<br />
$<br />
65,000<br />
Estimated SDC $ - $ 162,000 $ 1,593,000 $ 945,000<br />
$<br />
2,700,000<br />
Project Sub-Total $ - $ - $ 9,560,000 $ 65,000 $ 92,341,000 $ 1,593,000 $ 945,000 $ - $ 104,504,000<br />
SSO Odor Control NWWTP (07-TP-BD-0030)<br />
Estimated Design Engineering $ 101,000<br />
$<br />
101,000<br />
Estimated Construction $ 1,486,000<br />
$<br />
1,486,000<br />
Estimated SDC $<br />
-<br />
Project Sub-Total $ 101,000 $ 1,486,000 $ - $ - $ - $ - $ - $ - $<br />
1,587,000<br />
SWWTP IAP (08-TP-BD-0031)<br />
Estimated Design Engineering $ 2,839,112<br />
$<br />
2,839,112<br />
Estimated Construction $ 27,175,888<br />
$<br />
27,175,888<br />
Estimated SDC $ -<br />
$<br />
-<br />
Project Sub-Total $ 2,839,112 $ 27,175,888 $ - $ - $ - $ - $ - $ - $<br />
30,015,000<br />
WW Treatment/Storage Estimated Total Project Cost $ 4,200,000 $ 41,100,000 $ 125,700,000 $ 63,000,000 $ 95,300,000 $ 3,300,000 $ 1,030,000 $ - $ 333,500,000<br />
Estimated Construction Management Total (Based on 33%/50% - rehab/capacity - of SDC cost) $ - $ 48,000 $ 775,000 $ 1,911,000 $ 8,473,000 $ 11,311,000 $ 6,529,000 $ 3,064,000 $<br />
32,100,000<br />
Estimated <strong>Program</strong> Management Total $ 6,122,902 $ 10,074,758 $ 11,095,242 $ 15,516,000 $ 12,841,000 $ 12,336,000 $ 11,661,000 $ 5,933,000 $<br />
85,600,000<br />
Estimated Total of Construction Management and <strong>Program</strong> Management $ 6,122,902 $ 10,122,758 $ 11,870,242 $ 17,427,000 $ 21,314,000 $ 23,647,000 $ 18,190,000 $ 8,997,000 $ 117,700,000<br />
Total Estimated Wet Weather <strong>Program</strong> Cost (Sept. 2007 Dollars) $ 12,820,000 $ 108,520,000 $ 221,570,000 $ 411,130,000 $ 288,510,000 $ 171,050,000 $ 91,120,000 $ 12,700,000 $ 1,317,000,000<br />
Total Estimated Wet Weather <strong>Program</strong> Cost (Considering 3% Per Year Inflation Rate) $ 12,820,000 $ 108,520,000 $ 221,570,000 $ 411,130,000 $ 288,510,000 $ 175,500,000 $ 95,600,000 $ 13,000,000 $ 1,327,000,000<br />
GNV31031158160.xlsx/110050009 1-23<br />
JANUARY 2011<br />
REV. 5
TABLE 1-1<br />
Project Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
"Preliminary Master <strong>Plan</strong>"<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Project Description Estimated Cost<br />
STP-C-0002 (South WWTP - Phase 2 - MP)<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 15,040,000<br />
$<br />
15,040,000<br />
Estimated SDC $ -<br />
$<br />
-<br />
Project Sub-Total $ - $ - $ - $ - $ 15,040,000 $ - $ - $ - $<br />
15,040,000<br />
Sewer System & WWTP Backup Power <strong>Program</strong><br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 10,100,000 $ 10,000,000 $ 7,500,000 $ 2,500,000 $ 400,000<br />
$<br />
30,500,000<br />
Estimated SDC $ 305,000 $ 300,000 $ 225,000 $ 75,000 $ 10,000<br />
$<br />
915,000<br />
Project Sub-Total $ - $ - $ 10,405,000 $ 10,300,000 $ 7,725,000 $ 2,575,000 $ 410,000 $ - $<br />
31,415,000<br />
North WWTP Backup Power<br />
Estimated Design Engineering $ 385,000 $<br />
385,000<br />
Estimated Construction $ 5,337,000 $<br />
5,337,000<br />
Estimated SDC $ - $ - $ - $ - $ - $ 165,000 $<br />
165,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 5,887,000 $<br />
5,887,000<br />
Choctaw Sewer Collection Maintenance Facility<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 14,943,000<br />
$<br />
14,943,000<br />
Estimated SDC $ 460,000<br />
$<br />
460,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 15,403,000 $ - $ - $<br />
15,403,000<br />
SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway - LSU Pump Station)<br />
Estimated Design Engineering $<br />
-<br />
Estimated Construction $ 2,154,000<br />
$<br />
2,154,000<br />
Estimated SDC $ 1,300 $ 43,550 $ 20,150 $<br />
65,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ 2,155,300 $ 43,550 $ 20,150 $<br />
2,219,000<br />
North WWTP Priority One (Urgent Needs) Project<br />
Estimated Design Engineering $ -<br />
$ 740,000 $<br />
740,000<br />
Estimated Construction $ -<br />
$<br />
10,188,000<br />
Estimated SDC $ -<br />
$<br />
300,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 740,000 $<br />
11,228,000<br />
North WWTP Priority Two (O&M Needs) Project<br />
Estimated Design Engineering $ - $ 1,197,000 $<br />
1,197,000<br />
Estimated Construction $ - $<br />
16,592,000<br />
Estimated SDC $ - $<br />
500,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 1,197,000 $<br />
18,289,000<br />
North WWTP SCADA<br />
Estimated Design Engineering $ 161,000 $<br />
161,000<br />
Estimated Construction $ -<br />
$ 2,232,000 $<br />
2,232,000<br />
Estimated SDC $ -<br />
$ 70,000 $<br />
70,000<br />
Project Sub-Total $ - $ - $ - $ - $ - $ - $ - $ 2,463,000 $<br />
2,463,000<br />
Collection System SCADA<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 6,258,500 $ 6,258,500<br />
$<br />
12,517,000<br />
Estimated SDC $ 192,500 $ 192,500<br />
$<br />
385,000<br />
Project Sub-Total $ - $ - $ - $ - $ 6,451,000 $ 6,451,000 $ - $ - $<br />
12,902,000<br />
SCADA Operations Data/Control Center<br />
Estimated Design Engineering $ -<br />
$<br />
-<br />
Estimated Construction $ 1,164,000<br />
$<br />
1,164,000<br />
Estimated SDC $ 50,000<br />
$<br />
50,000<br />
Project Sub-Total $ - $ - $ - $ - $ 1,214,000 $ - $ - $ - $<br />
1,214,000<br />
"Preliminary Master <strong>Plan</strong>" Total Project Cost $ - $ - $ 10,500,000 $ 10,300,000 $ 30,400,000 $ 26,600,000 $ 450,000 $ 10,300,000 $ 116,100,000<br />
Total Estimated <strong>Program</strong> Cost (Sept. 2007 Dollars) $ 12,800,000 $ 108,500,000 $ 232,100,000 $ 421,400,000 $ 318,900,000 $ 197,600,000 $ 91,600,000 $ 23,000,000 $ 1,433,000,000<br />
Total Estimated <strong>Program</strong> Cost (Considering 3% Per Year Inflation Rate) $ 12,800,000 $ 108,500,000 $ 232,100,000 $ 421,400,000 $ 318,900,000 $ 202,800,000 $ 96,100,000 $ 24,300,000 $ 1,448,000,000<br />
GNV31031158160.xlsx/110050009 1-25<br />
JANUARY 2011<br />
REV. 5
This page intentionally left blank.<br />
GNV31031158160.XLSX/110050009 1-26 JANUARY 2011<br />
REV. 5
FIGURE 1-1<br />
<strong>Program</strong> Funding Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
450,000,000<br />
Estim mated Total <strong>Program</strong> Cost<br />
400,000,000<br />
350,000,000<br />
300,000,000<br />
250,000,000<br />
200,000,000<br />
150,000,000000 000<br />
REHAB<br />
CAPACITY<br />
WWTP/STORAGE<br />
"PRELIM. MASTER PLAN"<br />
OVERALL PROGRAM<br />
100,000,000<br />
50,000,000<br />
0<br />
2007 2008 2009 2010 2011 2012 2013 2014<br />
Year<br />
GNV31031158160.xlsx/110050009 1-27<br />
JANUARY 2011<br />
REV. 5
This page intentionally left blank.<br />
GNV31031158160.XLSX/110050009 1-28 JANUARY 2011<br />
REV. 5
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
1 SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
2 SFL-R-0001 (Jefferson Hwy - HooShooToo Road Area Rehabilitation Project) - construction<br />
3 SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project) - pre-construction<br />
4 SGL-R-0002 (Staring Lane - Boone Drive Area Rehabilitation Project) - construction<br />
5 SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project) - pre-construction<br />
6 SGL-R-0001 (Burbank Drive - Gardere Lane Area Rehabilitation Project) - construction<br />
7 SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project) - pre-construction<br />
8 SGU-R-0001 (Oak Villa Blvd - Choctaw Street Area Rehabilitation Project) - construction<br />
9 NGS-R-0002 (Scotland Avenue - Progress Road Area Rehabilitation Project) - pre-construction<br />
10 NGS-R-0002 (Scotland Avenue - Progress Road Rehabilitation Project) - construction<br />
11 NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project) - pre-construction<br />
12 NGS-R-0001 (Elm Grove Garden Road - Harding Blvd Area Rehabilitation Project) - construction<br />
13 SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project) - pre-construction<br />
14 SGU-R-0002 (Sharp Road - Florida Blvd Area Rehabilitation Project) - construction<br />
15 SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project) - pre-construction<br />
16 SGL-R-0003 (Kenilworth Blvd - Boone Drive Area Rehabilitation Project) - construction<br />
17 CGS-R-0001 (Foster Drive - Government Street Area Rehabilitation Project) - pre-construction<br />
18 CGS-R-0001 (Foster Drive - Government Street Area Rehabilitation Project) - construction<br />
19 NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project) - pre-construction<br />
20 NFE-R-0001 (Silverleaf Road - Ford Street Area Rehabilitation Project) - construction<br />
21 NFW-R-0001a (Brookstown Road - Evangeline Street - Phase I Area Rehabilitation Project) - pre-construction<br />
22 NFW-R-0001a (Brookstown Road - Evangeline Street - Phase I Area Rehabilitation Project) - construction<br />
23 NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project) - pre-construction<br />
24 NFW-R-0001b (Brookstown Road - Evangeline Street - Phase II Area Rehabilitation Project) - construction<br />
25 SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project) - pre-construction<br />
26 SGC-R-0001a (Bluebonnet Blvd - Jefferson Hwy - Phase I Area Rehabilitation Project) - construction<br />
27 SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project) - pre-construction<br />
28 SGC-R-0001b (Bluebonnet Blvd - Jefferson Hwy - Phase II Area Rehabilitation Project) - construction<br />
29 CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project) - pre-construction<br />
30 CGS-R-0005 (Acadian Thruway - Perkins Road Area Rehabilitation Project) - construction<br />
31 CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project) - pre-construction<br />
32 CGS-R-0003 (Stanford Avenue - Morning Glory Road Area Rehabilitation Project) - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-29 JANUARY 2011<br />
REV 6
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
33 CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
34 CGS-R-0004 (Acadian Thruway - Claycut Road Area Rehabilitation Project) - construction<br />
35 CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project) - pre-construction<br />
36 CGS-R-0002 (Highland Road - Washington Street Area Rehabilitation Project) - construction<br />
37 SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project) - pre-construction<br />
38 SGC-R-0002a (Airline Highway - Goodwood Blvd - Phase I Area Rehabilitation Project) - construction<br />
39 SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project)- pre-construction<br />
40 SGC-R-0002b (Airline Highway - Goodwood Blvd - Phase II Area Rehabilitation Project) - construction<br />
41 SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project) - pre-construction<br />
42 SFU-R-0001 (Antioch Road - Chadsford Drive Area Rehabilitation Project) - construction<br />
43 SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project) - pre-construction<br />
44 SFL-R-0002 (Jones Creek Road - Tiger Bend Road Area Rehabilitation Project) - construction<br />
45 CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project) - pre-construction<br />
46 CGN-R-0001a (Scenic Highway - Spanish Town Road - Phase I Area Rehabilitation Project) - construction<br />
47 CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project) - pre-construction<br />
48 CGN-R-0001b (Scenic Highway - Spanish Town Road - Phase II Area Rehabilitation Project) - construction<br />
49 NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project) - pre-construction<br />
50 NFW-R-0002 (Interstate 110 - Hollywood Street Area Rehabilitation Project) - construction<br />
51 SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project) - pre-construction<br />
52 SFL-R-0003 (Siegen Lane - Interstate 10 Area Rehabilitation Project) - construction<br />
53 SGC-R-0003 (Ardenwood Drive - Winbourne Street Area Rehabilitation Project) - pre-construction<br />
54 SGC-R-0003 (Ardenwood Drive - Winbourne Street Area Rehabilitation Project) - construction<br />
55 SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project) - pre-construction<br />
56 SGU-R-0003 (Flannery Road - Florida Blvd Area Rehabilitation Project) - construction<br />
57 CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project) - pre-construction<br />
58 CGN-R-0002 (East Boulevard - Government Street Area Rehabilitation Project) - construction<br />
59 SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project) - pre-construction<br />
60 SGC-R-0004 (North 38th Street - Gus Young Avenue Area Rehabilitation Project) - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-31 JANUARY 2011<br />
REV 6
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
61 CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
62 CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements) - construction<br />
63 NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades) - pre-construction<br />
64 NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades) - construction<br />
65 NFE-C-0002 (Sullivan Road / Lovett Road / Wax Road Sewer Area Upgrades) - pre-construction<br />
66 NFE-C-0002 (Sullivan Road / Lovett Road / Wax Road Sewer Area Upgrades) - construction<br />
67 NFE-C-0003 (Comite Drive - Foster Road Sewer Area Upgrades - Phase 1) - pre-construction<br />
68 NFE-C-0003 (Comite Drive - Foster Road Sewer Area Upgrades - Phase 1) - construction<br />
69 NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades) - pre-construction<br />
70 NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades) - construction<br />
71 NFW-C-HWY61-I (ZATNIP - Phase I) - pre-construction<br />
72 NFW-C-HWY61-I (ZATNIP - Phase I) - construction<br />
73 NFW-C-HWY61-II (ZATNIP - Phase II) - pre-construction<br />
74 NFW-C-HWY61-II (ZATNIP - Phase II) - construction<br />
75 NFW-C-HWY61-III (ZATNIP - Phase III) - pre-construction<br />
76 NFW-C-HWY61-III (ZATNIP - Phase III) - construction<br />
77 NFW-C-HWY61-IV (ZATNIP - Phase IV) - pre-construction<br />
78 NFW-C-HWY61-IV (ZATNIP - Phase IV) - construction<br />
79 CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades) - pre-construction<br />
80 CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades) - construction<br />
81 CGN-C-0005 (Downtown Area Pump Stations Improvements) - pre-construction<br />
82 CGN-C-0005 (Downtown Area Pump Station Improvements) - construction<br />
83 CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades) - pre-construction<br />
84 CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades) - construction<br />
85 SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements) - pre-construction<br />
86 SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements) - construction<br />
87 Group Project 1A (Metro Airport Area Sewer Upgrades) - pre-construction<br />
88 Group Project 1A (Metro Airport Area Sewer Upgrades) - construction<br />
89 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) - pre-construction<br />
90 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) - construction<br />
91 SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements) - pre-construction<br />
92 SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements) - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-33 JANUARY 2011<br />
REV 6
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
93 Group Project 2 (Old Perkins - Highland Road Area Sewer Upgrades) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
94 Group Project 2 (Old Perkins - Highland Road Area Sewer Upgrades) - construction<br />
95 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) - pre-construction<br />
96 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) - construction<br />
97 SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements) - pre-construction<br />
98 SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements) - construction<br />
99 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) - pre-construction<br />
100 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) - construction<br />
101 CGN-C-0002 (25th Street - North Acadian Thruway Capacity Improvements) - pre-construction<br />
102 CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades) - pre-construction<br />
103 CGS-C-0006 (Government St - South Acadian Thruway Sewer Area Upgrades) - construction<br />
104 NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades) - pre-construction<br />
105 NGS-C-0002 (<strong>Plan</strong>k Road - Kleinpeter Road Sewer Area Upgrades) - construction<br />
106 SFU-C-0005 (O'Neal Lane Pipeline Improvements) - pre-construction<br />
107 SFU-C-0005 (O'Neal Lane Pipeline Improvements) - construction<br />
108 SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) - pre-construction<br />
109 SFL-C-0001 (Multiple PS - Nicholson Dr - Brightside Dr) - construction<br />
110 SGC-C-PS58A (Pump Station 58 Improvements) - pre-construction<br />
111 SGC-C-PS58A (Pump Station 58 Improvements) - construction<br />
112 SGC-C-PS58FM-A (Staring Lane FM (Ph I - Burbank Dr to Highland Rd)) - pre-construction<br />
113 SGC-C-PS58FM-A (Staring Lane FM (Ph I - Burbank Dr to Highland Rd)) - construction<br />
114 SGC-C-PS58FM-B (Staring Lane FM (Ph II - Highland Rd to Perkins Rd)) - pre-construction<br />
115 SGC-C-PS58FM-B (Staring Lane FM (Ph II - Highland Rd to Perkins Rd)) - construction<br />
116 SGC-C-PS58FM-C (Staring Lane FM (Ph III - Perkins Rd to PS 58)) - pre-construction<br />
117 SGC-C-PS58FM-C (Staring Lane FM (Ph III - Perkins Rd to PS 58)) - construction<br />
118 SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) - pre-construction<br />
119 SFU-C-0001 (Multiple PS - Jefferson Hwy - Park Forest Dr) - construction<br />
120 SGC-C-0002 (Airline Hwy Pipeline Improvements) - pre-construction<br />
121 SGC-C-0002 (Airline Hwy Pipeline Improvements) - construction<br />
122 SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - pre-construction<br />
123 SGL-C-0002 (Multiple PS - Highland Road - Kenilworth Parkway) - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-35 JANUARY 2011<br />
REV 6
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
124 SGC-C-0001 (Florida Boulevard Pump Station Improvements) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
125 SGC-C-0001 (Florida Boulevard Pump Station Improvements) - construction<br />
126 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) - pre-construction<br />
127 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) - construction<br />
128 NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road) - pre-construction<br />
129 NFW-C-0009 (Multiple PS - Highway 61 - <strong>Plan</strong>k Road) - construction<br />
130 SFU-C-0002a (O'Neal Lane Pump Station Improvements - Group A) - pre-construction<br />
131 SFU-C-0002a (O'Neal Lane Pump Station Improvements - Group A) - construction<br />
132 SFU-C-0002b (O'Neal Lane Pump Station Improvements - Group B) - pre-construction<br />
133 SFU-C-0002b (O'Neal Lane Pump Station Improvements - Group B) - construction<br />
134 SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements) - pre-construction<br />
135 SGU-C-0003 (Sherwood Forest Blvd - Goodwood Blvd Pipeline Improvements) - construction<br />
136 NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades) - pre-construction<br />
137 NFW-C-0001 (Joor Road - Greenwell Springs Road Sewer Area Upgrades) - construction<br />
138 NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades) - pre-construction<br />
139 NFW-C-0007 (<strong>Plan</strong>k Road - Port Hudson Pride Road Sewer Area Upgrades) - construction<br />
140 SGL-C-0003 (Highland Road Pipeline Improvements) - pre-construction<br />
141 SGL-C-0003 (Highland Road Pipeline Improvements) - construction<br />
142 SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades) - pre-construction<br />
143 SGU-C-0005 (Oak Villa Boulevard - Monterey Boulevard Sewer Area Upgrades) - construction<br />
144 NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades) - pre-construction<br />
145 NFE-C-0006 (Lovett Road - Greenwell Springs Road Sewer Area Upgrades) - construction<br />
146 NFE-C-0005 (Hooper Road Pump Station Improvements) - pre-construction<br />
147 NFE-C-0005 (Hooper Road Pump Station Improvements) - construction<br />
148 NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd) - pre-construction<br />
149 NFW-C-0010 (Multiple PS - Prescott Rd - Greenwell Springs Rd) - construction<br />
150 SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane) - pre-construction<br />
151 SFL-C-0003 (Multiple PS - Burbank Drive - Siegen Lane) - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-37 JANUARY 2011<br />
REV 6
FIGURE 1-2<br />
<strong>Program</strong> Schedule<br />
<strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />
ID<br />
Task Name<br />
152 CC-WWTP-PS (Pump Station 42) - pre-construction<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1<br />
153 CC-WWTP-PS (Pump Station 42) - construction<br />
154 CC-WWTP-FM (Pump Station 42 Forcemain) - pre-construction<br />
155 CC-WWTP-FM (Pump Station 42 Forcemain) - construction<br />
156 CC-East-PS (Central Consolidation Pump Stations) - pre-construction<br />
157 CC-East-PS (Central Consolidation Pump Stations) - construction<br />
158 CC-East-FM (Central Consolidated Forcemains) - pre-construction<br />
159 CC-East-FM (Central Consolidated Forcemains) - construction<br />
160 NFW-C-0002 (Choctaw Storage and Pump Station Facility) - pre-construction<br />
161 NFW-C-0002 (Choctaw Storage and Pump Station Facility) - construction<br />
162 NFW-C-0004 (Hooper Storage Facility) - pre-construction<br />
163 NFW-C-0004 (Hooper Storage Facility) - construction<br />
164 STP-C-0001 (SWWTP Wet Weather Improvements - Phase I) - pre-construction<br />
165 STP-C-0001 (SWWTP Wet Weather Improvements - Phase I) - construction<br />
166 STP-C-0002 (SWWTP Wet Weather Improvements - Phase II) - pre-construction<br />
167 STP-C-0002 (SWWTP Wet Weather Improvements - Phase II) - construction<br />
168 SWWTP Immediate Action Projects - pre-construction<br />
169 SWWTP Immediate Action Projects - construction<br />
Project: BTR_<strong>Program</strong>_Schedule_brok<br />
Date: Thu 1/27/11<br />
Task<br />
Split<br />
Progress<br />
Milestone<br />
Summary<br />
Project Summary<br />
External Tasks<br />
External Milestone<br />
Deadline<br />
1-39 JANUARY 2011<br />
REV 6
SECTION 2<br />
<strong>Plan</strong>ning Description<br />
2.1 <strong>Plan</strong>ning Overview<br />
This section describes the process used to define the projects outlined in this report. This<br />
planning was necessary to meet the goals of the C-P for a sewer system rehabilitation and<br />
replacement program for SSO reduction.<br />
2.2 Comprehensive Rehabilitation <strong>Plan</strong>ning<br />
Rainfall dependent infiltration/inflow (RDII) is the major cause of wet weather related<br />
capacity deficiencies. Previously conducted concurrent monitoring of flow and rainfall<br />
throughout the wastewater collection system during several rainfall events of different<br />
magnitudes was used to characterize RDII and predict the system’s wet weather response to<br />
rainfall.<br />
The collected data were then used to set up and calibrate a computational BTRSSO<br />
hydraulic model of the Baton Rouge collection and transmission system. Each subcatchment<br />
or drainage area was evaluated to establish the share of the rainfall that is<br />
predicted to enter the sewer system. Sub-catchments in which the RDII was excessive are<br />
scheduled for rehabilitation.<br />
The sub-catchments selected for comprehensive rehabilitation were then arranged into 30<br />
projects. Sections 3, 4, and 5 of this report describe the comprehensive rehabilitation<br />
projects.<br />
The sub-catchments selected for rehabilitation will undergo a review of the rehabilitation<br />
work already completed by the DPW. Portions of the sub-catchments that have been<br />
previously rehabilitated will be deleted from the individual rehabilitation projects.<br />
2.3 Capacity Improvement <strong>Plan</strong>ning<br />
Capacity improvement planning for the <strong>Program</strong> is based on evaluating and replacing those<br />
facilities in the collection system where the <strong>Program</strong> hydraulic modeling and field<br />
information indicate that the existing collection or transmission system is inadequate to<br />
handle the future peak wet weather flows appropriately.<br />
For this analysis, the C-P was divided into ten hydraulically independent basins in order to<br />
separate the collection and transmission systems for analysis. The <strong>Program</strong> Manager (PM)<br />
developed a process for evaluating the hydraulic model and analyzing its output. The PM<br />
utilized planning and design criteria as a basis for the process overview.<br />
The PM prepared and used a 12-step hydraulic basin analysis method throughout the<br />
planning process. The 12-step process included the following components:<br />
1. Dynamic model runs for evaluation of the capacity of existing pipes with predicted postrehabilitation<br />
flows<br />
GNV31031158569.DOCX/110050010 2-1 JANUARY 2011<br />
REV. 5
SECTION 2. PLANNING DESCRIPTION<br />
2. Steady state calculations for evaluation of required pipe capacity<br />
3. Dynamic models runs for evaluation of existing pipes with future flows added to postrehabilitation<br />
flows<br />
4. Steady state calculations for evaluation of required pipe capacity with future flows<br />
5. Test of the revised model for its ability to handle future wet weather flows<br />
6. Evaluation of the model output for acceptable design criteria and physical evidence of<br />
overflows<br />
7. Documentation of project list<br />
8. DPW endorsement<br />
9. Prioritization of projects<br />
10. Development of planning level cost estimates<br />
11. Determine projects for reduction of existing SSOs<br />
12. Definition of projects<br />
Based on these steps, the capacity projects, described in Sections 3, 4, and 5 of this report<br />
were developed.<br />
2.4 Wastewater Treatment/Storage <strong>Plan</strong>ning<br />
The wastewater treatment planning process began in 2006 and concluded with the<br />
development of the Master <strong>Plan</strong> (CH2M HILL, 2008). The following documents describe the<br />
planning efforts:<br />
<br />
<br />
Technical Memorandum entitled Addressing Existing Noncompliance Issues and Future<br />
Wet-weather Flow Management Requirements for the South Wastewater Treatment <strong>Plan</strong>t:<br />
Summary of Findings and Recommendations (CH2M HILL, 2006)<br />
South Wastewater Treatment <strong>Plan</strong>t Immediate Action <strong>Plan</strong> Basis of Design Report<br />
(CH2M HILL, 2007)<br />
Draft Wastewater Master <strong>Plan</strong> (CH2MHILL, 2008)<br />
<br />
Consolidation of South and Central Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge TM<br />
(CH2M HILL, 2008)<br />
This document describes the immediate action projects and wet weather capacity project for<br />
the South WWTP only. No wet weather capacity projects are required at the North WWTP.<br />
Other improvements at the treatment plants are not a part of this plan, since they are<br />
included in the Draft Master <strong>Plan</strong> (CH2MHILL, May 2008). Four of the preliminary master<br />
plan projects however, are briefly described in this document involve construction at the<br />
North WWTP, specifically those involving the priority one improvements, priority two<br />
improvements, standby generators and SCADA.<br />
This document also describes additional improvements that will be necessary at the South<br />
WWTP in order to consolidate the Central WWTP with the South WWTP. These<br />
GNV31031158569.DOCX/110050010 2-2 JANUARY 2011<br />
REV. 5
SECTION 2. PLANNING DESCRIPTION<br />
improvements include additional influent pumping and storage at the South WWTP to<br />
accommodate future wet weather peak flows from the Central WWTP.<br />
Storage for shaving of peak hydraulic flows in the system is employed to reduce the scope<br />
and cost of downstream capacity projects and treatment plant capacity. Storage facilities are<br />
reservoirs that retain wet weather flows for a short time until the wet weather period is past.<br />
At the end of the wet weather period, the flow is returned to the collection system for<br />
transport and treatment. Each storage facility is sized for the 2-year frequency, 12-hour<br />
duration storm event. The storage facilities will be used in any significant rain event in the<br />
future.<br />
GNV31031158569.DOCX/110050010 2-3 JANUARY 2011<br />
REV. 5
SECTION 2. PLANNING DESCRIPTION<br />
This page intentionally left blank.<br />
GNV31031158569.DOCX/110050010 2-4 JANUARY 2011<br />
REV. 5
SECTION 3<br />
South Basin Projects<br />
Section 3 presents summaries of the South Gravity System Comprehensive Rehabilitation<br />
Projects, the South Gravity System Capacity Improvement Projects, the South Forced System<br />
Comprehensive Rehabilitation Projects, the South Forced System Capacity Improvement<br />
Projects, and the South WWTP Projects. These projects are all shown on Figures 3-1 and 3-2.<br />
As of October 2010, there are three projects functionally completed, eight projects under<br />
construction, and 16 projects under design in the South Basin.<br />
The project summaries presented herein represent the information available during this<br />
annual update period. The PDP is revisited on an annual basis and revised as necessary<br />
based on results of additional hydraulic wastewater modeling, immediate needs, DPW and<br />
public input, and other factors.<br />
GNV31031158547.DOCX/103440004 3-1 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158547.DOCX/103440004 3-2 JANUARY 2011<br />
REV. 5
F<br />
3rd<br />
Lupine<br />
Alba<br />
East<br />
Sunshine<br />
Elm<br />
Waverly<br />
Whitter<br />
Juban<br />
Cora<br />
Marilyn<br />
Aletha<br />
Sharp<br />
Acres<br />
Sam<br />
Cedarcrest<br />
Aubin<br />
Little John<br />
Devall<br />
Sullivan<br />
Foxlane<br />
Millerville<br />
Beaver<br />
O'Neal<br />
Antioch<br />
Round Oak<br />
Elliot<br />
³<br />
McCastle<br />
Dotson<br />
Scenic<br />
Glynn<br />
Thomas<br />
North WWTP<br />
I<br />
H<br />
Brightside<br />
Riverbend<br />
E<br />
Mills<br />
Harding<br />
Mengel<br />
Gourrier<br />
Swan<br />
Main<br />
72nd<br />
Convention<br />
North<br />
§¨¦I-110<br />
Central WWTP<br />
Highland<br />
Nicholson<br />
Blount<br />
Acadian<br />
Lee<br />
Burbank<br />
River<br />
38th<br />
<strong>Plan</strong>k<br />
Greenwell<br />
Foster<br />
Ford<br />
Comite<br />
Greenwell Springs<br />
Government<br />
Prescott<br />
Lobdell<br />
Pettit<br />
Goodwood<br />
South WWTP<br />
Lanier<br />
Mickens<br />
Blackwater<br />
Choctaw<br />
3rdMollylea<br />
6th<br />
Day<br />
New Rafe Meyer<br />
K<br />
Lafayette<br />
St Philip<br />
St John<br />
Stadium<br />
4th<br />
Sorrel<br />
9th<br />
Julia<br />
Scotland<br />
Central<br />
Rosenwald<br />
Stilt<br />
Louisiana<br />
Alvin Dark<br />
10th<br />
13th<br />
Grant<br />
Laurel Lakes<br />
Snipe<br />
Gsu<br />
Ben Hur<br />
79th<br />
68th<br />
Chippewa<br />
Terrace<br />
Dalrymple<br />
Mason<br />
17th<br />
Gayosa<br />
Parker<br />
22nd<br />
Gore<br />
77th<br />
Beech<br />
Fuqua<br />
18th<br />
South<br />
Harding<br />
Pimpernel<br />
Tower<br />
Doris<br />
D<br />
Wilbur<br />
23rd<br />
Stanford<br />
Gibbens<br />
Hollywood<br />
Dayton<br />
Sycamore<br />
Shelley<br />
Winnebago<br />
Ozark<br />
Madison<br />
L S U<br />
Sandy<br />
Oleander<br />
Olive<br />
May<br />
Charry<br />
Gibbens<br />
Palmyra<br />
Erie<br />
28th<br />
Myrtle<br />
Broussard<br />
Fiero<br />
Bella<br />
29th<br />
Edwin<br />
Carriage<br />
Ben Hur<br />
Lavey<br />
Algoa<br />
31st<br />
Mohican<br />
Winbourne<br />
Brady<br />
Hood<br />
Fairfields<br />
36th<br />
Burgin<br />
Sinbad<br />
Steele<br />
Stuart<br />
Clark<br />
Chuck Yeager<br />
Choctaw<br />
Parker<br />
Glendale<br />
Paige<br />
Glen Oaks<br />
Evangeline<br />
Sherwood<br />
Bawell<br />
Nelson<br />
Crown<br />
Leo<br />
Eaton<br />
Dutton<br />
44th<br />
Ingleside<br />
Hollier<br />
Glasgow<br />
Frey<br />
Adams<br />
College<br />
G S R I<br />
Clay Cut<br />
Ormandy<br />
Paola<br />
Pollard<br />
Wylie<br />
Boone<br />
Menlo<br />
Ardenwood<br />
Corporate<br />
Ned<br />
Myrtle<br />
South Basin Rehabilitation Projects<br />
Wedgewood<br />
Arena<br />
Lavey<br />
North<br />
Bluebell<br />
Troy<br />
Hope<br />
Ellen<br />
Brookstown<br />
Furr<br />
Stoneview<br />
Celia<br />
St Ann<br />
Guynell<br />
Corlett<br />
San Juan<br />
Maplewood<br />
Bank<br />
Ruby<br />
Silverleaf<br />
Sumrall<br />
Quail<br />
Baird<br />
Elvin<br />
Hanks<br />
Harry<br />
Kenilworth<br />
Rodney<br />
Rio<br />
Callahan<br />
Congress<br />
Moss Side<br />
Hadley<br />
Renoir<br />
Longwood <strong>Plan</strong>tation<br />
Donmoor<br />
Foster<br />
North Ridge<br />
Landis<br />
Maribel<br />
Staring<br />
Wooddale<br />
Sevenoaks<br />
Burden<br />
Castle Kirk<br />
Coates<br />
Baja<br />
Boyce<br />
Dalark<br />
Richards<br />
Picardy<br />
Kingcrest<br />
Avis<br />
Cline<br />
Meadow<br />
Price<br />
Breeden<br />
Phebus<br />
Annabelle<br />
Murphy<br />
Flag<br />
Ocean<br />
Tom<br />
Tradition<br />
Wright<br />
Cody<br />
Oak View<br />
Reco<br />
Rienzi<br />
Ryder<br />
Waters Edge<br />
Anderson<br />
Lasalle<br />
Airway<br />
Airport<br />
Essen<br />
Hennessy<br />
Bles<br />
Flora<br />
Hilltree<br />
Paris<br />
Brentwood<br />
Anselmo<br />
Windingway<br />
Lils<br />
Bliss<br />
Cortana<br />
Brown<br />
Tara<br />
Fleet<br />
Bluebonnet<br />
Shady Lake<br />
Loudon<br />
Oak Villa<br />
Fairway<br />
Carney<br />
Monhegan<br />
Joyce<br />
Wartelle<br />
Summa<br />
Shady Bluff<br />
Monterrey<br />
Riveroaks<br />
Drusilla<br />
Baker<br />
Hill<br />
Oak Hills<br />
Oakdale<br />
El Scott<br />
Dancy<br />
Tracy<br />
Interline<br />
Gail<br />
Carmel<br />
Great Smokey<br />
Crescent<br />
Wimbledon<br />
Reitz<br />
Pastureview<br />
Smith<br />
Syble<br />
Cuyhanga<br />
Floynell<br />
Elain<br />
Cal<br />
Azrok<br />
Mint<br />
Tams<br />
Perkins<br />
Amiss<br />
Tallowwood<br />
Darryl<br />
Ridgely<br />
Kinglet<br />
Peck<br />
Neil<br />
Ida<br />
Browning<br />
Judi<br />
Oakbrook<br />
Lonita<br />
Daradele<br />
Beta<br />
Tudor<br />
Bramble<br />
Glen View<br />
Briarhurst<br />
Joor<br />
Siegen<br />
Lovett<br />
Lassen<br />
Sherwood Forest<br />
Mall<br />
Core<br />
Gurney<br />
Landfair<br />
Woodleigh<br />
Cook<br />
Hillmont<br />
Voorhies<br />
Tinley<br />
Southpark<br />
Bellfort<br />
Pecos<br />
Toulon<br />
Honore<br />
Reiger<br />
Poydras<br />
Corsair<br />
Stan<br />
Sylvan<br />
Shoe Creek<br />
Frontier<br />
Lariat<br />
Richcroft<br />
St Alban's<br />
Coral<br />
Ocala<br />
Dabney<br />
Baylor<br />
Triple B<br />
Catalina<br />
Archery<br />
Parkforest<br />
Cloverland<br />
Pecue<br />
Warfield<br />
Elva<br />
Pecue<br />
Erin<br />
Shay<br />
Millburn<br />
Warwick<br />
Justice<br />
Parkside<br />
Cherryl<br />
Flannery<br />
Coursey<br />
Stumberg<br />
Woodcliff<br />
Elwick<br />
Woodland Ridge<br />
Newcastle<br />
Sun Belt<br />
Dorset<br />
Langer<br />
Fulwar Skipwith<br />
Britain<br />
Wyndy<br />
Briarwood<br />
Hooper<br />
Huntley<br />
Florida<br />
Airline<br />
Hickory Ridge<br />
Old Perkins<br />
Five Oaks<br />
Quinn<br />
Saint Clare<br />
Dena Lynn<br />
Roundsaville<br />
Kohler<br />
Holt<br />
Brent<br />
Trey<br />
Mapleton<br />
Greens<br />
Sage<br />
Ponderosa<br />
Buckley<br />
Castille<br />
Augusta<br />
Chaucer<br />
Breton<br />
Firewood<br />
Sessions<br />
Herridge<br />
Jones Creek<br />
§¨¦I-10<br />
Paint<br />
Wax<br />
Frenchtown<br />
Old Hammond<br />
Jester<br />
Board<br />
Barringer<br />
Crystal<br />
Brookside<br />
Director<br />
Shetland<br />
Chanove<br />
Aspenwood<br />
Alford<br />
Chivre<br />
Choctaw<br />
Boreas<br />
Terrell<br />
Profit<br />
Droze<br />
Stevendale<br />
Fir<br />
Roble<br />
Magnolia Bridge<br />
Donnybrook<br />
Hamilton<br />
Woodvale<br />
Thibodeaux<br />
Strain<br />
Bristoe<br />
Ellis<br />
George Oneal<br />
Morgan<br />
Centurion<br />
Chadsford<br />
Hogenville<br />
Shenandoah<br />
Alder<br />
Morel<br />
Doyle<br />
Spyglass Hill<br />
Trent Jones<br />
J L Fairchild<br />
Lawnside<br />
Umbehagen<br />
Blouin<br />
Riverview<br />
§¨¦I-12<br />
Hoyt<br />
Ashford<br />
Deer Lake<br />
Will<br />
Gottlieb<br />
Cicero<br />
Landmor<br />
<strong>Plan</strong>chet<br />
Monitor<br />
Achord<br />
Talton<br />
Beachview<br />
Jefferson<br />
Harrells Ferry<br />
Wildflower<br />
Barrett<br />
Hagerstown<br />
Vignes<br />
Lake Iris<br />
Babin<br />
Bengal<br />
Tiger Bend<br />
Phillips<br />
Womack<br />
Jaybird<br />
Campanile<br />
Rehabilitation Projects<br />
Wastewater Treatment <strong>Plan</strong>t<br />
3<br />
Project Name<br />
Jefferson Hwy. - Hoo Shoo Too Rd.<br />
Burbank Rd. - Gardere Ln.<br />
Staring Ln. - Boone Dr.<br />
Oak Villa Blvd. - Choctaw St.<br />
Sharp Rd. - Florida Blvd.<br />
Kenilworth Blvd. - Boone Dr.<br />
Bluebonnet Blvd. - Jefferson Hwy. PHASE 1<br />
Bluebonnet Blvd. - Jefferson Hwy. PHASE 2<br />
Airline Hwy. - Goodwood Blvd. PHASE 1<br />
Airline Hwy. - Goodwood Blvd. PHASE 2<br />
Antioch Rd. - Chadsford Dr.<br />
Jones Creek Rd. - Tiger Bend Rd.<br />
Siegen Lan. - Interstate 10<br />
Ardenwood Dr. - Winbourne St.<br />
Flannery Rd. - Florida St.<br />
N. 38th St. - Gus Young Ave.<br />
Southern Basins<br />
East Baton Rouge<br />
0 1 2 4<br />
Miles Figure 3-1<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG3-1_PDP2010.MXD SGELPI 11/15/2010 12:12:09
F<br />
3rd<br />
Iowa<br />
Lupine<br />
Alba<br />
East<br />
Sunshine<br />
Elm<br />
Waverly<br />
Whitter<br />
Juban<br />
Cora<br />
Marilyn<br />
Aletha<br />
Sharp<br />
Acres<br />
Sam<br />
Cedarcrest<br />
Aubin<br />
Little John<br />
Devall<br />
Sullivan<br />
Foxlane<br />
Millerville<br />
Beaver<br />
O'Neal<br />
Antioch<br />
Round Oak<br />
Elliot<br />
McCastle<br />
Dotson<br />
Scenic<br />
Avenue L<br />
Glynn<br />
Thomas<br />
E<br />
I<br />
H<br />
Brightside<br />
Mills<br />
Harding<br />
Gourrier<br />
Blount<br />
Swan<br />
Main<br />
72nd<br />
Convention<br />
North<br />
§¨¦I-110<br />
Highland<br />
Nicholson<br />
Acadian<br />
Lee<br />
Burbank<br />
River<br />
38th<br />
<strong>Plan</strong>k<br />
Greenwell<br />
Foster<br />
Ford<br />
Comite<br />
Greenwell Springs<br />
Government<br />
Prescott<br />
Lobdell<br />
Pettit<br />
Lanier<br />
Goodwood<br />
Mickens<br />
Blackwater<br />
Joor<br />
Choctaw Storage Tank Facility<br />
Choctaw<br />
3rdMollylea<br />
6th<br />
Day<br />
New Rafe Meyer<br />
Hillcrest<br />
Riverbend<br />
Elmer<br />
K<br />
Lafayette<br />
St Philip<br />
St John<br />
Mengel<br />
Stadium<br />
Emma<br />
Sorrel<br />
9th<br />
Julia<br />
Scotland<br />
Silverwood<br />
4th<br />
Central<br />
Rosenwald<br />
Stilt<br />
Louisiana<br />
10th<br />
Alice<br />
Taylor<br />
Alvin Dark<br />
13th<br />
Grant<br />
Laurel Lakes<br />
Snipe<br />
Gsu<br />
Ben Hur<br />
79th<br />
68th<br />
Chippewa<br />
Terrace<br />
Dalrymple<br />
Pimpernel<br />
Mason<br />
17th<br />
Gayosa<br />
Parker<br />
22nd<br />
Gore<br />
77th<br />
Beech<br />
Fuqua<br />
18th<br />
South<br />
Tower<br />
Kentucky<br />
Doris<br />
D<br />
Wilbur<br />
Stanford<br />
Gibbens<br />
Hollywood<br />
Dayton<br />
23rd<br />
Sycamore<br />
Shelley<br />
Winnebago<br />
Ozark<br />
Madison<br />
L S U<br />
Sandy<br />
Oleander<br />
Olive<br />
May<br />
Charry<br />
Progress<br />
Erie<br />
Virgil<br />
Myrtle<br />
Broussard<br />
Fiero<br />
Bella<br />
29th<br />
Edwin<br />
Carriage<br />
28th<br />
Eugene<br />
Lavey<br />
31st<br />
Mohican<br />
Winbourne<br />
Brady<br />
Hood<br />
Fairfields<br />
36th<br />
Burgin<br />
Sinbad<br />
Steele<br />
Stuart<br />
Clark<br />
Chuck Yeager<br />
Glendale<br />
Paige<br />
Glen Oaks<br />
Evangeline<br />
Sherwood<br />
Bawell<br />
Nelson<br />
Crown<br />
Leo<br />
Eaton<br />
Dutton<br />
44th<br />
Ingleside<br />
Hollier<br />
Glasgow<br />
Frey<br />
Adams<br />
Clay Cut<br />
Ormandy<br />
College<br />
Paola<br />
Pollard<br />
Wylie<br />
G S R I<br />
Boone<br />
Menlo<br />
Ardenwood<br />
Corporate<br />
Ned<br />
Myrtle<br />
Algoa<br />
South Basin Capacity Improvement Projects<br />
Gibbens<br />
Palmyra<br />
Pryce<br />
Ben Hur<br />
South WWTP<br />
Wet Weather<br />
Improvements<br />
Wedgewood<br />
Devall<br />
Choctaw<br />
Arena<br />
Lavey<br />
North<br />
Bluebell<br />
Troy<br />
Hope<br />
Ellen<br />
Brookstown<br />
Celia<br />
St Ann<br />
Corlett<br />
San Juan<br />
Silverleaf<br />
Sumrall<br />
Congress<br />
Moss Side<br />
Leake<br />
Stoneview<br />
Guynell<br />
Maplewood<br />
Bank<br />
Ruby<br />
Meadow Bend<br />
Furr<br />
Quail<br />
Baird<br />
Gardere<br />
Elvin<br />
Hanks<br />
Harry<br />
Kenilworth<br />
Rodney<br />
Rio<br />
Callahan<br />
Pascagoula<br />
Renoir<br />
Donmoor<br />
Foster<br />
North Ridge<br />
Landis<br />
Maribel<br />
Staring<br />
Wooddale<br />
Sevenoaks<br />
Burden<br />
Castle Kirk<br />
Coates<br />
Baja<br />
Boyce<br />
Dalark<br />
Richards<br />
Kingcrest<br />
Avis<br />
Bluebonnet<br />
Cline<br />
Meadow<br />
Price<br />
Breeden<br />
Phebus<br />
Annabelle<br />
Murphy<br />
Flag<br />
Parkway<br />
Ocean<br />
Tom<br />
Picardy<br />
Tradition<br />
Wright<br />
Cody<br />
Oak View<br />
Rienzi<br />
Ryder<br />
Waters Edge<br />
Anderson<br />
Lasalle<br />
Airway<br />
Airport<br />
Essen<br />
Hennessy<br />
Bles<br />
Flora<br />
Hillmont<br />
Windingway<br />
Campanile<br />
Lils<br />
Brentwood<br />
Anselmo<br />
Bliss<br />
Cortana<br />
Shady Lake<br />
Brown<br />
Loudon<br />
Oak Villa<br />
Tara<br />
Fairway<br />
Fleet<br />
Carney<br />
Monhegan<br />
Wartelle<br />
Summa<br />
Paulet<br />
Shady Bluff<br />
Monterrey<br />
Riveroaks<br />
Drusilla<br />
Baker<br />
Hill<br />
Oak Hills<br />
Oakdale<br />
El Scott<br />
Dancy<br />
Tracy<br />
Crescent<br />
Wimbledon<br />
Reitz<br />
Interline<br />
Gail<br />
Pastureview<br />
Smith<br />
Syble<br />
Ventura<br />
Carmel<br />
Floynell<br />
Elain<br />
Darryl<br />
Cal<br />
Azrok<br />
Mint<br />
Tams<br />
Ridgely<br />
Kinglet<br />
Perkins<br />
Amiss<br />
Tallowwood<br />
Peck<br />
Neil<br />
Ida<br />
Red Oak<br />
Browning<br />
Judi<br />
Oakbrook<br />
Lonita<br />
Daradele<br />
Tudor<br />
Bramble<br />
Glen View<br />
Briarhurst<br />
Siegen<br />
Lovett<br />
Lassen<br />
Mall<br />
Core<br />
Gurney<br />
Landfair<br />
Woodleigh<br />
Cook<br />
Hillmont<br />
Voorhies<br />
Tinley<br />
Southpark<br />
Pecos<br />
Collins<br />
Bellfort<br />
Toulon<br />
Honore<br />
Reiger<br />
Poydras<br />
St Alban's<br />
Corsair<br />
Stan<br />
Sylvan<br />
Shoe Creek<br />
Frontier<br />
Lariat<br />
Coral<br />
Dabney<br />
Baylor<br />
Triple B<br />
Catalina<br />
Archery<br />
Parkforest<br />
Cloverland<br />
Pecue<br />
Warfield<br />
Elva<br />
Pecue<br />
Erin<br />
Shay<br />
Millburn<br />
Warwick<br />
Justice<br />
Parkside<br />
Cherryl<br />
Flannery<br />
Coursey<br />
Stumberg<br />
Woodcliff<br />
Elwick<br />
Woodland Ridge<br />
Newcastle<br />
Sun Belt<br />
Dorset<br />
Langer<br />
Fulwar Skipwith<br />
Britain<br />
Wyndy<br />
Briarwood<br />
Hooper<br />
Huntley<br />
Florida<br />
Airline<br />
Hickory Ridge<br />
Old Perkins<br />
Five Oaks<br />
Quinn<br />
Saint Clare<br />
Dena Lynn<br />
Roundsaville<br />
Kohler<br />
Holt<br />
Brent<br />
Trey<br />
Mapleton<br />
Greens<br />
Sage<br />
Ponderosa<br />
Buckley<br />
Castille<br />
Augusta<br />
Chaucer<br />
Breton<br />
Firewood<br />
Sessions<br />
Herridge<br />
Jones Creek<br />
§¨¦I-10<br />
Paint<br />
Wax<br />
Frenchtown<br />
Old Hammond<br />
Jester<br />
Board<br />
Barringer<br />
Crystal<br />
Brookside<br />
Director<br />
Shetland<br />
Chanove<br />
Aspenwood<br />
Alford<br />
Chivre<br />
Choctaw<br />
Boreas<br />
Terrell<br />
Profit<br />
Droze<br />
Stevendale<br />
Fir<br />
Roble<br />
Magnolia Bridge<br />
Donnybrook<br />
Hamilton<br />
Woodvale<br />
Thibodeaux<br />
Strain<br />
Bristoe<br />
Ellis<br />
George Oneal<br />
Morgan<br />
Centurion<br />
Chadsford<br />
Hogenville<br />
Shenandoah<br />
Alder<br />
Morel<br />
Doyle<br />
Spyglass Hill<br />
Trent Jones<br />
J L Fairchild<br />
Lawnside<br />
Umbehagen<br />
Blouin<br />
Riverview<br />
§¨¦I-12<br />
Hoyt<br />
Ashford<br />
Deer Lake<br />
Will<br />
Gottlieb<br />
Cicero<br />
Landmor<br />
<strong>Plan</strong>chet<br />
Monitor<br />
Achord<br />
Talton<br />
Beachview<br />
Jefferson<br />
Harrells Ferry<br />
Wildflower<br />
Barrett<br />
Hagerstown<br />
Vignes<br />
Lake Iris<br />
Babin<br />
Bengal<br />
Tiger Bend<br />
Phillips<br />
Womack<br />
Jaybird<br />
³<br />
Capacity Improvement Projects<br />
¬<br />
Waste<br />
")<br />
Water Treatment <strong>Plan</strong>t<br />
New Storage Facilities<br />
PDP Projects - South Basin<br />
#*<br />
Force Main<br />
Gravity Main<br />
PDP WWTP PS Projects<br />
Project Area<br />
Existing Force Main<br />
Existing Gravity Main<br />
#* Existing Pump Stations<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG3-2_PDP2010.MXD SGELPI 11/15/2010 14:43:50<br />
0 0.5 1 2<br />
Miles<br />
Figure 3-2
SECTION 3. SOUTH BASIN PROJECTS<br />
3.1 South Gravity System Comprehensive Rehabilitation<br />
Projects<br />
3.1.1 SGC-R-0001a, SCG-R-001b, SGC-R-0002a, SGC-R-0002b, SGC-R-0003, SGC-<br />
R-0004, SGL-R-0001, SGL-R-0002, SGL-R-0003, SGU-R-0001, SGU-R-0002,<br />
SGU-R-0003<br />
Project Description<br />
The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />
various components of the collection system to reduce the amount of I/I that enter into the<br />
system.<br />
Purpose<br />
The purpose of comprehensive sewer rehabilitation is to correct defects in the system such<br />
as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources.<br />
The water that enters the system through the defects is a major contributor to sanitary sewer<br />
overflows. Comprehensive rehabilitation of the collection system will contribute to<br />
alleviating sanitary sewer overflows by reducing infiltration and inflow.<br />
Location<br />
There are 12 projects located primarily within the South Gravity Basin. The locations of the<br />
projects are shown on the maps following this section (Figures 3-3 through 3-12).<br />
Scope of Project<br />
The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />
the pipes and manholes including closed circuit television (CCTV) inspection of all pipes.<br />
Smoke testing will also be included in the physical inspection phase.<br />
The data collected by the physical inspection contractor will be analyzed and, based on that<br />
analysis, a listing of recommended repairs with associated construction costs will be<br />
generated.<br />
An engineering firm will then complete preparation of construction documents for project<br />
bidding.<br />
The construction of comprehensive rehabilitation projects will typically include the<br />
following components.<br />
<br />
<br />
<br />
<br />
<br />
Replacement of pipes<br />
Point repair of pipes<br />
Rehabilitation of pipes by cured in place liners<br />
Rehabilitation or replacement of sewer manholes<br />
Repair of sewer laterals to the property line<br />
Cost<br />
The estimated construction cost for each project is presented in Table 3-1. These costs are<br />
based on preliminary estimates of the amounts of each component of the system that will<br />
require repair or replacement. During the physical inspection phase, the actual condition of<br />
GNV31031158547.DOCX/103440004 3-7 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
the components are assessed and appropriate methods recommended. At that time, the cost<br />
estimate for each project is revised. For those projects under construction, the bid amounts<br />
were included as construction costs in Table 3-1.<br />
TABLE 3-1<br />
Estimated Construction Costs for South Gravity System Comprehensive Rehabilitation Projects<br />
Project Description<br />
Estimated<br />
Construction<br />
Cost<br />
Scheduled Design<br />
Appropriation<br />
Year<br />
Scheduled<br />
Construction<br />
Appropriation Year<br />
Status<br />
SGC-R-0001a Bluebonnet<br />
Blvd-Jefferson Highway<br />
Phase I<br />
SGC-R-0001b Bluebonnet<br />
Blvd-Jefferson Highway<br />
Phase II<br />
SGC-R-0002a Airline<br />
Highway-Goodwood Blvd,<br />
Phase I<br />
SGC-R-0002b Airline<br />
Highway-Goodwood Blvd,<br />
Phase II<br />
SGC-R-0003 Ardenwood<br />
Drive-Winbourne Street<br />
SGC-R-0004 North 38 th<br />
Street-Gus Young Avenue<br />
SGL-R-0001 Burbank<br />
Drive – Gardere Lane<br />
SGL-R-0002 Staring Lane-<br />
Boone Drive<br />
SGL-R-0003 Kenilworth<br />
Blvd-Boone Drive<br />
SGU-R-0001 Oak Villa<br />
Blvd-Choctaw Street<br />
SGU-R-0002 Sharp Road-<br />
Florida Blvd<br />
SGU-R-0003 Flannery<br />
Road-Florida Blvd<br />
$6,700,000 2009* 2010* Design On-Going<br />
$6,700,000 2009* 2010* Design On-Going<br />
$11,900,000 2010* 2011 Not Started<br />
$11,900,000 2010* 2011 Not Started<br />
$4, 700,000 2011 2012 Not Started<br />
$3,600,000 2012 2013 Not Started<br />
$6,127,000 2008* 2008* Construction On-<br />
Going<br />
$5,417,000 2008* 2008* Functionally<br />
Complete<br />
$8,500,000 2009* 2009* Construction On-<br />
Going<br />
$8,997,000 2008* 2008* Construction On-<br />
Going<br />
$17,493,000 2009* 2009* Construction On-<br />
Going<br />
$7,900,000 2012 2013 Not Started<br />
*Appropriations already made for these projects (design and/or construction, as marked)<br />
GNV31031158547.DOCX/103440004 3-8 JANUARY 2011<br />
REV. 5
Energy<br />
Whitter<br />
Lobdell<br />
Cyril<br />
Carter<br />
Shawn<br />
Roseneath<br />
Bricklin<br />
Cora<br />
Marilyn<br />
Inniswold<br />
Idlewood<br />
Bea<br />
Aubin<br />
Bellfort<br />
Castile<br />
Ridge<br />
Bunker Hill<br />
Potomac<br />
Forsythia<br />
Hyacinth<br />
Dahlia<br />
Leycester<br />
Citiplace<br />
Boone<br />
Albert Hart<br />
Guilford<br />
Quail<br />
Pollard<br />
Bromley<br />
Jefferson<br />
Stratford<br />
Krista<br />
Brent<br />
Stokes<br />
Barford<br />
Stoneliegh<br />
Trenton<br />
Aries<br />
Louray<br />
Maxine<br />
Gates<br />
Rodney<br />
Baird<br />
Highland<br />
Corporate<br />
Peggy<br />
Burden<br />
Moss Side<br />
Orion<br />
Menlo<br />
Kimbro<br />
Carrollton<br />
Lasalle<br />
Irene<br />
Kenilworth<br />
Walden<br />
Applewood<br />
Harts Mill<br />
Magnolia Wood<br />
Staring<br />
Heatherwood<br />
East Baton Rouge Parish<br />
Pikes<br />
Castle Kirk<br />
Sheffield<br />
Joliet<br />
Woodstock<br />
Murphy<br />
Sevenoaks<br />
Keed<br />
Svendson<br />
Boyce<br />
Richards<br />
Dijon<br />
Perkins Place<br />
Camelia Trace<br />
Chandler<br />
Highpoint<br />
Kingcrest<br />
Kevel<br />
Mc Connell<br />
Thibodeaux<br />
Ryder<br />
Lake Calais<br />
Guy<br />
Bocage<br />
Mc Carroll<br />
Picardy<br />
Bles<br />
Kings Hill<br />
Mayfair Hill<br />
Theron<br />
Flora<br />
Avis<br />
Chanadia<br />
Arcadia<br />
Worthington Lake<br />
Legend<br />
Sabine<br />
Myrtle Hill<br />
Dove Hollow<br />
Owen<br />
Sholar<br />
Essen<br />
Hyacinth<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001.MXD SGELPI 11/9/2010 11:03:22<br />
Oak<br />
Anselmo<br />
Samoa<br />
Thayer<br />
Roundhill<br />
Windingway<br />
Lils<br />
Nouvelle<br />
Office Park<br />
Hickorylake<br />
Mancuso<br />
Madeira<br />
Myrtlelake<br />
Lasalle<br />
Argosy<br />
Plaza<br />
Rainbow<br />
Keswick<br />
Area Designated for<br />
Physical Inspection<br />
Phase I<br />
Area Designated for<br />
Physical Inspection<br />
Phase II<br />
Chevelle<br />
Brentwood<br />
Tara<br />
Barnett<br />
United Plaza<br />
Oak Hills<br />
Scarlett<br />
Old Hammond<br />
I-12<br />
Oakley<br />
Drusilla<br />
Summa<br />
Myrtle Grove<br />
Wakefield<br />
Forest Hill<br />
Cypress Point<br />
Thistlewood<br />
0 2,000 4,000 Feet<br />
Carter<br />
Paulet<br />
Obrien<br />
Downing<br />
Maiden<br />
Picardy<br />
Great Oak<br />
Fairway<br />
Fleet<br />
Rue Desiree<br />
Rue Crozat<br />
Crescent<br />
Tallyho<br />
Vista<br />
Carmen<br />
Strand<br />
Blecker<br />
Chelsea<br />
Field<br />
Houston<br />
Don Budge<br />
Jack Kramer<br />
q<br />
Contour<br />
Wimbledon<br />
Rue Le Bouef<br />
Keaty<br />
Hill<br />
Cammy<br />
Interline<br />
Baker<br />
Pine Park<br />
Oakdale<br />
Oakcliff<br />
Twisted Oak<br />
Brookline<br />
Barkley<br />
Partridge<br />
Reitz<br />
Purvis<br />
Bluebonnet<br />
Bluebonnet<br />
Cal<br />
Gail<br />
Blue Cross<br />
Oak Creek<br />
Ridgetop<br />
Judi<br />
Regency<br />
Dawnadele<br />
Willow Bay<br />
Oakbrook<br />
Carnforth<br />
Marilyn<br />
Upton<br />
St Regis<br />
Gwenadele<br />
Mc Innis<br />
Perkins<br />
Mayfair<br />
Winston<br />
Octavia<br />
Groner<br />
Woodhaven<br />
Daradele<br />
Floynell<br />
Azrok<br />
Glen View<br />
Mint<br />
Lebanon<br />
Cedarlane<br />
Coursey<br />
Ridgely<br />
Hillyard<br />
Groner<br />
Thrush<br />
Tudor<br />
Kinglet<br />
Arnold<br />
Oliphant<br />
Tanwood<br />
Mullen<br />
Meadowpark<br />
Elaine<br />
Seracedar<br />
Rondo<br />
Bronzebush<br />
Timberline<br />
Cedarcrest<br />
Sharp<br />
Oakline<br />
Harrells Ferry<br />
Stanley Aubin<br />
Airline<br />
Orleans<br />
Siegen<br />
Mead<br />
Southpark<br />
Airline Hwy Service Road<br />
Danbury<br />
Pinebrook<br />
Andrea<br />
Honey<br />
Metairie<br />
Ericson<br />
Oakley Trace<br />
Broad<br />
Darius<br />
E Heck<br />
Shoreline<br />
Jeffrey<br />
Cavalier<br />
Reiger<br />
Toulon<br />
Industriplex<br />
Poydras<br />
Telesmar<br />
Honore<br />
Mall<br />
I-10<br />
Sherwood Forest<br />
Paddock<br />
Jockey Club<br />
Fuller<br />
McCann<br />
Cedar Park<br />
Bluebonnet Blvd. - Jefferson Hwy.<br />
Phase I, II<br />
SGC-R-0001 A/B<br />
Project Vicinity Map<br />
Figure 3-3
Bennington<br />
Constitution<br />
Jamestown<br />
Revere<br />
Yorktown<br />
Brandywine<br />
Concord<br />
Bunker Hill<br />
Lexington<br />
Saratoga<br />
Monmouth<br />
Congress<br />
Potomac<br />
Perkins<br />
Guilford<br />
Krista<br />
Trenton<br />
Tarrytown<br />
Stratford<br />
Peggy<br />
Overton<br />
Murphy<br />
Burden<br />
Torrance<br />
Fritchie<br />
Richards<br />
Mc Carroll<br />
I-10<br />
Peebles<br />
Peebles<br />
I-12<br />
Sholar<br />
Office Park<br />
Rainbow<br />
Essen<br />
Brentwood<br />
Quarters Lake<br />
United Plaza<br />
Forest Hill<br />
Fairway<br />
Drusilla<br />
Jefferson<br />
Baker<br />
Strand<br />
Maiden<br />
Alma<br />
Pointer<br />
Burbank<br />
Wylie<br />
Pollard<br />
Columbine<br />
Seyburn<br />
Menlo<br />
Highland Park<br />
Highland<br />
Hibiscus<br />
Clematis<br />
Dahlia<br />
Beckenham<br />
Forsythia<br />
Chippenham<br />
Daventry<br />
Tipperary<br />
Boone<br />
Leycester<br />
Cardiff<br />
Bromley<br />
Albert Hart<br />
Quail<br />
Stoneliegh<br />
Louray<br />
Rodney<br />
Maxine<br />
Magnolia Wood<br />
Moss Side<br />
Orion<br />
Baird<br />
Irene<br />
Kimbro<br />
Kenilworth<br />
Applewood<br />
Walden<br />
Castle Kirk<br />
Pikes<br />
Chandler<br />
Nolen<br />
Staring<br />
Highpoint<br />
Camelia Trace<br />
Worth<br />
Ryder<br />
Dijon<br />
Alberta<br />
Didesse<br />
Picardy<br />
Bellonia<br />
Worthington Lake<br />
Brittany<br />
Theron<br />
Bles<br />
Arcadia<br />
Hennessy<br />
Avis<br />
Hyacinth<br />
Chanadia<br />
Elysian<br />
Southlawn<br />
Flanders<br />
Flora<br />
Mancuso<br />
Balboa<br />
Granada<br />
Thayer<br />
Sabine<br />
Roundhill<br />
Flatsway<br />
Windingway<br />
Corsica<br />
Bermuda<br />
Tasmania<br />
Samoa<br />
Rhine<br />
Hickorylake<br />
Margaret Ann<br />
Madeira<br />
Myrtlelake<br />
Essen Heights<br />
Blair<br />
Cypress Point<br />
Summa<br />
Anselmo<br />
Myrtle Grove<br />
Bluebonnet<br />
Obrien<br />
Downing<br />
Maiden<br />
Westminster<br />
Claus<br />
Elmcrest<br />
Chandler<br />
Sedley<br />
Amesbury<br />
Copperfield<br />
Columbine<br />
Hammatt<br />
East Baton Rouge Parish<br />
Stokes<br />
Quail Run<br />
Palmetto<br />
Blendon<br />
Aries<br />
Legend<br />
Delaville<br />
Harts Mill<br />
Menlo<br />
Thoreau<br />
Area Designated for<br />
Physical Inspection<br />
Phase I<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001A.MXD SGELPI 11/15/2010 11:16:27<br />
Perkins Place<br />
0 1,300 2,600 Feet<br />
Lake Calais<br />
Sharynwood<br />
O'Donovan<br />
Silverside<br />
Cedar Lake<br />
q<br />
Village Park<br />
Kings Hill<br />
Mayfair Hill<br />
Sabine<br />
One Calais<br />
Essen Park<br />
Payne<br />
Pennth<br />
Butter Creek<br />
Linkwood<br />
Capital<br />
Picardy<br />
World Ministry<br />
Rod Laver<br />
Great Oak<br />
Fleet<br />
Greenbriar Hollow<br />
Blecker<br />
Norfolk<br />
Sharlane<br />
Don Budge<br />
Wimbledon<br />
Chelsea<br />
Hill<br />
Gail<br />
Houston<br />
John Newcombe<br />
Field<br />
Lew Hoad<br />
Rue Baton<br />
Bluebonnet Blvd. - Jefferson Hwy.<br />
Phase I<br />
SGC-R-0001A<br />
Project Vicinity Map<br />
Figure 3-3a
Lobdell<br />
Crown<br />
Cyril<br />
Carter<br />
Lasalle Parc<br />
Shawn<br />
Riveroaks<br />
Cora<br />
Carolyn Sue<br />
Marilyn<br />
Hamblin<br />
Elizabeth<br />
Idlewood<br />
Bea<br />
Arnold<br />
Aubin<br />
Bellfort<br />
Wellington<br />
Audubon<br />
Baird<br />
Government<br />
Irene<br />
Keed<br />
Sevenoaks<br />
Lasalle<br />
Jefferson<br />
Burden<br />
Pikes<br />
Kenilworth<br />
Thoreau<br />
Alden<br />
Walden<br />
Finchley<br />
Joliet<br />
Corporate<br />
Staring<br />
Mc Connell<br />
Boyce<br />
Richards<br />
Dijon<br />
Perkins<br />
Goodwood<br />
Picardy<br />
Mc Carroll<br />
Avis<br />
I-12<br />
Hyacinth<br />
Anselmo<br />
Airport<br />
Colonial<br />
Essen<br />
Madeira<br />
Mancuso<br />
Ashland<br />
Chevelle<br />
Brentwood<br />
Tara<br />
Trinity<br />
Oakley<br />
Old Hammond<br />
Summa<br />
Paulet<br />
Drusilla<br />
Downing<br />
Fairway<br />
Fleet<br />
Crescent<br />
Annabelle Tallyho<br />
Woodstock<br />
Murphy<br />
Torrance<br />
Svendson<br />
Chandler<br />
Fritchie<br />
Perkins Place<br />
Camelia Trace<br />
Thibodeaux<br />
Ryder<br />
Lake Calais<br />
Windrush<br />
Gilbert<br />
Rienzi<br />
Conway<br />
Alberta<br />
Village Park<br />
East Baton Rouge Parish<br />
Linda<br />
Independence<br />
Guy<br />
Brittany<br />
Bles<br />
Kings Hill<br />
Bellonia<br />
Theron<br />
Lasalle<br />
Owen<br />
Sholar<br />
Hennessy<br />
Oak<br />
Wayside<br />
Dove Hollow<br />
Thayer<br />
Galloway<br />
Granada<br />
Samoa<br />
Legend<br />
Bermuda<br />
Lils<br />
Carter<br />
Nouvelle<br />
Office Park<br />
Argosy<br />
Rainbow<br />
Barnett<br />
Plaza<br />
Essen Heights<br />
Margaret Ann<br />
Pennth<br />
Payne<br />
Charmaine<br />
One Calais<br />
Cullen<br />
Scarlett<br />
Forest Hill<br />
United Plaza<br />
Butter Creek<br />
Connells Park<br />
Fairway<br />
Myrtle Grove<br />
Wakefield<br />
Stone's Throw<br />
Cypress Point<br />
Bayside<br />
Maiden<br />
World Ministry<br />
Area Designated for<br />
Physical Inspection<br />
Phase II<br />
0 1,500 3,000 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0001A.MXD SGELPI 11/15/2010 11:16:27<br />
Picardy<br />
Vista<br />
Contour<br />
Carmen<br />
Strand<br />
Chelsea<br />
Sharlane<br />
Field<br />
Houston<br />
q<br />
Frances Harriet<br />
Airline<br />
Keaty<br />
Field<br />
Bordeaux<br />
Hill<br />
Cammy<br />
Baker<br />
Pine Park<br />
Damuth<br />
Cottondale<br />
Brookline<br />
Corinth<br />
Purvis<br />
Interline<br />
Partridge<br />
Bluebonnet<br />
Reitz<br />
Donald<br />
Bluebonnet<br />
Cal<br />
Gail<br />
Blue Cross<br />
Damuth<br />
Van<br />
Diane<br />
Judi<br />
Spencer<br />
Ridgetop<br />
Upton<br />
Regency<br />
Dawnadele<br />
Willow Bay<br />
Cottage Hill<br />
Cynthia<br />
Marilyn<br />
Mc Innis<br />
Winston<br />
Prytania<br />
St Regis<br />
Mayfair<br />
I-10<br />
Woodhaven<br />
Floynell<br />
Daradele<br />
Inniswold<br />
Dwyerwood<br />
Floynell<br />
Azrok<br />
Glen View<br />
Mint<br />
Woodhaven<br />
Runnymede<br />
Hillyard<br />
Kinglet<br />
Parkview<br />
Allyson<br />
Kenlee<br />
Browning<br />
Firelight<br />
Tudor<br />
Lebanon<br />
Cedarlane<br />
Cinquefoil<br />
Plaza Americana<br />
Tanager<br />
Ridgely<br />
Barry<br />
Oliphant<br />
Tanwood<br />
Groner<br />
Bunting<br />
Elaine<br />
Seracedar<br />
Major Oaks<br />
Rosebud<br />
Cedarcrest<br />
Sharp<br />
Rhus Fringe<br />
Mayfair<br />
Ann<br />
Oakline<br />
Sheraton<br />
Coursey<br />
Reiger<br />
Siegen<br />
Mead<br />
Southpark<br />
Toulon<br />
Industriplex<br />
Honore<br />
Sherwood Forest<br />
Harrells Ferry<br />
Alco<br />
Airline Hwy Service Road<br />
Landsbury<br />
Danbury<br />
Pinebrook<br />
Copperleaf<br />
Caroljack<br />
Stonegate<br />
Braeburn<br />
Burton<br />
Ericson<br />
Stanley Aubin<br />
Oak Bend<br />
Jeffrey<br />
Magellan<br />
Muriel<br />
Cavalier<br />
Ellsworth<br />
Bellrose<br />
Cherryhill<br />
Shoreline<br />
Leton<br />
Telesmar<br />
Ashbourne<br />
Paddock<br />
Crestmount<br />
Cedar Park<br />
Bluebonnet Blvd. - Jefferson Hwy.<br />
Phase II<br />
SGC-R-0001B<br />
Project Vicinity Map<br />
Figure 3-3b
Elm<br />
Paulson<br />
Topaz<br />
Waverly<br />
Guilford<br />
Whitter<br />
Juban<br />
Alello<br />
Monet<br />
Maribel<br />
Cyril<br />
Carter<br />
Shawn<br />
Airway<br />
Crescent<br />
Alameda<br />
Vega<br />
Monterrey<br />
Cora<br />
Marilyn<br />
Inniswold<br />
Aletha<br />
Fiesta<br />
Sharp<br />
Bea<br />
Gum<br />
Edgemont<br />
Tee<br />
Acorn<br />
Aubin<br />
Lassen<br />
Bellridge<br />
Gwen<br />
American<br />
Plaza Tower<br />
Sterling<br />
Beechwood<br />
Rhodes<br />
44th<br />
Ingleside<br />
Lee<br />
Charles<br />
Mission<br />
Mouton<br />
Wiltz<br />
Jean<br />
46th<br />
47th<br />
48th<br />
49th<br />
North<br />
Longwood<br />
Bawell<br />
Shelley<br />
Sherwood<br />
Mohican<br />
North<br />
Beck<br />
Frey<br />
Woodside<br />
Balis<br />
Ferrett<br />
Martin<br />
Brame<br />
Glasgow<br />
Conrad<br />
Osborne<br />
48th<br />
Moore<br />
Foster<br />
Voss<br />
Adams<br />
Fairfields<br />
Government<br />
Clay Cut<br />
College<br />
Pollard<br />
Linden<br />
Hermitage<br />
Melrose<br />
Afton<br />
Westdale<br />
Bennington<br />
Concord<br />
Belvedere<br />
Silliman<br />
Foster<br />
Caddo<br />
Blackwell<br />
Bankers<br />
Constitution<br />
Brookstown<br />
Brandywine<br />
Clayton<br />
Ruby<br />
Brookstown<br />
Dahlia<br />
Hibiscus<br />
Cloud<br />
Howell<br />
Choctaw<br />
Castile<br />
Ridge<br />
Ardenwood<br />
Congress<br />
Potomac<br />
Michelli<br />
Woodhill<br />
Energy<br />
Williamson<br />
Azam<br />
Trenton<br />
Perkins<br />
Sheldon<br />
Krista<br />
Marion<br />
Quail<br />
Winbourne<br />
Executive Park<br />
Carrollton<br />
Smiley<br />
Renoir<br />
Harry<br />
Esplanade<br />
Stratford<br />
Corporate<br />
Peggy<br />
Moss Side<br />
Orion<br />
Calumet<br />
Nellie<br />
Industrial<br />
Goya<br />
Carrollton<br />
Donmoor<br />
Conley<br />
Victoria<br />
Lobdell<br />
Audubon<br />
Keed<br />
Jefferson<br />
Burden<br />
Irene<br />
Prescott<br />
Sevenoaks<br />
Joliet<br />
Lasalle<br />
Woodstock<br />
Murphy<br />
Victoria<br />
Winthrop<br />
Pikes<br />
Industrial<br />
Exchange<br />
Finchley<br />
Fritchie<br />
Lanier<br />
Dallas<br />
Wooddale<br />
Goodwood<br />
Boyce<br />
Richards<br />
Dijon<br />
Reco<br />
Realtors<br />
Linda<br />
Linda<br />
Guy<br />
Bocage<br />
Oak View<br />
I-10<br />
Lone Oak<br />
Tom<br />
Essen<br />
Paris<br />
Landwood<br />
Albert<br />
Independence<br />
Brittany<br />
Dickens<br />
Harry<br />
Lasalle<br />
Oak<br />
Owen<br />
Sholar<br />
Gay<br />
Darryl<br />
Carter<br />
Fernwood<br />
Summa<br />
Airport<br />
Thurman<br />
Brandon<br />
Office Park<br />
Berlin<br />
Plaza<br />
Colonial<br />
Chevelle<br />
Oak Crest<br />
Kiowa<br />
Florline<br />
Kelwood<br />
One Calais<br />
Margaret Ann<br />
Southview<br />
Brentwood<br />
Greenwell Springs<br />
Joyce<br />
Tara<br />
Barnett<br />
Woodcrest<br />
Wakefield<br />
Scarlett<br />
Oakley<br />
Wartelle<br />
Stone's Throw<br />
Forest Hill<br />
United Plaza<br />
Chatawa<br />
Cypress Point<br />
Maiden<br />
Vine<br />
Fairway<br />
Fleet<br />
Joor<br />
Trinity<br />
Oak Villa<br />
Choctaw<br />
Cortana<br />
Florida<br />
Broadmoor<br />
Vista<br />
Carmen<br />
Strand<br />
Chelsea<br />
Drusilla<br />
Norfolk<br />
Frances Harriet<br />
Hill<br />
Tracy<br />
Kimberly<br />
Raton<br />
Gail<br />
Elain<br />
Syble<br />
Mammoth<br />
Ventura<br />
Riveroaks<br />
Parkview<br />
Interline<br />
Baker<br />
El Cajon<br />
Cuyhanga<br />
Pomona<br />
Donna<br />
Purvis<br />
Partridge<br />
Bluebonnet<br />
Cal<br />
Warren<br />
Coronado<br />
Delplaza<br />
Brookline<br />
Drew<br />
Castlewood<br />
Bluebonnet<br />
Mollylea<br />
Teddy<br />
Ridgetop<br />
Westerly<br />
Judi<br />
Byrd<br />
Platt<br />
Great Smokey<br />
Elizabeth<br />
Floynell<br />
Pasadena<br />
Perdue<br />
Presidio<br />
Lonita<br />
Big Bend<br />
Tams<br />
Florida<br />
Darryl<br />
Red Oak<br />
Old Hammond<br />
Ridgely<br />
Cletus<br />
Harvey<br />
Kenlee<br />
Cynthia<br />
Browning<br />
Regency<br />
Marilyn<br />
Willow Bay<br />
Woodhaven<br />
Silverest<br />
Daradele<br />
Mayfair<br />
Winston<br />
Ballina<br />
Cashel<br />
St Regis<br />
Gwenadele<br />
Idlewood<br />
Allyson<br />
Tudor<br />
Nelwyn<br />
Elaine<br />
Lebanon<br />
Oliphant<br />
Hillmont<br />
Seracedar<br />
Shermoor<br />
Heather<br />
Arnold<br />
Cedarcrest<br />
Voorhies<br />
Oakline<br />
Rainier<br />
Dual<br />
Waverland<br />
Marlbrook<br />
Braeburn<br />
Airline<br />
Redlands<br />
Sherwood Forest<br />
Toulon<br />
Stan<br />
Catalpa<br />
Tinley<br />
Mead<br />
Southpark<br />
Sarasota<br />
Flamingo<br />
Ocala<br />
Richcroft<br />
Bard<br />
Harrells Ferry<br />
Stanley Aubin<br />
Green Oak<br />
Lava Bed<br />
Ericson<br />
Del Cano<br />
E Heck<br />
Sylvan<br />
Little John<br />
Pamela<br />
Archery<br />
Sheraton<br />
Airline Hwy Service Road<br />
Bellfort<br />
Paddock<br />
Darryl<br />
Florida<br />
Sherbrook<br />
I-12<br />
Baylor<br />
Auburn<br />
Westfork<br />
Vickers<br />
Dabney<br />
Salem<br />
Kay<br />
King Richard<br />
Eastgate<br />
Coursey<br />
Superior<br />
East Baton Rouge Parish<br />
Legend<br />
Area Designated for<br />
Physical Inspection<br />
Phase I<br />
Area Designated for<br />
Physical Inspection<br />
Phase II<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002.MXD SGELPI 11/9/2010 11:07:39<br />
0 2,500 5,000 Feet<br />
q<br />
Airline Hwy. - Goodwood Blvd.<br />
Phase I and II<br />
SGC-R-0002A/B<br />
Project Vicinity Map<br />
Figure 3-4
48th<br />
49th<br />
Elm<br />
Topaz<br />
Garnet<br />
Waverly<br />
Whitter<br />
Juban<br />
Alello<br />
Monet<br />
Crown<br />
Cyril<br />
Carter<br />
Lasalle Parc<br />
Rome<br />
Shawn<br />
Airway<br />
Broadmoor<br />
Frances Harriet<br />
Vega<br />
Monterrey<br />
Cora<br />
Carolyn Sue<br />
Crestaire<br />
Charles<br />
Foster<br />
Brookstown<br />
Winbourne<br />
Calumet<br />
Maribel<br />
Lanier<br />
Gerlando<br />
Lone Oak<br />
Farrington<br />
Redwood<br />
Syble<br />
Graham<br />
Woodcrest<br />
Oak Crest<br />
Woodglynn<br />
Kimberly<br />
Marydon<br />
Joyce<br />
Conrad<br />
Victoria<br />
Conley<br />
46th<br />
Foster<br />
Harelson<br />
Jean<br />
47th<br />
Frey<br />
Madison<br />
Mouton<br />
Ritterman<br />
North<br />
Laurel<br />
Convention<br />
North<br />
Country Club<br />
Moore<br />
Balis<br />
Silliman<br />
Wells<br />
Bawell<br />
Rabey<br />
Adams<br />
Dougherty<br />
Leighton<br />
Fairfields<br />
College<br />
Greenwell Springs<br />
Afton<br />
Melrose<br />
Clay Cut<br />
Cloud<br />
Ardenwood<br />
I-10<br />
Michelli<br />
Government<br />
Elgin<br />
Osborne Mammoth<br />
Hermitage<br />
Parlange<br />
Capital Heights<br />
Greenside<br />
Avondale<br />
Woodside<br />
Bardwell<br />
Barber<br />
Voss<br />
Bootsie<br />
Kincaid<br />
Rebel<br />
Bahm<br />
Westdale<br />
Ormandy<br />
Bazaar<br />
Valcour<br />
Fairfax<br />
Choctaw<br />
Bankers<br />
Constitution<br />
Bel Air<br />
Hilton<br />
Ridge<br />
Howell<br />
Castile<br />
Pino<br />
Timberside<br />
Williamson<br />
Azam<br />
Glenwood<br />
Eastwood<br />
George<br />
Arden<br />
Evans<br />
Citiplace<br />
Winn<br />
Sheldon<br />
Marion<br />
Clinton<br />
Executive Park<br />
Marquette<br />
Smiley<br />
Carrollton<br />
Jefferson<br />
Renoir<br />
Esplanade<br />
Marquette<br />
Carrollton<br />
Gates<br />
Anita<br />
Nellie<br />
Industrial<br />
Rodin<br />
Cezanne<br />
Goya<br />
Harry<br />
Titian<br />
Audubon<br />
Corporate<br />
Kenwood<br />
Lobdell<br />
Van Gogh<br />
Cameron<br />
Donmoor<br />
Alden<br />
Keed<br />
Sheffield<br />
Croydon<br />
Sevenoaks<br />
Joliet<br />
Lasalle<br />
Annabelle<br />
Woodstock<br />
Murphy<br />
Torrance<br />
Industrial<br />
Bon Marche<br />
Pierce<br />
Svendson<br />
Scobell<br />
Lubbock<br />
Finchley<br />
Ocean<br />
Fritchie<br />
Riverlon<br />
Thibodeaux<br />
Linda<br />
Mc Connell<br />
Dallas<br />
Wooddale<br />
Exchange<br />
Bocage<br />
Beaumont<br />
Bishop Ott<br />
Linda<br />
Realtors<br />
Rienzi<br />
Boyce<br />
Gilbert<br />
Conway<br />
Reco<br />
Airline<br />
Franwood<br />
Wooddale<br />
Goodwood<br />
Guy<br />
Bocage<br />
Mc Carroll<br />
Tom<br />
Gladewood<br />
Albert<br />
Independence<br />
Lasalle<br />
Dove Hollow<br />
Harry<br />
Galloway<br />
Normandy<br />
Oak<br />
Wayside<br />
Owen<br />
Landwood<br />
Airport<br />
Athens<br />
Lils<br />
Madrid<br />
Fernwood<br />
Paris<br />
Commerce<br />
Thornwood<br />
Carter<br />
Argosy<br />
Nouvelle<br />
Colonial<br />
Berlin<br />
Harry<br />
Parkland<br />
Kelwood<br />
Charmaine<br />
Barnett<br />
Plaza<br />
Florline<br />
Chevelle<br />
Kiowa<br />
Southview<br />
Wrenwood<br />
Airway<br />
Souter<br />
Roseneath<br />
Shirley<br />
Shadows<br />
Brentwood<br />
Connells Park<br />
Tara<br />
Chatawa<br />
Trinity<br />
Cortana<br />
Florida<br />
Airline<br />
Wakefield<br />
Oakley<br />
Scarlett<br />
Vine<br />
Old Hammond<br />
Oak Villa<br />
Choctaw<br />
Florida<br />
Meadowood<br />
Fairway<br />
Broadmoor<br />
Crescent<br />
Trudeau<br />
Tallyho<br />
Vista<br />
Carmen<br />
Alameda<br />
Crater Lake<br />
Contour<br />
Great Smokey<br />
Delmar<br />
Belcaro<br />
San Lo<br />
Drusilla<br />
Darryl<br />
Tams<br />
Ventura<br />
Pomona<br />
Riveroaks<br />
Meredith<br />
Parkview<br />
Keaty<br />
Vega<br />
Berkeley<br />
Tampa<br />
Cuyhanga<br />
Mollylea<br />
Donna<br />
Woodbine<br />
Greenbriar<br />
Cammy<br />
Lindale<br />
El Cajon<br />
Florida<br />
Havana<br />
Cottondale<br />
Fenway<br />
Brookline<br />
Corinth<br />
Elite<br />
Purvis<br />
Chalma<br />
Donald<br />
Judi<br />
Interline<br />
I-12<br />
East Baton Rouge Parish<br />
Legend<br />
Area Designated for<br />
Physical Inspection<br />
Phase I<br />
0 1,600 3,200 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002A.MXD SGELPI 11/15/2010 11:24:18<br />
q<br />
Airline Hwy. - Goodwood Blvd.<br />
Phase I<br />
Figure 3-4a<br />
SGC-R-0002A<br />
Project Vicinity Map
Woodvine<br />
Whitter<br />
Juban<br />
Alello<br />
Monet<br />
Maribel<br />
Lobdell<br />
Cyril<br />
Carter<br />
Shawn<br />
Airway<br />
Frances Harriet<br />
Monterrey<br />
Cora<br />
Marilyn<br />
Elizabeth<br />
Aletha<br />
Lonita<br />
Milnor<br />
Sharp<br />
Bea<br />
Gum<br />
Sam<br />
Tee<br />
Cal<br />
Pioneer<br />
Aubin<br />
Gwen<br />
American<br />
Sterling<br />
Winbourne<br />
Ruby<br />
Waverly<br />
Brookstown<br />
Michelli<br />
Williamson<br />
Ardenwood<br />
Glenwood<br />
Bunker Hill<br />
Potomac<br />
Howell<br />
Pino<br />
Roselyn<br />
Foch<br />
Ridge<br />
Dahlia<br />
Azam<br />
Arden<br />
Government<br />
I-10<br />
Guilford<br />
Perkins<br />
Sheldon<br />
Winn<br />
Citiplace<br />
Executive Park<br />
Elgin<br />
Jefferson<br />
Stratford<br />
Marion<br />
Carrollton<br />
Smiley<br />
Renoir<br />
Congress<br />
Harry<br />
Corporate<br />
Peggy<br />
Moss Side<br />
Calumet<br />
Industrial<br />
Cezanne<br />
Goya<br />
Van Gogh<br />
Carrollton<br />
Conley<br />
Audubon<br />
Victoria<br />
Donmoor<br />
Burden<br />
Keed<br />
Croydon<br />
Sevenoaks<br />
Joliet<br />
Lasalle<br />
Woodstock<br />
Murphy<br />
Svendson<br />
Industrial<br />
Lubbock<br />
Bon Marche<br />
Exchange<br />
Finchley<br />
Mc Connell<br />
Ocean<br />
Lanier<br />
Dallas<br />
Wooddale<br />
Goodwood<br />
Thibodeaux<br />
Linda<br />
Reco<br />
Realtors<br />
Linda<br />
Rienzi<br />
Guy<br />
Bocage<br />
Boyce<br />
Richards<br />
Gerlando<br />
Lone Oak<br />
Oak View<br />
Tom<br />
Landwood<br />
Albert<br />
Independence<br />
Dove Hollow<br />
Harry<br />
Oak<br />
Owen<br />
Sholar<br />
Airport<br />
Paris<br />
Commerce<br />
Carter<br />
Lils<br />
Fernwood<br />
Thurman<br />
Nouvelle<br />
Office Park<br />
Essen<br />
Berlin<br />
Harry<br />
Kelwood<br />
Colonial<br />
Lasalle<br />
Argosy<br />
Plaza<br />
Rainbow<br />
Chevelle<br />
Oak Crest<br />
Kiowa<br />
Florline<br />
Southview<br />
Brentwood<br />
Greenwell Springs<br />
Joyce<br />
Tara<br />
Barnett<br />
Essen Heights<br />
Souter<br />
United Plaza<br />
Connells Park<br />
Chatawa<br />
Airline<br />
Scarlett<br />
I-12<br />
Oakley<br />
Wartelle<br />
Drusilla<br />
Woodcrest<br />
Wakefield<br />
Forest Hill<br />
Fairway<br />
Fleet<br />
Oak Villa<br />
Choctaw<br />
Cortana<br />
Trinity<br />
Downing<br />
Joor<br />
Crestaire<br />
Broadmoor<br />
Crescent<br />
Carmen<br />
Alameda<br />
Chelsea<br />
Kimberly<br />
Meadowood<br />
Vine<br />
Vista<br />
Riveroaks Alameda<br />
Strand<br />
Great Smokey<br />
San Lo<br />
Florida<br />
Contour<br />
Mammoth<br />
Ventura<br />
Pomona<br />
Donna<br />
Riveroaks<br />
Parkview<br />
Interline<br />
Baker<br />
Pine Park<br />
Syble<br />
Cuyhanga<br />
Mollylea<br />
Van<br />
Bluebonnet<br />
Big Bend<br />
Platt<br />
Perdue<br />
Elain<br />
Darryl<br />
Gerald<br />
Cletus<br />
Tams<br />
Harvey<br />
Kenlee<br />
Browning<br />
Cynthia<br />
Diane<br />
Judi<br />
Delcourt<br />
Cammy<br />
Singletary<br />
Purvis<br />
Partridge<br />
Warren<br />
Graham<br />
Grand Teton<br />
El Cajon<br />
Coronado<br />
Elite<br />
Brookline<br />
Bluebonnet<br />
Teddy<br />
Ridgetop<br />
Byrd<br />
Presidio<br />
Inniswold<br />
Patio<br />
Regency<br />
Marilyn<br />
Madeline<br />
Willow Bay<br />
Fiesta<br />
St Regis<br />
Daradele<br />
Floynell<br />
Jo Anne<br />
Tampa<br />
Mayfair<br />
Winston<br />
Ballina<br />
Cashel<br />
Woodhaven<br />
Silverest<br />
Gwenadele<br />
Allyson<br />
Tudor<br />
Elaine<br />
Florida<br />
Old Hammond<br />
Lebanon<br />
Ridgely<br />
Seracedar<br />
Cedarcrest<br />
Coursey<br />
Toledo Bend<br />
Acorn<br />
Red Oak<br />
Shermoor<br />
Arnold<br />
Sinclair<br />
Mayfair<br />
Voorhies<br />
Ann<br />
Dual<br />
Robin Hood<br />
Marlbrook<br />
Airline<br />
Tinley<br />
Major Oaks<br />
Aubinwood<br />
Lava Bed<br />
Ericson<br />
Stanley Aubin<br />
Jeffrey<br />
Braeburn<br />
Catalpa<br />
Burgess<br />
Mead<br />
Cavalier<br />
Redlands<br />
Chalice<br />
Bellfort<br />
Southpark<br />
Toulon<br />
Ocala<br />
Richcroft<br />
Stan<br />
Glenda<br />
Glenhaven<br />
Vieux<br />
E Heck<br />
Muriel<br />
Bard<br />
Pamela<br />
Boardwalk<br />
Sylvan<br />
Little John<br />
Archery<br />
Sheraton<br />
Westfork<br />
Paddock<br />
Jockey Club<br />
Fuller<br />
Big Bend<br />
Florida<br />
Darryl<br />
Catalina<br />
Sherwood Forest<br />
Nassau<br />
Kay<br />
Sherbrook<br />
Millburn<br />
King Richard<br />
Dabney<br />
Harrells Ferry<br />
Baylor<br />
Auburn<br />
Southfork<br />
Vickers<br />
Parkside<br />
Eastgate<br />
East Baton Rouge Parish<br />
Legend<br />
Area Designated for<br />
Physical Inspection<br />
Phase II<br />
0 2,100 4,200 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGC-R-0002B.MXD SGELPI 11/15/2010 11:25:57<br />
q<br />
Airline Hwy. - Goodwood Blvd.<br />
Phase II<br />
Figure 3-4b<br />
SGC-R-0002B<br />
Project Vicinity Map
Brookstown<br />
Topaz<br />
Garnet<br />
Juban<br />
Evangeline<br />
Shelley<br />
Clayton<br />
Sherwood<br />
Victory<br />
Hope<br />
Clayton<br />
Victoria<br />
Cyrus<br />
Beechwood<br />
Joseph<br />
Levera<br />
St Andrew<br />
Prescott<br />
Foster<br />
Dayton<br />
Hazelwood<br />
Linden<br />
Heidel<br />
Airline<br />
Eleanor<br />
Mohican<br />
Elm<br />
Fairwoods<br />
Conrad<br />
Charles<br />
Brookstown<br />
Calumet<br />
Winbourne<br />
Eaton<br />
Mission<br />
Addison<br />
Wilmot<br />
Frey<br />
Jean<br />
Ritterman<br />
Voss<br />
Underwood<br />
Osborne<br />
Kincaid<br />
Dougherty<br />
Bootsie<br />
Mc Clelland<br />
Shelley<br />
Clayton<br />
Cyrus<br />
Fairwoods<br />
Bicentennial<br />
Winnebago<br />
Linden<br />
Howell Park<br />
Hendricks<br />
Eaton<br />
Wyandotte<br />
Wyandotte<br />
Cleo<br />
Eleanor<br />
Ozark<br />
Conley<br />
Victoria Garden<br />
Bradley<br />
Bradley<br />
Wilmot<br />
Blackwell<br />
Ruby<br />
Ardenwood<br />
Howell<br />
Michelli<br />
Ritterman<br />
Underwood<br />
Nellie<br />
Osborne<br />
Kincaid<br />
Lambert<br />
Sheldon<br />
Elgin<br />
Clinton<br />
Anita<br />
Nellie<br />
Anita<br />
Conley<br />
Greenwell Springs<br />
Melon<br />
Victoria<br />
Choctaw<br />
Industrial<br />
Monroe<br />
Adams<br />
Madison<br />
Adams<br />
Pino<br />
Confidence<br />
Smiley<br />
Choctaw<br />
Augustus<br />
Sobers<br />
Rhodes<br />
Washington<br />
Mission<br />
Martin<br />
Harelson<br />
Jefferson<br />
Fairfields<br />
Jackson<br />
Washington<br />
Bahm<br />
Paulson<br />
Roselyn<br />
Blackberry<br />
Williamson<br />
Blueberry<br />
Callahan<br />
Lobdell<br />
44th<br />
46th<br />
49th<br />
Foster<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGC-R-0003.MXD SGELPI 10/21/2009 12:54:24<br />
Area Designated for<br />
Physical Inspection<br />
0 750 1,500 Feet<br />
q<br />
Ardenwood Dr.- Winbourne St.<br />
SGC-R-0003<br />
Project Vicinity Map<br />
Figure 3-5
48th<br />
49th<br />
Chippewa<br />
Iroquois<br />
Seneca<br />
Iroquois<br />
Delaware<br />
Bartlett<br />
Eaton<br />
Mission<br />
Osborne<br />
Kincaid<br />
Dougherty<br />
Foster<br />
Choctaw<br />
Monroe<br />
Monroe<br />
Adams<br />
37th<br />
Adams<br />
Adams<br />
Belfair<br />
Rhodes<br />
Adams<br />
Madison<br />
Madison<br />
39th<br />
Carleton<br />
Bateman<br />
Belfair<br />
Martin<br />
Fairfields<br />
Jackson<br />
Bahm<br />
Mission<br />
Jackson<br />
Barrow<br />
Rice<br />
Washington<br />
Harelson<br />
Jefferson<br />
Washington<br />
Jefferson<br />
41st<br />
Amos<br />
Noah<br />
Noah<br />
46th<br />
Greenwell Springs<br />
Paulson<br />
47th<br />
40th<br />
Noah<br />
43rd<br />
Gus Young<br />
Urban<br />
Cain<br />
38th<br />
Billops<br />
Provost<br />
Pitcher<br />
42nd<br />
43rd<br />
44th<br />
Hermitage<br />
37th<br />
Valcour<br />
36th<br />
Odell<br />
Odell<br />
Waverly<br />
Leighton<br />
Columbus Dunn<br />
35th<br />
Zion<br />
Rosedown<br />
Acadian<br />
39th<br />
Jonah<br />
Foster<br />
Parlange<br />
Jonah<br />
40th<br />
32nd<br />
Ruth<br />
Afton<br />
Melrose<br />
North<br />
48th<br />
Kernan<br />
Laurel<br />
Main<br />
Saguaro<br />
Main<br />
Maywood<br />
Wabash<br />
Wabash<br />
Bernardo<br />
Lofaso<br />
Live Oak<br />
Roselawn<br />
Laurel<br />
Tuscaloosa<br />
Beck<br />
49th<br />
Laurel<br />
Florida<br />
Asphodel<br />
Fairfax<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGC-R-0004.MXD SGELPI 10/21/2009 13:03:51<br />
Area Designated for<br />
Physical Inspection<br />
0 590 1,180 Feet<br />
q<br />
N. 38th St. - Gus Young Ave.<br />
SGC-R-0004<br />
Project Vicinity Map<br />
Figure 3-6
Burbank<br />
Wylie<br />
Kenilworth<br />
Kenilworth<br />
G S R I<br />
Menlo<br />
Amesbury<br />
Copperfield<br />
Rodney<br />
Hammatt<br />
Albert Hart<br />
Boone<br />
Baird<br />
Maxine<br />
Magnolia Wood<br />
Highland<br />
Menlo<br />
Castle Kirk<br />
Kimbro<br />
Staring<br />
Nolen<br />
Highpoint<br />
Halfway Tree<br />
Worth<br />
Kingcrest<br />
Worthington Lake<br />
Wild Valley<br />
Windward<br />
Elysian<br />
Southlawn<br />
Arcadia<br />
Flora<br />
Sabine<br />
Sabine<br />
Flatsway<br />
Roundhill<br />
Rhine<br />
Windingway<br />
Lila<br />
Tracy Lee<br />
Gulf South<br />
Hadley<br />
Meadow Bend<br />
Bayou Fountain<br />
Stoney Creek<br />
Fox Run<br />
Highland Creek<br />
Governor<br />
Heatherwood<br />
Renee<br />
Kevel<br />
Emerald<br />
Myrtle View<br />
Myrtle Hill<br />
Knox Hill<br />
River<br />
Nicholson<br />
Helm<br />
Keel<br />
Starwood<br />
Skysail<br />
Port<br />
Gardere<br />
Mast<br />
Mariner<br />
Longwood View<br />
Starboard<br />
Ned<br />
Amanda<br />
Leake<br />
Anne Marie<br />
Rush<br />
General Jackson<br />
Longwood <strong>Plan</strong>tation<br />
General Lee<br />
General Taylor<br />
Pascagoula<br />
Crosscreek<br />
Seabord<br />
Fountain<br />
Old Hermitage<br />
General Adams<br />
General Mouton<br />
Bimini<br />
Coy<br />
Jasper<br />
St Croix<br />
Elvin<br />
Glerma<br />
Jade<br />
Pecan Tree<br />
Parkway<br />
Springlake<br />
Springbrook<br />
Springwind<br />
Springdale<br />
Springhaven<br />
Westhaven<br />
Winterhaven<br />
Springcrest<br />
Springpark<br />
Hillmont<br />
Springvalley<br />
Springridge<br />
Hillglen<br />
Hillgate<br />
Bluebonnet<br />
Hillshire<br />
Hilltree<br />
Hillmont<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0001.MXD SGELPI 11/9/2010 11:19:41<br />
Area Designated for<br />
Physical Inspection<br />
0 1,250 2,500 Feet<br />
q<br />
Burbank Dr. - Gardere Ln.<br />
SGL-R-0001<br />
Project Vicinity Map<br />
Figure 3-7
Wylie<br />
Seyburn<br />
Daventry<br />
Menlo<br />
Highland Park<br />
Palmetto<br />
Sedley<br />
Boone<br />
Amesbury<br />
Beckenham<br />
Chippenham<br />
Leycester<br />
Rodney<br />
Watford<br />
Cardiff<br />
Copperfield<br />
Tipperary<br />
Bromley<br />
Stoneliegh<br />
Kenilworth<br />
Palmetto<br />
Louray<br />
Albert Hart<br />
Aries<br />
Maxine<br />
Delaville<br />
Chandler<br />
Harts Mill<br />
Baird<br />
Applewood<br />
Castle Kirk<br />
Thoreau<br />
Walden<br />
Chandler<br />
Staring<br />
Lake Calais<br />
Theron<br />
Leonard<br />
Avis<br />
Arcadia<br />
Savanna View<br />
Flora<br />
Kimbro<br />
Clear Lake<br />
Charleston<br />
Sharynwood<br />
Village Park<br />
Mayfair Hill<br />
Kings Hill<br />
Mary Evers<br />
Bellonia<br />
Doolittle<br />
Elysian<br />
Southlawn<br />
Chanadia<br />
Gurlie<br />
Balboa<br />
Thayer<br />
Hyacinth<br />
Sabine<br />
Roundhill<br />
Vienna<br />
Lansington<br />
Samoa<br />
Madeira<br />
Chanadia<br />
Perkins<br />
Burbank<br />
Hammatt<br />
Bontura<br />
Magnolia Wood<br />
Menlo<br />
Kimbro<br />
Nolen<br />
Highpoint<br />
Worth<br />
Halfway Tree<br />
Rustwood<br />
Wild Valley<br />
Worthington Lake<br />
Sabine<br />
Lake Donna<br />
Mohawk<br />
Flatsway<br />
Bookerline<br />
Rhine<br />
Windingway<br />
Hickorylake<br />
Myrtlelake<br />
Oak Hills<br />
Skysail<br />
Port<br />
Mast<br />
Stern<br />
Ned<br />
Starboard<br />
Hadley<br />
John Henry<br />
G S R I<br />
Meadow Bend<br />
Fountain View<br />
Stoney Creek<br />
Lochness<br />
Misty Creek<br />
Bayou Fountain<br />
Seabord<br />
Highland Creek<br />
Jade<br />
Heatherwood<br />
Fox Run<br />
Gardere<br />
Coy<br />
G S R I<br />
Elvin<br />
Onter<br />
Renee<br />
Kingcrest<br />
Rainford<br />
Kevel<br />
Westhaven<br />
Winterhaven<br />
Windward<br />
Emerald<br />
Springhaven<br />
Myrtle View<br />
Myrtle Hill<br />
Knox Hill<br />
Bluebonnet<br />
Kentshire<br />
Hidden Lake<br />
Highland<br />
Shady Lake<br />
High Lake<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0002.MXD SGELPI 11/9/2010 11:20:34<br />
Area Designated for<br />
Physical Inspection<br />
0 1,000 2,000 Feet<br />
q<br />
Staring Ln - Boone Dr.<br />
SGL-R-0002<br />
Project Vicinity Map<br />
Figure 3-8
Issac Cline<br />
Etta<br />
Campus<br />
Dean Lee<br />
Princeton<br />
Cornell<br />
L S U<br />
Lakeshore<br />
Yale<br />
Henry Adams<br />
Ben Hur<br />
Delgado<br />
Tulane<br />
Newcomb<br />
Clara<br />
Stanford<br />
Highland<br />
Ben Hur<br />
Lakeshore<br />
Nicholson<br />
Lee<br />
Burgin<br />
Stuart<br />
Bengal<br />
Loyola<br />
Carriage<br />
Chalet<br />
Lakeshore<br />
Heritage<br />
Ferndale<br />
Bancroft<br />
Marigold<br />
Morning Glory<br />
Floyd<br />
Palm<br />
Pickett<br />
Cloverdale<br />
Burbank<br />
Nelson<br />
Menlo<br />
Wylie<br />
Pollard<br />
Tipperary<br />
Boone<br />
Perkins<br />
Quail<br />
Kenilworth<br />
Louray<br />
Rodney<br />
Hood<br />
Whitehaven<br />
Aberdeen<br />
Carl<br />
Dubois<br />
Sunset<br />
Chandler<br />
Balis<br />
Orchid<br />
Arrowhead<br />
Mimosa<br />
Sweetbriar<br />
Woodstone<br />
College<br />
Tupello<br />
Edinburgh<br />
Woodgate<br />
Dentation<br />
Glasgow<br />
Bennington<br />
Columbine<br />
Highland Park<br />
Dahlia<br />
Chippenham<br />
Congress<br />
Beckenham<br />
Daventry<br />
Leycester<br />
Bromley<br />
Guilford<br />
Albert Hart<br />
Stoneliegh<br />
Trenton<br />
Stratford<br />
Moss Side<br />
Baird<br />
Maxine<br />
Castle Kirk<br />
Magnolia Wood<br />
Peggy<br />
Burden<br />
Pikes<br />
Kimbro<br />
Seyburn<br />
Hibiscus<br />
Tarrytown<br />
Orion<br />
I-10<br />
Irene<br />
Staring<br />
Cedardale<br />
Forge<br />
Cloverdale<br />
Bourbon<br />
Helvetia<br />
Hood<br />
Jolly<br />
Mc Donald<br />
Stephens<br />
Leeward<br />
University Highlands<br />
College Hill<br />
Menlo<br />
Guava<br />
Sassy<br />
Rubin<br />
Leeward<br />
Hyacinth<br />
Bennett<br />
Ryan<br />
Bluebell<br />
Boone<br />
Poplar<br />
Knollwood<br />
Woodruff<br />
Boone<br />
Brame<br />
Bluebell<br />
Millstone<br />
Millgate<br />
Kenilworth<br />
Concord<br />
Whitehaven<br />
Fieldgate<br />
Fieldgate<br />
Whitlow<br />
Jamestown<br />
Pointer<br />
Woodchase<br />
Rothmer<br />
Seyburn<br />
Revere<br />
Yorktown<br />
Elmcrest<br />
Brandywine<br />
Lexington<br />
Clematis<br />
Palmetto<br />
Saratoga<br />
Monmouth<br />
Potomac<br />
Forsythia<br />
Amesbury<br />
Cardiff<br />
Copperfield<br />
Columbine<br />
Chandler<br />
Hammatt<br />
Krista<br />
Stokes<br />
Quail Run<br />
Palmetto<br />
Blendon<br />
Overton<br />
Delaville<br />
Menlo<br />
Applewood<br />
Walden<br />
Harts Mill<br />
Thoreau<br />
Bella<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGL-R-0003.MXD SGELPI 11/9/2010 11:23:44<br />
Area Designated for<br />
Physical Inspection<br />
0 1,400 2,800 Feet<br />
q<br />
Kenilworth Blvd. - Boone Dr.<br />
SGL-R-0003<br />
Project Vicinity Map<br />
Figure 3-9
Oakmoss<br />
Maribel<br />
Benson<br />
Kilona<br />
Lanier<br />
Fernwood<br />
Rome<br />
Airway<br />
Marydon<br />
Courtland<br />
Farrington<br />
Monterrey<br />
Redondo<br />
Cora<br />
Sunnybrook<br />
Warren<br />
Elmwood<br />
Palermo<br />
Aletha<br />
Palisades<br />
Sharp<br />
Pasadena<br />
Gum<br />
Sam<br />
Pin Oak<br />
Tee<br />
Hillmont<br />
Dual<br />
Bomer<br />
Dan<br />
Loring<br />
Hartford<br />
Clairmont<br />
Atlanta<br />
Percy<br />
Davlin<br />
Tioga<br />
Greenwell<br />
Phebus<br />
Riffel<br />
Charlene<br />
El Scott<br />
Astoria<br />
Savoy<br />
Bryant<br />
Hanks<br />
Dancy<br />
Videt Polk<br />
Ridgewood<br />
Dickens<br />
Ridgewood<br />
Evan Brooks<br />
Tree Trunk<br />
Monet<br />
Greenwell Spgs Rd Ra<br />
Bon Marche<br />
Industrial<br />
Scobell<br />
Lubbock<br />
Exchange<br />
Lobdell<br />
Harry<br />
Wooddale<br />
Prescott<br />
Greenwell Spgs<br />
Beaumont<br />
Dallas<br />
Bishop Ott<br />
Realtors<br />
Reco<br />
Oak View<br />
Gerlando<br />
Airline<br />
Franwood<br />
Lone Oak<br />
Albert<br />
Tom<br />
Gladewood<br />
Royalwood<br />
Harry<br />
Wooddale<br />
Greenway<br />
Landwood<br />
Bern<br />
Gay<br />
Greentree<br />
Athens<br />
Madrid<br />
Paris<br />
Commerce<br />
Berlin<br />
Harry<br />
Greenmoss<br />
Airway<br />
Dutsch<br />
Oak Crest<br />
Florline<br />
Souter<br />
Kiowa<br />
Joor<br />
Greenwell Springs<br />
Oak Villa<br />
Choctaw<br />
Tracy<br />
Great Smokey<br />
Mammoth<br />
Ventura<br />
Cuyhanga<br />
Elain<br />
Olympic<br />
Florida<br />
Big Bend<br />
Platt<br />
Ridgemont<br />
Edgemont<br />
CortanaJoyce<br />
Syble<br />
Woodcrest<br />
Chatawa<br />
Woodglynn<br />
Florida<br />
Centerway<br />
Crestaire<br />
Alameda<br />
Alameda<br />
Kimberly<br />
Fellsway<br />
Vega<br />
Delmar<br />
Belcaro<br />
San Lo<br />
Swingalong<br />
Redwood<br />
Syble<br />
Graham<br />
El Cajon<br />
Coronado<br />
Tampa<br />
Castlewood<br />
Pomona<br />
Westerly<br />
Grand Teton<br />
Mesa Verde<br />
Havana<br />
Jamaica<br />
Manitou<br />
Yosemite<br />
Orlando<br />
Byrd<br />
Vega<br />
Redondo<br />
Chalma<br />
Yellowstone<br />
Meeker<br />
Marilyn<br />
Presidio<br />
San Jauquin<br />
Patio<br />
Fiesta<br />
Alpha<br />
Beta<br />
Gamma<br />
Jo Anne<br />
San Clemente<br />
Perdue<br />
Coronado<br />
Tampa<br />
Ballina<br />
David<br />
Karen<br />
Cashel<br />
Harvey<br />
Florida<br />
Nelwyn<br />
Canyonland<br />
Darryl<br />
Gerald<br />
Cletus<br />
Tams<br />
White Oak<br />
Casa Grande<br />
Acorn<br />
Red Oak<br />
Mc Gehee<br />
Mollylea<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGU-R-0001.MXD SGELPI 11/9/2010 11:25:18<br />
Area Designated for<br />
Physical Inspection<br />
0 1,400 2,800 Feet<br />
q<br />
Oak Villa Blvd. - Choctaw St.<br />
SGU-R-0001<br />
Project Vicinity Map<br />
Figure 3-10
Frances Harriet<br />
Monterrey<br />
Redondo<br />
Carlsbad<br />
Cora<br />
Carolyn Sue<br />
Palermo<br />
Marilyn<br />
Elizabeth<br />
Brocade<br />
Madras<br />
Aletha<br />
Woodhaven<br />
Palisades<br />
Lonita<br />
Allyson<br />
Broadmoor<br />
Sharp<br />
Gum<br />
Sam<br />
Pin Oak<br />
Tee<br />
Eileen<br />
Sinclair<br />
Bellridge<br />
Stonegate<br />
Vieux<br />
Braeburn<br />
Bellfort<br />
Burgess<br />
Sherwood Forest<br />
Elbert<br />
Little John<br />
Mike<br />
Harco<br />
Hampton<br />
Raton<br />
Grand Teton<br />
Mesa Verde<br />
Great Smokey<br />
Chalma<br />
Yellowstone<br />
Mammoth<br />
Perdue<br />
Dual<br />
Richcroft<br />
Meeker<br />
Vega<br />
Vega<br />
Riveroaks<br />
Van<br />
Airline<br />
Donna<br />
Meredith<br />
Parkview<br />
Lindale<br />
Redondo<br />
Berkeley<br />
Choctaw<br />
Castlewood<br />
Woodbine<br />
Southmoor<br />
Greenbriar<br />
Cammy<br />
El Cajon<br />
Coronado<br />
Tampa<br />
Ventura<br />
Havana<br />
Jamaica<br />
Pomona<br />
Cottondale<br />
Elite<br />
Damuth<br />
Van<br />
Manitou<br />
Cuyhanga<br />
Broadmoor<br />
Van<br />
Judi<br />
Sierra Vista<br />
Damuth<br />
Diane<br />
East Baton Rouge Parish<br />
Summit Ridge<br />
Chateau<br />
Madeline<br />
Regency<br />
Presidio<br />
Coronado<br />
San Jauquin<br />
Patio<br />
Capri<br />
Woodhaven<br />
Fiesta<br />
Mollylea<br />
Legend<br />
Ballina<br />
Cashel<br />
San Clemente<br />
Tampa<br />
David<br />
Karen<br />
Barbara<br />
White Oak<br />
Tudor<br />
Harvey<br />
Allyson<br />
Kenlee<br />
Rhapsody<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SGU-R-0002.MXD SGELPI 11/9/2010 11:28:16<br />
Woodhaven<br />
Firelight<br />
Gerald<br />
Parkview<br />
Grandeur<br />
Cletus<br />
Tams<br />
Red Oak<br />
Lynell<br />
Browning<br />
Elaine<br />
Melanie<br />
Classique<br />
Acorn<br />
Black Oak<br />
Florida<br />
Rondo<br />
Mc Gehee<br />
Shermoor<br />
Heather<br />
Area Designated for<br />
Physical Inspection<br />
Green Oak<br />
Ranchwood<br />
0 1,200 2,400 Feet<br />
Heatherview<br />
Hedgewood<br />
Bellglade<br />
Voorhies<br />
q<br />
Darryl<br />
Green Oak<br />
Florida<br />
Major Oaks<br />
Tinley<br />
Catalpa<br />
Robin Hood<br />
Marlbrook<br />
Tifton<br />
Burton<br />
Chalice<br />
Oak<br />
Marcia<br />
Glenhaven<br />
Charington<br />
Silverton<br />
Muriel<br />
Gwen<br />
Bellrose<br />
Dartmoor<br />
Darryl<br />
Glenda<br />
Ashbourne<br />
Stan<br />
Bard<br />
Blackoak<br />
Fairoak<br />
Willow Oak<br />
Florida<br />
Sylvan<br />
Parkwood<br />
Rosedale<br />
Dumont<br />
Pamela<br />
Archery<br />
Robinhood<br />
Fairhaven<br />
Millburn<br />
Sheraton<br />
King Richard<br />
Old Hammond<br />
Shady Oaks<br />
Twin Oak<br />
Fair Oak<br />
Nassau<br />
Sherbrook<br />
Westbrook<br />
Vickers<br />
Dabney<br />
Kay<br />
Erlanger<br />
Shannon<br />
Nile<br />
Dawn<br />
Tamari<br />
Wilton<br />
Havenwood<br />
Warfield<br />
Wingate<br />
Goodwood<br />
La Margie<br />
Stacy<br />
Cristy<br />
Glenhaven<br />
Stockton<br />
Millburn<br />
Warwick<br />
Lorna<br />
Cate<br />
Shay<br />
Parnell<br />
Fairhaven<br />
Sheraton<br />
Brookshire<br />
Queensbury<br />
Buckingham<br />
Beauverde<br />
Tams<br />
Boulevard de Province<br />
La Annie<br />
Shadydale<br />
Robbie<br />
Longbow<br />
Montgomery<br />
Lea Ann<br />
Marque Ann<br />
Duchess<br />
King John<br />
Arlingford<br />
Lockhaven<br />
Sherbrook<br />
Pelham<br />
Harco<br />
Robinhood<br />
Parnell<br />
Parkwood<br />
Bristol<br />
Elva<br />
Sharp Rd. - Florida Blvd.<br />
SGU-R-0002<br />
Project Vicinity Map<br />
Figure 3-11<br />
I-12
Aletha<br />
Fiesta<br />
Palisades<br />
Lonita<br />
Sharp<br />
Gum<br />
Edgemont<br />
Sam<br />
Tee<br />
Acorn<br />
Aubin<br />
Lassen<br />
Tinley<br />
Green Ridge<br />
Gwen<br />
Sterling<br />
Mike<br />
Harco<br />
Steffek<br />
Millerville<br />
Fountainbleau<br />
Laurie Lynne<br />
Boreas<br />
Balsawood<br />
Hammond Manor<br />
O'Neal<br />
Crossbow<br />
Godfrey<br />
Brillock<br />
Triple B<br />
Greenwell Springs<br />
Cherryl<br />
Winterset<br />
Goodland<br />
Mapleton<br />
Parkin<br />
Fryers<br />
Frenchtown<br />
Chanove<br />
Maison<br />
Bayonne<br />
Lesage<br />
Chambord<br />
Chinon<br />
Chaumont<br />
Dry Creek<br />
Bristle Cone<br />
Thibodeaux<br />
Morgan<br />
Erin<br />
Canterbury<br />
Shamrock<br />
Country<br />
<strong>Plan</strong>chet<br />
Coral<br />
Nelwyn<br />
Rainier<br />
Monticello<br />
Kilkenny<br />
Langer<br />
Catalina<br />
Langlois<br />
Sarasota<br />
Hillmont<br />
Pasadena<br />
Norwich<br />
Flamingo<br />
Platt<br />
Elain<br />
Perdue<br />
Jo Anne<br />
Cashel<br />
Riveroaks<br />
Woodhaven<br />
Silverest<br />
Allyson<br />
Big Bend<br />
Darryl<br />
Cletus<br />
Tams<br />
Red Oak<br />
Harvey<br />
Kenlee<br />
Browning<br />
Tudor<br />
Elaine<br />
Heather<br />
Old Hammond<br />
Lebanon<br />
Cedarcrest<br />
Mc Gehee<br />
Voorhies<br />
Lava Bed<br />
Dual<br />
Sherwood Forest<br />
Goodwood<br />
Major Oaks<br />
Braeburn<br />
Ericson<br />
Redlands<br />
Chalice<br />
Darius<br />
Stan<br />
Catalpa<br />
Bellfort<br />
Mead<br />
Fort Meyers<br />
Toulon<br />
Richcroft<br />
Bard<br />
Glenda<br />
Muriel<br />
Ocala<br />
Darryl<br />
Archery<br />
Mollylea<br />
Catalina<br />
Little John<br />
Sylvan<br />
Sheraton<br />
Boardwalk<br />
Florida<br />
Pamela<br />
Manorwood<br />
Kay<br />
Baylor<br />
Auburn<br />
Vickers<br />
Dabney<br />
Westbrook<br />
King Richard<br />
Merritt<br />
Eastgate<br />
Havenwood<br />
Mendenhal<br />
Warfield<br />
Nile<br />
Shay<br />
Tamari<br />
Wingate<br />
Stockton<br />
Choctaw<br />
Arlingford<br />
Robinhood<br />
Millburn<br />
Warwick<br />
Lancelot<br />
Britain<br />
Ireland<br />
La Margie<br />
Buckingham<br />
Province<br />
Galahad<br />
Tams<br />
Elva<br />
Woodland Ridge<br />
Woodcliff<br />
Windsor<br />
Kirkley<br />
Elwick<br />
Trammell<br />
Flannery<br />
Allan<br />
Holt<br />
Sunnyhill<br />
Rushmore<br />
Darilyn<br />
Ponderosa<br />
Parwood<br />
Tonya<br />
Astolat<br />
Mallory<br />
Kimmeridge<br />
Torrey Pine<br />
Franbill<br />
Damon<br />
Katherine<br />
Azalea Pk<br />
Foxlane<br />
Fairview<br />
Florida<br />
Lilac<br />
Woodbrook<br />
Holly<br />
Mora<br />
Birmingham<br />
Breton<br />
Avalon<br />
Palmwood<br />
Versailles<br />
Choctaw<br />
Bailey<br />
Chimneywood<br />
Firewood<br />
Lily<br />
Jester<br />
Stonewood<br />
General Prentiss<br />
Terrell<br />
Marjorie<br />
Gloria<br />
Rhonda<br />
Aspenwood<br />
Woodmoss<br />
Monica<br />
Lirocchi<br />
Woodvale<br />
O Neal<br />
Hamilton<br />
Hill<br />
Frontage<br />
Hewwood<br />
London<br />
Vermillion<br />
Amite<br />
Stevendale<br />
Coliseum<br />
Derby<br />
Strain<br />
Centurion<br />
Caesar<br />
Bristoe<br />
Ellis<br />
Harrells Ferry<br />
Blouin<br />
Riverview<br />
Deer Lake<br />
Lakepark<br />
Hoyt<br />
Riverside Park<br />
Chariot<br />
I-12<br />
Pompey<br />
Cicero<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SGU-R-0003.MXD SGELPI 10/21/2009 12:57:32<br />
Area Designated for<br />
Physical Inspection<br />
0 2,300 4,600 Feet<br />
q<br />
Flannery Rd. - Florida St.<br />
SGU-R-0003<br />
Project Vicinity Map<br />
Figure 3-12
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2 South Gravity System Capacity Improvements Projects<br />
3.2.1 SGU-C-0001 (Multiple PSs - Florida Blvd - Sherwood Forest Blvd)<br />
The SGU-C-0001 (Multiple PSs – Florida Blvd – Sherwood Forest Blvd) project has been<br />
combined with SGC-C-0001 (Airline Highway-Florida Blvd – PS 30 Improvements and New<br />
Pump Station). The combined project has been designated SGC-C-0001 (Florida Blvd PS<br />
Improvements) and is described in Section 3.2.6.<br />
3.2.2 SGU-C-0002 (Airline Highway - Interstate 12)<br />
The SGU-C-0002 (Airline Highway – Interstate 12) project has been combined with SGC-C-<br />
0002 (Airline Highway-Jefferson Highway) and SGC-C-0003 (Essen Lane-Interstate 12)<br />
projects. The combined project has been designated SGC-C-0002 (Airline Highway Pipeline<br />
Improvements) project and is described in Section 3.2.7.<br />
3.2.3 SGU-C-0003 (Sherwood Forest Blvd- Goodwood Blvd Pipeline<br />
Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) project<br />
includes the upgrade of gravity sewers upstream of PS 13, PS 50, PS 21, PS 31, and PS 101 to<br />
alleviate SSOs.<br />
Location<br />
The gravity sewer replacements that comprise this project are located near the intersections<br />
of Florida Blvd and Sherwood Forest Drive, and are shown in Figure 3-13.<br />
Gravity segment 050-00619 to 050-00682 starts on Sharp Lane near the Tams Drive<br />
intersection. The gravity segment travels north and turns east at Tams Drive. The line<br />
continues east until reaching 050-00682, located on Tams Drive between the Gum Street and<br />
Pin Oak Street intersections.<br />
Gravity segment 050-00480 to 050-00924 starts near the Elizabeth Drive and South Riveroaks<br />
Drive intersection. The gravity segment travels east along a drainage to 050-00150, south<br />
along a drainage to 050-00168, and east parallel to Riveroaks Drive to 050-00909 where it<br />
then continues southeast along Sharp Road until reaching 050-00924.<br />
Gravity segment 050-00400A to 050-00837 starts on Goodwood Blvd near Westbrook Drive.<br />
The gravity line travels west along Goodwood Blvd until reaching 050-00837, located near<br />
Sherwood Forest Drive and Goodwood Blvd intersection.<br />
Gravity segment 050-00392 to 050-00280 starts on Pamela Drive. The gravity line travels<br />
southwest until reaching 050-00390, northwest until reaching 050-00388, and west until<br />
reaching 050-00280, located northwest of the Glenda Drive and Sherwood Forest Blvd<br />
intersection.<br />
Gravity segment 050-00280 to 050-00272 starts northwest of Glenda Drive and Sherwood<br />
Forest Blvd intersection. The gravity line travels south until reaching 050-00272, located<br />
northwest of the Florida Blvd and North Sherwood Forest Drive intersection.<br />
GNV31031158547.DOCX/103440004 3-23 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 013-00002 to 013-00001 starts north of the intersection of Elizabeth Drive<br />
with River Oaks Drive. The gravity line travels west until reaching 013-00001, located near<br />
PS 13.<br />
Gravity segment 013-00049 to PS 13 starts near the Marilyn Drive and Mollylea Drive<br />
intersection. The gravity segment travels south until reaching 013-00012 and then traveling<br />
east until reaching PS 13. PS 13 will be upgraded as part of SGC-C-0001 (Florida Blvd PS<br />
Projects).<br />
Gravity segment 021-00009 to PS 21 starts southwest of the Warfield Avenue and Windsor<br />
Drive intersection. The gravity segment travels southeast along Windsor Drive, crossing<br />
Florida Blvd until reaching 021-00001F. The gravity line continues west parallel to Florida<br />
Blvd until reaching PS 21, located near the Florida Blvd and Shelby Drive intersection.<br />
Gravity segment 101-00024 to PS 101 starts south of the Darwin Avenue and South Flannery<br />
Road intersection. The gravity segments travels west until reaching 101-00018, southeast<br />
until reaching 101-00016, east until reaching 101-00014, and then southeast along Brinwood<br />
Avenue until reaching PS 101. PS 101 is located northeast of the Goodwood Blvd and<br />
Brinwood Avenue intersection.<br />
Gravity segment 031-00035 to 031-00030 starts southwest of the Robinhood Drive and Little<br />
John Drive intersection. The gravity segment travels east until reaching 031-00033 and then<br />
southwest parallel to Little John Drive until reaching 031-00030. The segment ends<br />
northwest of the Little John Drive and Mollyea Drive intersection.<br />
Gravity segment 031-00030 to PS 31 starts northeast of Little John Drive and Mollyea Drive<br />
intersection. The gravity segment travels southeast until reaching 031-00006 and then travels<br />
south along the canal parallel to Westbrook Drive until reaching PS 31. PS 31 is located<br />
southeast of the Goodwood Blvd and Westbrook Drive intersection.<br />
Gravity segment 031-00378 to 031-00006 starts southwest of the East Glenhaven Drive and<br />
Wilton Drive intersection. The gravity line travels southwest until reaching 031-00006,<br />
located northeast of the Westbrook Drive and Mollylea Drive intersection.<br />
Gravity segment 031-00442 to 031-00435 starts northwest of the Goodwood Blvd and<br />
Brinwood Avenue intersection. The gravity line travels southwest until reaching 031-00435,<br />
located northeast of the Goodwood Blvd and South Flannery Road intersection.<br />
Gravity segment 031-00435 to 031-00237 starts northeast of South Flannery Road and<br />
Goodwood Blvd. The gravity line travels west until reaching 031-00434, south until reaching<br />
031-00433, and then northwest until reaching 031-00237, following Goodwood Blvd. The<br />
segment ends northeast of the Goodwood Blvd and Trammell Drive intersection.<br />
Gravity segment 031-00237 to 031-00132 starts northeast of the Trammell Drive and<br />
Goodwood Blvd intersection. The gravity line travels northwest along Goodwood Blvd until<br />
reaching 031-00132, located west of the Trammell Drive and Camelot Avenue intersection.<br />
Gravity segment 031-00132 to 031-00112 is located west of the Trammell Drive and Camelot<br />
Avenue intersection. The gravity line travels northwest until reaching 031-00131, north until<br />
reaching 031-00129, and west until reaching 031-00112. The gravity segment ends southeast<br />
of the Fairhaven Drive and Woodcliff Drive intersection.<br />
GNV31031158547.DOCX/103440004 3-24 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 031-00112 to PS 31 starts southeast of the Fairhaven Drive and Woodcliff<br />
Drive intersection. The gravity line travels west until reaching 031-00102, south until<br />
reaching 031-00102A, and then southwest until reaching PS 31. PS 31 is located southeast of<br />
the Westbrook Drive and Goodwood Blvd intersection.<br />
Gravity segment 031-00270 to 031-00112 starts northeast of the East Robinhood Drive and<br />
Woodcliff Drive intersection. The gravity segment travels south until reaching 031-00112,<br />
located southeast of the Fairhaven Drive and Woodcliff Drive intersection.<br />
Gravity segment 031-00299 to 031-00289 starts southeast of the Arlingford Avenue and<br />
Shelby Drive intersection The gravity line travels south until reaching 031-00289, located<br />
northeast of the Archery Drive and Woodcliff Drive intersection.<br />
Gravity segment 031-00330 to 031-00299 starts east of the Norma Court and Shelby Drive<br />
intersection. The gravity line travels south until reaching 031-00299, located southeast of the<br />
Arlingford Avenue and Shelby Drive intersection.<br />
Gravity segment 031-00330A to 031-00330 starts southeast of the Shelby Drive and Florida<br />
Blvd intersection. The gravity line travels south until reaching 031-00330, located east of the<br />
Norma Court and Shelby Drive intersection.<br />
Forcemain segment PS21FM to 031-00330A starts near Florida Boulevard. The forcemain<br />
segment travels south until reaching 031-00330A, located southeast of the Shelby Drive and<br />
Florida Blvd intersection.<br />
Scope<br />
The scope of this project is shown in Table 3-2. This project includes the construction of<br />
approximately 8,400 feet of 15-inch, 21-inch, 24-inch, and 36-inch gravity sewer upstream of<br />
PS 50, approximately 950 feet of 12-inch and 15-inch gravity sewer upstream of PS 13,<br />
approximately 2,100 feet of 18-inch gravity sewer upstream of PS 21, approximately 2,000<br />
feet of 10-inch gravity sewer upstream of PS 101, and approximately 13,800 feet of 10-inch,<br />
12-inch, 15-inch, 18-inch, 21-inch, 24-inch, and 36-inch gravity sewer and forcemain<br />
upstream of PS 31.<br />
TABLE 3-2<br />
SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
050-00619 050-00682 1,000 15 24<br />
050-00480 050-00924 2,000 8 and 12 15<br />
050-00400A 050-00837 2,800 18 36<br />
050-00392 050-00280 2,400 12 21<br />
050-00280 050-00272 1,200 15 or 18 24<br />
013-00002 013-00001 150 8 12<br />
Comments<br />
013-00049 PS13 800 8 and 10 15 PS Replacement under SGC-C-0001<br />
(Florida Blvd PS Improvements)<br />
021-00009 PS21 2,100 12 and 15 18 Crosses Florida Blvd; PS will be<br />
upgraded in SGC-C-0001 (Florida<br />
Blvd PS Improvements)<br />
GNV31031158547.DOCX/103440004 3-25 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-2<br />
SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
101-00024 PS101 2,000 8 10<br />
031-00035 031-00030 1,100 8 15<br />
Comments<br />
031-00030 PS 31 2,600 8 to 12 21 PS upgraded in SGC-C-0001 (Florida<br />
Blvd PS Improvements)<br />
031-00378 031-00006 80 8 12 Crosses drainage canal<br />
031-00442 031-00435 670 8 10<br />
031-00435 031-00237 930 8 and 12 12<br />
031-00237 031-00132 260 10 15<br />
031-00132 031-00112 550 10 to 12 18<br />
031-00112 PS31 3,400 21 36<br />
031-00270 031-00112 2,600 18 24<br />
031-00289 031-00270 740 8 18<br />
031-00299 031-00289 320 15 18<br />
031-00330 031-00299 670 15 18<br />
031-00330A 031-00330 340 15 18<br />
PS21FM 031-00330A 310 8 10 Forcemain<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $11,200,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2013.<br />
Design and Construction Not Started.<br />
GNV31031158547.DOCX/103440004 3-26 JANUARY 2011<br />
REV. 5
Marilyn<br />
Elizabeth<br />
Brocade<br />
Aletha<br />
Madras<br />
Sharp<br />
Gum<br />
Tinley<br />
Gwen<br />
Friar Tuck<br />
Bellfort<br />
Burgess<br />
#<br />
Harco<br />
Harco<br />
Big Bend<br />
#<br />
PS16<br />
#<br />
#<br />
PS293<br />
#<br />
Sierra Vista<br />
Capri<br />
Mammoth<br />
Perdue<br />
050-00619<br />
Darryl<br />
Gerald<br />
Cletus<br />
!R !R<br />
050-00682<br />
Dual<br />
Oak<br />
PS359<br />
#<br />
Chalice<br />
Tams<br />
Catalpa<br />
#<br />
#<br />
PS89<br />
#<br />
Tamari<br />
Vickers<br />
PS314<br />
Mike<br />
Stacy<br />
La Annie<br />
Warfield<br />
Cristy<br />
Choctaw<br />
Lorna<br />
#<br />
!R<br />
PS169<br />
021-00009<br />
Flannery<br />
PS295<br />
#<br />
Rushmore<br />
Orlando<br />
Van<br />
!R<br />
#<br />
#<br />
!R!R!R<br />
PS81<br />
Ballina<br />
013-00049<br />
PS13<br />
Riveroaks<br />
!R<br />
#<br />
PS51AA<br />
013-00001 050-00924<br />
Woodhaven<br />
Goodwood<br />
Allyson<br />
Firelight<br />
East Baton Rouge Parish<br />
Parkview<br />
Kenlee<br />
Browning<br />
Ranchwood<br />
#<br />
PS370<br />
Red Oak<br />
Major Oaks<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
Stonegate<br />
Tifton<br />
050-00272<br />
Tinley<br />
!R<br />
!R<br />
050-00837<br />
!R<br />
Bellrose<br />
#<br />
Muriel<br />
050-00280<br />
PS50<br />
Sherwood Forest<br />
Millburn<br />
Sheraton<br />
Archery<br />
Robinhood<br />
Manorwood<br />
!R<br />
#<br />
!R<br />
031-00030<br />
050-00392<br />
PS151<br />
031-00035<br />
Kay<br />
#<br />
#<br />
!R<br />
!R<br />
!R<br />
!R<br />
!R<br />
!R !R 031-00006<br />
050-00203<br />
!R<br />
#<br />
!R<br />
!R<br />
!R!R<br />
Parkwood<br />
PS31A<br />
Dabney<br />
Erlanger<br />
Wilton<br />
031-00378<br />
PS87<br />
Millburn<br />
PS21FM<br />
031-00330<br />
031-00299<br />
Robinhood<br />
Parnell<br />
Glenhaven<br />
Mollylea<br />
Parkwood<br />
Sherbrook<br />
Fairhaven<br />
Warwick<br />
Elva<br />
!R<br />
Woodcliff<br />
PS21<br />
031-00330A<br />
031-00289<br />
031-00270<br />
031-00435<br />
#<br />
!R<br />
!R<br />
031-00442<br />
031-00132 031-00237<br />
Elwick<br />
Parnell<br />
#<br />
PS227<br />
#!R<br />
!R<br />
PS448<br />
#<br />
PS163<br />
#<br />
101-00024<br />
§¨¦ I-12<br />
Holt<br />
PS101<br />
#<br />
Legend<br />
Sherwood Forest Blvd. - Goodwood Blvd.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Pipeline Projects<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SGU-C-0003<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-13<br />
0 1,000 2,000<br />
Feet
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.4 SGU-C-0004 (Goodwood Blvd - South Flannery Road)<br />
The SGU-C-004 (Goodwood Blvd – South Flannery Road) project has been combined with<br />
SGU-C-0003 (Florida Blvd-Sherwood Forest Blvd) from the October 2008 PDP. The<br />
combined project has been designated SGC-C-0003 (Sherwood Forest Blvd-Goodwood Blvd<br />
Pipeline Improvements) project and is described in Section 3.2.3.<br />
3.2.5 SGU-C-0005 (Oak Villa Blvd - Monterey Blvd Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) project includes<br />
the upsizing of the gravity sewer upstream of PS 16, PS 50, and PS 51 and the forcemain<br />
from PS 16, which is being upgraded as part of the SGC-C-0001 (Florida Blvd PS<br />
Improvements) project.<br />
Location<br />
The gravity sewer replacements that comprise the SGU-C-0005 project are located northeast<br />
of Airline Highway and Florida Blvd, and along Sherwood Forest Blvd, south of Florida<br />
Boulevard Road, and are shown in Figure 3-14.<br />
Gravity segment 051-00222 to 051-00196 starts southeast of the Kimberly Drive and<br />
Kimberly Way intersection. The gravity segment travels east until reaching 051-00196,<br />
located northwest of the Monterrey Drive and Great Smokey Avenue intersection.<br />
Gravity segment 016-00002 to PS 16 starts southwest of the Jo Anne Drive and Big Bend<br />
Avenue intersection. The gravity line travels south until reaching PS 16, located northeast of<br />
the Jo Anne Drive and Great Smokey Avenue intersection.<br />
Gravity segment 051-00467 to 051-00196 starts southeast of the Syble Drive and Monterrey<br />
Drive intersection. The gravity line travels south until reaching 051-00196, located northwest<br />
of the Great Smokey Avenue and Monterrey Drive intersection.<br />
Gravity segment 051-00196 to 051-00169 starts northwest of the Great Smokey Avenue and<br />
Monterrey Drive intersection. The gravity line travels south until reaching 051-00169,<br />
located northwest of the Great Smokey Avenue and Monterrey Drive intersection.<br />
Gravity segment 051-00169 to 051-00168 starts northwest of the Great Smokey Avenue and<br />
Monterrey Drive intersection. The gravity line travels south until reaching 051-00168,<br />
located northwest of the Mammoth Avenue and Monterrey Drive intersection.<br />
Gravity segment 051-00168 to 051-00070 starts northwest of the Mammoth Avenue and<br />
Monterrey Drive intersection. The gravity line travels south until reaching 051-00070, located<br />
near Mammoth Avenue between its intersections with Monterrey Drive and Needham Drive.<br />
Gravity segment 051-00070 to PS 51 starts near Mammoth Avenue between its intersections<br />
with Monterrey Drive and Needham Drive. The gravity line travels east along the north side<br />
of the drainage channel until reaching PS 51, located north of Cuyhanga Parkway and Sierra<br />
Vista Drive intersection.<br />
Gravity segment DS16 to 051-00169 starts at the intersection of Kings Canyon Drive and<br />
Great Smokey Avenue. The segment travels south behind the row of houses on the south side<br />
of Great Smokey Avenue, heading northeast behind four houses before it doubles back on<br />
its same path and goes southwest and then straight west behind the houses south of Great<br />
Smokey Avenue. It ends at manhole 051-00169 on Monterrey Drive, just northwest of its<br />
intersection with Great Smokey Avenue.<br />
GNV31031158547.DOCX/103440004 3-28 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 051-00364B to 051-00070 starts north of a drainage canal near Cortana<br />
Place. The gravity segment travels southeast until reaching 051-00077, and then east until<br />
reaching 051-00070. The gravity segment ends near Mammoth Avenue between its<br />
intersection with Monterrey Drive and Needham Drive.<br />
Gravity segment 051-00369 to 051-00364B starts above the drainage canal near Airway Drive.<br />
The gravity segment travels east until reaching 051-00364B, located north of Cortana Place.<br />
Gravity segment 050-00837 to 050-00300A starts near Sherwood Forest Blvd and Goodwood<br />
Blvd intersection. The gravity line travels south along Sherwood Forest Blvd until reaching<br />
051-00300, and then west until reaching 050-00300A. The segment ends northwest of the<br />
Sherwood Forest Blvd and Major Oaks Drive intersection.<br />
The SGU-C-0005 (Oak Villa Blvd – Monterey Blvd) project also includes the replacement of<br />
the PS 16 forcemain. This forcemain is located along Great Smokey Drive near JoAnne<br />
Drive. The forcemain travels southwest along Great Smokey Avenue until reaching DS16,<br />
located near the King Canyon Drive and Great Smokey Avenue intersection.<br />
Scope<br />
This project includes construction of approximately 380 feet of 18-inch gravity sewer<br />
upstream of PS 16, approximately 2,600 feet of 42-inch gravity sewer upstream of PS 50, and<br />
approximately 16,700 feet of 18-inch, 21-inch, 24-inch, 30-inch, and 42-inch gravity sewer<br />
upstream of PS 51. This project also includes approximately 950 feet of 8-inch forcemain<br />
from PS 16. The full scope of this project is shown in Table 3-3.<br />
TABLE 3-3<br />
SGU-C-0005 (Oak Villa Blvd – Monterey Blvd Sewer Area Upgrades) – Pipeline Information<br />
US Node DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
051-00222 051-00196 1,400 12 18<br />
016-00002 PS16 380 10 18 Influenced by the SGC-C-0001 (Florida Blvd PS<br />
Improvements) project in which PS 16 will be<br />
upgraded<br />
051-00467 051-00196 1,500 12 18<br />
051-00196 051-00169 260 15 21<br />
051-00169 051-00168 680 15 24<br />
051-00168 051-00070 3,300 15 30<br />
051-00070 PS51 1,500 18 42 Crosses Choctaw Drive and the railway just north<br />
of Choctaw Drive This segment will need to be<br />
coordinated with the PS51 upgrade as part of the<br />
NFW-C-0002 (Choctaw Storage and Pump<br />
Station Facility) Project<br />
DS16 051-00169 3,200 10 18<br />
051-00364B 051-00070 3,300 15 24<br />
051-00369 051-00364B 1,600 15 21<br />
050-00837 050-00300A 2,600 24 42<br />
PS16 DS16 950 6 8 Forcemain<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $9,000,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2013.<br />
Design and Construction Not Started.<br />
GNV31031158547.DOCX/103440004 3-29 JANUARY 2011<br />
REV. 5
Rome<br />
Airway<br />
Oak Villa<br />
Courtland<br />
Vega<br />
Cora<br />
Marilyn<br />
Elizabeth<br />
Sharp<br />
Gum<br />
Tinley<br />
Burgess<br />
Greentree<br />
Athens<br />
Madrid<br />
#<br />
Paris<br />
Tom<br />
Harry<br />
Airline<br />
Dutsch<br />
Oak Crest<br />
Souter<br />
!R<br />
Joyce<br />
Kiowa<br />
Greenwell Springs<br />
051-00369<br />
Choctaw<br />
051-00364B<br />
!R<br />
Cortana<br />
Woodglynn<br />
Crestaire<br />
#<br />
#<br />
!R<br />
!R !R<br />
!R<br />
Alameda<br />
PS98<br />
051-00222<br />
Vega<br />
Monterrey<br />
!R<br />
Redondo<br />
PS18<br />
#<br />
051-00467<br />
Grand Teton<br />
051-00196<br />
051-00169<br />
Mammoth<br />
051-00168<br />
El Cajon<br />
Coronado<br />
Tampa<br />
051-00070<br />
!R !R<br />
#<br />
Havana<br />
Jamaica<br />
Big Bend<br />
Orlando<br />
PS51<br />
Capri<br />
#<br />
#<br />
DS16<br />
!R<br />
PS81<br />
PS25<br />
Perdue<br />
Ballina<br />
016-00002<br />
#<br />
!R PS16<br />
!R #<br />
#<br />
Darryl<br />
#<br />
PS51AA<br />
Elain<br />
Dual<br />
#<br />
PS359<br />
#<br />
Gerald<br />
Cletus<br />
Chalice<br />
Tams<br />
Oak<br />
Catalpa<br />
Red Oak<br />
#<br />
PS293<br />
Richcroft<br />
#<br />
PS89<br />
Archery<br />
Robinhood<br />
#<br />
Wynnewood<br />
Mollylea<br />
Donna<br />
Woodbine<br />
Bracewell<br />
Airway<br />
#<br />
Tifton<br />
Tinley<br />
Airport<br />
Colonial<br />
Tara<br />
#<br />
PS323<br />
Wakefield<br />
Riveroaks<br />
Riveroaks<br />
Meredith<br />
Parkview<br />
Van<br />
Goodwood<br />
Southmoor<br />
Greenbriar<br />
Cammy<br />
Damuth<br />
Van<br />
Parkview<br />
Kenlee<br />
Browning<br />
#<br />
PS370<br />
Major Oaks<br />
!R<br />
!R #<br />
050-00837<br />
Millburn<br />
Sheraton<br />
PS50 050-00300A<br />
#<br />
East Baton Rouge Parish<br />
Crescent<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
Diane<br />
Judi<br />
Firelight<br />
Legend<br />
Proposed<br />
Existing<br />
Oak Villa Blvd. - Monterrey Blvd.<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SGU-C-0005<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-14<br />
0 1,050 2,100<br />
Feet
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.6 SGC-C-0001 (Florida Blvd PS Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGC-C-0001 (Florida Blvd PS Improvements) project includes those improvements that<br />
were previously included in SGU-C-0001 (Multiple Pump Stations-Florida Blvd - Sherwood<br />
Forest Blvd) and SGC-C-0001 (Airline Highway - Florida Blvd PS 30 Improvements and new<br />
pump station). This combined project includes upgrades of PS 13, PS 16, PS 18, PS 21, PS 30,<br />
PS 31, PS 50, and PS 66, and the construction of a new pump station (PS 5xx) to alleviate<br />
SSOs in their upstream basins.<br />
PS 51 was originally part of the SGU-C-0001 (Multiple PSs – Florida Blvd – Sherwood Forest<br />
Blvd) project and was moved to the NFW-C-0002 (Choctaw Storage and Pump Station<br />
Facility) project.<br />
Location<br />
The locations for the pump stations are presented in Table 3-4 and are shown in Figure 3-15.<br />
Scope<br />
The scope of this project is described in Table 3-4. PS 13, PS 16, PS 18, PS 21, PS 30, PS 31, PS 50,<br />
and PS 66 will be replaced. The new pump station (PS 5xx) will be located at or near manhole 058-<br />
01106, conveying all flow from the gravity system upstream directly to PS 58 through a new 30-<br />
inch forcemain will be constructed as part of project SGC-C-0002 (Airline Highway Pipeline<br />
Improvements) project. This new pump station and forcemain will be constructed to alleviate<br />
peak wet weather flow exceedances in the gravity system downstream of the new pump station.<br />
TABLE 3-4<br />
SGC-C-0001 (Florida Blvd Pump Station Improvements) – Pump Station Information<br />
Future Peak<br />
Existing Max. Wet Weather<br />
Capacity (GPM) Flow (GPM)<br />
PS No.<br />
PS 13<br />
PS 16<br />
PS 18<br />
PS 21<br />
PS 31<br />
PS 50<br />
PS 66<br />
PS 30<br />
New PS<br />
(PS 5xx)<br />
Location<br />
Intersection of Elizabeth Drive and<br />
River Oaks Drive<br />
Intersection of Great Smokey<br />
Avenue and JoAnne Drive<br />
Intersection of Monterrey Avenue<br />
and Swingalong Avenue<br />
Near Florida Blvd. at intersection<br />
of Shelby Drive<br />
Goodwood Boulevard near<br />
Havenwood Boulevard<br />
Intersection Major Oaks Road and<br />
Sherwood Forest Boulevard<br />
Comal Drive, near intersection of<br />
Erlanger Drive<br />
Tom Drive near intersection of<br />
Dallas Drive<br />
North of Tara Boulevard and Old<br />
Hammond Highway<br />
Dry<br />
Weather<br />
Flow<br />
1,042 1,389 158<br />
972 1,249 187<br />
625 777 44.4<br />
1,389 2,249 619<br />
2,083 7,500 1,330<br />
7,291 21,375 4,190<br />
833 1,937 556<br />
624 1,096 273<br />
Comments<br />
New 19,543 3,145 Located at or near<br />
MH 058-01106<br />
Note: The existing maximum capacity for the existing pump stations was obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $ 14,500,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design and Construction Not Started.<br />
GNV31031158547.DOCX/103440004 3-31 JANUARY 2011<br />
REV. 5
Lobdell<br />
Cyril<br />
Cora<br />
Maribel<br />
#<br />
Lanier<br />
Gerlando<br />
#I<br />
#<br />
#<br />
#<br />
#<br />
Reco<br />
#<br />
PS55<br />
PS30<br />
Wooddale<br />
PS11<br />
#<br />
#<br />
PS30<br />
Independence<br />
Rienzi<br />
Goodwood<br />
Oak<br />
PS335<br />
Prescott<br />
Airport<br />
#<br />
Carter<br />
PS83<br />
Joor<br />
Oak Villa<br />
Cortana<br />
#<br />
#<br />
#<br />
#<br />
BPS503 # PS454<br />
#<br />
# #<br />
PS222<br />
# # # #<br />
PS281<br />
PS18 #<br />
#I<br />
#<br />
#<br />
#<br />
#<br />
PS16<br />
#I<br />
#<br />
PS16<br />
PS293<br />
# PS359<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#I<br />
#<br />
#<br />
PS81<br />
#<br />
#I<br />
#<br />
#<br />
#<br />
Wakefield<br />
PS17<br />
#<br />
#I<br />
#<br />
PS116<br />
PS5XX<br />
PS5XX<br />
Choctaw<br />
Cuyhanga<br />
Donald<br />
PS288<br />
PS13<br />
#<br />
#<br />
Sharp<br />
#<br />
#I<br />
#<br />
PS50<br />
#<br />
#<br />
Aubin<br />
Toulon<br />
PS328<br />
Bard<br />
Catalpa<br />
Archery<br />
#<br />
#I<br />
#<br />
PS50<br />
#I<br />
#<br />
Mike<br />
PS31<br />
#<br />
PS66<br />
Lancelot<br />
Stacy<br />
Langer<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS334<br />
PS169<br />
#<br />
PS380<br />
PS77<br />
#<br />
Flannery<br />
PS227<br />
PS121<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS21<br />
PS163<br />
§¨¦ I-12<br />
#<br />
#<br />
PS448<br />
PS156<br />
PS270<br />
#<br />
#<br />
#<br />
#<br />
#<br />
East Baton Rouge Parish<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
Legend<br />
#<br />
Proposed<br />
Existing<br />
Florida Blvd. PS Projects<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SGC-C-0001<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-15<br />
0 2,000 4,000<br />
Feet
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.7 SGC-C-0002 (Airline Highway Pipeline Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGC-C-0002 (Airline Highway Pipeline Improvements) project includes those segments<br />
previously included in SGC-C-0003 (Essen Lane - Interstate-12) and SGU-C-0002 (Airline<br />
Highway - Interstate 12) from the October 2008 PDP. The project includes the following:<br />
<br />
<br />
<br />
Upsizing of the gravity sewer upstream of PS 58 to alleviate SSOs in the vicinity of the<br />
gravity sewer and pump station.<br />
Upsizing of the gravity sewers upstream of PS 50 and PS 66 and construction of new<br />
forcemains at PS 66 and PS 50 to address upstream SSOs.<br />
Construction of a new forcemain from the new pump station (PS 5xx), described in SGC-<br />
C-0001 (Florida Blvd Pump Station Improvements project), to the manifold point with<br />
the new forcemain from PS 50.<br />
Construction of a new forcemain from the manifold point to PS 58.<br />
Location<br />
The gravity sewers to be replaced under the SGC-C-0002 project are located near the<br />
intersection of Interstates 10 and 12, Old Hammond Highway, and north toward Airline<br />
Highway, and are shown in Figure 3-16.<br />
Gravity segment 058-00036 to 058-00015 starts northeast of the intersection of McCarroll<br />
Drive and Claret Drive, north of Interstate 12. The gravity segment travels south crossing<br />
Interstate 12 until reaching 058-00029. The gravity segment then travels southeast until<br />
reaching 058-00021, and southwest along Essen Lane until reaching 058-00015, located<br />
northeast of the North Essen Heights Court and Essen Lane Intersection.<br />
Gravity segment 058-00586 to 058-00523 starts near the intersection of South Seracedar Street<br />
and Cedarcrest Avenue and travels south on Cedarcrest Avenue until reaching 058-00523. The<br />
gravity segment ends northeast of the Cedarcrest Avenue and Airline Highway intersection.<br />
Section 058-00523 to 058-00501 starts northeast of the Cedarcrest Avenue and Airline<br />
Highway intersection. The gravity segment travels southwest until reaching 058-00501,<br />
located west of the Airline Highway and Cedarcrest Avenue intersection.<br />
Section 058-00501 to 058-00479 starts west of the Airline Highway and Cedarcrest Avenue.<br />
intersection. The gravity segment travels southwest until reaching 058-00430, south along<br />
Bea Drive until reaching 058-00440 near Jefferson Highway, west until reaching 058-00446,<br />
and south until reaching 058-00479, located east of the Idlewood Drive and Ridgely Road<br />
intersection.<br />
Gravity segment PS250DS to 058-00479 starts east of the Landsbury Avenue and Hackberry<br />
Drive intersection. The gravity segment travels northwest until reaching 058-00479, located<br />
east of the Idlewood Drive and Ridgely Road intersection.<br />
Gravity segment 058-00479 to 058-00490 starts east of the Idlewood Drive and Ridgely Road<br />
intersection. The gravity line travels northwest along a drainage canal until reaching 058-<br />
00490, located south of the Inniswold Road and Jefferson Highway intersection.<br />
Segment 058-00490 to 058-00017 starts south of the Inniswold Road and Jefferson Highway<br />
intersection. The gravity line travels northwest crossing Bluebonnet Blvd and travels along<br />
GNV31031158547.DOCX/103440004 3-33 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
the canal. At 058-00499, the gravity segment travels southwest along Bluebonnet Road until<br />
reaching 058-00219. At the intersection of Oliphant Road and Bluebonnet Road, the segment<br />
travels west to the drainage canal west of Drusilla Drive. The segment then travels north<br />
along the canal, crosses the canal, and ends at 058-00017 near the North Essen Heights Court<br />
and East Essen Heights Court intersection.<br />
Gravity segment 058-01316 to 058-01310 starts west of North Donmore Avenue between<br />
intersections with Goya Avenue and Cezanne Avenue. The gravity segment travels south<br />
along Donmore Avenue until reaching 058-01310 located on Donmore Avenue between<br />
intersections with Rembrandt Avenue and Harry Avenue.<br />
Gravity segment 058-01318 to 058-01316 starts west of North Donmore Avenue between<br />
intersections with Renoir Avenue and Cezanne Avenue. The gravity segment travels south<br />
along Donmore until reaching 058-01316, located on Donmore Avenue between<br />
intersections with Goya Avenue and Cezanne Avenue.<br />
Gravity segment 058-03110 to 058-03116 starts near the Wooddale Blvd and Tom Drive<br />
intersection. The gravity segment travels southwest until reaching 058-03116, located east of<br />
the Tom Drive and Lobdell Blvd intersection.<br />
Gravity segment 058-03116 to 058-03117 starts east of the Tom Drive and Lobdell Blvd<br />
intersection. The gravity segment travels northwest until reaching 058-03117.<br />
Gravity segment 058-03117 to 058-03118 starts east of the Tom Drive and Lobdell Blvd<br />
intersection. The gravity segment travels west until reaching 058-03118.<br />
Gravity segment 058-03118 to 058-03124 starts at the Tom Drive and Lobdell Blvd<br />
intersection. The gravity segment travels west until reaching 058-03124, located west of Tom<br />
Drive and Lobdell Blvd intersection.<br />
Gravity segment 058-04039 to 058-04041A starts near the cul-de-sac of W E Heck Court and<br />
travels west through an industrial area to manhole 058-04041A, which is located near the<br />
intersection of Cedarcrest Avenue and Airline Highway.<br />
Gravity segment 058-00016E to 058-00011E starts at the end of the PS 66 forcemain and<br />
travels south until reaching 058-00014E. The segment travels west until reaching 058-00011E,<br />
located northeast of Sherwood Forest Blvd and North Harrells Ferry intersection.<br />
Segment 058-00011E to 058-02653 starts east of Sherwood Forest Blvd. The gravity segment<br />
travels west until reaching 058-00005E. The line travels north until reaching 058-00002E.The<br />
line travels west to 058-00001E and north until reaching 058-02653, located west of the<br />
Sherwood Forest Blvd and Old Hammond Highway intersection.<br />
Gravity segment 058-01868 to 058-01862 starts northeast of Airline Highway (North) and<br />
North Parkview Drive intersection. The gravity line travels southwest until reaching 058-<br />
01866, southeast until reaching 058-01865, and southwest crossing Airline Highway (North)<br />
until reaching 058-01864. The gravity line travels southeast until reaching 058-01862, located<br />
near the Airline Highway (North) and South Parkview Drive intersection.<br />
Gravity segment 058-02851 to 058-02833 starts northwest of the Parkview Drive and Cora<br />
Drive intersection, traveling south, parallel to Cora Drive, until reaching 058-02833. Segment<br />
058-02833 to 058-02677 starts northwest of Goodwood Blvd and Cora Drive. The gravity<br />
segment travels south, parallel to Cora Drive, and then travels east until reaching 058-02701.<br />
The line travels south until reaching 058-02677, located near the end of Carolyn Sue Drive.<br />
GNV31031158547.DOCX/103440004 3-34 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 058-02478 to 058-02475 starts on Airline Highway near the Gwenadele<br />
Avenue intersection. The gravity segment travels northwest along Airline Highway until<br />
reaching 058-02475, located near Airline Highway and Commonwealth Blvd intersection.<br />
Gravity segment 058-02571 to 058-01395 starts on Cedarcrest Avenue near Bronzebush<br />
Avenue. The segment travels north up to 058-001495 north of the intersection of Cedarcrest<br />
Avenue and Lebanon Drive and then turns west paralleling a drainage canal to manhole<br />
058-01395 on Old Hammond Highway east of Silverest Avenue.<br />
Gravity segment 058-01859 to 058-01851A starts on Airline Highway (North) between its<br />
intersections with South Parkview Drive and Goodwood Blvd. The gravity line travels<br />
southeast until reaching 058-1851A, located near Lindale Avenue and Airline Highway<br />
intersection.<br />
Gravity segment 058-01851A to 058-01850 starts near Lindale Avenue and Airline Highway<br />
intersection. The gravity line travels southeast until reaching 058-01850, located near the<br />
Delcourt Avenue and Airline Highway intersection.<br />
Gravity segment 058-01850 to 058-01850A starts northeast of the Delcourt Avenue and<br />
Airline Highway intersection. The gravity segment travels southeast, towards Delcourt Ave,<br />
until reaching 058-01850A.<br />
Gravity segment 058-01310 to 058-00935 starts at the Harry Drive and Donmoor Avenue<br />
intersection and travels south along Donmoor Avenue until reaching 058-00935 The gravity<br />
segment ends north of the Florida Blvd and Donmore Avenue intersection.<br />
Gravity segment 058-01830 to 058-01826 starts on the west side of Fernwood Avenue. The<br />
gravity line travels south along Fernwood Avenue until 058-01826, located near the Florida<br />
Blvd and Fernwood Avenue intersection.<br />
Gravity segment 058-01335 to 058-00890 starts north of Lils Court and Sevenoaks Avenue<br />
intersection. The gravity line travels north past the end of Lils Court at 058-01337, then<br />
travels southeast until reaching 058-00890, located near the north end of Carter Avenue.<br />
Gravity segment 058-00890 to 058-01132 starts south of Thurman Drive, just north of the<br />
drainage canal. The segment travels north on Thurman Drive until reaching 058-01132,<br />
located south of the Thurman Drive and Goodwood Blvd intersection.<br />
Gravity segment 058-05074 to 058-05006 starts on Murphy Drive north of the Murphy Drive<br />
and Richards Drive intersection. The gravity line travels south until reaching 058-05005,<br />
located south of the Murphy Drive and Richards Drive intersection.<br />
Gravity segment 058-05006 to 058-00349 starts south of Murphy Drive and Richards Drive<br />
intersection. The gravity line travels south until reaching 058-00349, located near the north<br />
side of Interstate 12.<br />
Gravity segment 058-00369 to 058-00004B starts northeast of the Marcel Avenue and Plaza<br />
Drive intersection. The segment travels east down Marcel Avenue, and then southeast across a<br />
golf course, terminating just east of Fairway Drive at 058-00004B.<br />
Gravity segment 058-01171 to 058-01159 starts on Brentwood Drive at the edge of a golf<br />
course. The gravity line travels east across a golf course and crossing Fairway Drive until<br />
reaching 058-01157. The line continues north until reaching 058-01159.<br />
GNV31031158547.DOCX/103440004 3-35 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 058-00497 to 058-00499 starts along Bluebonnet Road between intersections<br />
with Jefferson Highway and French Village Avenue. The gravity line travels south along<br />
Bluebonnet Road until reaching 058-00499.<br />
Gravity segment 058-00481 to 058-00483 starts near the Floynell Drive and Ridgely Road<br />
intersection. The gravity line travels north until reaching 058-00483 near the drainage canal.<br />
Gravity segment 058-00172 to 058-00173 starts south of the Florida Blvd and Marquette<br />
Avenue intersection. The gravity line travels west, parallel to Florida Blvd, until reaching<br />
058-00173.<br />
Gravity segment 058-00173 to 058-00940A starts southwest of the Florida Blvd and South<br />
Carrollton Avenue intersection. The gravity line travels north, crossing Florida Blvd, until<br />
reaching 058-00940A, located north of Florida Blvd between intersections with Marquette<br />
Avenue and South Carrollton Avenue.<br />
Gravity segment 250-00026 to PS250 starts on a drainage path southeast of the intersection<br />
of Jefferson Highway and Auto Plex Drive, near an apartment complex. The segment then<br />
parallels Jefferson Highway along the drainage path to PS 250, which is located just south of<br />
the intersection of Jefferson Highway and Cal Road.<br />
Gravity segment 066-00005 to PS 66 starts on the north side of Interstate 12, off of Harrells<br />
Ferry Road and travels north along the right-of-way of the road leading to PS66 near the<br />
Comal Drive and Erlanger Drive intersection. Gravity segment 066-00088 to PS 66 travels<br />
west from Boulevard de Providence to PS 66.<br />
Gravity segment 066-0087A to 066-00001A starts at Woodland Ridge Boulevard. The line<br />
travels north, crossing Interstate 12, and then west to Blvd de Providence. Segment 066-<br />
00088 to PS 66 travels west from Blvd de Providence to PS 66.<br />
The PS 66 forcemain runs from the upgraded PS 66, described in the SGC-C-0001 (Florida<br />
Blvd PS Improvements) project on Comal Drive travels westward to the termination of the<br />
forcemain at manhole 058-00016E on Sherwood Meadow Drive.<br />
This project includes the construction of a new forcemain from the upgraded PS 50,<br />
upgraded as described in Project SGC-C-0001 (Florida Boulevard PS Improvements). The<br />
segment of forcemain starts at the new location of PS 50 on Old Hammond Highway east of<br />
the intersection of Sherwood Boulevard and Old Hammond Highway, and travels west on<br />
Old Hammond Highway to the manifold point with the forcemain from PS 5XX on Old<br />
Hammond Highway, east of Tara Boulevard.<br />
The forcemain from the new pump station PS 5XX described in SGC-C-0001 (Florida<br />
Boulevard PS Improvements) project starts east of the intersection of Tara Boulevard and<br />
Old Hammond Highway at the BREC Park (PS 5XX location). The forcernain then manifolds<br />
with the forcemain from PS 50 on the south side of Old Hammond Highway and runs south<br />
down Fairway Drive to Interstate 12. The forcemain crosses Interstate 12 to Quarters Lake<br />
Road and follows Quarter Lake Road till it reaches Essen Lane. The forcemain then crosses<br />
Essen Lane and travels south down the ROW of Essen Lane to the wet well of PS58 on Essen<br />
Lane.<br />
The existing gravity line feeding into PS 50 will be relocated as part of this project to the<br />
new location of PS 50 on Old Hammond Highway, east of the intersection of Old Hammond<br />
Highway and Sherwood Boulevard.<br />
GNV31031158547.DOCX/103440004 3-36 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Scope<br />
This project involves replacing 51,360 LF of 10-inch, 12-inch, 15-inch, 18-inch, 21-inch, 24-inch,<br />
27-inch, 36-inch, 42-inch gravity sewer upstream of PS 58; approximately 2,500 LF of 15-inch<br />
and 18-inch gravity sewer upstream of PS 66; approximately 880 LF of 12-inch gravity sewer<br />
upstream of PS 250; approximately 1,860 LF of new 48-inch gravity sewer downstream of<br />
existing location of PS 50; and establishment of 1,280 LF of new 12-inch forcemain from PS 66<br />
to replace existing forcemain and approximately 23,720 LF of new 36-inch and 48-inch<br />
forcemain from PS 50 and PS 5XX to PS 58 in the South Gravity Central Basin.<br />
Additional project details are presented in Table 3-5.<br />
TABLE 3-5<br />
SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
058-00034 058-00015 6,300 18 24 Segment crosses<br />
Interstate 12<br />
058-00586 058-00523 1,900 12 18<br />
058-00523 058-00501 640 12 and 15 21<br />
058-00501 058-00479 2,700 15 27<br />
PS250DS 058-00479 1,100 8 and 15 18<br />
058-00479 058-00490 1,900 15 and 18 36<br />
058-00490 058-00017 8,200 18 and 24 42 Segment has a canal<br />
crossing near Drusilla<br />
Drive<br />
058-01316 058-01310 880 10 15<br />
058-01318 058-01316 350 10 15<br />
058-03110 058-03116 720 12 15<br />
058-03116 058-03117 120 12 15<br />
058-03117 058-03118 420 12 15<br />
058-03118 058-03124 75 12 15<br />
058-04039 058-04041A 550 12 15<br />
058-00011E 058-02653 1,400 12 and 15 24<br />
058-00016E 058-00011E 740 12 21<br />
058-01868 058-01862 840 8 12<br />
058-02851 058-02833 1,140 8 15<br />
058-02833 058-02677 3,870 15 21<br />
058-02478 058-02475 830 8 12<br />
058-02571 058-01395 3,520 8 15<br />
058-01850 058-01850A 80 15 18<br />
058-01851A 058-01850 800 15 18<br />
058-01859 058-01851A 2,230 15 18<br />
058-01310 058-00935 2,000 10 18<br />
058-01830 058-01826 530 10 and 15 21<br />
058-01335 058-00890 460 8 and 10 15<br />
GNV31031158547.DOCX/103440004 3-37 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-5<br />
SGC-C-0002 (Airline Highway Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
058-00890 058-01132 450 12 18 Includes a drainage<br />
cancel crossing<br />
058-05074 058-05006 370 8 15<br />
058-05006 058-00349 270 12 18<br />
058-00369 058-00004B 2,900 18 24 Portion of these gravity<br />
segments go through a<br />
golf course.<br />
058-01171 058-01159 1,800 8 12<br />
058-00497 058-00499 520 8 12<br />
058-00481 058-00483 290 8 12<br />
058-00172 058-00173 330 8 10<br />
058-00173 058-00940A 130 8 12 Includes a crossing under<br />
Florida Blvd<br />
250-00026 PS250 880 10 12<br />
066-00005 066-00002 730 8 15<br />
066-00002 PS66 660 8,10 & 12 18<br />
066-00087A 066-00001A 1,070 8,10 & 12 18<br />
PS 66 066-00005 1,280 8 12 Forcemain Replacement<br />
NEW FM (PS 50)<br />
New PS – PS 5xx<br />
(described in<br />
SGC-C-0001<br />
[Florida Blvd PS<br />
Improvements])<br />
Manifold Pt w/ new<br />
FM from PS 50<br />
Existing PS 50<br />
Manifold Pt<br />
w/ new PS<br />
5xx<br />
Manifold Pt<br />
w/ new FM<br />
from PS 50<br />
10,600 New 36 New forcemain<br />
100 New 36 Forcemain<br />
PS58 13,020 New 48 Forcemain; Crosses both<br />
Interstate 12 and<br />
Interstate 10<br />
New PS 50<br />
location 1858 New 48<br />
Extension of gravity line to<br />
New PS 50 location.<br />
Segment has a crossing<br />
on Old Hammond<br />
Highway<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $35,200,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
GNV31031158547.DOCX/103440004 3-38 JANUARY 2011<br />
REV. 5
Whitter<br />
Monet<br />
Lobdell<br />
Lanier<br />
Cyril<br />
Shawn<br />
Airway<br />
Bea<br />
Aubin<br />
Mike<br />
#<br />
Waverly<br />
#<br />
Michelli<br />
#<br />
Smiley<br />
#<br />
Elgin<br />
Renoir<br />
Conley<br />
Goya<br />
Victoria<br />
!R<br />
!R<br />
Reco<br />
Beaumont<br />
#<br />
PS30<br />
Wooddale<br />
Tom<br />
#<br />
Paris<br />
Landwood<br />
Berlin<br />
Harry<br />
PS83<br />
Kiowa<br />
Choctaw<br />
Oak Villa<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS16<br />
PS293<br />
# Cuyhanga<br />
#<br />
Mammoth<br />
PS81<br />
Perdue<br />
#<br />
PS190<br />
Darryl<br />
#<br />
Harvey<br />
Cletus<br />
Dual<br />
PS359<br />
Tams<br />
Florida<br />
#<br />
Richcroft<br />
#<br />
#<br />
Stan<br />
Bard<br />
Catalpa<br />
Archery<br />
#<br />
#<br />
PS314<br />
Wilton<br />
Stacy<br />
Cristy<br />
Harco<br />
#<br />
#<br />
Woodcliff<br />
PS169<br />
Flannery<br />
#<br />
!R!R!R !R !R<br />
!R !R !R !R<br />
#<br />
#<br />
#<br />
I-10<br />
#<br />
!R!R<br />
#<br />
PS267<br />
Marion<br />
Quail<br />
Marquette<br />
Jefferson<br />
Corporate<br />
PS119<br />
#<br />
Peggy<br />
Orion<br />
PS97<br />
!R<br />
# #<br />
# # #<br />
Kenilworth<br />
Burden<br />
Irene<br />
Walden<br />
Keed<br />
Woodstock<br />
Murphy<br />
#<br />
#<br />
!R<br />
!R<br />
!R<br />
#<br />
#<br />
#<br />
!R<br />
!R<br />
!R !R #<br />
PS335<br />
!R<br />
Pikes<br />
Joliet<br />
East Baton Rouge Parish<br />
Ocean<br />
Dijon<br />
Rienzi<br />
Perkins<br />
Bocage<br />
Boyce<br />
Gilbert<br />
Conway<br />
Goodwood<br />
PS58<br />
PS58A<br />
Essen<br />
Picardy<br />
Proposed<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\RFQ\SGC-C-0002._mpj120610<br />
Airport<br />
!R<br />
#<br />
Anselmo<br />
New Gravity Main<br />
New Force Main<br />
!R<br />
#<br />
Wakefield<br />
PS317<br />
PS17<br />
!R<br />
Drusilla<br />
Summa<br />
!R<br />
!R<br />
!R<br />
#<br />
!R<br />
#<br />
Crescent<br />
Carmen<br />
Legend<br />
³<br />
#<br />
!R<br />
Gail<br />
PS299<br />
!R<br />
!R!R<br />
Hill<br />
#<br />
!R<br />
Donna<br />
#<br />
!R<br />
!R<br />
Interline<br />
Partridge<br />
!R<br />
!R<br />
!R<br />
Cal<br />
#<br />
Mollylea<br />
Bluebonnet<br />
#<br />
#<br />
#<br />
#<br />
#<br />
!R<br />
Sharp<br />
#<br />
!R<br />
!R !R<br />
Oliphant<br />
Reitz<br />
Judi<br />
Existing<br />
0 2,600 5,200<br />
Feet<br />
Hilltrace<br />
Upton<br />
Exist. Gravity<br />
!R<br />
#<br />
#<br />
#<br />
!R<br />
!R !R !R<br />
!R<br />
!R<br />
!R !R<br />
!R<br />
Azrok<br />
Exist. Forcemain<br />
Exist. Pump Station<br />
Manholes\Nodes<br />
Allyson<br />
Mayfair<br />
!R<br />
# # !R<br />
Major Oaks<br />
PS389<br />
#<br />
#<br />
Tinley<br />
Coursey<br />
#<br />
#<br />
#<br />
PS50<br />
#<br />
#<br />
!R<br />
!R !R !R!R !R<br />
Toulon<br />
PS328<br />
PS171<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
I-12<br />
#<br />
#<br />
#<br />
PS134<br />
#<br />
#<br />
Stumberg<br />
#<br />
PS77<br />
PS217<br />
#<br />
##<br />
#<br />
#<br />
#<br />
#<br />
PS147 #<br />
# # PS379<br />
#<br />
#<br />
# #<br />
Airline Highway Pipeline<br />
Improvements Projects<br />
Siegen<br />
King Richard<br />
McCann<br />
Baylor<br />
Havenwood<br />
Investor<br />
Figure 3-16<br />
Parkoaks<br />
Elva<br />
Pecue<br />
Harrells Ferry<br />
Deerpath<br />
Braxton<br />
SGC-C-0002<br />
Project Vicinity Map
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.8 SGC-C-0003 (Essen Lane - Interstate 12)<br />
The SGC-C-0003 (Essen Lan – Interstate 12) project has been combined with SGC-C-0002<br />
(Airline Highway - Jefferson Highway) project and SGU-C-0002 (Airline Highway -<br />
Interstate 12) project from the October 2008 PDP. The combined project has been designated<br />
SGC-C-0002 (Airline Highway Pipeline Improvements) project, and is described in Section<br />
3.2.7.<br />
3.2.9 SGC-C-PS58A (Pump Station 58 Replacement)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The SGC-C-PS58A (Pump Station 58 Replacement) project includes the construction of a<br />
new overflow pump station pump station (PS 58) that will handle the existing flow<br />
conditions and the predicted future wet weather peak flow. The design of a single pump<br />
station was selected as the best design option to meet the long-term needs of the C-P and the<br />
sensitive environmental and aesthetic concerns of the surrounding area. (<br />
The purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream<br />
and downstream basins. This project is related to SGC-C-PS58FM-A (Staring Lane FM Phase<br />
I – Burbank to Highland), SGC-C-PS58FM-B (Staring Lane FM - Phase II – Highland to<br />
Perkins), and SGC-C-PS58FM-C (Staring Lane FM - Phase III – Perkins to PS58) which<br />
involve the construction of the forcemain from PS 58 to the South WWTP.<br />
Location<br />
The project site and existing PS 58 are located at the entrance of the Louisiana State<br />
University Burden Center. The location of PS 58 is shown in Table 3-6 and in Figure 3-17.<br />
Scope<br />
The current PS 58 will not have enough pumping capacity to handle the predicted future<br />
wet weather peak flow. PS 58 shall be replaced with a pump station that will handle both<br />
the existing flow conditions and future wet weather peak flow conditions. The pump station<br />
will pump flow into the downstream gravity system when flows do not exceed 20,870 gpm.<br />
When flows exceed 20,870 gpm, the pump station will pump the excess flow directly to the<br />
South WWTP. The proposed scope is shown in Table 3-6.<br />
TABLE 3-6<br />
SGC-C-PS58A (Pump Station 58 Replacement) – Pump Station Information<br />
Existing Max.<br />
Capacity<br />
PS No.<br />
Location<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry Weather<br />
Flow<br />
(GPM)<br />
PS58 Intersection of Essen Lane and Essen Park New 61,107 208,700<br />
Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $15,800,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Construction Appropriation Year was 2010.<br />
Design is On-Going<br />
GNV31031158547.DOCX/103440004 3-40 JANUARY 2011<br />
REV. 5
I-10<br />
Essen Heights<br />
Essen Heights<br />
#I<br />
PS58<br />
One Calais<br />
Essen Park<br />
Franciscan<br />
Margaret Ann<br />
Essen<br />
Hennessy<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Pump Station 58 Replacement<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SGC-C-PS58A<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-17<br />
0 275<br />
550<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SGC-C-PS58A_mpj120610
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.10 SGC-C-PS58FM-A (Staring Lane FM - Phase I – Burbank Drive to Highland<br />
Road)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGC-C-PS58FM-A (Staring Lane FM-Phase I – Burbank Drive to Highland Road) project<br />
includes the construction of a portion of the new forcemain from the PS 58 overflow pump<br />
station to the South WWTP. The purpose of this project is to relieve SSOs at PS 58 as well as<br />
in the respective upstream basins. The construction of the direct forcemain between PS 58<br />
and the South WWTP alleviates the wet weather flows into existing downstream gravity<br />
pipe, and allows the capacity needed for future flows in the Staring Lane area.<br />
This portion of the new forcemain is being constructed as part of the Green Light <strong>Program</strong><br />
project for the Staring Lane Extension.<br />
Location<br />
This portion of the new forcemain runs along Staring Lane Extension from Burbank Drive to<br />
Highland Road (to the South WWTP), connecting into Staring Lane forcemain.<br />
Scope<br />
The scope of this project is shown in Table 3-7 and in Figure 3-18.<br />
TABLE 3-7<br />
SGC-C-PS58FM-A (Staring Lane FM - Phase I - Burbank Drive to Highland Road) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
Highland Road Burbank Road 2,960 New 64 To be constructed<br />
under Green Light<br />
<strong>Program</strong><br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is$4,616,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2009.<br />
Construction Functionally Complete 2 nd Quarter 2010.<br />
GNV31031158547.DOCX/103440004 3-42 JANUARY 2011<br />
REV. 5
Burbank<br />
PS58_n6<br />
!R<br />
Lochness<br />
Clover Ridge<br />
Summer Grove<br />
#<br />
PS321<br />
Meadow Bend<br />
Stoney Creek<br />
Bonarbridge<br />
Staring Lane P<br />
Highland Creek<br />
Kilt Place<br />
Highland<br />
Heatherwood<br />
Hadley<br />
PS261<br />
#<br />
!R<br />
PS58_n7<br />
Fox Run<br />
John Henry<br />
Fountain View<br />
#<br />
PS279<br />
Gardere<br />
PS58_n8<br />
!R<br />
Bayou Fountain<br />
Governor<br />
Burbank Drive (Segment 1) A<br />
Proposed<br />
#I<br />
New Pump<br />
Stations<br />
New Gravity Main<br />
New Force Main<br />
Green Light Project<br />
Legend<br />
³<br />
#<br />
!R<br />
Existing<br />
Exist. Gravity<br />
Exist. Forcemain<br />
Exist. Pump Station<br />
Manholes\Nodes<br />
Staring Ln. FM - Phase I - Highland Rd.<br />
to Burbank Dr.<br />
SGC-C-PS58FM-A<br />
Project Vicinity Map<br />
Figure 3-18<br />
East Baton Rouge Parish<br />
0 300<br />
600<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.11 SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to Perkins<br />
Road)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road – Perkins Road) project<br />
includes the construction of a portion of the new forcemain from PS 58 to the South WWTP.<br />
The purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream<br />
and downstream basins. The construction of the direct forcemain between PS 58 and the<br />
South WWTP alleviates the wet weather flows into existing downstream gravity pipe, and<br />
allows the capacity needed for future flows in the Staring Lane area.<br />
This portion of the new forcemain will be constructed as part of the Green Light <strong>Program</strong><br />
project for improvements to Staring Lane. The project also includes the construction of a<br />
new 36-inch forcemain exiting PS 57 at Dawson Creek.<br />
Location<br />
This portion of the new forcemain from PS 58 to the South WWTP runs along Staring Lane<br />
from Dawson Creek to Highland Road. The new 36-inch forcemain runs along Staring Lane<br />
from Dawson Creek to Chandler Drive.<br />
Scope<br />
The scope of the project is shown in Table 3-8 and in Figure 3-19. The forcemain from PS 58<br />
increases in size at Boone Drive due to the addition of flow at this point from a new<br />
overflow pump station at PS 53, described in the SGL-C-0002 (Multiple Pump Stations –<br />
Highland Road – Kenilworth Parkway) project.<br />
TABLE 3-8<br />
SGC-C-PS58FM-B (Staring Lane FM-Phase II - Highland Road to Perkins Road) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
Boone Drive Highland Road 3,200 New 64 Constructed under Green<br />
Light <strong>Program</strong><br />
Dawson Creek Boone Drive 4,900 New 60 Constructed under Green<br />
Light <strong>Program</strong><br />
Dawson Creek Chandler Drive 2,200 36 36 Constructed under Green<br />
Light <strong>Program</strong><br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is$10,700,000.<br />
Design was appropriated in 2008 with the SGC-C-PS58FM-A (Staring Lane FM Phase I –<br />
Burbank Drive to Highland Road) project.<br />
Construction Appropriation Year was 2010.<br />
Construction is On-Going.<br />
GNV31031158547.DOCX/103440004 3-44 JANUARY 2011<br />
REV. 5
#<br />
Pollard<br />
Picardy<br />
Blair<br />
Summa<br />
#<br />
PS317<br />
Irene<br />
Seyburn<br />
Chandler<br />
#<br />
#<br />
PS267<br />
Shrensbury<br />
#<br />
PS214<br />
#<br />
Kenilworth<br />
PS178<br />
Walden<br />
Camelia Trace<br />
Ryder<br />
Silverside<br />
Alberta<br />
!R<br />
Essen<br />
Bles<br />
Mancuso<br />
Granada<br />
Pet<br />
Corsica<br />
Bermuda<br />
Tasmania<br />
Anselmo<br />
#<br />
Wylie<br />
Menlo<br />
Highland Park<br />
Amesbury<br />
Copperfield<br />
Beckenham<br />
Boone<br />
Chippenham<br />
Leycester<br />
Stoneliegh<br />
Daventry<br />
Rodney<br />
Bromley<br />
Watford<br />
Cardiff<br />
Coventry<br />
Sheringham<br />
Louray<br />
Albert Hart<br />
Aries<br />
Maxine<br />
Delaville<br />
Baird<br />
Applewood<br />
Harts Mill<br />
Castle Kirk<br />
!R<br />
Staring<br />
#<br />
#<br />
PS40<br />
Theron<br />
Leonard<br />
Elysian<br />
Avis<br />
Arcadia<br />
Flora<br />
#<br />
PS114<br />
Thayer<br />
Hyacinth<br />
Sabine<br />
Roundhill<br />
Samoa<br />
Vienna<br />
Chanadia<br />
Perkins<br />
PS1010<br />
#<br />
PS300<br />
Bluebonnet<br />
#<br />
Burbank<br />
Hadley<br />
Meadow Bend<br />
#<br />
PS321<br />
Magnolia Wood<br />
Highland<br />
#<br />
PS261<br />
PS279<br />
Kimbro<br />
!R<br />
Highpoint<br />
Kingcrest<br />
Kevel<br />
#<br />
#<br />
PS412<br />
PS257<br />
#<br />
Legend<br />
#<br />
Proposed<br />
Existing<br />
Staring Lane FM Phase II<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SGC-C-PS58FM-Ph II<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-19<br />
Gardere<br />
Nolen<br />
Worth<br />
Kimbro<br />
Sharynwood<br />
Town South<br />
Cedar Lake<br />
Southlawn<br />
Mayfair Hill<br />
Kings Hill<br />
Bellonia<br />
Gurlie<br />
Emmaline<br />
Balboa<br />
Rhine<br />
Macedonia<br />
Myrtle Grove<br />
John Henry<br />
East Baton Rouge Parish<br />
Menlo<br />
Lochness<br />
Misty Creek<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGC-C-PS58FM-B_mpj120610<br />
Onter<br />
Halfway Tree<br />
Renee<br />
Rainford<br />
Wild Valley<br />
Windward<br />
0 1,400<br />
2,800<br />
Feet<br />
PS131<br />
Lake Donna<br />
#<br />
Myrtle Hill<br />
Mohawk<br />
Blakemore<br />
Windingway<br />
Glenstone<br />
Myrtlelake<br />
PS301<br />
#<br />
High Lake<br />
High Plains<br />
Thistlewood<br />
Shady Lake
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.12 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) project involves<br />
the construction of a portion of the new forcemain from the PS 58 to the South WWTP. The<br />
purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream and<br />
downstream basins. The construction of the direct forcemain between PS 58 and the South<br />
WWTP alleviates the wet weather flows into existing downstream gravity pipe, and allows<br />
the capacity needed for future flows in the Staring Lane area.<br />
The project includes replacing an existing 36-inch aerial forcemain crossing of Ward’s Creek<br />
from PS 58. The purpose is to replace the aerial crossing with a subsurface crossing due to<br />
the condition of the forcemain.<br />
Location<br />
This portion of the new 60-inch forcemain starts approximately at the intersection of Essen<br />
Lane and Essen Park and proceeds in a southerly direction crossing Ward’s Creek. The<br />
forcemain then proceeds in an easterly direction along Ward’s Creek. The forcemain turns<br />
south and follows Mancuso Lane, crossing a Kansas City Southern Railroad at the<br />
intersection of Anselmo Lane. The forcemain continues south along Granada Drive until<br />
reaching Dawson’s Creek. At Dawson’s Creek, the forcemain turns in a westerly direction<br />
and continues to the intersection of Dawson’s Creek and Staring Lane near PS57.<br />
The 36-inch forcemain starts approximately at the intersection of Essen Lane and Essen Park<br />
and proceeds in a southerly direction crossing Ward’s Creek. The new forcemain will be<br />
connected to the existing forcemain on the south side of Ward’s Creek.<br />
Scope<br />
The scope of this project is shown in Table 3-9 and in Figure 3-20.<br />
TABLE 3-9<br />
SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
PS58 Dawson Creek 9,490 New 60<br />
PS58<br />
South Side of<br />
Ward’s Creek<br />
300 36 36<br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $9,600,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158547.DOCX/103440004 3-46 JANUARY 2011<br />
REV. 5
Samoa<br />
PS58A<br />
PS58<br />
#<br />
Essen Park<br />
One Calais<br />
Cypress Point<br />
I-10<br />
Margaret Ann<br />
Dijon<br />
O'Donovan<br />
Didesse<br />
Brittany<br />
Flanders<br />
Hennessy<br />
Essen<br />
#<br />
PS193<br />
Summa<br />
Keswick<br />
Pennth<br />
Perkins Place<br />
Payne<br />
Camelia Trace<br />
Mancuso<br />
Picardy<br />
Pet<br />
Everett<br />
Blair<br />
Butter Creek<br />
#<br />
Sasanqua<br />
Silverside<br />
Anselmo<br />
Camelia Way<br />
Southpointe<br />
Alberta<br />
Staring<br />
Corsica<br />
Bermuda<br />
Ryder<br />
Bles<br />
Granada<br />
Tasmania<br />
Town South<br />
Kings Hill<br />
Lake Calais<br />
Perkins<br />
Clear Lake<br />
PS57<br />
#<br />
Macedonia<br />
Cedar Lake<br />
Vienna<br />
Theron<br />
Thayer<br />
Leonard<br />
Madeira<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Existing<br />
Staring Lane FM Phase III<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SGC-C-PS58FM-Ph III<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-20<br />
0 750<br />
1,500<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGC-C-PS58FM-C_mpj120610
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.13 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) project<br />
includes the construction of both 8,100 feet of new 16-inch forcemain from PS 119 to PS 58<br />
and the upgrade of PS 119 due to the longer forcemain and the predicted increase in future<br />
peak wet weather flow.<br />
Location<br />
Figure 3-21 shows the scope of this project. PS 119 is located on the north side of Highway I-<br />
10 on the western side of the creek near the movie theater and Citiplace Drive.<br />
A new 16-inch forcemain will replace the existing 12-inch forcemain extending from PS 119<br />
to MH 058-00194T. From MH 058-00194T, an existing 16-inch forcemain will be utilized. The<br />
existing forcemain follows Ward’s Creek to MH 058-00129T. At MH 058-00129T, a new 16-<br />
inch forcemain will be connected to the existing forcemain and continue to follow Ward’s<br />
Creek until nearing the intersection of Essen Lane and Ward’s Creek. At this point, the<br />
forcemain will turn in a northerly direction and connect to PS 58.<br />
Scope<br />
The scope of the project is shown in Tables 3-10 (pump station scope) and 3-11 (forcemain<br />
scope).<br />
TABLE 3-10<br />
SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS 119 Citiplace Drive near the Movie Theater 2,430 2,700 594<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
TABLE 3-11<br />
SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pipeline Information<br />
US<br />
Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
PS 119 PS58 8,100 New 16 New forcemain segments (PS 119 to<br />
058-00194T and 058-00129T to PS 58)<br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $2,800,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Construction Appropriation Year was 2010.<br />
Construction is On-Going.<br />
GNV31031158547.DOCX/103440004 3-48 JANUARY 2011<br />
REV. 5
Corporate<br />
Woodstock<br />
Moniteau<br />
Bocage<br />
Brandon<br />
Nouvelle<br />
Boyce<br />
#I<br />
#<br />
PS119<br />
PS119<br />
Murphy<br />
Torrance<br />
Svendson<br />
Fritchie<br />
Mc Connell<br />
Gilbert<br />
Conway<br />
Mc Carroll<br />
Peebles<br />
Palm Park<br />
Owen<br />
#<br />
PS28<br />
Trenton<br />
#<br />
PS97<br />
#<br />
PS335<br />
Valley Forge<br />
Bennington<br />
Tarrytown<br />
Georgetown<br />
§¨¦ I-12<br />
Sholar<br />
Rainbow<br />
Stratford<br />
Guilford<br />
Peggy<br />
Overton<br />
Burden<br />
Moss Side<br />
Quail Oak<br />
Quail Run<br />
Quail<br />
Orion<br />
East Baton Rouge Parish<br />
Perkins<br />
Pikes<br />
Dijon<br />
Didesse<br />
Hennessy<br />
Legend<br />
Proposed<br />
Existing Citi Place - Essen Area PS119 and FM<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SGC-C-PS119<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-21<br />
0 500<br />
1,000<br />
Feet<br />
PS58<br />
#<br />
Essen<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.14 SGL-C-0001 (Essen/Staring Area PS 57 Improvements)<br />
Project Description<br />
This project has been deleted from the PDP.<br />
3.2.15 SGL-C-0002 (Multiple PSs – Highland Road – Kenilworth Parkway)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGL-C-0002 (Multiple Pump Stations – Highland Road – Kenilworth Parkway) project<br />
includes the replacement of PS 120, PS 329, PS 40, PS 56, PS 68, PS 102, PS 27, PS 74, and PS<br />
302, and the construction of a new PS 53A (overflow for the existing PS 53) and a new LSU PS.<br />
The new pump stations will work in conjunction with forcemain upgrades in other south<br />
lower basin projects to alleviate SSOs at and near the pump stations and in their respective<br />
upstream basins. The BTRSSO hydraulic model also predicts that these pump stations will<br />
exceed their existing capacities at the predicted future peak wet weather flows. PS 102 was<br />
originally slated as a master plan pump station but was added to this PDP project. PS 27, PS<br />
74, and PS 302 have been added to this project since the October 2008 PDP.<br />
Location<br />
The locations of the pump stations are shown in Table 3-12 and in Figure 3-22.<br />
Scope<br />
The scope of the project is shown in Table 3-12. All pump stations except PS 53A are<br />
replacements of existing pump stations. PS 53A is a new overflow pump station for PS 53,<br />
which will alleviate upstream overflows and not require PS 53 to be upsized. PS 53A will have<br />
a dedicated forcemain, described in the SGL-C-0003 (Highland Road Pipeline Improvements)<br />
project, through which it will pump to the manifold with the new forcemain from PS 58A,<br />
described in the SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to Perkins<br />
Road) project.<br />
TABLE 3-12<br />
SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry Weather<br />
(GPM)<br />
PS 120<br />
PS 329<br />
PS 40<br />
PS 53A<br />
PS 56<br />
PS 68<br />
PS 102<br />
Helvetia Drive, near the intersection of<br />
Bancroft Way<br />
Kenilworth Parkway, near the intersection<br />
of Burbank Drive<br />
Southlawn Drive, near the intersection of<br />
Arcadia Drive<br />
Boone Avenue, near the intersection of<br />
Chippenham Drive<br />
Chandler Drive, near the intersection of<br />
Highland Park Drive<br />
Burbank Drive, near the intersection of<br />
Jennifer Jean Drive<br />
GSRI Avenue, near the intersection of<br />
Jasper Avenue<br />
200 511 92<br />
450 1,224 196<br />
400 802 117<br />
6,041 9,716 N/A<br />
600 4,740 573<br />
350 1,136 385<br />
430 897 356<br />
GNV31031158547.DOCX/103440004 3-50 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-12<br />
SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry Weather<br />
(GPM)<br />
PS 27<br />
PS 74<br />
PS 302<br />
LSU PS<br />
Intersection of Ridgehaven Avenue and<br />
Burbank Drive<br />
Northeast of Pecan Tree Drive and Jade<br />
Avenue intersection<br />
Southwest of Bluebonnet Boulevard and<br />
Highland Road intersection<br />
Near Intersection of Stadium Dr. and<br />
Nicholson Dr.<br />
382 382 80<br />
568 568 167<br />
5,150 5,150 915<br />
N/A 6,940 4,000<br />
Note: Estimated total dynamic head (TDH) for PS 120, PS 329, PS 40, PS 53A, PS 56, PS 68, PS 102, and LSU PS<br />
based on the Pump Station Design Requirements Hazen-Williams “C” value, rather than InfoWorks model “C” value.<br />
The TDH for PS 302, PS 27, and PS 74 is based on these pump stations being manifolded together and their design<br />
flow. The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $8,900,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design is On-Going.<br />
GNV31031158547.DOCX/103440004 3-51 JANUARY 2011<br />
REV. 5
Dalrymple<br />
Campus<br />
Line<br />
Boyd<br />
#<br />
#<br />
Doris<br />
Campus Lake<br />
Stadium<br />
Parker<br />
Jennifer Jean<br />
PS439<br />
Brightside<br />
Dean Lee<br />
Amherst<br />
#<br />
Ben Hur<br />
#<br />
Cornell<br />
L S U<br />
#<br />
Lakeshore<br />
PS401<br />
Yale<br />
#<br />
#I<br />
PS68<br />
#<br />
PS68<br />
Henry Adams<br />
Etta<br />
PS305<br />
BPS505<br />
Delgado<br />
BPS505A<br />
Tulane<br />
Clara<br />
<strong>Plan</strong>t Pth-Crp Phys<br />
East Baton Rouge Parish<br />
#<br />
PS1013 PS1014<br />
PS6<br />
Loyola<br />
Highland<br />
#<br />
Carriage<br />
Ben Hur<br />
#<br />
Nicholson<br />
Bella<br />
Stanford<br />
Cloverdale<br />
Forge<br />
PS120<br />
PS120<br />
# #<br />
#I<br />
Bourbon<br />
Bancroft<br />
Lee<br />
PS387<br />
Cloverdale<br />
Floyd<br />
Burgin<br />
River<br />
Hood<br />
Whitehaven<br />
Aberdeen<br />
Boston<br />
Carl<br />
Stuart<br />
Menlo<br />
College Hill<br />
Leeward<br />
Guava<br />
#<br />
PS70<br />
Sunset<br />
Pickett<br />
Bennett<br />
Dubois<br />
PS1009<br />
Leeward<br />
#<br />
Burbank<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2009UPDATE-SCOTT_102009.MXD SGELPI 10/20/2009 12:37:09<br />
Rubin<br />
Ryan<br />
Palm<br />
Hyacinth<br />
Nelson<br />
#<br />
#<br />
PS158<br />
PS34<br />
PS82<br />
PS329<br />
#I<br />
#<br />
Lila<br />
Bluebell<br />
Orchid<br />
Arrowhead<br />
Mimosa<br />
Boone<br />
Sweetbriar<br />
Knollwood<br />
Woodruff<br />
Woodstone<br />
Gulf South<br />
Tupello<br />
Glasgow<br />
Brame<br />
Bluebell<br />
PS329<br />
#<br />
Millstone<br />
Millgate<br />
Woodgate<br />
Dentation<br />
PS Glasgow<br />
#<br />
#<br />
#<br />
#<br />
PS56<br />
PS245<br />
#<br />
#I<br />
PS56<br />
PS214<br />
# #<br />
#<br />
# PS267<br />
PS37<br />
#<br />
Whitlow<br />
#I<br />
#<br />
PS53A PS53<br />
Keel<br />
Pointer<br />
Woodchase<br />
Fieldgate<br />
Rothmer<br />
Seyburn<br />
Kenilworth<br />
Helm<br />
Starwood<br />
#<br />
Pollard<br />
Wylie<br />
Menlo<br />
PS446<br />
Port<br />
Skysail<br />
#<br />
Concord<br />
Columbine<br />
Seyburn<br />
PS376<br />
PS294<br />
PS61<br />
Leake<br />
Hibiscus<br />
Dahlia<br />
Highland Park<br />
Palmetto<br />
Copperfield<br />
Mast<br />
Mariner<br />
Moss Point<br />
Ned<br />
Starboard<br />
Columbine<br />
Chandler<br />
Amesbury<br />
PS91<br />
PS375<br />
Chippenham<br />
Rush<br />
Potomac<br />
Forsythia<br />
Daventry<br />
Bromley<br />
Boone<br />
Hammatt<br />
Hadley<br />
G S R I<br />
Gardere<br />
Quail<br />
Stoneliegh<br />
Albert Hart<br />
#<br />
Meadow Bend<br />
General Lee<br />
Pascagoula<br />
Krista<br />
Stratford<br />
Brent<br />
Stokes<br />
Quail Run<br />
Shrensbury<br />
Menlo<br />
Stoney Creek<br />
PRIVATEPS<br />
Louray<br />
Maxine<br />
Rodney<br />
Magnolia Wood<br />
PS321<br />
#<br />
#<br />
#I<br />
PS102<br />
# #<br />
Seabord<br />
Old Hermitage<br />
#<br />
Peggy<br />
Overton<br />
Moss Side<br />
Orion<br />
Baird<br />
PS261<br />
PS279<br />
Bayou Fountain<br />
Gen Ewell<br />
Aries<br />
Coy<br />
Jasper<br />
PS237<br />
Kimbro<br />
Fountain<br />
Burden<br />
Irene<br />
Kenilworth<br />
PS178<br />
Applewood<br />
Fox Run<br />
Highland Creek<br />
Harts Mill<br />
St Croix<br />
Staring<br />
#<br />
Elvin<br />
Castle Kirk<br />
Pikes<br />
Walden<br />
Thoreau<br />
Chandler<br />
PS142<br />
Pecan Tree<br />
#<br />
#<br />
#<br />
PS40<br />
#I<br />
PS40<br />
# #<br />
#<br />
Highpoint<br />
Kingcrest<br />
Parkway<br />
Kevel<br />
PS74<br />
Dijon<br />
Ryder<br />
Worthington Lake<br />
Renee<br />
Perkins Place<br />
Camelia Trace<br />
Lake Calais<br />
Westhaven<br />
Springlake<br />
Springbrook<br />
Springdale<br />
Perkins<br />
#<br />
#<br />
PS27<br />
PS324<br />
Alberta<br />
Charleston<br />
Rickshire<br />
Didesse<br />
Picardy<br />
PS57<br />
Brittany<br />
Chanadia<br />
PS412<br />
PS257<br />
Hilltree<br />
I-10<br />
Hennessy<br />
Bles<br />
Kings Hill<br />
Theron<br />
Avis<br />
Arcadia<br />
Southlawn<br />
Hillglen<br />
Lake Donna<br />
Raintree<br />
Sabine<br />
Myrtle Hill<br />
Knox Hill<br />
Flora<br />
PS131<br />
#<br />
Essen<br />
PS58<br />
#<br />
PS302<br />
#<br />
PS58A<br />
#<br />
PS304<br />
PS386<br />
# PS374 #<br />
#<br />
#<br />
Legend<br />
Proposed<br />
Existing Multiple PS - Highland Rd. - Kenilworth Dr.<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SGL-C-0002<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-22<br />
0 2,375 4,750<br />
Feet<br />
Anselmo<br />
Balboa<br />
Sabine<br />
End<br />
Granada<br />
Thayer<br />
PS193<br />
Hyacinth<br />
PS114<br />
Roundhill<br />
Bluebonnet<br />
Vienna<br />
Windingway<br />
#<br />
#
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.16 SGL-C-0003 (Highland Road Pipeline Improvements)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The SGL-C-0003 (Highland Road Pipeline Improvements) project was originally called the<br />
SGL-C-0003 (Essen Lane-Highland Road) project in the October 2008 PDP, and has been<br />
combined with segments previously included in the SGL-C-0004 (Highland Road-Lee<br />
Drive) project also from the October 2008 PDP. The combined project is designated the SGL-<br />
C-0003 (Highland Road Pipeline Improvements) project and is described in this section.<br />
The following is a summary of the project: upsizing of gravity sewers upstream of PS 57, PS<br />
61, PS 302, PS 329, and PS 40; upsizing of the forcemain from PS 329; construction of a new<br />
forcemain from PS 53A, described in the SGL-C-0002 (Multiple Pump Stations – Highland<br />
Road – Kenilworth Parkway) project, to the manifold point with the new PS 58A forcemain,<br />
described in SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Rd to Perkins Rd)<br />
projects; upsizing of gravity sewers upstream of PS 53, which will assist with alleviating<br />
upstream SSOs; and upsizing of the forcemain from PS 56 to alleviate overflows. PS 56 is<br />
described in the SGL-C-0002 (Multiple Pump Stations – Highland Road – Kenilworth<br />
Parkway) project.<br />
Location<br />
The SGL-C-0003 project is roughly bound by I-10 in the north, Nicholson Drive in the south,<br />
Winterhue Drive in the east, and Wylie Drive in the west. It also includes upgrades of<br />
gravity sewers near Highland Road between Bromley Road in the east and Delgado Drive in<br />
the west. Project specifics are presented in Table 3-17 and are shown in Figure 3-23.<br />
Gravity segment 057-00117 to 057-00080 starts south of the Thoreau Drive and Baird Drive<br />
intersection, and goes north along Baird Drive and back over the water channel. This<br />
segment bends east along the water channel, then travels north, parallel to Walden Road.<br />
Gravity segment 057-00080 to 057-00003 starts southeast of the intersection of Walden Road<br />
and Applewood Road and travels in an easterly direction over a drainage canal toward<br />
Lake Calais Court. The gravity segment then runs parallel to Clear Lake Avenue south of<br />
the houses on that street and next travels in an easterly direction to the west side of Staring<br />
Lane. Segment 057-00003 to 057-00001 runs northerly along Staring Lane to PS 57.<br />
Gravity segment 057-00330 to 057-05069 starts east of Madeira Drive between Perkins Road<br />
and Vienna Avenue. The gravity segment travels southeast to the back of nearby houses<br />
that are along Madeira Drive. The segment then turns southwest and ends just north of<br />
Perkins Road. Segment 057-05069 to 057-00367 starts north of Perkins Road and travels<br />
southwest to the southern side of Perkins Road. Gravity segment 057-00367 to 057-00368 runs<br />
northwest from Perkins Road on the north side of a drainage canal. Gravity segments 057-<br />
00368 to 057-00495, 057-00495 to 057-00371D, 057-00371D to 057-00371E, and 057-00371E to<br />
057-00003 follow the northern side of the drainage canal west and north to Staring Lane.<br />
Gravity segment 040-00012 to PS 40 is located west of Elysian Drive and goes in a<br />
southwesterly direction past Southlawn Drive until reaching 040-00002. The segment then<br />
travels southeast to PS 40, located southwest of Southlawn Drive and Arcadia Drive<br />
intersection.<br />
GNV31031158547.DOCX/103440004 3-53 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segments 329-00016 to 329-00008 and 329-00008 to PS 329 are located in a wooded<br />
area off GSRI Avenue. 329-00016 to 329-00008 runs northerly from Tracy Lee Drive. Segment<br />
329-00008 to PS 329 runs northerly to PS 329.<br />
Gravity segment PS102DS to 061-00364 is located along GSRI Road, starting at Seaboard<br />
Drive and running northwesterly past Gardere Lane.<br />
Gravity segment 302-05073 to 302-05052 runs down Lakeview Drive and heads in a<br />
southeasterly direction to the corner of Lakeview Drive and Oak Hills Parkway. Segment<br />
302-05052 to 302-05031 starts at Lakeview Drive and Oak Hills Parkway and heads in a<br />
southerly direction down Oak Hills Parkway, cutting southwesterly to Pastureview Drive.<br />
The segment continues southeasterly past Pastureview Drive to Willow End Drive, which it<br />
follows easterly to Mossy Oak Avenue. It then turns southerly and ends at Highland Road.<br />
Segment 302-05031 to 302-05010 goes westerly along Highland Road to manhole 302-05010,<br />
which is halfway between Huntington Drive and Grand Lakes Drive. Segment 302-05010 to<br />
302-05007A runs along Highland Road to the intersection of highland Road and Rue de<br />
Laplace. Segment 302-05007A to 302-05004 starts at Rue de Laplace and heads up Highland<br />
Road westerly to Shady Lake Place. Segment 302-05004 to 302-05002 runs along Highland<br />
Road between Shady Lake Place and Bluebonnet Boulevard.<br />
Gravity segment 061-00102 to 061-00407 is located on Boone Avenue between the first<br />
manhole southeast of Daventry Drive and Staring Lane.<br />
Gravity segment 061-00351 to 061-00302 starts south of the cul-de-sac of Southlawn Drive<br />
and heads westward to Staring Lane.<br />
Gravity segment PS56DS to 053-00003 is located between Wylie Drive and Highland Park<br />
Drive. The northern boundary of this line is Chandler Avenue and the southern boundary is<br />
Boone Avenue.<br />
Gravity segments 053-00177 to 053-00168 and 053-00168 to 053-00144 start near the<br />
intersection of Leycster Drive and Kenilworth Parkway and run southwest behind houses<br />
between Kenilworth Parkway and Chippenham Drive to Boone Avenue.<br />
Gravity segment 053-00410 to 053-00407 starts on Highland Road between Lee Drive and<br />
Duplantier Boulevard and runs in a southeasterly direction down Highland Road to<br />
manhole 053-00407, which is just past Lee Drive. Segment 053-00407 to 053-00316 starts on<br />
Highland Road just past Lee Drive and runs in a southeasterly direction to Burgin Avenue.<br />
At Burgin Avenue, this segment goes in a northeasterly direction. At Boston Street, it turns<br />
southeasterly again. At McDonald Avenue, the line turns to go northeasterly, then turns<br />
again southeasterly onto Menlo Drive. The segment goes down Menlo Drive to manhole<br />
053-00316, which is halfway between Leeward Drive and Sunset Boulevard.<br />
Gravity segments 053-00316 to 053-00016 and gravity segment 053-00016 to 053-00014 starts<br />
on Menlo Drive halfway between Leeward Drive and Sunset Blvd and travels southeasterly<br />
along Menlo Drive past the intersection of Nelson Drive with Menlo Drive. The segment<br />
continues past the end of Menlo Drive behind a line of houses, and then the segment turns<br />
northerly to manhole 053-00014, which is northwest of Woodstone Drive.<br />
GNV31031158547.DOCX/103440004 3-54 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 053-00010A to 053-00003 starts northwest of the Woodgate Blvd and North<br />
Woodgate Court intersection and travels southeasterly direction along a drainage canal<br />
between Woodgate Court and Millgate Place to manhole 053-00003, which is located on<br />
Boone Avenue halfway between Wylie Drive and Highland Park Drive.<br />
Gravity segment 053-00429 to 053-00410 runs parallel to Bancroft Way, set off southeasterly<br />
half a block. The segment starts northeast of Timbercove Street and ends at Highland Road.<br />
Gravity segment 068-00050 to PS 68 begins near the cul-de-sac on the northern end of<br />
Jennifer Jean Drive and follows a servitude east in between Highland Road and Burbank<br />
Drive to PS 68, which is located just south of the intersection of Highland Road and Delgado<br />
Drive<br />
The forcemain from PS 56 begins at PS 56, which is roughly located at the intersection of<br />
Highland Park Drive with Chandler Drive, and continues along Highland Park Drive for<br />
approximately 540 feet.<br />
The PS 329 forcemain will be replaced under this project. This forcemain starts at PS 329,<br />
which is located in a wooded area in a northerly direction from GSRI Avenue, then runs<br />
south to GSRI Avenue, and turns easterly on GSRI Avenue to Gulf South Parkway.<br />
The PS 53A forcemain is a new forcemain from PS 53 to the manifold with the new PS 58A<br />
forcemain, as described above. This forcemain begins at PS 53A, which will be located near<br />
the intersection of Boone Avenue and Chippenham Drive, and runs southeasterly along<br />
Boone Avenue to Staring Lane.<br />
Scope<br />
This project includes construction of the following: approximately 6,800 feet of 15-inch, 18-<br />
inch, 21-inch, 27-inch, 30-inch, 36-inch, and 42-inch gravity sewer upstream of PS 57;<br />
approximately 1,200 feet of 15-inch gravity sewer upstream of PS 40; approximately 2,000<br />
feet of 15-inch and 18-inch gravity sewer upstream of PS 329; approximately 7,800 feet of 12-<br />
inch, 15-inch, 18-inch, 24-inch, and 27-inch gravity sewer upstream of PS 302; approximately<br />
2,400 feet of 15-inch and 18-inch gravity sewer upstream of PS 61; approximately 18,300 feet<br />
of 18-inch, 21-inch, 24-inch, 27-inch, 30-inch, and 36-inch gravity sewer upstream of PS 53;<br />
approximately 1,200 feet of 18-inch gravity sewer upstream of PS 68; approximately 4,300<br />
feet of 10-inch forcemain from PS 329 to replace the existing forcemain; approximately 6,200<br />
feet of new 24-inch forcemain from PS 53A; and approximately 540 feet of 18-inch forcemain<br />
from PS 56 to replace the existing forcemain.<br />
Table 3-13 shows the detailed scope of this project.<br />
GNV31031158547.DOCX/103440004 3-55 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-13<br />
SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
057-00117 057-00080 710 10 and 12 18 This segment goes underneath a<br />
water channel.<br />
057-00080 057-00003 2,200 12 21<br />
057-00003 057-00001 180 24 42 Segment includes crossing of a<br />
drainage canal.<br />
057-00330 057-05069 460 8 15<br />
057-05069 057-00367 170 10 15<br />
057-00367 057-00368 190 10 18<br />
057-00368 057-00495 700 10 21<br />
057-00495 057-00371D 1,345 12 27<br />
057-00371D 057-00371E 230 12 30<br />
057-00371E 057-00003 665 12 36<br />
040-00012 PS 40 1,200 8 15 PS 40 will be upgraded under SGL-C-<br />
0002 (Multiple PS – Highland Road –<br />
Kenilworth Parkway)<br />
329-00016 329-00008 1,700 10 15<br />
329-00008 PS 329 300 10 18 PS 329 will be upgraded under SGL-<br />
C-0002 (Multiple PS – Highland Road<br />
– Kenilworth Parkway) – forcemain<br />
replacement described below.<br />
302-05073 302-05052 660 8 12<br />
302-05052 302-05031 1,700 8 15<br />
302-05031 302-05010 1,800 15 to 18 18<br />
302-05010 302-05007A 950 18 24<br />
302-05007A 302-05004 1,200 18 24<br />
302-05004 302-05002 1,500 18 27<br />
PS102DS 061-00364 930 8 15<br />
061-00351 061-00302 1,500 12 18<br />
PS56DS 053-00003 2,900 18 24 This segment includes a canal<br />
crossing.<br />
053-00177 053-00168 325 10 18<br />
053-00168 053-00144 1,600 10 21<br />
053-00410 053-00407 715 12 18<br />
053-00407 053-00316 3,500 12 or 18 24<br />
053-00316 053-00016 1,800 18 27<br />
053-00016 053-00014 470 18 30<br />
GNV31031158547.DOCX/103440004 3-56 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-13<br />
SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
053-00010A 053-00003 2,400 24 36 This segment includes a canal<br />
crossing.<br />
053-00429 053-00410 1,800 12 18<br />
068-00050 PS68 1,200 10 18<br />
PS 329 PS329DS 4,300 8 10 Forcemain – PS 329 replacement is<br />
described in SGL-C-0002 (Multiple PS<br />
– Highland Road – Kenilworth<br />
Parkway)<br />
PS 53A<br />
Manifold point<br />
with Staring<br />
Lane FM (PS<br />
58A FM)<br />
6,220 New 24 New forcemain from new PS 53A,<br />
which is described in SGL-C-0002<br />
(Multiple PS – Highland Road –<br />
Kenilworth Parkway)<br />
PS56FM PS56DS 540 12 18 Forcemain from PS 56 (see Project<br />
SGL-C-0002 (Multiple PS – Highland<br />
Road – Kenilworth Parkway) for PS<br />
description)<br />
Note: The existing pipe sizes and lengths and new pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $17,800,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design and Construction has not Started.<br />
GNV31031158547.DOCX/103440004 3-57 JANUARY 2011<br />
REV. 5
#<br />
#<br />
Stadium<br />
!R<br />
PS439<br />
Ben Hur<br />
#<br />
#<br />
#!R<br />
#<br />
Lakeshore<br />
!R<br />
PS68<br />
PS68<br />
#<br />
#<br />
PS2<br />
PS6<br />
#<br />
#<br />
#<br />
!R<br />
!R<br />
!R<br />
!R<br />
!R !R<br />
PS120<br />
# PS70<br />
053-00429<br />
PS305053-00407 053-00343<br />
Lee<br />
Lakeshore<br />
Stanford<br />
068-00050<br />
053-00421<br />
Ben Hur<br />
Bella<br />
Forge<br />
Burgin<br />
Hood<br />
Carl<br />
#<br />
!R<br />
River<br />
Dubois<br />
053-00410<br />
053-00321<br />
053-00016<br />
#<br />
# #<br />
#<br />
Stuart<br />
Chandler<br />
!R<br />
!R<br />
Nelson<br />
#<br />
Burbank<br />
PS2005<br />
!R<br />
#<br />
Balis<br />
#<br />
#<br />
#<br />
#!R<br />
!R<br />
Nicholson<br />
Bluebell<br />
053-00316<br />
!R<br />
!R<br />
PS329<br />
College<br />
053-00014<br />
Menlo<br />
PS329<br />
329-00008<br />
329-00016<br />
#<br />
#<br />
#<br />
#<br />
PS245<br />
PS56 PS56FM<br />
# # # #<br />
PS56DS #!R<br />
#<br />
!R<br />
053-00010A<br />
PS329DS<br />
Helm<br />
!R<br />
#<br />
PS61<br />
#!R<br />
Port<br />
PS446<br />
#<br />
#<br />
Gardere<br />
Seyburn<br />
053-00003<br />
Highland<br />
Mast<br />
!R !R<br />
G S R I<br />
Ned<br />
Dahlia<br />
PS53WWDS<br />
PS267<br />
#<br />
#<br />
PS261 #<br />
#<br />
!R<br />
Quail<br />
Maxine<br />
Louray<br />
Rodney<br />
Albert Hart<br />
!R # #<br />
#<br />
#<br />
#<br />
Peggy<br />
Orion<br />
Baird<br />
Elvin<br />
Kimbro<br />
PS97<br />
Kenilworth<br />
#<br />
Burden<br />
Irene<br />
PS178<br />
Staring<br />
!R<br />
!R<br />
Castle Kirk<br />
Magnolia Wood<br />
Pikes<br />
Walden<br />
057-00117<br />
053-00177<br />
053-00168<br />
Hadley<br />
PS58_n5<br />
061-00364<br />
PS102DS<br />
Glerma<br />
PS374<br />
!R<br />
!R<br />
Worth<br />
PS142<br />
PS27<br />
#<br />
#<br />
Dijon<br />
#!R<br />
!R<br />
Highpoint<br />
PS40<br />
!R<br />
#!R<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
Didesse<br />
057-00080<br />
Springlake<br />
!R !R<br />
!R<br />
#<br />
PS335<br />
PS58<br />
PS58A<br />
#<br />
#<br />
#<br />
!R !R<br />
!R<br />
!R<br />
PS301<br />
#<br />
#<br />
#<br />
#<br />
#<br />
302-00003<br />
PS302 !R 302-05002<br />
PS417<br />
I-10<br />
Hennessy<br />
Bluebonnet<br />
Hilltree<br />
Flanders<br />
057-00003<br />
Essen<br />
Picardy<br />
057-00371E<br />
Hyacinth<br />
040-00012<br />
061-00351<br />
Anselmo<br />
057-00495<br />
Perkins<br />
Myrtlelake<br />
#<br />
#<br />
#<br />
#<br />
!R<br />
!R<br />
302-05073<br />
!R<br />
!R !R<br />
302-05007A<br />
!R<br />
PS409 !R<br />
302-05004<br />
057-00330<br />
057-00368<br />
PS437<br />
PS317<br />
PS1010<br />
I-12<br />
Drusilla<br />
Summa<br />
Paulet<br />
Houston<br />
PS300<br />
Obrien<br />
Villa<br />
Fleet<br />
Sharlane<br />
302-05010<br />
Hill<br />
Gail<br />
PS299<br />
PS223<br />
#<br />
#<br />
#<br />
Oakdale<br />
302-05052<br />
302-05031<br />
#<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Highland Rd. Pipeline Improvements<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SGL-C-0003<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-23<br />
0 3,625<br />
7,250<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SGL-C-0003_mpj120510
SECTION 3. SOUTH BASIN PROJECTS<br />
3.2.17 SGL-C-0004 (Highland Road – Lee Drive)<br />
This project has been combined with the SGL-C-0003 (Essen Lane-Highland Road) from the<br />
October 2008 PDP. The combined project has been designated the SGL-C-0003 (Highland<br />
Pipeline Improvements) project and is found in Section 3.2.16.<br />
3.2.18 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) project was originally<br />
designated SGL-C-0005 (Perkins Road – Dahlia Street) project in the October 2008 PDP. This<br />
project includes the upsizing of gravity sewer and forcemain upstream of PS 56 and PS 91 to<br />
alleviate upstream SSOs.<br />
Location<br />
The SGL-C-0005 project includes gravity sewer and forcemain replacements in the area of<br />
Perkins Road and Bayou Duplantier, and is shown in Figure 3-24.<br />
Gravity segment 056-00133H to 056-00153 is located in a wooded area, starting south of<br />
Belvedere Drive and progressing in an easterly direction through the woods south of<br />
Elmcrest Drive and Pollard Parkway.<br />
Gravity segment 056-00208 to 056-00133H starts at Lee Drive south of Bennett Drive. The<br />
segment travels in a northeasterly direction, then goes easterly on Bluebell Drive. This<br />
segment continues easterly beyond the end of Bluebell Drive through a wooded area to<br />
manhole 056-00133H, which is south of Belvedere Drive.<br />
Gravity segment 056-00148 to PS 56 starts in the wooded area north of Chandler Drive and<br />
heads in a southeasterly direction to PS 56, which is located off Chandler Drive west of its<br />
intersection with Highland Park Drive. Gravity segment 056-00153 to 056-00148 starts south<br />
of the Christian Life Academy off Quail Drive and continues in a southwesterly direction to<br />
manhole 056-00148 in a wooded area.<br />
Gravity segment PS70DS to 056-00208 is located along Lee Drive north of the drainage canal<br />
north of PS 70.<br />
Gravity segment 091-00004 to 091-00001 is located along Concord Avenue between<br />
Yorktown Drive and Brandywine Drive. Segment 091-00074 to 091-00006 begins on Valley<br />
Creek Drive and continues southeasterly through a wooded area to the intersection of<br />
Concord Avenue and Congress Boulevard.<br />
Forcemain segment PS70 to 056-00208 starts south of Bayou Duplantier on Lee Drive. The<br />
segment travels in a northwesterly direction crossing Bayou Duplantier to 056-00208.<br />
Scope<br />
This project includes the construction of approximately 10,500 feet of 18-inch, 21-inch,<br />
24-inch, 30-inch, and 36-inch gravity sewer upstream of PS 56 and approximately 2,000 feet<br />
of 15-inch and 18-inch gravity sewer upstream of PS 91. Table 3-14 shows the detailed scope<br />
of this project.<br />
GNV31031158547.DOCX/103440004 3-59 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-14<br />
SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) – Pipeline Information<br />
US Node DS Node Length (ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
056-00133H 056-00153 3,800 15 24<br />
056-00208 056-00133H 4,200 12 to 15 21 Includes a crossing of a<br />
drainage canal<br />
056-00148 PS56 970 18 36 PS 56 will be upgraded in the<br />
SGL-C-0002 (Multiple PS –<br />
Highland –Kenilworth) project<br />
056-00153 056-00148 700 15 or 18 30<br />
PS70DS 056-00208 790 12 18<br />
091-00004 091-00001 700 12 18<br />
091-00074 091-00006 1,300 10 15<br />
PS70 PS70DS 645 8 8 Forcemain segment was<br />
lengthened<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Estimated Construction is $4,400,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-60 JANUARY 2011<br />
REV. 5
Mimosa<br />
Orchid<br />
Poplar<br />
Tupello<br />
Perkins<br />
!R<br />
091-00074<br />
Revere<br />
Congress<br />
Yorktown<br />
091-00006<br />
Brandywine<br />
Lexington<br />
Saratoga<br />
Bennington<br />
Hood<br />
Carl<br />
Anglo<br />
Palm<br />
Rubin<br />
Arrowhead<br />
#<br />
PS Glasgow<br />
!R !R<br />
091-00004<br />
!R<br />
#<br />
PS91<br />
091-00001<br />
Ross<br />
Hyacinth<br />
Mimosa<br />
Boone<br />
Stephens<br />
Floyd<br />
Aberdeen<br />
Stuart<br />
PS70DS<br />
056-00208<br />
#<br />
!R<br />
Whitehaven<br />
PS70<br />
!R<br />
Cypress<br />
Pickett<br />
Lee<br />
Bennett<br />
PS34<br />
#<br />
Knollwood<br />
Brame<br />
Bluebell<br />
Sweetbriar<br />
Whitehaven<br />
Belvedere<br />
Meadow Lea<br />
Woodchase<br />
Pointer<br />
#<br />
Pollard<br />
Columbine<br />
PS375<br />
#<br />
Hibiscus<br />
Clematis<br />
Columbine<br />
Tamarix<br />
Hyacinth<br />
!R<br />
056-00133H<br />
Elmcrest<br />
Dahlia<br />
Quail<br />
Burgin<br />
#<br />
PS1009<br />
College Hill<br />
Menlo<br />
Leeward<br />
Dubois<br />
Guava<br />
Leeward<br />
Boone<br />
Sunset<br />
Chandler<br />
PS82<br />
#<br />
Woodruff<br />
#<br />
PS245<br />
056-00148<br />
Seyburn<br />
!R<br />
Chandler<br />
Wylie<br />
!R<br />
!R #<br />
056-00153<br />
PS56<br />
#<br />
PS267<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Bayou Duplantier Area Sewer Upgrades<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SGL-C-0005<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-24<br />
0 750<br />
1,500<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23
SECTION 3. SOUTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158547.DOCX/103440004 3-62 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
3.3 South Forced System Comprehensive Rehabilitation<br />
Projects<br />
3.3.1 SFL-R-0001, SFL-R-0002, SFL-R-0003, AND SFU-R-0001<br />
Project Description<br />
The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />
various components of the sewer collection system to reduce the amount of rainwater and<br />
groundwater that leak into the system.<br />
Purpose<br />
The purpose of the comprehensive sewer rehabilitation is to correct defects in the system<br />
such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow<br />
sources. The water that enters the system through the defects can contribute to sanitary<br />
sewer overflows. Comprehensive rehabilitation of the collection system will contribute to<br />
alleviating sanitary sewer overflows by reducing I/I.<br />
Location<br />
There are four (4) projects located primarily within the South Forced Basin. The locations of<br />
the projects are shown on the attached maps, Figures 3-25 to 3-28.<br />
Scope of Project<br />
The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />
the pipes and manholes including closed circuit television inspection of all pipes. Smoke<br />
testing may also be included in the physical inspection phase.<br />
The data collected by the physical inspection contractor will be analyzed and based on that<br />
analysis, a listing of recommended repairs with associated construction costs will be<br />
generated.<br />
An engineering firm will then complete detailed design and preparation of construction<br />
documents for project bidding.<br />
The construction of rehabilitation projects will include the following components:<br />
<br />
<br />
<br />
<br />
<br />
Replacement of pipes<br />
Point repair of pipes<br />
Rehabilitation of pipes by cured in place liners<br />
Rehabilitation or replacement of sewer manholes<br />
Repair of sewer laterals to the property line<br />
Cost<br />
The estimated construction cost for each project is presented in Table 3-15. These costs are<br />
based on preliminary estimates of the amounts of each component of the system that will<br />
require repair or replacement. During the physical inspection phase, the actual condition of<br />
the components will be assessed and appropriate methods recommended. At that time, the<br />
cost estimate for each project will be revised. For those projects under construction, the bid<br />
amounts were included as construction costs in Table 3-15.<br />
GNV31031158547.DOCX/103440004 3-63 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-15<br />
Estimated Construction Costs for South Forced System Comprehensive Rehabilitation Projects<br />
Project Description<br />
Construction<br />
Cost<br />
Scheduled Design<br />
Appropriation Year<br />
Scheduled<br />
Construction<br />
Appropriation Year<br />
Status<br />
SFU-R-0001-Antioch<br />
Road-Chadsford Drive<br />
SFL-R-0001-Jefferson<br />
Highway-Hoo Shoo<br />
Too Road<br />
SFL-R-0002-Jones<br />
Creek Road-Tiger<br />
Road<br />
SFL-R-0003-Siegen<br />
Lane-Interstate 10<br />
$7,700,000 2010* 2011 Not Started<br />
$1,770,000 2008* 2008* Functionally<br />
Complete<br />
$5,200,000 2011 2011 Not Started<br />
$6,100,000 2011 2012 Not Started<br />
*Appropriations already made for these projects (design and/or construction, as marked).<br />
GNV31031158547.DOCX/103440004 3-64 JANUARY 2011<br />
REV. 5
Sassafras<br />
Antioch<br />
Shady Grove<br />
Vignes<br />
Alder<br />
La Louisiane<br />
Crepemyrtle<br />
Round Oak<br />
Smoke Rock<br />
Airline<br />
Castle Ridge<br />
Highland<br />
Kindletree<br />
Waterleaf<br />
Wenwood<br />
Shady Arbor<br />
Glen Forest<br />
Glen Knoll<br />
Preston<br />
Barrett<br />
Elliot<br />
Green Willow<br />
Poujeaux<br />
Vouvray<br />
Margeaux<br />
Beaujolaes<br />
Vignes<br />
Thad Cain<br />
Airline<br />
Umbehagen<br />
Brookfield<br />
Nine Oaks<br />
Morsewood<br />
Sugar Mill<br />
Beckfield<br />
Chasefield<br />
Dawnwood<br />
Jefferson Ridge<br />
Glen Park<br />
Glen Club<br />
Hoo Shoo Too<br />
Lake Camellia<br />
Lake Tulip<br />
Old World<br />
Vignes Lake<br />
Bryans Crossing<br />
Benjamins<br />
Kaitlyn<br />
Breman<br />
Paladin<br />
Diversion<br />
La Grange<br />
Bainbridge<br />
Bevan<br />
Brunswick<br />
Jefferson<br />
Moultrie<br />
Blanton<br />
Lake Myrtle<br />
Lake Orchid<br />
Garden Oaks<br />
Lake Azalea<br />
Cherry Oak<br />
Lake Terrace<br />
Lakefield<br />
Lake Indigo<br />
Lake Iris<br />
Bellerive<br />
Talton<br />
Macon<br />
Arcadian Shores<br />
Airline<br />
Manchac Landing<br />
Spyglass Hill<br />
Cape Hart<br />
Santa Maria<br />
Ferncrost<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\SOUTH\SOUTH MAPS\SFL-R-0001.MXD SGELPI 11/9/2010 10:48:33<br />
Area Designated for<br />
Physical Inspection<br />
0 910 1,820 Feet<br />
q<br />
Jefferson Hwy - Hoo Shoo Too Rd.<br />
SFL-R-0001<br />
Project Vicinity Map<br />
Figure 3-25
Bea<br />
Arnold<br />
American<br />
Plaza Tower<br />
Parkhurst<br />
O'Neal<br />
Antioch<br />
Daradele<br />
Floynell<br />
Bunting<br />
Mint<br />
Cedarlane<br />
Cal<br />
Hillyard<br />
Groner<br />
Mullen<br />
Potwin<br />
Neil<br />
I-12<br />
Ridgely<br />
Kinglet<br />
Peck<br />
Potwin<br />
Seracedar<br />
Oliphant<br />
Cedarcrest<br />
Aubin<br />
Oakline<br />
Siegen<br />
Mead<br />
Stanley Aubin<br />
Landsbury<br />
Andrea<br />
Meadowpark<br />
Metairie<br />
Woodleigh<br />
Southland<br />
Michel Delving<br />
Gentilly<br />
Orleans<br />
Magellan<br />
E Heck<br />
Alco<br />
Woodland Oak<br />
Brookhollow<br />
Southpark<br />
Toulon<br />
Cloverland<br />
Industriplex<br />
Honore<br />
Reiger<br />
Mall<br />
Baylor<br />
I-10<br />
Coursey<br />
Sherwood Forest<br />
Cedar Park<br />
St Alban's<br />
Jean Lafitte<br />
Highland Oaks<br />
Paddock<br />
Baronne<br />
Telesmar<br />
Corsair<br />
Westfork<br />
Pennywood<br />
Campden<br />
Pecue<br />
Langley<br />
Complex<br />
Claiborne<br />
Eastgate<br />
Justice<br />
Newcastle<br />
Exchequer<br />
Lancelot<br />
Parkforest<br />
Perkins<br />
Galahad<br />
Parkmeadow<br />
Pecue<br />
Highland<br />
Harris<br />
Parkhaven<br />
Tartan<br />
Stumberg<br />
Woodland Ridge<br />
Doral<br />
Rose<br />
Briarwood<br />
Old Perkins<br />
Five Oaks<br />
Country Hill<br />
Tollway<br />
Saint Clare<br />
Airline<br />
Hickory Ridge<br />
Tennyson<br />
Kimbleton<br />
Castille<br />
Buckley<br />
Buzbee<br />
Highlandia<br />
Harrells Ferry<br />
Sessions<br />
Director<br />
Boulevard Louisiane<br />
Snowden<br />
Jones Creek<br />
Board<br />
Barringer<br />
Barringer Foreman<br />
Terrell<br />
George Oneal<br />
Profit<br />
Chairman<br />
Lirocchi<br />
Ferrell<br />
Shenandoah<br />
Debit<br />
Parkview Church<br />
Fulwar Skipwith<br />
Highland Bluff<br />
Reiger<br />
George Cain<br />
Pecan Meadow<br />
Philip Hickey<br />
Highland Crossing<br />
Lake Sherwood<br />
Parkciel<br />
Pecue<br />
Deerpath<br />
Hollyhill<br />
Mourning Dove<br />
Quinn<br />
Crossing<br />
Eaglewood<br />
Millwood<br />
Braxton<br />
Bayridge<br />
Pinehurst<br />
Lilian<br />
Cypress Ridge<br />
Dale<br />
Canterdale<br />
Chaucer<br />
Herridge<br />
Barringer<br />
Perkins<br />
Heidis<br />
Sotile<br />
Petroleum<br />
Allegheny<br />
Amen Corner<br />
Seven Pines<br />
Cocodrie<br />
Antler<br />
Jefferson<br />
Yorkfield<br />
Roster<br />
Spyglass Hill<br />
Santa Maria<br />
Chadsford<br />
Haynes Bluff<br />
Malvern Hill<br />
Confederate<br />
La Louisiane<br />
Alder<br />
Castle Ridge<br />
Point O' Woods<br />
Berryhill<br />
Thad Cain<br />
Morel<br />
Doyle<br />
Silver Sand<br />
Appomattox<br />
Round Oak<br />
Umbehagen<br />
Gray Moss<br />
Miller<br />
Pine Hill<br />
Stonewall<br />
Pine Moss<br />
Kaitlyn<br />
Talton<br />
Rapidan<br />
Monitor<br />
Culps Bluff<br />
General Forrest<br />
Wildflower<br />
Amaryliss<br />
Belle Helene<br />
Hendrick<br />
Airline<br />
Elliot<br />
Lake Azalea<br />
Moultrie<br />
Achord<br />
Barrett<br />
Palmer<br />
Shadow Creek<br />
Bull Run<br />
Grand Couteau<br />
Harness<br />
Hagerstown<br />
Woodlake<br />
Wildlife Way<br />
Green Willow<br />
Lake Harbour<br />
Bay Ridge<br />
Vouvray<br />
Babin<br />
Tiger Bend<br />
Vignes<br />
Hoo Shoo Too<br />
Lake Iris<br />
Westwind<br />
Lost Oak<br />
South Shore<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFL-R-0002.MXD SGELPI 10/21/2009 12:46:55<br />
Area Designated for<br />
Physical Inspection<br />
0 2,500 5,000 Feet<br />
q<br />
Jones Creek Rd. - Tiger Bend Rd.<br />
SFL-R-0002<br />
Project Vicinity Map<br />
Figure 3-26
Inniswold<br />
Idlewood<br />
Parkbriar<br />
Cypress Point<br />
Summa<br />
Fleet<br />
Norfolk<br />
Sharlane<br />
Field<br />
Houston<br />
Hill<br />
Cal<br />
Gail<br />
Upton<br />
Floynell<br />
Hillyard<br />
Ridgely<br />
Oliphant<br />
Tanwood<br />
Hackberry<br />
Danbury<br />
Oakline<br />
Airline Hwy Service Road<br />
McCann<br />
Parkforest<br />
Anselmo<br />
Bluebonnet<br />
Paulet<br />
Rue Crozat<br />
Oakdale<br />
Oak Hills<br />
Pastureview<br />
Barkley<br />
Highland<br />
I-10<br />
Azrok<br />
Mint<br />
Neil<br />
Kinglet<br />
Peck<br />
Mall<br />
Siegen<br />
Industriplex<br />
Honore<br />
Cloverland<br />
Jefferson<br />
Parkmeadow<br />
Shady Lake<br />
Myrtle Grove<br />
Corby<br />
Patrick<br />
Obrien<br />
Picardy<br />
Field<br />
Bluebonnet<br />
Oliphant<br />
Blue Cross<br />
Cottage Hill<br />
Dwyerwood<br />
Barry<br />
Landsbury<br />
Copperleaf<br />
Pinebrook<br />
Oak Bend<br />
Oakley Trace<br />
Telesmar<br />
Cozumel<br />
Sherwood Forest<br />
Galeria<br />
Parkview Church<br />
Superior<br />
Parkknoll<br />
High Plains<br />
Thistlewood<br />
Gatewood<br />
Rue de Laplace<br />
Rue de Tonti<br />
Rue Desiree<br />
Court<br />
Rod Laver<br />
Great Oak<br />
Ridgeland<br />
Lake Estates<br />
Wimbledon<br />
Verdun<br />
Lakeview<br />
Grand Lakes<br />
Don Budge<br />
John Newcombe<br />
Chester<br />
Oakcliff<br />
Wyatt<br />
Lazy K<br />
Reitz<br />
Oakbrook<br />
Briarrose<br />
Groner<br />
Mullen<br />
Thrush<br />
Denver<br />
Stafford<br />
Briarridge<br />
Bullrush<br />
Bunting<br />
Potwin<br />
Amiss<br />
Twisted Oak<br />
King James<br />
Mc Quaid<br />
Natchez<br />
Lombard<br />
Meadowpark<br />
Woodleigh<br />
Metairie<br />
Kathleen<br />
Southland<br />
Orleans<br />
Brookhollow<br />
Poydras<br />
Cedar Park<br />
Reiger<br />
St Alban's<br />
Fieldstone<br />
Pecue<br />
Lew Hoad<br />
Oakwilde<br />
Towering Oaks<br />
Rossmore<br />
Willows End<br />
Mirkwood<br />
Oak Creek<br />
Winterhue<br />
Carnforth<br />
Glen Cove<br />
Kentmere<br />
Tanglebriar<br />
Briarhurst<br />
Glen View<br />
Troutbeck Ymca Plaza<br />
Briar Hollow<br />
Westwood<br />
Autoplex<br />
Capital<br />
Diron<br />
Grand Lakes<br />
Greenbriar Hollow<br />
Rue Baton<br />
Roy Emerson<br />
Oak Manor<br />
White Cross<br />
Dunn<br />
Kimble<br />
Glen Arbor<br />
Tanager<br />
Honey<br />
Peck<br />
Potwin<br />
Fernbrook<br />
Andrea<br />
Meadowbrook<br />
Honey<br />
Kenner<br />
Michel Delving<br />
Woodview<br />
Woodmont<br />
Broad<br />
Conti<br />
Highland Oaks<br />
Gravier<br />
Baronne<br />
Paddington<br />
Shadow Oak<br />
Fieldstone<br />
Clarendon<br />
Highland<br />
Lichester<br />
Campden<br />
Hollyfield<br />
Boylan<br />
Benefit<br />
Sun Belt<br />
Dunlay<br />
Exchequer<br />
Airline<br />
Revenue<br />
Reiger<br />
Old Perkins<br />
Perkins<br />
Lakeland Park<br />
George Cain<br />
Hickory Knoll<br />
Pecue<br />
Pecue<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFL-R-0003.MXD SGELPI 10/21/2009 12:34:40<br />
Area Designated for<br />
Physical Inspection<br />
0 1,500 3,000 Feet<br />
q<br />
Siegen Ln. - Interstate 10<br />
SFL-R-0003<br />
Project Vicinity Map<br />
Figure 3-27
Millerville<br />
Mesbury<br />
O'Neal<br />
Antioch<br />
Cully<br />
Palmwood<br />
Sprucewood<br />
Firewood<br />
Elderwood<br />
Godfrey<br />
Bristoe<br />
Abshire<br />
Patton<br />
Ellis<br />
Bonham<br />
Hoyt<br />
Woodbrook<br />
Stonewood<br />
Shadowbrook<br />
Lirocchi<br />
Addington<br />
Bahin<br />
Sessions<br />
President Davis<br />
Millbrook<br />
Valentine<br />
Terrell<br />
Merritt Anne<br />
James Victor<br />
Windsong<br />
King Bradford<br />
Yorkfield<br />
Harrells Ferry<br />
Silver Sand<br />
<strong>Plan</strong>tation Key<br />
White Shadows<br />
Palmer<br />
Ferry Lane<br />
Lake Harbour<br />
Buckley<br />
Coursey<br />
Springwood<br />
Antler<br />
George Oneal<br />
Bankers<br />
White Oak Trace<br />
Monitor<br />
Brookcrest<br />
Gray Moss<br />
Woodlake<br />
Williamsburg<br />
Hickory Ridge<br />
Ridgemore<br />
Tennyson<br />
Shakespeare<br />
Eastridge<br />
Shenandoah<br />
Chaucer<br />
Herridge<br />
Snowden<br />
Heidis<br />
Jones Creek<br />
Ferrell<br />
Seven Pines<br />
Sleepy Hollow<br />
Vicksburg<br />
Bluewater<br />
Wilderness<br />
Chadsford<br />
Hogenville<br />
Malvern Hill<br />
Confederate<br />
Chantilly<br />
Antietam<br />
Kennesaw<br />
Antioch<br />
Port Hudson<br />
Mobile<br />
Pine Hill<br />
Front Royal<br />
Bay Ridge<br />
Beaconwoods<br />
Creek Round<br />
Overlook Point<br />
Spotsylvania<br />
Rapidan<br />
Chippendale<br />
Fern Ridge<br />
Canterdale<br />
Courtshire<br />
Celestial<br />
Macbeth<br />
Altus<br />
Springwater<br />
Memphis<br />
Carnifix<br />
Haynes Bluff<br />
Chattanooga<br />
Merrimac<br />
Harpers Ferry<br />
Fort Pulaski<br />
Ticonderoga<br />
Dahlgren<br />
Rock Bridge<br />
Stonewall<br />
Appomattox<br />
Tullahama<br />
Fleetwood<br />
Sweet Olive<br />
Sharpsburg<br />
Holly Springs<br />
Round Forrest<br />
Amaryliss<br />
Lantana<br />
Culps Bluff<br />
Wildflower<br />
Chancellorsville<br />
General Forrest<br />
Creek Hollow<br />
Achord<br />
Harness<br />
Bull Run<br />
Piney Point<br />
Hagerstown<br />
Weatherwood<br />
Little Poplar<br />
Wildlife Way<br />
Summer Lake<br />
Lost Oak<br />
North Shore<br />
Feather Nest<br />
Double Tree<br />
Deer Park<br />
Indian Ridge<br />
Babin<br />
Kimbleton<br />
Jefferson<br />
Commission<br />
Proxie<br />
Board<br />
Charter<br />
East Baton Rouge Parish<br />
Currency<br />
Director<br />
Barringer<br />
Cocodrie<br />
President<br />
Quorum<br />
Chairman<br />
Vice President<br />
Debit<br />
Legend<br />
Members<br />
Treasurer<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\SOUTH\SFU-R-0001.MXD SGELPI 10/21/2009 12:44:46<br />
Profit<br />
Council<br />
Woodlawn Acres<br />
Somersby<br />
Beekman<br />
Doyle<br />
Area Designated for<br />
Physical Inspection<br />
0 1,500 3,000 Feet<br />
Morel<br />
Batavia<br />
Polo<br />
qO'Neal<br />
Belle Helene<br />
Hendrick<br />
Elliot<br />
Tiger Bend<br />
Phillips<br />
Antioch Rd. - Chadsford Dr.<br />
SFU-R-0001<br />
Project Vicinity Map<br />
Figure 3-28
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4 South Forced System Capacity Improvements Projects<br />
3.4.1 SFL-C-0001 (Multiple PSs – Nicholson Drive – Brightside Drive)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The project includes replacement of PS 236, PS 336, PS 311, PS 107, Booster Pump Station<br />
(BPS) 505, and construction of new PS 503A and PS 236A. The new pump stations will work<br />
in conjunction with forcemain upgrades in other South Forced Lower Basin projects to<br />
alleviate chronic SSOs at and near these pump stations.<br />
The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
are predicted by the model to exceed the existing maximum capacities.<br />
Location<br />
The locations of the pump stations are shown in Table 3-16 and in Figure 3-29.<br />
Scope<br />
This project includes construction of the pump stations shown in Table 3-16. BPS 505 and PS<br />
505A are related, in that PS 505A is an overflow pump station for BPS 505. BPS 505 is an existing<br />
in-line booster pump station that will be converted to a wet well pump station, PS 505. Since<br />
BPS 505 will be converted to a wet well, it is possible that rather than building two new pump<br />
stations, PS 505 and PS 505A could share a divided wet well and pump in two directions, with<br />
one piped to the existing forcemain (BPS 505) and one piped to the new forcemain that will<br />
intersect with the PS 42 forcemain (PS 505A). The PS 42 forcemain is described in the Central<br />
Consolidation PS 42 Forcemain Project, as described in Section 4 of this plan.<br />
PS 236 and PS 236A will also share a divided wet well and pump in two direction, with one<br />
piped to the existing forcemain from PS 236 (dry weather) and one piped to the new PS 236A<br />
(wet weather).<br />
TABLE 3-16<br />
SFL-C-0001 (Multiple Pump Stations – Nicholson Drive – Brightside Drive) – Pump Station Information<br />
Existing Max. Future Peak Wet Dry<br />
Capacity Weather Flow Weather<br />
(GPM)<br />
(GPM) (GPM)<br />
PS No.<br />
PS 236<br />
PS 336<br />
PS 311<br />
PS 107<br />
BPS 505<br />
PS 505A<br />
PS 236A<br />
Location<br />
Brightside Road, near<br />
Riverbend Road<br />
Nicholson Road, near<br />
Riverbend Road<br />
Twelve Oaks Road, near<br />
Riverbend Road<br />
Brightside Road, near Earl<br />
Gross<br />
Intersection of Oleson Road<br />
and Brightside Road<br />
Intersection of Oleson Road<br />
and Brightside Road<br />
Brightside Road near<br />
Riverbend Road<br />
625 4,361 609<br />
417 978 153<br />
556 2,115 152<br />
833 965 375<br />
Comments<br />
5,000 5,782 2,014 Will be converted from<br />
in-line to wet well.<br />
New 2,761 0 Overflow PS for BPS<br />
505<br />
New 699 0<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $6,100,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-69 JANUARY 2011<br />
REV. 5
Gourrier<br />
Janet<br />
Line<br />
Swire<br />
Highland<br />
L S U<br />
Delgado<br />
Nicholson<br />
River<br />
Parker<br />
Paula<br />
Boyd<br />
Jennifer Jean<br />
Clara<br />
Burbank<br />
Bob Pettit<br />
Brightside<br />
Landing<br />
Tezcucco<br />
Belle Fountaine<br />
Dakin<br />
Valcour Aime<br />
Belle Cherie<br />
#I PS236A<br />
Harwich<br />
Moorstone<br />
Tigerland<br />
Y A Tittle<br />
Sharlo<br />
Alvin Dark<br />
Earl Gros<br />
#I<br />
PS107<br />
Doris<br />
Ward<br />
Oleson<br />
BPS505<br />
Etta<br />
#I#I<br />
Lee<br />
BPS505A<br />
Ben Hur<br />
Westervelt<br />
Riverbend Lakes<br />
Riverine<br />
Destrehan<br />
#I<br />
Belle Grove<br />
PS336<br />
Robillard<br />
Riverbend<br />
#I<br />
Nottaway<br />
Ormand<br />
Sarpy<br />
Calanne<br />
Three Oaks<br />
PS311<br />
Twelve Oaks<br />
Laurel Lakes<br />
Ben Hur<br />
Dean Lee<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Multiple PS - Nicholson Dr. - Brightside Dr.<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFL-C-0001<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-29<br />
0 1,200 2,400<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SFL-C-0001_mpj120510
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.2 SFL-C-0002 (Perkins/Old Perkins Area BPS 514 Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The purpose of this project is to upgrade BPS514 to handle revised flow and head<br />
requirements. The existing BPS 514 has a capacity that is less than the predicted future peak<br />
wet weather flow.<br />
Location<br />
The location of BPS 514 is given in Table 3-17 and shown in Figure 3-30.<br />
Scope<br />
The scope of the project is noted in Table 3-17. BPS 514 will be converted from an in-line<br />
booster pump station to a wet well pump station as part of this project.<br />
TABLE 3-17<br />
SFL-C-0002 (Perkins/Old Perkins Area BSP 514 Improvements) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comments<br />
BPS 514<br />
Intersection of Pecue<br />
Lane and Old Perkins<br />
Road<br />
24,000 50,830 9,476 Will be converted<br />
from in-line to<br />
wet well.<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $10,400,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Construction Appropriation Year was 2010.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-71 JANUARY 2011<br />
REV. 5
§¨¦ I-10<br />
St Alban's<br />
Pecue<br />
BPS514<br />
#I<br />
#<br />
Old Perkins<br />
Pecue<br />
Perkins<br />
#<br />
PS394<br />
#<br />
PS416<br />
Highland<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Perkins - Old Perkins Area BPS514<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFL-C-0002<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-30<br />
0 400<br />
800<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.3 SFL-C-0003 (Multiple PSs - Burbank Drive – Siegen Lane)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The following pump stations will be replaced in this project: PS 118, PS 221, PS 358, BPS 999,<br />
PS 239, and PS 229. The new pump stations will work in conjunction with forcemain<br />
upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />
these pump stations.<br />
The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
are predicted by the model to exceed the existing maximum capacities.<br />
Location<br />
The locations of the pump stations are shown in Table 3-18 and in Figure 3-31.<br />
Scope<br />
The scope of the pump station replacements is shown in Table 3-18. BPS 999 will be<br />
converted from an in-line booster pump station to a wet well pump station.<br />
TABLE 3-18<br />
SFL-C-0003 (Multiple Pump Stations - Burbank Drive - Siegen Lane) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comments<br />
PS 118<br />
Near Rue Crozat and Rue<br />
Desiree<br />
417 909 171<br />
PS 221 Near Barkley and Mirkwood 694 1,058 232<br />
PS 358<br />
BPS 999<br />
PS 239<br />
PS 229<br />
Old Perkins Road, near<br />
Oakbrook Road<br />
Siegen Road, near Quail<br />
Ridge<br />
Near Neil Avenue and<br />
Highland Knoll Court<br />
Near intersection of<br />
Rendale Avenue and<br />
Brookhollow Drive<br />
208 235 29<br />
6,250 8,855 1,962 Will be converted<br />
from in-line to wet<br />
well.<br />
69 168 48<br />
278 694 202<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $4,100,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design and Construction has not started.<br />
GNV31031158547.DOCX/103440004 3-73 JANUARY 2011<br />
REV. 5
#<br />
#<br />
#<br />
Corby<br />
PS300<br />
PS90<br />
Obrien<br />
Lakeside Oak<br />
Court<br />
Rod Laver<br />
Greenbriar Hollow<br />
Great Oak<br />
#<br />
PS118<br />
#I<br />
#<br />
Oak Hills<br />
Amiens<br />
Don Budge<br />
Wimbledon<br />
#<br />
#<br />
Lew Hoad<br />
PS117<br />
Oak Haven<br />
Towering Oaks<br />
PS180<br />
Oakwilde<br />
Oakshire<br />
Chester<br />
Highland<br />
Oakcliff<br />
Barkley<br />
PS447<br />
#<br />
#<br />
PS381<br />
PS358<br />
#I<br />
#<br />
#I<br />
# PS221<br />
#<br />
Wyatt<br />
Winterhue<br />
#<br />
PS330<br />
#<br />
#<br />
#<br />
#<br />
BPS999<br />
#I<br />
##<br />
<strong>Plan</strong>tation Ridge<br />
Oakbrook<br />
Carnforth<br />
Briarrose<br />
#<br />
Amiss<br />
Mint<br />
PS182<br />
Perkins<br />
Siegen<br />
Troutbeck Ymca Plaza<br />
Highland Trace<br />
PS12<br />
Mullen<br />
Lombard<br />
#<br />
Briarridge<br />
Siegen<br />
Honey<br />
Bullrush<br />
Denver<br />
Highland<br />
#<br />
#<br />
Potwin<br />
PS411<br />
PS262<br />
Neil<br />
Kinglet<br />
Peck<br />
Stafford<br />
BPS944<br />
#<br />
#<br />
PS239<br />
#I<br />
PS99<br />
# #<br />
#I<br />
# PS229<br />
#<br />
PS108<br />
Gamwich<br />
#<br />
PS235<br />
Hobbiton<br />
Woodview<br />
PS333<br />
Orleans<br />
Broad<br />
Oaks<br />
Mall<br />
Gravier<br />
Poydras<br />
Paddington<br />
Reiger<br />
§¨¦ I-10<br />
Baronne<br />
Bayswater<br />
Shadow Oak<br />
Mall<br />
Burbank<br />
East Baton Rouge Parish<br />
#<br />
Legend<br />
Proposed<br />
Multiple PS - Burbank - Siegen<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFL-C-0003<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-31<br />
0 1,000<br />
2,000<br />
Feet<br />
Jean Lafitte<br />
Corsair<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.4 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer<br />
Upgrades)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The following pump stations will be replaced in this project: PS 182, PS 223, PS 327, PS 353,<br />
PS 278, PS 372, and PS 365. The new pump stations will work in conjunction with forcemain<br />
upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />
these pump stations.<br />
The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
are predicted by the model to exceed the existing maximum capacities.<br />
Location<br />
Table 3-19 and Figure 3-32 show the locations of the pump stations in this project. These<br />
pump stations are generally located in the area of Jefferson Highway and Highland Road.<br />
Scope<br />
Table 3-19 shows the detailed scope of this project.<br />
TABLE 3-19<br />
SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer Upgrades) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak<br />
Wet Weather<br />
Flow (GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS 182 Near YMCA Plaza Drive 208 417 148<br />
Comments<br />
PS 223<br />
PS 327<br />
PS 353<br />
Intersection of Don Budge<br />
Avenue and Backcourt Drive<br />
Intersection of Alder Drive and<br />
Crepe Myrtle Drive<br />
Intersection of Azalea Lakes<br />
Avenue and Lake Iris Avenue<br />
278 795 168<br />
278 369 44<br />
486 537 49<br />
PS 278 Near Bainbridge Avenue 347 764 174<br />
PS 372<br />
PS 365<br />
Intersection of West Lake<br />
Terrace Drive and Lake Tulip<br />
Avenue<br />
Intersection of Sugar Mill<br />
Avenue and Umbehagen Lane<br />
278 544 314<br />
1,528 4,155 762<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $3,476,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2009.<br />
Construction is on-going.<br />
GNV31031158547.DOCX/103440004 3-75 JANUARY 2011<br />
REV. 5
Bea<br />
Arnold<br />
Hickory Ridge<br />
O'Neal<br />
Antioch<br />
Elliot<br />
#<br />
#<br />
Shirley<br />
#<br />
#<br />
#<br />
PS300<br />
#<br />
# #<br />
#<br />
PS5XX PS404<br />
#<br />
# #<br />
#<br />
PS156<br />
PS77<br />
PS174<br />
PS337 PS154<br />
PS380 #<br />
PS162 #<br />
# #<br />
#<br />
#<br />
PS402<br />
PS17<br />
PS168<br />
BPS889 PS283<br />
#<br />
#<br />
#<br />
#<br />
PS143<br />
PS392 PS427 PS442 PS391<br />
PS328 # PS136<br />
PS270 PS173<br />
PS403<br />
#<br />
# # #<br />
# #<br />
# PS135 # # PS346<br />
PS390<br />
PS134<br />
#<br />
#<br />
PS216<br />
#<br />
PS396 #<br />
PS217<br />
PS258<br />
#<br />
PS384<br />
#<br />
# #<br />
PS256<br />
#<br />
#<br />
PS95 PS171<br />
#<br />
# #<br />
# #<br />
PS428<br />
PS36<br />
#<br />
PS115<br />
PS177<br />
## PS148<br />
BPS777 PS308<br />
#<br />
PS296<br />
PS250<br />
#<br />
#<br />
PS251<br />
PS434 PS219 PS172<br />
PS85<br />
#<br />
##<br />
# #<br />
PS88 PS423<br />
PS338<br />
PS339<br />
#<br />
#<br />
#<br />
# #<br />
PS307<br />
PS232<br />
PS247 #<br />
#<br />
#<br />
#<br />
PS299<br />
PS395<br />
PS379 PS1003<br />
PS112<br />
# #<br />
#<br />
#<br />
PS389<br />
PS252 PS147<br />
PS274<br />
PS201<br />
PS111 #<br />
PS213<br />
# # # # # # # PS438 PS410<br />
#<br />
#<br />
PS355<br />
PRIVATEPS<br />
PS287<br />
BPS507<br />
PS170<br />
# #<br />
#<br />
#<br />
#<br />
#I<br />
PRIVATEPS PRIVATEPS<br />
PS266<br />
PS223<br />
PS184<br />
# # #<br />
#<br />
#<br />
PS157<br />
#<br />
#<br />
#I<br />
PS332<br />
PS182<br />
PS447<br />
#<br />
PS1005<br />
# #<br />
PS248<br />
#<br />
#<br />
PS411<br />
#<br />
#<br />
PS117<br />
PS331<br />
BPS944<br />
# PS358<br />
#<br />
PS108<br />
#<br />
#<br />
#I<br />
PS435<br />
PS327<br />
PS118<br />
PS393<br />
#<br />
#<br />
#<br />
PS259<br />
#<br />
PS221<br />
#<br />
PS309<br />
PS1002<br />
PS254#<br />
# # # # PS431<br />
PS330<br />
PS441<br />
PS12<br />
PS367<br />
#<br />
# #<br />
PS159<br />
PS180<br />
PS99<br />
PS400<br />
#<br />
#<br />
PS239<br />
BPS514<br />
PS405<br />
PS161<br />
# # #<br />
# #<br />
#<br />
PS365 #<br />
#I<br />
PS229<br />
#I<br />
#<br />
#<br />
PS372<br />
PS385 PS383<br />
PS394 PS416<br />
# PS235<br />
#<br />
# #<br />
PS378<br />
PS399<br />
PS333<br />
#<br />
PS413 #<br />
#<br />
#I #I<br />
#<br />
# PS353<br />
PS366<br />
PS398<br />
PS260<br />
#<br />
#<br />
#<br />
PS382 PS278<br />
# #<br />
PS344<br />
PS436<br />
#<br />
PS356<br />
#<br />
PS388<br />
#<br />
#<br />
# #<br />
PS343<br />
PS350<br />
PS349<br />
Fleet<br />
Summa<br />
Paulet<br />
Obrien<br />
PS90<br />
Rue Crozat<br />
PS409<br />
Burbank<br />
Tradition<br />
Fairway<br />
Drusilla<br />
Strand<br />
Maiden<br />
Great Oak<br />
Chelsea<br />
Gail<br />
Oakdale<br />
Hill<br />
I-12<br />
Baker<br />
Pine Park<br />
Pastureview<br />
Lake Estates<br />
Field<br />
Oakcliff<br />
Chester<br />
Brookline<br />
Interline<br />
Purvis<br />
Oliphant<br />
Barkley<br />
Jefferson<br />
Reitz<br />
Upton<br />
Carnforth<br />
Sundance<br />
Plaza Americana<br />
Bluebonnet<br />
Floynell<br />
Cal<br />
Tanglebriar<br />
Azrok<br />
Amiss<br />
Cedarlane<br />
Daradele<br />
Cedarcrest<br />
Ridgely<br />
Hillyard<br />
Mullen<br />
Neil<br />
Potwin<br />
Oakline<br />
Fernbrook<br />
Peck<br />
Perkins<br />
Caroljack<br />
Woodleigh<br />
Siegen<br />
Aubin<br />
Mead<br />
Ericson<br />
E Heck<br />
Southpark<br />
Industriplex<br />
Mall<br />
Toulon<br />
Honore<br />
Reiger<br />
Poydras<br />
Broad<br />
Brookhollow<br />
Jean Lafitte<br />
Highland Oaks<br />
Paddock<br />
Telesmar<br />
I-10<br />
Baylor<br />
Sherwood Forest<br />
Cloverland<br />
St Alban's<br />
Corsair<br />
Campden<br />
Claiborne<br />
Brakley<br />
Newcastle<br />
Exchequer<br />
Lancelot<br />
Wentling<br />
Sun Belt<br />
Parkmeadow<br />
Parkforest<br />
Parkhaven<br />
British<br />
Galahad<br />
Harris<br />
Pecue<br />
George Cain<br />
Coursey<br />
Pecue<br />
Woodland Ridge<br />
Stumberg<br />
Mourning Dove<br />
Rose<br />
La Crete<br />
Five Oaks<br />
Country Hill<br />
Millwood<br />
Quinn<br />
Crossing<br />
Gentry<br />
Airline<br />
Briarwood<br />
Saint Clare<br />
Westridge<br />
Kimbleton<br />
Greens<br />
Buckley<br />
Pinehurst<br />
Mission Hill<br />
Buzbee<br />
Highlandia<br />
Augusta<br />
Sessions<br />
Herridge<br />
Snowden<br />
Old Perkins<br />
Harrells Ferry<br />
Jones Creek<br />
Barringer<br />
Terrell<br />
Board<br />
Director<br />
Barringer Foreman<br />
Highland<br />
Elmhurst<br />
George Oneal<br />
Ferrell<br />
Profit<br />
Perkins<br />
Muirfield<br />
Windsong<br />
Debit<br />
Jefferson<br />
Malvern Hill<br />
Shenandoah<br />
Confederate<br />
Spyglass Hill<br />
Santa Maria<br />
Silver Sand<br />
Chantilly<br />
Morel<br />
Doyle<br />
Round Oak<br />
Gray Moss<br />
Chadsford<br />
Appomattox<br />
Miller<br />
Paladin<br />
Monitor<br />
Culps Bluff<br />
General Forrest<br />
Achord<br />
Amaryliss<br />
Belle Helene<br />
Hendrick<br />
Barrett<br />
Hoo Shoo Too<br />
Palmer<br />
Hagerstown<br />
Harness<br />
Vignes<br />
Woodlake<br />
Piney Point<br />
Wildlife Way<br />
Green Willow<br />
Beaujolaes<br />
PS316<br />
PS211<br />
PS360<br />
PS347<br />
Babin<br />
Bengal<br />
Phillips<br />
Tiger Bend<br />
1<br />
2<br />
4<br />
5<br />
107 6<br />
8<br />
12 11<br />
9<br />
3<br />
East Baton Rouge Parish<br />
Proposed<br />
#I<br />
")<br />
New Pump<br />
Stations<br />
New Gravity Main<br />
New Force Main<br />
New Storage Facility<br />
Legend<br />
³<br />
#<br />
!R<br />
0 0.5 1<br />
Miles<br />
Existing<br />
Exist. Gravity<br />
Exist. Forcemain<br />
Exist. Pump Station<br />
Manholes\Nodes<br />
Figure 3-32<br />
Group Project 2<br />
SFL-C-0004<br />
Project Vicinity Map<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0004.MXD SGELPI 10/22/2009 08:40:06
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.5 SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) project consists of<br />
forcemain upgrades in the South Forced Lower Basin. This project includes the upsizing of<br />
forcemain in an area that extends north to the intersection of Jefferson Highway and Tiger<br />
Bend Road and continues south to the Staring Lane extension and Burbank Drive intersection.<br />
The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />
forcemain capacity. The upgrades range in size from 48-inch to 60-inch diameter.<br />
Location<br />
The first segment of forcemain from node BPS 507 to BPS 514 begins at BPS 507 near the<br />
intersection of Kimbleton Avenue and Jefferson Highway. Upon leaving the pump station the<br />
forcemain travels south through a servitude along the east edge of the Briarwood Golf Club<br />
for approximately 2,800 feet before turning slightly east. At this point, the forcemain crosses<br />
the golf club for approximately 1,300 feet before crossing Airline Highway. After crossing<br />
Airline Highway, the forcemain continues south parallel to Pecue Lane. Approximately 1,200<br />
feet passed the Airline Hwy, new 48-inch forcemain connects to an existing 42-inch PCCP<br />
forcemain and 3,000 LF of existing forcemain is used for this alignment. Before I-10, the<br />
existing 42-inch PCCP forcemain crossing connects to a new 48-inch forcemain that then<br />
crosses I-10, Ward Creek, and the railroad, and continues south to BPS 514.The forcemain<br />
resumes downstream of BPS 514 and continues south to Highland Road, crosses, and follows<br />
the Entergy right-of-way to Buccaneer Avenue, then to Burbank Drive. It then follows<br />
Burbank Drive to the intersection of Burbank Drive and Staring Lane extension.<br />
Scope<br />
SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) includes<br />
construction of approximately 12,600 feet of 48-inch forcemain, approximately 23,800 feet of<br />
54-inch forcemain, and approximately 6,200 feet of 60-inch forcemain downstream of BPS<br />
507 and BPS 514. Table 3-20 and Figure 3-33 shows the detailed scope of this project.<br />
TABLE 3-20<br />
SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing Diameter<br />
(in)<br />
BPS 507 SS340 6,610 42 48<br />
SS340 SS364 3,780 42 48<br />
SS369 BPS514 2,200 42 48<br />
BPS514<br />
15,000 48 54<br />
Burbank Drive<br />
Intersection<br />
Bluebonnet Blvd<br />
Intersection<br />
Burbank Dr<br />
Intersection<br />
Bluebonnet Blvd<br />
Intersection<br />
Staring Lane<br />
Extension<br />
Proposed Diameter<br />
(in)<br />
8,800 48 54<br />
6,200 48 60<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Comments<br />
Total Construction Bid Amount is $20,700,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Construction Appropriation Year was 2010.<br />
Construction is on-going.<br />
GNV31031158547.DOCX/103440004 3-77 JANUARY 2011<br />
REV. 5
Bea<br />
# #<br />
#<br />
#<br />
#<br />
# ##<br />
# #<br />
#<br />
#<br />
PS446<br />
#<br />
G S R I<br />
Port<br />
#<br />
#<br />
Gardere<br />
Ned<br />
Quail<br />
#<br />
#<br />
#<br />
PS267<br />
Orion<br />
PS97<br />
# #<br />
Burden<br />
Irene<br />
Walden<br />
Pikes<br />
#<br />
#<br />
# #<br />
PS40<br />
#<br />
#<br />
#<br />
#<br />
# #<br />
SS381<br />
!R<br />
# PS27 #<br />
#<br />
# #<br />
# !R<br />
#<br />
Highland<br />
PS374<br />
Staring<br />
Springlake<br />
#<br />
Hilltree<br />
PS417<br />
I-12<br />
PS58<br />
PS58A<br />
#<br />
Picardy<br />
Essen<br />
PS301<br />
#<br />
#<br />
PS302<br />
SS98<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS437<br />
PS317<br />
Anselmo<br />
PS409<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
Drusilla<br />
Summa<br />
PS300<br />
Obrien<br />
Villa<br />
#<br />
#<br />
# #<br />
#<br />
#<br />
Burbank<br />
Gail<br />
PS299<br />
PS223<br />
#<br />
Hill<br />
#<br />
Cal<br />
#<br />
#<br />
PS447<br />
Reitz<br />
Azrok<br />
Upton<br />
# # #<br />
#<br />
# #<br />
#<br />
#<br />
PS355<br />
#<br />
#<br />
PS411 #<br />
#<br />
#<br />
#<br />
#<br />
#<br />
# #<br />
#<br />
#<br />
#<br />
#<br />
PS235 #<br />
Amiss<br />
Siegen<br />
PS389<br />
#<br />
#<br />
#<br />
PS108<br />
#<br />
Highland Oaks<br />
PS260<br />
#<br />
Honore<br />
Reiger<br />
Mall<br />
Corsair<br />
PS171<br />
PS331<br />
#<br />
#<br />
#<br />
#<br />
#<br />
Dunlay<br />
#<br />
#<br />
Reiger<br />
!R #<br />
PS416<br />
#<br />
PS134<br />
#<br />
#<br />
!R<br />
#<br />
PS147<br />
George Cain<br />
#<br />
BPS514<br />
Perkins<br />
British<br />
Fulwar Skipwith<br />
Pecue<br />
Stumberg<br />
#<br />
##<br />
#<br />
#<br />
# PS379<br />
#<br />
!R<br />
Pecue<br />
!R<br />
PS435<br />
#<br />
SS369<br />
Rose<br />
Old Perkins<br />
Colony<br />
#<br />
SS271<br />
SS340<br />
#<br />
Airline<br />
#<br />
#<br />
PS259<br />
PS378<br />
Westridge<br />
PS270<br />
#<br />
PS201<br />
#<br />
#<br />
PS1002<br />
#<br />
Coursey<br />
Buzbee<br />
PS184<br />
I-10<br />
#<br />
Nicholson<br />
#<br />
PS444<br />
Pentagon<br />
Tradition<br />
PS356<br />
#<br />
#<br />
PS350<br />
#<br />
PS344<br />
#<br />
#<br />
River<br />
University Club<br />
#<br />
PS408<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Existing<br />
Highland Rd. - Burbank Dr.<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
SFL-C-0005<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-33<br />
0 0.4 0.8<br />
³Miles<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES_2010\CAPACITY\SOUTH\SFL-C -0005_mpj111610.MXD
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.6 SFL-C-0006 (Nicholson Drive – Highland Road – Perkins Road Capacity<br />
Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SFL-C-0006 (Nicholson Drive – Highland Road –Perkins Road Capacity Improvements)<br />
project consists of forcemain and gravity upgrades in the South Forced Lower Basin. The<br />
project has been divided into two phases during construction for ease of execution: Phase A<br />
- Willow Grove Capacity Improvements and Phase B – Nicholson Drive – Highland Road –<br />
Perkins Road Capacity Improvements.<br />
The Phase A (Willow Grove Capacity Improvements) project consists of forcemain and<br />
gravity upgrades in the South Forced Lower Basin. This project includes the upsizing of<br />
forcemain and gravity mains in an area that extends east to the intersection of Siegen Lane<br />
and South Mall Drive and also to south to Perkins Road. The upgrades are designed to<br />
alleviate chronic SSOs at the pump stations and increase the gravity main capacity. The<br />
upgrades range in size from 8 inches to 18 inches in diameter.<br />
The Phase B (Nicholson Drive – Highland Road – Perkins Road Capacity Improvements)<br />
project consists of forcemain and gravity upgrades in the South Forced Lower Basin. This<br />
project includes the upsizing of forcemain and gravity mains in an area that extends north<br />
to the intersection of Jefferson Highway and Tiger Bend Road and continues south to the<br />
South WWTP on Gardere Lane. The upgrades are designed to alleviate chronic SSOs at the<br />
pump stations and increase the gravity main capacity. The upgrades range in size from 6<br />
inches to 24 inches in diameter.<br />
Location – Phase A<br />
The Phase A (Willow Grove Capacity Improvements) project involves the replacement of<br />
portions of the South Forced Lower forcemain and gravity systems as shown in Figures 3-<br />
34A. The majority of the contributing flows are from residential areas. The upgrades can be<br />
broken into the following segments.<br />
Forcemain segment PS 223 to SS312 starts at PS 223, which is at the intersection of Roy<br />
Emerson Drive and Don Budge Avenue, and travels overland to node SS312, which is on the<br />
corner of Lew Hoad Avenue.<br />
Forcemain segment Willow Grove added to the PDP at the request of the DPW. Forcemain<br />
starts from Willow Grove forcemain connection to existing 10-inch forcemain at the north<br />
side of KCS railroad. New 12-inch forcemain follows KCS railroad easterly direction<br />
approximately 1,600 LF and then crosses to the north side of Ward Creek. Approximately<br />
600 LF runs parallels to Ward Creek and extends all the way to PS944. Crosses at south side<br />
of the Ward Creek near Siegen Lane overpass and connects to existing 18-inch forcemain.<br />
The existing 14-inch crossing will be abandoned.<br />
Gravity segment 944-01006 to PS 944 begins near the intersection of Mint Drive and<br />
Buttercup Drive and runs east along a drainage path to PS 944, located near the intersection<br />
of Andrea Drive and South Mall Drive.<br />
GNV31031158547.DOCX/103440004 3-79 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 108-00047 to 108-00008 starts at manhole 108-00047, which is at the corner<br />
of Meadowbrook Avenue and Meadowmere Drive, and travels in a southerly direction<br />
along Meadowbrook Avenue to the corner of Meadowbrook and Meadowlane Drive. The<br />
gravity line turns westerly along Meadowlane Drive to manhole 108-00008, which is<br />
between Meadowlane Drive and Perkins Road.<br />
Forcemain segment SS371 to SS385 begins at node SS371, which is at corner of Twisted Oak<br />
Lane and Oak Hills Parkway, and travels along Oak Hills Parkway to node SS385, which is<br />
at Siegen Lane.<br />
Location – Phase B<br />
The Phase B (Nicholson – Highland – Perkins Capacity Improvements) project involves the<br />
replacement of portions of the South Forced Lower forcemain and gravity systems as shown<br />
in Figures 3-34B and 3-34C. A majority of the contributing flows are from residential areas.<br />
The upgrades can be broken into the following segments.<br />
Forcemain segment PS 259 to SS340 starts at PS 435, near the intersection of Thistle Ridge<br />
Drive and Martin Ridge Drive. From PS 259, the forcemain continues in a northwesterly<br />
direction through the subdivision and through empty lots, following a servitude/drainage<br />
path to Pecue Lane, where node SS340 is located.<br />
Forcemain segment PS278FM to SS459 starts at the intersection of Brunswick Avenue and<br />
Macon Drive. The forcemain continues in a generally northeasterly direction through the<br />
subdivision to Jefferson Highway, intersecting with Jefferson Highway near Pecan Creek<br />
Lane. At Jefferson Highway, the forcemain follows the highway in a northwesterly direction<br />
to node SS459, which is on Jefferson Highway between Lake Iris Road and Lake Azalea<br />
Drive.<br />
Gravity segment 365-01007 to 365-00001Z starts at manhole 365-01007, which is on Jefferson<br />
Highway between Chasefield Avenue and Nine Oaks Avenue, and travels in a southerly<br />
direction between Beckfield Avenue and Sugar Mill Avenue to manhole 365-00001Z, which<br />
is next to PS365.<br />
Forcemain segment PS 365FM to SS 471 starts at PS 365, which is on Umbehagen Lane near<br />
Sugar Mill Avenue, follows Umbehagen Lane for approximately 600 feet, crosses Airline<br />
Highway, and continues in a southwesterly direction to node SS449. From node SS449, the<br />
forcemain travels in a southwesterly direction parallel to Highland Road to node SS471,<br />
which is north of a drainage path that is south of Bellerive Court.<br />
Forcemain segment PS 398 to SS502 starts at the cul-de-sac on Arcadian Shores Drive and<br />
continues in a southwesterly direction along Arcadian Shores Drive and Spyglass Hill Drive<br />
to node SS502, which is roughly located near the end of Spyglass Hill drive, near a drainage<br />
path.<br />
Forcemain segment SS502 to SS489 starts at SS502, which is at the intersection of Santa Marie<br />
Avenue and Trent Jones Drive. The forcemain continues in a northwesterly direction<br />
following Trent Jones Drive and paralleling Perkins Road to a servitude near Petroleum<br />
Drive connects to SS489.<br />
Forcemain segment PS378 to Old Perkins starts at PS378, which is between La Create Lane<br />
and 5 Oaks Drive at the south side of Perkins Road. The forcemain travels west to La Crete<br />
Lane and turn north to La Crete Lane. connects to Old Perkins road new alignment.<br />
GNV31031158547.DOCX/103440004 3-80 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Forcemain segment SS451A to Old Perkins starts at SS451A, which is between La Create<br />
Lane and Pecue Lane at the north side of Perkins Road. The forcemain trowels south from<br />
wooded area to old Perkins Road connects to new alignment.<br />
Forcemain segment SS489 to BPS514 starts at SS489, which is near Petroleum Drive goes<br />
west parallel to KCS railroad crosses Highland Road and follows Old Perkins Road Crosses<br />
Barringer Foreman Road. KCS railroad and I-10 stays at south sides of Old Perkins and<br />
connect to BPS514.<br />
Forcemain segment PS 253 to SS370 starts on Round Oak Drive, north of its intersection with<br />
Shady Grove Avenue. The forcemain travels southwest until reaching SS370, located<br />
northwest of Highland Road and Jefferson Highway.<br />
Forcemain segment PS 229FM to SS400 begins at PS 229, which is at the end of Brookhollow<br />
Drive and travels in a northwesterly direction to node SS400, which is at the end of Scotland<br />
Court.<br />
Forcemain segment PS 336 to PS 311 begins at PS 336, which is at intersection of Bon Sejour<br />
Avenue and Destrehan Drive travels east at Bon Sejour Avenue. turns south at Belle Grove<br />
Avenue turns east at 12 Oaks Avenue and connects with PS 311<br />
Forcemain segment PS 311 to 236-00085A begins at PS 311, which is at south side of 12 Oaks<br />
Avenue Between Durander Drive and Riverbend Blvd. travels east to Entergy Transmission<br />
OW. Turns north and connects to new gravity manhole 236-00085A.<br />
Gravity segment 236-00085A to 236-00073A starts at manhole 365-01007, which is on<br />
Jefferson Highway between Chasefield Avenue and Nine Oaks Avenue, and travels in a<br />
southerly direction between Beckfield Avenue and Sugar Mill Avenue to manhole 365-<br />
00001Z, which is next to PS365.<br />
Gravity segment 236-00002 to PS 236 starts southwest of the PS236. The gravity line travels<br />
northeast until reaching PS 236, which is between Brightside Drive and Valcour Aime<br />
Avenue.<br />
Gravity segment 236-00055 to 236-00002 starts east of Duncan Kenner Drive at inside GSU<br />
servitude and travels north until reaching 236-00002, located southeast of Dakin Avenue<br />
cul-de-sac.<br />
Gravity segment 236-00073A to 236-00055 starts at manhole 236-00073A east of Duncan<br />
Kenner Drive at inside GSU servitude and travels north until reaching 236-00055.<br />
Gravity segment 236-00085A to 236-00073A starts at manhole 236-00085A east of Duncan<br />
Kenner Drive at inside GSU servitude and travels north until reaching 236-00073A.<br />
Forcemain segment PS 236 to PS 505A begins at PS 236, which is between Brightside Drive<br />
and Valcour Aime Avenue. travels southeast at GSU ROW. to Dean Lee Drive until reaching<br />
PS505A and connects to junction box right before PS505A.<br />
Forcemain segment PS 505 to PS 505A begins at PS 505, which is at intersection of Nicholson<br />
Drive and Dean Lee Drive travels west at Dean Lee Drive and connects to PS 505A.<br />
Forcemain segment PS 505A to PS 505 begins at PS 505A, which is at Deen Lee drive travels<br />
east at Dean Lee Drive and connects to PS 505 at intersection of Nicholson Drive and Dean<br />
Lee Drive.<br />
GNV31031158547.DOCX/103440004 3-81 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Scope – Phase A<br />
The Phase A (Willow Lane Capacity Improvements) project includes construction of<br />
approximately 1,800 feet of 8-inch forcemain upstream of PS223, 1,900 feet of 10-inch gravity<br />
sewer upstream of PS 944, approximately 1,600 feet of 12-inch, 256 feet of 14-inch, 2,358 feet<br />
of 16-inch and 280 feet of 18-inch forcemain upstream of PS944, approximately 1,600 feet of<br />
12-inch gravity sewer upstream of PS 108 and approximately 1,953 feet of 12-inch forcemain<br />
upstream of SS385 in the South Forced Lower Basin. Table 3-21 shows the detailed scope of<br />
this project.<br />
TABLE 3-21A<br />
Sfl-C-0006 (Phase A - Willow Lane Capacity Improvements)<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
108-00047 108-00001 50 8 12 Gravity sewer<br />
108-00001 108-00003 510 8 12 Gravity sewer<br />
108-00003 108-00005 560 8 12 Gravity sewer<br />
108-00005 108-00008 440 8 12 Gravity sewer<br />
PS 223 SS312 1,800 6 8<br />
SS371 SS385 1,953 10 12<br />
944-01006 PS 944 1,920 8 10 Gravity sewer<br />
Willow Grove SS327 1,654 12<br />
SS327 SS323A 256 14<br />
SS323A 944FM 2,358 16<br />
944FM SS335 280 18<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Scope – Phase B<br />
The Phase B (Nicholson – Highland – Perkins Capacity Improvements) project includes<br />
construction of approximately 945 feet of 18-inch gravity sewer upstream of PS 236,<br />
approximately 1,980 feet of 21-inch and 2,200 feet of 24-inch gravity sewer upstream of PS<br />
365. The project also includes the construction of approximately 5,470 feet of 8-inch, 5,277<br />
feet of 10-inch, 4,611 feet of 12-inch, 50 feet of 14-inch, 11,827 feet of 16-inch, 860 feet of 20-<br />
inch and 11,400 feet of 24-inch forcemain in the South Forced Lower Basin. Table 3-21B<br />
shows the detailed scope of this project.<br />
GNV31031158547.DOCX/103440004 3-82 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-21B<br />
SFL-C-0006 (Phase B - Nicholson Drive – Highland Road – Perkins Road Capacity Improvements) –<br />
Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
PS 259 SS340 1,650 6 8<br />
PS 278FM SS459 2,600 5 8<br />
Comments<br />
365-01007 365-00001Z 2,200 18 24 Gravity sewer<br />
PS 365FM SS444 50 10 14<br />
SS444 SS471 4,700 14 16<br />
PS 398 SS502 3,100 8 10<br />
SS502 SS489 1,900 8 12<br />
PS378 Old Perkins 1,850 6<br />
SS451A Old Perkins 750 6<br />
SS489 BPS514 11,400 24<br />
PS 253 SS370 4000 6 8<br />
PS 229FM SS400 1,700 6 8<br />
PS336 PS311 2,177 10<br />
PS311 236-00085A 2,711 12<br />
236-00002 PS 236 260 12 21 Gravity sewer<br />
236-00055 236-00002 510 12 21 Gravity sewer<br />
236-00055 236-00073A 1,210 21 Gravity sewer<br />
236-00073A 236-00085A 945 18 Gravity sewer<br />
PS236 PS505A 7,127 16<br />
PS505 PS505A 469 20<br />
PS505A 50504 391 20<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount (Phase A and B) is $11,400,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-83 JANUARY 2011<br />
REV. 5
!R #<br />
PS223<br />
!R<br />
SS312<br />
#<br />
PS203<br />
Kinglet<br />
Buttercup<br />
I-10<br />
Don Budge<br />
John Newcombe<br />
Fred Perry<br />
Roy Emerson<br />
Lew Hoad<br />
#<br />
PS447<br />
Mint<br />
Hawthorne<br />
Thrush<br />
Bunting<br />
Mall<br />
Rod Laver<br />
Jack Kramer<br />
Wimbledon<br />
Oak Manor<br />
Oakchase<br />
#<br />
PS381<br />
#<br />
PS182<br />
!R<br />
944-01006<br />
Andrea<br />
!R #<br />
Mall<br />
PS944<br />
Oak Shadow<br />
Great Oak<br />
Ridgeland<br />
PS118<br />
#<br />
Rue Crozat<br />
<strong>Plan</strong>tation Oak<br />
Rue Desiree<br />
Oak Hills<br />
Amiens<br />
Lakeview<br />
#<br />
PS117<br />
Towering Oaks<br />
Verdun<br />
Lakeview<br />
Oak Haven<br />
Rossmore<br />
East Baton Rouge Parish<br />
Oakferd<br />
Oakwilde<br />
Oakshire<br />
!R<br />
Chester<br />
Beacon Tree<br />
Oakdale<br />
Oak Point<br />
Manor Oak<br />
SS371<br />
Oakcliff<br />
Mirkwood<br />
Twisted Oak<br />
Barkley<br />
Pastureview<br />
Oak Creek<br />
#<br />
PS221<br />
#<br />
Shireburk<br />
Masterson<br />
Thornberry<br />
PS358<br />
Perkins<br />
Wyatt<br />
Suffolk<br />
#<br />
PS393<br />
#<br />
PS254<br />
Wordsworth<br />
PS330<br />
PS159<br />
Oakbrook<br />
Carnforth<br />
King James<br />
Magnolia Chase<br />
#<br />
#!R<br />
Kentmere<br />
Troutbeck Ymca Plaza<br />
Wheatsheaf<br />
Legend<br />
#<br />
Phase A<br />
Proposed<br />
Existing<br />
³<br />
(Willow Grove Capacity Improvements) !R<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
SFL-C-0006<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34A_mpj111910.MXD<br />
SS385<br />
0 1,000<br />
2,000<br />
Feet<br />
Siegen<br />
Natchez<br />
Briargrove<br />
Mc Quaid<br />
Lombard<br />
#<br />
Mullen<br />
PS12<br />
Denver<br />
!R<br />
#<br />
Meadowpark<br />
Honey<br />
Potwin<br />
PS411<br />
Meadowview<br />
Stafford<br />
Meadowbrook<br />
108-00008<br />
Figure 3-34A<br />
Honey<br />
Peck<br />
!R #<br />
Metairie<br />
Gamwich<br />
108-00047<br />
Michel Delving<br />
Kenner<br />
Hobbiton<br />
Southland
Antioch<br />
#<br />
#<br />
PS287<br />
#<br />
Exchequer<br />
#<br />
PS332<br />
#<br />
PS147<br />
Pecue<br />
#<br />
#<br />
PS379<br />
#<br />
PS201<br />
Kimbleton<br />
Pennhill<br />
Tiger Bend<br />
#<br />
PS184<br />
Proxie<br />
Board<br />
#<br />
#<br />
#<br />
PS274<br />
Barringer<br />
PS111<br />
Cocodrie<br />
Quorum<br />
Profit<br />
#<br />
#<br />
Debit<br />
#<br />
PS266<br />
#<br />
#<br />
PS438<br />
Woodlawn Acres<br />
Doyle<br />
Morel<br />
Batavia<br />
O'Neal<br />
Miller<br />
#<br />
Achord<br />
PS157<br />
Sweet Olive<br />
Hendrick<br />
#<br />
#<br />
PS1005<br />
Elliot<br />
PS410<br />
#<br />
#<br />
#<br />
Reiger<br />
#<br />
!R<br />
SS426<br />
BPS514<br />
PS394<br />
PS416<br />
#<br />
Perkins<br />
Pecue<br />
Old Perkins<br />
British<br />
!R<br />
SS340<br />
PS435<br />
Rose<br />
#<br />
Briarlake<br />
!R #<br />
PS1002<br />
#<br />
PS309<br />
#<br />
PS431<br />
#<br />
#<br />
!R<br />
Airline<br />
#!R SS471<br />
# !R<br />
PS378<br />
PS413 !R<br />
#<br />
278-00029<br />
!R<br />
#!R<br />
!R<br />
PS398<br />
#<br />
SS502 !R #<br />
!R<br />
Five Oaks<br />
SS458<br />
Lilian<br />
PS259<br />
Castille<br />
Greens<br />
Buzbee<br />
Highlandia<br />
Perkins<br />
Barringer<br />
Highland<br />
Barringer Foreman<br />
Sotile<br />
Jefferson<br />
SS370<br />
#<br />
Umbehagen<br />
Round Oak<br />
PS365FM<br />
PS426<br />
!R #<br />
!R #<br />
PS253FM<br />
Nine Oaks<br />
!R<br />
365-00001Z<br />
Breman<br />
Paladin<br />
Airline<br />
Talton<br />
Preston<br />
365-01007<br />
Moultrie<br />
#<br />
Vignes<br />
Barrett<br />
#<br />
PS405<br />
Green Willow<br />
PS367<br />
#<br />
SS459<br />
Lake Iris<br />
PS400<br />
#<br />
278-00028<br />
PS278FM<br />
#<br />
PS353<br />
#<br />
Highland Crossing<br />
PS356<br />
#<br />
PS350<br />
#<br />
#<br />
PS344<br />
#<br />
#<br />
I-10<br />
Amen Corner<br />
Lakeway<br />
Elmhurst<br />
Muirfield<br />
#<br />
Trent Jones<br />
PS343<br />
#<br />
PS382<br />
#<br />
PS436<br />
East Baton Rouge Parish<br />
Legend<br />
Phase B1<br />
Proposed<br />
Existing (Nicholson Dr. - Highland Rd. - Perkins Rd.)<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Capacity Improvements<br />
Stations<br />
Exist. Forcemain<br />
New Gravity Main<br />
# SFL-C-0006<br />
Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-34B<br />
0 2,900<br />
5,800<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34B_mpj111910.MXD
Bob Pettit<br />
#<br />
PS107<br />
Brightside<br />
Tigerland<br />
Y A Tittle<br />
Alvin Dark<br />
#<br />
Earl Gros<br />
PS305<br />
#<br />
#<br />
PS373<br />
Landing<br />
Belle Fountaine<br />
Dakin<br />
Valcour Aime<br />
PS236 PS236A<br />
#<br />
!R<br />
!R<br />
236-00002<br />
#<br />
PS303<br />
#<br />
#<br />
PS445<br />
Harwich<br />
PS140<br />
Moorstone<br />
Sharlo<br />
#<br />
#!R<br />
PS310<br />
PS292<br />
SS286<br />
#<br />
PS1011<br />
PS439<br />
#<br />
Nicholson<br />
Ward<br />
Oleson<br />
BPS505A<br />
Etta<br />
#<br />
Lee<br />
Tezcucco<br />
Belle Cherie<br />
Destrehan<br />
Westervelt<br />
#<br />
Belle Grove<br />
!R<br />
Robillard<br />
Riverbend<br />
236-00032<br />
Durande<br />
!R #<br />
Nottaway<br />
!R<br />
Sarpy<br />
Calanne<br />
Three Oaks<br />
Rene Beauregard<br />
PS311FM<br />
Twelve Oaks<br />
Ormand<br />
PS311DS<br />
!R<br />
236-00091<br />
Laurel <strong>Plan</strong>tation<br />
Laurel Lakes<br />
PS1008 PS415<br />
#<br />
Dean Lee<br />
Ben Hur<br />
East Baton Rouge Parish<br />
Legend<br />
Phase B2<br />
Proposed<br />
Existing<br />
³<br />
(Nicholson Dr.-Highland Rd.-Perkins Rd.)<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Capacity Improvements<br />
Exist. Forcemain<br />
New Gravity Main<br />
#<br />
SFL-C-0006<br />
Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 3-34C<br />
0 1,000 2,000<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\SOUTH\SFL-C-0006_3_34C_mpj_111710.MXD
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.7 SFU-C-0001 (Multiple PSs – Jefferson Highway – Park Forest Drive)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The pump stations to be replaced in this project consist of the following: PS 111, PS 115, PS<br />
338, PS 379, PS 201, and the Woman’s Hospital PS. The upgrades will work in conjunction<br />
with forcemain upgrades in other South Forced Upper Basin projects to alleviate chronic<br />
SSOs at and near these pump stations.<br />
The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
are predicted by the model to exceed the existing maximum capacities.<br />
Location<br />
The location of each PS is shown in Table 3-22 and in Figure 3-35.<br />
Scope<br />
Table 3-22 shows the detailed scope of this project, which includes the replacement of six<br />
pump stations in the South Forced Upper basin.<br />
TABLE 3-22<br />
SFU-C-0001 (Multiple PSs - Jefferson Highway - Park Forest Drive) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max.<br />
Capacity<br />
(GPM)<br />
Future Peak<br />
Wet Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comments<br />
PS 115<br />
PS 338<br />
PS 379<br />
PS 201<br />
PS 111<br />
Women’s<br />
Hospital PS<br />
Parkmeadow Avenue,<br />
near Parkhollow Drive<br />
Near intersection of<br />
Quail Meadow Drive<br />
and Golden Pheasant<br />
Court<br />
Jefferson Highway, near<br />
intersection of Tiger<br />
Bend<br />
Near the intersection of<br />
Tiger Bend and<br />
Jefferson Highway<br />
Near intersection of<br />
Tiger Bend Road and<br />
Green Trails Road<br />
Near intersection of<br />
Pecue Lane and Airline<br />
Highway<br />
556 556 58<br />
764 1,315 551<br />
208 361 39<br />
556 1,386 248<br />
1,575 2,323 241 Will be converted<br />
from in-line<br />
booster to wet well<br />
pump station<br />
New 4,800 Pump Station for<br />
new Women’s<br />
Hospital<br />
development<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $2,600,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Construction Appropriation Year was 2010.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-87 JANUARY 2011<br />
REV. 5
Parkside<br />
Parkbriar<br />
Millwood<br />
Antioch<br />
Sherwood Forest<br />
#<br />
Newcastle<br />
#<br />
#<br />
Wentling<br />
Investor<br />
#<br />
PS135<br />
PS252<br />
PS287<br />
Exchequer<br />
Superior<br />
Cloverland<br />
Benefit<br />
Sun Belt<br />
Parkridge<br />
Parkmount<br />
Parkbrook<br />
Market Place<br />
Galeria<br />
Lake Laberge<br />
#<br />
PS332<br />
#<br />
PS115<br />
#I<br />
#<br />
PS115<br />
#<br />
#<br />
Parkhill<br />
PS143<br />
#<br />
Industriplex<br />
Lake la Dare<br />
Parkoaks<br />
George Cain<br />
Parkforest<br />
PS134<br />
Shadeland<br />
PS148<br />
Parkknoll<br />
Parklake<br />
Parkvale<br />
Parkciel<br />
Parkvilla<br />
Parkrill<br />
Parktrail<br />
PRIVATEPS<br />
#<br />
#<br />
PS136<br />
Stumberg<br />
#<br />
#<br />
PS270<br />
PS434 PS338<br />
##I<br />
# PS338<br />
#<br />
#<br />
PS379<br />
#I<br />
PS232<br />
PS1003<br />
PS379<br />
#<br />
# PS201<br />
#I<br />
PS274 PS111<br />
#<br />
#I<br />
PS147<br />
# # PS201<br />
#<br />
BPS507<br />
Pecue<br />
Pecue<br />
Southwind<br />
Tartan<br />
Cyndal<br />
Stutgart<br />
Woodlyn<br />
Doral<br />
Oxley<br />
Airline<br />
Country Hill<br />
Quail Meadow<br />
Mourning Dove<br />
WH<br />
#I<br />
PS<br />
Country Way<br />
Tollway<br />
Angleton<br />
Legacy<br />
Braxton<br />
Gentry<br />
Westridge<br />
Bayridge<br />
Elm Ridge<br />
Foxridge<br />
Short Ridge<br />
Ridgeview<br />
Kimbleton<br />
Dale<br />
Buckley<br />
Ridgemore<br />
Tiger Bend<br />
#<br />
Tennyson<br />
PS173<br />
#<br />
Shakespeare<br />
PS184<br />
Chippendale<br />
Jefferson<br />
Sessions<br />
#<br />
Coursey<br />
Snowden<br />
Greenshire<br />
Chaucer<br />
Millbrook<br />
Canterdale<br />
Courtshire<br />
Celestial<br />
Herridge<br />
Proxie<br />
Trents<br />
Commission<br />
Board<br />
#<br />
#<br />
Currency<br />
PS428<br />
Heidis<br />
Jones Creek<br />
Director<br />
#<br />
PS403<br />
Shenandoah<br />
Seven Pines<br />
President<br />
Barringer<br />
Allegheny<br />
Profit<br />
#<br />
#<br />
BPS777<br />
PS258<br />
George Oneal<br />
Cocodrie<br />
Point Chenier<br />
Quorum<br />
Altus<br />
Barremore<br />
Vice President<br />
Windsong<br />
PS308<br />
#<br />
#<br />
Debit<br />
#<br />
Ferrell<br />
PS172<br />
Vicksburg<br />
Jefferson Park<br />
Antler<br />
PS111<br />
PS346<br />
Roster<br />
O'Neal<br />
Treasurer<br />
Bluewater<br />
Members<br />
Bankers<br />
Halls Ferry<br />
#<br />
Wilderness<br />
Confederate<br />
Council<br />
#<br />
Overlook Point<br />
Chadsford<br />
Chantilly<br />
Haynes Bluff<br />
Hogenville<br />
Malvern Hill<br />
Chickamauga<br />
Antietam<br />
PS266<br />
Morel<br />
Petersburg<br />
Batavia<br />
Somersby<br />
Doyle<br />
#<br />
PS438<br />
#<br />
#<br />
Reiger<br />
East Baton Rouge Parish<br />
Legend<br />
Multiple PS - Jefferson Hwy<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Park Forest Dr<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
SFU-C-0001<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-35<br />
0 1,900<br />
3,800<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\SOUTH\SFU-C-0001_mpj120910
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.8 SFU-C-0002a (O’Neal Lane Pump Stations Group A)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SFU-C-0002a (O’Neal Lane Pump Station Group A project includes segments<br />
previously included in SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger<br />
Bend Road), SFU-C-0003 (Multiple Pump Stations - O’Neal Lane) project, and SFU-C-0004<br />
(Multiple Pump Stations - O’Neal - S. Harrell’s Ferry) project. The combined project has<br />
then been split into two projects, Group A and Group B, since the November 2009 PDP.<br />
The project involves the upgrade of PS 112, PS 148, PS 157, PS 170, PS 172, PS 211, PS 232, PS<br />
247, PS 253, PS 274, PS 296, PS 316, PS 391, PS 428 and BPS 777. The upgrades will work in<br />
conjunction with forcemain upgrades in the SFU-C-0005 (O’Neal Lane Pipeline<br />
Improvements) project to alleviate chronic SSOs at and near these pump stations. The<br />
upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
modeling predicts will exceed the existing maximum capacities.<br />
Location<br />
The locations of the pump stations included in this project are given in Table 3-23A and<br />
shown in Figure 3-36A.<br />
Scope<br />
Table 3-23A shows the detailed scope of this project, which includes replacing 15 pump<br />
stations; including converting BPS 777 from an in-line booster station to a wet well pump station.<br />
TABLE 3-23A<br />
O’Neal Lane Pump Stations Group A – Pump Station Information<br />
PS ID<br />
Existing Maximum<br />
Pump Station Capacity<br />
(gpm)<br />
Future Average Dry<br />
Weather Flow<br />
(gpm)<br />
Peak Future Wet<br />
Weather Design Flow<br />
(gpm)<br />
Estimated TDH<br />
(ft)<br />
PS 112 350 505 1,430 48<br />
PS 148 198 305 527 58<br />
PS 157 278 155 541 167<br />
PS 170 146 833 4,789 90<br />
PS 172 125 104 396 116<br />
PS 211 350 416 2,249 12<br />
PS 232 150 215 1,083 26<br />
PS 247 407 208 1,506 143<br />
PS 253 145 69 472 81<br />
PS 274 403 62 861 102<br />
PS 296 250 215 1,173 72<br />
PS 316 390 382 2,478 97<br />
PS 391 85 139 430 78<br />
PS 428 unknown 111 160 138<br />
PS 777 14,616 4,650 21,930 105<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $12,226,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-89 JANUARY 2011<br />
REV. 5
O'Neal<br />
Antioch<br />
#<br />
#<br />
#<br />
PS143<br />
#<br />
#<br />
Coursey<br />
#<br />
Parkoaks<br />
#I<br />
#<br />
George Cain<br />
PS134<br />
#<br />
PS147<br />
I-10<br />
#<br />
#<br />
#<br />
PS148<br />
Pecue<br />
Pecue<br />
Stumberg<br />
PS77<br />
Deerpath<br />
#<br />
#<br />
#<br />
#<br />
PS379<br />
#<br />
#<br />
#<br />
PS435<br />
Rose<br />
PS217<br />
Briarlake<br />
Quinn<br />
East Baton Rouge Parish<br />
#<br />
#<br />
Tollway<br />
Braxton<br />
PS338<br />
Westridge<br />
Lilian<br />
PS156<br />
PS270<br />
Bayridge<br />
PS259<br />
#<br />
#<br />
#<br />
PS201<br />
Kimbleton<br />
Castille<br />
#<br />
PS173<br />
Tiger Bend<br />
Buzbee<br />
PS1002<br />
#<br />
#<br />
#<br />
PS403<br />
#<br />
#<br />
PS174<br />
#<br />
#<br />
PS346<br />
PS258<br />
#<br />
#<br />
PS396<br />
PS428<br />
#<br />
#I<br />
#<br />
BPS777 #<br />
#I<br />
PS172<br />
#<br />
#<br />
#I<br />
#<br />
#<br />
PS232<br />
#I<br />
#<br />
#I<br />
#<br />
#I<br />
# PS112<br />
#<br />
PS274<br />
#<br />
PS438<br />
#<br />
#<br />
#I<br />
PS170<br />
#<br />
PS266<br />
#<br />
#I<br />
#<br />
PS157<br />
#<br />
#<br />
PS184<br />
Sessions<br />
Jefferson<br />
Snowden<br />
PS309<br />
PS162<br />
Barringer Foreman<br />
Terrell<br />
Airline<br />
Debit<br />
Profit<br />
#<br />
Antietam<br />
Confederate<br />
Doyle<br />
#<br />
#<br />
#<br />
PS253<br />
#I<br />
#<br />
#<br />
PS391<br />
#I<br />
#<br />
#I<br />
PS316 #<br />
#I<br />
PS256 #<br />
#<br />
PS211<br />
PS296<br />
#I<br />
#<br />
PS247<br />
#I<br />
#<br />
Legend<br />
#<br />
Proposed<br />
Existing<br />
O'Neal Ln. Group A PS Projects<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFU-C-0002A<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
Project Vicinity Map<br />
New Force Main<br />
!R Manholes\Nodes<br />
") New Storage Facility<br />
0 0.5<br />
1<br />
Miles<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\SOUTH\SOUTH MAPS\SFU-C-0002A.MXD SGELPI 11/15/2010 10:55:07<br />
Seven Pines<br />
Highland<br />
PS402<br />
PS392<br />
Antioch<br />
Batavia<br />
George Oneal<br />
Mobile<br />
#<br />
PS442<br />
PS427<br />
#<br />
Sweet Olive<br />
PS1005<br />
Coffee<br />
Elliot<br />
PS390<br />
Monitor<br />
Achord<br />
PS410<br />
Preston<br />
Barrett<br />
#<br />
PS367<br />
Harrells Ferry<br />
#<br />
Green Willow<br />
Figure 3-36A<br />
PS441<br />
#<br />
PS360<br />
Vignes<br />
#<br />
#<br />
Babin<br />
Bengal
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.9 SFU-C-0002b (O’Neal Lane Pump Stations Group B)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SFU-C-0002b (O’Neal Lane Pump Station Group B) project includes segments<br />
previously included in SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger<br />
Bend Road) project, SFU-C-0003 (Multiple Pump Stations - O’Neal Lane) project, and SFU-<br />
C-0004 (Multiple Pump Stations - O’Neal - S. Harrell’s Ferry) project. The combined project<br />
has then been split into two projects, Group A and Group B, since the November 2009 PDP.<br />
The project involves the upgrade of PS 41, PS 77, PS101A, PS 139, PS 149, PS 153, PS 162, PS<br />
174, PS 175, PS 189, PS 191, PS 224, PS 227, PS 326, PS 345, and BPS 889. The upgrades will<br />
work in conjunction with forcemain upgrades in the SFU-C-0005 (O’Neal Lane Pipeline<br />
Improvements) project to alleviate chronic SSOs at and near these pump stations. The<br />
upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
modeling predicts will exceed the existing maximum capacities.<br />
Location<br />
The locations of the pump stations included in this project are given in Table 3-23B and<br />
shown in Figure 3-36B.<br />
Scope<br />
Table 3-23B shows the detailed scope of this project, which includes replacing 27 pump<br />
stations; including converting BPS 889 from an in-line booster station to a wet well pump<br />
station. BPS 100A will be decommissioned after this project and the O’Neal Lane Pipeline<br />
project are completed.<br />
TABLE 3-23B<br />
O’Neal Lane Pump Stations Group B – Pump Station Information<br />
PS ID<br />
Existing Maximum<br />
Pump Station Capacity<br />
(gpm)<br />
Future Average Dry<br />
Weather Flow<br />
(gpm)<br />
Peak Future Wet<br />
Weather Design Flow<br />
(gpm)<br />
Estimated TDH<br />
(ft)<br />
PS 41 504 125 504 31<br />
PS 77 350 167 590 90<br />
PS 101A 174 125 465 145<br />
PS 139 209 104 305 143<br />
PS 149 485 153 722 85<br />
PS 153 88 118 618 63<br />
PS 162 310 333 888 81<br />
PS 174 353 118 353 29<br />
PS 175 236 250 965 92<br />
PS 189 360 139 1,103 121<br />
PS 191 367 111 1,298 96<br />
PS 224 770 458 1,663 44<br />
PS 227 165 132 361 46<br />
PS 326 215 118 382 110<br />
PS 345 390 257 403 45<br />
PS 889 11,569 3,616 17,815 81<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $9,800,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design is on-going.<br />
GNV31031158547.DOCX/103440004 3-91 JANUARY 2011<br />
REV. 5
Harco<br />
Harco<br />
Dena Lynn<br />
Ponderosa<br />
Millerville<br />
Chalfont<br />
Bolivar<br />
Boreas<br />
Amir<br />
O'Neal<br />
Godfrey<br />
Fawn Lake<br />
#<br />
PS169<br />
Choctaw<br />
Windsor<br />
Chene<br />
#<br />
PS295<br />
Rushmore<br />
Sunnyhill<br />
Bywood<br />
Silverthorn<br />
Choctaw<br />
Elmbridge<br />
PS41<br />
#<br />
BPS508<br />
#I<br />
#<br />
#I<br />
#<br />
Woodvale<br />
Florida<br />
Park<br />
PS153<br />
#<br />
#<br />
Woodcliff<br />
Glenhaven<br />
Mollylea<br />
Parkwood<br />
Sherbrook<br />
Goodwood<br />
Millburn<br />
Elva<br />
#<br />
#<br />
Elwick<br />
PS380<br />
PS77<br />
PS21<br />
Kirkley<br />
Trammell<br />
Deerpath<br />
Todd<br />
#<br />
Flannery<br />
#<br />
PS227<br />
#I<br />
#<br />
Torrey Pine<br />
Harrells Ferry<br />
PS448<br />
#<br />
Damon<br />
Woodland Ridge<br />
Holt<br />
PS175 #<br />
#I<br />
#<br />
Darilyn<br />
Lafitte<br />
Azalea Pk<br />
#<br />
PS215<br />
#<br />
Holly<br />
Firethorn<br />
Locust<br />
Acacia<br />
Mora<br />
#<br />
PS226<br />
#<br />
PS451<br />
#<br />
#<br />
Florida<br />
PS62<br />
PS319<br />
Bailey<br />
Stoneberg<br />
Avalon<br />
Palmwood<br />
#I<br />
#<br />
PS162<br />
PS101A<br />
#I<br />
#<br />
#<br />
#<br />
#<br />
PS104<br />
#<br />
PS189<br />
#I<br />
#<br />
#<br />
PS224<br />
#<br />
#I #I #<br />
PS139<br />
PS407<br />
Colonel Allen<br />
Old Hammond<br />
Munal<br />
Lily<br />
Lakemont<br />
Jester<br />
Terrell<br />
Gloria<br />
PS315<br />
Schafer<br />
#<br />
PS174<br />
#I<br />
#<br />
BPS889 PS402<br />
#<br />
#<br />
#<br />
Jones Creek<br />
Lirocchi<br />
Woodway<br />
#I<br />
O Neal<br />
Frontage<br />
Strain<br />
Coliseum<br />
Brutus<br />
BPS100A<br />
Stevendale<br />
Caesar<br />
#I<br />
PS377<br />
Bristoe<br />
Abshire<br />
Ellis<br />
Bonham<br />
PS326<br />
#I<br />
#<br />
#I<br />
# PS191<br />
PS345<br />
#<br />
PS149<br />
#I<br />
#<br />
Patton<br />
PS392<br />
Deer Lake<br />
Centurion<br />
Hoyt<br />
Cicero<br />
I-12<br />
Chariot<br />
Pompey<br />
East Baton Rouge Parish<br />
Legend<br />
#<br />
Proposed<br />
Existing<br />
O'Neal Ln. Group B PS Projects<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFU-C-0002B<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
Project Vicinity Map<br />
New Force Main<br />
!R Manholes\Nodes<br />
") New Storage Facility<br />
0 2,000<br />
4,000<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\SOUTH\SOUTH MAPS\SFU-C-0002B.MXD SGELPI 11/15/2010 10:47:53<br />
Figure 3-36B
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.10 SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12)<br />
The SFU-C-0003 (Multiple PSs – O’Neal Lane – Interstate 12) project has been combined<br />
with SFU-C-0002 (Multiple Pump Stations - Jones Creek Road - Tiger Bend Road) and SFU-<br />
C-0004 (Multiple Pump Station - O’Neal Lane-S. Harrell’s Ferry Road) from the October<br />
2008 PDP. The combined project has been designated SFU-C-0002 (O’Neal Lane PS Projects)<br />
and is described in Section 3.4.8.<br />
3.4.11 SFU-C-0004 (Multiple Pump Stations – O’Neal Lane – South Harrell’s Ferry<br />
Road)<br />
The SFU-C-0004 (Multiple Pump Stations –O’Neal Lane – South Harrell’s Ferry Road)<br />
project has been combined with SFU-C-0002 (Multiple Pump Station - Jones Creek Road -<br />
Tiger Bend Road) and SFU-C-0003 (Multiple Pump Station - O’Neal) from the October 2008<br />
PDP. The combined project has been designated SFU-C-0002 (O’Neal Lane Pump Station<br />
Improvements) project and is described in Section 3.4.8.<br />
3.4.12 SFU-C-0005 (O’Neal Lane Pipeline Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The SFU-C-0005 (O’Neal Lane Pipeline Improvements) project includes segments<br />
previously included in SFU-C-0005 (O’Neal Lane - Tiger Bend Road) and SFU-C-0006<br />
(O’Neal Lane - Jones Creek Road).<br />
The project involves upsizing of gravity main in an area that extends north of Florida Blvd<br />
to the Monticello Subdivision and continues south to include the Shenandoah and Old<br />
Jefferson areas of East Baton Rouge Parish. The upgrades are developed to alleviate chronic<br />
SSOs at pump stations and increase the gravity main capacity. The forcemain upgrades are<br />
in an area that extends north of Florida Blvd to the Monticello Subdivision and continues<br />
south to include the Shenandoah and Old Jefferson areas of East Baton Rouge Parish. The<br />
upgrades are developed to alleviate chronic SSOs at the pump stations and increase the<br />
forcemain capacity.<br />
Location<br />
This project involves the replacement of portions of the South Forced Upper gravity main<br />
and forcemain systems and is shown in Figure 3-37. A majority of the contributing flows are<br />
from residential areas.<br />
The gravity main upgrades are divided into the following segments.<br />
Gravity segment 189-00022 to PS 189 starts north of Rhonda Avenue at manhole 189-00022<br />
and travels west in a servitude that parallels Rhonda Avenue to PS 189, which is located<br />
north of Rhonda Avenue near Outrigger Avenue.<br />
Gravity segment 224-00091 to PS 224 starts at manhole 224-00091 and continues<br />
approximately 500 feet east to PS 224. This main is located west of the cul-de-sacs for<br />
Banyanwood Avenue and Westwood Court.<br />
Gravity segment 211-00048 to 211-00001 starts at manhole 211-00048, which is located near<br />
the intersection of Burnt Oak Drive and Woodlake Drive. From this location, the gravity<br />
main travels generally north before reaching manhole 211-00001. This gravity main acts as<br />
an overflow line to the existing gravity main.<br />
GNV31031158547.DOCX/103440004 3-93 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 177-00180 to 177-00010 starts at manhole 177-00180. From this location, it<br />
continues northerly along Kennesaw Drive, replacing existing gravity pipe, to Missionary<br />
Ridge Court, then northeast along Missionary Ridge Court to manhole 177-00010.<br />
Gravity segment 112-00013 to PS 112 starts southwest of the Antioch Blvd and Antietam<br />
Avenue intersection. The gravity line travels southwest until reaching PS 112, located<br />
northeast of the Confederate Avenue and Chattanooga Drive intersection.<br />
Gravity segment 110-00088 to 110-000001 starts at the intersection of Confederate Avenue<br />
and Tiger Bend Road. The gravity line travels west along Tiger Bend Road until reaching PS<br />
111, located at the intersection of Tiger Bend Road and Green Trails Boulevard.<br />
Gravity segment 170-00022 to 170-00015 begins at manhole 170-00022, which is located on<br />
the north side of Tiger Bend Road west of Jones Creek Road. From there, it continues west<br />
for approximately 1,100 feet to manhole 170-00015.<br />
Gravity segment 170-00015 to 170-00001 begins at manhole 170-00015, which is located near<br />
the south end of Chaucer Street. From there, it continues south for approximately 1,300 feet<br />
and crosses Tiger Bend Road before turning east near Kimbleton Avenue. After turning east,<br />
the gravity main travels approximately 1,550 feet east and south to manhole 170-00001 near<br />
PS 170.<br />
Gravity segment 170-00167 to 170-00001 begins at manhole 170-00167 near the north end of<br />
Board Road. From there, it continues approximately 750 feet north and east to node 170-<br />
00001 near PS 170.<br />
Gravity segment 170-00110 to PS 170 begins at manhole 170-00110 near the intersection of<br />
Vice President and Profit Avenue and continues west to 170-00023A. This gravity main acts<br />
as an overflow line to the existing gravity main. The gravity main from 170-00023A to PS<br />
170 will be replaced.<br />
Gravity segment 148-00037 to 148-00034 begins at manhole 148-00037. The gravity segment<br />
travels west to Parkforest Drive, then south to manhole 148-00034, which feeds into PS 148<br />
near the intersection of Parklawn Avenue and Parkforest Drive.<br />
The forcemain upgrades consist of the following segments.<br />
Forcemain segment PS 153 to SS11 starts outside the property boundary of PS 153. Upon<br />
leaving the pump station, the forcemain travels southwest for approximately 800 feet along<br />
Woodvale Drive to the intersection of Woodvale Drive and Mockingbird Lane where it then<br />
travels 545 feet to the west, where it enters a manifold intersection with an existing 12-inch<br />
forcemain at node SS11.<br />
Forcemain segment PS 101A to SS32 starts outside the property boundary of PS 101A. Upon<br />
leaving the pump station, the forcemain travels southeast until reaching SS32, located at Old<br />
Hammond Highway and O’Neal Lane.<br />
Forcemain segment SS24 to SS36 starts west of South Choctaw Drive, above Florida<br />
Boulevard. The forcemain travels southwest, crossing Florida Blvd near O’Neal Lane<br />
intersection and crossing O’Neal Lane. The forcemain segment ends at SS36 and is located<br />
near the O’Neal Lane and Strain Road intersection.<br />
GNV31031158547.DOCX/103440004 3-94 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Forcemain segment PS 104 to SS64 starts outside the property boundary of PS 104. Upon<br />
leaving the pump station, the forcemain travels south for approximately 200 feet to node<br />
SS68 and enters a servitude where it turns east and follows the servitude for approximately<br />
3,800 feet to node SS64, where it intersects a manifold forcemain at O’Neal Lane.<br />
Forcemain segment PS 224 to SS96 begins outside the property boundary of PS 224. Upon<br />
leaving PS 224, the forcemain travels south for approximately 900 feet before reaching<br />
Firewood Drive. At Firewood Drive, the forcemain turns east and follows the ROW for<br />
approximately 2,300 feet to the intersection of O’Neal Lane where it manifolds with node<br />
SS96.<br />
Forcemain segment PS 173 to PS 173DS starts outside the property boundary of PS 173, east<br />
of Sessions Drive. The forcemain travels west to PS 173FM, then north until reaching PS<br />
173DS, located southwest of Colonel Allen Court and General Prentiss Avenue intersection.<br />
Forcemain segment PS 162 to SS109 starts at PS 162, which is located at the intersection of<br />
General Prentiss Avenue and President Davis Drive. Upon leaving PS 162, the forcemain<br />
travels generally north for approximately 2,800 feet before reaching node SS130 where it<br />
continues approximately 300 feet north to PS 162. The forcemain upsize continues north of<br />
PS 162 and travels approximately 1500 feet north to the intersection of Harrell’s Ferry Road<br />
where it manifolds with node SS109.<br />
Forcemain segment PS 211 to 316-00001 starts outside the property boundary of PS 211.<br />
Upon leaving PS 211, the forcemain travels approximately 1,100 feet north along Woodlake<br />
Drive to manhole 316-00001 near PS 316.<br />
Forcemain segment PS 316 to SS147 outside the northern property boundary of PS 316.<br />
Upon leaving PS 316, the forcemain travels north along Woodlake Drive for approximately<br />
2,000 feet to node SS 173 and the intersection of South Harrell’s Ferry Road. At South Harrell’s<br />
Ferry Road, the forcemain turns west and continues for approximately 5,600 feet to node<br />
SS147 where it ties into a larger forcemain, which continues along South Harrell’s Ferry<br />
Road.<br />
Forcemain segment PS 296 to 211-00051 starts outside the property boundary of PS 296.<br />
Upon leaving PS 296, the forcemain travels approximately 400 feet north and east where it<br />
crosses West Piney Point Avenue. It then continues west along West Piney Point Avenue,<br />
then north along Burnt Oak Avenue, the east along Woodlake Drive to manhole 211-00048.<br />
Forcemain segment PS 347 to 247-00001 starts outside the property boundary of PS 347.<br />
Upon leaving PS 347, the forcemain travels approximately 500 feet west between South<br />
Shore Drive and Double Tree Drive and into a servitude. At this point, the forcemain<br />
continues approximately 500 feet along the servitude and then heads southwest toward the<br />
intersection of Double Tree Drive and Feather Nest Lane. The forcemain continues<br />
approximately 400 feet into another servitude located between Double Tree Drive and<br />
Wildlife Way Drive and then turns northwest. The forcemain follows the servitude for<br />
approximately 450 feet to a point located between Hagerstown Drive and Double Tree<br />
Drive. The forcemain then continues west in a servitude, crossing Hagerstown Drive, for<br />
approximately 2,400 feet to manhole 247-00001, which then ties into PS 247.<br />
Forcemain segment PS 247 to SS274 continues outside the property boundary of PS 247.<br />
Upon leaving PS 247, the forcemain travels approximately 800 feet west in a servitude to<br />
GNV31031158547.DOCX/103440004 3-95 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
East Achord Road. At East Achord Road, the forcemain turns south and travels<br />
approximately 2,100 feet to node SS274 where it ties into a larger manifolded forcemain,<br />
which continues along Tiger Bend Road.<br />
Forcemain segment PS 213 to SS274 begins outside the property boundary of PS 213. Upon<br />
leaving PS 213, the forcemain travels approximately 250 feet south to Tiger Bend Road<br />
where it then turns west and continues approximately 1,200 feet to node SS274.<br />
Forcemain segment SS274 to SS248 begins at node SS274 and continues west along Tiger<br />
Bend Road for approximately 1,500 feet to node SS282 where it receives flow from a 4-inch<br />
forcemain and increases in size. From node SS282, the forcemain continues west along Tiger<br />
Bend Road for approximately 6,200 feet to the intersection of Antioch Road where it turns<br />
south and then continues approximately 250 feet to node SS275. From SS275, the forcemain<br />
turns west again and continues approximately 1,800 feet in a servitude to node SS265 where<br />
it receives flow from a 10-inch forcemain and increases in size. From SS265 the forcemain<br />
continues approximately 1,900 feet west to node SS248 near PS 274.<br />
Forcemain segment PS 112 to 110-00088 begins at PS 112 and continues north to Antioch<br />
Boulevard before turning west and south along Confederate Avenue to Tiger Bend Road at<br />
manhole 10-00088.<br />
Forcemain segment SS196 to SS243 begins at node SS196 located at George O‘Neal Road and<br />
approximately 170 feet east of the intersection of Cumberland Cove Drive. The forcemain<br />
continues west for approximately 650 feet before turning south into a servitude. The<br />
forcemain then continues south for approximately 1,500 feet before entering the property<br />
boundary of BPS777. The forcemain continues along Sleepy Hollow Drive, then west along<br />
Ferrell Avenue to Jones Creek Road where it manifolds into the existing forcemain.<br />
Forcemain segment PS 258 to SS192 begins outside the property boundary of PS 258. Upon<br />
leaving the pump station, the forcemain travels along White Tail Court for approximately<br />
1,200 feet to node SS192 where it intersects a manifold forcemain at the corner of White Tail<br />
Court and Antler Drive.<br />
Forcemain segment PS 172 to PS 172DS begins outside the boundary of PS 172. Upon<br />
leaving the pump station, the forcemain travels west along Altus Avenue then north along<br />
Estelle Drive to PS 172DS where it joins a forcemain.<br />
Forcemain segment PS 170 to SS268 begins outside the property boundary of PS 170. Upon<br />
leaving the pump station, the forcemain travels west along Kimbleton Avenue until<br />
reaching SS268, located near the intersection of Kimbleton Avenue and Jefferson Highway.<br />
Forcemain segment PS 148FM to 147-00057A begins outside the boundary of PS 148 at node<br />
PS 148FM, east of the intersection of Parkview Church Road and Superior Drive. From that<br />
location, the forcemain travels approximately 1,500 feet south and east to node 147-00057A<br />
where it joins a manifold forcemain.<br />
Forcemain segment PS 147 to SS268 includes a forcemain that begins outside the property<br />
boundary of PS 147. Upon leaving the pump station, the forcemain travels approximately<br />
3,000 feet south and west to node SS268 where it joins a manifold forcemain near Jefferson<br />
Highway.<br />
PS 77 forcemain begins at PS 77, located northeast of the intersection of Deerpath Way and<br />
Woodland Ridge Blvd, and continues west along an existing servitude to Woodland Ridge<br />
GNV31031158547.DOCX/103440004 3-96 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
Blvd, where it then parallels Woodland Ridge Blvd north to SS102A, located near the<br />
intersection of South Harrells Ferry Road.<br />
PS 379 forcemain begins at PS 379, located near the intersection of Jefferson Highway and<br />
Tiger Bend Road and parallels Tiger Bend Road east to 201-00009, located east of the<br />
intersection of Tiger Bend road and Quinn Road. PS 139 forcemain begins at PS 139, located<br />
near the intersection of Firewood Drive and Stonewood Drive, and parallels Firewood Drive<br />
east, then turning north to 224-00001, located near the intersection of Balsawood Drive and<br />
Banyanwood Avenue.<br />
PS 189 forcemain begins at PS 189, located south of the intersection of Jester Avenue and<br />
Boreas Drive, and parallels Jester Avenue before turning north then east to intersection BPS<br />
100A.<br />
PS 191 forcemain begins at PS 191, located south of the intersection of Catline Drive and<br />
Caesar Avenue, and continues west within an Entergy transmission servitude to node SS60<br />
where it joins a manifold forcemain along O’Neal Lane.<br />
Scope<br />
This project includes construction of approximately 850 feet of 15-inchgravity sewer<br />
upstream of PS 62; approximately 210 feet of 18-inch gravity sewer upstream of PS 189;<br />
approximately 945 feet of 18-inch gravity sewer upstream of PS 224; approximately 2,400<br />
feet of 12-inch gravity sewer upstream of PS 211; approximately 1,000 feet of 12-inch gravity<br />
sewer upstream of PS 177; approximately 1,030 feet of 18-inch gravity sewer upstream of PS<br />
112; approximately 310 feet of 15-inch and 24-inch gravity sewer upstream of PS 110;<br />
approximately 6,710 feet of 12-inch, 15-inch, and 18-inchgravity sewer upstream of PS 170;<br />
approximately 600 feet of 8-inch sewer upstream of PS 148; and approximately 80,000 feet of<br />
6-inch, 8-inch, 10-inch, 12-inch, 14-inch, 16-inch, 18-inch, 20-inch, 24-inch, 30-inch, 36-inch,<br />
and 42-inch forcemain in the South Forced Upper Basin.<br />
Table 3-24 shows the detailed scope of this project.<br />
TABLE 3-24<br />
SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information<br />
Existing<br />
US Node DS Node<br />
Length<br />
(ft)<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
062-00048 062-00014 850 New 15<br />
189-00022 PS189 210 8 18<br />
224-00091 224-00057 500 8 12<br />
224-00057 224-00001 445 8 12<br />
211-00048 211-00001 2,400 New 12<br />
177-00180 177-00010 1,000 New 12<br />
112-00013 112-00002 830 10 18<br />
112-00002 PS112 200 10 18<br />
110-00088 110-00001 240 10 15<br />
110-00001 PS111 70 10 24<br />
170-00022 170-00015 1,100 10 12<br />
170-00015 170-00005 2,100 10 15<br />
170-00005 170-00001 750 10 15<br />
170-00167 170-00001 600 10 18<br />
170-00110 170-00023A 1,900 New 12<br />
Comments<br />
GNV31031158547.DOCX/103440004 3-97 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
TABLE 3-24<br />
SFU-C-0005 (O’Neal Lane Pipeline Improvements) – Pipeline Information<br />
Existing<br />
US Node DS Node<br />
Length<br />
(ft)<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
170-00023A 170-00001 200 10 21<br />
170-00001 PS170 60 15 21<br />
148-00037 148-00034 600 New 8<br />
PS 153 SS11 1,300 4 6<br />
PS 101A SS32 1,700 6 8<br />
SS24 SS32 3,220 14 18<br />
SS32 SS36 1,300 16 20<br />
PS 104 SS69 220 10 16<br />
SS69 SS64 3,800 16 24<br />
PS 224 SS96 3,300 10 12<br />
PS173 PS173DS 3,100 4 6<br />
PS162 SS109 1,500 6 8<br />
PS 211 316-00001 1,100 6 14<br />
PS 316 SS173 1,300 8 14<br />
SS173 SS147 6,300 10 14<br />
PS 296 211-00048 2,200 6 8<br />
PS 347 SS222 3,100 4 8<br />
SS222 247-00001 1,100 6 8<br />
PS 247 SS274 3,100 8 12<br />
PS 213 SS274 1,400 4 6<br />
SS274 SS282 1,600 10 12<br />
SS282 SS265 7,300 12 16<br />
SS265 SS248 1,900 16 24<br />
PS 112 110-00088 4,400 6 10<br />
SS196 BPS 777 2,100 30 36<br />
BPS 777 SS522 2,100 30 36<br />
PS 258 SS192 1,200 4 6<br />
PS 172 PS172DS 500 4 6<br />
PS 170 SS268 4,800 New 20<br />
PS148FM 147-00057A 1,500 4 6<br />
PS 147 SS268 3,000 8 10<br />
PS 77 PS77DS 1,200 New 10<br />
PS 379 201-00009 1,500 4 6<br />
PS 139 224-00001 1,900 New 4<br />
PS 189 BPS 100A 3,000 New 8<br />
PS 191 SS60 3,000 8 10<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $14,100,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
Comments<br />
GNV31031158547.DOCX/103440004 3-98 JANUARY 2011<br />
REV. 5
Mike<br />
O'Neal<br />
Elliot<br />
#<br />
#<br />
#<br />
Toulon<br />
#<br />
Richcroft<br />
#<br />
#<br />
Stan<br />
Bard<br />
Catalpa<br />
Archery<br />
PS50<br />
#<br />
PS171<br />
McCann<br />
#<br />
#<br />
#<br />
#<br />
Baylor<br />
Havenwood<br />
Investor<br />
PS314<br />
Wilton<br />
Stacy<br />
Airline<br />
#<br />
Choctaw<br />
Elva<br />
#<br />
#<br />
#<br />
#!R<br />
#<br />
Pecue<br />
Woodcliff<br />
PS169<br />
#<br />
SS102A<br />
Stumberg<br />
Chene<br />
PS77<br />
Flannery<br />
#<br />
Torrey Pine<br />
#<br />
#<br />
#<br />
PS295<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
!R<br />
#!R<br />
!R<br />
#<br />
#!R<br />
#!R<br />
#!R<br />
!R!R !R<br />
!R<br />
#<br />
#<br />
062-00002 PS62<br />
#<br />
062-00048<br />
!R<br />
#!R<br />
!R<br />
#<br />
#<br />
#<br />
#<br />
#<br />
SS11 #!R<br />
SS24<br />
191-00065 191-00001<br />
104-00050<br />
PS104<br />
SS69 SS64 !R !R<br />
# #<br />
!R<br />
SS75 # PS191<br />
#!R!R<br />
146-00018<br />
BPS100A<br />
!R 189-00022 PS189<br />
PS448<br />
PS156<br />
Tollway<br />
Westridge<br />
Sunnyhill<br />
Katherine<br />
PS215<br />
Florida<br />
Choctaw<br />
146-00031<br />
146-00015<br />
224-00001 PS224<br />
224-00057<br />
SS109<br />
PS173DS PS162<br />
Coursey<br />
PS162<br />
Canterdale<br />
Lily<br />
Terrell<br />
Jones Creek<br />
BPS508<br />
PS41<br />
224-00060<br />
Lirocchi<br />
!R<br />
!R<br />
!R<br />
Park<br />
SS32<br />
SS36<br />
PS225<br />
#<br />
SS96<br />
BPS889 SS148<br />
Antietam<br />
Strain<br />
Centurion<br />
PS377 PS345<br />
#<br />
# #<br />
#<br />
PS402<br />
PS392<br />
Deer Lake<br />
#<br />
PS173<br />
# # PS442<br />
#<br />
#<br />
#<br />
# #!R<br />
#<br />
PS427<br />
SS173<br />
PS270<br />
PS346<br />
!R<br />
PS403<br />
PS390<br />
#<br />
#<br />
PS211DS PS316<br />
PS134<br />
#!R<br />
#<br />
#<br />
PS258<br />
SS192<br />
#<br />
#<br />
#<br />
211-00001 PS211<br />
PS217<br />
PS256<br />
!R !R<br />
#<br />
!R<br />
#<br />
PS396 #<br />
SS196<br />
211-00038 211-00037<br />
# # !R<br />
#<br />
!R !R #<br />
#<br />
!R !R !R !R!R!R<br />
148-00038<br />
177-00021<br />
PS148<br />
BPS777 SS207 !R 177-00025<br />
PS296<br />
!R<br />
177-00179<br />
#<br />
!R #!R<br />
148-00034<br />
!R!R<br />
PS172 !R<br />
!R!R<br />
177-00180<br />
147-00057A # #<br />
#<br />
#!R<br />
PS360<br />
!R<br />
274-00009<br />
#<br />
#<br />
PS347<br />
SS222<br />
274-00005<br />
112-00013 247-00001 PS247 #!R<br />
#!R!R<br />
#<br />
!R<br />
#<br />
!R # !R !R !R<br />
!R<br />
!R<br />
PS347<br />
274-00002<br />
110-00107<br />
112-00002<br />
!R !R PS112<br />
!R<br />
SS241 !R #!R<br />
PS147 PS147<br />
SS248<br />
# # #<br />
!R<br />
110-00113<br />
#<br />
# !R<br />
SS268<br />
!R!R SS265<br />
PS213<br />
SS243#<br />
!R!R<br />
#!R<br />
!R<br />
!R<br />
170-00008 SS291 PS111<br />
# # SS282<br />
# #<br />
!R<br />
!R<br />
!R #<br />
!R !R !R<br />
170-00001<br />
!R<br />
!R PS170 170-00110 PS438<br />
SS274<br />
!R!R !R<br />
170-00002<br />
170-00037<br />
170-00039 #<br />
#<br />
PS157<br />
#<br />
#<br />
Legend<br />
Proposed<br />
O'Neal Ln. Pipeline Improvements<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
SFU-C-0005<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 3-37<br />
East Baton Rouge Parish<br />
!R<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2010_mpj112310<br />
0 2,750 5,500<br />
Feet<br />
George Oneal<br />
Hoyt<br />
!R<br />
#<br />
I-12<br />
PS149<br />
PS326<br />
SS147<br />
Monitor<br />
Achord<br />
PS391<br />
Tiger Bend<br />
Deer Park<br />
Babin
SECTION 3. SOUTH BASIN PROJECTS<br />
3.4.13 SFU-C-0006 (O’Neal Lane – Tiger Bend Road)<br />
The SFU-C-0006 (O’Neal Lane – Tiger Bend Road) project has been combined with SFU-C-<br />
0005 (O’Neal Lane - Jones Creek Road) from the October 2008 PDP. The combined project<br />
has been designated SFU-C-0005 (O’Neal Lane Pipeline Improvements) project and is<br />
described in Section 3.4.11.<br />
GNV31031158547.DOCX/103440004 3-100 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
3.5 South WWTP Projects<br />
3.5.1 STP-C-0001 South WWTP – Phase 1<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The existing unit processes at the South WWTP have been designed and constructed to<br />
process a peak hydraulic capacity of 119 million gallons per day (MGD). Based on the 2-yr<br />
12-hr design storm, the predicted future peak hydraulic flow to this facility after<br />
improvements to collection and conveyance infrastructure is 273 MGD. The C-P is also<br />
going to consolidate the Central WWTP and the South WWTP, with all flow being diverted<br />
to the South WWTP for treatment. The predicted future peak wet weather flow from the<br />
Central WWTP is 93 MGD. Therefore, the total predicted wet weather peak flow to the<br />
South WWTP after the Central Consolidation is 366 MGD. To accept and treat this flow,<br />
several wet weather improvements must be constructed at the South WWTP. These<br />
improvements will be achieved in two projects, specifically the STP-C-0001 (South WWTP –<br />
Phase 1) project and the STP-C-0002 (South WWTP – Phase 2) project.<br />
Location<br />
The South WWTP is located at 2850 South Gardere Lane, and its outfall is located at<br />
geographical coordinates of latitude 30° 20’ 27” north and longitude 91° 08’ 52” west.<br />
Scope<br />
The South WWTP will be upgraded to process wet-weather flows up to 366 mgd. Influent<br />
flows will be equalized to allow not more than a 200 mgd maximum flow to the treatment<br />
facilities. Sixty-six (66) million gallons (MG)of equalization storage will be provided for this<br />
purpose.<br />
The existing gravity pump station at the South WWTP will be modified as part of this<br />
project to pump to a new preliminary treatment facility. An additional new raw<br />
wastewater/equalization pump station will also be constructed to convey flows from the<br />
forcemain system (existing South Suburban Transportation Network [STN]; new Pump<br />
Station 58A; and Central Consolidation). This pump station will have the capability to pump<br />
either to the preliminary treatment facility or to the storage facilities. This pump station will<br />
also accept flow from the storage facilities when flow is returned after a wet weather storage<br />
event. Raw sewage pumped from the modified gravity pump station and the new forcemain<br />
pump station to the process train will be directed into a new preliminary treatment facility<br />
sized to process 200 MGD. Both of the existing preliminary treatment facilities will be<br />
demolished and replaced by this single system. The proposed preliminary treatment facility<br />
will screen and degrit the influent wastewater.<br />
This project also includes odor control facilities for the influent pump stations, storage<br />
facilities, and preliminary treatment facility. A new electrical substation is also included in<br />
this project. The remainder of the South WWTP improvements are described in STP-C-0002<br />
(South WWTP – Phase 2). All of the proposed Phase 1 improvements are shown on the<br />
process flow diagram presented as Figure 3-38. Principal Phase 1 project elements are:<br />
<br />
<br />
Modify existing gravity pump station to pump 62 MGD to new headworks<br />
Construct a new raw wastewater (138 MGD)/equalization (166 mgd) pump station and<br />
force main system<br />
GNV31031158547.DOCX/103440004 3-101 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
<br />
<br />
<br />
<br />
<br />
Below-grade concrete dry well/wet well-type structure. No building.<br />
Dry-pit submersible pumps with variable frequency drives (VFDs)<br />
Electrical building to house electrical systems and controls<br />
Facility includes discharge flow meters<br />
Facility is covered and includes odor control provisions<br />
<br />
Construct covered storage for flows in excess of 200 mgd<br />
<br />
<br />
<br />
<br />
Circular lined above-ground tanks (3 at 20 MG and 1 at 6 MG)<br />
Return line with control valve and flowmeter to convey return flow to forcemain<br />
system raw wastewater pump station<br />
Mixers are provided for 6 MG tank that will receive initial flows. Hydrants will be<br />
provided for cleaning.<br />
Odor control facilities included<br />
<br />
Construct 200 MGD preliminary treatment facility<br />
<br />
<br />
<br />
<br />
<br />
<br />
Elevated facility, constructed of cast in place concrete<br />
Facility contains both screening and grit removal equipment<br />
Six screening channels<br />
Six gravity vortex grit units<br />
Odor control facilities included.<br />
A splitter box is constructed on the end of the facility to split plant flow between the<br />
dry-weather and wet-weather process trains during wet-weather events. Splitter box<br />
conveys 120 MGD to dry-weather train, and 80 MGD to wet-weather train.<br />
<br />
<br />
<br />
<br />
Construct new electrical substation and electrical building.<br />
Yard piping<br />
Site work<br />
Demolition<br />
Total Construction Bid Amount is $108,200,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2009.<br />
Construction is On-Going.<br />
GNV31031158547.DOCX/103440004 3-102 JANUARY 2011<br />
REV. 5
N<br />
Feet<br />
0 50 100 150 200<br />
Legend<br />
IAP<br />
Phase 1<br />
Phase 2<br />
Preliminary<br />
Treatment<br />
Facility<br />
Screenings/Grit<br />
i i<br />
Building<br />
Odor<br />
Control<br />
Units<br />
Force Main<br />
RW/EQ<br />
Pump Station<br />
Standby<br />
Generators<br />
Staring Staring Lane Lane Extension Extension<br />
Odor<br />
Control<br />
Main Electrical<br />
Building<br />
Utility<br />
Substation<br />
Ferric Storage<br />
Thickened Sludge<br />
Mixing Tanks<br />
Flow Equalization Tanks<br />
Final<br />
l<br />
Settling<br />
Tanks<br />
9-12<br />
GBT Building<br />
Dewatering Building<br />
RSS/WSS<br />
Pump<br />
Station<br />
Odor Control<br />
Polymer Storage<br />
Flow Splitter Structure<br />
Anaerobic Digesters<br />
Solids Contact<br />
Basins<br />
RSS PS<br />
Blower-Electrical<br />
Sodium Hypochlorite<br />
Building<br />
Day Tank Facility<br />
Odor<br />
Control<br />
Trickling Filter<br />
Pump Station<br />
Electrical<br />
Building<br />
Polymer<br />
Storage<br />
Gravity<br />
Influent<br />
Pump<br />
Station<br />
GIPS<br />
Electrical/<br />
Control<br />
Building<br />
Administration<br />
m<br />
Building<br />
d<br />
Laboratory<br />
o<br />
Building<br />
d<br />
Chlorine Contact Basin<br />
Sodium Hypochlorite Storage Facility<br />
Effluent Pump Station<br />
FIGURE 3-38<br />
SWWTP IMPROVEMENT PROJECTS<br />
WBG110310211718GNV Fig3-38_dn00c503_350589_Rev11-04-10-01 LED
SECTION 3. SOUTH BASIN PROJECTS<br />
3.5.2 STP-C-0002 South WWTP – Phase 2<br />
Project Description<br />
Purpose of the Project/Background Information<br />
Existing unit processes at the South WWTP have been designed and constructed to process<br />
a peak hydraulic capacity of 119 MGD. Based on the 2-yr 12-hr design storm, the predicted<br />
future peak hydraulic flow to this facility after improvements to collection and conveyance<br />
infrastructure is 273 MGD. The C-P is also going to consolidate the Central WWTP and the<br />
South WWTP, with all flow being diverted to the South WWTP for treatment. The predicted<br />
future peak wet weather flow from the Central WWTP is 93 MGD. Therefore, the total<br />
predicted wet weather peak flow to the South WWTP after the Central consolidation is 366<br />
MGD. To accept and treat and this flow , several wet weather improvements must be<br />
constructed at the South WWTP. These improvements will be achieved in two projects,<br />
specifically the STP-C-0001 (South WWTP – Phase 1) project and STP-C-0002 (South WWTP<br />
– Phase 2) project.<br />
Location<br />
The South WWTP is located at 2850 South Gardere Lane, and its outfall is located at<br />
geographical coordinates of latitude 30° 20’ 27” north and longitude 91° 08’ 52” west.<br />
Scope<br />
The South WWTP will be upgraded to process wet-weather flows up to 366 MGD. The STP-<br />
C-0001 South WWTP Phase 1 project includes influent pumping, equalization storage, a<br />
preliminary treatment facility. This project begins downstream of the preliminary treatment<br />
facility and includes additional wet weather treatment improvements at the South WWTP.<br />
Some of the project improvements are required due to wet weather and some are required<br />
from the Draft Wastewater Master <strong>Plan</strong> (CH2M HILL, May 2008).<br />
Wet Weather Improvements<br />
From the preliminary treatment facility, wastewater up to 120 MGD will flow by gravity to<br />
the existing primary clarifiers. Flows in excess of 120 MGD (up to 80 MGD) will flow from<br />
the preliminary treatment facility to new solids contact basins (SCBs). Under this scenario,<br />
up to 120 MGD of preliminary treated wastewater will flow from the preliminary treatment<br />
facility through the existing primary clarifiers and the existing trickling filters (TFs). The<br />
upgraded secondary treatment process will contain both TFs and SCBs. Normally, flows up<br />
to 120 MGD will be pumped into the TFs and then be pumped into the SCBs. Trickling Filter<br />
recirculation is part of the ongoing IAP projects at the plant<br />
Additional final settling tanks must also be provided to manage the 200 MGD wet-weather<br />
flow condition. The existing disinfection system will be converted from gaseous chlorination<br />
to hypochlorite disinfection for excess flows above 120 MGD. A new effluent pump station<br />
and outfall piping will be added. These improvements are shown also on Figure 3-38.<br />
Principal project elements include the following:<br />
<br />
Construct Solids Contact Basins Return secondary and waste secondary sludge pump<br />
stations for sludge return from the final settling tanks to the solids contact basins, and<br />
for sludge wasting to the gravity belt thickeners<br />
GNV31031158547.DOCX/103440004 3-105 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
A splitter box is constructed on the end of the solids contact basins to distribute the<br />
flow between the existing and proposed final settling tanks<br />
Construct four additional final clarifiers at 134-foot diameter each<br />
Conversion of chlorine gas disinfection to hypochlorite disinfection and construction of<br />
an additional chlorine contact basin<br />
Construction of a new effluent PS (200 MGD)<br />
<br />
<br />
Existing PS will be abandoned<br />
New PS will consist of vertical turbine pumps mounted on a concrete slab. Discharge<br />
piping and flow metering will be above grade.<br />
Construction of parallel effluent pipeline and river outfall structure<br />
Construction of odor control for the primary clarifiers effluent weirs and the existing<br />
solids processing building.<br />
Yard piping<br />
Site work<br />
Demolition<br />
Methane storage/power conversion facilities<br />
Miscellaneous yard piping and electrical<br />
Preliminary Master <strong>Plan</strong> Improvements<br />
Several Master <strong>Plan</strong> improvements were outlined in the Draft Wastewater Master <strong>Plan</strong><br />
(CH2M HILL, May 2008). The following are the principal project elements as modified<br />
during the project design.<br />
<br />
<br />
<br />
<br />
<br />
<br />
Secondary electrical source consisting of on-site engine/generators<br />
Improvements to the existing solids thickening and dewatering facilities including new<br />
thickened sludge mixing tanks<br />
Repair and improvements to existing anaerobic digesters including a new sludge<br />
heating system utilizing digester gas and hot water boilers<br />
Rehabilitation of existing buildings<br />
Construction of a plant SCADA system<br />
Construction of new laboratory and administration buildings<br />
Total Construction Bid Amount for the Wet Weather Improvements is $92,200,000.<br />
Total Construction Bid Amount for the Preliminary Master <strong>Plan</strong> Improvements is<br />
$15,000,000.<br />
Total Construction Bid Amount for the entire project is $107,200,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
GNV31031158547.DOCX/103440004 3-106 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
3.5.3 South WWTP Immediate Action Projects<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The South WWTP is under consent decree due to NPDES Permit violations related to total<br />
suspended solids (TSS) and biochemical oxygen demand (BOD). The WWTP is presently<br />
required to meet a 30-MG TSS/L and 30-MG BOD/L monthly average and 45-MG TSS/L<br />
and 45-MG BOD/L weekly average discharge standard.<br />
A number of improvement projects will be implemented to assist the plant in complying<br />
with its effluent permit limits. These improvements will be implemented early in the<br />
program to bring the plant into compliance as soon as possible under dry weather<br />
conditions.<br />
The screenings improvements project that was formerly in this project has been moved to<br />
STP-C-0001 (South WWTP Phase 1). The effluent pumping station stabilization project has<br />
been completed.<br />
Location<br />
The South WWTP is located at 2850 South Gardere Lane.<br />
Scope<br />
The improvement projects have been grouped together for their implementation. A<br />
description of each group of projects follows.<br />
Primary Treatment Improvements<br />
Primary treatment improvements will be implemented to improve the reliability of the<br />
primary settling tanks and consistently meet BOD and TSS effluent limits.<br />
The first project element includes the addition of ferric chloride and polymer injection<br />
systems for enhanced BOD/TSS removal. This element includes installation of chemical<br />
storage and feed systems on both the gravity and forcemain trains of the plant.<br />
The second project element includes various improvements to the primary settling tanks to<br />
improve their mechanical reliability. There are six existing tanks. Several of these tanks<br />
currently experience significant down time due to issues with mechanical reliability. DPW<br />
operations staff also experience difficulty in removing sludge from the clarifiers, which<br />
could be associated with issues such as improper collector mechanism speed, pump<br />
capacities, pump cycle times, or a combination thereof. The following improvements have<br />
been identified for enhanced operational reliability:<br />
<br />
<br />
Repair/Replace clarifier mechanisms and components. Improvements include<br />
replacement of boards, wear strips, sprockets, drives, and expansion joints. Some<br />
clarifiers will require new chain.<br />
Replace existing sludge pumps. The current piston pumps have significant<br />
maintenance problems. New pumps will be installed to ensure sludge removal design<br />
criteria are met.<br />
The third project element includes the addition of flow control/flow measurement devices<br />
at several splitter boxes. The plant has several structures designed to split the flow between<br />
process trains, and between discrete basins. These flow splits occur by gravity flow over<br />
GNV31031158547.DOCX/103440004 3-107 JANUARY 2011<br />
REV. 5
SECTION 3. SOUTH BASIN PROJECTS<br />
weir gates. Currently, there is no means to monitor or control the flow splits, or determine<br />
proper distribution to downstream facilities. To improve this, weir gate electric actuators<br />
and level (flow) elements will be installed at splitter boxes No. 1 and 2.<br />
Trickling Filter Improvements<br />
The secondary treatment process consists of two separate trickling filter, final settling tank,<br />
and effluent PS trains. An upstream splitter box receives flow from the primary clarifiers,<br />
and splits it to the two secondary trains. The following improvements will assist in<br />
achieving permit compliance.<br />
<br />
<br />
<br />
<br />
Construction of a new Trickling Filter Pump Station. This includes two independent<br />
sides, the Trickling Filter Recirculation Pump Station and the Trickling Filter Effluent<br />
Pump Station. The Recirculation Pump Station is needed to maintain proper wetting<br />
rates on the trickling filters.<br />
Construction of new Electrical Building.<br />
Construction of new flow splitting structure to divide the pump station effluent flow<br />
among existing clarifiers.<br />
Construction of new piping, valves, flow meters, pipe supports, concrete structures,<br />
piping tie-ins, and other work to deliver primary effluent flow to the new station, to<br />
pump primary effluent to the existing trickling filter splitter boxes at a controlled rate, to<br />
deliver return flow from the trickling filters to the new pump station, and to deliver<br />
trickling filter effluent at a controlled rate to the flow splitting structure and form there<br />
to the existing clarifiers.<br />
Sludge Handling Improvements<br />
Improvements to the sludge handling systems are as follows:<br />
<br />
<br />
Gravity Thickeners and Thickened Sludge Pump Station Rehabilitation. The gravity<br />
thickener complex has not been in service for many years. The complex will be<br />
rehabilitated so that primary and secondary sludge can be evacuated in a timely manner<br />
from process facilities, and allow for thickening prior to anaerobic digestion. The<br />
thickened sludge will enhance the digestion unit process. Improvements include<br />
replacing gravity thickeners, and rehabilitating/replacing sludge pump station<br />
components.<br />
Final Settling Tank Sludge Withdrawal Improvements. Sludge pumps from each<br />
settling tank complex discharge through a common header and do not provide adequate<br />
withdrawal. A new larger diameter pump discharge manifold will be installed to<br />
increase pumping capacity.<br />
Total Construction Bid Amount is $25,632,000.<br />
Construction is On-Going.<br />
GNV31031158547.DOCX/103440004 3-108 JANUARY 2011<br />
REV. 5
SECTION 4<br />
Central Basin Projects<br />
Section 4 presents summaries of the Central Gravity System Comprehensive Rehabilitation<br />
Projects, the Central Gravity System Capacity Improvement Projects, and the Central<br />
Consolidation Projects. These projects are shown on Figures 4-1 and 4-2. As of October 30,<br />
2010, there are approximately six projects under construction and eight projects under<br />
design in the Central Basin.<br />
The project summaries presented herein represent the information available during this<br />
annual update period. The PDP will be revisited on an annual basis and revised, as<br />
necessary, based on results of additional hydraulic wastewater modeling, immediate needs,<br />
DPW and public input, and other factors.<br />
GNV31031158548.DOCX/103440008 4-1 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158548.DOCX/103440008 4-2 JANUARY 2011<br />
REV. 5
3rd<br />
Lupine<br />
9th<br />
15th<br />
15th<br />
17th<br />
18th<br />
19th<br />
22nd<br />
25th<br />
26th<br />
31st<br />
32nd<br />
35th<br />
West<br />
39th<br />
39th<br />
East<br />
47th<br />
48th<br />
49th<br />
Elm<br />
Topaz<br />
Garnet<br />
Waverly<br />
Bank<br />
Whitter<br />
Juban<br />
Alello<br />
Monet<br />
³<br />
Rivermeadow<br />
Riverbend<br />
Dakin<br />
River<br />
Garfield<br />
3rd<br />
Stadium<br />
Gourrier<br />
Lafayette<br />
St Philip<br />
Emma<br />
Emma<br />
Haig<br />
Chimes<br />
Dort<br />
St Louis<br />
4th<br />
Iowa<br />
6th<br />
South<br />
Aster<br />
5th<br />
Europe<br />
Mayflower<br />
Iris<br />
St Ferdinand<br />
Oklahoma<br />
Wyoming<br />
Irby C Nichols<br />
Eiland<br />
Miller<br />
Capitol Lake<br />
4th<br />
Laurel<br />
North<br />
Garner<br />
Johnson<br />
Alaska<br />
Neosho<br />
State Capitol<br />
Lakeland<br />
5th<br />
Terrace<br />
Grant<br />
St Charles<br />
Royal<br />
Napoleon<br />
Taylor<br />
7th<br />
France<br />
Veta<br />
Chatsworth<br />
Iowa<br />
Azalea<br />
St Joseph<br />
Van Buren<br />
Maximillian<br />
Nicholson<br />
Sorrel<br />
§¨¦I-110<br />
Mc Kinley<br />
Arbutus<br />
8th<br />
Tyler<br />
Field House<br />
Tigerland<br />
Roosevelt<br />
Manda<br />
Pittsburg<br />
Joplin<br />
De Queen<br />
Mansfield<br />
Lakeridge<br />
Margaret<br />
Mary<br />
Polk<br />
Y A Tittle<br />
Campus<br />
Alvin Dark<br />
Alice<br />
10th<br />
Julia<br />
Terrace<br />
Swart<br />
Kansas<br />
Highway<br />
Howard<br />
Nebraska<br />
Harding<br />
Bob Pettit<br />
11th<br />
Thomas H Delpit<br />
Taft<br />
Grant<br />
State<br />
Scenic Hwy. - Spanish Town Rd. Sharlo PHASE 1<br />
Harwich<br />
Harrison<br />
Riverwood<br />
7th<br />
8th<br />
8th<br />
Rehabilitation Projects<br />
3Wastewater Treatment <strong>Plan</strong>t<br />
Project Name<br />
Foster Dr. - Government St.<br />
Acadian Thrwy. - Perkins Rd.<br />
Stanford Ave. - Morning Glory Rd.<br />
Acadian Thrwy. - Claycut Rd.<br />
Highland Rd. - Washington St.<br />
7th<br />
8th<br />
8th<br />
9th<br />
Dot<br />
Brightside View<br />
11th<br />
Infirmary<br />
Milford<br />
Hart<br />
13th<br />
Tower<br />
12th<br />
Boyd<br />
Brightside<br />
Lockwood<br />
Beaumont<br />
Dooley<br />
12th<br />
America<br />
Louisiana<br />
East<br />
10th<br />
Louise<br />
Scenic Hwy. - Spanish Town Rd. PHASE 2<br />
East Blvd. - Government St.<br />
Central Basins<br />
Iris<br />
12th<br />
Gsu<br />
17th<br />
16th<br />
18th<br />
Parker<br />
Cedar<br />
19th<br />
Bay<br />
Foss<br />
Spanish Town Road<br />
Eddie Robinson Sr<br />
14th<br />
Braddock<br />
13th<br />
Mc Calop<br />
Georgia<br />
Chimes<br />
Janet<br />
Jennifer Jean<br />
14th<br />
14th<br />
Grant<br />
Vicaro<br />
Iberville<br />
15th<br />
Washington<br />
14th<br />
Kentucky<br />
Doris<br />
15th<br />
Linwood<br />
Smith<br />
Louise<br />
Harrison<br />
Georgia<br />
15th<br />
Marcellious<br />
Fig<br />
Maryland<br />
Ivanhoe<br />
Campus Lake<br />
16th<br />
North<br />
Swire<br />
16th<br />
Oleson<br />
Ontario<br />
17th<br />
Gracie<br />
Gayosa<br />
Convention<br />
Missouri<br />
16th<br />
Brice<br />
Park<br />
Dalrymple<br />
Alamoster<br />
Lobelia<br />
Scenic<br />
Olive<br />
Pocahontas<br />
Burbank<br />
Hiawatha<br />
23rd<br />
Wisteria<br />
Oleander<br />
Lehmann<br />
June<br />
Amherst<br />
17th<br />
18th<br />
Fig<br />
Dean Lee<br />
17th<br />
Etta<br />
L S U<br />
20th<br />
Galvez<br />
Farrar<br />
Louisiana<br />
Cherokee<br />
Tulip<br />
May<br />
Lakeshore<br />
Pontiac<br />
21st<br />
Tecumseh<br />
Kleinert<br />
Iberia<br />
Uncas<br />
America<br />
Delgado<br />
Navajo<br />
Osceola<br />
Birch Birch<br />
Cherry<br />
April<br />
Cornell<br />
Cable<br />
Gordon<br />
Adams<br />
March<br />
Issac Cline<br />
Yale<br />
Baton Rouge<br />
Weller<br />
Tuscarora<br />
Calumet<br />
Pawnee<br />
Shawnee<br />
City Park<br />
Henry Adams<br />
19th<br />
Navajo<br />
Erie<br />
Monroe<br />
20th<br />
Spain<br />
Seminole<br />
Magnolia<br />
Willow<br />
Canonicus<br />
Iroquois<br />
Myrtle<br />
Highland<br />
Stanford<br />
Dayton<br />
<strong>Plan</strong>k<br />
Brady<br />
Chippewa<br />
Newton<br />
Fuqua<br />
Gracie<br />
Belmont<br />
Ben Hur<br />
Alliquippa<br />
Spain<br />
Virgil<br />
Tulane<br />
Clara<br />
Beech<br />
Winbourne<br />
Huron<br />
24th<br />
Pocasset<br />
Adella<br />
Fiero<br />
Geronimo<br />
Duke<br />
Lula<br />
Topeka<br />
Bogan<br />
26th<br />
27th<br />
Drehr<br />
Ovid<br />
Morning Glory<br />
St Rose<br />
Hillsdale<br />
Loyola<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG4-1_PDP2010.MXD SGELPI 11/15/2010 12:39:57<br />
Elissalde<br />
Christian<br />
Carriage<br />
29th<br />
28th<br />
Keokuk<br />
Ozark<br />
Huron<br />
Erie<br />
30th<br />
Atkinson<br />
Gottlieb<br />
Letitia<br />
Ogden<br />
Lee<br />
Progress<br />
Acadian<br />
Main<br />
Broussard<br />
Lydia<br />
Ferndale<br />
Bancroft<br />
Cedardale<br />
Glendale<br />
Eugene<br />
Byron<br />
Winnebago<br />
Myrtledale<br />
Kernan<br />
Floyd<br />
Ontario<br />
Burgin<br />
Charles<br />
Seneca<br />
Cherrydale<br />
Beech<br />
Central Basin Rehabilitation Projects<br />
Lakeshore<br />
23rd<br />
Lake Hills<br />
Douglas<br />
Sherwood<br />
Monroe<br />
Adams<br />
26th<br />
Lavinia<br />
Baywood<br />
Bengal<br />
Chalet<br />
25th<br />
Heritage<br />
Longfellow<br />
Pluskat<br />
28th<br />
Madison<br />
Jackson<br />
Jefferson<br />
28th<br />
Arlington<br />
Zeeland<br />
Hollydale<br />
Forge<br />
Bourbon<br />
Eugene<br />
30th<br />
30th<br />
30th<br />
Connell<br />
Anna<br />
Bedford<br />
Hearthstone<br />
Kenmore<br />
Reymond<br />
Tyrone<br />
33rd<br />
Lynn<br />
Oswego<br />
Ozark<br />
Dalton<br />
Zion<br />
Wilshire<br />
Goldenrod<br />
Greenwood<br />
Cloverdale<br />
Linden<br />
31st<br />
Parker<br />
Marigold<br />
Hood<br />
Jolly<br />
Cloverdale<br />
Ross<br />
Mc Donald<br />
36th<br />
Hood<br />
37th<br />
Stuart<br />
Menlo<br />
Maple<br />
Cain<br />
Carl<br />
Aberdeen<br />
Tunica<br />
Wyandotte<br />
Monroe<br />
Madison<br />
Jackson<br />
Saguaro<br />
Boone<br />
Phillips<br />
Carol<br />
Marwede<br />
Guava<br />
Iroquois<br />
Westmoreland<br />
Main<br />
38th<br />
40th<br />
Wabash<br />
Bernardo<br />
Cole<br />
Ira<br />
Sherwood<br />
Sunset<br />
Clay Cut<br />
Steele<br />
Webb<br />
Mohican<br />
Washington<br />
41st<br />
Odell<br />
Hundred Oaks<br />
Honeysuckle<br />
Delaware<br />
Barrow<br />
Bawell<br />
Palm<br />
Pickett<br />
Dubois<br />
Leeward<br />
Gus Young<br />
Billops<br />
Lofaso<br />
Richland<br />
Churchill<br />
Rubin<br />
Hyacinth<br />
Bennett<br />
Ryan<br />
Live Oak<br />
Jasmine<br />
Delaware<br />
Adams<br />
Edison<br />
Nelson<br />
Glenmore<br />
Bartlett<br />
Sycamore<br />
Shelley<br />
Clayton<br />
Mission<br />
Eaton<br />
Wiltz<br />
Valley<br />
Whitehaven<br />
Wayne<br />
Yaun<br />
Monroe<br />
Belfair<br />
Noah<br />
Tuscaloosa<br />
Edison<br />
Chatfield<br />
Richland<br />
Ramsey<br />
Tyrone<br />
Eugene<br />
Bluebell<br />
Leo<br />
Yazoo<br />
Rhodes<br />
Hanson<br />
44th<br />
Ingleside<br />
Nairn<br />
Orchid<br />
Arrowhead<br />
Mimosa<br />
43rd<br />
Sweetbriar<br />
Chandler<br />
Boone<br />
Eaton<br />
Beck<br />
Beechwood<br />
Dayton<br />
46th<br />
Evangeline<br />
Frey<br />
Florida<br />
North<br />
Glasgow<br />
Jean<br />
Madison<br />
Fairfields<br />
Capital Heights<br />
Woodside<br />
Poplar<br />
Winnebago<br />
Woodstone<br />
Cleo<br />
Woodruff<br />
Martin<br />
Odell<br />
Beck<br />
Knollwood<br />
Longwood<br />
Ferrett<br />
Balis<br />
Harelson<br />
Mouton<br />
Woodgate<br />
Levera<br />
Fairwoods<br />
Country Club<br />
Wells<br />
Balis<br />
Tupello<br />
Brame<br />
Dentation<br />
Moore<br />
Bluebell<br />
Millgate<br />
Urban<br />
Conrad<br />
Ritterman<br />
Silliman<br />
Rabey<br />
Millstone<br />
Foster<br />
Linden<br />
Laurel<br />
Foster<br />
Osborne<br />
Avondale<br />
Eleanor<br />
Charles<br />
Convention<br />
Caddo<br />
Barber<br />
Concord<br />
Whitlow<br />
Voss<br />
Kincaid<br />
Adams<br />
Dougherty<br />
Linden<br />
Jackson<br />
Hermitage<br />
Parlange<br />
Leighton<br />
Greenside<br />
Abelia<br />
Wylie<br />
Greenwell Springs<br />
Afton<br />
Melrose<br />
Westdale<br />
Ormandy<br />
Bazaar<br />
Valcour<br />
Acadia<br />
Fairfax<br />
Bankers<br />
Constitution<br />
Jamestown<br />
Pointer<br />
Woodchase<br />
Fieldgate<br />
Rothmer<br />
Byron<br />
Wyandotte<br />
Choctaw<br />
Rebel<br />
Yorktown<br />
Annette<br />
Howell Park<br />
Holloway<br />
Bootsie<br />
Bennington<br />
Boone<br />
Brookstown<br />
Pollard<br />
Seyburn<br />
Hilton<br />
Columbine<br />
Byron<br />
Bel Air<br />
Cloud<br />
Ardenwood<br />
College<br />
Corporate<br />
§¨¦I-10<br />
Dahlia<br />
Highland Park<br />
Victory<br />
Clayton<br />
Cyrus<br />
Franklin<br />
Leycester<br />
Brookstown<br />
Michelli<br />
Congress<br />
Bennington<br />
Hibiscus<br />
Beckenham<br />
Heidel<br />
Llanfair<br />
Castile<br />
Ridge<br />
Clematis<br />
Potomac<br />
Pino<br />
Forsythia<br />
Daventry<br />
Williamson<br />
Azam<br />
Glenwood<br />
Eastwood<br />
George<br />
Palmetto<br />
Saratoga<br />
Columbine<br />
Chandler<br />
Howell<br />
Timbercreek<br />
Arden<br />
Evans<br />
Prescott<br />
Hendricks<br />
Government<br />
Citiplace<br />
Coventry<br />
Goodwood<br />
Guilford<br />
Marion<br />
Quail<br />
Stoneliegh<br />
Sheldon<br />
Jefferson<br />
Louray<br />
Hanks<br />
Airline<br />
Winbourne<br />
Elgin<br />
Esplanade<br />
Trenton<br />
Clinton<br />
Executive Park<br />
Tarrytown<br />
Marquette<br />
Stratford<br />
Krista<br />
Brent<br />
Stokes<br />
Barford<br />
Quail Run<br />
Smiley<br />
Carrollton<br />
Aries<br />
Carrollton<br />
Rodney<br />
Bicentennial<br />
Renoir<br />
Rodin<br />
Moss Side<br />
Harry<br />
Audubon<br />
Lasalle<br />
Peggy<br />
Orion<br />
Anita<br />
Nellie<br />
Industrial<br />
Sheffield<br />
Gates<br />
Ozark<br />
Choctaw<br />
Goya<br />
Titian<br />
Overton<br />
Kenwood<br />
Perkins<br />
Victoria<br />
Lobdell<br />
Cezanne<br />
Van Gogh<br />
Sevenoaks<br />
Burden<br />
Irene<br />
Baird<br />
Donmoor<br />
Kenilworth<br />
Applewood<br />
Harts Mill<br />
Conley<br />
Melon<br />
Alden<br />
Walden<br />
Keed<br />
Joliet<br />
Annabelle<br />
Murphy<br />
Torrance<br />
Pikes<br />
Thoreau<br />
0 0.25 0.5 1<br />
Miles Figure 4-1<br />
Victoria<br />
Bon Marche<br />
Croydon<br />
Woodstock<br />
Boyce<br />
Chandler
3rd<br />
Lupine<br />
9th<br />
15th<br />
15th<br />
16th<br />
17th<br />
22nd<br />
25th<br />
26th<br />
31st<br />
32nd<br />
35th<br />
West<br />
39th<br />
39th<br />
East<br />
47th<br />
48th<br />
49th<br />
Topaz<br />
Garnet<br />
Waverly<br />
Whitter<br />
Juban<br />
Alello<br />
Monet<br />
³<br />
Rivermeadow<br />
Riverbend<br />
Dakin<br />
Belle Cherie<br />
Ormand<br />
#*<br />
#*<br />
#*<br />
River<br />
#*<br />
#*<br />
Garfield<br />
3rd<br />
Stadium<br />
Gourrier<br />
Lafayette<br />
St Philip<br />
Emma<br />
Chimes<br />
Emma<br />
#*<br />
Dort<br />
#*<br />
St Louis<br />
4th<br />
#*<br />
#*<br />
#*<br />
§¨¦I-110<br />
#*<br />
#*<br />
Terrace<br />
Swart<br />
Central WWTP<br />
Iowa<br />
6th<br />
South<br />
Aster<br />
5th<br />
Europe<br />
Mayflower<br />
Iris<br />
St Ferdinand<br />
Oklahoma<br />
Wyoming<br />
Irby C Nichols<br />
Eiland<br />
Miller<br />
Capitol Lake<br />
4th<br />
North<br />
Garner<br />
Grant<br />
Alaska<br />
Neosho<br />
State Capitol<br />
Lakeland<br />
5th<br />
Terrace<br />
St Charles<br />
Van Buren<br />
Johnson<br />
Royal<br />
Napoleon<br />
7th<br />
France<br />
Veta<br />
Chatsworth<br />
Azalea<br />
Maximillian<br />
Minnesota<br />
Mc Kinley<br />
Field House<br />
Tigerland<br />
St Joseph<br />
Arbutus<br />
Roosevelt<br />
Sorrel<br />
Manda<br />
Pittsburg<br />
Joplin<br />
De Queen<br />
Mansfield<br />
Lakeridge<br />
Margaret<br />
Harwich<br />
8th<br />
Mary<br />
Arizona<br />
Y A Tittle<br />
Campus<br />
Alvin Dark<br />
Alice<br />
10th<br />
#*<br />
#*<br />
#* #*<br />
Kansas<br />
Highway<br />
Bob Pettit<br />
Sharlo<br />
Riverwood<br />
7th<br />
8th<br />
7th<br />
8th<br />
8th<br />
Laurel<br />
9th<br />
Dot<br />
Howard<br />
Brightside View<br />
11th<br />
11th<br />
12th<br />
Grant<br />
State<br />
Tower<br />
Julia<br />
Thomas H Delpit<br />
Boyd<br />
#*<br />
#*<br />
#*<br />
Brightside<br />
Gsu<br />
17th<br />
Parker<br />
18th<br />
19th<br />
Bay<br />
Foss<br />
Spanish Town Road<br />
Buchanan<br />
Johnson<br />
Infirmary<br />
Milford<br />
Lockwood<br />
Beaumont<br />
Dooley<br />
12th<br />
Louisiana<br />
East<br />
10th<br />
10th<br />
Louise<br />
Capacity Improvement Projects<br />
¬ Waste Water Treatment <strong>Plan</strong>t<br />
PDP Projects - Central Basin<br />
#*<br />
WWTP<br />
Force Main<br />
Gravity Main<br />
PDP PS Projects<br />
Project Area<br />
Existing Force Main<br />
Existing Gravity Main<br />
#* Existing Pump Stations<br />
13th<br />
Iris<br />
Eddie Robinson Sr<br />
14th<br />
Braddock<br />
14th<br />
13th<br />
Mc Calop<br />
Georgia<br />
Vicaro<br />
Georgia<br />
Chimes<br />
Janet<br />
Jennifer Jean<br />
Iberville<br />
14th<br />
Kentucky<br />
Doris<br />
15th<br />
15th<br />
Marcellious<br />
Linwood<br />
Smith<br />
Louise<br />
16th<br />
Fig<br />
Ivanhoe<br />
Campus Lake<br />
16th<br />
Swire<br />
16th<br />
17th<br />
Oleson<br />
Cedar<br />
Gayosa<br />
Convention<br />
16th<br />
Polk<br />
18th<br />
Brice<br />
#*#*<br />
Dalrymple<br />
#*<br />
Park<br />
#*<br />
#*<br />
#*<br />
Scenic<br />
Olive<br />
Burbank<br />
Nicholson<br />
Pocahontas<br />
Hiawatha<br />
23rd<br />
Wisteria<br />
Oleander<br />
Lehmann<br />
Carolina<br />
June<br />
Amherst<br />
Dean Lee<br />
17th<br />
Etta<br />
20th<br />
Lobelia<br />
L S U<br />
20th<br />
Louisiana<br />
Cherokee<br />
Tulip<br />
May<br />
Kleinert<br />
#*<br />
Lakeshore<br />
21st<br />
20th<br />
Pontiac<br />
Tecumseh<br />
Uncas<br />
America<br />
Delgado<br />
Navajo<br />
Osceola<br />
Birch Birch<br />
Cherry<br />
March<br />
April<br />
Issac Cline<br />
Cornell<br />
Alamoster<br />
Gordon<br />
Baton Rouge<br />
Yale<br />
Weller<br />
Cable<br />
Tuscarora<br />
Calumet<br />
Pawnee<br />
Shawnee<br />
Seminole<br />
Gracie<br />
Spain<br />
Navajo<br />
Magnolia<br />
City Park<br />
Henry Adams<br />
Willow<br />
Lakeshore<br />
#*<br />
#*<br />
Canonicus<br />
Iroquois<br />
Myrtle<br />
#*<br />
Highland<br />
#*<br />
#*#*<br />
Stanford<br />
#*<br />
Evangeline<br />
<strong>Plan</strong>k<br />
#*<br />
Dayton<br />
Brady<br />
Chippewa<br />
Newton<br />
Fuqua<br />
Gracie<br />
Belmont<br />
Ben Hur<br />
Alliquippa<br />
Spain<br />
Virgil<br />
Tulane<br />
Clara<br />
Osceola<br />
24th<br />
Pocasset<br />
Adella<br />
Lake Hills<br />
23rd<br />
24th<br />
26th<br />
Fiero<br />
Geronimo<br />
Duke<br />
Lula<br />
Topeka<br />
Bogan<br />
26th<br />
27th<br />
Drehr<br />
Ovid<br />
Morning Glory<br />
St Rose<br />
Hillsdale<br />
Loyola<br />
Alliquippa<br />
Lavinia<br />
Christian<br />
29th<br />
28th<br />
Keokuk<br />
Ozark<br />
Erie<br />
30th<br />
Atkinson<br />
Gottlieb<br />
Baywood<br />
Elissalde<br />
Bengal<br />
Carriage<br />
Chalet<br />
25th<br />
28th<br />
Heritage<br />
Pluskat<br />
Huron<br />
Madison<br />
Arlington<br />
Letitia<br />
Ogden<br />
#*<br />
Lee<br />
Progress<br />
Zeeland<br />
Winnebago<br />
Ontario<br />
Acadian<br />
Main<br />
Broussard<br />
Lydia<br />
Hollydale<br />
Forge<br />
Ferndale<br />
Bourbon<br />
30th<br />
Bancroft<br />
Connell<br />
Bedford<br />
Kenmore<br />
Cedardale<br />
Linden<br />
Anna<br />
Glendale<br />
Myrtledale<br />
Kernan<br />
Hearthstone<br />
Reymond<br />
Tyrone<br />
33rd<br />
Floyd<br />
Eugene<br />
Burgin<br />
Charles<br />
Seneca<br />
Cherrydale<br />
Lynn<br />
Oswego<br />
Ozark<br />
Wilshire<br />
Goldenrod<br />
Greenwood<br />
Parker<br />
Marigold<br />
Hood<br />
Jolly<br />
Cloverdale<br />
Ross<br />
Mc Donald<br />
Dalton<br />
36th<br />
37th<br />
#* #*<br />
Hood<br />
Stuart<br />
Maple<br />
Cain<br />
Carl<br />
Aberdeen<br />
Tunica<br />
Wyandotte<br />
Monroe<br />
Saguaro<br />
Phillips<br />
Carol<br />
Marwede<br />
Westmoreland<br />
38th<br />
#*<br />
College Hill<br />
40th<br />
Cole<br />
#*<br />
Steele<br />
#*<br />
#*#*<br />
Sherwood<br />
Sunset<br />
Webb<br />
Mohican<br />
#*<br />
Noah<br />
Washington<br />
Odell<br />
Clay Cut<br />
Hundred Oaks<br />
Guava<br />
Wabash<br />
Bernardo<br />
Ira<br />
Honeysuckle<br />
Menlo<br />
Iroquois<br />
Delaware<br />
Barrow<br />
41st<br />
Bawell<br />
Palm<br />
Pickett<br />
Dubois<br />
Leeward<br />
Glenmore<br />
#*<br />
Nelson<br />
Bartlett<br />
Shelley<br />
Clayton<br />
Eaton<br />
#*<br />
Gus Young<br />
Billops<br />
Richland<br />
Churchill<br />
Rubin<br />
Lofaso<br />
Hyacinth<br />
Bennett<br />
Ryan<br />
Live Oak<br />
Jasmine<br />
Delaware<br />
Adams<br />
Edison<br />
Valley<br />
Whitehaven<br />
Wayne<br />
Yaun<br />
Monroe<br />
Belfair<br />
Tuscaloosa<br />
Chatfield<br />
Ramsey<br />
Tyrone<br />
Valley<br />
Edison<br />
Bluebell<br />
Leo<br />
Yazoo<br />
#*<br />
Wiltz<br />
Rhodes<br />
#*<br />
44th<br />
Ingleside<br />
Mission<br />
Nairn<br />
Orchid<br />
Arrowhead<br />
Mimosa<br />
Sweetbriar<br />
Chandler<br />
Boone<br />
43rd<br />
Hanson<br />
Beck<br />
Beechwood<br />
46th<br />
Frey<br />
#*<br />
Florida<br />
North<br />
Glasgow<br />
Jean<br />
#*<br />
#*<br />
Madison<br />
Fairfields<br />
Capital Heights<br />
Woodside<br />
Poplar<br />
Woodstone<br />
Winnebago<br />
Woodruff<br />
Martin<br />
Knollwood<br />
Longwood<br />
Ferrett<br />
Balis<br />
Cleo<br />
Harelson<br />
Mouton<br />
Woodgate<br />
Country Club<br />
Wells<br />
Balis<br />
Tupello<br />
Brame<br />
Dentation<br />
Levera<br />
Fairwoods<br />
Menlo<br />
Moore<br />
Bluebell<br />
Millgate<br />
Linden<br />
Urban<br />
Conrad<br />
Ritterman<br />
Foster<br />
#*<br />
Silliman<br />
Rabey<br />
Millstone<br />
Laurel<br />
Elm<br />
Osborne<br />
Avondale<br />
Eleanor<br />
Caddo<br />
Barber<br />
Concord<br />
Voss<br />
Kincaid<br />
Adams<br />
Dougherty<br />
Linden<br />
Jackson<br />
Hermitage<br />
Parlange<br />
Leighton<br />
Greenside<br />
Abelia<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#*<br />
#* #*<br />
#* #* #*<br />
#*<br />
Whitlow<br />
Eleanor<br />
Choctaw<br />
Convention<br />
Wylie<br />
#*<br />
Greenwell Springs<br />
Afton<br />
Melrose<br />
Westdale<br />
Ormandy<br />
Bazaar<br />
Valcour<br />
Acadia<br />
Fairfax<br />
Pollard<br />
Daventry<br />
Cloud<br />
Ardenwood<br />
Government<br />
Bankers<br />
Constitution<br />
Jamestown<br />
Pointer<br />
Woodchase<br />
Fieldgate<br />
Rothmer<br />
Seyburn<br />
Rebel<br />
Holloway<br />
Shelley<br />
Central Basin Capacity Improvement Projects<br />
12th<br />
12th<br />
14th<br />
14th<br />
Ontario<br />
North<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG4-2_PDP2010.MXD SGELPI 11/15/2010 14:48:28<br />
17th<br />
18th<br />
Fig<br />
19th<br />
Erie<br />
Huron<br />
Monroe<br />
Adams<br />
Sherwood<br />
Jefferson<br />
28th<br />
Jackson<br />
Eugene<br />
Cloverdale<br />
Madison<br />
Leeward<br />
Main<br />
0 0.25 0.5 1<br />
30th<br />
30th<br />
31st<br />
37th<br />
Richland<br />
Eaton<br />
Dayton<br />
Odell<br />
Beck<br />
Foster<br />
Charles<br />
Clayton<br />
Yorktown<br />
Bootsie<br />
Bennington<br />
Brookstown<br />
Seyburn<br />
Hilton<br />
Columbine<br />
Bel Air<br />
Dahlia<br />
Highland Park<br />
Boone<br />
Cyrus<br />
Heidel<br />
Brookstown<br />
College<br />
Corporate<br />
§¨¦I-10<br />
Congress<br />
Chippenham<br />
Leycester<br />
Victory<br />
Ridge<br />
Bromley<br />
Michelli<br />
Bennington<br />
Hibiscus<br />
Clematis<br />
Clayton<br />
Franklin<br />
Llanfair<br />
Castile<br />
Potomac<br />
Pino<br />
Forsythia<br />
Williamson<br />
Azam<br />
Glenwood<br />
Eastwood<br />
George<br />
Saratoga<br />
Columbine<br />
Chandler<br />
Howell<br />
Timbercreek<br />
Arden<br />
Evans<br />
Hendricks<br />
Winn<br />
Citiplace<br />
Guilford<br />
Prescott<br />
Winbourne<br />
Marion<br />
Sevenoaks<br />
Quail<br />
Stoneliegh<br />
Sheldon<br />
Jefferson<br />
Louray<br />
Elgin<br />
Esplanade<br />
Trenton<br />
Clinton<br />
Executive Park<br />
Marquette<br />
Stratford<br />
Krista<br />
Brent<br />
Stokes<br />
Barford<br />
Carrollton<br />
Rodney<br />
Moss Side<br />
Baird<br />
Airline<br />
Harry<br />
Goodwood<br />
Tarrytown<br />
Quail Run<br />
Albert Hart<br />
Smiley<br />
Carrollton<br />
Aries<br />
Gates<br />
Rodin<br />
Audubon<br />
Lasalle<br />
Peggy<br />
Orion<br />
Maxine<br />
Bicentennial<br />
Ozark<br />
Anita<br />
Nellie<br />
Industrial<br />
Choctaw<br />
Titian<br />
Overton<br />
Perkins<br />
Lobdell<br />
Renoir<br />
Cezanne<br />
Goya<br />
Van Gogh<br />
Kenwood<br />
Conley<br />
Burden<br />
Irene<br />
Donmoor<br />
Kenilworth<br />
Applewood<br />
Harts Mill<br />
Conley<br />
Victoria<br />
Melon<br />
Alden<br />
Keed<br />
Joliet<br />
Murphy<br />
Pikes<br />
Walden<br />
Thoreau<br />
Magnolia Wood<br />
Victoria<br />
Woodstock<br />
Miles Figure 4-2<br />
Torrance<br />
Castle Kirk
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.1 Central Gravity System Comprehensive Rehabilitation<br />
Projects<br />
4.1.1 CGS-R-0001, CGS-R-0002, CGS-R-0003, CGS-R-0004, CGS-R-0005, CGN-R-<br />
0001a, CGN-R-0001b, and CGN-R-0002<br />
Project Description<br />
The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />
various components of the collection system to reduce the amount of infiltration and inflow<br />
that enter the system.<br />
Purpose<br />
The purpose of comprehensive rehabilitation is to correct defects in the system such as offset<br />
pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources. The water<br />
that enters the system through the defects is a major contributor to SSOs. Comprehensive<br />
rehabilitation of the collection system will contribute to alleviating SSOs.<br />
Location<br />
There are eight rehabilitation projects located within the Central Gravity Basin. The<br />
locations of the projects are shown in Figures 4-3 to 4-9.<br />
Scope of Project<br />
The first phase of comprehensive rehabilitation projects will consist of the physical<br />
inspection of the pipes and manholes including CCTV inspection. Smoke testing may also<br />
be included in the physical inspection phase.<br />
The data collected by the physical inspection contractor will be analyzed and, based on that<br />
analysis, a listing of recommended repairs with associated construction costs will be generated.<br />
An engineering firm will then complete detailed design and preparation of construction<br />
documents for project bidding.<br />
The construction of comprehensive rehabilitation projects will typically include the<br />
following components::<br />
<br />
<br />
<br />
<br />
<br />
Replacement of pipes<br />
Point repair of pipes<br />
Rehabilitation of pipes by cured in place pipe liners<br />
Rehabilitation or replacement of manholes<br />
Repair of sewer laterals to the property line<br />
Cost<br />
The estimated construction cost for each project is presented in Table 4-1. These costs are<br />
based on preliminary estimates of the amounts for each component of the system that will<br />
require repair or replacement. During the physical inspection phase, the actual condition of<br />
the components will be assessed and appropriate methods recommended. At that time, the<br />
cost estimate for each project will be revised. For those projects under construction, the bid<br />
amounts were included as construction costs in Table 4-1.<br />
GNV31031158548.DOCX/103440008 4-7 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
TABLE 4-1<br />
Estimated Construction Costs for Central Gravity System Comprehensive Rehabilitation Projects<br />
Project Description<br />
Construction<br />
Cost<br />
Scheduled<br />
Design<br />
Appropriation<br />
Year<br />
Scheduled<br />
Construction<br />
Appropriation<br />
Year<br />
Status<br />
CGS-R-0001-Foster<br />
Drive-Government<br />
Street Phase A and B<br />
CGS-R-0002-Highland<br />
Road-Washington<br />
Street<br />
CGS-R-0003-Stanford<br />
Avenue-Morning Glory<br />
Road<br />
CGS-R-0004-Acadian<br />
Thruway-Claycut Road<br />
CGS-R-0005-Acadian<br />
Thruway-Perkins Road<br />
CGN-R-0001a-Scenic<br />
Highway-Spanish Town<br />
Road Phase I<br />
CGN-R-0001b-Scenic<br />
Highway-Spanish Town<br />
Road Phase II<br />
CGN-R-0002- East<br />
Boulevard-Government<br />
Street<br />
$7,683,000 2009* 2009* Construction<br />
On-Going<br />
$8,000,000 2010* 2011 Not Started<br />
$6,900,000 2010* 2010* Design On-<br />
Going<br />
$7,500,000 2010* 2011 Design On-<br />
Going<br />
$3,900,000 2010* 2010* Design On-<br />
Going<br />
$8,600,000 2011 2012 Not Started<br />
$8,600,000 2011 2012 Not Started<br />
$9,600,000 2012 2013 Not Started<br />
*Appropriations already made for these projects (design and/or construction, as marked)<br />
GNV31031158548.DOCX/103440008 4-8 JANUARY 2011<br />
REV. 5
East<br />
47th<br />
48th<br />
49th<br />
Whitter<br />
Alello<br />
Audubon<br />
Rembrandt<br />
39th<br />
40th<br />
44th<br />
Jonah<br />
46th<br />
Parlange<br />
Valcour<br />
Timbercreek<br />
Columbus Dunn<br />
North<br />
Melrose<br />
Afton<br />
Waverly<br />
Leighton<br />
Azam<br />
Villa Ashley<br />
Carrollton<br />
Harry<br />
Titian<br />
Van Gogh<br />
Ardenwood<br />
49th<br />
Bernardo<br />
Lofaso<br />
Live Oak<br />
Roselawn<br />
Tuscaloosa<br />
Beck<br />
48th<br />
Laurel<br />
Fairfax<br />
Asphodel<br />
Florida Blvd Service Road<br />
Florida<br />
Convention<br />
Steele<br />
Live Oak<br />
Richland<br />
Edison<br />
Blanchard<br />
Edison<br />
Leo<br />
Hatcher<br />
Hanson<br />
Keen<br />
Wiltz<br />
Capital Heights<br />
Longwood<br />
BeckLongwood<br />
Clay Cut<br />
Mouton<br />
North<br />
Hebert<br />
Moore<br />
Convention<br />
Bienville<br />
Garig<br />
Government<br />
Greenside<br />
Caddo<br />
St Tammany<br />
Acadia<br />
Foster<br />
St Landry<br />
Concordia<br />
Fairfax<br />
Cloud<br />
George<br />
Franklin<br />
Pershing<br />
Rapides<br />
Ardenwood<br />
Waverly<br />
Castile<br />
Convention<br />
Burgundy<br />
Glenwood<br />
Eastwood<br />
Arden<br />
Evans<br />
Winn<br />
Goodwood<br />
Marion<br />
Marion<br />
Marquette<br />
Marion<br />
Marquette<br />
Apartment Court<br />
Marquette<br />
Carrollton<br />
Esplanade<br />
Bellewood<br />
Sheffield<br />
Carrollton<br />
Kenwood<br />
Sevenoaks<br />
Donmoor<br />
Winthrop<br />
Alden<br />
Sheffield<br />
Richland<br />
Glenmore<br />
Jefferson<br />
Joliet<br />
Broussard<br />
Westdale<br />
Lasalle<br />
Ingleside<br />
Rosemont<br />
Ridge<br />
Berkshire<br />
Cameron<br />
Silliman<br />
Avondale<br />
Country Club<br />
Hundred Oaks<br />
Ormandy<br />
Marshall<br />
College<br />
Longwood<br />
Hillside<br />
Churchill<br />
Acadian<br />
Chatfield<br />
Bawell<br />
Delta<br />
Ramsey<br />
Yazoo<br />
Wells<br />
Yazoo<br />
Nairn<br />
Valley<br />
Woodside<br />
Wells<br />
Woodland<br />
Perth<br />
Balis<br />
Abelia<br />
Brownlee<br />
Barber<br />
Bardwell<br />
Holloway<br />
Bankers<br />
Corporate<br />
East Baton Rouge Parish<br />
Legend<br />
Area Designated for<br />
Physical Inspection<br />
0 880 1,760 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGS-R-0001.MXD SGELPI 11/9/2010 10:18:43<br />
q<br />
Foster Dr. - Government St.<br />
Phase A and B<br />
CGS-R-0001<br />
Project Vicinity Map<br />
Figure 4-3
10th<br />
Emma<br />
Brickyard<br />
Aztec<br />
Gila<br />
St Philip<br />
Terrace<br />
Monrovia<br />
Oklahoma<br />
Duane<br />
St Charles<br />
South<br />
Royal<br />
Ellwood<br />
Veta<br />
Margaret<br />
St Joseph<br />
Napoleon<br />
Maximillian<br />
10th<br />
Dot<br />
Burns<br />
Cotton<br />
I-110<br />
11th<br />
12th<br />
14th<br />
15th<br />
Julia<br />
Terrace<br />
Swart<br />
Burns<br />
Mc Calop<br />
Pecan<br />
Smith<br />
Orange<br />
Apple<br />
Louise<br />
Myrtle<br />
Bruce<br />
16th<br />
17th<br />
Lehmann<br />
18th<br />
Park<br />
Olive<br />
Perkins<br />
River<br />
Indiana<br />
Emma<br />
Garner<br />
Haig<br />
Illinois<br />
Irby C Nichols<br />
Nicholson<br />
Iris<br />
Violet<br />
Iowa<br />
Iowa<br />
Aster<br />
Geranium<br />
Chatsworth<br />
Van Buren<br />
Duncan<br />
Taylor<br />
Vermont<br />
Minnesota<br />
Roosevelt<br />
Tyler<br />
Mary<br />
Polk<br />
Alice<br />
Johnson<br />
Mc Kinley<br />
Grant<br />
Garfield<br />
Washington<br />
Alaska<br />
Infirmary Lake<br />
Cypress<br />
Stadium<br />
Field House<br />
Gov Claiborne<br />
Kansas<br />
Colorado<br />
Nebraska<br />
Arizona<br />
Howard<br />
Education<br />
Lettsworth<br />
Harding<br />
Taft<br />
Buchanan<br />
Thomas H Delpit<br />
Highland<br />
State<br />
Tower<br />
Utah<br />
Matilda<br />
Magnolia<br />
Coolidge<br />
Wyoming<br />
Aswell<br />
Easton<br />
Galvez<br />
Marigny<br />
Oregon<br />
Azalea<br />
Sonora<br />
Jeff Davis<br />
California<br />
Tinga<br />
Louise<br />
16th<br />
Olive<br />
Orange<br />
17th<br />
18th<br />
Daniel Webster<br />
Chimes<br />
Grant<br />
Garfield<br />
Wyoming<br />
Johnson<br />
Garfield<br />
Alice<br />
Harrison<br />
Howard<br />
Buchanan<br />
Donahue<br />
Harding<br />
Tinga<br />
Polk<br />
Johnson<br />
Tennessee<br />
Vicaro<br />
I-10<br />
Braddock<br />
Fig<br />
Georgia<br />
Mc Kinley<br />
Grant<br />
Garfield<br />
Roosevelt<br />
Tula<br />
Fraternity<br />
Willard<br />
Virginia<br />
Maryland<br />
Kentucky<br />
Chimes<br />
Raphael Semmes<br />
Campus<br />
Eddie Robinson Sr<br />
Pear<br />
Harrison<br />
Johnson<br />
Fig<br />
Virginia<br />
Carlotta<br />
Missouri<br />
Missouri<br />
Carolina<br />
Fig<br />
Lakeshore<br />
Arkansas<br />
Harrison<br />
July<br />
April<br />
June<br />
Issac Cline<br />
Dalrymple<br />
March<br />
City Park<br />
Lakeshore<br />
May<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0002.MXD SGELPI 10/26/2009 11:38:24<br />
Area Designated for<br />
Physical Inspection<br />
0 500 1,000 Feet<br />
q<br />
Highland Rd. - Washington St.<br />
CGS-R-0002<br />
Project Vicinity Map<br />
Figure 4-4
14th<br />
Arialo<br />
Trinity<br />
Twelve Oaks<br />
Westervelt<br />
Destrehan<br />
Belle Grove<br />
Riverway<br />
Tezcucco<br />
Riverbend<br />
Durande<br />
Sarpy<br />
Calanne<br />
River<br />
Stadium<br />
Gourrier<br />
Dakin<br />
Ormand<br />
Garfield<br />
Emma<br />
Haig<br />
Chimes<br />
Valcour Aime<br />
Irby C Nichols<br />
Terrace<br />
Oklahoma<br />
Garner<br />
Johnson<br />
Grant<br />
Chatsworth<br />
Iowa<br />
Iowa<br />
Iris<br />
Aster<br />
Azalea<br />
Taylor<br />
Alaska<br />
Harwich<br />
Royal<br />
Minnesota<br />
Alice<br />
Mc Kinley<br />
Julia<br />
Roosevelt<br />
Campus<br />
St Joseph<br />
Napoleon<br />
Polk<br />
Bob Pettit<br />
Y A Tittle<br />
Alvin Dark<br />
Sharlo<br />
Riverwood<br />
Nebraska<br />
Brightside View<br />
Terrace<br />
Swart<br />
Washington<br />
Kansas<br />
Infirmary<br />
Thomas H Delpit<br />
Grant<br />
Milford<br />
Taft<br />
State<br />
Tower<br />
11th<br />
Utah<br />
Iris<br />
I-10<br />
Georgia<br />
Chimes<br />
Janet<br />
Boyd<br />
Jennifer Jean<br />
Brightside<br />
15th<br />
Orange<br />
Louise<br />
Harrison<br />
Vicaro<br />
Kentucky<br />
Dean Lee<br />
Fig<br />
Johnson<br />
Grant<br />
Doris<br />
Ivanhoe<br />
Line<br />
Virginia<br />
Parker<br />
Oleson<br />
17th<br />
Fig<br />
Carolina<br />
July<br />
Dalrymple<br />
Park<br />
Issac Cline<br />
Amherst<br />
Etta<br />
Magnolia<br />
June<br />
L S U<br />
May<br />
Lakeshore<br />
Cornell<br />
Ben Hur<br />
City Park<br />
Yale<br />
Delgado<br />
Kleinert<br />
Lakeshore<br />
Myrtle<br />
Belmont<br />
Virgil<br />
Tulane<br />
Clara<br />
Fiero<br />
Bengal<br />
Glendale<br />
Stanford<br />
Highland<br />
Ben Hur<br />
Nicholson<br />
Drehr<br />
Ovid<br />
Elissalde<br />
Broussard<br />
St Rose<br />
Hillsdale<br />
Carriage<br />
Christian<br />
Lakeshore<br />
Loyola<br />
Letitia<br />
Elissalde<br />
Lydia<br />
Ferndale<br />
Forge<br />
Bancroft<br />
Lee<br />
Gladden<br />
Hundred Oaks<br />
Reymond<br />
Greenwood<br />
Cedardale<br />
Cloverdale<br />
Eugene<br />
Cherrydale<br />
Floyd<br />
Tyrone<br />
Marigold<br />
Jolly<br />
Helvetia<br />
Thalia<br />
Parker<br />
Burgin<br />
Cloverdale<br />
Perkins<br />
Hood<br />
Carl<br />
Aberdeen<br />
Boone<br />
Honeysuckle<br />
Stuart<br />
Acadian<br />
Menlo<br />
Guava<br />
Burbank<br />
Steele<br />
Churchill<br />
Sassy<br />
Sunset<br />
Rubin<br />
Richland<br />
Hyacinth<br />
Pickett<br />
Dubois<br />
Leeward<br />
Bawell<br />
Bennett<br />
Ryan<br />
Palm<br />
Nelson<br />
Glenmore<br />
Yazoo<br />
Eugene<br />
Valley<br />
Whitehaven<br />
Bluebell<br />
Ramsey<br />
Ingleside<br />
Nairn<br />
Mimosa<br />
Woodstone<br />
Balis<br />
Tupello<br />
Orchid<br />
Bluebell<br />
Chandler<br />
Boone<br />
Woodgate<br />
Longwood<br />
Edinburgh<br />
Glasgow<br />
Woodruff<br />
College<br />
<strong>Plan</strong>tation<br />
Laurel Lakes<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0003.MXD SGELPI 10/22/2009 08:21:41<br />
Area Designated for<br />
Physical Inspection<br />
0 1,800 3,600 Feet<br />
q<br />
Stanford Ave. - Morning Glory Rd.<br />
CGS-R-0003<br />
Project Vicinity Map<br />
Figure 4-5
21st<br />
22nd<br />
West<br />
East<br />
47th<br />
48th<br />
49th<br />
Gracie<br />
Hurst<br />
20th<br />
Convention<br />
Scenic<br />
Gayosa<br />
Fuqua<br />
23rd<br />
24th<br />
Adella<br />
23rd<br />
24th<br />
Gracie<br />
Boyd<br />
Edgewood<br />
25th<br />
25th<br />
26th<br />
26th<br />
Laurel<br />
26th<br />
25th<br />
27th<br />
28th<br />
29th<br />
Eugene<br />
Fuqua<br />
30th<br />
31st<br />
Gebelin<br />
Progress<br />
Fuqua<br />
Gayosa<br />
30th<br />
Fuqua<br />
Gracie<br />
Boyd<br />
Atkinson<br />
Gottlieb<br />
Greta<br />
Kernan<br />
Connell<br />
32nd<br />
Main<br />
Jonah<br />
35th<br />
Laurel<br />
36th<br />
Saguaro<br />
Phillips<br />
Zion<br />
37th<br />
Ruth<br />
Main<br />
Maywood<br />
Peachtree<br />
38th<br />
Wabash<br />
Wabash<br />
39th<br />
Bernardo<br />
40th<br />
North<br />
Live Oak<br />
Jasmine<br />
Lofaso<br />
North<br />
Live Oak<br />
Roselawn<br />
Tuscaloosa<br />
Convention<br />
44th<br />
Beck<br />
Beck<br />
Columbus Dunn<br />
Jonah<br />
46th<br />
48th<br />
Florida<br />
49th<br />
Laurel<br />
Convention<br />
Foster<br />
Parlange<br />
Leighton<br />
Afton<br />
Melrose<br />
Leo<br />
19th<br />
20th<br />
21st<br />
Wisteria<br />
Cherokee<br />
Tulip<br />
Olive<br />
Baxter<br />
24th<br />
Spain<br />
America<br />
Oleander<br />
Louisiana<br />
Cedar<br />
22nd<br />
Baxter<br />
23rd<br />
Spain<br />
Drehr<br />
Evergreen<br />
St Rose<br />
Myrtle<br />
Lavinia<br />
Belleview<br />
St Rose<br />
Cork<br />
Rittner<br />
Eugene<br />
Arlington<br />
Ogden<br />
Kenmore<br />
Bedford<br />
Hearthstone<br />
Hearthstone<br />
Beverly<br />
Acadian<br />
Wilshire<br />
Government<br />
Carol<br />
Carol Marie<br />
Lovers<br />
Terry<br />
Westmoreland<br />
Steele<br />
Cole<br />
Ira<br />
Florence<br />
Blanchard<br />
Richland<br />
Richland<br />
Edison<br />
Edison<br />
Glenmore<br />
Hanson<br />
Keen<br />
Hatcher<br />
Wiltz<br />
Capital Heights<br />
Longwood<br />
Mouton<br />
Clay Cut<br />
Moore<br />
Hebert<br />
Bienville<br />
Rebel<br />
Greenside<br />
Caddo<br />
St Tammany<br />
Hearthstone<br />
Marwede<br />
Kleinert<br />
Camelia<br />
Parker<br />
Park<br />
Terrace<br />
Magnolia<br />
Broussard<br />
Westdale<br />
Dalrymple<br />
Dalrymple<br />
City Park<br />
Lakeshore<br />
Blouin<br />
I-10<br />
Belmont<br />
Drehr<br />
Eola<br />
Lake Hills<br />
Virgil<br />
Horace<br />
Hillsdale<br />
Fairmont<br />
Homer<br />
Pericles<br />
Ovid<br />
Dogwood<br />
Baywood<br />
St Rose<br />
Letitia<br />
Zeeland<br />
Perkins<br />
Arlington<br />
Lydia<br />
Eastland<br />
Edward<br />
Kenmore<br />
Reymond<br />
Gladden<br />
Tyrone<br />
Eugene<br />
Daggett<br />
Goldenrod<br />
Moreland<br />
Eliza Beaumont<br />
Orpine<br />
Hundred Oaks<br />
Hillside<br />
Churchill<br />
Chatfield<br />
Woodside<br />
Bawell<br />
Delta<br />
Ramsey<br />
Malmaison<br />
Yazoo<br />
Ingleside<br />
Wells<br />
Yazoo<br />
Nairn<br />
Valley<br />
Longwood<br />
Country Club<br />
Wells<br />
Woodland<br />
Perth<br />
Silliman<br />
Balis<br />
Avondale<br />
Abelia<br />
Brownlee<br />
Barber<br />
Rosemont<br />
Ormandy<br />
Bardwell<br />
Marshall<br />
College<br />
Bankers<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0004.MXD SGELPI 10/22/2009 08:10:07<br />
Area Designated for<br />
Physical Inspection<br />
0 850 1,700 Feet<br />
q<br />
Acadian Thruway - Claycut Rd.<br />
CGS-R-0004<br />
Project Vicinity Map<br />
Figure 4-6
10th<br />
10th<br />
12th<br />
15th<br />
21st<br />
Arlington<br />
West<br />
East<br />
Florida<br />
East<br />
10th<br />
Nebraska<br />
Kansas<br />
Alice<br />
11th<br />
France<br />
Howard<br />
America<br />
I-110<br />
Thomas H Delpit<br />
Burbank<br />
Polk<br />
Tower<br />
Julia<br />
Washington<br />
Taft<br />
Mc Kinley<br />
Grant<br />
Roosevelt<br />
Infirmary<br />
Hart<br />
State<br />
Nicholson<br />
Gourrier<br />
12th<br />
12th<br />
Tennessee<br />
Eddie Robinson Sr<br />
Highland<br />
14th<br />
Iberville<br />
Smith<br />
Swart<br />
Braddock<br />
Mc Calop<br />
Georgia<br />
Buchanan<br />
Garfield<br />
Vicaro<br />
13th<br />
Janet<br />
14th<br />
Chimes<br />
Boyd<br />
Louise<br />
Harrison<br />
Mc Kinley<br />
Kentucky<br />
Campus<br />
15th<br />
Convention<br />
North<br />
16th<br />
Parker<br />
July<br />
Park<br />
Dalrymple<br />
19th<br />
Wisteria<br />
Oleander<br />
Pruyn<br />
Cherokee<br />
Tulip<br />
South<br />
Fig<br />
Missouri<br />
Stadium<br />
Ag Center<br />
Swire<br />
Wisteria<br />
15th<br />
Ivanhoe<br />
Campus Lake<br />
15th<br />
Virginia<br />
17th<br />
Lehmann<br />
16th<br />
17th<br />
Fig<br />
Carolina<br />
Lakeshore<br />
Arkansas<br />
Brice<br />
Amherst<br />
17th<br />
18th<br />
June<br />
Olive<br />
L S U<br />
20th<br />
March<br />
April<br />
Issac Cline<br />
18th<br />
Cornell<br />
Spain<br />
Magnolia<br />
May<br />
Lakeshore<br />
Yale<br />
Henry Adams<br />
21st<br />
Camelia<br />
City Park<br />
Delgado<br />
22nd<br />
Louisiana<br />
Spain<br />
Virgil<br />
Tulane<br />
Newcomb<br />
Clara<br />
23rd<br />
Cedar<br />
22nd<br />
Lake Hills<br />
Drehr<br />
Drehr<br />
St Rose<br />
Myrtle<br />
Terrace<br />
Hillsdale<br />
Fiero<br />
Stanford<br />
25th<br />
Ovid<br />
Elissalde<br />
Lavinia<br />
Belleview<br />
Pericles<br />
Baywood<br />
Bengal<br />
Loyola<br />
St Rose<br />
Carriage<br />
Chalet<br />
Rittner<br />
Christian<br />
Lakeshore<br />
Lakeshore<br />
Eugene<br />
Eugene<br />
Letitia<br />
Gottlieb<br />
Ogden<br />
Arlington<br />
Kleinert<br />
Belmont<br />
Zeeland<br />
Lydia<br />
Hollydale<br />
Forge<br />
Ferndale<br />
Bourbon<br />
Kenmore<br />
Edward<br />
Wilshire<br />
Reymond<br />
Kalurah<br />
Hearthstone<br />
Eugene<br />
Cedardale<br />
Glendale<br />
Floyd<br />
Acadian<br />
Government<br />
Gladden<br />
Greenwood<br />
Cloverdale<br />
Greta<br />
Tyrone<br />
Marigold<br />
Morning Glory<br />
Helvetia<br />
Hearthstone<br />
Hood<br />
Phillips<br />
Kernan<br />
Jolly<br />
Goldenrod<br />
Parker<br />
Cloverdale<br />
Carl<br />
Stuart<br />
Hood<br />
Whitehaven<br />
Stephens<br />
Carol Marie<br />
Marwede<br />
Moreland<br />
Rhododendron<br />
Aberdeen<br />
Westmoreland<br />
Lee<br />
Steele<br />
Cole<br />
Richland<br />
Edison<br />
Glenmore<br />
Pickett<br />
Broussard<br />
Hundred Oaks<br />
Honeysuckle<br />
Wabash<br />
Florence<br />
Ramsey<br />
Mimosa<br />
Rubin<br />
Jasmine<br />
Richland<br />
Blanchard<br />
Chatfield<br />
Bawell<br />
Delta<br />
Sassy<br />
Palm<br />
Churchill<br />
Hyacinth<br />
Bennett<br />
Convention<br />
Edison<br />
Mississippi<br />
Valley<br />
Wiltz<br />
Clay Cut<br />
Ingleside<br />
Nairn<br />
Orchid<br />
Arrowhead<br />
Leo<br />
Yazoo<br />
Para<br />
Tyrone<br />
Eugene<br />
Balis<br />
Bluebell<br />
Mimosa<br />
Hanson<br />
Keen<br />
Longwood<br />
Capital Heights<br />
Woodside<br />
Poplar<br />
Beck<br />
Wells<br />
Sweetbriar<br />
Yazoo<br />
Ferrett<br />
Knollwood<br />
Country Club<br />
Wells<br />
Balis<br />
Tupello<br />
Edinburgh<br />
Brame<br />
Moore<br />
Rabey<br />
Glasgow<br />
Bluebell<br />
Woodland<br />
Perth<br />
Silliman<br />
Aldrich<br />
Barber<br />
Perkins<br />
Avondale<br />
Foster<br />
Greenside<br />
Abelia<br />
Bennington<br />
Concord<br />
Whitehaven<br />
Caddo<br />
Rosemont<br />
Bazaar<br />
Westdale<br />
Ormandy<br />
Bardwell<br />
Acadia<br />
College<br />
Constitution<br />
Pointer<br />
Woodchase<br />
St Tammany<br />
Holloway<br />
Trust<br />
Yorktown<br />
Congress<br />
St Landry<br />
Bankers<br />
Corporate<br />
Hilton<br />
Jamestown<br />
Brandywine<br />
Pollard<br />
Columbine<br />
Fairfax<br />
I-10<br />
Moss Side<br />
Franklin<br />
Hibiscus<br />
Cloud<br />
George<br />
Lexington<br />
Ridge<br />
Clematis<br />
Dahlia<br />
Jefferson<br />
Castile<br />
Bunker Hill<br />
Energy<br />
Ardenwood<br />
Waverly<br />
Burgundy<br />
Saratoga<br />
Sandalwood<br />
Potomac<br />
Forsythia<br />
Columbine<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGS-R-0005.MXD SGELPI 10/22/2009 08:10:40<br />
Area Designated for<br />
Physical Inspection<br />
0 1,300 2,600 Feet<br />
q<br />
Acadian Thruway - Perkins Rd.<br />
CGS-R-0005<br />
Project Vicinity Map<br />
Figure 4-7
I-110<br />
28th<br />
Brookstown<br />
Topaz<br />
Garnet<br />
Greenwell<br />
Amarillo<br />
Comish<br />
Saurage<br />
Comish<br />
Alexander<br />
Denham<br />
Douglas<br />
Henderson<br />
Henagen<br />
Hollywood<br />
Greenwell<br />
Vaughn<br />
Lakewood<br />
Quivera<br />
Lemonwood<br />
Dutton<br />
Robertson<br />
Wood<br />
Hollywood<br />
Woodlawn<br />
Lancaster<br />
Winchester<br />
Airline<br />
Greenwell<br />
St Dorothy<br />
Breckenridge<br />
Gsu<br />
Cedar<br />
Riley<br />
Lobelia<br />
Scenic<br />
Alamoster<br />
Powhatan<br />
Ontario<br />
Kelvin<br />
Lorraine<br />
Iberia<br />
Shelley<br />
Cable<br />
Sherwood<br />
Gordon<br />
Pontiac<br />
Galvez<br />
Nokomis<br />
Farrar<br />
Tecumseh<br />
Hiawatha<br />
Osceola<br />
Uncas<br />
Navajo Navajo<br />
Calumet<br />
Baton Rouge<br />
Winbourne<br />
Tuscarora<br />
Baton Rouge<br />
Osceola<br />
Beech<br />
Sherman<br />
Huron<br />
Erie Erie<br />
Osage<br />
Wenonah<br />
Cable<br />
Wenonah<br />
Alliquippa<br />
Pocasset<br />
Alliquippa<br />
Canonicus<br />
Douglas<br />
Weller<br />
Geronimo<br />
Erie<br />
Iroquois<br />
Duke<br />
Keokuk<br />
Beech<br />
Sherwood<br />
Topeka<br />
Dayton<br />
Wyandotte<br />
<strong>Plan</strong>k<br />
Huron<br />
Brady<br />
Dalton<br />
Longfellow<br />
Pluskat<br />
Pawtucket<br />
Ozark<br />
Midway<br />
Erie<br />
Chippewa<br />
31st<br />
Riley<br />
Kelvin<br />
Lorraine<br />
Beech<br />
Byron<br />
Clayton<br />
Myrtlelawn<br />
Roppolo<br />
Weller<br />
Anna<br />
Spedale<br />
Calumet<br />
Linden<br />
Wyandotte<br />
Oswego<br />
30th<br />
33rd<br />
Accardo<br />
Lynn<br />
38th<br />
Maple<br />
Delaware<br />
Winnebago<br />
Wyandotte<br />
Charles<br />
Oswego<br />
Ozark<br />
Ontario<br />
Seneca<br />
Tunica<br />
Wildwood<br />
Webb<br />
St Katherine<br />
Mohican<br />
Wayne<br />
Mission<br />
Eaton<br />
Bartlett<br />
Yaun<br />
St Gerard<br />
Sycamore<br />
Shelley<br />
Mohican-Prescott Crossover<br />
Delaware<br />
Wildwood<br />
Iroquois<br />
Delaware<br />
Lorraine<br />
Lemonwood<br />
Eaton<br />
Addison<br />
Beechwood<br />
Dayton<br />
Winnebago<br />
Wyandotte<br />
Joseph<br />
Evangeline<br />
Frey<br />
Levera<br />
Hazelwood<br />
Fairwoods<br />
Bradley<br />
Onter<br />
Wilmot<br />
Jean<br />
Foster<br />
Linden<br />
Eleanor<br />
Conrad<br />
Ritterman<br />
Choctaw<br />
Sherwood<br />
Cleo<br />
Charles<br />
Eleanor<br />
Byron<br />
Wyandotte<br />
Bradley<br />
Wilmot<br />
Elm<br />
Underwood<br />
Osborne<br />
McClelland<br />
Mc Clelland<br />
Prescott<br />
Dougherty<br />
Linden<br />
Winbourne<br />
Voss<br />
Bootsie<br />
Kincaid<br />
Blackwell<br />
Annette<br />
Annette<br />
Howell Park<br />
St Gerard<br />
Beech<br />
Enterprise<br />
Broadway<br />
Victory<br />
Cyrus<br />
Heidel<br />
28th<br />
Pocahontas<br />
19th<br />
Monroe<br />
20th<br />
Pawnee<br />
Monroe<br />
Adams<br />
East Baton Rouge Parish<br />
26th<br />
Legend<br />
30th<br />
Monroe<br />
Adams<br />
Madison<br />
Acadian<br />
37th<br />
Area Designated for<br />
Physical Inspection<br />
PHASE I<br />
Monroe<br />
0 880 1,760 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGN-R-0001A.MXD SGELPI 11/15/2010 11:43:09<br />
39th<br />
q<br />
Adams<br />
Barrow<br />
Monroe<br />
Belfair<br />
Belfair<br />
Rice<br />
Rhodes<br />
Mission<br />
Martin<br />
Harelson<br />
Fairfields<br />
Jackson<br />
Foster<br />
Adams<br />
Madison<br />
Bahm<br />
Paulson<br />
Washington<br />
Scenic Hwy. - Spanish Town Rd.<br />
Phase I<br />
Figure 4-8a<br />
CGN-R-0001A<br />
Project Vicinity Map<br />
Sobers
3rd<br />
Lupine<br />
9th<br />
11th<br />
15th<br />
16th<br />
17th<br />
18th<br />
18th<br />
19th<br />
I-110<br />
Hiawatha<br />
21st<br />
22nd<br />
26th<br />
West<br />
East<br />
River<br />
Lafayette<br />
Dort<br />
Woodrow<br />
Spain<br />
3rd<br />
St James<br />
Eiland<br />
South<br />
4th<br />
Miller<br />
St Philip<br />
St Ferdinand<br />
Spanish Town Road<br />
St Louis<br />
Capitol Lake<br />
State Capitol<br />
Lakeland<br />
St Philip<br />
4th<br />
University<br />
5th<br />
5th<br />
6th<br />
North<br />
France<br />
East Baton Rouge Parish<br />
St Charles<br />
7th<br />
Europe<br />
Daisy<br />
Ted Dunham<br />
Napoleon<br />
7th<br />
Mayflower<br />
Arbutus<br />
8th<br />
7th<br />
Ontario<br />
8th<br />
America<br />
8th<br />
St Joseph<br />
8th<br />
Sorrel 10th<br />
Manda<br />
Neosho<br />
Maximillian<br />
Phlox<br />
Pittsburg<br />
Joplin<br />
De Queen<br />
Lakeridge<br />
8th<br />
Mansfield<br />
9th<br />
Highway<br />
Capitol Access<br />
East<br />
Canal<br />
Louisiana<br />
10th<br />
Legend<br />
11th<br />
11th<br />
10th<br />
11th<br />
12th<br />
12th<br />
Beaumont<br />
Dooley<br />
12th<br />
12th<br />
11th<br />
11th<br />
South<br />
13th<br />
13th<br />
Spain<br />
Peach<br />
13th<br />
14th<br />
Eddie Robinson Sr<br />
Purslane<br />
Iberville<br />
15th<br />
15th<br />
14th<br />
Lockwood<br />
Bay<br />
17th<br />
Gracie<br />
14th<br />
Gayosa<br />
15th<br />
15th<br />
Pimpernel<br />
Marcellious<br />
Linwood<br />
16th<br />
Frisco<br />
16th<br />
17th<br />
North<br />
Spain<br />
Area Designated for<br />
Physical Inspection<br />
PHASE II<br />
0 980 1,960 Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\CENTRAL\CENTRAL MAPS\CGN-R-0001B.MXD SGELPI 11/15/2010 11:46:13<br />
16th<br />
17th<br />
18th<br />
Foss<br />
Laurel<br />
Cedar<br />
Jessamine<br />
19th<br />
Convention<br />
17th<br />
17th<br />
Ontario<br />
Brice<br />
Chestnut<br />
Scenic<br />
<strong>Plan</strong>k<br />
Pocahontas<br />
Florida<br />
Louisiana<br />
Wisteria<br />
Blanche<br />
Pruyn<br />
Bynum<br />
Lobelia<br />
Monroe<br />
Mulberry<br />
Birch<br />
Ellerslie<br />
19th<br />
18th<br />
Walnut<br />
Park<br />
Erie<br />
Adams<br />
18th<br />
q<br />
20th<br />
21st<br />
Hiawatha<br />
Cherry<br />
Gracie<br />
20th<br />
Spain<br />
Baton Rouge<br />
Cherokee<br />
Tecumseh<br />
Pawnee<br />
Shawnee<br />
Seminole<br />
Osceola<br />
Winbourne<br />
Huron<br />
Erie<br />
Seneca<br />
23rd<br />
America<br />
Oleander<br />
Osceola<br />
Tulip<br />
Wenonah<br />
Monroe<br />
Adams<br />
Birch<br />
Willow<br />
Irene<br />
24th<br />
Inez<br />
Madison<br />
Iroquois<br />
Duke<br />
Lula<br />
Bogan<br />
Boyd<br />
Edgewood<br />
Adella<br />
23rd<br />
24th<br />
24th<br />
Cedar<br />
24th<br />
23rd<br />
Delphine<br />
Canonicus<br />
Spain<br />
Drehr<br />
Alliquippa<br />
Osage<br />
25th<br />
Gracie<br />
24th<br />
25th<br />
St Rose<br />
Wyandotte<br />
Navajo<br />
26th<br />
26th<br />
25th<br />
Lavinia<br />
Geronimo<br />
Adams<br />
Fuqua<br />
27th<br />
St Rose<br />
Belleview<br />
Midway<br />
Chippewa<br />
29th<br />
28th<br />
Brady<br />
Dalton<br />
Washington<br />
Eugene<br />
St Rose<br />
28th<br />
29th<br />
30th<br />
Ozark<br />
Huron<br />
Erie<br />
Monroe<br />
Jackson<br />
Jefferson<br />
Newton<br />
Atkinson<br />
Eugene<br />
Mc Grath<br />
28th<br />
Gayosa<br />
Calumet<br />
Progress<br />
Gottlieb<br />
Wyandotte<br />
Oswego<br />
Ogden<br />
Kenmore<br />
Arlington<br />
30th<br />
30th<br />
Laurel<br />
Slate<br />
30th<br />
31st<br />
Gebelin<br />
Bedford<br />
33rd<br />
31st<br />
Fairfields<br />
Bond<br />
32nd<br />
Connell<br />
Acadian<br />
Greta<br />
Hearthstone<br />
Wyandotte<br />
Main<br />
Kernan<br />
Charles<br />
Oswego<br />
Ozark<br />
Winbourne<br />
Ontario<br />
Seneca<br />
Monroe<br />
37th<br />
Jackson<br />
Cain<br />
Jonah<br />
North<br />
Laurel<br />
Wilshire<br />
Government<br />
35th<br />
36th<br />
Saguaro<br />
Phillips<br />
Carol<br />
Choctaw<br />
Zion<br />
37th<br />
Ruth<br />
Main<br />
Peachtree<br />
Iroquois<br />
Terry<br />
Washington<br />
Jefferson<br />
Noah<br />
38th<br />
Wabash<br />
Wabash<br />
40th<br />
39th<br />
Steele<br />
Cole<br />
Capital Heights<br />
Ira<br />
Delaware<br />
Monroe<br />
Barrow<br />
41st<br />
Marie<br />
Clay Cut<br />
39th<br />
Webb<br />
Gus Young<br />
Billops<br />
Provost<br />
Bernardo<br />
Odell<br />
Jasmine<br />
Lofaso<br />
Blanchard<br />
Delaware<br />
Roselawn<br />
Belfair<br />
Rice<br />
42nd<br />
Live Oak<br />
Richland<br />
Scenic Hwy. - Spanish Town Rd.<br />
Phase II<br />
Figure 4-8b<br />
CGN-R-0001B<br />
Richland<br />
Amos<br />
Edison<br />
Project Vicinity Map
9th<br />
10th<br />
15th<br />
17th<br />
18th<br />
19th<br />
21st<br />
22nd<br />
River<br />
Lafayette<br />
St Philip<br />
3rd<br />
Spain<br />
Emma<br />
Aztec<br />
Gila<br />
Emma<br />
Wyoming<br />
Capitol Lake<br />
State Capitol<br />
Peabody<br />
Nicholson<br />
4th<br />
St Philip<br />
Garner<br />
Spanish Town Road<br />
St Ferdinand<br />
5th<br />
6th<br />
7th<br />
North<br />
Spain<br />
Government<br />
France<br />
St Charles<br />
Oklahoma<br />
Duane<br />
5th<br />
Lakeland<br />
University<br />
St James<br />
St Louis<br />
Royal<br />
Brickyard<br />
Terrace<br />
Monrovia<br />
Oregon<br />
St Charles<br />
State Capitol<br />
6th<br />
Royal<br />
Europe<br />
South<br />
Royal<br />
Napoleon<br />
Highland<br />
7th<br />
St Joseph<br />
Mayflower<br />
Veta<br />
Minnesota<br />
Sonora<br />
America<br />
Napoleon<br />
7th<br />
7th<br />
8th<br />
8th<br />
Beauregard<br />
Van Buren<br />
8th<br />
8th<br />
8th<br />
Louise<br />
Howard<br />
Mary<br />
8th<br />
I-110<br />
13th<br />
9th<br />
Maximillian<br />
East<br />
10th<br />
Alice<br />
California<br />
Dot<br />
10th<br />
Florida<br />
Convention<br />
Cotton<br />
Highway<br />
Capitol Access<br />
Howard<br />
Washington<br />
Arizona<br />
Canal<br />
Louisiana<br />
Education<br />
Tinga<br />
Nebraska<br />
11th<br />
Canal<br />
11th<br />
10th<br />
11th<br />
Terrace<br />
Swart<br />
Colorado<br />
11th<br />
Thomas H Delpit<br />
Kansas<br />
12th<br />
11th<br />
12th<br />
11th<br />
Hart<br />
Utah<br />
Alabama<br />
Peach<br />
14th<br />
14th<br />
13th<br />
Dooley<br />
12th<br />
12th<br />
13th<br />
14th<br />
12th<br />
11th<br />
Larkins<br />
Eddie Robinson Sr<br />
Iberville<br />
12th<br />
15th<br />
Mc Calop<br />
Braddock<br />
Fig<br />
I-10<br />
14th<br />
17th<br />
Julia<br />
Smith<br />
Orange<br />
Pecan<br />
Tennessee<br />
Georgia<br />
Gracie<br />
Kentucky<br />
15th<br />
Marcellious<br />
Apple<br />
Louise<br />
Pear<br />
Fig<br />
16th<br />
Laurel<br />
Myrtle<br />
Bruce<br />
Frisco<br />
Foss<br />
Brice<br />
Pruyn<br />
Lehmann<br />
Park<br />
18th<br />
19th<br />
Louisiana<br />
Spain<br />
Wisteria<br />
Dalrymple<br />
20th<br />
<strong>Plan</strong>k<br />
Olive<br />
Perkins<br />
Scenic<br />
21st<br />
Inez<br />
Fuqua<br />
Cherokee<br />
Tulip<br />
Camelia<br />
America<br />
24th<br />
Oleander<br />
Kleinert<br />
Boyd<br />
Spain<br />
Belmont<br />
Blouin<br />
Virgil<br />
26th<br />
26th<br />
Belleview<br />
Eugene<br />
27th<br />
Main<br />
Matilda<br />
Broussard<br />
Arkansas<br />
Hurst<br />
Edgewood<br />
Bridge<br />
Gayosa<br />
Adella<br />
15th<br />
14th<br />
15th<br />
Wisteria<br />
North<br />
16th<br />
North<br />
Virginia<br />
15th<br />
Missouri<br />
17th<br />
16th<br />
Spain<br />
St Vincent de Paul<br />
17th<br />
Brice<br />
18th<br />
Blanche<br />
16th<br />
17th<br />
Bynum<br />
Olive<br />
17th<br />
17th<br />
Fig<br />
18th<br />
18th<br />
Gracie<br />
Gass<br />
20th<br />
City Park<br />
Lakeshore<br />
23rd<br />
24th<br />
25th<br />
23rd<br />
Baxter<br />
Cedar<br />
23rd<br />
Drehr<br />
Delphine<br />
Evergreen<br />
26th<br />
25th<br />
Ovid<br />
Pericles<br />
Lavinia<br />
22nd<br />
Rittner<br />
Eola<br />
24th<br />
Drehr<br />
Laurel<br />
24th<br />
25th<br />
Horace<br />
Gracie<br />
Fairmont<br />
Homer<br />
St Rose<br />
St Rose<br />
Cork<br />
St Rose<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\CENTRAL\CGN-R-0002.MXD SGELPI 10/22/2009 08:07:53<br />
Area Designated for<br />
Physical Inspection<br />
0 800 1,600 Feet<br />
q<br />
East Blvd. - Government St.<br />
CGN-R-0002<br />
Project Vicinity Map<br />
Figure 4-9
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2 Central Gravity System Capacity Improvements Projects<br />
4.2.1 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />
Improvements)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The purpose of this project is to re-route flow from PS 15 and PS 19 so that they directly<br />
pump through a common forcemain and manifold with the forcemain from PS 60 to<br />
increase the capacity of the system. The forcemain then discharges wastewater into the<br />
gravity system at the existing manhole (MH# 059-05885) located at the intersection of River<br />
Road and Capital Drive. The October 2009 version of the PDP add the construction of those<br />
gravity segments originating at the intersection of North Acadian Thruway and Ontario<br />
Street, and the intersection of Washington Avenue and West Belfair Drive, both terminating<br />
at PS 15, that were originally part of CGN-C-0002 (25 th Street-North Acadian) project to<br />
improve constructability and scheduling issues. Information about those segments has been<br />
included in this section.<br />
Location<br />
The locations of forcemains and gravity sewers in this project are shown in Figure 4-10.<br />
Forcemain segment PS 15FM to PS 15DS (manifold point of PS19 and PS15 forcemain) starts<br />
south of the Washington Ave and West Belfair Drive intersection. The forcemain travels<br />
west until reaching North Acadian Thruway. The forcemain then turns in a northerly<br />
direction until reaching the intersection of North Acadian Thruway West and Madison<br />
Avenue where the forcemain turns in a westerly direction, and continues until reaching<br />
Eiland Street. On Eiland Street, the PS 15 forcemain will be manifolded at PS 15DS with the<br />
forcemain exiting PS 19.<br />
Forcemain segment PS 15DS to PS 60 travels west along Eiland Street until reaching 3 rd<br />
Street and then travels south to PS 60 along River Road where it is manifolded with the PS60<br />
forcemain at PS60DS<br />
Forcemain segment PS 60DS to 059-05885 travels south from PS 60 on River Road to<br />
manhole 059-05885, which is located on River Road at the intersection of State Capitol Drive<br />
and River Road.<br />
Gravity segment 060-07642 to 060-07619 starts at the North Acadian Thruway West and<br />
Ontario Street intersection. The gravity segment travels south until reaching 060-07619, near<br />
the North Acadian Thruway West and Baron Street intersection.<br />
Gravity segment 060-07619 to 060-07544 travels south until reaching 060-07544 located near<br />
the North Acadian Thruway West and Fairfields Avenue intersection.<br />
Gravity segment 060-07544 to 060-07529 travels south until reaching 060-07529 located near<br />
the North Acadian Thruway and Washington Avenue intersection. Gravity segment 060-<br />
07529 to PS15 travels east until reaching PS15.<br />
Gravity segment 060-07529 to PS 15 travels east along Washington Avenue until reaching PS<br />
15, located south of the Washington Avenue and Belfair Drive intersection.<br />
GNV31031158548.DOCX/103440008 4-17 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
Gravity segment 015-05119 to PS 15 starts northwest of the Washington Avenue and Belfair<br />
Drive intersection. The gravity segment travels southwest until reaching 015-05117. At 015-<br />
05117, the gravity segment travels south east until reaching the intersection of Rice Drive<br />
and Washington Avenue. The gravity segment then turns in an easterly direction until<br />
reaching PS 15.<br />
Scope<br />
The entire CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity Improvements)<br />
project consists of approximately 7,150 feet of 10-inch, 18-inch, 21-inch, and 24-inch gravity<br />
sewer and approximately 19,340 feet of 18-inch, 20-inch, and 30-inch forcemain, as outlined<br />
below in Table 4-2<br />
TABLE 4-2<br />
CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
PS15FM PS15DS 14,600 New 18<br />
PS15DS PS60 3,600 New 20<br />
PS 60FM 059-05885 1,140 24 30<br />
060-07642 060-07619 950 10 to 12 18<br />
060-07619 060-07544 2,100 12, 15, 18 21<br />
060-07544 PS 15 3,600 18, New 24<br />
015-05119 PS 15 500 18 10<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $10,498,000.<br />
Design was appropriated in 2007.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Construction is On-Going.<br />
GNV31031158548.DOCX/103440008 4-18 JANUARY 2011<br />
REV. 5
4th<br />
15th<br />
22nd<br />
28th<br />
West<br />
East<br />
Wiltz<br />
Lynn<br />
Mohican<br />
Scenic<br />
#<br />
Charles<br />
Ozark<br />
Oswego<br />
Erie<br />
38th<br />
!R<br />
060-07642<br />
Brady<br />
Mission<br />
#<br />
PS1012<br />
Chippewa<br />
#<br />
Iroquois<br />
060-07619<br />
!R<br />
Choctaw<br />
Bartlett<br />
Eaton<br />
#<br />
3rd<br />
4th<br />
#I<br />
#!R<br />
PS19<br />
Joplin<br />
Pittsburg<br />
#<br />
Mansfield<br />
18th<br />
060-07741<br />
!R<br />
060-07544<br />
!R<br />
015-05119<br />
!R!R<br />
#I!R<br />
PS15<br />
#I<br />
!R #<br />
PS60<br />
River<br />
3rd<br />
6th<br />
7th<br />
10th<br />
9th<br />
17th<br />
060-07729<br />
!R<br />
060-06953A 060-07931<br />
!R<br />
!R<br />
060-07038<br />
!R<br />
060-06935 060-06987<br />
!R !R<br />
!R<br />
060-07736<br />
060-07735I 060-07735<br />
!R !R !R<br />
060-07735J !R 060-07734<br />
Main<br />
23rd<br />
Fuqua<br />
North<br />
44th<br />
Beck<br />
#<br />
Kernan<br />
Steele<br />
5th<br />
Tunica<br />
Eaton<br />
Dort<br />
17th<br />
43rd<br />
Capitol Lake<br />
Highway<br />
23rd<br />
7th<br />
North<br />
Leo<br />
Eugene<br />
14th<br />
16th<br />
Richland<br />
Hanson<br />
059-06282<br />
!R !R<br />
059-06287<br />
PS59<br />
#<br />
South<br />
Kleinert<br />
Myrtle<br />
Clay Cut<br />
Ingleside<br />
Richland<br />
#<br />
Proposed Projects<br />
Existing<br />
!R Manholes<br />
# Pump Stations<br />
#I PumpStations Force Main<br />
CGN-C-0001 "Capital lake Drive - Gayosa Street"<br />
Gravity Main<br />
¯<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\CGN_PROJECT_CONSOLIDATION_060909.MXD GBOQUIN 6/9/2009 14:06:40<br />
CGN-C-0002 "25th Street - North Acadian Thruway"<br />
To be constructed with:<br />
CGN-C-0001<br />
0 20 40<br />
Miles<br />
Capital Lake Drive - Gayosa Street<br />
CGN-C-0001<br />
Project Vicinity Map<br />
Figure 4-10
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.2 CGN-C-0002 (25 th Street – North Acadian Thruway)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The original purpose of the CGN-C-0002 (25th Street – North Acadian Thruway) project was<br />
to increase the capacity of the gravity trunk sewer upstream of PS 60, PS 15, and PS 59 to<br />
alleviate SSOs. This project now consists of designing approximately 9,500 linear feet of<br />
gravity sanitary sewer pipeline replacement with pipelines ranging in diameter from 15 to<br />
24 inches, and installing approximately 3,000 lf of new gravity sanitary sewer pipeline with<br />
diameters of 21 to 24 inches.<br />
For constructability and schedule alignment, those segments originating near North<br />
Acadian Thruway to PS 15 will be constructed as project CGN-C-0001 (Capital Lake Drive-<br />
Gayosa Street), while those segments originating north of I-110 near Memorial Stadium and<br />
east of I-110 between Spanish Town Road and Main Street will be constructed in the vicinity<br />
of project CGN-C-0003 (South Boulevard-St. Joseph Street). The location descriptions and<br />
maps of those projects include the scope that is being designed under this project.<br />
Total Estimated Design Cost is $521,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Design has been Completed.<br />
GNV31031158548.DOCX/103440008 4-20 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.3 CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The purpose of this project is to increase the capacity of the gravity sewers upstream PS 59<br />
and PS 60. Nearly 3,000 feet of gravity sewer and the forcemain from PS 10 were deleted<br />
from this project due to hydraulic modeling updates. This October 2009 version of the PDP<br />
also adds construction of gravity segments that were part of CGN-C-0002 (25 th Street - North<br />
Acadian Thruway) to improve constructability and scheduling issues. This section includes<br />
information about those segments.<br />
Location<br />
The locations of the gravity sewers in this project are shown in Figure 4-11. Gravity segment<br />
059-06088 to new MH #C-3 starts at the intersection of St Philip Street and South Blvd. The<br />
gravity segment travels west until reaching new MH #C-3 at the intersection of South<br />
Boulevard and River Road<br />
The gravity segment C-3 to C-1 travels in a southerly direction until reaching new MH#C-1.<br />
Gravity segment 059-06445 to 059-06532 starts at the Camellia Avenue and Tulip Street<br />
intersection. The gravity segment travels west, turning south at 059-06575A. The gravity<br />
segment turns west at 059-06574, continuing until reaching 059-06532.<br />
Gravity segment 059-06532 to 059-06045 starts at the South 15 th Street and South Street<br />
intersection. The gravity segment travels west along South Street, crossing the KCS railroad<br />
tracks and under I-110 ramps and overpass. The line travels north at the intersection of<br />
South Street and Maximillian Street to 059-06613. The line travels north, turning west at 059-<br />
06614. The line continues west until reaching 059-06045 located northwest of the St Joseph<br />
Street and South Blvd intersection.<br />
Gravity segment 059-06140 to 059-06236 starts near the North Blvd and N 6th Street<br />
intersection. The gravity segment travels south until reaching 059-06139. The line travels<br />
east until reaching 059-06229. The gravity segment travels south until reaching 059-06230.<br />
The line travels east until reaching 059-06236, located near the America Street and St Joseph<br />
Street intersection.<br />
Gravity segment 059-6236 to 059-06128 starts at the America Street and St. Joseph Street<br />
intersection. The gravity segment travels south until reaching 059-06128, located at the<br />
Government Street and St. Joseph Street intersection.<br />
Gravity segment 059-06128 to 059-06045 starts at the Government Street and St. Joseph<br />
Street intersection. The gravity segment travels south until reaching 059-06045, located near<br />
the South Boulevard and St. Joseph Street intersection.<br />
Gravity segment 059-05878 to 059-05868 starts south of North St and River Road<br />
intersection. The gravity segment travels south until reaching 059-05868, located near the<br />
River Road and North Boulevard intersection.<br />
Gravity segment 059-06287 to 059-06128 starts northwest of the Government Street and 11th<br />
Street intersection. The gravity segment travels west, running parallel to Government Street,<br />
until reaching 059-06128 near Government and St. Joseph Street.<br />
GNV31031158548.DOCX/103440008 4-21 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
Gravity segment 060-06987 to 060-06935 starts west of Main Street and N 12th Street<br />
intersection. The gravity segment travels southwest until reaching 060-06935 located east of<br />
the Main Street and North 11th Street intersection.<br />
Gravity segment 060-07038 to 060-06953A starts north of North Street between Canal Street<br />
and N 11th Street. The gravity segment travels north until reaching 060-06953A near<br />
Spanish Town Road.<br />
Gravity segment 060-7741 to 060-07736 starts west of Scenic Highway between Bay Street<br />
and Ellerslie Drive. The gravity segment travels southeast until reaching 060-07737 near<br />
Ellerslie Drive, where it then travels southwest along a drainage canal towards Foss Street to<br />
060-07736. Gravity segment 060-07736 to 060-07735 travels southwest ending at 060-07735<br />
near Foss Street.<br />
Gravity segment 060-07735 to 060-07735I starts northeast of Foss Street and North 19th<br />
Street intersection. The gravity segment travels southwest along Foss Street until reaching<br />
060-07735I.<br />
Gravity segment 060-07735I to 060-07735J travels west, parallel to Foss Street, until reaching<br />
060-07735J, located at the intersection of Foss Street and North 19 th Street.<br />
Gravity segment 060-07735J to 060-07734 travels southeast parallel to North 19 th Street until<br />
reaching 060-07734, located northwest of the intersection of North 19th Street and North 17 th<br />
Street.<br />
Gravity segment 060-7734 to 060-07729 starts northwest of the intersection of North 19 th<br />
Street and North 17 th Street and travels over land in a southwesterly direction near the<br />
Memorial Stadium to 060-07739, which is west of the interchange of I-110 and North 19 th<br />
Street.<br />
Gravity segment 060-7729 to 060-07931 travels south from 060-07729, crosses I-110, and<br />
parallels Frisco Street to 060-07931, which is located near the intersection of North 16 th Street<br />
and Spanish Town Road.<br />
Scope<br />
The entire CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) project<br />
consists of approximately 16,600 feet of gravity sewer upstream of PS 59 and PS 60. Table 4-<br />
3 shows the scope of this project.<br />
TABLE 4-3<br />
CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
059-06088 New MH #C-3 570 24 36<br />
New MH #C-3 New MH #C-1 30 39 48<br />
059-06445 059-06532 2,195 10 & 12 21<br />
059-06532 059-06045 2,920 10 & 12 24<br />
059-06140 059-06236 1,100 10 15<br />
059-06236 059-06128 940 18 24<br />
GNV31031158548.DOCX/103440008 4-22 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
TABLE 4-3<br />
CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
059-06128 059-06045 1,330 15 & 21 27<br />
059-05878 059-05868 1,961 8, 27, 30, & 36 42<br />
059-06287 059-06128 1,530 10 15<br />
060-06987 060-06935 280 10 15<br />
060-07038 060-06953A 360 18 24<br />
060-07741 060-07736 400 18 24<br />
060-07736 060-07735 345 18 24<br />
060-07735 060-07735I 80 18 24<br />
060-07735I 060-07735J 70 18 24<br />
060-07735J 060-07734 170 18 24<br />
060-07734 060-07729 1,300 18 24<br />
060-07729 060-07931 1,000 18 24<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $17,970,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Construction is On-Going.<br />
GNV31031158548.DOCX/103440008 4-23 JANUARY 2011<br />
REV. 5
3rd<br />
5th<br />
Royal<br />
9th<br />
15th<br />
17th<br />
18th<br />
18th<br />
19th<br />
21st<br />
22nd<br />
4th<br />
De Queen<br />
#<br />
Chestnut<br />
Walnut<br />
16th<br />
19th<br />
Dort<br />
Mansfield<br />
15th<br />
Birch<br />
<strong>Plan</strong>k<br />
Woodrow<br />
PS60<br />
#<br />
Miller<br />
Capitol Lake<br />
Lakeridge<br />
Sorrel<br />
Capitol Access<br />
Highway<br />
Foss<br />
Bay<br />
060-07741<br />
!R<br />
!R 060-07736<br />
060-07735I<br />
!R !R !R 060-07735<br />
060-07735J !R<br />
060-07734<br />
17th<br />
Ellerslie<br />
Fuqua<br />
River<br />
Lafayette<br />
3rd<br />
State Capitol<br />
4th<br />
!R<br />
059-05878<br />
059-05875<br />
!R!R 059-05873<br />
!R 059-05872<br />
059-05872A !R<br />
!R<br />
059-05871<br />
!R<br />
059-05870<br />
5th<br />
Laurel<br />
6th<br />
7th<br />
7th<br />
6th<br />
I-110<br />
7th<br />
Bungalow<br />
8th<br />
8th<br />
!R<br />
060-07038<br />
059-06140<br />
!R<br />
!R 059-06236<br />
8th<br />
8th<br />
10th<br />
060-06953A<br />
!R<br />
Canal<br />
060-06987<br />
!R !R<br />
060-06935<br />
Florida<br />
11th<br />
10th<br />
11th<br />
11th<br />
12th<br />
12th<br />
17th<br />
12th<br />
14th<br />
13th<br />
Bridge<br />
13th<br />
15th<br />
12th<br />
12th<br />
13th<br />
14th<br />
14th<br />
14th<br />
Gracie<br />
North<br />
15th<br />
!R<br />
15th<br />
16th<br />
North<br />
060-07931<br />
16th<br />
17th<br />
16th<br />
Main<br />
17th<br />
17th<br />
Brice<br />
18th<br />
Gracie<br />
19th<br />
Hurst<br />
Gayosa<br />
20th<br />
Convention<br />
Gass<br />
Meyer<br />
18th<br />
20th<br />
21st<br />
Scenic<br />
Eddie Robinson Sr<br />
St Louis<br />
Royal<br />
I-10<br />
059-05858<br />
#<br />
059-05857<br />
059-05864<br />
059-06089<br />
059-06088<br />
!R !R<br />
059-06128<br />
059-06282<br />
Royal<br />
East<br />
10th<br />
South<br />
Spain<br />
059-06287<br />
!R<br />
059-06045<br />
059-06532<br />
!R !R<br />
Hart<br />
10th<br />
12th<br />
11th<br />
Peach<br />
Eddie Robinson Sr<br />
Julia<br />
Iberville<br />
Marcellious<br />
14th<br />
15th<br />
15th<br />
Olive<br />
Bruce<br />
16th 16th<br />
Oleander<br />
17th<br />
Brice<br />
Myrtle<br />
17th<br />
18th<br />
059-06445<br />
!R<br />
Dare<br />
Park<br />
Spain<br />
Wisteria<br />
Oleander<br />
Olive<br />
Kleinert<br />
Tulip<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
South Blvd - St. Joseph St.<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Sewer Area Upgrades<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
CGN-C-0003<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 4-11<br />
0 1,150<br />
2,300<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDAT ES2010\CAPACITY\CENTRAL\CGN-C-0003_mpj012011.MXD
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.4 CGN-C-0004 (Downtown Area –PS 59 Improvements)<br />
The CGN-C-0004 project has been combined with CGN-C-0005 (Downtown Area - PS 15, PS<br />
19, PS 59, and PS 60 Improvements) from the October 2008 PDP. The combined project has<br />
been designated CGN-C-0005 (Downtown Area Pump Station Improvements) and is<br />
described in Section 4.2.5.<br />
4.2.5 CGN-C-0005 (Downtown Area Pump Station Improvements)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The CGN-C-0005 (Downtown Area Improvements) project includes the upgrade of PS 15, PS<br />
19, and PS 59 to alleviate SSOs at and near the PSs as well as in their respective upstream<br />
basins. This project is the combination of CGN-C-0005 (Downtown Area – PS515, PS519, and<br />
PS 59 Improvements) and CGN-C-0004 (Downtown Area – PS 59 Improvements) from the<br />
October 2008 PDP. The combined project has been designated CGN-C-005 (Downtown Area<br />
Pump Stations) and is described in the rest of this section.<br />
The BTRSSO hydraulic model also predicts a PS capacity exceedance for the future peak wet<br />
weather flow. PS 15, PS 19, and the existing PS 60 will utilize the new forcemains outlined in<br />
the project CGN-C-0001 (Capital Lake Drive – Gayosa Street). PS 59 was added to this<br />
project in 2009 because of the similarity of the project and proximity to the other pump<br />
stations included in this project. During design, it was discovered that PS 59 could be<br />
rehabilitated by installing new pumps rather than completely replacing the entire pump<br />
station.<br />
Location<br />
The locations of PS 15, PS 19, and PS 59 are given in Table 4-4 and in Figure 4-12.<br />
Scope<br />
The scope of this project is shown in Table 4-4.<br />
TABLE 4-4<br />
CGN-C-0005 (Downtown Area Pump Station Improvements) – Pump Station Information<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
PS No.<br />
PS 15<br />
PS 19<br />
PS 59<br />
(rehab)<br />
Location<br />
Washington Street, near intersection of<br />
West Belfair Drive<br />
Eiland Drive, near intersection of 4th<br />
Street<br />
Near the intersection of River Road and<br />
South Blvd.<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
694 4,014 799<br />
417 1,493 193<br />
7,777 26,665 4,570<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $4,841,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Construction Underway.<br />
GNV31031158548.DOCX/103440008 4-25 JANUARY 2011<br />
REV. 5
3rd<br />
9th<br />
12th<br />
22nd<br />
28th<br />
29th<br />
West<br />
East<br />
Edison<br />
46th<br />
Mouton<br />
PS1012<br />
#<br />
Chippewa<br />
#<br />
#I<br />
#<br />
#<br />
#I<br />
#<br />
Birch<br />
4th<br />
Daisy<br />
PS19<br />
Pittsburg<br />
Joplin<br />
Phlox<br />
Neosho<br />
De Queen<br />
Mansfield<br />
Lockwood<br />
Beaumont<br />
Purslane<br />
15th<br />
16th<br />
17th<br />
18th<br />
19th<br />
Madison<br />
Walnut<br />
Bay<br />
Erie<br />
#<br />
26th<br />
Iroquois<br />
29th<br />
28th<br />
Calumet<br />
Ozark<br />
Erie<br />
Brady<br />
Dalton<br />
Monroe<br />
Adams<br />
Oswego<br />
Ozark<br />
Winbourne<br />
Ontario<br />
Seneca<br />
Monroe<br />
38th<br />
37th<br />
Choctaw<br />
39th<br />
39th<br />
Barrow<br />
Webb<br />
Gus Young<br />
Mission<br />
Eaton<br />
Bartlett<br />
#<br />
Monroe<br />
Belfair<br />
Eaton<br />
Yaun<br />
Martin<br />
Mission<br />
Bradley<br />
Jean<br />
Wilmot<br />
Frey<br />
Ritterman<br />
Adams<br />
Madison<br />
Fairfields<br />
PS15<br />
Foster<br />
Jackson<br />
49th<br />
Foster<br />
#<br />
Conrad<br />
44th<br />
Scenic<br />
PS60<br />
#<br />
I-110<br />
#<br />
Sorrel 10th<br />
25th<br />
27th<br />
Highway<br />
43rd<br />
Capitol Lake<br />
17th<br />
Foss<br />
24th<br />
Fuqua<br />
36th<br />
7th<br />
11th<br />
48th<br />
3rd<br />
Main<br />
35th<br />
Florida<br />
6th<br />
23rd<br />
30th<br />
6th<br />
5th<br />
8th<br />
8th<br />
19th<br />
30th<br />
Connell<br />
Main<br />
North<br />
Beck<br />
48th<br />
49th<br />
4th<br />
Leo<br />
Phillips<br />
5th<br />
7th<br />
8th<br />
North<br />
8th<br />
12th<br />
PS59<br />
#I<br />
#<br />
#<br />
Terrace<br />
South<br />
11th<br />
10th<br />
10th<br />
11th<br />
14th<br />
15th<br />
16th<br />
16th<br />
17th<br />
Tulip<br />
Olive<br />
Terrace<br />
Myrtle<br />
Acadian<br />
Steele<br />
Government<br />
#<br />
River<br />
#<br />
PS7A PS7<br />
#<br />
I-10<br />
#<br />
PS10<br />
#<br />
PS3<br />
#<br />
#<br />
Perkins<br />
Kleinert<br />
Eugene<br />
Clay Cut<br />
Broussard<br />
Parker<br />
Richland<br />
Glenmore<br />
Edison<br />
Wiltz<br />
Nicholson<br />
Alice<br />
Dalrymple<br />
Lakeshore<br />
Ingleside<br />
Valley<br />
Longwood<br />
Wells<br />
Bawell<br />
Balis<br />
Avondale<br />
St Rose<br />
Letitia<br />
Eugene<br />
Ogden<br />
Lovers<br />
Cole<br />
Richland<br />
Hanson<br />
Moore<br />
Hebert<br />
Westdale<br />
Emma<br />
Haig<br />
East Baton Rouge Parish<br />
Iowa<br />
Mary<br />
Polk<br />
Harding<br />
Fig<br />
Fig<br />
July<br />
June<br />
Hillsdale<br />
Greenwood<br />
Legend<br />
Proposed<br />
Existing<br />
Downtown Area PS Improvements<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
CGN-C-0005<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 4-12<br />
0 0.5<br />
1<br />
Miles<br />
Goldenrod<br />
Delta<br />
Yazoo<br />
17th<br />
Country Club<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\CENTRAL\CENTRAL MAPS\CGN-C-0005.MXD SGELPI 11/9/2010 09:49:50
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.6 CGS-C-0001 (Roosevelt Street Area – PS 1 Improvements)<br />
Project Description<br />
This project was deleted due to the Central Consolidation, as PS 1 no longer required<br />
improvements due to consolidation.<br />
4.2.7 CGS-C-0002 (University Lake Area – PS2, PS5, and PS6 Improvements)<br />
Project Description<br />
This project was deleted due to the Central Consolidation. PS 2, PS 5, and PS 6 will all be<br />
part of the CC-EAST-PS (Central Consolidated Pump Station) project.<br />
4.2.8 CGS-C-0003 (Acadian/Claycut Area – PS3 and PS4 Improvements)<br />
Project Description<br />
This project was deleted due to the Central Consolidation. PS 3 and PS 4 will be part of the<br />
CC-EAST-PS (Central Consolidated Pump Station) project.<br />
4.2.9 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The purpose of this project is to upgrade gravity sewers upstream of PS 1, PS 2, and PS 5to<br />
alleviate SSOs in the Central Gravity South basin. The project also includes new forcemain<br />
from PS 6, PS 91, and the new Glasgow PS, which will all be constructed as part of the<br />
Central Consolidated Pump Stations project. The original project from the January 2008 PDP<br />
had several hundred feet of gravity sewer deleted from it with several hundred feet of<br />
forcemain added to it due to Central Consolidation, and was combined with the CGS-C-<br />
0005 (Stanford Avenue – Ferndale Avenue) project. The combined project has been<br />
designated the CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />
described in this section.<br />
Location<br />
The forcemains and gravity segments in this project are shown in Figure 4-13.<br />
Gravity segment 001-00425A to 001-00425 starts on East Polk Street between Colorado Street<br />
and Nebraska Street. The gravity segment travels west until reaching 001-00425 located on<br />
East Polk Street between Nebraska Street and Highland Road.<br />
Gravity segment 001-00425 to 001-00293 starts on East Polk Street between Nebraska Street<br />
and Highland Road. The gravity segment travels west on Polk Street, then southeasterly<br />
along Highland Road, ending at Johnson Street.<br />
Gravity segment 002-01393 to 002-01390 starts northeast of the Stanford Avenue and West<br />
Lakeshore Drive intersection. The gravity segment travels northeast until reaching 002-<br />
01391. The line travels north until reaching 002-01390 near the Stanford Avenue and South<br />
Lakeshore Drive intersection.<br />
Gravity segment 002-01390 to 002-01361 starts near the Stanford Avenue and South<br />
Lakeshore Drive intersection. The gravity segment travels northeast along Stanford Ave<br />
until reaching 002-01361, located southwest of the Stanford Avenue and East Lakeshore<br />
Drive intersection.<br />
GNV31031158548.DOCX/103440008 4-27 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
Gravity segment 005-03915 to 005-03914 starts southwest of the Eugene Street and Valley<br />
Street intersection. The gravity segment travels southeast until reaching 005-03914, located<br />
near the railroad crossing at Valley Street.<br />
Gravity segment 005-03808 to JM001 starts at the Nairn Drive and Valley Street intersection.<br />
The gravity segment travels southwest until reaching 005-03802. The line travels southeast<br />
until reaching 005-03801. The gravity line travels southwest until reaching JM001 , located<br />
near Valley St and Pump Station 5.<br />
Gravity segment JM001 to 005-03800 will travel in a southwesterly direction until reaching<br />
005-03800 near Valley Street and PS 5.<br />
Gravity segment 006-04250 to PS 6 starts southeast of the West Lakeshore Drive and<br />
Stanford Drive intersection. The gravity segment travels northwest until reaching PS 6.<br />
The new forcemain segment PS 91 FM to DUM 001 will start from PS 91 located near the<br />
intersection of Concord Avenue and Lexington Drive, and travels south then southwest<br />
along Moss Side Lane until reaching the railroad right-of-way on the north side of the<br />
railroad. The forcemain will then travel in a northwesterly direction within the railroad<br />
right-of-way until it intersects (DUM 001) with a new forcemain near the intersection of<br />
Glasgow Avenue and Perkins Road.<br />
The new forcemain segment Glasgow PS to DUM 0001 will start near the intersection of<br />
Tupelo Street and Glasgow Avenue, and follow Glasgow Avenue crossing Perkins Road<br />
and the railroad to intersection (DUM 001) with the forcemain segment from PS 91.<br />
The new forcemain segment DUM 001 to JM001 will begin at the intersection point of<br />
segments PS 91 forcemain to DUM 001 and DUM DS to DUM 001. The forcemain will then<br />
travel in a northwesterly direction mostly within the railroad right-of-way until reaching JM<br />
001.<br />
Forcemain segment PS6 to PS6DS starts southeast of West Lakeshore Drive and Stanford<br />
Drive intersection. The forcemain travels northeast, parallel to Stanford Drive until reaching<br />
PS6DS near the South Lakeshore Drive and Stanford Drive intersection.<br />
Scope<br />
Project CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) includes<br />
approximately 1,100 feet of 10-inch and 15-inch gravity sewer upstream of PS 1,<br />
approximately 2,000 feet of 21-inch and 24-inch gravity sewer upstream of PS 2,<br />
approximately 1,100 feet of 12-inch, 18-inch, and 42-inch gravity sewer upstream of PS 5,<br />
approximately 40 feet of 21-inch gravity sewer upstream of PS 6,approximately 1,400 feet of<br />
12-inch forcemain downstream of PS 6, and approximately 7,000 feet of 10-inch, 12-inch, and<br />
15-inch forcemain downstream of PS 91 and Glasgow PS, as shown in Table 4-5.<br />
GNV31031158548.DOCX/103440008 4-28 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
TABLE 4-5<br />
CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
001-00425A 001-00425 15 8 10<br />
Comments<br />
001-00425 001-00293 1,100 8 & 10 15<br />
002-01393 002-01390 1,200 15 & 18 21<br />
002-01390 002-01361 800 18 24<br />
005-03915 005-03914 400 8 12<br />
005-03808 JM 0001 560 10 18<br />
JM 001 005-03800 110 New 42<br />
PS 91 FM DUM 001 2,750 New 12 Forcemain<br />
Glasgow PS DUM 001 960 New 10 Forcemain<br />
DUM 001 JM 001 3,280 New 15 Forcemain<br />
006-04250 PS6 40 10 21<br />
PS6 PS6DS 1,400 8 12 Forcemain<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $4,326,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2009.<br />
Construction is On-Going.<br />
GNV31031158548.DOCX/103440008 4-29 JANUARY 2011<br />
REV. 5
South<br />
§¨¦ I-110<br />
Terrace<br />
Myrtle<br />
Clay Cut<br />
Steele<br />
Richland<br />
Greenside<br />
Foster<br />
Westdale<br />
Castile<br />
College<br />
Avondale<br />
Silliman<br />
Fig<br />
17th<br />
Parker<br />
Longwood<br />
Ingleside<br />
Glenmore<br />
Woodside<br />
001-00425<br />
Alaska<br />
!R!R<br />
!R<br />
001-00425A<br />
001-00293<br />
Dalrymple<br />
May<br />
Hillsdale<br />
Christian<br />
Hollydale<br />
Bawell<br />
!R<br />
!R<br />
!R!R<br />
005-03915<br />
005-03800<br />
Nairn<br />
005-03808<br />
Balis<br />
Balis<br />
Bankers<br />
Hilton<br />
§¨¦ I-10<br />
002-01390<br />
!R<br />
!R<br />
002-01361<br />
Hood<br />
Carl<br />
Hood<br />
Mimosa<br />
Yorktown<br />
Campus<br />
Nicholson<br />
Gourrier<br />
Tower<br />
Stadium<br />
Lakeshore<br />
002-01393<br />
!R !R<br />
PS6DS<br />
!R<br />
Stanford<br />
006-04250<br />
Forge<br />
Aberdeen<br />
Stuart<br />
Bluebell<br />
Sweetbriar<br />
Hyacinth<br />
Perkins<br />
Y A Tittle<br />
Earl Gros<br />
Parker<br />
East Baton Rouge Parish<br />
Jennifer Jean<br />
Nicholson<br />
Boyd<br />
Burbank<br />
Proposed<br />
#I<br />
")<br />
New Pump<br />
Stations<br />
New Gravity Main<br />
New Force Main<br />
New Storage Facility<br />
Highland<br />
Legend<br />
³<br />
Ben Hur<br />
#<br />
Lee<br />
0 2,000<br />
4,000<br />
Feet<br />
!R<br />
Existing<br />
Burgin<br />
Dubois<br />
Leeward<br />
Sunset<br />
Exist. Gravity<br />
Exist. Forcemain<br />
Exist. Pump Station<br />
Manholes\Nodes<br />
Nelson<br />
Chandler<br />
Woodstone<br />
Woodgate<br />
Elmcrest<br />
Wylie<br />
Seyburn<br />
Dahlia<br />
Pollard<br />
Chandler<br />
CGS-C-0004<br />
Project Vicinity Map<br />
Figure 4-14<br />
Quail<br />
Highland Rd. - Buchanan St.<br />
Sewer Area Updates<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_060909.MXD SGELPI 10/19/2009 11:10:59
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.10 CGS-C-0005 (Stanford Avenue – Ferndale Avenue)<br />
Project Description<br />
This project was combined with project CGS-C-0004 (Highland Road – Buchanan Street) due<br />
to deletion of large gravity sewer because of the Central Consolidation projects and has been<br />
designated CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />
described in Section 4.2.9<br />
4.2.11 CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area<br />
Upgrades)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
Project CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades)<br />
includes the upgrade of gravity sewers upstream of PS 3 and PS 4 to alleviate SSOs in the<br />
vicinity. Sections of gravity sewer that were to be upgraded as part of this project in the<br />
January 2008 PDP have been deleted due to hydraulic modeling improvements.<br />
Location<br />
The gravity segments in this project are shown in Figure 4-14.<br />
The project begins near the intersection of Westdale Drive and College Drive. The new<br />
gravity line follows College Drive until reaching Ward’s Creek. The gravity line turns<br />
northwest, paralleling Wards Creek along the edge of Webb Golf Course (BREC) and<br />
continues to Claycut Drive. The gravity line turns northeast and continues along Claycut<br />
Drive to PS 4.<br />
Segment 2 begins north of Government Street and parallels the eastside of Ward’s Creek for<br />
approximately 300 feet. The gravity line crosses Government Street, and follows along<br />
Mouton Street to Capital Heights Ave. The line then turns east along Capital Heights until<br />
the intersection with Hebert Street. The line turns south following Hebert Street and then<br />
paralleling Ward’s Creek. The gravity line crosses Ward’s Creek and terminates at PS 4.<br />
Segment 3 starts near Florida Blvd and Kernan Avenue intersection. The gravity line travels<br />
south along Beverly Drive, crosses Government Street and routes through the<br />
Westmoreland Shopping Center. The line then crosses Dawson’s Creek and parallels<br />
Dawson’s Creek along the east side of Catholic High School. The line crosses Dawson’s<br />
Creek on the north side of Claycut Drive and terminates on the east side of the creek.<br />
Segment 4 starts near the Government Street and Beverly Drive intersection. The gravity<br />
line travels west east along Government Street terminating at the intersection of<br />
Westmoreland Drive and Government Street.<br />
Segment 5 starts north of the Myrtle Avenue and Marwede Avenue intersection. The gravity<br />
line travels north until reaching Claycut Drive. The gravity line travels east tying into<br />
Segment 3.<br />
Scope<br />
The project includes approximately 12,000 feet of new gravity sewer pipe ranging in<br />
diameter from 8 inches to 27 inches.<br />
GNV31031158548.DOCX/103440008 4-31 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
Project CGS-C-0006 (Government St – South Acadian Thruway Sewer Area Upgrades)<br />
includes approximately 5,800 feet of 21-inch, 24-inch, and 27-inch gravity sewer construction<br />
upstream of PS 4 and approximately 5,200 feet of 12-inch, 15-inch, 18-inch, 24-inch, and 27-<br />
inch gravity sewer construction upstream of PS 3, as shown in Table 4-6.<br />
TABLE 4-6<br />
CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Proposed<br />
Diameter<br />
(in)<br />
004-03027 004-02967A 1,210 21<br />
004-02967D 004-03004 20 15<br />
004-02967A 004-02951 1,230 24<br />
004-02951 004-02950 110 27<br />
004-3201 004-02980B 3,730 24<br />
003-02286 003-02203 2,240 15<br />
003-02203 003-02039 340 18<br />
003-02039 003-01927B 1,410 21<br />
003-01927B 003-01927A 90 24<br />
003-01929 003-01927B 300 12<br />
003-02203B 003-02235 700 15<br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Comments<br />
Total Construction Bid Amount is $4,700,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
GNV31031158548.DOCX/103440008 4-32 JANUARY 2011<br />
REV. 5
West<br />
East<br />
46th<br />
49th<br />
Columbus Dunn<br />
36th<br />
38th<br />
44th<br />
Parlange<br />
47th<br />
31st<br />
32nd<br />
40th<br />
29th<br />
35th<br />
30th<br />
30th<br />
37th<br />
Ruth<br />
39th<br />
48th<br />
North<br />
Melrose<br />
Afton<br />
Leighton<br />
Waverly<br />
48th<br />
Main<br />
49th<br />
Roselawn<br />
Main<br />
Maywood<br />
Laurel<br />
Asphodel<br />
Live Oak<br />
Beck<br />
Gottlieb<br />
Ogden<br />
Gebelin<br />
Convention<br />
Bedford<br />
Connell<br />
Kernan<br />
!R<br />
Hearthstone Greta<br />
Beverly<br />
Acadian<br />
003-02286<br />
Phillips<br />
Peachtree<br />
Lovers<br />
North<br />
Steele<br />
Lofaso<br />
Florida<br />
Richland<br />
Tuscaloosa<br />
Fairfax<br />
Wabash<br />
Wabash<br />
Park Hills<br />
Edison<br />
Leo<br />
Convention<br />
Ray<br />
004-03027<br />
Beck<br />
Beck<br />
Hatcher<br />
!R<br />
Convention<br />
Fairfax<br />
Cloud<br />
Waverly<br />
Ardenwood<br />
Rebel<br />
003-02084<br />
!R !R<br />
!R<br />
003-02203<br />
!R<br />
003-02039<br />
003-02203B<br />
004-03006<br />
Wiltz<br />
!R<br />
Government<br />
Mouton<br />
Moore<br />
Hebert<br />
Bienville<br />
Caddo<br />
St Tammany<br />
Acadia<br />
St Landry<br />
Concordia<br />
Franklin<br />
Rapides<br />
Jefferson<br />
Eugene<br />
Arlington<br />
Kenmore<br />
Myrtle<br />
Kleinert<br />
003-01928<br />
003-01929<br />
!R<br />
!R!R<br />
!R<br />
003-02035<br />
003-01927<br />
Blanchard<br />
Edison<br />
PS4<br />
PS4<br />
#!R !R<br />
004-02951<br />
004-03279<br />
Greenside<br />
Foster<br />
Castile<br />
Glenmore<br />
Westmoreland<br />
Ira<br />
Longwood<br />
Burgundy<br />
Foch<br />
Eugene<br />
Arlington<br />
Kenmore<br />
Belmont<br />
Parker<br />
Broussard<br />
Goldenrod<br />
Moreland<br />
Silliman<br />
Avondale<br />
Rosemont<br />
!R<br />
!R<br />
!R<br />
004-03269 004-03199<br />
Westdale<br />
004-03201<br />
#<br />
PS22<br />
Country Club<br />
Longwood<br />
Ormandy<br />
Ridge<br />
Ingleside<br />
College<br />
Ramsey<br />
Zeeland<br />
Chatfield<br />
Lydia<br />
Edward<br />
Reymond<br />
#<br />
PS3<br />
Churchill<br />
Ramsey<br />
Yazoo<br />
Woodside<br />
Wells<br />
Wells<br />
Balis<br />
Abelia<br />
Bardwell<br />
Perth<br />
East Baton Rouge Parish<br />
# Legend<br />
Government St. - South Acadian Thrwy.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Sewer Upgrades<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
CGS-C-0006<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 4-14<br />
0 1,125<br />
2,250<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\CENTRAL\C GS-C-0006_mpj120810
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.12 CGS-C-0007 (Central Storage/Equalization)<br />
Project Description<br />
This project has been deleted from the PDP due to the Central Consolidation. The storage at<br />
the Central WWTP is no longer needed, although the storage volume required at the South<br />
WWTP has been increased due to the consolidation of the Central WWTP with the South<br />
WWTP operations.<br />
4.2.13 CC-WWTP-PS (PS 42)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The CC-WWTP-PS (PS 42) Project includes the design and construction of one 48 MGD<br />
(33,300 gal/min) pump station facility (PS 42), vapor phase biotower-type odor control, and<br />
associated yard piping and valves to pump the flow from PS 1, PS 59, and the LSU pump<br />
station to the South WWTP. The Central WWTP pump station will be located near the<br />
current site of the Central WWTP, and will pump through the new forcemain described in<br />
the project entitled CC-WWTP-PS (PS 42 FM). Once this project is completed, the Central<br />
WWTP will be decommissioned and demolished.<br />
Location<br />
The Central Pump Station Project is located adjacent to the existing Central WWTP property<br />
at 2443 River Road, south of the downtown Baton Rouge area. The proposed location of the<br />
pump station is on existing property owned by the C-P and is shown in Figure 4-15.<br />
Scope<br />
The scope of this project is shown in Table 4-7.<br />
TABLE 4-7<br />
CC-WWTP-PS (PS 42) – Pump Station Information<br />
Existing Max<br />
Capacity<br />
PS NO.<br />
LOCATION<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry Weather<br />
(GPM)<br />
PS 42 2443 River Bend New 40,000 6,144<br />
Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $6,700,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158548.DOCX/103440008 4-34 JANUARY 2011<br />
REV. 5
River<br />
Central WWTP<br />
3Q<br />
Johnson<br />
Mc Kinley<br />
#I<br />
PS42<br />
PS42<br />
Grant<br />
Nicholson<br />
Indiana<br />
Illinois<br />
Garfield<br />
Garfield<br />
Roosevelt<br />
Wyoming<br />
Daniel Webster<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed Existing<br />
PS 42<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
Wastewater Treatment <strong>Plan</strong>t<br />
Figure 4-15<br />
#I<br />
") WTP<br />
0 170<br />
340<br />
Feet<br />
CC-WWTP-PS<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-2009UPDATE-SCOTT_102009.MXD SGELPI 10/20/2009 12:37:09
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.14 CC-EAST-PS (Central Consolidated PSs)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The CC-EAST-PS (Central Consolidated Pump Stations) Project involves the design and<br />
construction of nine pump stations (PS 2, PS 3, PS 4, PS 5, PS 6, PS 7, PS 10, PS 91, and the<br />
Glasgow Pump Station). Three pump stations (PS 2, PS 7, and PS 10) are to be interconnected<br />
in a network that will discharge into PS 5. PS 5 will pump directly to the South WWTP via a<br />
new large forcemain following completion of construction of the South WWTP – Phase I<br />
project, which is currently in the design phase. PS 3, PS 91, and the Glasgow Pump Station<br />
will each pump independently to PS 5 through two separate new forcemains. PS 4 pumps to<br />
PS 3 through an existing forcemain. PS 6 will pump through a new 12–inch forcemain that<br />
will replace the existing forcemain from PS 6 along Stanford Avenue northeast to node PS 6DS<br />
(MH 002-01393), located near the intersection of South Lakeshore Drive and Stanford Avenue.<br />
The forcemains from PS 2, PS 3, PS 5, PS 7, and PS 10 will be constructed as part of the<br />
CC-EAST-FM (Central Consolidated Forcemains) project. The forcemains from PS 6, PS 91,<br />
and the Glasgow Pump Station will be constructed as part of the CGS-C-0004 (Highland<br />
Road – Buchanan Street Sewer Area Upgrades) project.<br />
Location<br />
The CC-EAST-PS (Consolidated Pump Stations) project is primarily located in the Central<br />
Baton Rouge area. Detailed location descriptions of the required capacity improvements are<br />
presented in Table 4-10and are shown in Figure 4-16.<br />
Scope<br />
The scope of this project is shown in Table 4-8.<br />
TABLE 4-8<br />
CC-EAST-PS (Central Consolidated PSs) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry Weather<br />
(GPM)<br />
PS 2 Claycut Bayou 3,819 6,458 1,481<br />
PS 3 Acadian Thruway, near Bawell Street 3,958 16,436 2,094<br />
PS 4<br />
Claycut Road near the intersection at<br />
3,819 8,055 1,042<br />
Bienville Street<br />
PS 5 Valley Street and Perkins Road 903 29,720 5,589<br />
PS 6 Stanford Ave and Lakeshore Drive 347 1,805 351<br />
PS 7<br />
Dalrymple Drive, near the intersection at E 720 1,180 140<br />
Washington Street<br />
PS10<br />
East Lakeshore Drive, near southeastern 500 1,479 92<br />
corner of City Park<br />
PS 91<br />
Concord Drive near the intersection with<br />
500 1,517 294<br />
Lexington Drive<br />
Southdowns<br />
Pump Station<br />
Glasgow Avenue near the intersection with<br />
Tupelo Drive<br />
New 1,800 N/A<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $16,600,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158548.DOCX/103440008 4-36 JANUARY 2011<br />
REV. 5
15th<br />
Park<br />
20th<br />
Arlington<br />
West<br />
East<br />
Whitter<br />
14th<br />
14th<br />
Pear<br />
Chimes<br />
15th<br />
Virginia<br />
16th<br />
State<br />
Stadium<br />
Ag Center<br />
Swire<br />
Burbank<br />
15th<br />
17th<br />
16th<br />
17th<br />
Parker<br />
#I<br />
#<br />
July<br />
17th<br />
March<br />
June<br />
Dalrymple<br />
#<br />
#<br />
Olive<br />
PS7<br />
PS68<br />
Kleinert<br />
Terrace<br />
#I<br />
#<br />
May<br />
Lakeshore<br />
L S U<br />
Delgado<br />
East Baton Rouge Parish<br />
21st<br />
Tulip<br />
Lakeshore<br />
#<br />
#I<br />
#<br />
#I<br />
#<br />
Clara<br />
Highland<br />
Spain<br />
Blouin<br />
PS10<br />
Fiero<br />
Hillsdale<br />
Carriage<br />
Elissalde<br />
PS2<br />
Stanford<br />
Ursuline<br />
Christian<br />
#<br />
PS6<br />
St Rose<br />
Letitia<br />
Lydia<br />
Hollydale<br />
PS1014<br />
PS1013<br />
Forge<br />
Bourbon<br />
Barrosa<br />
Ogden<br />
Myrtle<br />
Ferndale<br />
#<br />
Broussard<br />
Reymond<br />
Tyrone<br />
Eugene<br />
Greenwood<br />
Bedford<br />
Cedardale<br />
Cloverdale<br />
Floyd<br />
Glendale<br />
PS120<br />
Beverly<br />
Clay Cut<br />
Myrtledale<br />
Hood<br />
Jolly<br />
Goldenrod<br />
#I<br />
#<br />
#<br />
Lee<br />
Parker<br />
Stephens<br />
Acadian<br />
Perkins<br />
Aberdeen<br />
Lovers<br />
PS3<br />
Ross<br />
Burgin<br />
Carl<br />
Stuart<br />
Hood<br />
#<br />
Cole<br />
Palm<br />
Hyacinth<br />
Florence<br />
Mimosa<br />
PS70<br />
#<br />
Pickett<br />
PS1009<br />
Steele<br />
Churchill<br />
Rubin<br />
Richland<br />
Bawell<br />
Delta<br />
Bennett<br />
Richland<br />
Edison<br />
Edison<br />
#I<br />
#<br />
Bluebell<br />
PS34<br />
Glenmore<br />
Yazoo<br />
Tupello<br />
Orchid<br />
Hanson<br />
Poplar<br />
Whitehaven<br />
#<br />
Glasgow<br />
Wiltz<br />
Ingleside<br />
Wells<br />
Valley<br />
PS5<br />
Yazoo<br />
Mimosa<br />
Longwood<br />
Balis<br />
Mouton<br />
Country Club<br />
Wells<br />
Moore<br />
#I<br />
#<br />
Balis<br />
PS Southdowns<br />
Bluebell<br />
Rabey<br />
#I<br />
Sweetbriar<br />
Silliman<br />
Hebert<br />
Avondale<br />
Abelia<br />
Barber<br />
Concord<br />
Whitehaven<br />
Caddo<br />
PS4<br />
Greenside<br />
Rosemont<br />
Government<br />
Foster<br />
Westdale<br />
Ormandy<br />
Bardwell<br />
Bazaar<br />
Pointer<br />
Trust<br />
Revere<br />
Acadia<br />
College<br />
PS375<br />
#<br />
Bankers<br />
Pollard<br />
Franklin<br />
Hilton<br />
#<br />
#<br />
PS22<br />
#I<br />
#<br />
Bunker Hill<br />
Dahlia<br />
Jefferson<br />
Castile<br />
Berkshire<br />
Energy<br />
Corporate<br />
I-10<br />
Evans<br />
Winn<br />
Congress<br />
Valley Forge<br />
Stratford<br />
Esplanade<br />
Marion<br />
PS91<br />
Legend<br />
Proposed<br />
Central Consolidated Pump Stations<br />
Existing<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
CC-EAST-PS<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 4-16<br />
0 1,600 3,200<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\CENTRAL\CENTRAL MAPS\CC-EAST-PS.MXD SGELPI 11/9/2010 09:51:52<br />
Krista<br />
#<br />
Quail<br />
Marion<br />
PS119<br />
Marion<br />
#<br />
Trenton<br />
Peggy
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.15 CC–WWTP-FM (PS 42 FM)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The CC–WWTP-FM (PS 42 FM) project includes the design and construction of the<br />
forcemain to convey flow from PS 42 FM to the South WWTP. In addition, forcemains will<br />
be constructed from the proposed LSU pump station to PS 42 and from PS 505 to the PS42<br />
FM. This project also includes segments of two other separate forcemains that are part of the<br />
SFL-C-0006 (Highland Road – Burbank Drive Capacity Improvements) project and the SGC-<br />
C-PS58A (Pump Station 58 Replacement) project.<br />
The project purpose is to redirect flows within the Central Basin to the South WWTP and<br />
accommodate upgrades within the South Basin following completion of construction of the<br />
South WWTP – Phase I project, which is currently in the design phase.<br />
Location<br />
The location of this project is shown in Figure 4-17. The forcemain will start out as a 42-inch<br />
pipe from the new PS 42 and will parallel the west side of the railroad tracks, west of<br />
Nicholson Drive. The forcemain turns west and follows Aster Street to West Chimes Street.<br />
The forcemain then follows West Chimes Street onto the LSU campus. The forcemain parallels<br />
the west side of Upper Bayou Fountain, crossing Skip Bertman Drive, and turns east just<br />
south of the LSU Football practice facilities. The forcemain crosses the railroad tracks at<br />
Nicholson Drive and parallels the east side of Nicholson Drive to Gourrier Avenue. The<br />
forcemain follows Gourrier Avenue, crosses Parker Boulevard then turns south on Dodson<br />
Avenue, and then crosses East Boyd and continues to Jennifer Jean Drive. At the rear of<br />
Jennifer Jean Drive, the forcemain follows Jennifer Jean Drive to Burbank Drive. The<br />
forcemain continues along the east side of Burbank Drive to the intersection of Lee Drive. At<br />
Burbank Drive and Lee Drive, the forcemain will increase in size to 54-inch due to the<br />
forcemain from the CC-East-FM (Central Consolidated Forcemains) project joining this<br />
forcemain at that point. The 54-inch forcemain will run from Burbank Drive east to Gardere<br />
Lane, where it will follow the right-of-way that parallels Gardere Lane roughly south to the<br />
South WWTP. At Burbank Drive, the 64-inch forcemain from the SGC-C-PS58A (PS 58<br />
Replacement) project and the 60-inch forcemain from the SFL-C-0005 (Highland Road -<br />
Burbank Drive Capacity Improvements) project will also be constructed all of the way to the<br />
South WWTP in the right-of-way parallel to the Staring Lane extension.<br />
This project also includes the construction of a 20-inch forcemain from the new LSU pump<br />
station being constructed as a part of the Master <strong>Plan</strong> SGL-C-0002 (Multiple PS – Highland<br />
Road – Kenilworth Parkway – LSU Pump Station) project to PS 42. This forcemain will<br />
parallel the 48 inch forcemain alignment. In addition, a new 16-inch forcemain will be<br />
constructed from PS505A along the new Ben Hur Road to Burbank Drive, where it will tie in<br />
to the 54-inch forcemain.<br />
Scope<br />
The scope of this project is shown in Table 4-9.<br />
The project includes approximately 49,400 feet of new forcemain sewer pipe ranging in<br />
diameter from 16 inches to 64 inches.<br />
GNV31031158548.DOCX/103440008 4-38 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
TABLE 4-9<br />
CC-WWTP-FM (PS42 FM) – Pipeline Information<br />
US Node<br />
PS505A<br />
DS Node<br />
Ben Hur/<br />
Burbank<br />
Length<br />
(ft)<br />
Existing Diameter<br />
(in)<br />
Proposed Diameter<br />
(in)<br />
3,400 New 16<br />
LSU PS PS 42 6,900 New 20<br />
PS 42 Lee/Burbank 18,000 New 48<br />
Lee/Burbank SWWTP 18,000 New 54<br />
Staring Lane/<br />
Burbank<br />
SWWTP 6,300 New 60<br />
Staring Lane<br />
/Burbank<br />
SWWTP 3,700 New 64<br />
Comments<br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $25,000,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158548.DOCX/103440008 4-39 JANUARY 2011<br />
REV. 5
Aster<br />
#<br />
Stadium<br />
Iowa<br />
Iowa<br />
#<br />
PS1<br />
State<br />
July<br />
May<br />
#<br />
#<br />
#<br />
PS2<br />
Christian<br />
Hollydale<br />
# #<br />
Hood<br />
Carl<br />
#<br />
Stuart<br />
Balis<br />
Balis<br />
College<br />
#<br />
Barber<br />
Concord<br />
Perkins<br />
Bankers<br />
Hilton<br />
Corporate<br />
I-10<br />
PS119<br />
#<br />
#<br />
#<br />
Lakeshore<br />
Campus<br />
#<br />
#<br />
PS165<br />
PS373<br />
#<br />
Westervelt<br />
River<br />
#<br />
#<br />
Sarpy<br />
Gourrier<br />
#<br />
#<br />
PS140<br />
#<br />
# # #<br />
PS445<br />
#<br />
PS236<br />
Tigerland<br />
Bob Pettit<br />
Alvin Dark<br />
Parker<br />
PS292<br />
Boyd<br />
PS1011<br />
#<br />
#<br />
Brightside<br />
PS439<br />
Etta<br />
#<br />
#<br />
#<br />
#<br />
PS68<br />
PS305<br />
#<br />
Ben Hur<br />
Stanford<br />
PS6<br />
#<br />
Highland<br />
Forge<br />
#<br />
Lee<br />
# 2N-1<br />
!R<br />
PS120<br />
Burgin<br />
#<br />
PS70<br />
#<br />
Dubois<br />
Chandler<br />
Nelson<br />
#<br />
Burbank<br />
#<br />
Bluebell<br />
#<br />
Menlo<br />
#<br />
#<br />
#<br />
PS245<br />
#<br />
PS56#<br />
# # #<br />
#<br />
#<br />
Seyburn<br />
Dahlia<br />
Pollard<br />
PS267<br />
Rodney<br />
Quail<br />
Baird<br />
Maxine<br />
Louray<br />
Albert Hart<br />
#<br />
PS1008<br />
Laurel Lakes<br />
PS415<br />
PS329<br />
#<br />
!R<br />
PS2N_2<br />
Bella<br />
Ben Hur<br />
#<br />
PS446<br />
Hadley<br />
#<br />
#<br />
#<br />
PS261<br />
Nicholson<br />
Helm<br />
Port<br />
Mast<br />
#<br />
G S R I<br />
Ned<br />
#<br />
Seabord<br />
River<br />
PS61<br />
Gardere<br />
#<br />
#<br />
#<br />
East Baton Rouge Parish<br />
Legend<br />
Proposed<br />
Existing<br />
PS 42 Forcemain<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
CC-WWTP-FM<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 4-17<br />
0 3,250<br />
6,500<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\CENTRAL\C C-WWTP-FM_mpj120810
SECTION 4. CENTRAL BASIN PROJECTS<br />
4.2.16 CC-EAST-FM (Central Consolidated FM)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The CC-EAST-FM (Central Consolidated Forcemain) project will work in conjunction with<br />
the CC-EAST-PS (Central Consolidated Pump Stations) project which includes design and<br />
construction of nine new pump stations (PS 2, PS 3, PS 4, PS 5, PS 6, PS 7, PS 10, PS 91, and<br />
Glasgow). This project includes the design and construction of a manifolded forcemain to<br />
convey flow to PS 5 from PS 2, PS 7, and PS 10. The project also includes a new individual<br />
forcemain separate from the aforementioned manifolded forcemain to convey flow from PS<br />
3 directly to PS 5. In addition, a forcemain will be constructed to convey flow from PS 5 to a<br />
new manifolded forcemain that will be constructed as part of the CC-WWTP-FM (PS 42 FM)<br />
project.<br />
The project purpose is to redirect flows within the Central Basin to the South WWTP<br />
following completion of construction of the South WWTP Wet Weather Improvements<br />
Project, Phase I, which is currently in the design phase.<br />
Location<br />
Figure 4-18 shows the location of the gravity sewer and forcemain in this project.<br />
Gravity segment 010-04925 to PS 10 begins near the intersection of Hillsdale Drive and<br />
Cottonwood Avenue, and terminates at PS 10, which is located on East Lakeshore Drive,<br />
near Dalrymple Drive.<br />
The project begins at PS 7, where the 8-inch forcemain runs east, crossing Dalrymple Drive<br />
and the City Park Golf Course (BREC). At Lakeshore Drive, the 12-inch forcemain from PS<br />
10 ties into the 8 inch forcemain and the forcemain becomes a 14-inch pipe. The line<br />
continues east along Hillsdale Drive, turns south on Ebony Avenue, and east on Baywood<br />
Avenue. The line continues along Baywood Avenue and turns south on Elissalde Street,<br />
where it crosses Interstate 10. The forcemain continues down Elissalde Street and turns east<br />
on Morning Glory Avenue. The line continues down Morning Glory Avenue, where it picks<br />
up the 16-inch forcemain from PS 2 at the intersection with Christian Street. At this junction,<br />
the line increases to 24 inches and continues down Morning Glory Avenue. The line crosses<br />
Stanford Avenue, turns north on Cloverdale Avenue, crosses Perkins Road and continues<br />
until it terminates at PS 5.<br />
Segment 2 begins at PS 3 where the 36-inch forcemain follows South Acadian Thruway to<br />
Bawell Street, turns east on Bawell Street, then south on Delta Street. The forcemain turns<br />
east on Malmaison Drive and continues until it turns north on Valley Street. The line turns<br />
east on Aldrich Drive and south on Nairn Drive, where it crosses Interstate 10 and<br />
terminates at a manhole just north of PS 5.<br />
Segment 3 begins as a 42-inch forcemain leaving PS 5 and following the railroad tracks to<br />
Balis Drive. The line follows Balis Drive and crosses Perkins Road, turns east on Poplar Street<br />
and south on Pickett to Lee High School. At Lee High School, the pipeline turns east to Lee<br />
Drive, turns south on Lee Drive and runs to the tie-in with PS 42 FM near Burbank Drive.<br />
Scope<br />
The scope of this project is shown in Table 4-10.<br />
GNV31031158548.DOCX/103440008 4-41 JANUARY 2011<br />
REV. 5
SECTION 4. CENTRAL BASIN PROJECTS<br />
TABLE 4-10<br />
CC-EAST-FM (Central Consolidated FM ) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
010-04925 PS 10 520 10 18 Gravity sewer<br />
PS 7 PS10DS 1,900 New 8<br />
PS 10DS PS2DS 3,500 New 12 Includes 500 feet of<br />
tunneling under I-10<br />
PS 2 PS2DS 3,400 New 16<br />
PS 2DS PS3DS 1,800 New 24<br />
PS 3 PS3DS 3,500 New 36 Includes 500 feet of<br />
tunneling under I-10<br />
PS 3DS PS5US 1,800 New 42<br />
PS 5US 2N-1 13,000 New 42<br />
Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $10,600,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158548.DOCX/103440008 4-42 JANUARY 2011<br />
REV. 5
Kansas<br />
Steele<br />
#<br />
#<br />
Grant<br />
Garfield<br />
Roosevelt<br />
Alvin Dark<br />
PS1<br />
Harding<br />
#<br />
Taft<br />
State<br />
Tower<br />
Nicholson<br />
Gourrier<br />
Bob Pettit<br />
Earl Gros<br />
Alabama<br />
Paula<br />
PS107<br />
Braddock<br />
Fig<br />
Boyd<br />
#<br />
Georgia<br />
Vicaro<br />
Jennifer Jean<br />
Nicholson<br />
PS7DS1<br />
Chimes<br />
Janet<br />
Kentucky<br />
Campus<br />
Ag Center<br />
Maryland<br />
Swire<br />
East Baton Rouge Parish<br />
Virginia<br />
Stadium<br />
Parker<br />
Fig<br />
#!R<br />
#<br />
#<br />
#<br />
PS7FM<br />
!R<br />
PS10FM<br />
July<br />
Amherst<br />
Dalrymple<br />
Etta<br />
March<br />
June<br />
PS68<br />
Burbank<br />
PS305<br />
May<br />
!R<br />
#!R<br />
!R<br />
Lakeshore<br />
L S U<br />
Delgado<br />
Lakeshore<br />
PS2FM<br />
Clara<br />
Blouin<br />
Fiero<br />
#<br />
PS10DS1<br />
Hillsdale<br />
010-04925<br />
#!R<br />
Stanford<br />
PS6<br />
Polytech<br />
Elissalde<br />
Ursuline<br />
PS2<br />
#<br />
PS8<br />
Christian<br />
PS2FM<br />
#<br />
Highland<br />
Ben Hur<br />
Carriage<br />
PS387<br />
#<br />
!R<br />
Letitia<br />
PS1014<br />
PS1013<br />
Bancroft<br />
Hollydale<br />
Forge<br />
Bourbon<br />
Barrosa<br />
Lydia<br />
Ferndale<br />
#<br />
2N-1<br />
Reymond<br />
Lee<br />
Tyrone<br />
Eugene<br />
Greenwood<br />
Cedardale<br />
Cloverdale<br />
Floyd<br />
Glendale<br />
PS120<br />
Thalia<br />
Parker<br />
Myrtledale<br />
Hood<br />
Jolly<br />
Goldenrod<br />
Mc Donald<br />
Cherrydale<br />
Ross<br />
Stephens<br />
PS3<br />
#!R<br />
Aberdeen<br />
Leeward<br />
Orpine<br />
Burgin<br />
Carl<br />
Stuart<br />
Acadian<br />
PS3FM<br />
Hood<br />
#<br />
Guava<br />
#<br />
Mimosa<br />
Palm<br />
PS70<br />
#<br />
Sunset<br />
Rubin<br />
Cypress<br />
Pickett<br />
PS1009<br />
Dubois<br />
Leeward<br />
Boone<br />
Bennett<br />
Menlo<br />
Bawell<br />
Delta<br />
PS5<br />
Richland<br />
!R #<br />
Bluebell<br />
Nelson<br />
Yazoo<br />
Tupello<br />
Orchid<br />
PS34<br />
PS82<br />
PS5FM<br />
Hyacinth<br />
Whitehaven<br />
Boone<br />
Ramsey<br />
Poplar<br />
#<br />
Glasgow<br />
Chandler<br />
#<br />
Ingleside<br />
Wells<br />
Yazoo<br />
Valley<br />
Mimosa<br />
Longwood<br />
Nairn<br />
I-10<br />
Bluebell<br />
Woodruff<br />
Woodstone<br />
Balis<br />
Country Club<br />
Wells<br />
Brame<br />
Millgate<br />
Balis<br />
Rabey<br />
Perkins<br />
#<br />
Sweetbriar<br />
Perth<br />
Silliman<br />
#<br />
PS37<br />
PS Southdowns<br />
PS245<br />
#<br />
Abelia<br />
Barber<br />
Concord<br />
Whitehaven<br />
Meadow Lea<br />
Woodchase<br />
Fieldgate<br />
Ormandy<br />
Bardwell<br />
Bazaar<br />
Pointer<br />
Congress<br />
College<br />
Corporate<br />
Bankers<br />
Legend<br />
PS50504<br />
Proposed<br />
Existing<br />
PS505FM<br />
Central Consolidated Forcemain<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
CC-EAST-FM<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 4-18<br />
0 1,600<br />
3,200<br />
Feet<br />
Trust<br />
Revere<br />
Yorktown<br />
#<br />
Pollard<br />
Hilton<br />
Seyburn<br />
Wylie<br />
#<br />
Glenmore<br />
Avondale<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\CENTRAL\CC-EAST-FM_mpj120810
SECTION 4. CENTRAL BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158548.DOCX/103440008 4-44 JANUARY 2011<br />
REV. 5
SECTION 5<br />
North Basin Projects<br />
Section 5 presents summaries of the North Gravity System Comprehensive Rehabilitation<br />
Projects, the North Gravity System Capacity Improvements, the North Forced System<br />
Rehabilitations Projects, and the North Forced Capacity Improvement Projects. These<br />
projects are shown on Figures 5-1 and 5-2. As of October 2010, there are approximately two<br />
projects functionally completed, 11 projects under construction, and eight projects under<br />
design in the North Basin.<br />
The project summaries presented herein represent the information available during this<br />
annual update period. The PDP will be revisited on an annual basis and revised as<br />
necessary based on results of additional hydraulic wastewater modeling, immediate needs,<br />
DPW and public input, and other factors.<br />
GNV31031158552.DOCX/103470004 5-1 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158552.DOCX/103470004 5-2 JANUARY 2011<br />
REV. 5
F<br />
3rd<br />
3rd<br />
6th<br />
Lupine<br />
9th<br />
15th<br />
Acadian<br />
Alba<br />
East<br />
Sunshine<br />
Waverly<br />
Whitter<br />
McHost<br />
Juban<br />
Charlton<br />
Carter<br />
Shawn<br />
Monterrey<br />
Cora<br />
Marilyn<br />
Blackwater<br />
Aletha<br />
Sharp<br />
Acres<br />
Sam<br />
Black<br />
Aubin<br />
Tinley<br />
Burrel<br />
Devall<br />
Hubbs<br />
Anderson<br />
Sullivan<br />
Reames<br />
Millerville<br />
Hunt<br />
O'Neal<br />
North Basin Rehabilitation Projects<br />
Lemon<br />
Cook<br />
Scott Barr<br />
Robinson<br />
Lemon B<br />
Port Hudson Plains<br />
Ligon<br />
Brian<br />
Shellmire<br />
Pony<br />
Munson<br />
Vernon<br />
Zachary-Slaughter<br />
Graves<br />
Jacock<br />
Port Hudson-Pride<br />
Zeb Chaney<br />
Mills<br />
Della<br />
Tucker<br />
Jackson<br />
Edwards<br />
Williams<br />
Tom Drehr<br />
Liberty<br />
McKee<br />
Flonacher<br />
Mount Pleasant Zachary<br />
Barnett<br />
Carney<br />
Job<br />
Zimmerman<br />
Old Scenic<br />
Martin<br />
Par<br />
Heck Young<br />
Fennwood<br />
Meadow Glen<br />
Newell<br />
July<br />
Faith<br />
Rollins<br />
Rita<br />
Church<br />
Wisdom<br />
Cedar<br />
Maple<br />
Old Baker Zachary<br />
39th<br />
40th<br />
Pope<br />
Shaffett<br />
David<br />
Baker<br />
Ada<br />
Scotlandville-Zachary<br />
Lee<br />
Avenue K<br />
New Weis<br />
Hillcrest<br />
Mae<br />
Old Slaughter<br />
McHugh<br />
Park<br />
Main<br />
Angus<br />
Lower Zachary<br />
Eric<br />
J Wicker<br />
Jodie<br />
Watson<br />
Buck Horn<br />
Wagner<br />
Arleen<br />
Fawn<br />
Peairs<br />
Greenwell Spg Pt Hudson<br />
Pinta<br />
Neff<br />
Joor<br />
Chaney<br />
Lavell<br />
Milldale<br />
Liberty<br />
Alphonse Forbes<br />
Samuels<br />
Springfield<br />
McCastle<br />
Dotson<br />
Edgar<br />
Barge Canal<br />
³<br />
Glynn<br />
Groom<br />
Thomas<br />
North WWTP<br />
K<br />
E<br />
I<br />
H<br />
Rehabilitation Projects<br />
Hovey<br />
Harding<br />
River<br />
Nicholson<br />
Chamberlain<br />
Swan<br />
Mengel<br />
Day<br />
New Rafe Meyer<br />
St John<br />
Merganzer<br />
Wastewater Treatment <strong>Plan</strong>t<br />
3<br />
Project Name<br />
Oak Villa Blvd. - Choctaw St.<br />
Flannery Rd. - Florida St.<br />
Scotland Ave. - Progress Rd.<br />
4th<br />
Central<br />
Chippewa<br />
Sorrel<br />
Convention<br />
France<br />
Landry<br />
Leisure<br />
Magnolia<br />
Stilt<br />
Capitol Lake<br />
Elm Grove Garden Rd. - Harding Blvd.<br />
Julia<br />
Scotland<br />
10th<br />
Main<br />
79th<br />
72nd<br />
68th<br />
Terrace<br />
§¨¦I-110<br />
Central WWTP<br />
Highland<br />
Cypress<br />
Rosenwald<br />
Mason<br />
Gsu<br />
17th<br />
Gayosa<br />
Scenic<br />
Fuqua<br />
18th<br />
D<br />
Fairchild<br />
13th<br />
Brookstown Rd. - Evangeline St. PHASE 1<br />
Brookstown Rd. - Evangeline St. PHASE 2<br />
Silverleaf Rd. - Ford St.<br />
Interstate 110 - Hollywood St.<br />
North Basin<br />
Texas<br />
June<br />
Polk<br />
Epperson<br />
Gibbens<br />
Palmyra<br />
Pryce<br />
Wilbur<br />
77th<br />
22nd<br />
23rd<br />
Gore<br />
North<br />
Baker<br />
Jefferson<br />
Dayton<br />
Ozark<br />
Gibbens<br />
Blount<br />
Sycamore<br />
28th<br />
Shelley<br />
Myrtle<br />
Broussard<br />
Lakeshore<br />
Wimbish<br />
Hollywood<br />
Iberia<br />
Farrar<br />
Olive<br />
Daniels<br />
Winnebago<br />
Madison<br />
21st<br />
Myrtle<br />
Lavey<br />
Progress<br />
Erie<br />
29th<br />
Edwin<br />
Eugene<br />
Lavey<br />
31st<br />
Ferndale<br />
Ashland<br />
Husband<br />
Algoa<br />
Mohican<br />
Winbourne<br />
Brady<br />
Parker<br />
36th<br />
38th<br />
Sinbad<br />
Chuck Yeager<br />
Greenwell<br />
Kernan<br />
Middlewood<br />
Scott<br />
Cannon<br />
Choctaw<br />
Perkins<br />
<strong>Plan</strong>k<br />
Ford<br />
Glen Oaks<br />
Greenwell<br />
Evangeline<br />
Fairfields<br />
Steele<br />
44th<br />
Clark<br />
Beech<br />
Sherwood<br />
Leo<br />
Eaton<br />
Ingleside<br />
Bawell<br />
Dutton<br />
Frey<br />
49th<br />
Bentley<br />
Peerless<br />
Charles<br />
Foster<br />
College<br />
Rolling Acres<br />
Elm<br />
Ellen<br />
Osborne<br />
Adams<br />
Myrtle<br />
Greenwell Springs<br />
Ardenwood<br />
Government<br />
Clay Cut<br />
Brookstown<br />
§¨¦I-10<br />
Comite<br />
Celia<br />
St Ann<br />
Corlett<br />
San Juan<br />
Bank<br />
Westdale<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG5-1_PDP2010.MXD SGELPI 11/15/2010 12:26:12<br />
Moon<br />
Arena<br />
Chemin<br />
Hollier<br />
Beck<br />
Troy<br />
Chipley<br />
Holden<br />
Hope<br />
White<br />
Furr<br />
Stoneview<br />
Guynell<br />
Maplewood<br />
Ruby<br />
Kent<br />
Silverleaf<br />
Sumrall<br />
Rio<br />
Callahan<br />
Ruston<br />
Jupiter<br />
Hanks<br />
Renoir<br />
Harry<br />
Donmoor<br />
Prescott<br />
Lobdell<br />
Hall<br />
North Ridge<br />
Landis<br />
Airline<br />
Pettit<br />
Lanier<br />
Wooddale<br />
Tom<br />
Goodwood<br />
Sevenoaks<br />
Lasalle<br />
Murphy<br />
Flag<br />
Baja<br />
Corporate<br />
Boyce<br />
Dalark<br />
Richards<br />
Cline<br />
Price<br />
Breeden<br />
Wright<br />
Reco<br />
Rienzi<br />
Meadow<br />
Phebus<br />
Ocean<br />
Waters Edge<br />
Anderson<br />
Foster<br />
Watts<br />
Cody<br />
Oak View<br />
Paris<br />
Airway<br />
Airport<br />
Brown<br />
Mickens<br />
Colonial<br />
Bliss<br />
Cortana<br />
Brentwood<br />
Joyce<br />
Vail<br />
Loudon<br />
Tara<br />
Fairway<br />
Woodcrest<br />
Ardoon<br />
Oak Villa<br />
Airline<br />
Wartelle<br />
Drusilla<br />
Dyer<br />
Shady Bluff<br />
Tracy<br />
Choctaw<br />
Riveroaks<br />
Carmel<br />
El Scott<br />
Dancy<br />
Crescent<br />
Carney<br />
Ventura<br />
Vega<br />
Mollylea<br />
Interline<br />
Smith<br />
Judi<br />
Old Settlement<br />
Tallowwood<br />
Beta<br />
Elain<br />
Ida<br />
Darryl<br />
Tams<br />
Red Oak<br />
Parkview<br />
Kenlee<br />
0 1 2 4<br />
Oak Forest<br />
Capri<br />
Daradele<br />
Tudor<br />
Bramble<br />
Cook<br />
Lovett<br />
Lassen<br />
Sherwood Forest<br />
Dual<br />
Core<br />
Gurney<br />
Landfair<br />
Hillmont<br />
Rondo<br />
Sherry<br />
Browning<br />
Brillock<br />
Mc Gehee<br />
Joor<br />
McCullough<br />
Tinley<br />
Bellfort<br />
Pecos<br />
Toulon<br />
Sarasota<br />
Little John<br />
Monticello<br />
Archery<br />
Sylvan<br />
Shoe Creek<br />
Frontier<br />
Lariat<br />
Richcroft<br />
Dabney<br />
Baylor<br />
Triple B<br />
Erin<br />
Catalina<br />
Warfield<br />
Shay<br />
Elva<br />
Cherryl<br />
Flannery<br />
Arlingford<br />
Millburn<br />
Warwick<br />
Newcastle<br />
Oak Berry<br />
Dorset<br />
Britain<br />
La Margie<br />
Justice<br />
Parnell<br />
Woodcliff<br />
Elwick<br />
Woodland Ridge<br />
Hubbs Acres<br />
Hooper<br />
Florida<br />
Fairview<br />
Pinewood<br />
Forest View<br />
Huntley<br />
Roundsaville<br />
Kohler<br />
Sage<br />
Brent<br />
Trey<br />
Mapleton<br />
Sunnyhill<br />
Holt<br />
Ponderosa<br />
Glenn<br />
Russett<br />
Denham<br />
Beaver<br />
Silverthorn<br />
Damon<br />
Breton<br />
Crystal<br />
Libra<br />
Brookside<br />
Firewood<br />
Shetland<br />
Paint<br />
Wax<br />
Chanove<br />
Stevendale<br />
Old Hammond<br />
Jester<br />
Alford<br />
Boreas<br />
Terrell<br />
Chaumont<br />
Stonewood<br />
El Ranchitos<br />
Pernecia<br />
Droze<br />
Hill<br />
Fir<br />
Magnolia Bridge<br />
Donnybrook<br />
Woodvale<br />
Norway Pine<br />
Four Oaks<br />
Hewwood<br />
J L Fairchild<br />
Thibodeaux<br />
Hamilton<br />
Frenchtown<br />
Strain<br />
Centurion<br />
Bristoe<br />
Ellis<br />
Durmast<br />
Blouin<br />
§¨¦I-12<br />
Hoyt<br />
Ashford<br />
Ronson<br />
Will<br />
Magnolia Bend<br />
Landmor<br />
Riverview<br />
Deer Lake<br />
Cicero<br />
Ednie<br />
Beachview<br />
Keystone<br />
Morgan<br />
<strong>Plan</strong>chet<br />
Harrells Ferry<br />
Miles Figure 5-1
F<br />
3rd<br />
3rd<br />
Lupine<br />
Truth<br />
Alba<br />
East<br />
Sunshine<br />
Elm<br />
Waverly<br />
Whitter<br />
McHost<br />
Juban<br />
Cora<br />
Marilyn<br />
Blackwater<br />
Aletha<br />
Sharp<br />
Bea<br />
Acres<br />
Sam<br />
Black<br />
Aubin<br />
Little John<br />
Burrel<br />
Devall<br />
Hubbs<br />
Anderson<br />
Sullivan<br />
Reames<br />
Millerville<br />
Hunt<br />
O'Neal<br />
North Basin Capacity Improvement Projects<br />
Lemon<br />
Cook<br />
Scott Barr<br />
Robinson<br />
Lemon B<br />
Portwood<br />
Sunnyside<br />
Port Hudson Plains<br />
Ligon<br />
Brian<br />
Shellmire<br />
Pony<br />
Munson<br />
Vernon<br />
Zachary-Slaughter<br />
Graves<br />
Jacock<br />
Port Hudson-Pride<br />
Zeb Chaney<br />
Mills<br />
Della<br />
Tucker<br />
Jackson<br />
Edwards<br />
Williams<br />
Tom Drehr<br />
Liberty<br />
Chaney<br />
Irene<br />
Barnett<br />
McKee<br />
Old Scenic<br />
Red Mud Lakes 20 MG<br />
Samuels<br />
Flonacher<br />
Mount Pleasant Zachary<br />
Irene<br />
Barnett<br />
Carney<br />
Springfield<br />
Zimmerman<br />
McCastle<br />
Dotson<br />
Scenic<br />
Heck Young<br />
River<br />
Groom<br />
Glynn<br />
Thomas<br />
Elmer<br />
K<br />
E<br />
Tee<br />
Woodpecker<br />
I<br />
H<br />
Blount<br />
Harding<br />
Mengel<br />
Nicholson<br />
Hovey<br />
Swan<br />
6th<br />
Day<br />
New Rafe Meyer<br />
Lafayette<br />
Martin<br />
Fennwood<br />
Merganzer<br />
Newell<br />
Lake Pointe<br />
Meadow Glen<br />
Hillcrest<br />
Magnolia<br />
St John<br />
³<br />
Capacity Improvement Project<br />
Waste Water Treatment <strong>Plan</strong>t<br />
¬<br />
")<br />
New Storage Facilities<br />
PDP Projects<br />
WWTP<br />
- North Basin<br />
Force Main<br />
Gravity Main<br />
PDP PS Projects<br />
#*<br />
Project Area<br />
Existing Force Main<br />
#*<br />
Existing Gravity Main<br />
Existing Pump Stations<br />
St Philip<br />
Stadium<br />
Emma<br />
Royal<br />
4th<br />
Alaska<br />
Rollins<br />
Central<br />
Stilt<br />
Sorrel<br />
9th<br />
Church<br />
Main<br />
72nd<br />
Convention<br />
North<br />
10th<br />
July<br />
Julia<br />
Rita<br />
Faith<br />
Landry<br />
Scotland<br />
Progress<br />
Rosenwald<br />
13th<br />
Highland<br />
Gsu<br />
39th<br />
79th<br />
68th<br />
22nd<br />
Gore<br />
77th<br />
§¨¦I-110<br />
Chippewa<br />
Terrace<br />
Dalrymple<br />
Tower<br />
Cedar<br />
Twin Oaks<br />
Texas<br />
Snipe<br />
11th<br />
Pimpernel<br />
Mason<br />
17th<br />
Gayosa<br />
Pope<br />
Beech<br />
Fuqua<br />
18th<br />
South<br />
Maple<br />
Old Baker Zachary<br />
Allen<br />
Epperson<br />
D<br />
Wilbur<br />
Washington<br />
Polk<br />
40th<br />
Baker<br />
Palmyra<br />
Pryce<br />
Scotlandville-Zachary<br />
23rd<br />
Lee<br />
Stanford<br />
Baker<br />
Jefferson<br />
Dayton<br />
Ozark<br />
Olive<br />
Wimbish<br />
Daniels<br />
Gibbens<br />
Hollywood<br />
Sycamore<br />
28th<br />
Shelley<br />
Winnebago<br />
Madison<br />
Oleander<br />
May<br />
Lavey<br />
Gibbens<br />
Progress<br />
Erie<br />
29th<br />
Edwin<br />
Ada<br />
Acadian<br />
Myrtle<br />
Broussard<br />
Fiero<br />
Avenue K<br />
31st<br />
Mohican<br />
38th<br />
McHugh<br />
Winbourne<br />
Brady<br />
Fairfields<br />
Parker<br />
36th<br />
Sinbad<br />
Steele<br />
Paige<br />
<strong>Plan</strong>k<br />
Greenwell<br />
Foster<br />
Ford<br />
Glen Oaks<br />
Evangeline<br />
44th<br />
Comite<br />
Hooper Storage Tank Facility 10 MG<br />
Greenwell Springs<br />
Government<br />
Clay Cut<br />
Dyer<br />
Goodwood<br />
§¨¦I-10<br />
0 1.25 2.5 5<br />
Hood<br />
Mae<br />
New Weis<br />
Ovid<br />
Ashland<br />
Husband<br />
Lavey<br />
Algoa<br />
Glendale<br />
Wedgewood<br />
Devall<br />
Ronnie<br />
Old Slaughter<br />
Scott<br />
Stuart<br />
Clark<br />
Chuck Yeager<br />
Choctaw<br />
Lee<br />
Arena<br />
Crown<br />
Sherwood<br />
Leo<br />
Eaton<br />
Ingleside<br />
Bawell<br />
Dutton<br />
Palm<br />
Chemin<br />
Hollier<br />
North<br />
Orchid<br />
Chipley<br />
College<br />
Bentley<br />
Frey<br />
Rolling Acres<br />
Ellen<br />
Adams<br />
Ormandy<br />
Park<br />
Myrtle<br />
Hope<br />
Brookstown<br />
Ardenwood<br />
Perkins<br />
Lower Zachary<br />
Celia<br />
St Ann<br />
Kent<br />
Stoneview<br />
San Juan<br />
Maplewood<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\FIG5-2_PDP2010.MXD SGELPI 11/15/2010 14:58:04<br />
Troy<br />
Furr<br />
Bank<br />
Ruby<br />
Silverleaf<br />
Sumrall<br />
Rio<br />
Callahan<br />
Hanks<br />
Renoir<br />
Harry<br />
Donmoor<br />
Main<br />
Angus<br />
Ruston<br />
Jupiter<br />
Charlton<br />
Foster<br />
Prescott<br />
Victoria<br />
Lobdell<br />
Pettit<br />
Lanier<br />
Wooddale<br />
Sevenoaks<br />
Corporate<br />
Burden<br />
Hall<br />
North Ridge<br />
Landis<br />
Baja<br />
Boyce<br />
Dalark<br />
Richards<br />
Cline<br />
Price<br />
Wright<br />
Tom<br />
J Wicker<br />
Meadow<br />
Phebus<br />
Annabelle<br />
Murphy<br />
Flag<br />
Ocean<br />
Waters Edge<br />
Anderson<br />
Cody<br />
Oak View<br />
Reco<br />
Rienzi<br />
Lasalle<br />
Sholar<br />
Airway<br />
Lils<br />
Essen<br />
Brown<br />
Mickens<br />
Peairs<br />
Choctaw Storage Tank Facility 26 GM<br />
Airport<br />
Cortana<br />
Brentwood<br />
Cypress<br />
Choctaw<br />
Oak Villa<br />
Tara<br />
Fairway<br />
Watson<br />
Vail<br />
Loudon<br />
Monhegan<br />
Riveroaks<br />
Wartelle<br />
Buck Horn<br />
Carney<br />
Shady Bluff<br />
Monterrey<br />
Drusilla<br />
Airline<br />
Fleet<br />
Arleen<br />
Carmel<br />
El Scott<br />
Dancy<br />
Tracy<br />
Redbud<br />
Mollylea<br />
Interline<br />
Fawn<br />
Ventura<br />
Old Settlement<br />
Lonita<br />
Woodhaven<br />
Tallowwood<br />
Elain<br />
Darryl<br />
Daradele<br />
Allyson<br />
Tams<br />
Tudor<br />
Cedarcrest<br />
Ida<br />
Greenwell Spg Pt Hudson<br />
Cook<br />
Lassen<br />
Red Oak<br />
Core<br />
Gurney<br />
Landfair<br />
Hillmont<br />
Voorhies<br />
Joor<br />
McCullough<br />
Tinley<br />
Toulon<br />
Alco<br />
Explorer<br />
Neff<br />
Pecos<br />
Collins<br />
Major Oaks<br />
Muriel<br />
Cherryhill<br />
Stan<br />
Sylvan<br />
Shoe Creek<br />
Lovett<br />
Frontier<br />
Lariat<br />
Coral<br />
Dabney<br />
Baylor<br />
Joor<br />
Triple B<br />
Erin<br />
Catalina<br />
Warfield<br />
Shay<br />
Archery<br />
Millburn<br />
Warwick<br />
Justice<br />
Elva<br />
Cherryl<br />
Woodcliff<br />
Elwick<br />
Woodland Ridge<br />
Newcastle<br />
Oak Berry<br />
Dorset<br />
Langer<br />
Britain<br />
Hooper<br />
Flannery<br />
Coursey<br />
Wyndy<br />
Hubbs Acres<br />
Pinewood<br />
Forest View<br />
Huntley<br />
Florida<br />
Dena Lynn<br />
Roundsaville<br />
Kohler<br />
Holt<br />
Sage<br />
Brent<br />
Trey<br />
Mapleton<br />
Ponderosa<br />
Buckley<br />
Glenn<br />
Russett<br />
Denham<br />
Beaver<br />
Bywood<br />
Breton<br />
Firewood<br />
Sessions<br />
Crystal<br />
Brookside<br />
Shetland<br />
Paint<br />
Wax<br />
Chanove<br />
Frenchtown<br />
Stevendale<br />
Old Hammond<br />
Jester<br />
Jones Creek<br />
Aspenwood<br />
Alford<br />
Boreas<br />
Terrell<br />
El Ranchitos<br />
Chivre<br />
Choctaw<br />
Geraldine<br />
Pernecia<br />
Droze<br />
Fir<br />
Roble<br />
Magnolia Bridge<br />
Donnybrook<br />
Four Oaks<br />
Hamilton<br />
Black<br />
Thibodeaux<br />
Strain<br />
Bristoe<br />
Ellis<br />
George Oneal<br />
Lavell<br />
Lawnside<br />
Morgan<br />
Blouin<br />
Riverview<br />
Centurion<br />
§¨¦I-12<br />
Hoyt<br />
Milldale<br />
Ashford<br />
Deer Lake<br />
Will<br />
Gottlieb<br />
Cicero<br />
Liberty<br />
Landmor<br />
<strong>Plan</strong>chet<br />
Harrells Ferry<br />
Monitor<br />
Jon Michelle<br />
Beachview<br />
Miles Figure 5-2
SECTION 5. NORTH BASIN PROJECTS<br />
5.1 North Gravity System Comprehensive Rehabilitation<br />
Projects<br />
5.1.1 NGS-R-0001 and NGS-R-0002<br />
Project Description<br />
The comprehensive sewer rehabilitation projects consist of improvements to various<br />
components of the sewer collection system to reduce the amount of rainwater and<br />
groundwater that leak into the system.<br />
Purpose<br />
The purpose of the comprehensive sewer rehabilitation projects is to correct defects in the<br />
system such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct<br />
inflow sources. The water that enters the system through the defects is a major contributor<br />
to SSOs. Comprehensive rehabilitation of the collection system will alleviate SSOs.<br />
Location<br />
There are two projects located within the North Gravity Basin. The attached maps show the<br />
project locations in Figures 5-3 to 5-4 in Figures 5-3 to 5-4.<br />
Scope of Project<br />
The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />
the pipes and manholes including CCTV inspection. Smoke testing may also included in the<br />
physical inspection phase. The data collected by the physical inspection contractor will be<br />
analyzed. Based on that analysis, a listing of recommended repairs with associated<br />
construction costs will be generated. An engineering firm will then complete detailed design<br />
and preparation of construction documents for project bidding. The construction of<br />
rehabilitation projects will typically include the following components:<br />
Replacement of pipes<br />
Point repair of pipes<br />
Rehabilitation of pipes by cured in place pipe liners<br />
Rehabilitation or replacement of manholes<br />
Repair of sewer laterals to the property line<br />
Cost<br />
The estimated construction costs for each project are presented in Table 5-1. The cost for NGS-<br />
R-0001 is based on a preliminary estimate of the amounts of each component of the system<br />
that will require repair or replacement. During the physical inspection phase, the actual<br />
condition of the components will be assessed and appropriate methods recommended. At that<br />
time, the cost estimate for each project will be revised. Since both of these projects have<br />
already bid for construction, the construction costs in Table 5-1 are the bid amounts.<br />
TABLE 5-1<br />
Estimated Construction Costs for the North Gravity System Comprehensive Rehabilitation Projects<br />
Construction<br />
Project Description<br />
Cost<br />
NGS-R-0001 –Elm Grove Garden<br />
Road-Harding Boulevard<br />
NGS-R-0002 –Scotland Avenue-<br />
Progress Road<br />
*Appropriations already made for these projects (design and/or construction, as marked)<br />
Scheduled Design Scheduled Construction<br />
Appropriation Year Appropriation Year<br />
Status<br />
$12,989,000 2009* 2009* Construction<br />
On-Going<br />
$9,208,000 2009* 2009* Construction<br />
On-Going<br />
GNV31031158552.DOCX/103470004 5-7 JANUARY 2011<br />
REV. 5
Chinn<br />
Helene<br />
Sussex<br />
Golden<br />
Muse<br />
Elmer<br />
Egret<br />
Flicker<br />
Mills<br />
Avocet<br />
Bittern<br />
Merganzer<br />
Airline<br />
Tallow<br />
Almond<br />
Livestock<br />
Mengel<br />
Bowman<br />
Blount<br />
Kitty<br />
Bayberry<br />
Kingfisher<br />
Balsam<br />
Mayhaw<br />
Silverwood<br />
Marsh<br />
Lee<br />
Southern<br />
Lewis<br />
Booker<br />
East Baton Rouge Parish<br />
Scotland<br />
Oriole<br />
Zerlee<br />
Central<br />
King<br />
Wall<br />
Jordan<br />
Cardinal<br />
Teal<br />
Tern<br />
Stilt<br />
Scenic<br />
Monte Sano<br />
Snipe<br />
Stanicola<br />
Killdeer<br />
Success<br />
Robin<br />
Swan<br />
Sora<br />
Fairchild<br />
Helene<br />
Sanchez<br />
Thelma<br />
Legend<br />
Curtis<br />
Burt<br />
Kaufman<br />
Rosenwald<br />
Somerset<br />
Sara<br />
Snipe<br />
Goudchaux<br />
Rawlins<br />
Progress<br />
74th<br />
78th<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NGS-R-0001.MXD SGELPI 11/9/2010 09:54:13<br />
Somerset<br />
Somerset<br />
73rd<br />
Elm Grove Garden<br />
77th<br />
Goode<br />
71st<br />
79th<br />
69th<br />
Goudchaux<br />
Midland<br />
Jenkins<br />
Jones<br />
Bacon<br />
Elm Grove<br />
Sharon<br />
Alamoster<br />
Pembroke<br />
Kaufman<br />
Pryce<br />
Crockett<br />
D<br />
Mason<br />
Greenwell<br />
Iberia<br />
Area Designated for<br />
Physical Inspection<br />
Heath<br />
Pembroke<br />
Pembroke<br />
Barksdale<br />
Plover<br />
Wilbur<br />
Tanner<br />
75th<br />
68th<br />
Casper<br />
Amarillo<br />
Riley<br />
Beech<br />
0 1,300 2,600 Feet<br />
Kennedy<br />
Middlesex<br />
Baton Rouge<br />
Lark<br />
Badley<br />
73rd<br />
70th<br />
Shada<br />
Veterans Memorial<br />
Hollywood<br />
Breckenridge<br />
Progress<br />
Varsity<br />
Wren<br />
Jay<br />
Nottingham<br />
qNottingham<br />
Dorrie Miller<br />
B<br />
Rosenwald<br />
74th<br />
Bourgeois<br />
Saurage<br />
Emile<br />
Iris<br />
Kerr<br />
Edwin<br />
Alexander<br />
Emile<br />
Cambridge<br />
General Chennault<br />
Douglas<br />
Village<br />
Liberty<br />
Harriet Quimby<br />
Sally Ride<br />
Louis Wiles<br />
Fritz Maizer<br />
J D Hair Sr<br />
Village<br />
I-110<br />
Longfellow<br />
Jackie Cochran<br />
Greenwell<br />
Beech<br />
Yancy<br />
Gibbens<br />
Monte Sano<br />
I- 110 Serice<br />
Henagen<br />
Henderson<br />
Riley<br />
Kelvin<br />
Lorraine<br />
Ridgecrest<br />
Smiley<br />
Harding<br />
72nd<br />
Beech<br />
Chuck Yeager<br />
T B Hearndon<br />
Mason<br />
Harriet<br />
St Dorothy<br />
Cannon<br />
Dawson<br />
Denham<br />
Greenwell<br />
Quivera<br />
Beachwood<br />
Lemonwood<br />
Dutton<br />
Cadillac<br />
Peerless<br />
St Katherine<br />
Lorraine<br />
Sycamore<br />
Hollier<br />
Ford<br />
Monarch<br />
Glen Oaks<br />
Beechwood<br />
Blount<br />
St Gerard<br />
Velie<br />
<strong>Plan</strong>k<br />
Blanche Noyes<br />
Beechwood<br />
Robique<br />
Martin<br />
Hooper<br />
Stearns<br />
Paige<br />
Crown<br />
Sumrall<br />
Oaklan<br />
Robertson<br />
Vida<br />
Hollywood<br />
Elm Grove Rd. - Harding Blvd.<br />
NGS-R-0001<br />
Project Vicinity Map<br />
Figure 5-3<br />
Foster<br />
Onter<br />
Winchester<br />
Stutz<br />
Lancaster
F<br />
E<br />
Chinn<br />
Helene<br />
Goode<br />
Palmyra<br />
Sussex<br />
Golden<br />
Gibbens<br />
Amerest<br />
Ronaldson<br />
Avenue M<br />
Avenue K<br />
Sapsucker<br />
Bon Crest<br />
Lakecrest<br />
Rivercrest<br />
Hillcrest<br />
Avenue I<br />
Woodcock<br />
Woodpecker<br />
Elmer<br />
Mills Mills<br />
College<br />
Avenue G<br />
I<br />
Avenue E<br />
Avenue F<br />
K<br />
Swan<br />
D<br />
C Harrison<br />
St John<br />
Dillard<br />
Scenic<br />
Avenue C<br />
F<br />
Coot<br />
H<br />
Farm<br />
Avenue A<br />
St Irma Lee<br />
Bertha<br />
Dove<br />
Catherine<br />
Almond<br />
Williams<br />
Merganzer<br />
Harding<br />
Pintail<br />
Leisure<br />
Bayberry<br />
Kingfisher<br />
Balsam<br />
Mayhaw<br />
Almond<br />
Lewis<br />
Lee<br />
Rail<br />
Southern<br />
Oriole<br />
Teal<br />
Zerlee<br />
Central<br />
Stilt<br />
Sora<br />
Tern<br />
King<br />
Fairchild<br />
Robin<br />
Swan<br />
79th<br />
Scotland<br />
Stanicola<br />
Killdeer<br />
Success<br />
Allendale<br />
Thelma<br />
Curtis<br />
78th<br />
Thomas<br />
Bradfield<br />
Sparta<br />
Cunard<br />
Gore<br />
Progress<br />
Progress<br />
Rosenwald<br />
Sara<br />
Snipe<br />
Somerset<br />
Jones<br />
Brock<br />
Elm Grove Garden<br />
77th<br />
<strong>Plan</strong>tation<br />
Elm Grove Sharon<br />
Candace<br />
Pryce<br />
Leonidas<br />
Crockett<br />
Heath<br />
Desoto<br />
1st<br />
Kennedy<br />
Key<br />
Wilbur<br />
Hallmark<br />
Queens<br />
Dorrie Miller<br />
Varsity<br />
I-110<br />
Badley<br />
75th<br />
Blount<br />
Veterans Memorial<br />
B<br />
Plover<br />
Fairchild<br />
Turnley<br />
Kingston<br />
Layton<br />
Emile<br />
Jolson<br />
Kingston<br />
General Chennault<br />
Liberty<br />
Yancy<br />
Jackie Cochran<br />
Gibbens<br />
Sachet<br />
Hickory Wood<br />
Ashworth<br />
Devall<br />
Middlewood<br />
Wedgewood<br />
Chuck Yeager<br />
T B Hearndon<br />
Engleswood<br />
Clark<br />
<strong>Plan</strong>k<br />
Pembroke<br />
Hunt<br />
East Baton Rouge Parish<br />
Legend<br />
Mengel<br />
Monte Sano<br />
Area Designated for<br />
Physical Inspection<br />
0 1,500 3,000 Feet<br />
74th<br />
Kaufman<br />
Laramie<br />
q<br />
71st<br />
69th<br />
73rd<br />
Goudchaux<br />
Pembroke<br />
68th<br />
73rd<br />
70th<br />
Nottingham<br />
Cambridge<br />
Monte Sano<br />
I- 110 Serice<br />
72nd<br />
Mason<br />
Oaklan<br />
Airline<br />
Crown<br />
Sumrall<br />
Scotland Ave. - Progress Rd.<br />
NGS-R-0002<br />
Project Vicinity Map<br />
Figure 5-4<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NGS-R-0002.MXD SGELPI 11/9/2010 09:58:58
SECTION 5. NORTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158552.DOCX/103470004 5-10 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
5.2 North Gravity System Capacity Improvements Projects<br />
5.2.1 NGS-C-0001 (Progress Road – Baton Rouge Metro Airport)<br />
Project Description<br />
Purpose of the Project / Background Information<br />
This project has been deleted and consolidated with Group Project 1A and Group Project 1B,<br />
which are described in the North Forced System section.<br />
5.2.2 NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The purpose of the NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) is to<br />
upsize gravity sewers upstream of PS 45, PS 127, PS 44, and PS 244 as well as forcemains<br />
exiting PS 38, PS 244, and PS 63, which will alleviate chronic SSOs in the gravity system.<br />
Location<br />
The locations of the gravity sewers and forcemains in this project are shown in Figure 5-5.<br />
Gravity segment 045-00039 to 045-00026 begins on Kleinpeter Road between its intersections<br />
with St. Peter Avenue and St. Claude Avenue and travels west along Kleinpeter Road to<br />
045-00026, located near the intersection of Newsom Drive and Kleinpeter Road.<br />
Gravity segment 045-00026 to PS 45 begins near the intersection of Newsom Drive and<br />
Kleinpeter Road and travels west along Kleinpeter Road to its intersection with Nimitz<br />
Street. The segment then turns south and follows Nimitz Street to its intersection with Clark<br />
Street. The segment then turns west and follows Clark Street to PS 45, which is near the<br />
intersection of Clark Street and Granberry Drive.<br />
Gravity segment 045-00043 to 045-00020 begins at manhole 045-00043, located near the<br />
intersection of <strong>Plan</strong>k Road and Brownfields Drive, and follows <strong>Plan</strong>k Road southwest to<br />
manhole 045-00020, located near the intersection of <strong>Plan</strong>k Road and Kleinpeter Road.<br />
Gravity segment (044-00338 to 044-00156 and 044-00325 to 044-00156) starts at 044-00338 ,<br />
located north of the intersection of 78 th Avenue and Pembroke Street, and connects west to<br />
the existing 36-inch sewer line on Pembroke street (between manholes 044-00277 and 044-<br />
00276). The next connection is located north of the intersection of 79 th Avenue and Pembroke<br />
Street. The connection starts at manhole 044-00274 and connects west to the existing 36-inch<br />
sewer line on Pembroke (between manholes 044-00276 and 044-00156). The third connection<br />
is at the intersection of Pembroke Street and Harding Boulevard at manhole 044-00328 and<br />
connects between manholes 044-00273 and 044-00156. On Harding Boulevard, the segment<br />
begins at manhole 044-00325, located at the intersection of Nottingham Street and Harding<br />
Boulevard, where it then follows Harding Boulevard west to manhole 044-00156, located<br />
near the intersection of Harding Boulevard and Pembroke Street.<br />
Gravity segment 244-00029 to 244-00004 begins at manhole 244-00029, located near the<br />
intersection of Brig. Gen. Isaac Smith and Veterans Memorial Boulevard and follows Brig.<br />
Gen. Isaac Smith (turns into Louis Wiles Ave.) east to General Chennault Drive. The<br />
segment then runs south, along General Chennault Drive to manhole 244-00002. The<br />
Segment then turns east and terminates in PS 244 located on General Chennault drive.<br />
GNV31031158552.DOCX/103470004 5-11 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
Gravity segment 080-00011 to PS 80 begins at Manhole 080-00011, which is located in a<br />
drainage path north of Kleinpeter Road between its intersections with St. Peter Avenue and<br />
St. Claude Avenue. The segment travels south to PS 80, which is on Kleinpeter Avenue.<br />
Forcemain segment PS 38 to PS 38DS runs from PS 38, located at the south end of Constance<br />
Street, in an easterly direction through a servitude that parallels Desoto Drive to manhole PS<br />
38DS, located near the intersection of Rebecca Lynn Avenue and Hallmark Drive.<br />
Forcemain segment PS 244FM to PS 244DS begins at PS 244, located on General Chennault<br />
Drive, near the Baton Rouge Metropolitan Airport, and follows General Chennault Drive<br />
south for approximately 1,195 feet. At this location, the forcemain turns west and runs<br />
through an open field, crosses Veterans Memorial Blvd, and continues west through an open<br />
field to Edwin Street. The force main runs south on Edwin Street until it is just south of North<br />
Lark street where it runs west underneath I-110 and continues west midway between North<br />
Lark Street and Lark Street crossing Wilbur street. At the end of Lark street the force main<br />
turns south and crosses Scotlandville Lateral and continues along the south side of<br />
Scotlandville lateral in a northwest direction until the west side of the Chevron gas pipeline<br />
ROW. At the west side of the gas pipeline ROW the force main runs south for approximately<br />
434 ft. The force main then turns west and terminates at manhole 044-00118, located near the<br />
intersection of Jones Street and Robin Drive.<br />
Forcemain segment PS 63FM to PS 63DS starts at PS 63, located on Georgia Street, in between<br />
Groom Road and Harding Street, and runs south along Georgia Street for approximately 115<br />
feet to its termination point at manhole PS 63DS.<br />
Scope<br />
This project includes approximately 9,400 feet of 12-inch, 24-inch, 27-inch, 30-inch, and 42-<br />
inch gravity sewer upstream of PS 45, approximately 2,600 feet of 12-inch, 15-inch, and 21-<br />
inch gravity sewer upstream of PS 127, approximately 2,300 feet of 12-inch, 18-inch, and 24-<br />
inch gravity sewer upstream of PS 44, approximately 1,500 feet of 12-inch, and 15-inch<br />
gravity sewer upstream of PS 244, and approximately 330 feet of 15-inch gravity sewer<br />
upstream of PS 80. This project also includes replacement of forcemains from PS 38, PS 244,<br />
and PS 63. Table 5-2 shows the detailed scope of this project.<br />
TABLE 5-2<br />
NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
045-00039 045-0026 3,160 12 24<br />
045-00026 045-00020 840 12 & 18 24<br />
045-00020 045-00007 2,600 18 27<br />
045-00007 045-00001 1,500 18 30<br />
045-00001 PS 45 65 18 42<br />
045-00043 045-00020 1,200 8 12<br />
PS38DS 127-00020 100 8 12<br />
127-00020 127-00015A 970 8 & 12 15<br />
GNV31031158552.DOCX/103470004 5-12 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-2<br />
NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
127-00015A PS 127 1,500 12 21<br />
044-00342 044-00274 560 8 12<br />
044-00274 044-00325 1,070 10 18<br />
044-00325 044-00323 340 18 24<br />
044-00323 044-00322 320 18 24<br />
244-00029 244-00006 1,260 10 12<br />
244-00006 244-00004 265 10 15<br />
080-00011 PS 80 330 8 15<br />
PS 38 PS38DS 1,700 6 8 Forcemain<br />
PS244FM PS244DS 5,570 8 12 Forcemain<br />
PS63FM PS63DS 115 18 24 Forcemain<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $7,600,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-13 JANUARY 2011<br />
REV. 5
See Inset
SECTION 5. NORTH BASIN PROJECTS<br />
5.2.3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) Project includes the<br />
replacement of PS 127, PS 129, PS 38, PS 63, PS 64, PS 244, PS 44, PS 75, and PS 80. This<br />
project is the combination of NGS-C-0003 (Multiple PS – <strong>Plan</strong>k Road – Thomas Road) and<br />
NGS-C-0004 (Multiple PS-<strong>Plan</strong>k Road-Harding Boulevard) from the October 2008 PDP. The<br />
combined project has been designated NGS-C-0003 (<strong>Plan</strong>k Road Pump Station<br />
Improvements) project and is described in this section.<br />
The pump station replacements will work in conjunction with the forcemain and gravity<br />
sewer upgrades in the North Gravity Basin projects to alleviate chronic SSOs at the pump<br />
stations and in the gravity basins upstream of the pump stations.<br />
The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />
modeling predicts will equal or exceed the existing maximum capacities.<br />
Location<br />
The locations of the pump stations are given in Table 5-3 and in Figure 5-6.<br />
Scope<br />
This project includes the replacement of the nine pump stations shown in Table 5-3.<br />
TABLE 5-3<br />
NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) – Pump Station Information<br />
Existing Max<br />
Capacity<br />
Future Peak Wet<br />
Weather Flow<br />
Dry<br />
Weather<br />
PS No.<br />
Location<br />
(GPM) (GPM) (GPM)<br />
PS 127 Gibbens Road, near intersection of Gore Road 1,805 1,805 308<br />
PS 129<br />
Near the intersection of Wynell Drive and Lebrent<br />
Avenue<br />
417 417 68<br />
PS 38 Desoto Drive, near Clifford Seymour Senior Park 1,389 1,389 186<br />
PS 63 Near the intersection of Groom Road and Georgia 7,152 12,492 2,586<br />
Street<br />
PS 64 Near the intersection of Cypress Street and South 1,319 1,640 567<br />
Street<br />
PS 244 Near the intersection of Captain Ryan Drive and 972 3,865 181<br />
General Chennault Drive<br />
PS 44 Near the intersection of Oriole Street and Thelma 11,180 11,180 1,558<br />
Street<br />
PS 75 Near the intersection of 72nd Avenue and<br />
278 278 49<br />
Yorkshire Street<br />
PS 80 Near the intersection of St. Peter Avenue and<br />
Kleinpeter Road<br />
417 694 0<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flows were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $9, 300,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation year is 2012.<br />
Design and Construction has Not Started.<br />
GNV31031158552.DOCX/103470004 5-15 JANUARY 2011<br />
REV. 5
F<br />
Chinn<br />
Golden<br />
Sunshine<br />
Troy<br />
#<br />
Avenue F<br />
St John<br />
Dillard<br />
#<br />
Thomas<br />
Hovey<br />
PS276<br />
Blount<br />
#<br />
Magnolia<br />
Leland<br />
Ray Weiland<br />
New Rafe Meyer<br />
Leisure<br />
Day<br />
Landry<br />
PRIVATEPS<br />
Ronaldson<br />
Scotland<br />
#I<br />
# PS64<br />
Cypress<br />
Main<br />
Texas<br />
#<br />
PS109<br />
BPS513<br />
Jefferson<br />
#I<br />
PS63<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#I<br />
PS129<br />
#<br />
PS241<br />
# #<br />
#I<br />
PS38<br />
#<br />
#I<br />
PS127<br />
#I<br />
#<br />
PS80<br />
#<br />
PS45<br />
#<br />
PS79<br />
Ashworth<br />
#<br />
Devall Lane<br />
PS210<br />
#<br />
#<br />
PS126<br />
#<br />
#<br />
Pryce<br />
Gibbens<br />
Baker<br />
Gore<br />
Liberty<br />
Plaza<br />
Debra<br />
Patricia<br />
Ector<br />
Gibbens<br />
Husband<br />
Lavey<br />
Alba<br />
Amerest<br />
Devall<br />
Charles<br />
Arena<br />
Lavey<br />
#<br />
PS268<br />
PS29<br />
Clark<br />
PS240<br />
Groom<br />
<strong>Plan</strong>k<br />
Myrtle<br />
Ellen<br />
Bentley<br />
PS242<br />
Comite<br />
Felicity<br />
Celia<br />
Roman<br />
Brownfields<br />
Ruston<br />
Colfax<br />
Kent<br />
PS312<br />
PS141<br />
Hall<br />
PS105<br />
PS150<br />
#<br />
PS291<br />
#<br />
Pettit<br />
Greencrest<br />
PS246<br />
Anderson<br />
Fieldcrest<br />
#<br />
Foster<br />
Progress<br />
Progress<br />
#<br />
I<br />
K<br />
Swan<br />
D<br />
E<br />
H<br />
#<br />
Airline<br />
Scenic<br />
Central<br />
Mengel<br />
East Baton Rouge Parish<br />
#I<br />
PS44<br />
#I<br />
# # PS244<br />
Monte Sano<br />
Jones<br />
75th<br />
Mason<br />
79th<br />
74th<br />
#I<br />
#<br />
PS75<br />
Harding<br />
72nd<br />
PS78<br />
#<br />
# #<br />
# #<br />
#<br />
Legend<br />
Proposed<br />
Existing<br />
<strong>Plan</strong>k Rd. PS Improvements<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NGS-C-0003<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-6<br />
Shada<br />
Edwin<br />
Monte Sano<br />
0 0.5<br />
1<br />
Miles<br />
Yancy<br />
Chuck Yeager<br />
Denham<br />
Dutton<br />
#<br />
Martin<br />
Crown<br />
Foster<br />
PS179<br />
#<br />
Ford<br />
Sumrall<br />
Mable<br />
PS429<br />
#<br />
#<br />
St Gabriel<br />
Cadillac<br />
Guynell<br />
Buckeye<br />
#<br />
PS432<br />
Gov Pleasant<br />
#<br />
PS433<br />
Belvin<br />
Carlene<br />
PS92<br />
#<br />
#<br />
#<br />
Hooper<br />
PS313<br />
Dalark<br />
#<br />
Mickens<br />
Wright<br />
#<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NGS-C-0003.MXD SGELPI 11/9/2010 09:45:10
SECTION 5. NORTH BASIN PROJECTS<br />
5.2.4 NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding Boulevard)<br />
The NGS-C-0004 (Multiple Pump Stations – <strong>Plan</strong>k Road – Harding Boulevard) project was<br />
combined with NGS-C-0003, (Multiple PS-<strong>Plan</strong>k Road-Thomas Road) from the October 2008<br />
PDP. The combined project has been designated NGS-C-0003 (<strong>Plan</strong>k Road Pump Station<br />
Improvements), and is described in Section 5.2.3.<br />
GNV31031158552.DOCX/103470004 5-17 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158552.DOCX/103470004 5-18 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
5.3 North Forced System Comprehensive Rehabilitation<br />
Projects<br />
5.3.1 NFW-R-0001, NFW-R-0002, and NFE-R-0001<br />
Project Description<br />
The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />
various components of the sewer collection system to reduce the amount of rainwater and<br />
groundwater that leak into the system.<br />
Purpose<br />
The purpose of the comprehensive sewer rehabilitation is to correct defects in the system<br />
such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow<br />
sources. The water that enters the system through the defects is a major contributor to SSOs.<br />
Comprehensive rehabilitation of the collection system will contribute to alleviating SSOs.<br />
Location<br />
There are four projects located within the North Forced Basin. The attached maps show the<br />
locations of the projects, shown in Figure 5-7 to 5-9.<br />
Scope of Project<br />
The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />
the pipes and manholes including CCTV inspection of pipes. Smoke testing may also be<br />
included in the physical inspection phase.<br />
The data collected by the physical inspection contractor will be analyzed and based on that<br />
analysis a listing of recommended repairs with associated construction costs will be generated.<br />
An engineering firm will then complete detailed design and preparation of construction<br />
documents for project bidding.<br />
The construction of rehabilitation projects will typically include the following components.<br />
<br />
<br />
<br />
<br />
<br />
Replacement of pipes<br />
Point repair of pipes<br />
Rehabilitation of pipes by cured in place pipe liners<br />
Rehabilitation or replacement of manholes<br />
Repair of sewer laterals to the property line<br />
Cost<br />
The estimated costs for each project are presented in Table 5-4. These costs are based on<br />
preliminary estimates of the amounts of each component of the system that will require<br />
repair or replacement. During the physical inspection phase, the actual condition of the<br />
components will be assessed and appropriate methods recommended. At that time, the cost<br />
estimate for each project will be revised. For those projects under construction, the actual<br />
bid amounts are included as construction costs in Table 5-4.<br />
GNV31031158552.DOCX/103470004 5-19 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-4<br />
Estimated Construction Costs for North Forced System Comprehensive Rehabilitation Projects<br />
Project Descriptions<br />
Construction<br />
Cost<br />
Scheduled Design<br />
Appropriation Year<br />
Scheduled<br />
Construction<br />
Appropriation Year<br />
Status<br />
NFW-R-0001a-<br />
Brookstown Road-<br />
Evangeline Street,<br />
Phase I<br />
NFW-R-0001b-<br />
Brookstown Road –<br />
Evangeline Street,<br />
Phase II<br />
NFW-R-0002-Interstate<br />
110-Hollywood Street<br />
NFE-R-0001-Silverleaf<br />
Road-Ford Street<br />
$12,100.000 2009* 2010* Construction<br />
On-Going<br />
$11,000,000 2009* 2010* Design On-<br />
Going<br />
$6,000,000 2011 2012 Not Started<br />
$10,500,000 2009* 2010* Design On-<br />
Going<br />
*Appropriations already made for these projects (design and/or construction, as marked)<br />
GNV31031158552.DOCX/103470004 5-20 JANUARY 2011<br />
REV. 5
F<br />
3rd<br />
Alba<br />
Sunshine<br />
Elm<br />
McHost<br />
Blackwater<br />
Aletha<br />
Acres<br />
Black<br />
Burrel<br />
Anderson<br />
Reames<br />
Hunt<br />
Chaney<br />
Lea<br />
Ligon<br />
Brian<br />
Shellmire<br />
Pony<br />
Zachary-Slaughter<br />
Safer<br />
Vernon<br />
Rush<br />
Lemon<br />
Jacock<br />
Port Hudson-Pride<br />
<strong>Plan</strong>k<br />
Della<br />
Edwards<br />
Jackson<br />
Tom Drehr<br />
Riley<br />
Mahoney<br />
Carson<br />
Zeb Chaney<br />
Flonacher<br />
Old Scenic<br />
Dotson<br />
Avenue M<br />
Groom<br />
Thomas<br />
Elmer<br />
K<br />
I<br />
H<br />
Fennwood<br />
Heck Young<br />
Hovey<br />
Merganzer<br />
Newell<br />
Lake Pointe<br />
Meadow Glen<br />
New Rafe Meyer<br />
D<br />
Magnolia<br />
St John<br />
Farm<br />
Scotland<br />
Blount<br />
Mengel<br />
Rollins<br />
Harding<br />
Church<br />
Main<br />
Chippewa<br />
Sorrel<br />
Rita<br />
Faith<br />
Landry<br />
Day<br />
Central<br />
Stilt<br />
Old Baker Zachary<br />
39th<br />
79th<br />
70th<br />
72nd<br />
Mason<br />
Scenic I-110<br />
Gore<br />
Shelley<br />
17th<br />
Wilbur<br />
Foss<br />
East Baton Rouge Parish<br />
4th<br />
Ash<br />
Pope<br />
Baker<br />
Polk<br />
Beech<br />
Lee<br />
Wimbish<br />
Scotlandville-Zachary<br />
Daniels<br />
Lavey<br />
Gibbens<br />
Pryce<br />
Liberty<br />
Acadian<br />
38th<br />
McHugh<br />
Baker Bentley<br />
Gibbens<br />
Hollywood<br />
St Louis<br />
Mae<br />
Devall<br />
Evangeline<br />
Mohican<br />
Winbourne<br />
Brady<br />
Hillcrest<br />
Sinbad<br />
Clark<br />
Chuck Yeager<br />
Monte Sano<br />
Cannon<br />
Eaton<br />
Odell<br />
Hollier<br />
Lower Zachary<br />
Rolling Acres<br />
Chipley<br />
Velie<br />
Park<br />
Ford<br />
Pettit<br />
Comite<br />
Sumrall<br />
Greenwell<br />
Frey<br />
Hope<br />
Devore<br />
Byron<br />
Celia<br />
St Ann<br />
Hanks<br />
Prescott<br />
Greenwell Springs<br />
Charlton<br />
Kent<br />
Stoneview<br />
Mable<br />
Laca<br />
Corlett<br />
Cyrus<br />
Foster<br />
Glen Oaks<br />
Rio<br />
Main<br />
Lobdell<br />
Hall<br />
North Ridge<br />
Caprice<br />
Angus<br />
Airline<br />
Dyer<br />
J Wicker<br />
Cline<br />
Mickens<br />
Lanier<br />
Cody<br />
Paris<br />
Tom<br />
Tucker<br />
Brown<br />
Carney<br />
Bliss<br />
Harry<br />
Legend<br />
Area Designated for<br />
Physical Inspection<br />
Phase I<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NFW-R-0001.MXD SGELPI 11/9/2010 10:05:21<br />
Area Designated for<br />
Physical Inspection<br />
Phase II<br />
0 1 2 Miles<br />
Oak Villa<br />
Airway<br />
Watson<br />
Vail<br />
Loudon<br />
Ardoon<br />
Buck Horn<br />
Shady Bluff<br />
Arleen<br />
Carmel<br />
El Scott<br />
Dancy<br />
Tracy<br />
Choctaw<br />
Ventura<br />
Pomona<br />
q<br />
Fawn<br />
Elain<br />
Darryl<br />
Tams<br />
Lovett<br />
Peairs<br />
Greenwell Spg Pt Hudson<br />
Old Settlement<br />
Smith<br />
Ida<br />
Red Oak<br />
Core<br />
Gurney<br />
Tallowwood<br />
Bramble<br />
Joor<br />
McCullough<br />
Haven<br />
Landfair<br />
Lassen<br />
Sherwood Forest<br />
Neff<br />
Shoe Creek<br />
Pecos<br />
Coral<br />
Joor<br />
Frontier<br />
Devall Hubbs<br />
Denham<br />
Hooper<br />
Catalina<br />
Warfield<br />
Triple B<br />
Cherryl<br />
Erin<br />
Ireland<br />
Florida<br />
Hubbs Acres<br />
Flannery<br />
Sullivan<br />
Pinewood<br />
Huntley<br />
Brent<br />
Trey<br />
Mapleton<br />
Locust<br />
Glenn<br />
Roundsaville<br />
Alamo<br />
Crystal<br />
Paint<br />
Florida<br />
Wax<br />
Pernecia<br />
Alford<br />
Chanove<br />
Choctaw<br />
Four Oaks<br />
Frenchtown<br />
Norway Pine<br />
Droze<br />
Bristle Cone<br />
Stevendale<br />
Lavell<br />
Fir<br />
Milldale<br />
Will<br />
Magnolia Bridge<br />
Blouin<br />
Gottlieb<br />
Morgan<br />
<strong>Plan</strong>chet<br />
Liberty<br />
Stubbs<br />
Alphonse Forbes<br />
Brookstown Rd. - Evangeline St.<br />
Phase I and II<br />
NFW-R-0001<br />
Project Vicinity Map<br />
Figure 5-7
Hiawatha<br />
Mengel<br />
Sanchez<br />
Goudchaux<br />
Kaufman<br />
74th<br />
Monte Sano<br />
Rawlins<br />
Somerset<br />
Gsu<br />
Midland<br />
Goode<br />
Bacon<br />
73rd<br />
71st<br />
69th<br />
Goudchaux<br />
Kaufman<br />
Laramie<br />
Rhoderick<br />
Mason<br />
Amarillo<br />
Alamoster<br />
Pembroke<br />
Pembroke<br />
Pembroke<br />
Greenwell<br />
Riley<br />
Kelvin<br />
Iberia<br />
Middlesex<br />
68th<br />
Ralph<br />
Lorraine<br />
74th<br />
Casper<br />
Comish<br />
Saurage<br />
Baton Rouge<br />
Comish<br />
Galvez<br />
Farrar<br />
73rd<br />
70th<br />
Bourgeois<br />
Shada<br />
Breckenridge<br />
Nottingham<br />
Beech<br />
Cambridge<br />
Kerr<br />
Douglas<br />
Alexander<br />
Village<br />
Bamboo<br />
Village<br />
Denham<br />
Douglas<br />
Beech<br />
I-110<br />
Longfellow<br />
Airline<br />
I- 110 Serice<br />
Greenwell<br />
Hollywood<br />
Riley<br />
Kelvin<br />
Henagen<br />
Henderson<br />
Hilltop<br />
Smiley<br />
72nd<br />
<strong>Plan</strong>k<br />
Lorraine<br />
Beech<br />
Byron<br />
Vaughn<br />
Evangeline<br />
Monte Sano<br />
Mason<br />
Harriet<br />
St Dorothy<br />
Cannon<br />
Denham<br />
Lakewood<br />
Wildwood<br />
Quivera<br />
Beachwood<br />
Gurney<br />
Dawson<br />
Lemonwood<br />
Dutton<br />
Greenwell<br />
St Katherine<br />
Lorraine<br />
Lemonwood<br />
St Gerard<br />
Sycamore<br />
Shelley<br />
Monarch<br />
Beechwood<br />
Beechwood<br />
Robertson<br />
Crown<br />
Sumrall<br />
Oaklan<br />
Glen Oaks<br />
Wood<br />
Hollywood<br />
Byron<br />
Foster<br />
Woodlawn<br />
Greenwell<br />
Onter<br />
Winchester<br />
Denham<br />
Lancaster<br />
Winchester<br />
Winchester<br />
Wildwood<br />
Powhatan<br />
Scenic<br />
Pocahontas<br />
Shelley<br />
Cable<br />
Sherwood<br />
Gordon<br />
Pontiac<br />
Nokomis<br />
Tuscarora<br />
Baton Rouge<br />
Tecumseh<br />
Uncas<br />
Sherman<br />
Osceola<br />
Cable<br />
Wenonah<br />
Pocasset<br />
Sherwood<br />
Alliquippa<br />
Geronimo<br />
Wyandotte<br />
Huron<br />
Topeka<br />
Navajo<br />
Keokuk<br />
Dayton<br />
Weller<br />
Weller<br />
Anna<br />
Calumet<br />
Huron<br />
Pluskat<br />
Pawtucket<br />
Pampas<br />
Calumet<br />
Ozark<br />
Midway<br />
Myrtlelawn<br />
Roppolo<br />
Linden<br />
Wyandotte<br />
Oswego<br />
Winnebago<br />
33rd<br />
Clayton<br />
Sherwood<br />
Accardo<br />
Wyandotte<br />
Lynn<br />
38th<br />
Maple<br />
Delaware<br />
Charles<br />
Oswego<br />
Ozark<br />
Winbourne<br />
Tunica<br />
Webb<br />
Prescott<br />
Mohican-Prescott Crossover<br />
Delaware<br />
Mohican<br />
Winnebago<br />
Wyandotte<br />
Cleo<br />
Wayne<br />
Yaun<br />
Eaton<br />
Charles<br />
Eaton<br />
Mission<br />
Beechwood<br />
Dayton<br />
Joseph<br />
Levera<br />
Hazelwood<br />
Fairwoods<br />
Bradley<br />
Jean<br />
Linden<br />
Eleanor<br />
Conrad<br />
Eleanor<br />
Wyandotte<br />
Bradley<br />
Elm<br />
Addison<br />
Bartlett<br />
East Baton Rouge Parish<br />
Legend<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\REHAB\NORTH\NFW-R-0002.MXD SGELPI 10/22/2009 08:13:14<br />
Area Designated for<br />
Physical Inspection<br />
0 1,000 2,000 Feet<br />
q<br />
Interstate 110 - Hollywood St.<br />
NFW-R-0002<br />
Project Vicinity Map<br />
Figure 5-8
F<br />
E<br />
Chinn<br />
Golden<br />
Alba<br />
Sunshine<br />
Foster<br />
Buckeye<br />
Lacey<br />
Lanier<br />
Old Scenic<br />
Dotson<br />
Cheatham<br />
McCastle<br />
Edgar<br />
Scenic<br />
Groom<br />
New Rafe Meyer<br />
Avenue M<br />
Avenue K<br />
Glynn<br />
Sapsucker<br />
I<br />
Avenue F<br />
Elmer<br />
K<br />
D<br />
St John<br />
Woodcock<br />
Woodpecker<br />
East Baton Rouge Parish<br />
Greely<br />
Dillard<br />
Kingfisher<br />
Mills<br />
H<br />
Farm<br />
Hovey<br />
Catherine<br />
Egret<br />
Merganzer<br />
Airline<br />
College<br />
Blount<br />
Almond<br />
Livestock<br />
Mengel<br />
Legend<br />
Magnolia<br />
Leisure<br />
Grebe<br />
Leland<br />
Ray Weiland<br />
Day<br />
Zerlee<br />
Central<br />
Oriole<br />
Stilt<br />
Swan<br />
Landry<br />
Center<br />
Robin<br />
Scotland<br />
Success<br />
King<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\REHAB\NORTH\NORTH MAPS\NFE-R-0001.MXD SGELPI 11/9/2010 10:08:46<br />
Curtis<br />
78th<br />
Cypress<br />
Main<br />
Rosenwald<br />
Thelma<br />
Sora<br />
South<br />
Elm Grove Garden<br />
74th<br />
Texas<br />
Camelia<br />
Cunard<br />
Snipe<br />
Kaufman<br />
Sanchez<br />
Parkway<br />
69th<br />
79th<br />
Mason<br />
Midland<br />
77th<br />
71st<br />
Alabama<br />
<strong>Plan</strong>tation<br />
Jones<br />
Allen<br />
68th<br />
Coolidge<br />
Wilbur<br />
Shada<br />
Grant<br />
Progress<br />
D<br />
Heath<br />
Kelvin<br />
Nichols<br />
75th<br />
70th<br />
Iberia<br />
Mc Vea<br />
Van Buren<br />
Hallmark<br />
Jefferson<br />
Daniels<br />
Epperson<br />
Veterans Memorial<br />
Jay<br />
Emile<br />
Monte Sano<br />
Area Designated for<br />
Physical Inspection<br />
0 0.5 1 Miles<br />
Gibbens<br />
73rd<br />
Alexander<br />
Galvez<br />
Emile<br />
Turnley<br />
Gore<br />
Village<br />
Liberty<br />
Ector<br />
I-110<br />
Hollywood<br />
q<br />
Yancy<br />
Debra<br />
Patricia<br />
Rabel<br />
Gibbens<br />
Jackie Cochran<br />
Lavey<br />
Baker<br />
Thomas<br />
Harding<br />
72nd<br />
Amarillo<br />
Riley<br />
Lorraine<br />
Husband<br />
Morvant<br />
McHugh<br />
Fourchon<br />
Algoa<br />
Ridgecrest<br />
Greenwell<br />
Devall<br />
Georgia<br />
Sherron<br />
Amerest<br />
Middlewood<br />
Sinbad<br />
Sandra<br />
Chuck Yeager<br />
Monte Sano<br />
Gurney<br />
Cannon<br />
Quivera<br />
Dutton<br />
St Gerard<br />
Engleswood<br />
Beech<br />
Shilo<br />
Shilo<br />
Lavey<br />
Arena<br />
Hollier<br />
Chemin<br />
O'Callagham<br />
Clark<br />
Robique<br />
Martin<br />
Cadillac<br />
Monarch<br />
Sumrall<br />
Ford<br />
Paige<br />
<strong>Plan</strong>k<br />
Glen Oaks<br />
Denham<br />
Sycamore<br />
Troy<br />
Troy<br />
Chipley<br />
Lancaster<br />
Holden<br />
Oak Bend<br />
Balm<br />
Bentley<br />
Stearns<br />
Greenwell<br />
Byron<br />
Hope<br />
Oaklan<br />
McClelland<br />
Comite<br />
Brownfields<br />
Guice<br />
Laredo<br />
San Juan<br />
Crown<br />
Myrtle<br />
Sharon Hills<br />
Kleinpeter<br />
Ellen<br />
Blue Grass<br />
Bank<br />
Lake Mary<br />
Furr<br />
Stoneview<br />
Guynell<br />
Junelise<br />
Byron<br />
Corlett<br />
Hooper<br />
St Pius<br />
Silverleaf<br />
Felicity<br />
Celia<br />
D'Juanna<br />
Grand<br />
Brookstown<br />
Roman<br />
St Ann<br />
Monarch<br />
Rio<br />
Ruston<br />
Colfax<br />
Kent<br />
Juno<br />
Jupiter<br />
Perimeter<br />
Myrtlewood<br />
Juniper<br />
Satinwood<br />
Winter<br />
Vineyard<br />
Landis<br />
Hall<br />
St Francis<br />
Flintwood<br />
Gov Nichols<br />
Belvin<br />
North Park<br />
Angles<br />
Oakside<br />
Matthews<br />
Pettit<br />
Foster<br />
Caprice<br />
Mickens<br />
Maplewood<br />
Astoria<br />
Sutton<br />
Atlanta<br />
Dalark<br />
Hanks<br />
Lazy Oaks<br />
Greencrest<br />
Gov Davis<br />
Davlin<br />
Tioga<br />
Pettit<br />
Silverleaf Rd. - Ford St.<br />
NFE-R-0001<br />
Project Vicinity Map<br />
Figure 5-9<br />
Ingram
SECTION 5. NORTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158552.DOCX/103470004 5-24 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
5.4 North Forced System Capacity Improvements Projects<br />
5.4.1 NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/ Project Background<br />
The purpose of the NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) project is<br />
to replace PS176 to alleviate SSOs at and near the pump station. The forcemains exiting PS<br />
176 and PS 284 will also be upsized. In addition, the future wet weather peak flow at PS 176<br />
is predicted by the BTRSSO model to be greater than the existing maximum capacity of the<br />
pump station.<br />
Location<br />
The location of PS 176 is described in Table 5-5 and shown along with the forcemain<br />
locations in Figure 5-10.<br />
Forcemain segment PS 176 to NS 6157 begins at PS 176, located on Tallowwood Avenue,<br />
between Pheasantwood Drive and Partridgewood Drive, travels north on Partridgewood<br />
Drive to Gurney Road, follows Gurney Road east, and terminates at node NS6157, near the<br />
intersection of Gurney Road with Sullivan Road.<br />
Gravity segment 176-00001 to PS 176 begins at manhole 176-00001, which is located near the<br />
pump station, which is on Tallowwood Avenue between Pheasantwood Drive and<br />
Partridgewood Drive, and travels to PS 176.<br />
Forcemain segment PS 284 to NS6156 begins at PS 284, located at the cul-de-sac on Fairmead<br />
Drive, travels down a servitude that parallels to the north of Arrowood Avenue, proceeds<br />
up Joor Road and terminates at node NS 6156, which is located at the intersection of Joor<br />
Road and Gurney Road.<br />
Scope<br />
This project includes replacement of one pump station as well as approximately 14,500 feet<br />
of 8-inch, 10-inch, 12-inch, and 14-inch forcemain and approximately 100 feet of 15-inch<br />
gravity sewer. Tables 5-5 and 5-6 show the detailed scope of the project.<br />
TABLE 5-5<br />
NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak<br />
Wet Weather<br />
Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comment<br />
s<br />
PS 176 Tallowwood Ave, between the<br />
417 1,187 79<br />
intersection of Pheasantwood<br />
Drive and Patridgewood Drive<br />
Note: The existing maximum capacity for the pump station was obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
GNV31031158552.DOCX/103470004 5-25 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-6<br />
NFE-C-0001 (Gurney Road – Joor Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
PS 176 NS6172 1,800 6 10<br />
NS6172 NS6158 75 8 10<br />
NS6158 NS6156 3,400 10 12<br />
NS6156 NS6157 2,500 10 14<br />
176-00001 PS176 100 8 15 Gravity segment<br />
PS 284 NS6156 6,700 6 8<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Bid Amount is $1,550,000.<br />
Design was appropriated in 2007.<br />
Scheduled Construction Appropriation Year was 2008.<br />
Construction was Functionally Completed in 4 th Quarter 2009.<br />
GNV31031158552.DOCX/103470004 5-26 JANUARY 2011<br />
REV. 5
Wild Rose<br />
Core<br />
Blackwater<br />
Welcome Heights<br />
Dorset<br />
York<br />
Virgil Jackson<br />
#<br />
PS125<br />
Joor<br />
Centerra<br />
Gurney<br />
NS6158<br />
!R<br />
!R<br />
NS6156<br />
!R<br />
NS6157<br />
Ouachita<br />
Sullivan<br />
Pheasantwood<br />
BPS501<br />
#!R<br />
NS6172<br />
Candletree<br />
#I<br />
!R PS176 PS176<br />
!R # 176-00001<br />
!R #<br />
PS176<br />
Ribbonwood<br />
Tallowwood<br />
Lancewood<br />
Willowmore<br />
PS284<br />
PS284<br />
Milstead<br />
Arrowood<br />
Wickwood<br />
Morganfield<br />
Morgan Hill<br />
#<br />
Shoe Creek<br />
Glen Watts<br />
Ida<br />
PS406<br />
#<br />
Stoneway<br />
PS103<br />
#<br />
#<br />
#<br />
PS86<br />
Hooper<br />
East Baton Rouge Parish<br />
Gate Way<br />
Morgan Meadow<br />
Legend<br />
Proposed<br />
Existing<br />
Gurney Rd. Sewer Area Upgrades<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NFE-C-0001<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-10<br />
0 1,000<br />
2,000<br />
Feet<br />
Sagefield<br />
#<br />
PS230<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\NORTH\NFE-C-0001.MXD GBOQUIN 10/25/2009 14:23:14
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.2 NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The purpose of NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades)<br />
project is to replace PS 230, PS 282, and PS 187 to alleviate SSOs at and near the pump stations.<br />
This project also includes the upsizing of the forcemains from the three (3) pump stations as<br />
well as the gravity sewer that feeds PS 230. This project was originally designated as the NFE-<br />
C-0002 (Multiple Pump Stations – Lovett Road Area) project in the October 2008 PDP.<br />
Location<br />
The locations of the pump stations is described in Table 5-7 and shown along with the<br />
forcemain locations in Figure 5-11.<br />
Gravity segment 230-00009 to PS 230 begins at manhole 230-00009, which is located near the<br />
intersection of Stoneway Place and Shoe Creek Drive, and travels south along Shoe Creek<br />
Drive to Morgan Meadow Avenue, where it then parallels Morgan Meadow Avenue in a<br />
westerly direction to PS 230, which is located on Morgan Meadow Avenue in between its<br />
intersection with Shoe Creek Drive and Sagefield Drive.<br />
Forcemain segment PS 230 to 230-00015 begins at PS 230, describe above, and follows<br />
Morgan Meadow Avenue in a westerly direction to its intersection with Sagefield Drive,<br />
where it then parallels Sagefield Drive in a southerly direction to its termination point at<br />
manhole 230-00015, which is located on Sagefield Drive, approximately halfway in between<br />
Morgan Meadow Avenue and Conwood Avenue.<br />
Forcemain segment PS 187 to NS6402 begins at PS 187, located near the intersection of Clear<br />
Oak Avenue and Oak Meadow Drive, goes east down Clear Oak Avenue then turns north<br />
on Woods Edge Drive and terminates at node NS6402, located near the intersection of<br />
Woods Edge Drive and Sullivan Road.<br />
Forcemain segment PS 282 to NS6305 begins at PS 282, located at the end of Regent Avenue<br />
near the intersection of Regent Avenue and Trendale Drive, goes west through a wooded<br />
area crossing Beaver Bayou, and connects to the existing forcemain.<br />
Scope<br />
The scope of this project includes three pump station replacements, approximately 4,200 feet<br />
of 6-inch and 8-inch forcemain, and approximately 2,100 feet of 12-inch gravity sewer. The<br />
detailed scope is shown in Tables 5-7 and 5-8.<br />
TABLE 5-7<br />
NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road Sewer Area Upgrades) - Pump Station Information<br />
Existing Max Future Peak Wet Dry<br />
Capacity Weather Flow Weather<br />
(GPM) (GPM) (GPM)<br />
PS No.<br />
PS 230<br />
PS 282<br />
PS 187<br />
Location<br />
Morgan Meadow Ave, near the<br />
intersection of Shoe Creek Drive<br />
Regent Ave, near the intersection<br />
of Trendale Drive<br />
Clear Oak Ave, near the<br />
intersection of Oak Meadow Drive<br />
417 1,229 146<br />
127 924 42<br />
139 382 87<br />
Comments<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
GNV31031158552.DOCX/103470004 5-28 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-8<br />
NFE-C-0002 (Sullivan Road/Lovett Road/Wax Road) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
230-00009 PS230 2,100 8 12 Gravity segment<br />
PS230 230-00015 1,200 6 8<br />
PS187 NS6402 1,100 4 6<br />
PS282 NS6305 1,900 4 8<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Bid Amount is $2,200,000.<br />
Design was appropriated in 2007.<br />
Construction Appropriation Year was 2008.<br />
Construction is On-Going.<br />
GNV31031158552.DOCX/103470004 5-29 JANUARY 2011<br />
REV. 5
Sullivan<br />
Shoe Creek<br />
Lazy Lake<br />
Hooper<br />
Bon Dickey<br />
Stoneway<br />
!R<br />
230-00009<br />
#<br />
PS103<br />
#<br />
PS167<br />
Rifle<br />
Marlin<br />
Huntley<br />
Central Woods<br />
Forestgrove<br />
#<br />
PS271<br />
Magnolia Blossom<br />
Central Pine<br />
Wax<br />
Sagefield<br />
!R<br />
#I<br />
PS230<br />
!R #<br />
PS230<br />
PS230<br />
PS230DS<br />
Lawndale<br />
Brent<br />
Republic<br />
Ridgeside<br />
Jenson<br />
Roanoke<br />
Brookside<br />
#<br />
BPS601<br />
Brookside<br />
Cloudland<br />
Banway<br />
Trendale<br />
#<br />
PS231<br />
Leeanne<br />
Sully<br />
Sparkle<br />
NS6305<br />
!R<br />
#I<br />
PS282<br />
!R #<br />
PS282<br />
PS282<br />
##<br />
PS510AA<br />
Lovett<br />
Summers<br />
#<br />
PS450<br />
Washington<br />
#<br />
Frontier<br />
Prairie<br />
!R<br />
#I !R #<br />
PS187<br />
PS187<br />
NS6402<br />
PS187<br />
Woodsedge<br />
Woodlett<br />
Trey<br />
BPS510<br />
Brett<br />
#<br />
Greenwell Springs<br />
Alford<br />
Shady Park<br />
Greenmeadow<br />
Lariat<br />
Kohler<br />
Chaparral<br />
#<br />
East Baton Rouge Parish<br />
Triple B<br />
PS113<br />
#<br />
Legend<br />
Sullivan Rd. /Lovett Rd. /Wax Rd.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Sewer Area Upgrades<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
NFE-C-0002<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-11<br />
Triple B<br />
0 1,500<br />
3,000<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\NORTH\NF E-C-0002_mpj120610
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.3 NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades - Phase I)<br />
Project Description<br />
Purpose of the Project/Project Background<br />
The purpose of the NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades - Phase<br />
I) project is to replace PS 291, PS 246, and PS 94 to alleviate SSOs at and near the PS. The<br />
forcemains exiting these pump stations will also be upsized. In addition, the future peak wet<br />
weather flow at the pump stations is predicted by the BTRSSO model to exceed the existing<br />
maximum capacity.<br />
Location<br />
The locations of the pump stations is given in Table 5-9 and shown along with the forcemain<br />
locations in Figure 5-12.<br />
Forcemain segment PS 291 to NS6393 begins at PS 291R, located on Comite Rd 953’ north of<br />
Misty Oaks, and goes South 953’ to Misty Oaks; then East on Misty Oaks Avenue to Lazy<br />
Oak Drive, where it then follows Laky Oak Drive south to its cul-de-sac, and then continues<br />
south over-land to node NS6393, which is located just downstream of PS 246, located near<br />
the intersection of Green Gate Drive and Holly Fern Avenue.<br />
Forcemain segment NS6193 to NS6251 begins at node NS6193, located near the intersection<br />
of Green Gate Drive and Holly Fern Avenue, runs southeast along Green Gate Drive to<br />
Foster Road, where it then follows Foster Road south to its termination at node NS6251,<br />
located at the intersection of North Park Ave and Foster Road.<br />
Forcemain segment PS 94 to NS6193 begins at PS 94, located at the westerly cul-de-sac on<br />
Anderson Drive and proceeds aligning Anderson to the easterly cul-de-sac, then runs<br />
northerly overland to node NS6193.<br />
Scope<br />
This project includes the replacement of three pump stations and the upsizing of<br />
approximately 12,000 feet of 6-inch and 8-inch forcemain. The detailed scope of the project is<br />
presented in Tables 5-9 and 5-10.<br />
TABLE 5-9<br />
NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comments<br />
PS 291<br />
PS 246<br />
PS 94<br />
Misty Oaks Ave, near the<br />
intersection of Lazy Oak<br />
Drive<br />
Holly Fern Ave, near the<br />
intersection of Green Gate<br />
Drive<br />
Fieldcrest Dr. near the<br />
intersection of Meadow Ave<br />
69 208 92<br />
69 278 21<br />
278 764 62<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
GNV31031158552.DOCX/103470004 5-31 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-10<br />
NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) – Pipeline Information<br />
US<br />
Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
PS291 NS6193 3,340 4 8 New routing of existing<br />
FM to PS 246<br />
NS6193 NS6251 5,600 4 10<br />
PS94 NS6193 3,140 6 8<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Bid Amount is $1,925,000.<br />
Design was appropriated in 2007.<br />
Construction Appropriation Year was 2008.<br />
Construction was Functionally Completed 2 nd Quarter 2010.<br />
GNV31031158552.DOCX/103470004 5-32 JANUARY 2011<br />
REV. 5
Comite<br />
#I<br />
!R #<br />
PS291<br />
Misty Oaks<br />
Whispering Oaks<br />
Comite<br />
PS291<br />
Lazy Oaks<br />
Cline<br />
Celia<br />
Sleepy Oaks<br />
Holly Fern<br />
St Francis<br />
Barbara Cohn<br />
Green Gate<br />
Oak Fern<br />
#I<br />
!R #<br />
NS6193<br />
PS246<br />
St Mary<br />
St Ann<br />
Anderson<br />
Northampton<br />
Timberlane<br />
North Park<br />
North Ridge<br />
Greencrest<br />
Meadow<br />
Fieldcrest<br />
#I<br />
!R #<br />
PS94<br />
PS94<br />
#<br />
PS150<br />
Northdale<br />
Willowood<br />
Banbury<br />
Foster<br />
Tidecrest<br />
Dawncrest<br />
Malcolm<br />
Price<br />
NS6251<br />
!R<br />
Windcrest<br />
East Baton Rouge Parish<br />
Legend<br />
Comite Dr. - Foster Rd.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Sewer Area Upgrades Phase I<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
NFE-C-0003<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-12<br />
0 1,000<br />
2,000<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFE-C-0003.MXD SGELPI 11/9/2010 09:48:51
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.4 NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The purpose of Project NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) is to<br />
increase the capacity of the STN forcemain system and the manifold forcemains along Foster<br />
Road and Hooper Road to assist in transferring high flows to the main STN forcemain along<br />
Hooper Road.<br />
Location<br />
The location of the forcemains in this project are shown in Figure 5-13.<br />
Forcemain segment PS 255 to NS6289 begins at PS 255, which is located at the end of the culde-sac<br />
at Loch Fyne Avenue, and goes east on Loch Fyne Avenue to Ardoon Drive, turns<br />
north/northwest on Ardoon Drive to Monhegan Avenue, turns northeast on Monhegan<br />
Avenue to Blackwater Road, turns south onto Blackwater Road and terminates at node<br />
NS6289, located at the intersection of Blackwater Road and Hooper Road.<br />
Forcemain segment PS 196 to NS 6281 begins at PS 196, which is located near the intersection<br />
of Shady Bluff Drive and Shady Knoll Place, and goes north along Shady Bluff Drive to node<br />
NS 6281, which is located at the intersection of Shady Bluff Dive and Hooper Road.<br />
Forcemain segment BPS 509 to NS 6247 begins at BPS 509, located near the intersection of Hooper<br />
Road and Lazy Lake Drive, and follows Hooper Road southwest until it reaches node NS 6247,<br />
located approximately 600 feet east of the intersection of Hooper Road and Lovett Road.<br />
Forcemain segment BPS 511 to NS6334 starts at BPS 511, located in between Hooper Road and<br />
Blackwater Road, and travels west along Hooper Road to node NS 6334, located near the<br />
intersection of Hooper Road and Foster Road.<br />
Forcemain segment NS6306 to NS6334 starts at node NS 6306, located on Foster Road south of<br />
its intersection with Summer Place Avenue and goes south along Foster Road to node NS6334,<br />
located near the intersection of Hooper Road and Foster Road.<br />
Scope<br />
This project includes the construction of approximately 26,000 feet of 6-inch, 8-inch, 14-inch,<br />
24-inch, and 36-inch forcemain in the North Forced Basin. The detailed scope of this project is<br />
presented in Table 5-11.<br />
TABLE 5-11<br />
NFE-C-0004 (Foster Road – Hooper Road Sewer Area Upgrades) – Pipeline Information<br />
US Node DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter (in)<br />
Proposed<br />
Diameter (in) Comments<br />
PS 255 NS6289 7,600 6 8<br />
PS 196 NS6281 5,200 4 6<br />
BPS 509 NS6247 6,500 20 24<br />
BPS 511 NS6326 2,700 24 36<br />
NS6326 NS6334 3,000 30 36<br />
NS6306 NS6334 1,200 12 14<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Bid Amount is $8,762,000.<br />
Design was appropriated in 2007.<br />
Construction Appropriation Year was 2008.<br />
Construction is On-Going.<br />
GNV31031158552.DOCX/103470004 5-34 JANUARY 2011<br />
REV. 5
Brown<br />
Acres<br />
Devall<br />
#<br />
Hubbs<br />
Pettit<br />
Core<br />
Northeast<br />
#<br />
Denham<br />
PS263<br />
#<br />
PS198<br />
Crystal<br />
#<br />
# #<br />
PS192<br />
PS155<br />
PS265<br />
#<br />
#<br />
Foster<br />
#<br />
# # #<br />
BPS509 PS509 #<br />
PS246<br />
!R #<br />
#<br />
PS94<br />
PS255<br />
!R #<br />
NS6289<br />
NS6306<br />
# !R # NS6326<br />
!R<br />
PS313#<br />
!R !R #<br />
!R<br />
PS511<br />
NS6334<br />
Carlene<br />
PS291<br />
Greencrest<br />
Fieldcrest<br />
Cline<br />
Hickcock<br />
#<br />
PS130<br />
Carney<br />
Comite<br />
Loudon<br />
Blackwater<br />
Monhegan<br />
PS196<br />
PS144<br />
!R<br />
Big Sur<br />
Santa Monica<br />
#<br />
PS196<br />
!R #<br />
Pheasantwood<br />
NS6247 #<br />
!R<br />
NS6281<br />
PS69<br />
#<br />
Gurney<br />
BPS501<br />
PS418<br />
#<br />
PS125<br />
#<br />
Glen Watts<br />
Joor<br />
Lovett<br />
PS284<br />
Pecos<br />
#<br />
#<br />
Sagefield<br />
PS152<br />
#<br />
PS202<br />
Hooper<br />
Shoe Creek<br />
#<br />
#<br />
#<br />
PS231<br />
Prairie<br />
Sullivan<br />
PS230<br />
PS510AA<br />
Dorset<br />
PS103<br />
#<br />
#<br />
PS187<br />
PS234<br />
#<br />
#<br />
PS167<br />
Reed<br />
#<br />
Huntley<br />
Sully<br />
PS72<br />
Roundsaville<br />
Sage<br />
Brent<br />
#<br />
#<br />
NS6268a<br />
PS282<br />
!R !R #<br />
NS6305<br />
#<br />
#<br />
PS233<br />
Republic<br />
Summers<br />
Brett<br />
PS271<br />
Brookside<br />
PS450<br />
BPS510<br />
Paint<br />
Bridlewood<br />
Wax<br />
Alford<br />
#<br />
Frontier<br />
#<br />
# #<br />
#<br />
Hanks<br />
Dalark<br />
PS39<br />
#<br />
Lanier<br />
Wright<br />
PS277<br />
Greenwell<br />
#<br />
Dickens<br />
PS11<br />
East Baton Rouge Parish<br />
Mickens<br />
#<br />
Prescott<br />
PS453<br />
PS116<br />
Ridgewood<br />
#<br />
PS288<br />
Suncrest<br />
#<br />
PS195<br />
Lariat<br />
PS138<br />
#<br />
Triple B<br />
Langer<br />
PS113<br />
#<br />
Greenwell Springs<br />
Cherryl<br />
#<br />
PS121<br />
PS1006<br />
#<br />
#<br />
PS121 #<br />
PS197<br />
#<br />
#<br />
BPS503 # PS454<br />
PS207<br />
# #<br />
#<br />
# # # #<br />
Legend<br />
Foster Rd. - Hooper Rd.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Sewer Area Upgrades<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
New Gravity Main<br />
NFE-C-0004<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-13<br />
0 0.5 1<br />
Miles<br />
Bayonne<br />
Chanove<br />
#<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES2010\CAPACITY\NORTH\NFE-C-0004_mpj120610
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.5 NFE-C-0005 (Hooper Road Pump Station Improvements)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
This project NFE-C-0005 (Hooper Road Pump Station Improvements) project is a combination<br />
of NFE-C-0005 (Multiple PS – Hooper Road- Greenwell Springs Road) and NFE-C-0007<br />
(Multiple BPS - Hooper Road - Lovett Road) from the October 2008 PDP. The combined<br />
project has been designated NFE-C-0005 (Hooper Road Pump Station Improvements) project<br />
and is described in this section. The purpose of the NFE-C-0005 (Hooper Road Pump Station<br />
Improvements) project is the following:<br />
Replace PS 113, PS 313, PS 144, PS 86, PS 234, PS 218, PS 271, PS 249, PS 164, PS 285, PS 196,<br />
PS 231, PS 207, BPS 509, BPS 510 and BPS 511 to alleviate SSOs. BPS 510 will be replaced<br />
with a new PS 510AA, located downstream of the existing BPS 510. The three in-line booster<br />
pump stations being replaced in this project will be replaced with wet well pump stations.<br />
Location<br />
The locations of the pump stations are described in Table 5-12 and shown in Figure 5-14. PS<br />
510AA will replace the existing BPS 510, which is currently located at the end of Lovett<br />
Road east of Sullivan Road. The exact location of PS 510AA has not yet been determined.<br />
Scope<br />
The detailed scope of this project is given in Table 5-12.<br />
TABLE 5-12<br />
NFE-C-0005 (Hooper Road Pump Station Improvements) – Pump Station Information<br />
Existing Max<br />
Capacity<br />
PS No.<br />
Location<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS 313 Summer Place Avenue off Foster Road 58 109 4<br />
PS 144 La Jolla Court off Carmel Drive 440 601 104<br />
PS 86 Hooper Road between Lovett Road and Allena Drive 337 544 112<br />
PS 234 Dorset Avenue off Farnham Avenue 101 489 65<br />
PS 218 Weyanoke Drive off Solitude Lane 221 424 53<br />
PS 271 Central Place Drive off Central Woods Avenue 244 482 129<br />
PS 249 Durmast Drive off Way Road 612 1,124 247<br />
PS 164 Stoneridge Drive off Donnybrook Avenue 261 685 88<br />
PS 285 Bristle Cone Court off Evergreen Hills Avenue 84 399 52<br />
PS 196 Shady Bluff Drive off Hooper Road 115 409 56<br />
PS 231 Shoe Creek Drive off Morgan Creek Avenue 240 1,596 222<br />
PS 207 Red Maple Drive off West Post Oak Court 101 394 136<br />
PS 509 Hooper Road between Sullivan Road and Lazy Lake Drive 2,424 7,592 951<br />
PS 511 Hooper Road between Hickcock Drive and Blackwater Road 1,781 20,404 2,970<br />
PS 510AA To be determined 5,326 8,106 1,194<br />
PS 113 13308 Triple B. Rd. Hgts. 190 596 42<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $11,900,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2011.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-36 JANUARY 2011<br />
REV. 5
Maribel<br />
Lanier<br />
Charlton<br />
Oak Villa<br />
Brown<br />
Blackwater<br />
Acres<br />
Devall<br />
Hubbs<br />
Rolling Acres<br />
BPS513<br />
#<br />
Bentley<br />
#<br />
#<br />
# #<br />
#<br />
PS129<br />
<strong>Plan</strong>k<br />
Dyer<br />
PS312<br />
PS141<br />
PS318<br />
#<br />
PS125<br />
#<br />
#I<br />
# PS218 #<br />
#<br />
#I<br />
#<br />
#<br />
#<br />
#<br />
PS234<br />
# #<br />
PS72<br />
#<br />
#<br />
#<br />
# # # #<br />
#I<br />
PS233<br />
PS509 #<br />
PS246<br />
#<br />
PS325<br />
PS176 PS284<br />
# #<br />
#<br />
#<br />
#<br />
##<br />
# #<br />
#<br />
#I #I #I #I<br />
PS79<br />
PS249<br />
# PS86 PS103<br />
PS144<br />
PS150<br />
#<br />
#<br />
#<br />
PS313<br />
#<br />
#<br />
# # # #I<br />
PS271<br />
#I<br />
PS255<br />
# PS231<br />
PS432<br />
#I<br />
# PS282<br />
# # PS511<br />
# # #<br />
#I<br />
#<br />
#<br />
#<br />
#<br />
PS130<br />
#I<br />
PS418<br />
#<br />
#<br />
# #<br />
PS280<br />
#<br />
##<br />
PS272<br />
PS510AA #<br />
PS202<br />
PS196<br />
#I<br />
# # #<br />
#<br />
# # #<br />
#I#I<br />
PS164<br />
#<br />
PS453<br />
PS138<br />
#<br />
## # # # #<br />
PS195<br />
PS277<br />
#<br />
PS113<br />
#<br />
PS288<br />
# PS285<br />
#<br />
#<br />
#<br />
# # PS160<br />
PS116<br />
#<br />
#I<br />
PS11<br />
#<br />
PS121 #<br />
BPS503<br />
# #<br />
# #<br />
##<br />
# # # #<br />
PS55<br />
PS281<br />
#<br />
PS207<br />
#<br />
#<br />
PS334<br />
# #<br />
# PS289<br />
# PS16 PS359<br />
#<br />
#<br />
#<br />
#<br />
PS314<br />
PS169 PS295 PS41<br />
# #<br />
#<br />
#<br />
#<br />
# #<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
# #<br />
#<br />
Legend<br />
Proposed<br />
Existing<br />
Hooper Rd. PS Projects<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NFE-C-0005<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 2-1<br />
Comite<br />
Brownfields<br />
Victoria<br />
Landis<br />
Lobdell<br />
Foster<br />
Pettit<br />
Choctaw<br />
Airline<br />
East Baton Rouge Parish<br />
Dickens<br />
Cline<br />
Mickens<br />
Greenwell<br />
Ski Stone<br />
Bliss<br />
Prescott<br />
Airway<br />
Loudon<br />
Carney<br />
Gurney<br />
Joor<br />
Dual<br />
McCullough<br />
Core<br />
Lovett<br />
Richcroft<br />
0 1<br />
2<br />
Miles<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFE-C-0005.MXD SGELPI 11/9/2010 09:47:55<br />
BPS500<br />
Denham<br />
Flannery<br />
Sullivan<br />
Pinewood<br />
PS192<br />
Sage<br />
Brett<br />
Choctaw<br />
Florida<br />
PS155<br />
#<br />
PS93<br />
#<br />
PS265<br />
Paint<br />
Four Oaks<br />
Alford<br />
BPS504<br />
#<br />
Hooper<br />
Droze<br />
Lavell<br />
Liberty<br />
Blouin<br />
#<br />
PS443<br />
Will<br />
Wax<br />
<strong>Plan</strong>chet<br />
Frenchtown<br />
Morgan
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.6 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project / Background Information<br />
The purpose of the NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area<br />
Upgrades) project is to increase the capacity of the forcemain system in the North East<br />
Forcemain Basin to assist in transferring peak flows to the main STN sewer along Hooper<br />
Road and to increase the capacity of the gravity sewer systems upstream of PS 155, PS 195,<br />
PS 200, and PS 231. The gravity sewer and forcemain upgrades will work to alleviate chronic<br />
SSOs at the upstream or downstream locations of PS 69, 106, 113, 152, 155, 160, 164, 181, 195,<br />
200, 207, 231, 233 234, 249, 285, and 510.<br />
Location<br />
The gravity sewers and forcemains in this project are shown in Figure 5-15.<br />
Gravity segment 155-00037 to PS 155 begins at manhole 155-00037, located near the<br />
intersection of Crystal Drive and Libra Avenue and heads north along Crystal Drive to its<br />
termination point at PS 155, located near the intersection of Crystal Drive and Taurus<br />
Avenue.<br />
Gravity segment 195-00004 to PS 195 begins at manhole 195-00004, located east of the<br />
intersection of Suncrest Avenue and Bretshire Drive, and heads generally east through a<br />
servitude in a forested area to PS 195, which is located just south of the south end of<br />
Stoneshire Drive.<br />
Gravity segment 200-00011 to PS 200 starts at manhole 200-00011, located east of the<br />
intersection of Keystone Avenue and Bridgeport Drive, and heads east along Keystone<br />
Avenue to PS 200, located on Keystone Avenue, in between Teah Drive and Tarrora Drive.<br />
Gravity segment 231-00015 to PS 231 begins at manhole 231-00015, located on Sagefield<br />
Drive, in between Cornwood Avenue and Morgan Meadow Avenue, and heads south along<br />
Sagefield Drive to PS 231, located near the intersection of Sagefield Avenue and Cornwood<br />
Avenue.<br />
Forcemain segment PS 181 to NS6088 starts at PS 181, located off of Pinewood Drive, in<br />
between Arceneaux Avenue and Denham Avenue, and follows the access road from the<br />
pump station to Pinewood Drive, and then follows Pinewood Drive south to node NS6088,<br />
located near the intersection of Pinewood Drive and Denham Avenue.<br />
Forcemain segment PS 155 to NS6103 begins at PS 155, located near the intersection of<br />
Crystal Drive and Taurus Avenue, and follows Taurus Avenue west to node NS6103,<br />
located near the intersection of Taurus Avenue and West Beaver Drive.<br />
Forcemain segment PS 106 to NS6128 begins at PS 106, located near the intersection of<br />
Palomino Drive and Paint Avenue, heads north along Palomino Drive, turns west on<br />
Shetland Avenue, and terminates at node NS6128, which is located in an open area, just<br />
south of the intersection of Libra Avenue and Crystal Drive.<br />
Forcemain segment PS 233 to NS6189 begins at PS 233, located at the south end of Sage<br />
Drive, heads north along Sage Drive and Cimmaron Drive, turns southwest at Hooper<br />
Road, and terminates at node NS6189, located at the intersection of Hooper Road and<br />
Sullivan Road.<br />
GNV31031158552.DOCX/103470004 5-38 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
Forcemain segment PS 234 to NS 6189 starts at PS 234, located at the intersection of Dorset<br />
Avenue and York Road, heads west on Dorset Avenue, turns southeast on Sullivan Road,<br />
and terminates at node NS6189, located at the intersection of Hooper Road and Sullivan<br />
Road.<br />
Forcemain segment PS 249 to NS 6239 starts at PS 249, located near the intersection of<br />
Durmast Drive and Roble Avenue, heads south along Durmast Drive, turns west on Wax<br />
Road, and terminates at node NS6239, located near the intersection of Wax Road and<br />
Brookside Road.<br />
Forcemain segment NS 6268A to NS 6393 begins at new node NS 6268A, located just<br />
southwest of the intersection of Regent Avenue and Overwood Drive, and follows a<br />
drainage path roughly south to node NS6393, located on Greenwell Springs Road, in<br />
between Greenmeadow Drive and Sullivan Road.<br />
Forcemain segment PS 200 to NS 6391 starts at PS 200, located on Keystone Avenue, in<br />
between Teah Drive and Tarrora Drive, follows Gottlieb Road and a drainage path generally<br />
northwest, turns southwest on Greenwell Springs Road, and follows Greenwell Springs<br />
Road to NS6391, located on Greenwell Springs Road in between Greenmeadow Drive and<br />
Sullivan Road.<br />
Forcemain segment PS 285 to NS 6406 begins at PS 285, located on Bristlecone Court, just<br />
north of its intersection with Evergreen Hills Avenue, and follows a servitude to the<br />
northwest to PS 164, located at the eastern end of Stoneridge Drive. From PS 164, the<br />
forcemain follows Stoneridge Drive west, turns north at Donnybrook Avenue, and<br />
terminates at node NS6406, located near the intersection of Donnybrook Avenue and<br />
Greenwell Springs Road.<br />
Forcemain segment PS 113 to NS 6431 starts at PS 113, located near the intersection of Triple<br />
B Road and Chapparal Place, heads east along Triple B Road, and terminates at node<br />
NS6431, located near the intersection of Triple B Road and Sullivan Road.<br />
Forcemain segment PS 160 to NS 6419, begins at PS 160, located near the intersection of<br />
Chambord Drive and Chaumont Avenue, heads southwest along Chaumont Avenue, turns<br />
northwest on Frenchtown Road, turns northeast on Greenwell Springs Road, and follows<br />
Greenwell Springs Road to node NS6419, located near the drainage path that is in between<br />
Sullivan Road and Greenmeadow Drive.<br />
Forcemain segment PS 207 to NS 6489 begins at PS 207, located near the intersection of Red<br />
Maple Place and Post Oak Court, heads north along Post Oak Court, turn east on Country<br />
Road, turns northwest on Frenchtown Road, and terminates at node NS 6489, located near<br />
the intersection of Frenchtown Road and Chaumont Road.<br />
Forcemain segment PS 152 to NS 6377 starts at PS 152, located just southwest of the<br />
intersection of Pecos Avenue and Prairie Drive, heads east to Prairie Drive, turns north on<br />
Prairie Drive, and terminates at node NS 6377, located near the intersection of Prairie Drive<br />
and Lovett Road.<br />
Forcemain segment PS 231 to NS 6328 begins at PS 231, located near the intersection of<br />
Sagefield Avenue and Cornwood Avenue, heads south through a wooded area, and<br />
terminates at node NS 6328, located on Lovett Road, approximately 3,500 feet east of its<br />
intersection with Joor Road. Forcemain segment PS 195 to NS 6308 begins at PS 195, located<br />
GNV31031158552.DOCX/103470004 5-39 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
just south of the south end of Stoneshire Drive, goes north along Stoneshire Road, turns<br />
west on Landfair Road, turns north on Burtcliff Drive, turns west on Tynwood Avenue,<br />
turns north on Joor Road, and terminates at node NS 6308, located at the intersection of Joor<br />
Road and Lovett Road.<br />
Forcemain segment PS 69 to NS 6257 starts at PS 69, located in between the eastern ends of<br />
Tanglewood Drive and Rustling Oaks Drive, heads north on Tanglewood Road, and<br />
terminates at node NS 6257, located near the intersection of Tanglewood Drive and Lovett<br />
Road.<br />
Forcemain segment BPS 510 to NS 6252 begins at BPS 510, which will be abandoned as part<br />
of project NFE-C-0005 (Hooper Road Pump Station Projects), located near the intersection of<br />
Sullivan Road and Lovett Road. From BPS 510, the forcemain follows Lovett Road west and<br />
north to node NS 6252, located near the intersection of Lovett Road and Hooper Road.<br />
Scope<br />
This project includes construction of approximately 5,200 feet of 10-inch, 12-inch, and 15-<br />
inch gravity sewer upstream of PS 155, PS 195, PS 200, and PS 231. This project also includes<br />
construction of approximately 115,000 feet of 6-inch, 8-inch, 10-inch, 12-inch, 14-inch, 16-<br />
inch, 18-inch, 24-inch, and 30-inch forcemain in the North Forced East Basin. The detailed<br />
scope of the project is shown in Table 5-13.<br />
TABLE 5-13<br />
NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
155-00037 155-00031 710 8 10 Gravity segment<br />
155-00031 155-00013 1,230 8 12 Gravity segment<br />
155-00013 PS155 420 10 15 Gravity segment<br />
195-00004 PS 195 940 8 12 Gravity segment<br />
200-00011 PS 200 370 8 12 Gravity segment<br />
231-00015 231-00013 500 8 12 Gravity segment<br />
231-00013 PS 231 1,040 8 15 Gravity segment<br />
PS181 NS6088 1,840 6 10<br />
PS155 NS6103 1,900 8 10<br />
PS106 NS6134 2,460 6 10<br />
NS6134 NS6128 3,100 8 10<br />
PS233 NS6165 2,060 4 6<br />
NS6165 NS6183 3,000 18 24<br />
NS6183 NS6189 1,450 18 24<br />
PS234 NS6150 3,400 4 8<br />
NS6150 NS6157 2,320 10 16<br />
NS6157 NS6189 3,040 14 24<br />
PS249 NS6239 9,100 8 10<br />
NS6268A NS6393 4,410 12 16<br />
GNV31031158552.DOCX/103470004 5-40 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-13<br />
NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
PS200 NS6404 4,260 8 10<br />
NS6404 NS6395 970 8 10<br />
NS6395 NS6406 3,600 10 12<br />
NS6406 NS6419 5,950 12 16<br />
NS6419 NS6393 1,750 14 18<br />
NS6393 NS6391 380 18 30<br />
PS285 PS164 1,300 6 8<br />
PS164 NS6406 3,960 6 8<br />
PS113 NS6419 3,170 6 8<br />
NS6419 NS6431 2,680 12 14<br />
PS160 NS6489 2,510 6 10<br />
NS6489 NS6472 2,540 8 12<br />
NS6472 NS6419 6,110 10 14<br />
PS207 NS6489 1,600 4 6<br />
PS152 NS6381 500 4 6<br />
NS6381 NS6377 500 4 6<br />
PS231 NS6328 1,720 6 12<br />
PS195 NS6575 7,840 8 14<br />
NS6575 NS6308 2,920 8 14<br />
PS69 NS6257 1,510 6 8<br />
PS510 NS6402 4,280 10 30<br />
NS6402 NS6351 4,890 20 30<br />
NS6351 NS6328 2,200 20 30<br />
NS6328 NS6308 2,930 20 30<br />
NS6308 NS6257 4,340 24 30<br />
NS6257 NS6252 600 24 30<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $18,200,000.<br />
Scheduled Design Appropriation Year is 2010.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-41 JANUARY 2011<br />
REV. 5
Blackwater<br />
Acres<br />
Hubbs<br />
Sullivan<br />
Carney<br />
#<br />
PS263<br />
!R # #<br />
NS6088<br />
!R<br />
155-00013<br />
#<br />
PS155<br />
!R !R !R #<br />
!R<br />
NS6128<br />
# !R #<br />
!R !R<br />
NS6103 PS198<br />
155-00031<br />
PS265<br />
NS6134<br />
BPS504<br />
PS234 PS234<br />
!R #<br />
NS6150 !R #<br />
PS106<br />
PS125 !R<br />
#<br />
NS6157 NS6165<br />
!R<br />
#<br />
PS72 !R<br />
NS6183 #<br />
!R<br />
# #<br />
BPS509 !R #<br />
#<br />
NS6189 !R<br />
PS176<br />
PS233<br />
PS284<br />
PS325<br />
# #<br />
PS103<br />
#<br />
PS249<br />
# PS271<br />
# !R #<br />
PS86<br />
NS6239<br />
#<br />
!R<br />
PS144 NS6252<br />
NS6257<br />
# !R #<br />
!R #<br />
#<br />
!R !R<br />
231-00015 PS230<br />
PS69<br />
!R<br />
PS231<br />
231-00013<br />
NS6268a<br />
NS6308 !R #<br />
PS282<br />
!R<br />
!R #<br />
!R<br />
NS6328 PS510AA NS6351<br />
#<br />
NS6575 PS418 !R #<br />
!R # PS152<br />
PS196<br />
!R<br />
#<br />
# !R<br />
NS6391 NS6393<br />
NS6395<br />
PS202 NS6381<br />
PS280<br />
#<br />
!R!R #<br />
!R<br />
!R #<br />
PS187<br />
PS510<br />
NS6406<br />
NS6404<br />
#<br />
# NS6419<br />
!R !R<br />
NS6402<br />
!R<br />
#<br />
PS200<br />
NS6431<br />
# !R !R #<br />
195-00004<br />
!R # !R # !R<br />
200-00011<br />
PS195<br />
PS164<br />
!R #<br />
PS113<br />
PS138<br />
!R #<br />
#<br />
# !R #<br />
PS1007 PS285<br />
#<br />
NS6472 PS160<br />
PS288<br />
!R #<br />
#<br />
!R<br />
#<br />
#<br />
PS121#<br />
NS6489 !R<br />
PS197<br />
#<br />
!R #<br />
BPS503 #<br />
PS207<br />
# #<br />
#<br />
## # #<br />
PS281<br />
#<br />
PS334<br />
#<br />
#<br />
#<br />
# Legend<br />
Proposed<br />
Existing Lovett Rd. - Greenwell Springs Rd.<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NFE-C-0006<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-15<br />
Smith<br />
Joor<br />
East Baton Rouge Parish<br />
Core<br />
Northeast<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
Joor<br />
Denham<br />
0 0.375 0.75<br />
Mile<br />
Sully<br />
Pinewood<br />
PS181<br />
PS155<br />
Chanove<br />
Wax<br />
Droze<br />
Willow Creek<br />
Thibodeaux<br />
#<br />
PS443<br />
Wax<br />
Morgan<br />
<strong>Plan</strong>chet
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.7 NFE-C-0007 (Multiple BPS – Hooper Road – Lovett Road)<br />
The NFE-C-007 (Multiple BPS – Hooper Road – Lovett Road) project has been combined<br />
with NFE-C-0005 (Multiple PS-Hooper Road-Greenwell Springs Road) from the October<br />
2008 PDP. The combined project has been designated NFE-C-0005 (Hooper Road Pump<br />
Station Improvements) project and is described in Section 5.4.5.<br />
GNV31031158552.DOCX/103470004 5-43 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.8 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The NFW-C-0001 (Joor Road –Greenwell Springs Road Sewer Area Upgrades) project<br />
involves the design and construction of forcemain upgrades in the North Forced West Basin.<br />
The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />
forcemain capacity. The upgrades range in size from 6 to 24 inch diameter.<br />
Location<br />
This project involves the replacement of portions of the North Forced West manifold<br />
forcemain system as well as replacement of some gravity segments in the same area as the<br />
forcemain segments. The locations of the gravity sewer and forcemains in this project are<br />
shown in Figure 5-16.<br />
Forcemain segment PS 183 to NS 6485 begins outside the property boundary of PS 183.<br />
Upon leaving the pump station, the forcemain travels north for approximately 50 feet before<br />
reaching Canterbury Drive. At Canterbury Drive, the forcemain turns east and follows the<br />
road for approximately 225 feet to the intersection of Canterbury Drive and Greenforrest<br />
Drive. At Greenforrest Drive, the forcemain turns northward and follows the road for<br />
approximately 1,500 feet to the intersection of Greenforrest Drive and Greenwell Springs<br />
Road. At this point, the forcemain travels under Greenwell Springs Road and manifolds into<br />
a larger forcemain at node NS 6485.<br />
Forcemain segment PS 119N to NS 6509 begins outside the property boundary of PS 119.<br />
Upon leaving the pump station, the forcemain travels west for approximately 50 feet before<br />
reaching Sarasota Drive. At Sarasota Drive, the forcemain turns north and follows the road<br />
for approximately 1,000 feet to the intersection of Sarasota Drive and Coral Drive. At Coral<br />
Drive, the forcemain turns northward and follows the road for approximately 500 feet to the<br />
intersection of Coral Drive and Greenwell Springs Road. At this point, the forcemain travels<br />
under Greenwell Springs Road and manifolds into a larger forcemain at node NS 6509.<br />
Forcemain segment BPS 503 to NS 6438 begins outside the property boundary of BPS 503<br />
and travels south for approximately 150 feet before reaching Greenwell Springs Road. At<br />
Greenwell Springs Road, the forcemain turns west and follows the north ROW for<br />
approximately 6,000 feet to the intersection of Greenwell Springs Road and Joor Road. At<br />
Joor Road, the forcemain turns north and follows the east ROW for approximately 7,600 feet<br />
to the intersection of Joor Road and Mickins Road. At the intersection of Joor Road and<br />
Mickens Road (node NS6438), the forcemain travels northwest along Mickens Road for<br />
approximately 7,000 feet to node NS6438, located at the intersection of Mickens Road and<br />
Lanier Drive.<br />
Forcemain segment PS 288 to NS 6461 begins outside the property boundary of PS 288.<br />
Upon leaving PS 288, the forcemain travels northwest along an electrical servitude for<br />
approximately 2,650 feet to its intersection with Joor Road. At Joor road, the forcemain turns<br />
south for approximately 250 feet to node NS 6461, located near the intersection of Mickens<br />
Road and Joor Road.<br />
Forcemain segment NS 6499 to NS 6500 begins at node NS 6499, located near the end of the<br />
cul-de-sac on Dancy Avenue, and follows Dancy Avenue west to node NS6500, located near<br />
the intersection of Dancy Avenue and Joor Road.<br />
GNV31031158552.DOCX/103470004 5-44 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
Gravity segment 119N-00039 to PS 119N starts at manhole 119-00039, located near the<br />
intersection of Daytona Avenue and Flamingo Drive, runs northeast along Flamingo Drive,<br />
and turns north on Sarasota Drive to PS 119N, located on Sarasota Drive in between<br />
Flamingo Drive and Biscayne Drive.<br />
Gravity segment 183-00009 to 183-00001Z begins at manhole 183-00009, located near the<br />
intersection of Cardigan Avenue and Kilkenny Drive, and follows Kilkenny Drive north to<br />
manhole 183-00001Z, which is located near the intersection of Kilkenny Drive and N. Salem<br />
Drive.<br />
Gravity segment 128-00041A to PS 128 starts at manhole 128-00041A, located near the<br />
intersection of Toledo Bend Avenue and Redlands Drive, and heads south to PS 128, located<br />
on Redlands Drive, in between Cedar Bend Avenue and Elaine Drive.<br />
Scope<br />
The scope of this project includes construction of approximately 1,750 feet of 10-inch and 12-<br />
inch gravity sewer upstream of PS 119N and PS 128 and approximately 2,600 feet of 21-inch<br />
gravity sewer upstream of PS 183. This project also includes construction of 29,800 feet of 4-<br />
inch, 6-inch, 10-inch, 16-inch, and 24-inch forcemain in the North Forced West basin. The<br />
detailed scope of this project is given in Table 5-14.<br />
TABLE 5-14<br />
NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter (in)<br />
Proposed<br />
Diameter (in)<br />
PS 183 NS6512 160 14 16<br />
Comments<br />
NS6512 NS6485 1,600 14 16<br />
PS 119N NS6509 2,150 8 10<br />
BPS503 NS6550 8,500 14 24<br />
NS6550 NS6500 2,300 18 24<br />
NS6500 NS6438 10,200 14 24<br />
PS288 NS6461 3,400 4 6<br />
NS6499 NS6500 1,500 3 4<br />
119N-00039 PS119N 990 8 10 Gravity segment<br />
183-00009 183-00001Z 2,600 12, 15, & 16 21 Gravity segment<br />
128-00041A 128-00040A 360 10 12 Gravity segment<br />
128-00040A 128-00001Z 320 10 12 Gravity segment<br />
128-00001Z PS128 85 10 12 Gravity segment<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $6,900,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation Year is 2013.<br />
Design and Construction has Not Started.<br />
GNV31031158552.DOCX/103470004 5-45 JANUARY 2011<br />
REV. 5
Greenway<br />
Rome<br />
Airway<br />
Vega<br />
Monterrey<br />
Platt<br />
Aletha<br />
Ridgemont<br />
Hillmont<br />
Lassen<br />
Mike<br />
Erin<br />
Harco<br />
#<br />
Watts<br />
Hickcock<br />
Cody<br />
#<br />
Hooper<br />
PS130<br />
#<br />
Blackwater<br />
BPS511<br />
Shady Bluff<br />
#<br />
PS196<br />
PS418<br />
Joor<br />
#<br />
Cook<br />
Haven<br />
Conestoga<br />
Pecos<br />
#<br />
PS202<br />
PS152<br />
#<br />
#<br />
#<br />
Prairie<br />
PS510AA<br />
Lovett<br />
PS187<br />
#<br />
!R<br />
NS6438<br />
Suncrest<br />
Brillock<br />
Burtcliff<br />
Landfair<br />
#<br />
PS195<br />
Frontier<br />
Lariat<br />
PS113<br />
PS138<br />
# #<br />
#<br />
#<br />
#<br />
Wright<br />
#<br />
PS277<br />
#<br />
Hanks<br />
Airline<br />
Greenwell<br />
Dickens<br />
Riffel<br />
Oak View<br />
PS11<br />
Tom<br />
Prescott<br />
Gay<br />
Greentree<br />
Athens<br />
Madrid<br />
#<br />
Paris<br />
Kiowa<br />
East Baton Rouge Parish<br />
Berlin<br />
Oak Crest<br />
Joyce<br />
Mickens<br />
#<br />
PS453<br />
NS6500<br />
Choctaw<br />
!R<br />
!R<br />
Oak Villa<br />
Crestaire<br />
!R<br />
Dancy<br />
NS6550<br />
#<br />
NS6461<br />
!R<br />
Ridgewood<br />
Ridgewood<br />
PS222<br />
Greenwell Springs<br />
#<br />
El Scott<br />
NS6499<br />
#<br />
PS281<br />
PS18<br />
Syble<br />
Ventura<br />
#<br />
Grand Teton<br />
El Cajon<br />
Tampa<br />
!R #<br />
Westerly<br />
PS288<br />
PS288<br />
BPS503<br />
#<br />
!R #<br />
Beta<br />
Elain<br />
Mammoth<br />
Perdue<br />
PS503<br />
Edgemont<br />
#<br />
#<br />
128-00001Z<br />
!R<br />
!R<br />
!R #<br />
#<br />
PS16<br />
# PS190<br />
Darryl<br />
Gerald<br />
Tams<br />
Cletus<br />
#<br />
!R!R #<br />
!R<br />
# PS119N<br />
PS119NFM<br />
#<br />
!R<br />
183-00009 #<br />
!R<br />
#<br />
Legend<br />
Joor Rd. - Greenwell Springs Rd.<br />
Proposed<br />
Existing<br />
#I<br />
³<br />
Sewer Area upgrades<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
NFW-C-0001<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-16<br />
0 0.5<br />
1<br />
Miles<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFW-C-0001.MXD SGELPI 11/9/2010 09:46:31<br />
Capri<br />
#<br />
119N-00039<br />
Dual<br />
NS6509<br />
PS454<br />
PS128<br />
#<br />
!R<br />
128-00041A<br />
PS359<br />
Chalice<br />
Catalpa<br />
128-00040A<br />
PS89<br />
Sarasota<br />
PS293<br />
Richcroft<br />
Darryl<br />
#<br />
Bard<br />
Ocala<br />
Coral<br />
!R<br />
PS183<br />
PS183<br />
Stan<br />
Vickers<br />
#<br />
NS6485<br />
Salem<br />
PS314<br />
Warfield<br />
NS6512<br />
183-00001Z<br />
Wendover<br />
Stacy<br />
La Annie<br />
#<br />
Linstrom<br />
Cherryl<br />
Kerry<br />
#<br />
PS169<br />
Windsor
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.9 NFW-C-0002 (Choctaw Storage and Pump Station Facility)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The NFW-C-0002 (Choctaw Storage and Pump Station Facility) project is a project that was a<br />
combination of the NFW-C-0002 (Choctaw Storage, PS52A, PS 51A, PS 51AA, and<br />
Forcemains) project and the NFW-C-0003 (Choctaw Storage Pump Station) project from the<br />
October 2008 PDP. The combined project has been designated NFW-C-0002 (Choctaw Storage<br />
and Pump Station Facility) project and is described in this section.<br />
This project involves the design and construction of a 26-million gallon (MG) storage facility<br />
(Choctaw Storage Facility) in west-central Baton Rouge Parish. This project also includes the<br />
construction of an overflow pump station for Pump Station 52 (PS 52A), an overflow pump<br />
station for PS 51 (PS 51A), a gravity trunk line overflow pump station (PS 51AA), and the<br />
forcemains to convey the flow from the pump stations to the storage facility. One of the<br />
forcemains will also serve as the return line for flow from the Choctaw Storage Facility to PS<br />
52. The purpose of this facility is to detain peak wet weather flows during a storm event, and<br />
release them back into the collection system when demand is lower.<br />
Construction of the storage facility will eliminate approximately 6.5 miles of pipe<br />
replacement, reduce the overall pipe diameter for the remaining sewer projects, and eliminate<br />
the need to increase the capacity of the North WWTP.<br />
Location<br />
The location of the 26 MG storage facility is near the northeast corner of the intersection of<br />
Airline Highway and South Choctaw Drive. The C-P already owns the parcel of land. The<br />
locations of the pump stations are given in Table 5-15.<br />
The force main from PS 52A to the storage facility will lead south along E. Brookstown Drive<br />
to Winbourne Avenue It will then head east along Winbourne Avenue to the intersection with<br />
Victoria Drive. From Victoria Drive, the main will cross Greenwell Springs Road and follow<br />
the frontage road at the intersection of Airline Highway and Greenwell Springs Road. The<br />
main will then cross Airline Highway and run parallel to Reco Avenue to the storage facility.<br />
The forcemain from PS 51A to the storage facility will run south along Sierra Vista Drive to<br />
Cuyhanga Parkway. It then travels west along Cuyhanga Parkway to the end of Cuyhanga<br />
Parkway and cross open field to Tom Drive. The main will run west along Tom Drive to<br />
Airway Drive where it will head north to W. El Cajon Drive. It will run west along W. El<br />
Cajon Drive north on Commerce Avenue and across Choctaw Drive to the storage facility.<br />
The forcemain from PS 51AA to the manifold point with the forcemain from PS 51A will begin<br />
near the intersection of Red Oak Drive and Sharp Lane and head north along Sharp Lane to<br />
the intersection with Cuyhanga Parkway. From this point, the force main will head west along<br />
Cuyhanga Parkway to the intersection with Sierra Vista Drive, where it will intersect with the<br />
force main from PS 51A.<br />
Scope<br />
This project includes the construction of one, 20 million gallon (MG) storage tank and one 6<br />
MG storage tank at the Choctaw Storage Facility and their associated piping, valving,<br />
controls, and appurtenances. The pump stations and forcemains are detailed in Table 5-15 and<br />
Table 5-16 and are shown in Figure 5-17.<br />
GNV31031158552.DOCX/103470004 5-47 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-15<br />
NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS51A<br />
PS51AA<br />
Sierra Vista Drive north of the intersection with<br />
Cuyhanga Parkway<br />
Near the intersection of Red Oak Drive and<br />
Sharp Lane<br />
New 8,333 0<br />
New 3,125 0<br />
PS 52A<br />
NE of Brookstown Drive intersection with<br />
Winbourne<br />
New 31,924 0<br />
Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
TABLE 5-16<br />
NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Forcemain Information<br />
US No.<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
PS52A Choctaw Storage 10,100 New 42<br />
PS51A PS51WW1 130 New 30<br />
PS51WW1 Choctaw Storage 10,780 New 30<br />
PS51AA PS51WW1 3,100 New 14<br />
Note: The new pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $55,000,000.<br />
Total Storage Facility Land Acquisition Cost is $1,218,720 (already acquired).<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-48 JANUARY 2011<br />
REV. 5
Anita<br />
Alello<br />
Maribel<br />
Airway<br />
Cora<br />
Sharp<br />
#<br />
#<br />
Greenwell<br />
El Scott<br />
Cyrus<br />
Merrydale<br />
Airline<br />
Dover<br />
Hanks<br />
Prescott<br />
#<br />
PS11<br />
PS39<br />
#<br />
Ridgewood<br />
#<br />
PS222<br />
PS116<br />
#<br />
#<br />
PS288<br />
#<br />
BPS503<br />
#<br />
Heidel<br />
PS52<br />
!R#I<br />
PS52WW_3<br />
#<br />
PS52A<br />
Calumet<br />
Victoria<br />
#<br />
PS55<br />
Joor<br />
Greenwell Springs<br />
#<br />
PS18<br />
#<br />
PS281<br />
#<br />
Elain<br />
Greenway<br />
Gerlando<br />
Lone Oak<br />
Oak Crest<br />
Joyce<br />
Winbourne<br />
Grand Teton<br />
# #<br />
PS16<br />
Victoria<br />
#<br />
PS49<br />
#<br />
Renoir<br />
Lobdell<br />
#<br />
PS30<br />
Choctaw # Storage Tank Facility<br />
# #<br />
Carrollton<br />
Rodin<br />
Industrial<br />
Cezanne<br />
Goya<br />
Donmoor<br />
Harry<br />
Dallas<br />
Wooddale<br />
Florida<br />
")<br />
Fernwood<br />
Athens<br />
Tom<br />
Harry<br />
Florline<br />
Kiowa<br />
Choctaw<br />
Cortana<br />
Oak Villa<br />
Monterrey<br />
Mollylea<br />
Darryl<br />
PS51WW3<br />
Cuyhanga<br />
Donna<br />
PS51A<br />
#I<br />
!R<br />
!R!R #<br />
#I<br />
#<br />
PS81<br />
#<br />
Marilyn<br />
#<br />
Perdue<br />
Riveroaks<br />
Gerald<br />
Cletus<br />
PS51WW2<br />
Ocean<br />
Ship<br />
Marion<br />
Marquette<br />
Independence<br />
Airport<br />
Colonial<br />
#<br />
PS323<br />
Meredith<br />
Parkview<br />
Keed<br />
East Baton Rouge Parish<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
# Legend<br />
³<br />
Choctaw Storage, PS52A, PS51A,<br />
Proposed<br />
Existing<br />
PS51AA, FM<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
NFW-C-0002<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility<br />
0 1,500 3,000<br />
Feet<br />
Figure 5-17
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.10 NFW-C-0003 (Choctaw Storage Pump Station)<br />
Project Description<br />
This project has been deleted and combined with NFW-C-0002 (Choctaw Storage, PS 52A, PS<br />
51A, PS 51AA, and Forcemains) from the October 2008 PDP and the combined project has<br />
been designated as the NFW-C-0002 (Choctaw Storage and Pump Station Facility) and is<br />
described in Section 5.4.9.<br />
5.4.11 NFW-C-0004 (Hooper Storage Facility)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
The NFW-C-0004 (Hooper Storage Facility) project involves the design and construction of a<br />
10-MG storage facility (Hooper Storage Facility) in northwest Baton Rouge Parish as well as<br />
the replacement of BPS 897 with a wet well pump station. The purpose of this facility is to<br />
detain peak wet weather flows during a storm event, and release them back into the collection<br />
system when demand is lower.<br />
Construction of the storage facility will eliminate the need for approximately 13,200 feet of<br />
pipe replacement, reduce the overall pipe diameter for the remaining sewer projects, and<br />
eliminate the need to increase the capacity of the North WWTP.<br />
Location<br />
The proposed location of the storage facility is near the northwest corner of the intersection<br />
of Hooper Drive (Highway 408) and Mickens Road and is shown in Figure 5-18.<br />
Scope<br />
The project scope includes the design and construction of the storage facility and associated<br />
pumping systems to transfer flows in and out of the facility. A new PS 897 will be built on<br />
the same site as the storage facility to transfer flows in and out of the facility. Once the<br />
storage facility and pump station are operational, BPS 897 will be abandoned.<br />
Total Construction Bid Amount is $19,100,000.<br />
Scheduled Design Appropriation Year was 2009.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-50 JANUARY 2011<br />
REV. 5
Mable<br />
Sharon Hills<br />
Cefalu<br />
Junelise<br />
Hooper Storage Tank Facility<br />
") #I<br />
New PS897<br />
Marionette<br />
Cedar Glen<br />
Corlett<br />
#<br />
Hooper<br />
#<br />
BPS897<br />
Mickens<br />
Laredo<br />
St Gabriel<br />
Juarez<br />
St Pius<br />
Mc Clelland<br />
Santa Cruz<br />
Toria<br />
San Juan<br />
East Baton Rouge Parish<br />
Legend<br />
³<br />
Existing<br />
Exist. Gravity<br />
Hooper Storage Facility<br />
Exist. Forcemain<br />
# Exist. Pump Station<br />
!R<br />
Project Vicinity Map<br />
Figure 5-18<br />
0 300 600<br />
Feet<br />
Proposed<br />
#I<br />
New Pump<br />
Stations<br />
New Gravity Main<br />
New Force Main<br />
Manholes\Nodes<br />
") New Storage Facility<br />
NFW-C-0004<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\CAPACITY\NORTH\NORTH MAPS\NFW-C-0004.MXD SGELPI 11/9/2010 09:45:53
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.12 Group Project 1A (Metro Airport Sewer Upgrades)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The Group Project 1A (Metro Airport Sewer Upgrades) project involves the design and<br />
construction of upgrades to the collection system in the North Forced West Basin and the<br />
North Gravity Basin. This project includes upgrading portions of the gravity collection<br />
system located in the areas served by PS 46, PS 55, PS 39, PS 52, PS47, PS 54, PS 24, and PS<br />
43. The upgrades are designed to alleviate chronic SSOs in the collection system and at the<br />
pump stations, as well as increase the system capacity. This project includes gravity sewers<br />
from the following projects in the January 2008 PDP: NGS-C-0001 (Progress Road – Baton<br />
Rouge Metro Airport), NFW-C-0005 (Airline Highway – Victoria Drive), and NFW-C-0006<br />
(McClelland Drive). Some line segments, or portions of these projects, from the January 2008<br />
PDP are being executed as part of the C-P Green Light <strong>Program</strong> Ford Street Project.<br />
Location<br />
This project involves the replacement of portions of the gravity collection system, which are<br />
shown in Figure 5-19.<br />
Gravity segment 054-00027 to 054-00001A begins at manhole 054-00027, located on Dutton<br />
Street, south of the intersection of Dutton Street and Cannon street. From this point, the<br />
gravity line travels south for approximately 1,200-feet to manhole 054-00009, located near<br />
intersection of Dutton Street and Greenwell Street. At manhole 054-00009, the gravity line<br />
turns east and follows Greenwell Street to manhole 054-00001A, which is adjacent to PS 54.<br />
The inverts along this segment are approximately 10 feet to 15 feet deep.<br />
Gravity segment 052-00700 to 052-00521 begins at manhole 052-00700, located on Greenwell<br />
Street, and travels east along Greenwell Street to manhole 052-000710, located near the<br />
intersection of Greenwell Street and Winchester Avenue. At manhole 054-00710, the gravity<br />
line turns south and follows Winchester Avenue to the intersection of Winchester Avenue<br />
and Hollywood Street. At this point, the gravity turns east and travels along Hollywood<br />
Street for approximately 950 feet before joining a larger trunk line at manhole 052-00521.<br />
The inverts along this segment are approximately 15 feet to 20 feet deep.<br />
Gravity segment 024-00186 to 024-00011 begins at manhole 024-00186, which is located east<br />
of the intersection of <strong>Plan</strong>k Road and Lorraine Street. At this point, the gravity line travels<br />
east along Lorraine Street for approximately 1,380 feet to manhole 024-000182, located near<br />
Lorraine Street. At manhole 24-000182, the gravity line turns south and travels to manhole<br />
024-00088 and then follows Wildwood Parkway for approximately 1,400 feet to manhole<br />
024-00011. The inverts along this segment are approximately 15 feet to 20 feet deep.<br />
Gravity segment 024-00192 to 024-00182 begins at manhole 024-00192 which is located west<br />
of the intersection of Lorraine Street and Lemonwood Drive. At this point, the gravity line<br />
travels west along Lorraine Street for approximately 850 feet to manhole 24-000182, located<br />
near Lorraine Street. The inverts along this segment are approximately 15 feet to 20 feet<br />
deep.<br />
Gravity segment 039-00035 to PS 39 begins at manhole 039-00035 located near Phebus Drive.<br />
From this point, the gravity line travels east for approximately 850 feet to manhole 039-<br />
00008. At manhole 039-00008, the gravity line connects with a larger trunk line. The trunk<br />
GNV31031158552.DOCX/103470004 5-52 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
line runs south for approximately 2,600 feet to PS 39. The inverts along this segment are<br />
approximately 10 feet to 15 feet deep.<br />
Gravity segment 052-00214 to 052-00204 begins near the intersection of Videt Polk Drive and<br />
Lanier Drive and travels south along Lanier Drive to the intersection of Lanier Drive and<br />
Prescott Road.<br />
Gravity segment 043-00095 to 043-00073 begins north of Interstate 110, near Baton Rouge<br />
Avenue. The gravity line travels north along Baton Rouge Avenue to the intersection of<br />
Baton Rouge Avenue and Hollywood Street.<br />
Gravity segment 052-00882 to 052-00768 begins at manhole 052-00882 which is located at the<br />
intersection of <strong>Plan</strong>k Road and Crown Avenue. From this point, the gravity line travels east<br />
along Crown Avenue approximately 1,100 feet to manhole 052-00451, located at the<br />
intersection of Crown Avenue and Beachwood Drive. Gravity segment 052-00451 to PS 47<br />
begins at manhole 052-00451, located at the intersection of Crown Avenue and Beachwood<br />
Drive. From this point, the gravity line travels east until reaching 052-00583B located near<br />
the intersection of Crown Avenue and Winchester Avenue. The gravity segment travels<br />
south until reaching 052-00556JA, located near the intersection of Winchester Avenue and<br />
Glenn Oaks Drive, continuing east until reaching 052-00556D. After leaving 052-00556D, the<br />
gravity line travels south along McClelland Drive until reaching 052-00556DA, located at the<br />
intersection of Crestway Avenue and McClelland Drive. The gravity line continues east<br />
along Crestway Avenue until reaching 047-00008, located east of the Crestway Avenue and<br />
Buckeye Drive intersection. The gravity segment travels south until reaching PS 47, located<br />
near the intersection of Vineyard Drive and W Rio Drive.<br />
Gravity segment 052-00583A to 052-00583B begins at manhole 052-00583A, located near<br />
Monarch Avenue and Winchester Avenue intersection. The gravity line travels south until<br />
reaching 052-00583B, located near the intersection of Crown Avenue and Winchester<br />
Avenue.<br />
Gravity segment 047-00014 to 047-00008 begins at manhole 047-00014, located near Glen<br />
Oaks Drive and Buttonwood Drive intersection. The gravity line travels south until reaching<br />
047-00008, located east of the Crestway Avenue and Buckeye Drive intersection.<br />
Gravity segment PS92DS to 047-00003 begins at PS92DS, located north of Glen Oaks Drive<br />
and Landis Drive intersection. The gravity line travels southwest until reaching 047-00556,<br />
then travels south, crossing Glen Oaks Drive until reaching 047-00557. The gravity line<br />
travels south until reaching Maplewood Drive and then travels northwest along<br />
Maplewood Drive until reaching 047-00474, located near Maplewood Drive and Cedar<br />
Grove Drive intersection. After leaving 047-00474, the gravity line travels southwest until<br />
reaching 047-00472. The gravity segment travels west along the north side of the drainage<br />
canal until reaching 047-00003.<br />
Gravity segment 052-00144 to 052-00001 begins at 052-00144, located south of the Evangeline<br />
Street and East Brookstown Drive intersection. The gravity line travels south down East<br />
Brookstown Drive until reaching 052-00400. The gravity line continues east until reaching<br />
052-00001.<br />
Gravity segment PS 35 DS to PS 52 begins at PS35DS, located near Maplewood Drive and<br />
Shiloh Street intersection. The gravity line travels southwest along the drainage canal until<br />
reaching 052-00295 (PS47DS). The gravity line travels south, from 052-00295 until reaching<br />
GNV31031158552.DOCX/103470004 5-53 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
052-00269A located on Greenwell Street between its intersections with Landis Drive and<br />
Loring Drive. The gravity line continues east on Greenwell Street for 268 ft until reaching<br />
052-00280A and then continues south. The gravity segment continues to travel south along<br />
Victoria Drive until reaching 052-00100, locates south of Victoria Drive and Prescott Road<br />
intersection. The gravity line travels southwest, crossing Airline Highway and traveling<br />
parallel to Bicentennial Place for 1,390 feet. The gravity line continues south until reaching<br />
052-00006A and then travels west for 1600 feet until reaching 052-00001. The gravity<br />
segments travels southwest until reaching PS52, located near the intersection of East<br />
Brookstown Drive and Hendricks Avenue.<br />
Gravity segment 052-00168 to 052-00161 begins at 052-00168, located at Prescott Road and<br />
Maribel Drive intersection. The gravity line travels west until reaching 052-00161, located at<br />
the intersection of Prescott Road and Victoria Drive.<br />
Scope<br />
The detailed scope of this project is shown in Table 5-17.<br />
TABLE 5-17<br />
Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
047-00428 047-00418 221 10 18<br />
047-00418 047-00417 313 12 21<br />
047-00417 047-00029 1602 12 18<br />
047-00264 047-00043 507 8 15<br />
054-00027 054-00026 246 8 18<br />
054-00026 054-00009 966 15 21<br />
054-00009 054-00008 233 15 24<br />
054-00008 054-00006 530 15 24<br />
054-00006 054-00001A 177 15 24<br />
054-00001A PS54 77 15 24<br />
052-00755 052-00521 499 18 27<br />
052-00745 052-00755 235 18 27<br />
052-00716 052-00745 816 18 27<br />
052-00710 052-00716 289 18 27<br />
052-00700 052-00710 1277 18 27<br />
024-00192 024-00182 673 8 21<br />
024-00186 024-00182 1373 10 21<br />
024-00182 024-00110 323 15 21<br />
024-00110 024-00101 301 15 21<br />
024-00101 024-00088 332 18 21<br />
024-00088 024-00067 349 18 24<br />
024-00067 024-00064 365 18 27<br />
024-00064 024-00030 338 21 27<br />
024-00030 024-00011 347 21 27<br />
052-00214 052-00209 1173 12 15<br />
GNV31031158552.DOCX/103470004 5-54 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-17<br />
Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
052-00209 052-00205 586 12 18<br />
052-00205 052-00204 301 15 18<br />
039-00035 039-00008 847 10 15<br />
039-00008 039-00007 299 10 18<br />
039-00007 039-00006 268 10 18<br />
039-00006 039-00003 1436 10 21<br />
039-00003 PS39 599 12 21<br />
043-00095 043-00093 357 15 24<br />
043-00093 043-00085 1198 15 24<br />
043-00085 043-00076 1311 15 24<br />
043-00076 043-00075 339 15 24<br />
043-00075 043-00073 315 15 24<br />
PS 23DS 043-00135 451 12 15<br />
052-00014 052-00012 754 15 18<br />
052-00882 052-00880 416 8 12<br />
052-00880 052-00792 298 8 12<br />
052-00792 052-00451 438 8 12<br />
052-00451 052-00768 455 8 12<br />
052-00583B 052-00556JA 1329 New 18<br />
052-00556JA 052-00556D 990 15 21<br />
052-00556DA 047-00192 1680 New 30<br />
052-00556D 052-00556DA 342 18 30<br />
052-00451 052-00583B 1627 New 12<br />
047-00192 047-00191 320 8 30<br />
047-00191 047-00009 375 8 30<br />
047-00009 047-00008 257 10 30<br />
047-00008 047-00005 896 24 36<br />
047-00005 047-00004 352 24 36<br />
047-00004 047-00003 154 24 42<br />
047-00003 PS47 209 24 42<br />
052-00583A 052-00583B 496 New 18<br />
047-00014 047-00012 146 24 36<br />
047-00012 047-00011 243 24 36<br />
047-00011 047-00008 273 24 36<br />
PS92DS 047-00556 129 8 12<br />
047-00557 047-00474 1957 8 18<br />
047-00556 047-00557 135 8 15<br />
047-00474 047-00472 150 8 18<br />
047-00472 047-00466 785 New 18<br />
GNV31031158552.DOCX/103470004 5-55 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-17<br />
Group Project 1A (Metro Airport Sewer Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
047-00466 047-00003 764 New 18<br />
052-00400 052-00001 105 36 42<br />
052-00152A 052-00152 118 30 42<br />
052-00152 052-00115 959 30 42<br />
052-00144 052-00143 306 30 42<br />
052-00143 052-00152A 441 30 42<br />
052-00115 052-00113 700 30 42<br />
052-00113 052-00107 311 30 42<br />
052-00107 052-00106 261 30 42<br />
052-00106 052-00400 98 36 42<br />
PS35DS 052-00299 27 8 15<br />
052-00299 052-00295<br />
634 8 21<br />
(PS47DS)<br />
052-00295 052-00292 262.4 8 42<br />
(PS47DS)<br />
052-00292 052-00284 469 8 42<br />
052-00284 052-00280 414 8 42<br />
052-00280A 052-00245 2007 New 42<br />
052-00280 052-00280A 268 New 42<br />
052-00245 052-00240 1452 30 48<br />
052-00240 052-00239 361 30 48<br />
052-00239 052-00163 399 30 48<br />
052-00163 052-00161 404 30 48<br />
052-00161 052-00105 290 30 48<br />
052-00105 052-00100 367 30 48<br />
052-00100 052-00067B 675 New 48<br />
052-00067B 052-00006A 1253 New 48<br />
052-00006A 052-00004 483 36 54<br />
052-00004 052-00003 435 36 54<br />
052-00003 052-00001 712 36 54<br />
052-00001 PS52 69 48 66<br />
052-00168 052-00161 1673 24 36<br />
Note The existing pipe sizes and all pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $26,800,000.<br />
Scheduled Design Appropriation Year was 2008.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-56 JANUARY 2011<br />
REV. 5
#<br />
PS244<br />
#<br />
PS179<br />
PS429<br />
#<br />
#<br />
St Gabriel<br />
#<br />
BPS897<br />
PS432<br />
#<br />
PS433<br />
#<br />
PS313<br />
PSPRVT<br />
#<br />
#<br />
PS341<br />
Rosewood<br />
#<br />
#<br />
047-00003 !R<br />
PS47 PS35 PS35DS<br />
054-00027<br />
#<br />
!R!R #<br />
#<br />
#<br />
#<br />
!R<br />
!R<br />
!R !R<br />
PS122<br />
054-00026<br />
!R<br />
047-00004<br />
052-00299<br />
PS43<br />
PS78<br />
047-00472<br />
!R #<br />
Comish<br />
054-00008 054-00009<br />
PS26<br />
052-00268<br />
#<br />
!R!R !R!R<br />
# !R<br />
!R<br />
!R!R<br />
!R<br />
039-00008<br />
052-00521<br />
054-00006 052-00710<br />
!R!R !R<br />
!R !R<br />
!R<br />
043-00075<br />
052-00280 039-00035 !R<br />
!R 052-00755<br />
!R #<br />
!R<br />
043-00073<br />
052-00745<br />
024-00186<br />
052-00245<br />
!R !R !R<br />
!R !R<br />
!R !R!R !R 043-00076 024-00101<br />
052-00214 PS39<br />
024-00088<br />
052-00144<br />
#<br />
!R<br />
043-00085<br />
!R<br />
!R<br />
024-00064<br />
!R<br />
052-00240 PS39<br />
EOPP 024-00030<br />
#<br />
!R<br />
052-00152 !R<br />
!R<br />
!R<br />
!R 024-00011<br />
!R!R<br />
!R<br />
!R<br />
043-00095<br />
052-00163<br />
!R !R #<br />
!R<br />
052-00168<br />
052-00115<br />
!R<br />
043-00093<br />
PS24<br />
PS24A<br />
052-00105<br />
!R<br />
!R!R !R !R<br />
Lynn<br />
052-00100<br />
!R<br />
!R<br />
052-00106<br />
# PS55<br />
Eaton<br />
!R PS52<br />
!R!R !R!R<br />
# !R!R<br />
#<br />
PS75<br />
PS23<br />
East Baton Rouge Parish<br />
Yancy<br />
Merle Gustafson<br />
052-00451<br />
!R!R!R!R !R<br />
052-00792<br />
Delaware<br />
Carleton<br />
Beechwood<br />
#<br />
PS20<br />
Harelson<br />
052-00768<br />
052-00556D<br />
#<br />
047-00417<br />
PS84<br />
PS71<br />
!R<br />
Dougherty<br />
Voss<br />
Bahm<br />
Jewel<br />
!R !R<br />
047-00008<br />
#<br />
!R<br />
047-00428<br />
047-00418<br />
Garnet<br />
Topaz<br />
Sobers<br />
!R!R<br />
!R<br />
052-00003<br />
PS49<br />
!R<br />
!R<br />
047-00029<br />
047-00011<br />
!R!R<br />
047-00012<br />
Lambert<br />
Anita<br />
Anita<br />
Anita<br />
047-00043<br />
052-00004<br />
#<br />
Baja<br />
#<br />
Sutton<br />
PS92DS<br />
PS272<br />
PS92<br />
Palomar<br />
Maribel<br />
Beaumont<br />
Dallas<br />
Gerlando<br />
PS277<br />
039-00006<br />
039-00003<br />
052-00204<br />
052-00205<br />
Greenway<br />
#<br />
Legend<br />
Metro Airport Area<br />
Proposed<br />
Existing<br />
³<br />
Sewer Upgrades<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
Group Project 1A<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-19<br />
0 2,950<br />
5,900<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES-2010\C APACITY\GROUP_PROJECTS1AB\GROUP_PROJECT1_A.MXD_mpj121610<br />
Bern<br />
#
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.13 Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />
Upgrades)<br />
Project Description<br />
Purpose of the Project/Background Information<br />
Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) is a<br />
combination of two individual projects identified in the January 2008 PDP, specifically the<br />
NFW-C-0008 (Multiple Pump Stations – Airline Highway – Greenwell Street) and portions<br />
of NFW-C-0005 (Airline Highway – Victoria Drive). The combined project has been<br />
designated Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain<br />
Upgrades) project and is described in this section.<br />
This project includes the upgrades of forcemain segments and pump stations in the North<br />
Gravity and North Forced West Basins. The Group Project 1B consists of the replacement of<br />
nine pump stations, replacement of 8,000 linear feet of 8 to 15-inch sanitary sewer forcemain<br />
pipeline, and 26,060 linear feet of new 30 sanitary sewer forcemain.<br />
The pump station and forcemain upgrades will work in conjunction with the Group Project<br />
1A gravity sewer upgrades in the North Gravity and North Forced West Basin projects to<br />
alleviate chronic sanitary sewer overflows (SSOs) at the pump stations and in the gravity<br />
basins upstream of the pump stations.<br />
Location<br />
The locations of the pump stations are given in Table 5-18 and shown in Figure 5-20.<br />
Group Project 1B is primarily located in the north Baton Rouge area. Detailed location<br />
descriptions of the required capacity improvements follow.<br />
Forcemain segment PS45FM to North WWTP begins at PS 45 located near Clark Street and<br />
Granberry Drive. Upon leaving the pump station, the forcemain travel west and then south,<br />
traveling south down Devall Lane. After reaching Devall Lane and Blount Road, the<br />
forcemain travels west until reaching Liberty Drive. The forcemain travels south until the<br />
end of Liberty Drive and travels southwest near the airport runway until reaching Progress<br />
Road. The forcemain travels west down Progress Road until reaching intersection with Elm<br />
Grove Garden Drive. The forcemain travels south down Elm Grove Garden Drive. The<br />
forcmain turns west near I-110 and travels west down Central Road. The forcemain travels<br />
southwest down Scotland Avenue and then travels west until reaching Mills Avenue. The<br />
forcemain continues west along Mills Avenue until reaching North WWTP.<br />
Forcemain segment PS277FM to NS6438 begins near PS 277 located at the end of Wright<br />
Drive. The forcemain travels north, parallel to Wright Drive until reaching NS6438, located<br />
on Mickens Road.<br />
Forcemain segment PS275FM to NS6140AA (new node) begins at PS275, located at Glynn<br />
Road and Old Rafe Meyer Road. Upon leaving the pump station, the forcemain travels west<br />
along Old Rafe Meyer Road to a new node, NS6140AA, located at the intersection of Old<br />
Rafe Meyer Road and Highway 61.<br />
Forcemain segment PS54FM to PS54DS begins at PS 54, located at Greenwell Street and<br />
Robertson Avenue. The forcemain travels north until reaching PS54DS.<br />
GNV31031158552.DOCX/103470004 5-58 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
Forcemain segment PS 47FM to PS 47DS begins at PS 47, located on Vineyard Drive between<br />
Grand Drive and West Rio Drive, travels northeast towards Maplewood Drive. The<br />
forcemain segment then travels east and then southeast until reaching PS47DS located near<br />
W Fairlane Court.<br />
Forcemain segment PS35FM to PS35DS begins at PS 35, located on Maplewood Drive<br />
between East Fairlane Court and Flag Street. The forcemain segment travels southwest until<br />
reaching PS 35DS, located near the intersection of Maplewood Drive and Shiloh Street.<br />
Forcemain segment PS39FM to PS39DS starts at PS 35, located on Lanier Drive between<br />
Hanks Drive and Prescott Drive, and follows Lanier Drive south for approximately 35 feet<br />
to manhole PS39DS.<br />
Scope<br />
This project includes the replacement of PS 45, PS47, PS 35, PS 39, PS 54, PS 23, PS 275, and<br />
PS 277. This project also includes the replacement of the forcemains PS277, PS 275, PS 54, PS<br />
47, PS 35, PS 39 and an extension of PS45 forcemain. Tables 5-18 and 5-19 show the detailed<br />
scope of this project.<br />
TABLE 5-18<br />
Group Project 1B (Metro Airport Sewer Area Pump Station and Forcemain Upgrades) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak<br />
Wet Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
Comments<br />
PS45<br />
PS47<br />
PS35<br />
PS39<br />
PS54<br />
PS23<br />
Near intersection of 72nd Avenue<br />
and Yorkshire Street<br />
Vineyard Drive between Grand<br />
Drive and West Rio Drive<br />
Maplewood Drive between East<br />
Fairlane Court and Flag Street<br />
Lanier Drive between Hanks Drive<br />
and Prescott Drive<br />
Greenwell Street between North<br />
Foster Drive and Beechwood<br />
Drive<br />
Canonicus Street between<br />
Calumet Street and Navajo Street<br />
9,652 16,558 1,917 Moved from<br />
NGS-C-<br />
0004<br />
7,152 13,698 1,202<br />
694 1,687 323<br />
625 2,083 256<br />
1,042 3,715 201<br />
1,528 1,590 418<br />
PS275<br />
Intersection of Old Rafe Meyer<br />
Road and Glynn Road<br />
694 1,574 0<br />
PS277 End of Wright Drive 208 661 134<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
GNV31031158552.DOCX/103470004 5-59 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-19<br />
Group Project 1B (Metro Airport Area Forcemain Upgrades) – Forcemain Information<br />
US<br />
DS<br />
Length<br />
(ft)<br />
Existing<br />
(in)<br />
Proposed<br />
(in)<br />
PS45FM North WWTP 23,256 New 30<br />
PS277FM NS6438 3,124 6 8<br />
PS55FM PS55DS 1,100 8 10<br />
PS275FM NS6140AA (new node) 3,400 8 & 10 12<br />
PS54FM PS54DS 60 8 15<br />
PS47FM PS47DS 2,803 16 30<br />
PS35FM PS35DS 240 6 8<br />
PS39FM PS39DS 35 8 10<br />
Note: The existing pipe sizes and all pipe lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is$19,300,000.<br />
Scheduled Design Appropriation Year was 2008<br />
Scheduled Construction Appropriation Year was 2010.<br />
Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-60 JANUARY 2011<br />
REV. 5
NS6145A<br />
!R<br />
#I !R<br />
PS275FM<br />
PS275<br />
#I<br />
PS45<br />
3Q<br />
North WWTP<br />
!R<br />
Vet Mem PS DS<br />
PS23<br />
#I<br />
PS54FM<br />
PS54<br />
PS35<br />
!R<br />
#I #I #I<br />
PS47<br />
#I !R<br />
!R!R<br />
#I !R<br />
PS54DS<br />
PS39DS<br />
NS6438<br />
PS277FM<br />
PS277<br />
PS39<br />
East Baton Rouge Parish<br />
Legend<br />
Metro Airport Area Sewer Pump Station<br />
Proposed<br />
Existing<br />
³<br />
and Forcemain Upgrades<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
Group Project 1B<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-20<br />
0 5,000<br />
10,000<br />
Feet<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP_UPDATES\CAPACITY\GROUP_PROJECTS1AB\GROUP_PROJECT1_B.MXD GBOQUIN 10/21/2009 11:20:56
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.14 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades)<br />
Project Description<br />
Purpose of the Project / Background Information<br />
The NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) project<br />
involves the design and construction of forcemain upgrades in the North Forced West Basin.<br />
The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />
forcemain capacity.<br />
Location<br />
This project involves the replacement of portions of the North Forced West manifold<br />
forcemain system and locations are shown in Figure 5-21.<br />
Forcemain segment BPS 513 to NS 6087 starts outside the property boundary of BPS 513.<br />
Upon leaving the pump station, the forcemain travels east for approximately 400 feet along<br />
Bentley Drive to the intersection of Bentley Drive and <strong>Plan</strong>k Road At <strong>Plan</strong>k Road, the<br />
forcemain turns southwest and follows the road for approximately 1,800 feet to node NS<br />
6087, located near the intersection of <strong>Plan</strong>k Road and Kent Drive.<br />
Forcemain segment PS 371 to NS 6049 starts outside the property boundary of PS371. Upon<br />
leaving the pump station, the forcemain travels north for approximately 50 feet west before<br />
reaching Danielle Avenue. At Danielle Avenue, the forcemain turns west and follows the<br />
road for approximately 1,000 feet to the intersection of Danielle Avenue and Eric Drive. At<br />
Eric Drive, the forcemain turns northward and follows the road for approximate 50 feet to<br />
the intersection of Eric Drive and an existing servitude. At this point the forcemain travels<br />
west for approximately 500 feet to manhole NS6049, located on the west side of <strong>Plan</strong>k Road,<br />
and manifolds into the larger forcemain, which runs along <strong>Plan</strong>k Road.<br />
Forcemain segment PS OXLF to NS 6037 starts at PS OXLF, located near the intersection of<br />
Hereford Avenue and Little Farms Drive, and travels east along a servitude to node NS6307,<br />
which is located on <strong>Plan</strong>k Road.<br />
Forcemain segment PS 123 to NS 6033 starts outside the property boundary of PS 123. Upon<br />
leaving the PS, the forcemain travels west for approximately 50 feet before reaching Tucker<br />
Road. At Tucker Road, the forcemain turns north and follows the road for approximately<br />
5,600 feet to node NS6033, located near the intersection of Tucker Road and Zachary<br />
Deerford Road.<br />
Forcemain segment PS 124 to NS 6025 starts outside the property boundary of PS 124. Upon<br />
leaving PS 124, the forcemain travels south for approximately 50 feet before reaching Port<br />
Hudson Pride Road. At Port Hudson Pride Road, the forcemain turns east and follows the<br />
roadway for approximately 6,600 feet to node NS 6015, which is located south of the<br />
intersection of Port Hudson Pride Road and WJ Wicker Road. At WJ Wicker Road the<br />
forcemain turns southeast and follows the roadway for approximately 8,500 feet to node<br />
NS6022, located near the intersection of WJ Wicker Road and <strong>Plan</strong>k Road. At node NS 6022,<br />
the forcemain turns south and follows <strong>Plan</strong>k Road to node NS 6025, located near the<br />
intersection of <strong>Plan</strong>k Road and Main Street/Zachary Deerford Road.<br />
Forcemain segment PS 320 to NS 6035 begins outside the property boundary of PS 320.<br />
Upon leaving PS 320, the forcemain travels west for approximately 50 feet before reaching<br />
Buckhorn Drive. At Buckhorn Drive forcemain turns south and follows the roadway for<br />
approximately 1,600 feet as Buckhorn Drive turns to the west and intersects with Deercreek<br />
GNV31031158552.DOCX/103470004 5-62 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
Drive. At Deercreek Drive, the forcemain turns south and follows roadway for<br />
approximately 1,000 feet to the intersection of Deercreek Drive and Greenwell Spring Point<br />
Road. At Greenwell Spring Point Road the forcemain turns west and follows the road for<br />
approximately 2,000 feet to manhole NS 6035, located near the intersection of Tucker Road<br />
and Greenwell Spring Point Road.<br />
Forcemain segment PS 243FM to NS6140 starts at PS 243, located at the northern end of<br />
Northgate Drive, and travels south along Northgate Drive to node NS6140, located at the<br />
intersection of Northgate Drive and Old Rafe Meyer Road. This forcemain will tie into the<br />
forcemain from PS 275, which is part of Group Project 1B (Metro Airport Area Sewer Pump<br />
Station and Forcemain Upgrades).<br />
Scope<br />
The detailed scope of this project, which includes construction of forcemains in the North<br />
Forced West Basin, is shown in Table 5-20.<br />
TABLE 5-20<br />
NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer Area Upgrades) – Pipeline<br />
Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
BPS 513 NS6087 2,500 18 20<br />
PS 371 NS6049 1,600 4 6<br />
PS OXLF NS6037 1,500 6 10<br />
PS123 NS6033 3,000 6 8<br />
PS124 NS6011 30 6 8<br />
NS6011 NS6022 15,000 10 12<br />
NS6022 NS6025 5,800 10 14<br />
PS320FM NS6035 3,000 6 8<br />
PS243FM NS6140 3,340 8 12<br />
Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />
Total Construction Bid Amount is $4,800,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation Year is 2013.<br />
Design and Construction have Not Started.<br />
GNV31031158552.DOCX/103470004 5-63 JANUARY 2011<br />
REV. 5
#<br />
PRIVATETMT<br />
#<br />
Port Hudson-Pride<br />
!R #<br />
PS124<br />
NS6011<br />
Jackson<br />
Samuels<br />
Irene<br />
Barnett<br />
Samuels<br />
East Baton Rouge Parish<br />
PS452 !R<br />
#<br />
NS6022 #<br />
#<br />
NS6025 PS320FM<br />
PS430<br />
!R !R #<br />
#<br />
PSOXLF NS6033<br />
## !R !R !R !R NS6035<br />
#<br />
NS6037<br />
#<br />
PS361<br />
#<br />
PS123<br />
NS6049 PS371<br />
!R #<br />
!R !R #<br />
#<br />
PS205 #<br />
PS318<br />
#<br />
PS65A<br />
PS14<br />
#<br />
#<br />
#<br />
PS513 Dyer<br />
!R #<br />
NS6087<br />
!R<br />
#<br />
PS243FM #<br />
#<br />
#<br />
#<br />
PS312 PS105<br />
!R<br />
#<br />
#<br />
# # # #<br />
!R NS6145A<br />
!R<br />
PS268 PS242<br />
# #<br />
#<br />
#<br />
PS109<br />
PS125#<br />
#<br />
# # PS240<br />
# #<br />
#<br />
NS6204<br />
!R # #<br />
# # PS176# # #<br />
#<br />
PS210 # #<br />
#<br />
# #<br />
PS86<br />
##<br />
# PS79 #<br />
#<br />
# #<br />
#<br />
PS46<br />
#<br />
#<br />
#<br />
PS230<br />
PS244 # #<br />
#<br />
#<br />
#<br />
# #<br />
#<br />
PS231<br />
#<br />
##<br />
# PS313 PS341<br />
PSPRVT BPS511 PS196<br />
#<br />
#<br />
#<br />
#<br />
# # #<br />
PSSU2<br />
PSSU1<br />
#<br />
#<br />
#§¨¦ I-110<br />
#<br />
# # #<br />
PS47FM PS35FM PS453<br />
#<br />
#<br />
# #<br />
# # #<br />
PS195 PS138 PS113<br />
!R !R!R<br />
#<br />
# #<br />
PS39DS<br />
# # PS39FM<br />
PS11 # PS454<br />
#<br />
#<br />
#<br />
!R!R<br />
# #<br />
# # #<br />
#<br />
#<br />
# # # #<br />
# # PS18<br />
#<br />
#<br />
# #<br />
#<br />
#<br />
#<br />
# PS16 PS190 PS293<br />
PS289<br />
PS1012<br />
# #<br />
#<br />
# PS169<br />
#<br />
#<br />
# #<br />
# #<br />
#<br />
# #<br />
# #<br />
Legend<br />
# # #<br />
Proposed<br />
Existing<br />
<strong>Plan</strong>k Rd. - Port Hudson Pride Rd.<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NFW-C-0007<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-21<br />
Barnett<br />
Carney<br />
NS6140<br />
Flonacher<br />
Groom<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
Rollins<br />
Gsu<br />
Scenic<br />
72nd<br />
0 1<br />
2<br />
Miles<br />
<strong>Plan</strong>k<br />
Tucker<br />
Milldale<br />
Core<br />
Peairs<br />
Joor<br />
Joor
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
Project NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) includes the<br />
upgrade of PS 243, PS 105, BPS 513, PS OXLF, PS 123, PS 124, PS 429, and PS 43. These<br />
upgrades are required to alleviate SSOs at and near the pump stations as well as in their<br />
respective upstream basins.<br />
Location<br />
The locations of the pump stations are given in Table 5-21 and is shown in Figure 5-22.<br />
Scope<br />
This project includes the replacement of the pump stations shown in Table 5-21. BPS 513 is<br />
being replaced so that it becomes a wet well pump station, rather than an in-line booster<br />
station.<br />
TABLE 5-21<br />
NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS 243 Northgate Drive 625 1,145 184<br />
PS 105 Jupiter Drive off Roman Drive 833 833 94<br />
BPS 513 Bentley Drive off <strong>Plan</strong>k Road 7,430 3,125 235<br />
PS OXLF<br />
Int of Little Farms Drive and<br />
Jersey Drive<br />
Not Available 1,416 112<br />
PS 123 Arleen Ave 139 403 31<br />
PS 124<br />
Int of Hudson Pride Road and<br />
Hagen Drive<br />
208 1,055 120<br />
PS 429 Hooper Ridge Blvd Not Available 412 22<br />
PS 43 Int of Ralph Street and Shada Ave 7,083 9,841 1,937<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $6,000,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation Year is 2013.<br />
Design and Construction have Not Started.<br />
GNV31031158552.DOCX/103470004 5-65 JANUARY 2011<br />
REV. 5
Burrel<br />
#<br />
PRIVATETMT<br />
PS357<br />
#<br />
Port Hudson-Pride<br />
#I<br />
#<br />
PS124<br />
PS124<br />
#<br />
Tucker<br />
Jackson<br />
Rollins<br />
McHost<br />
Irene<br />
Flonacher<br />
Samuels<br />
Barnett<br />
Barnett<br />
Zimmerman<br />
Carney<br />
East Baton Rouge Parish<br />
#<br />
# PS452<br />
#<br />
PS430<br />
PSOXLF #<br />
#<br />
#I<br />
PS320<br />
## PSOXLF<br />
PS361<br />
#<br />
#<br />
PS123<br />
#<br />
#I<br />
PS123<br />
PS371 #<br />
#<br />
PS205<br />
#<br />
#<br />
PS318<br />
#<br />
PS65A<br />
PS14<br />
#<br />
#<br />
BPS513<br />
#<br />
#I<br />
#<br />
BPS513 PS105<br />
PS243<br />
#<br />
#I<br />
PS243 #<br />
#<br />
PS312 PS105<br />
# PS275<br />
# #<br />
#I<br />
#<br />
# # # #<br />
PS268 PS129<br />
# #<br />
#<br />
#<br />
PS109<br />
PS125#<br />
#<br />
# #<br />
PS240<br />
# #<br />
PS176<br />
#<br />
PRIVATEPS # # PS45 # # # # #<br />
#<br />
# #<br />
#<br />
# #<br />
PS86<br />
##<br />
#<br />
PS79<br />
#<br />
#<br />
# #<br />
#<br />
PS46<br />
PS179<br />
PS230<br />
#<br />
#<br />
#<br />
PS255<br />
BPS897 PS429 # # #<br />
#<br />
# #<br />
#I#I<br />
#<br />
PS231<br />
#<br />
#<br />
##<br />
#<br />
PS313 PS341<br />
PS196<br />
#<br />
#<br />
#<br />
#<br />
#<br />
# # #<br />
PSSU2<br />
PSSU1<br />
#<br />
#<br />
#<br />
PS43 #<br />
# # #<br />
#I<br />
PS453<br />
PS138<br />
#<br />
#<br />
# #<br />
#<br />
PS113<br />
# #<br />
PS195<br />
#<br />
# #<br />
# # PS11 # PS288<br />
#<br />
#<br />
# #<br />
# # #<br />
Legend<br />
#<br />
# #<br />
Proposed<br />
#<br />
Existing<br />
Multiple PS - HWY 61 - <strong>Plan</strong>k Rd.<br />
#I<br />
³<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
NFW-C-0009<br />
Exist. Forcemain<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
Project Vicinity Map<br />
!R Manholes\Nodes<br />
") New Storage Facility Figure 5-22<br />
#I<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
McHugh<br />
0 1<br />
2<br />
Miles<br />
Main<br />
Pettit<br />
Comite<br />
Dyer<br />
Blackwater<br />
Core<br />
Neff<br />
Peairs<br />
Joor<br />
Joor<br />
Milldale<br />
Dorset
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs<br />
Road)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road)<br />
project includes the upgrade of PS 24, PS 24A, PS 503, PS 119N, and PS 183. These upgrades<br />
are required to alleviate SSOs at and near the pump stations as well as in their respective<br />
upstream basins.<br />
Location<br />
The locations of the pump stations are shown in Table 5-22 and in Figure 5-23.<br />
Scope<br />
This project includes the replacement of pump stations as outlined in Table 5-22.<br />
TABLE 5-22<br />
NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road) – Pump Station Information<br />
PS No.<br />
Location<br />
Existing Max<br />
Capacity<br />
(GPM)<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Dry<br />
Weather<br />
(GPM)<br />
PS 24<br />
PS 24A<br />
PS 503<br />
PS 119N<br />
PS 183<br />
Sherwood Street between Wildwood<br />
Parkway and Lemonwood Drive<br />
Sherwood Street between Wildwood<br />
Parkway and Lemonwood Drive<br />
Greenwell Springs Road between the<br />
intersection of Aletha Drive and Pasadena<br />
Drive<br />
Sarasota Drive between Biscayne Drive and<br />
Flamingo Drive<br />
Canterbury Drive between the intersection of<br />
Greenforest Drive and Monticello Blvd<br />
4,028 3,867 1,733<br />
5,902 3,692 165<br />
2,847 4,095 736<br />
417 968 108<br />
1,528 2,204 443<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />
Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />
model.<br />
Total Construction Bid Amount is $4,800,000.<br />
Scheduled Design Appropriation Year is 2011.<br />
Scheduled Construction Appropriation Year is 2012.<br />
Design and Construction have Not Started.<br />
GNV31031158552.DOCX/103470004 5-67 JANUARY 2011<br />
REV. 5
Foster<br />
Cora<br />
#<br />
#<br />
Yancy<br />
#<br />
PS78<br />
#<br />
#<br />
PS127<br />
#<br />
#<br />
72nd<br />
#<br />
#<br />
#I#I<br />
#<br />
#<br />
#<br />
#<br />
PS45<br />
PS126<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS179<br />
PS24A PS24<br />
North<br />
East Baton Rouge Parish<br />
44th<br />
#<br />
#<br />
#<br />
PS49<br />
PS79<br />
PS52A<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS52<br />
#<br />
PS432<br />
PS76<br />
Prescott<br />
Renoir<br />
Lobdell<br />
#<br />
#<br />
PS150<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
#<br />
# # #<br />
PS246<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#<br />
PS313 PS341<br />
# #<br />
#<br />
#I<br />
PS11<br />
#<br />
#<br />
#<br />
Choctaw<br />
Legend<br />
³<br />
PS55<br />
Tom<br />
Wooddale<br />
PS94<br />
Goodwood<br />
#<br />
#<br />
#<br />
PS83<br />
#<br />
PS255<br />
PS130<br />
#<br />
PS453<br />
#<br />
#<br />
PS277<br />
PS98<br />
BPS511<br />
#<br />
PS144<br />
#<br />
#<br />
#<br />
#<br />
# #<br />
PS222<br />
#<br />
Smith<br />
PS196<br />
# #<br />
#<br />
#<br />
#<br />
#<br />
#<br />
#I<br />
PS281<br />
PS81<br />
PS86<br />
PS288<br />
#<br />
##<br />
#<br />
#<br />
#<br />
#<br />
# PS190<br />
PS16<br />
#<br />
#<br />
PS176<br />
BPS503<br />
#<br />
PS284<br />
Joor<br />
PS418<br />
#<br />
#<br />
PS195<br />
BPS503<br />
Sharp<br />
#<br />
PS202<br />
#<br />
#<br />
#<br />
#<br />
# #<br />
#I<br />
#I<br />
#<br />
#<br />
# #<br />
PS293<br />
PS359<br />
#<br />
#<br />
PS50<br />
PS406<br />
#<br />
#<br />
PS231<br />
#<br />
PS230<br />
#<br />
PS113<br />
PS183<br />
PS119N<br />
Archery<br />
Multiple PS - Prescott Rd. -<br />
Proposed<br />
Existing<br />
Greenwell Springs Rd.<br />
New Pump<br />
Exist. Gravity<br />
#I Stations<br />
Exist. Forcemain<br />
NFW-C-0010<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility<br />
0 0.5 1<br />
Mile<br />
Figure 5-23<br />
PS169<br />
#<br />
#<br />
# #<br />
#<br />
#<br />
#<br />
#
SECTION 5. NORTH BASIN PROJECTS<br />
5.4.17 NFW-HWY61 (Zachary Area Transmission Network Improvement Project –<br />
Phases I, II, III, and IV)<br />
Project Description<br />
Purpose of the Project / Project Background<br />
The purpose of the NFW-C-HWY61 (Zachary Area Transmission Network Improvements)<br />
project is to address inadequate capacity in the Baker/Zachary contributing area and to<br />
divert flow from the Zachary contributing area around the Comite Diversion Canal to the<br />
North WWTP. This project also includes conversion of the Red Mud Lakes facility into a<br />
permanent storage facility, which will reduce the peak flows to the North WWTP from the<br />
Zachary area.<br />
Scope<br />
The NFW-C-HWY61 project consists of construction of pump stations, forcemains, and an<br />
equalization basin/storage facility to serve the Zachary area north of the Comite Diversion<br />
Canal. The project will re-route Zachary flows directly to the NWWTP, freeing up currently<br />
utilized capacity in the Baker system. The forcemains, shown in Figure 5-24, begin at the<br />
northern border of East Baton Rouge Parish and follow Highway 964 southward to its<br />
intersection with the Entergy transmission main right-of-way. This forcemain will increase<br />
in size as it runs southward, from a 16-inch to a 30-inch, since it will receive flow from this<br />
area as it develops. The existing Copper Mill pump station (PS 430) will pump through its<br />
existing 16-inch forcemain to the Hwy 964 PS located at the intersection of the Entergy rightof-way<br />
and Highway 964. A new pump station (Old Baker Road PS), located north of the<br />
intersection of Old Baker Road with the Entergy right-of-way, will capture all sewage from<br />
the Old Baker Road gravity main and pump through a 24-inch forcemain westward to<br />
Highway 964. The Hwy 964 PS will collect the flow from the 30-inch forcemain from the<br />
north, the existing 16-inch Copper Mill forcemain, and the new 24-inch Old Baker Road<br />
forcemain. This pump station will pump through a 48-inch forcemain westward along the<br />
Entergy right-of-way. The 48-inch forcemain will then follow Barnett Road, and cross<br />
Highway 61, to the Red Mud Lakes Equalization Facility.<br />
The 20 million gallon (MG) equalization facility will be built inside the existing Red Mud<br />
Lakes facility that the C-P purchased from Kaiser Aluminum in 2004. The equalization basin<br />
will be utilized for storage during wet weather when flows in the forcemain exceed 20 mgd. A<br />
pump station with a capacity of 20 MGD, constructed on the Red Mud Lakes site, will pump<br />
the flow from the equalization facility to the North WWTP through a 30-inch forcemain that<br />
travels southeasterly along an existing servitude that is located to the west of Highway 61.<br />
Table 5-23 below shows the capacities of each of the pump stations. Table 5-24 shows the<br />
sizes and lengths of the forcemains.<br />
TABLE 5-23<br />
NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) – Pump Station Information<br />
Existing Max<br />
Capacity<br />
PS No.<br />
Location<br />
(GPM)<br />
Old Baker West of the intersection of <strong>Plan</strong>k Road with Entergy<br />
New 10,188<br />
Road PS Right-of-Way<br />
Hwy 964 PS Intersection of Highway 964 and Entergy Right-of-Way New 27,257<br />
New 13,899<br />
Red Mud<br />
Lakes PS<br />
Red Mud Lakes Equalization Facility, near East Baton<br />
Rouge Parish Landfill<br />
Future Peak Wet<br />
Weather Flow<br />
(GPM)<br />
Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />
reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />
GNV31031158552.DOCX/103470004 5-69 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-24<br />
NFW-C-HWY61 (Zachary Area Transmission Network Improvement Project) - Forcemains<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Old Baker PS Hwy 964 PS 10,500 New 24<br />
Northern Parish<br />
Boundary<br />
Northern Parish<br />
Boundary<br />
Northern Parish<br />
Boundary<br />
Northern Parish<br />
Boundary<br />
Hwy 964 PS 3,100 New 16<br />
Hwy 964 PS 8,850 New 20<br />
Hwy 964 PS 2,000 New 24<br />
Hwy 964 PS 11,630 New 30<br />
Hwy 964 PS<br />
Red Mud Lakes<br />
EQ Facility<br />
33,900 New 48<br />
Red Mud Lakes<br />
EQ Facility<br />
North WWTP 32,750 New 30<br />
Note: The pipe sizes and pipe lengths were obtained from the BTRSSO hydraulic model.<br />
The project was separated into four (4) construction contracts for ease of management and<br />
execution, as follows:<br />
<br />
ZATNIP Phase I - 3 Pump Station Sites and Equalization Basin - 3 pump stations, 14 to<br />
40 MGD and a 20 MG Equalization Basin<br />
ZATNIP Phase II - Red Mud Lakes Force Main to NWWTP - 31,000 l.f. 30” to 42”<br />
ZATNIP Phase III - Force Main from Highway 964 to the Red Mud Lakes - 32,000 l.f. 48”<br />
to 66”<br />
<br />
ZATNIP Phase IV – Zachary Interceptor, Old Baker Road and Highway 964 Force Mains<br />
- 42,500 l.f. 14” to 36”<br />
Total Construction Bid Amount $58,600,000.<br />
Scheduled Design Appropriation Year is 2008.<br />
Scheduled Construction Appropriation Year was 2010.<br />
Phases I, III, and IV are Under Construction. Phase II Design is On-Going.<br />
GNV31031158552.DOCX/103470004 5-70 JANUARY 2011<br />
REV. 5
Charlton<br />
Adams<br />
Safer<br />
Jacock<br />
Portwood<br />
PS357<br />
#<br />
Vernon<br />
Sutter<br />
#<br />
PRIVATETMT<br />
Ligon<br />
Port Hudson-Pride<br />
#<br />
PS124<br />
J Wicker<br />
Rollins<br />
Port Hickey<br />
State Route 3113<br />
Mount Pleasant Zachary<br />
East Baton Rouge Parish<br />
Irene<br />
Samuels<br />
Flonacher<br />
")<br />
Barnett<br />
Irene<br />
#<br />
#<br />
#<br />
#I #I<br />
#<br />
PS361<br />
# #<br />
Old Baker Rd PS<br />
Hwy 964 PS<br />
#<br />
Red Mud Lakes Storage Facility 20 MG<br />
Samuels<br />
\\JAZZ\PROJ\BTR_SSO_350589\MAPFILES\PDP-UPDATE-SCOTT_BACKUP_060109.MXD SGELPI 6/17/2009 10:41:23<br />
PRIVATETMT<br />
Carney<br />
Zimmerman<br />
PS46<br />
PS243<br />
#<br />
#<br />
#<br />
#<br />
PRIVATEPS<br />
I<br />
Hovey<br />
H<br />
Leland<br />
PS430<br />
#<br />
PS205<br />
PS65A<br />
#<br />
#<br />
#<br />
§¨¦ I-110<br />
#<br />
PS210<br />
#<br />
PS109<br />
#<br />
PS14<br />
PS45<br />
#<br />
#<br />
# #<br />
# #<br />
#<br />
# #<br />
PS268 PS129<br />
#<br />
#<br />
#<br />
#<br />
PS126<br />
PS179<br />
Main<br />
Rolling Acres<br />
#<br />
BPS513<br />
PS240<br />
#<br />
PS79<br />
PSLF2<br />
<strong>Plan</strong>k<br />
#<br />
#<br />
##<br />
Dyer<br />
#<br />
#<br />
#<br />
PS452<br />
#<br />
PS312 PS105<br />
#<br />
#<br />
PS432<br />
# # #<br />
#<br />
# #<br />
PS313 PS341<br />
#<br />
# # #<br />
Legend #<br />
#<br />
Proposed<br />
Zachary Area Transmission Network<br />
Existing<br />
#I<br />
³<br />
Improvement Project<br />
New Pump<br />
Exist. Gravity<br />
Stations<br />
Exist. Forcemain<br />
NFW-C-HWY61<br />
New Gravity Main<br />
# Exist. Pump Station<br />
New Force Main<br />
!R Manholes\Nodes<br />
Project Vicinity Map<br />
") New Storage Facility Figure 5-24<br />
0 1<br />
2<br />
Miles<br />
Pettit<br />
#<br />
#
SECTION 5. NORTH BASIN PROJECTS<br />
This page intentionally left blank.<br />
GNV31031158552.DOCX/103470004 5-72 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
5.5 North WWTP Master <strong>Plan</strong> Improvements<br />
5.5.1 Background<br />
Capacity improvements are not required at the North WWTP, so there are no wet weather<br />
projects at the North WWTP. However, the treatment plant is more than 30 years old, so<br />
several improvements are needed to keep the plant running for years to come. The Draft<br />
Master <strong>Plan</strong> (CH2M HILL, 2008) outlined the needed improvements in two priorities:<br />
Priority One and Priority Two.<br />
5.5.2 Priority One Improvements<br />
Priority One improvements are urgent needs, which include health and safety, code<br />
compliance, and regulatory compliance. Health and safety needs include improvements that<br />
are required to mitigate endangerment to human health and safety, such as chlorine gas<br />
storage, missing/damaged handrails, and equipment in deteriorated conditions. Code<br />
compliance needs include improvements that are required to meet building codes, such as<br />
those outlined in the Master <strong>Plan</strong> – Wastewater Treatment <strong>Plan</strong>t Building Condition Assessment<br />
TM ( refer to Draft Master <strong>Plan</strong>; CH2M HILL, 2008). Regulatory compliance issues include<br />
improvements that are required to meet regulations, such as discharge limits. No additional<br />
facilities are needed at the North WWTP for regulatory compliance.<br />
The improvements included in Priority One include building improvements, equipment<br />
improvements, alternate disinfection, and standby power.<br />
Building Improvements<br />
The Master <strong>Plan</strong> – Wastewater Treatment <strong>Plan</strong>t Building Condition Assessment TM<br />
(CH2M HILL, 2008) recommends improvements to be made to at the buildings that are<br />
located at the North WWTP. The Draft Master <strong>Plan</strong> recommends that the following building<br />
components be repaired or replaced:<br />
<br />
<br />
<br />
<br />
Metal windows<br />
Roofing<br />
Damaged walls and floors<br />
Ventilation systems<br />
Improvements Due to Equipment Condition<br />
The Master <strong>Plan</strong> – Existing Wastewater Treatment <strong>Plan</strong>t Descriptions and Infrastructure Condition<br />
Assessment (CH2M HILL, 2008) recommends the following modifications at the North<br />
WWTP due to the condition assessment for priority one.<br />
<br />
<br />
Process Equipment – 71 mechanical/electrical items to be replaced<br />
Handrail replacement/reconditioning<br />
Alternate Disinfection<br />
The C-P currently utilizes gaseous chlorine for wastewater disinfection, which poses a<br />
significant health and safety hazard for plant staff and the surrounding community.<br />
Therefore, the Draft Master <strong>Plan</strong> (CH2M HILL, 2008) recommends that gas chlorine<br />
disinfection be abandoned at the North WWTP for a less hazardous alternative. A<br />
disinfection technology alternative analysis was performed and is outlined in Master <strong>Plan</strong> –<br />
Disinfection Assessment for the Baton Rouge North, Central, and South Wastewater Treatment<br />
GNV31031158552.DOCX/103470004 5-73 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
<strong>Plan</strong>ts (CH2M HILL, 2008). The technologies that were evaluated included purchased<br />
sodium hypochlorite, on-site generation of sodium hypochlorite, ultraviolet (UV)<br />
disinfection, and a combination of UV disinfection and purchased sodium hypochlorite.<br />
At the North WWTP, use of purchased 12.5% sodium hypochlorite is the least-costly<br />
alternative, given a 20-year present worth basis. UV was found to be considerably more<br />
expensive on a present worth basis than sodium hypochlorite, primarily because it would<br />
also require upgrading the North WWTP to a trickling filter/solids contact (TF/SC) process.<br />
Trickling filter effluents are considered unsuitable for UV disinfection.<br />
Standby Power<br />
Standby power for the North WWTP is discussed in the Emergency Generators section of<br />
this PDP.<br />
5.5.3 Priority Two Improvements<br />
Priority Two improvements include operations and maintenance needs that include asset<br />
preservation, cost efficiency needs, and environmental needs. Asset preservation needs<br />
include improvements that are required to preserve existing assets, such as screening and<br />
grit removal. Cost efficiency needs include improvements that are required to increase the<br />
efficiency of operations and maintenance, such as SCADA. Environmental needs include<br />
improvements that are required to improve the overall environment of the North WWTP,<br />
such as odor control.<br />
The improvements included in Priority Two are new preliminary treatment, new influent<br />
pump station, odor control, digester gas utilization, and SCADA.<br />
New Preliminary Treatment and Influent Pump Station<br />
The Master <strong>Plan</strong> – Existing Wastewater Treatment <strong>Plan</strong>t Descriptions and Infrastructure Condition<br />
Assessment (CH2M HILL, 2008) recommends the following modifications at the North<br />
WWTP due to the condition assessment for Priority Two.<br />
<br />
<br />
New Preliminary Treatment (screenings and grit removal)<br />
New Influent Pump Station<br />
These facilities will allow the North WWTP to continue to operate into the future.<br />
Odor Control<br />
Odor issues were evaluated at each of the three large WWTPs. This evaluation included<br />
conducting air sampling to determine where odors are experienced at each WWTP. Once<br />
the odor issues were identified, several odor control technologies were evaluated. Biotowers<br />
are recommended as the primary odor control technology, with some other<br />
technologies being used for specific odor issues, such as those at dewatering facilities. Refer<br />
to Master <strong>Plan</strong> – Odor Control Analysis and Facility <strong>Plan</strong> Recommendations (CH2M HILL, 2008)<br />
for more information.<br />
The North WWTP has the highest odor emissions, which are creating a nuisance for nearby<br />
residents. Given resident complaints at the North WWTP, the North WWTP Odor Control<br />
Project, which includes chemical feed at five pump stations feeding into the treatment plant<br />
and biotowers at the headworks, was given a high priority and is expected to remediate the<br />
GNV31031158552.DOCX/103470004 5-74 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
problem. This project is currently nearing construction completion. Other odor control<br />
improvements recommended at the North WWTP include:<br />
<br />
<br />
<br />
Install flat covers on the primary effluent weir and launder portions of the primary<br />
clarifiers with biotower odor treatment.<br />
Rehabilitate the existing carbon scrubbers on the dewatering building and add a firststage<br />
wet scrubber.<br />
Provide scrubbers and covers at the new influent pump station and headworks.<br />
Digester Gas Utilization<br />
An evaluation of the potential to utilize biogas that it a by-product of the anaerobic<br />
digestion process was discussed in the Master <strong>Plan</strong> – Biogas Storage and Utilization TM<br />
(CH2M HILL, 2008). The feasibility to capture the biogas and utilize it as an alternative fuel<br />
for heating the anaerobic digesters, rather than flaring the biogas and utilizing natural gas<br />
for heating (the current practice at all three large WWTPs) was evaluated. During the<br />
evaluation, it was found that most of the gas storage equipment, gas compressors, and<br />
engine generators that are necessary to utilize biogas were present but not in use at any of<br />
the three large WWTPs. Based on the evaluation, it is recommended to install biogas storage<br />
at the North WWTP. The stored biogas would be used for heating the anaerobic digesters.<br />
SCADA<br />
The North WWTP SCADA system is discussed in the SCADA section of this PDP.<br />
5.5.4 Estimated Costs<br />
The Draft Master <strong>Plan</strong> outlines the estimated construction cost of the Priority One and<br />
Priority Two improvements. The costs for standby power and SCADA are included in the<br />
Emergency Generators and SCADA sections of this document, although they are also shown<br />
in Table 5-25 below. The table outlines the estimated construction costs of the North WWTP<br />
Master <strong>Plan</strong> improvements. Even though costs are presented separately for Priority One,<br />
Priority Two, Standby Power, and SCADA, it is likely that one project would be designed<br />
and constructed to implement all improvements at once. The Total Construction Bid<br />
Amount, assuming that sales tax will be waived on materials, for the North WWTP Master<br />
<strong>Plan</strong> Improvements is $34,349,000.<br />
TABLE 5-25<br />
Summary of Estimated Construction Costs for the North WWTP<br />
Item<br />
Estimated Cost<br />
Priority One<br />
Building Condition Assessment $3,000,000<br />
Equipment Condition Assessment $4,200,000<br />
Handrail Rehabilitation/Replacement $800,000<br />
Alternate Disinfection (Sodium Hypochlorite) $2,500,000<br />
Priority One Sub-Total Construction Bid Amount $10,500,000<br />
Estimated Sales Tax Waiver -$312,000<br />
GNV31031158552.DOCX/103470004 5-75 JANUARY 2011<br />
REV. 5
SECTION 5. NORTH BASIN PROJECTS<br />
TABLE 5-25<br />
Summary of Estimated Construction Costs for the North WWTP<br />
Item<br />
Estimated Cost<br />
Priority One Total Construction Bid Amount $10,188,000<br />
Standby Power (including estimated sales tax waiver) $5,337,000<br />
Priority Two<br />
New Screenings/Grit Removal $6,500,000<br />
New Influent Pump Station $2,100,000<br />
Odor Control $6,800,000<br />
Digester Gas Utilization $1,700,000<br />
Priority Two Sub-Total Construction Bid Amount $17,100,000<br />
Estimated Sales Tax Waiver -$508,000<br />
Priority Two Total Construction Bid Amount $16,592,000<br />
SCADA (including estimated sales tax waiver) $2,232,000<br />
Total Construction Bid Amount for North WWTP Master <strong>Plan</strong> $34,349,000<br />
GNV31031158552.DOCX/103470004 5-76 JANUARY 2011<br />
REV. 5
SECTION 6<br />
Emergency Generators<br />
6.1 Background<br />
The C-P does not currently have emergency/standby power generators at the majority of its<br />
pump stations in the collection system or at the WWTPs. Hurricane Gustav caused power<br />
outages throughout much of the C-P for the majority of a week. During this time, the<br />
collection system was not able to convey flows to the WWTPs due to lack of power at the<br />
pump stations in the system, and the WWTPs were not able to operate. There were a total<br />
of34 pump stations in the C-P that overflowed during and/or following Hurricane Gustav.<br />
To address this issue, the C-P will install emergency generators at the combined<br />
South/Central WWTP, the North WWTP, and all the pump stations in the collection system.<br />
The wastewater projected flows and loads for the combined South/Central and North<br />
WWTP were used to determine the projected electrical demands for each plant. The<br />
treatment facilities at the North WWTP identified for upgrade during development of the C-<br />
P Draft Master <strong>Plan</strong> (CH2M HILL, 2008) are not included in this updated PDP. However, the<br />
costs for the generators needed at the North WWTP (and identified in the Draft Master <strong>Plan</strong>)<br />
are included in this updated PDP.<br />
6.2 Collection System Pump Stations<br />
To determine how many and what size of generators will be needed at each of the collection<br />
system pump stations, the stations were first divided into existing (non-PDP impacted) and<br />
PDP pump stations. For the PDP stations, each station’s pumped flow and head were then<br />
determined or assumed with the resulting hydraulic horsepower calculated. The<br />
horsepower of the motors were then determined and ultimately generator units were<br />
selected and installed costs were determined. Each of the existing pump stations were<br />
visited by a field crew, and the horsepower requirement for the pumps were recorded. A<br />
generator sizing software program was used to select the appropriate generator sizes.<br />
A list of 294 existing (non-PDP impacted) operational pump stations were developed based<br />
on C-P information (see Table 6-1). These stations will not be modified as part of the<br />
<strong>Program</strong>.<br />
TABLE 6-1<br />
Summary of Generator Units<br />
Existing Pump Stations (not impacted by the PDP)<br />
Generator Unit<br />
Size (KW)<br />
Number of<br />
Units Unit Installed Cost<br />
Total Installed Cost<br />
2007<br />
10 70 $ 25,000 $ 1,750,000<br />
20 64 $ 28,000 $ 1,792,000<br />
40 52 $ 45,000 $ 2,340,000<br />
60 44 $ 48,000 $ 2,112,000<br />
80 27 $ 53,000 $ 1,431,000<br />
100 15 $ 56,000 $ 840,000<br />
125 6 $ 62,000 $ 372,000<br />
GNV31031158554.DOCX/103470007 6-1 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-1<br />
Summary of Generator Units<br />
Existing Pump Stations (not impacted by the PDP)<br />
Generator Unit<br />
Size (KW)<br />
Number of<br />
Units<br />
Unit Installed Cost<br />
Total Installed Cost<br />
2007<br />
150 5 $ 68,000 $ 340,000<br />
250 3 $ 84,000 $ 252,000<br />
600 1 $ 193,000 $ 193,000<br />
TOTAL 287 $ 11,422,000<br />
Total Estimate: $11,422,000 Existing Stations (non-PDP impacted)<br />
Note 1: For each category, a diesel generator, automatic transfer switch, enclosure equipment pad, and other<br />
accessories were sized to estimate an installed construction cost.<br />
Note 2: See Appendix A for detailed information on each of the existing stations and their respective generator<br />
requirements.<br />
The 144 C-P pump stations that are to be added or modified as part of the <strong>Program</strong> are<br />
identified in Table 6-2.<br />
TABLE 6-2<br />
Summary of Generator Units<br />
PDP Pump Stations<br />
Generator Unit<br />
Size<br />
Number of<br />
Units Unit Installed Cost Total Installed Cost<br />
10 4 $ 25,000 $ 100,000<br />
20 11 $ 28,000 $ 308,000<br />
40 34 $ 45,000 $ 1,530,000<br />
60 19 $ 48,000 $ 912,000<br />
80 18 $ 53,000 $ 954,000<br />
100 8 $ 56,000 $ 448,000<br />
125 11 $ 62,000 $ 682,000<br />
150 6 $ 68,000 $ 408,000<br />
200 2 $ 75,000 $ 150,000<br />
250 5 $ 84,000 $ 420,000<br />
300 2 $ 98,000 $ 196,000<br />
400 6 $ 115,000 $ 690,000<br />
500 3 $ 154,000 $ 462,000<br />
600 6 $ 193,000 $ 1,158,000<br />
800 4 $ 266,000 $ 1,064,000<br />
1000 2 $ 339,000 $ 678,000<br />
2500 3 $ 1,260,000 $ 3,780,000<br />
TOTAL 141 $ 13,364,000<br />
Total Estimate: $15,556,000 Existing Stations (not expanded)<br />
Note 1: Some of the large pump stations require more than one installed generator unit.<br />
Note 2: See Appendix B for detailed information on each of the PDP stations and their respective generator<br />
requirements.<br />
Note 3: For each category, a diesel generator, automatic transfer switch, enclosure equipment pad, and other<br />
accessories were sized with a resulting estimated installed construction cost.<br />
GNV31031158554.DOCX/103470007 6-2 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
6.3 Wastewater Treatment <strong>Plan</strong>ts<br />
For the North and South/Central WWTPs, the generation capacity needed was estimated<br />
based on the future estimated total flows and current loads seen at each of the plants.<br />
Natural gas generators were selected due to operator preference for natural gas. Cost<br />
estimates were developed for both the stand alone generators, and for the installed<br />
generator systems including automatic transfer switches, equipment pads, enclosures, and<br />
other site specific equipment necessary to integrate the generators into the facility’s<br />
electrical system<br />
The North WWTP estimated generator installed cost is $5.3 M (including estimated sales tax<br />
waiver) for 7.5 MW of generation capacity. This cost for standby power at the North WWTP<br />
is also listed in Section 5.5 North Master <strong>Plan</strong> Improvements Table 5-25 – Summary of<br />
Estimated Construction Costs for the North WWTP.<br />
The South/Central WWTP estimated installed cost is $9.3 M, for 12.5 MW of generation<br />
capacity. This cost is already included in the estimated construction cost for the Phase 2<br />
expansion project (STP-C-0002, South WWTP Phase 2 – Master <strong>Plan</strong> Portion).<br />
6.4 Generator Project <strong>Delivery</strong> <strong>Plan</strong><br />
In order to install generators in a timely manner at all pump stations and the North and<br />
South/Central WWTPs, a project delivery plan was developed. The first step in developing<br />
the project delivery plan was to prioritize the pump stations that were to get generators<br />
using the following criteria:<br />
1) Pump stations to be replaced as a part of PDP<br />
2) Existing pump stations (not impacted by this PDP) that overflowed during Hurricane<br />
Gustav<br />
3) Existing pump stations (not impacted by this PDP) that were on DPW staff’s list of<br />
critical pump stations<br />
4) Existing pump stations (not impacted by this PDP) that were not on any of the previous<br />
lists (with larger pump stations receiving higher priority than smaller pump stations)<br />
The WWTPs were prioritized based on the PDP and Draft Master <strong>Plan</strong> projects. As<br />
mentioned above, the South/Central WWTP generators will be installed as part of the South<br />
WWTP – Phase 2 project, with the generators funded as part of the overall project. The<br />
North WWTP generators will be installed as part of the North WWTP Master <strong>Plan</strong> project.<br />
The existing Central WWTP will not receive emergency generators, since current plans call<br />
for it to be decommissioned.<br />
The schedule of the project delivery is based on this prioritization as well as available<br />
budget. The available budget for generators is estimated to be $10 million in 2009, $10<br />
million in 2010, and $13 million in 2011. Therefore, for each of these three years, the first<br />
priority was the budget for generators at the PDP pump stations. After that, the second,<br />
third, and fourth priorities were considered in the order noted above. Table 6-3 shows the<br />
cost summary- for generator installation.<br />
GNV31031158554.DOCX/103470007 6-3 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-3<br />
Emergency Generators Cost Summary<br />
Item<br />
Generator Purchase (including maintenance)<br />
Generator Installation (non-PDP pump stations)<br />
North WWTP<br />
Land Acquisition<br />
Total<br />
$19.1M<br />
$7.1M<br />
$5.3M<br />
$0.5M<br />
$32.2M<br />
In order to deliver these projects in a timely manner, the following criteria were used to<br />
develop the project delivery plan.<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
All pump stations will have installed generators (no temporary generators, unless site<br />
constraints dictate).<br />
A 5-year renewable maintenance contract is required for the service of all generators.<br />
Pump stations will be designed as generator-ready.<br />
Generators will be provided by a generator vendor and installed by a general contractor.<br />
For PDP pump stations and WWTPs, the general contractor will be the general<br />
contractor for the entire project.<br />
The generator vendor will be selected by a bidding process. A 5-year maintenance<br />
contract will be part of this contract. The contract will be based on the number of<br />
generators needed per year, with a unit price given for each type of unit for each year.<br />
The generators will be delivered to a local warehouse, kept by the vendor, to be picked<br />
up and installed by the general contractors.<br />
The South WWTP generators will be delivered on the <strong>Program</strong> schedule by 2014, when<br />
the South WWTP – Phase 2 project is scheduled to be completed.<br />
The delivery plan included two contracts, one for purchase and maintenance of the<br />
generators and one for installation of the non-PDP units. The purchase and maintenance<br />
contract was awarded to Arcco Power Systems in October 2009. The project to install the<br />
non-PDP generators was bid in July 2010. As of November 2010, a notice to proceed had not<br />
been issued for this project. The installation project will consist of work orders issued over a<br />
three year period.<br />
With this project delivery plan, each pump station and WWTP will have emergency power<br />
by the end of the <strong>Program</strong> (December 31, 2014). A list of the pump stations are provided in<br />
Table 6-4.<br />
GNV31031158554.DOCX/103470007 6-4 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
Generator<br />
KW<br />
8 2 500 1 50 9 10 10 10 10<br />
11 AIR 40 AIR - - 5 5 5 10<br />
12 2 727 1 50 13 15 15 15 20<br />
14 2 400 1 50 7 10 10 10 10<br />
17 2 100 1 50 2 3 3 3 10<br />
20 2 125 1 50 2 3 3 3 10<br />
22 2 115 1 50 2 3 3 3 10<br />
25 AIR 100 AIR - - 5 5 5 10<br />
26 2 200 1 50 4 5 5 5 10<br />
28 2 300 1 50 5 5 5 5 10<br />
29 2 300 1 50 5 5 5 5 10<br />
34 AIR 60 AIR - - 5 5 5 10<br />
36 2 500 1 50 9 10 10 10 10<br />
37 2 100 1 50 2 3 3 3 10<br />
48 3 2380 2 75 64 75 150 146 150<br />
49 4 2380 3 100 86 100 300 293 325<br />
57 5 6325 4 125 285 300 1200 1170 1250<br />
60 5 2300 4 55 50 50 50 250 250<br />
62 2 781 1 50 14 15 15 15 20<br />
69 2 282 1 50 5 5 5 5 10<br />
70 2 350 1 50 6 7.5 7.5 7 10<br />
71 2 300 1 50 5 5 5 5 10<br />
72 3 332 2 75 9 10 20 20 20<br />
73 2 150 1 50 3 3 3 3 10<br />
78 2 200 1 50 4 5 5 5 10<br />
79 2 200 1 50 4 5 5 5 10<br />
81 2 100 1 50 2 3 3 3 10<br />
82 2 100 1 50 2 3 3 3 10<br />
83 AIR 65 AIR - - 5 5 5 10<br />
84 2 450 1 50 8 10 10 10 10<br />
85 3 500 2 75 14 15 30 29 35<br />
87 AIR 150 AIR - - 5 5 5 10<br />
88 2 250 1 50 5 5 5 5 10<br />
89 AIR 150 AIR - - 5 5 5 10<br />
GNV31031158554.DOCX/103470007 6-5 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
90 2 292 1 50 5 5 5 5 10<br />
92 2 250 1 28 5 5 5 40 40<br />
93 2 438 1 50 8 10 10 10 10<br />
94 2 283 1 106 20 20 20 80 80<br />
95 2 100 1 50 2 3 3 3 10<br />
96 2 150 1 50 3 3 3 3 10<br />
97 AIR 100 AIR - - 5 5 5 10<br />
98 2 500 1 50 9 10 10 10 10<br />
99 AIR 70 AIR - - 5 5 5 10<br />
100 2 200 1 50 4 5 5 5 10<br />
101 2 200 1 50 4 5 5 5 10<br />
103 2 176 1 50 3 3 3 3 10<br />
104 2 664 1 50 12 15 15 15 20<br />
106 2 287 1 50 5 5 5 5 10<br />
108 2 1140 1 50 21 25 25 24 35<br />
109 2 200 1 50 4 5 5 5 10<br />
114 2 260 1 50 5 5 5 5 10<br />
116 3 33 2 75 1 2 4 4 10<br />
117 2 100 1 50 2 3 3 3 10<br />
121 2 184 1 50 3 3 3 3 10<br />
122 2 122 1 50 2 3 3 3 10<br />
125 2 65 1 55 5.5 5.5 5.5 20 20<br />
126 2 300 1 50 5 5 5 5 10<br />
128 2 631 1 50 11 15 15 15 20<br />
130 2 109 1 50 2 3 3 3 10<br />
131 2 100 1 50 2 3 3 3 10<br />
132 2 202 1 50 4 5 5 5 10<br />
133 2 13 1 50 0 1 1 1 10<br />
134 2 600 1 50 11 15 15 15 20<br />
138 2 70 1 50 1 2 2 2 10<br />
140 2 369 1 50 7 7.5 7.5 7 10<br />
141 2 139 1 50 3 3 3 3 10<br />
142 2 250 1 50 5 5 5 5 10<br />
145 2 524 1 50 9 10 10 10 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-6 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
147 2 613 1 50 11 15 15 15 20<br />
150 2 436 1 50 8 10 10 10 10<br />
151 2 175 1 50 3 3 3 3 10<br />
154 2 763 1 50 14 15 15 15 20<br />
155 2 663 1 50 12 15 15 15 20<br />
156 2 306 1 79 20 20 20 40 40<br />
158 AIR 80 AIR - - 5 5 5 10<br />
159 2 144 1 50 3 3 3 3 10<br />
160 2 300 1 50 5 5 5 5 10<br />
161 2 594 1 50 11 15 15 15 20<br />
163 AIR 125 AIR - 5 5 5 10<br />
165 2 1 - - 0 0 10 10<br />
166 2 400 1 50 7 7.5 7.5 7 10<br />
168 2 344 1 50 6 7.5 7.5 7 10<br />
169 2 100 1 50 2 3 3 3 10<br />
171 2 300 1 50 5 5 5 5 10<br />
173 2 150 1 50 3 3 3 3 10<br />
176 2 395 1 38.5 10 10 10 80 80<br />
177 2+2 1000 3 100 36 40 120 117 125<br />
178 AIR 20 AIR - - 5 5 5 10<br />
179 2 100 1 50 2 3 3 3 10<br />
180 2 83.8 1 50 2 3 3 3 10<br />
181 2 274 1 50 5 5 5 5 10<br />
184 2 142 1 50 3 3 3 3 10<br />
185 2 178 1 50 3 3 3 3 10<br />
187 2 1 20 20<br />
189 2 360 1 50 6 7.5 7.5 7 10<br />
190 2 160 1 50 3 3 3 3 10<br />
191 2 367 1 50 7 7.5 7.5 7 10<br />
192 2 100 1 50 2 3 3 3 10<br />
193 2 110 1 50 2 3 3 3 10<br />
194 2 170 1 50 3 3 3 3 10<br />
195 2 395 1 50 7 7.5 7.5 7 10<br />
197 2 329 1 50 6 7.5 7.5 7 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-7 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
198 2 263 1 50 5 5 5 5 10<br />
200 2 481 1 50 9 10 10 10 10<br />
202 AIR 30 AIR - - 5 5 5 10<br />
203 2 187 1 50 3 3 3 3 10<br />
204 2 183 1 50 3 3 3 3 10<br />
205 2 154 1 50 3 3 3 3 10<br />
206 2 641 1 50 12 15 15 15 20<br />
210 2 150 1 50 3 3 3 3 10<br />
213 2 85 1 50 2 3 3 3 10<br />
214 2 80 1 50 1 2 2 2 10<br />
215 2 160 1 50 3 3 3 3 10<br />
216 AIR 70 AIR - - 5 5 5 10<br />
217 AIR 80 AIR - - 5 5 5 10<br />
219 2 275 1 50 5 5 5 5 10<br />
220 2 150 1 50 3 3 3 3 10<br />
222 2 103 1 50 2 3 3 3 10<br />
225 2 519 1 50 9 10 10 10 10<br />
226 2 429 1 50 8 10 10 10 10<br />
228 2 270 1 27 5 5 5 40 40<br />
230 2 135 1 43 5 5 5 80 80<br />
232 2 150 1 50 3 3 3 3 10<br />
233 2 85 1 50 2 3 3 3 10<br />
235 2 80 1 50 1 2 2 2 10<br />
237 2 150 1 50 3 3 3 3 10<br />
240 2 500 1 25 7.5 7.5 7.5 100 100<br />
242 2 200 1 50 4 5 5 5 10<br />
245 AIR 82 AIR - - 5 5 5 10<br />
246 2 1 7.5 7.5 7.5 40 40<br />
248 2 100 1 50 2 3 3 3 10<br />
250 2 450 1 50 8 10 10 10 10<br />
251 2 300 1 50 5 5 5 5 10<br />
254 AIR 40 AIR - - 5 5 5 10<br />
255 2 147 1 50 3 3 3 3 10<br />
256 AIR 70 AIR - - 5 5 5 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-8 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
257 AIR 40 AIR - - 5 5 5 10<br />
258 2 156 1 50 3 3 3 3 10<br />
259 2 227 1 50 4 5 5 5 10<br />
260 2 91 1 50 2 3 3 3 10<br />
261 2 150 1 50 3 3 3 3 10<br />
262 2 295 1 50 5 4 4 4 10<br />
263 2 184 1 50 3 3 3 3 10<br />
264 2 333 1 50 6 7.5 7.5 7 10<br />
265 2 169 1 50 3 3 3 3 10<br />
266 2 120 1 50 2 3 3 3 10<br />
267 AIR 70 AIR - - 5 5 5 10<br />
268 2 200 1 50 4 5 5 5 10<br />
272 2 200 1 50 4 5 5 5 10<br />
276 2 100 1 50 2 3 3 3 10<br />
279 2 131 1 50 2 3 3 3 10<br />
280 2 127 1 50 2 3 3 3 10<br />
281 2 230 1 50 4 5 5 5 10<br />
282 2 127 1 50 2 3 3 3 10<br />
284 2 246 1 50 4 5 5 5 10<br />
286 AIR 40 AIR - - 5 5 5 10<br />
288 2 119 1 134 20 20 20 60 60<br />
289 2 320 1 50 6 7.5 7.5 7 10<br />
290 2 180 1 50 3 3 3 3 10<br />
291 2 1 7.5 7.5 7.5 80 80<br />
292 2 100 1 50 2 3 3 3 10<br />
293 2 225 1 50 4 5 5 5 10<br />
294 2 225 1 50 4 5 5 5 10<br />
295 2 266 1 50 5 5 5 5 10<br />
298 2 240 1 50 4 5 5 5 10<br />
299 2 640 1 50 12 15 15 15 20<br />
300 3 1650 2 75 45 50 100 98 100<br />
301 3 1750 2 75 47 50 100 98 100<br />
303 2 80 1 50 1 2 2 2 10<br />
304 2 520 1 50 9 10 10 10 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-9 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
305 2 494 1 50 9 10 10 10 10<br />
307 2 160 1 50 3 3 3 3 10<br />
310 2 424 1 50 8 10 10 10 10<br />
312 2 240 1 50 4 5 5 5 10<br />
314 2 300 1 50 5 5 5 5 10<br />
315 2 86 1 50 2 3 3 3 10<br />
317 2 350 1 50 6 7.5 7.5 7 10<br />
319 2 250 1 50 5 5 5 5 10<br />
320 2 222 1 50 4 5 5 5 10<br />
321 2 200 1 50 4 5 5 5 10<br />
322 2 265 1 50 5 5 5 5 10<br />
323 2 265 1 50 5 5 5 5 10<br />
324 2 360 1 50 6 7.5 7.5 7 10<br />
325 2 159 1 50 3 3 3 3 10<br />
328 2 735 1 50 13 15 15 15 20<br />
330 2 100 1 50 2 3 3 3 10<br />
334 2 225 1 50 4 5 5 5 10<br />
335 2 410 1 50 7 7.5 7.5 7 10<br />
337 2 250 1 50 5 5 5 5 10<br />
339 2 150 1 50 3 3 3 3 10<br />
341 2 80 1 50 1 2 2 2 10<br />
343 2 750 1 50 14 15 15 15 20<br />
344 2 700 1 50 13 15 15 15 20<br />
346 2 650 1 50 12 15 15 15 20<br />
347 2 450 1 50 8 10 10 10 10<br />
349 2 100 1 50 2 3 3 3 10<br />
350 2 100 1 50 2 3 3 3 10<br />
356 2 108 1 50 2 3 3 3 10<br />
357 OXID POND OXID POND - - 0 0 0 0<br />
359 2 125 1 50 2 3 3 3 10<br />
360 2 100 1 50 2 3 3 3 10<br />
361 2 93 1 50 2 3 3 3 10<br />
362 2 100 1 50 2 3 3 3 10<br />
366 2 425 1 50 8 10 10 10 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-10 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
367 2 1 40 40<br />
371 2 170 1 50 3 3 3 3 10<br />
373 2 240 1 50 4 5 5 5 10<br />
374 1 150 1 50 3 3 3 3 10<br />
375 2 100 1 50 2 3 3 3 10<br />
376 2 150 1 50 3 3 3 3 10<br />
377 2 150 1 50 3 3 3 3 10<br />
378 2 262 1 50 5 5 5 5 10<br />
380 2 185 1 50 3 3 3 3 10<br />
381 2 100 1 50 2 3 3 3 10<br />
382 2 48 1 50 1 2 2 2 10<br />
383 2 100 1 50 2 3 3 3 10<br />
384 2 100 1 50 2 3 3 3 10<br />
385 2 100 1 50 2 3 3 3 10<br />
386 2 400 1 50 7 7.5 7.5 7 10<br />
387 2 100 1 50 2 3 3 3 10<br />
388 2 100 1 50 2 3 3 3 10<br />
389 2 588 1 50 11 15 15 15 20<br />
390 2 100 1 50 2 3 3 3 10<br />
392 2 64 1 50 1 2 2 2 10<br />
393 2 199 1 50 4 5 5 5 10<br />
394 2 30 1 50 1 2 2 2 10<br />
395 2 127 1 50 2 3 3 3 10<br />
396 2 100 1 50 2 3 3 3 10<br />
398 2 389 1 50 7 7.5 7.5 7 10<br />
399 2 100 1 50 2 3 3 3 10<br />
400 2 161 1 50 3 3 3 3 10<br />
401 2 60 1 50 1 2 2 2 10<br />
402 2 800 1 68 20 20 20 20 20<br />
403 1 50 0 1 1 1 10<br />
404 2 161 1 50 3 3 3 3 10<br />
405 2 138 1 50 2 3 3 3 10<br />
406 2 200 1 50 4 4 4 4 10<br />
407 2 100 1 50 2 3 3 3 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-11 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
408 2 70 1 50 1 2 2 2 10<br />
410 2 100 1 50 2 3 3 3 10<br />
411 1 50 0 1 1 1 10<br />
412 2 125 1 50 2 3 3 3 10<br />
413 2 100 1 50 2 3 3 3 10<br />
415 2 100 1 50 2 3 3 3 10<br />
416 2 343 1 50 6 7.5 7.5 7 10<br />
417 2 240 1 50 4 5 5 5 10<br />
418 1 50 0 1 1 1 10<br />
422 1 50 0 1 1 1 10<br />
423 2 179 1 50 3 5 5 5 10<br />
425 1 50 0 1 1 1 10<br />
426 1 50 0 1 1 1 10<br />
427 1 50 0 1 1 1 10<br />
428 1 50 0 1 1 1 10<br />
430 1 50 0 1 1 1 10<br />
431 2 1 20 20<br />
432 2 1 20 20<br />
433 2 1 20 20<br />
434 2 1 10 10<br />
435 2 1 60 60<br />
436 2 1 80 80<br />
437 2 1 80 80<br />
438 2 1 20 20<br />
439 2 1 40 40<br />
441 2 1 10 10<br />
442 2 1 60 60<br />
443 2 1 80 80<br />
444 2 1 100 100<br />
445 2 1 60 60<br />
446 2 1 80 80<br />
447 3 2 100 100<br />
448 2 1 20 20<br />
449 2 1 60 60<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-12 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
TABLE 6-4<br />
Existing Pump Stations (Not Impacted By The PDP), Baton Rouge SSO <strong>Program</strong><br />
Pump Station<br />
Number<br />
Number of<br />
Pumps<br />
Capacity of<br />
Each Pump<br />
(gpm)<br />
No. of<br />
Pumps for<br />
Des. Cap.<br />
Pump TDH<br />
(ft)<br />
HP per Duty<br />
Pump<br />
Motor HP per<br />
Duty Pump<br />
Operating<br />
HP<br />
Station KW<br />
required<br />
450 2 1 40 40<br />
451 2 1 20 20<br />
452 2 1 80 80<br />
453 2 1 80 80<br />
454 2 1 40 40<br />
455 2 1 60 60<br />
456 2 1 60 60<br />
457 2 1 40 40<br />
458 2 1 20 20<br />
460 2 1 60 60<br />
500 2 617 1 50 11 15 15 15 20<br />
504 2 1012 1 50 18 20 20 20 20<br />
508 3 1077 2 75 29 30 60 59 60<br />
601 3 1450 2 75 39 40 80 78 85<br />
944 3 1177 2 75 32 40 80 78 85<br />
1001(367) 2 154 1 50 3 3 3 3 10<br />
1003(353) 2 292 1 50 5 5 5 5 10<br />
101A 2 174 1 50 3 3 3 3 10<br />
22A 2 115 1 50 2 3 3 3 10<br />
31A 2 2060 1 50 37 40 40 39 42<br />
353 (1003) 2 292 1 50 5 5 5 5 10<br />
365 (676) 3 771 2 75 21 25 50 49 60<br />
367(1001) 2 154 1 50 3 3 3 3 10<br />
65A 3 1736 2 75 47 50 100 98 100<br />
676(365) 3 770 2 75 21 25 50 49 60<br />
7A 2 800 1 50 14 15 15 15 20<br />
PARISH PRISON 1 50 0 1 1 1 10<br />
Generator<br />
KW<br />
GNV31031158554.DOCX/103470007 6-13 JANUARY 2011<br />
REV. 5
SECTION 6. EMERGENCY GENERATORS<br />
This page intentionally left blank.<br />
GNV31031158554.DOCX/103470007 6-14 JANUARY 2011<br />
REV. 5
Appendix A<br />
Existing Pump Stations and Generator Requirements
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
8 2 3 10 60 3/240 10<br />
11 2 3 5 18 121 1/240 40<br />
12 2 20 44 258 3/240 60<br />
14 2 5 22 3/240 20<br />
17 2 1.5 6.1 22.7 3/240 10<br />
20 2 5 9 50 3/240 20<br />
22 2 5 5 11 58 3/240 20<br />
25 2 5 5 9 58 3/240 20<br />
26 2 2 9 48 3/240 10<br />
28 2 2 3/240 10<br />
29 2 3 15 3/240 10<br />
34 1 1 14 1/240 40<br />
36 2 7.5 16 117 3/240 40<br />
37 2 5 5 9 59 3/240 20<br />
48 3 15 18 121 3/480 60<br />
49 4 25 32 3/480 125<br />
57 5 150 183 3/480 600<br />
60 5 185 3/480 250<br />
62 2 50/60 50 50 347 3/480 100<br />
69 2 15 46 273 3/240 60<br />
70 2 5 14 87 3/240 20<br />
71 2 5 3 14 56 3/240 20<br />
72 2 20 15 36 205 3/240 60<br />
73 2 5 12 58 3/240 20<br />
78 2 5 5 12 64 3/240 20<br />
79 2 3 7.7 56.1 3/240 10<br />
81 2 5 5 11 64 3/240 20<br />
82 2 3 7 61 3/240 10<br />
83 2 3 2 6 50 3/240 10<br />
84 2 7.5 16 92 3/240 40<br />
85 2 25 24 177 3/480 80<br />
87 2 5 14 82 3/240 20<br />
88 2 5 11 93 3/240 20<br />
89 2 3 3/240 10<br />
90 2 10 29 159 3/240 40<br />
92 1 7.5 18 80 3/240 40<br />
93 2 7.5 18.1 130 3/240 40<br />
95 2 3, 5 8 3/240 20<br />
96 2 7.5 6 66 3/480 20<br />
97 2 3 7 34 3/240 10<br />
98 2 7.5 18 125 3/240 40<br />
99 2 5 3/240 20<br />
GNV31031158554.DOCX/103470007 A-1 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
100 2 2 6 34 3/240 10<br />
101 2 3 7 38 3/240 10<br />
103 2 20 35 363 3/240 60<br />
104 2 29 31 224 3/480 80<br />
106 2 25 40 28 283 3/480 80<br />
108 2 50 52 399 3/480 100<br />
109 2 10 20.1 3/208 40<br />
114 2 3 9 56 3/240 10<br />
116 3 5 5 3/480 20<br />
117 2 2.2 5 14 74 3/240 20<br />
121 2 25, 30 30 3/480 80<br />
122 2 3 5 19 3/240 10<br />
125 5 20<br />
126 2 7.5 25 3/240 40<br />
128 2 50 44 277 3/480 100<br />
130 2 10 18 141 3/240 40<br />
131 2 3 10 57 3/240 10<br />
132 2 20 39 382 3/240 60<br />
133 2 2 7 21 3/240 10<br />
134 1 10 3/480 20<br />
138 2 3 7.8 19 3/240 10<br />
140 2 20 25 188 3/480 60<br />
141 2 25 65 355 3/240 100<br />
142 2 7.5 12 140 3/480 20<br />
145 2 15 35 208 3/240 60<br />
147 2 50 39 372 3/480 100<br />
150 2 20 45 309 3/240 60<br />
151 2 3 7 30 3/240 10<br />
154 2 15 38 169 3/240 60<br />
155 2 60 65 356 3/480 150<br />
156 1 10 3/240 40<br />
158 2 5 3/240 20<br />
159 2 5, 15 3/240 60<br />
160 2 60 60 45 413 3/480 125<br />
161 2 15 14 110 3/480 60<br />
163 2 3 7 33 3/240 10<br />
165 2 3 3/240 10<br />
166 2 5 15 83 3/240 20<br />
168 2 30 80<br />
169 2 2 10 46 3/240 10<br />
171 2 3 11 46 3/240 10<br />
173 2 15 20 162 3/240 60<br />
GNV31031158554.DOCX/103470007 A-2 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
176 1 30 3/480 80<br />
177 4 75 3/480 250<br />
178 2 5 8 3/240 20<br />
179 3 40 3/240 100<br />
180 2 2 5 28 3/240 10<br />
181 2 40 36.5 338 3/480 80<br />
184 2 20 34 237 3/240 60<br />
185 2 15 29 214 3/240 60<br />
187 1 5 3/240 20<br />
189 2 7.5 18 148 3/240 40<br />
190 2 3 2 5 39 3/240 10<br />
191 2 10 15 17 115 3/480 40<br />
192 2 3 6 3/240 10<br />
193 2 5 18 82 3/240 20<br />
194 2 5 3 11 53 3/240 20<br />
195 2 40 52 267 3/480 80<br />
197 2 40 50 49 381 3/480 100<br />
198 2 10 24 160 3/240 40<br />
200 2 60 46 423 3/480 150<br />
202 2 5 8 47.6 3/240 20<br />
203 2 5 12 96 3/240 20<br />
204 2 3, 5 3/240 20<br />
205 2 7.5 15 3/240 40<br />
206 2 20 24 188 3/480 60<br />
210 2 2 3.5 19.8 3/240 10<br />
213 2 20 20 173 3/480 60<br />
214 2 1.5 5 31 3/240 10<br />
215 2 5 2 12 49 3/240 20<br />
216 1 5 3/480 20<br />
217 1 5 3/480 20<br />
219 2 3 1/240 10<br />
220 2 5 16 3/240 20<br />
222 2 25 36 280 3/480 80<br />
225 2 29 30 40 3/480 80<br />
226 2 20 26 142 3/480 60<br />
228 1 7.5 40<br />
230 1 40 3/480 80<br />
232 2 3 17 1/240 10<br />
233 2 10 15 5 1/240 40<br />
235 2 3 7 55 3/240 10<br />
237 2 3 7 45 3/240 10<br />
242 2 5 12 3/240 20<br />
GNV31031158554.DOCX/103470007 A-3 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
245 2 3 102 1/240 10<br />
246 2 15 3/240 40<br />
248 2 5 3 14 16 3/240 20<br />
250 2 7.5 21 107 3/240 40<br />
251 2 5, 10 3/240 40<br />
254 2 5 1/240 30<br />
255 2 7.5 20.6 136 3/240 40<br />
256 2 3 7 1/240 10<br />
257 2 2 3 16 51 1/240 10<br />
258 2 20 28 168 3/480 60<br />
259 2 20 35 307 3/240 60<br />
260 2 25 25 89 451 3/240 100<br />
261 2 5 13 67 3/240 20<br />
262 2 15 20 31 243 3/240 60<br />
263 2 25 20 201 3/480 80<br />
264 2 5 14 95 1/240 30<br />
265 2 10 25 23 215 3/480 80<br />
266 2 10 16 146 3/240 40<br />
267 2 2 7 50 3/240 10<br />
268 2 7.5 15 3/240 40<br />
272 2 5 12 84 3/240 20<br />
276 2 7.5 10.5 54 3/480 20<br />
279 2 7.5 3/240 40<br />
280 2 30 28 239 3/480 80<br />
281 2 3 9 29 3/240 10<br />
282 1 30 3/480 80<br />
284 2 25 53 305 3/240 60<br />
286 2 2 2 11 1/240 10<br />
288 2 20 14 131 3/480 60<br />
289 2 3 14.6 54 3/240 10<br />
290 3 8 3/240 10<br />
291 1 40 3/480 80<br />
292 2 3 10 50 3/240 10<br />
293 2 5 13 90 3/240 20<br />
294 2 3 12 3/240 10<br />
295 2 10 11 67 3/480 40<br />
298 2 3 8 3/240 10<br />
299 2 5 13 63 3/240 20<br />
300 3 25 30 34 152 3/480 80<br />
301 3 25 28 165 3/480 100<br />
303 2 2 5 29 3/240 10<br />
304 1 10 17 188 3/240 40<br />
305 2 20 31 255 3/240 60<br />
GNV31031158554.DOCX/103470007 A-4 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
307 2 5 14 81 3/240 20<br />
310 2 15 13 136 3/480 60<br />
312 2 3 10 ? 3/240 10<br />
314 2 5 16 67 3/240 20<br />
315 2 10 25 211 3/240 40<br />
317 2 7.5 18 116 3/240 40<br />
319 2 3 8 51 3/240 10<br />
320 20 3/480 60<br />
321 2 3 8 37 3/240 10<br />
322 2 3 8 45 3/240 10<br />
323 2 3 12 56 3/240 10<br />
324 2 5 12 89 3/240 20<br />
325 2 5 12 87 1/240 60<br />
328 2 40 55 299 3/480 100<br />
330 2 3 5.86 39 3/240 10<br />
334 2 5 12 86 3/240 20<br />
335 2 7.5 29 148 3/240 40<br />
337 2 3 9.3 62.8 3/240 10<br />
339 2 3 7 42 3/240 10<br />
341 2 10 40<br />
343 2 150 3/480 80<br />
344 2 7.5 21 145 3/480 40<br />
346 2 20 24 185 3/480 60<br />
347 2 20 18 176 3/480 60<br />
349 2 3 9 61 3/240 10<br />
350 2 3 8 51 3/240 10<br />
356 2 5 8.3 68 3/240 20<br />
357 2 3 9 48 3/240 20<br />
359 2 5 12 91 3/240 20<br />
360 2 3 10 59 3/240 10<br />
361 2 25 27.5 182.5 3/480 80<br />
362 2 2 7.4 24.3 3/208 10<br />
366 2 5 13.8 96 3/240 20<br />
367 2 7.5 14 124 3/240 40<br />
371 2 20 16.5 3/480 60<br />
373 2 3 12 56 3/240 10<br />
374 2 3 9 54 3/240 10<br />
375 2 3 10 53 3/240 10<br />
376 2 2 5 29 3/240 10<br />
377 2 7.5 15 113 3/240 40<br />
378 2 10 31 223 3/240 40<br />
380 2 5 9 64 3/240 20<br />
381 2 2 7.1 50 3/240 10<br />
GNV31031158554.DOCX/103470007 A-5 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
383 2 5 10 85 3/240 20<br />
384 2 7.5 17 111 3/240 40<br />
385 2 2 16 46 1/240 10<br />
386 2 20 42 294 3/240 60<br />
387 2 5 10 93 3/240 20<br />
388 2 3 1/240 10<br />
389 2 40 34 232 3/480 100<br />
390 2 10 30 158 3/240 40<br />
392 2 5 14 70 3/240 20<br />
393 2 3 8 43 3/240 10<br />
394 2 3 8 59 3/240 10<br />
395 2 10 19 189 3/240 40<br />
396 2 5 20 96 3/240 20<br />
398 2 40 78 502 3/240 100<br />
399 2 5 14 102 3/240 20<br />
400 2 15 31 235 3/240 60<br />
401 2 5 10 76 3/240 20<br />
403 2 10 3/208 40<br />
404 2 3 6 49 3/240 10<br />
405 2 10 11 75 3/480 40<br />
406 2 20 21.5 140.5 3/480 60<br />
407 2 3 7.5 50 3/240 10<br />
408 2 20 21 167 3/480 60<br />
410 2 10 18 147 3/240 40<br />
412 2 7.5 15 118 3/240 40<br />
413 2 15 23 94 3/480 60<br />
415 2 5 10 3/240 20<br />
416 2 5 10 15 146 3/240 40<br />
417 2 20 21 179 3/480 60<br />
418 2 20 24.5 190 3/480 60<br />
422 2 40 37 289 3/480 80<br />
423 2 5 11 90 3/240 20<br />
425 2 3 10 53 3/240 10<br />
426 2 30 56 298 3/208 80<br />
427 2 7.5 17 146 3/240 40<br />
428 2 10 32 197 3/240 40<br />
430 3 100 95 3/480 250<br />
431 2 5 13.6 70 3/240 20<br />
432 2 5 10 70 3/240 20<br />
433 2 5 22 134 3/240 20<br />
434 2 1 4.3 20 3/208 10<br />
435 2 15 7.5 14.7 111 3/480 60<br />
436 2 40 20 33 259 3/480 80<br />
GNV31031158554.DOCX/103470007 A-6 JANUARY 2011<br />
REV. 5
APPENDIX A<br />
Existing Pump Stations and Generator Requirements<br />
Field Data<br />
Nameplate<br />
Horsepower<br />
Horsepower<br />
Based On<br />
Inrush Amps<br />
Pump Station<br />
# of<br />
Pumps<br />
F/L<br />
Amps<br />
Inrush<br />
Amps<br />
Phase/<br />
Volts<br />
Gen Size<br />
(KW)<br />
437 2 40 20 30 287 3/480 80<br />
438 2 5 9.5 86 3/480 20<br />
439 2 7.5 22 107 3/240 40<br />
441 2 2 5 47 3/240 10<br />
442 2 15 10 15.2 148 3/480 60<br />
443 2 20 34.5 61 3/480 80<br />
444 2 50 62 386 3/480 100<br />
445 2 10 31 260 3/240 60<br />
446 2 30 20 31 199 3/480 80<br />
447 3 15 26 120 3/480 100<br />
448 2 5 16 113 3/240 20<br />
449 2 15 28 206 3/480 60<br />
450 2 10 16 199 3/480 40<br />
451 2 5 17 79 3/240 20<br />
452 2 30 20 31 214 3/480 80<br />
453 2 20 36.7 202 3/480 80<br />
454 2 7.5 14 120 3/480 40<br />
455 2 50? 20 37 258 3/480 60<br />
456 2 20 12 70 3/240 60<br />
457 2 10 8 22 138 3/240 40<br />
458 2 3 8 50 3/240 20<br />
460 2 20 38 254 3/480 60<br />
500 2 50 60 351 3/480 100<br />
504 2 60 70 433 3/480 125<br />
508 3 50 56 376 3/480 125<br />
601 3 75? 60 53 393 3/480 125<br />
676 3 60 55 418 3/480 125<br />
944 3 75 52 3/480 150<br />
101A 2 10 27 161 3/240 40<br />
332A 2 70 3/480 150<br />
65A 3 77 84.0 3/480 150<br />
Parish Prison 2 2 6.6 34.9 3/240 10<br />
Total No. Generators 287<br />
Notes:<br />
If motors were accessible, motor nameplate data was obtained.<br />
If motors were not accessible, motor running and starting current was measured.<br />
For non-PDP pump stations the number of pumps listed is the number of installed pumps.<br />
It is not clear whether or not 1 pump less than listed is sufficient for the peak wet weather flow.<br />
Generators were sized based on running one pump less than the number listed, except that for pumps 20 hp<br />
and smaller, the generator was sized to run a minimum of 2 pumps.<br />
If the data indicated two different motor sizes, the generator was selected based on the larger motor size.<br />
GNV31031158554.DOCX/103470007 A-7 JANUARY 2011<br />
REV. 5
This page intentionally left blank.<br />
GNV31031158554.DOCX/103470007 A-8 JANUARY 2011<br />
REV. 5
Appendix B<br />
PDP Lift Stations
APPENDIX B<br />
PDP Lift Stations; Baton Rouge <strong>Program</strong><br />
PS number<br />
Number of<br />
Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />
1 5 3/480 600 CGN-C-0005<br />
2 3 3/480 500 CC-EAST-PS<br />
3 3 3/480 400 CC-EAST-PS<br />
4 3 3/480 1000 CC-EAST-PS<br />
5 5 3/480 (2) 2MW CC-EAST-PS<br />
6 1 3/480 60 CC-EAST-PS<br />
10 1 3/480 125 CC-EAST-PS<br />
13 1 3/480 80 SGC-C-0001<br />
15 2 3/480 400 CGN-C-0005<br />
16 1 3/480 60 SGC-C-0001<br />
18 1 3/240 35 SGC-C-0001<br />
19 1 3/480 125 CGN-C-0005<br />
21 1 3/480 80 SGC-C-0001<br />
23 1 3/480 150 Group Project 1B<br />
27 2 3/240 40<br />
30 1 3/480 80 SGC-C-0001<br />
31 2 3/480 150 SGC-C-0001<br />
35 2 3/480 60 Group Project 1B<br />
38 1 3/240 35 NGS-C-0003<br />
39 2 3/480 60 Group Project 1B<br />
40 1 3/480 40 SGL-C-0002<br />
41 1 3/240 35 SFU-C-0002B<br />
42 6 3/480 3000 CC-WWTP-PS<br />
43 3 3/480 500 NFW-C-0009<br />
44 2 3/480 125 NGS-C-0003<br />
45 4 3/480 2500 Group Project 1B<br />
47 3 3/480 300 Group Project 1B<br />
50 3 3/480 400 SGC-C-0001<br />
54 2 3/480 60 Group Project 1B<br />
55 3 3/240 40 Group Project 1B<br />
56 2 3/480 125 SGL-C-0002<br />
59 5 3/480 600 CGN-C-0005<br />
63 2 3/480 100 NGS-C-0003<br />
64 1 3/480 80 NGS-C-0003<br />
66 2 3/480 80 SGC-C-0001<br />
GNV31031158554.DOCX/103470007 B-1 JANUARY 2011<br />
REV. 5
APPENDIX B<br />
PDP Lift Stations; Baton Rouge <strong>Program</strong><br />
PS number<br />
Number of<br />
Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />
68 1 3/480 80 SGL-C-0002<br />
74 2 3/240 40<br />
75 1 3/240 10 NGS-C-0003<br />
77 1 3/240 20 SFU-C-002B<br />
80 1 3/480 40 NGS-C-0003<br />
86 1 3/480 40 NFE-C-0005<br />
91 1 3/240 125 CC-EAST-PS<br />
94 1 3/480 80 NFE-C-0003<br />
102 1 3/240 40 SGL-C-0002<br />
105 1 3/480 40 NFW-C-0009<br />
107 1 3/480 60 SFL-C-0001<br />
111 2 3/480 125 SFU-C-0001<br />
112 2 3/240 35 SFU-C-0002A<br />
113 1 3/240 100<br />
115 1 3/240 60 SFU-C-0001<br />
118 1 3/240 35 SFL-C-0003<br />
119 2 3/480 125 SGC-C-PS119<br />
120 1 3/240 35 SGL-C-0002<br />
123 1 3/240 35 NFW-C-0009<br />
124 1 3/480 80 NFW-C-0009<br />
127 1 3/240 35 NGS-C-0003<br />
129 1 3/240 35 NGS-C-0003<br />
136 2 3/480 400 CGN-C-0005<br />
139 1 3/240 10 SFU-C-0002B<br />
144 1 3/240 35 NFE-C-0005<br />
148 1 3/240 35 SFU-C-0002A<br />
149 2 3/480 60 SFU-C-0002B<br />
153 1 3/480 40 SFU-C-0002B<br />
157 1 3/240 60 SFU-C-0002A<br />
162 1 3/480 60 SFU-C-0002B<br />
164 1 3/480 60 NFE-C-0005<br />
170 2 3/480 150 SFU-C-0002A<br />
172 1 3/240 20 SFU-C-0002A<br />
174 1 3/240 20 SFU-C-0002B<br />
GNV31031158554.DOCX/103470007 B-2 JANUARY 2011<br />
REV. 5
APPENDIX B<br />
PDP Lift Stations; Baton Rouge <strong>Program</strong><br />
PS number<br />
Number of<br />
Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />
175 2 3/480 80 SFU-C-0002B<br />
182 1 3/480 40 SFL-C-0004<br />
183 2 3/480 150 NFW-C-0010<br />
196 1 3/480 40 NFE-C-0005<br />
201 1 3/240 60 SFU-C-0001<br />
207 1 3/480 40 NFE-C-0005<br />
211 2 3/240 35 SFU-C-0002A<br />
218 1 3/240 35 NFE-C-0005<br />
221 2 3/480 100 SFL-C-0003<br />
223 1 3/480 60 SFL-C-0004<br />
224 2 3/480 80 SFU-C-0002B<br />
227 1 3/240 35 SFU-C-0002B<br />
229 1 3/480 60 SFL-C-0003<br />
231 2 3/480 80 NFE-C-0005<br />
234 1 3/480 40 NFE-C-0005<br />
236 5 3/480 400 SFL-C-0001<br />
239 1 3/240 10 SFL-C-0003<br />
240 1 3/480 100<br />
243 2 3/480 100 NFW-C-0009<br />
244 1 3/480 80 NGS-C-0003<br />
247 2 3/480 125 SFU-C-0002A<br />
249 2 3/480 100 NFE-C-0005<br />
253 1 3/480 20 SFU-C-0002A<br />
271 1 3/240 20 NFE-C-0005<br />
274 2 3/480 60 SFU-C-0002A<br />
275 2 3/480 250 Group Project 1B<br />
277 2 3/480 60 Group Project 1B<br />
278 1 3/240 80 SFL-C-0004<br />
285 1 3/240 20 NFE-C-0005<br />
296 2 3/480 40 SFU-C-0002A<br />
302 3 3/480 100<br />
311 1 3/480 60 SFL-C-0001<br />
313 1 3/240 20 NFE-C-0005<br />
316 2 3/480 150 SFU-C-0002A<br />
GNV31031158554.DOCX/103470007 B-3 JANUARY 2011<br />
REV. 5
APPENDIX B<br />
PDP Lift Stations; Baton Rouge <strong>Program</strong><br />
PS number<br />
Number of<br />
Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />
326 1 3/240 35 SFU-C-0002B<br />
327 1 3/480 40 SFL-C-0004<br />
329 1 3/480 80 SGL-C-0002<br />
336 1 3/480 60 SFL-C-0001<br />
338 1 3/240 60 SFU-C-0001<br />
345 1 3/240 35 SFU-C-0002B<br />
353 1 3/480 40 SFL-C-0004<br />
358 1 3/240 35 SFL-C-0003<br />
365 2 3/480 200 SFL-C-0004<br />
372 1 3/480 80 SFL-C-0004<br />
379 1 3/240 20 SFU-C-0001<br />
382 2 3/480 80 03-RMP-S14<br />
391 1 3/240 20 SFU-C-0002A<br />
402 2 3/240 20 SFU-C-0002A<br />
429 1 3/240 10 NFW-C-0009<br />
503 2 3/480 125 NFW-C-0010<br />
505 3 3/480 800 SFL-C-0001<br />
509 3 3/480 200 NFE-C-0005<br />
511 5 3/480 800 NFE-C-0005<br />
513 2 3/480 250 NFW-C-0009<br />
514 5 3/480 (1) - 1000 ; (1) - 2500 SFL-C-0002<br />
777 2 3/480 300 SFU-C-0002<br />
889 2 3/480 800 SFU-C-0002<br />
897 3 3/480 (2) - 600 kW NFW-C-0004<br />
999 2 3/480 250 SFL-C-0003<br />
100A 2 3/480 250 SFU-C-0002<br />
119N 1 3/480 100 NFW-C-0010<br />
24/24A 4 3/480 400 NFW-C-0010<br />
505A 3 3/480 125 SFL-C-0001<br />
510AA 3 3/480 225 NFE-C-0005<br />
51A 3 3/480 1000 NFW-C-0002<br />
51AA 2 3/480 600 NFW-C-0002<br />
52A 5 3/480 3000 NFW-C-0002<br />
53A 6 3/480 500 SGL-C-0002<br />
GNV31031158554.DOCX/103470007 B-4 JANUARY 2011<br />
REV. 5
APPENDIX B<br />
PDP Lift Stations; Baton Rouge <strong>Program</strong><br />
PS number<br />
Number of<br />
Pumps Phase/Voltage Gen Size (KW) PDP Project Number<br />
58A 9 3/480 (3) - 1000 SGC-C-PS58A<br />
5XX 2 3/480 800 SGC-C-0001<br />
7/7A 1 3/480 125 CC-EAST-PS<br />
Choctaw Storage 3 3/480 150 NFW-C-0002<br />
Comite Dr 1 1 3/480 40 NFE-C-0003<br />
Comite Dr 2 1 3/480 20 NFE-C-0003<br />
OXLF (Little Farms) 1 3/480 80 NFW-C-0009<br />
Southdowns 1 3/480 80 CC-EAST-PS<br />
Womens Hospital 2 3/480 SFU-C-0001<br />
Total Number of PS = 147<br />
GNV31031158554.DOCX/103470007 B-5 JANUARY 2011<br />
REV. 5
This page intentionally left blank.<br />
GNV31031158554.DOCX/103470007 B-6 JANUARY 2011<br />
REV. 5
SECTION 7<br />
Supervisory Control and Data Acquisition<br />
(SCADA)<br />
7.1 Background<br />
The C-P currently has a very limited SCADA capability at few of its pump stations in the<br />
collection system and at the WWTPs. Without a comprehensive fully integrated SCADA<br />
system, collection system and WWTP operators have to physically change settings and<br />
check each pump station or piece of equipment on a daily to weekly basis, depending on the<br />
criticality of the piece of equipment. If a comprehensive and integrated SCADA system is<br />
put into place, operations of the collection system pump stations and the WWTPs will<br />
become more automated and streamlined and save operator time so that preventive, rather<br />
than reactive, maintenance can be performed. Also, a SCADA system will allow the<br />
collection system pump station operations to be optimized during wet weather to maximize<br />
storage and decrease the peak flows to the WWTPs. The SCADA system will allow quick<br />
overview of the WWTPs and the collection systems at a central location to afford systemwide<br />
efficient operation.<br />
To address this issue, the C-P will install a SCADA system at the South WWTP, the North<br />
WWTP, and all the pump stations in the collection system. The SCADA system for the South<br />
WWTP is being designed as part of the South WWTP – Phase 2 project and is not<br />
summarized in this chapter. The SCADA system for the collection system and the North<br />
WWTP are described in this chapter.<br />
7.2 SCADA Operations Data/Control Center<br />
The SCADA Operations Data/Control Center, as outlined in the SCADA Master <strong>Plan</strong><br />
(CH2M HILL, June 2008), is required to provide central collection, storage, and processing of<br />
data from WWTPs and the collection system. The Operations Data/Control Center will<br />
collect, reduce, and archive measurements, alarms and, status information for use by<br />
operators, managers, and engineers. The data center will include centralized information<br />
servers that allows managers and engineers to view process graphics and to generate<br />
reports using visualization application software installed on their business network<br />
workstations.<br />
The centralized information servers provide easy access to data for managers and engineers<br />
to support a number of activities, including regulatory reporting, management oversight,<br />
collection system and treatment capacity and quality analysis, and improvements planning.<br />
In the future, centralized control of the collection system and WWTPs can be accomplished<br />
via the centralized information servers.<br />
The SCADA Operations Data/Control Center will be located at a location to be determined,<br />
with a downtown location preferred. The Baton Rouge Emergency Operations Center will<br />
also house servers and workstations that will allow for monitoring and control of the<br />
GNV31031158555.DOCX/103470008 7-1 JANUARY 2011<br />
REV. 5
SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />
WWTPs and collection systems during an emergency. A data monitoring center will be<br />
provided at the Choctaw Collection System Maintenance Facility that is currently being<br />
planned. This data center will allow monitoring (but not control) of the South and North<br />
Collection System pump stations.<br />
The SCADA Operations Data/Control Center is expected to include centralized information<br />
servers integrating the data from the South WWTP SCADA server node (located at the<br />
South WWTP), the future North WWTP SCADA server node (located at the North WWTP),<br />
and the South and North Collection System pump station programmable logic controllers<br />
(PLCs).. Note that the South Collection System includes both the Central Basin pump<br />
stations and South Basin pump stations, since the Central Basin stations will pump to the<br />
South WWTP. The type of data link between the WWTP servers and the centralized<br />
information servers at the SCADA Operations Data/Control Center will be either dedicated<br />
Ethernet “T1” phone lines or fiber optic lines.<br />
As the design of each SCADA subsystem progresses, the requirements noted above will be<br />
further refined based on discussions with the C-P staff.<br />
7.3 Collection System SCADA System<br />
The collection system SCADA system will be used by collection system operators to monitor<br />
and exercise control of collection pump stations in accordance with pump station design<br />
criteria. The overall collection system pump stations will be split in to two groups, namely<br />
the North and the South collection system pump stations. The North collection system<br />
pump stations will report to the North Collection System SCADA servers, located at the<br />
SCADA Operations Data/Control Center, whereas the South Collection System Pump<br />
Stations will report to the South Collection System SCADA servers, located at the SCADA<br />
Operations Data/Control Center. The North and the South Collection System SCADA<br />
servers will then report to the centralized information servers, located at the SCADA<br />
Operations Data/Control Center. Each Collection System monitoring and control system<br />
includes the following major components:<br />
<br />
<br />
<br />
PLCs at each pump station to provide local automatic control and to communicate with<br />
their respective Collection System servers.<br />
The PLCs will communicate with servers located at the SCADA Operations<br />
Data/Control Center in an air conditioned environment with security measures that<br />
limit access to servers and network components. Redundant servers will be provided for<br />
reliability. The process control network collects collection system data and allows mobile<br />
collection system operators to monitor and exercise control of collection system pump<br />
stations without having to visit each pump station. Additionally, diagnostic information<br />
presented to operators can be used to prioritize maintenance activities and to plan<br />
preventive maintenance. An example of where control can be used is to pump down<br />
certain collection system pump stations in advance of a significant wet weather event to<br />
reduce the peak flows that will be experienced at the WWTPs during the wet weather<br />
event.<br />
A wireless communications network to provide reliable communications between the<br />
local pump station PLCs and the servers located at the SCADA Operations<br />
GNV31031158555.DOCX/103470008 7-2 JANUARY 2011<br />
REV. 5
SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />
Data/Control Center. It is recommended that wireless communications be accomplished<br />
by a digital cellular network. The collection system pump stations presently under<br />
design will accommodate a future Cellular Radio Modem to be installed in the local<br />
control panel. Details of the Collection System SCADA design will be worked out<br />
during design .<br />
7.4 North Wastewater Treatment <strong>Plan</strong>t<br />
The North WWTP Process Control Network will be used by WWTP operators to monitor<br />
and control North WWTP process equipment in accordance with operations procedures.<br />
The North WWTP network will be designed similar to the SWWTP SCADA System and<br />
include the following major components:<br />
<br />
A WWTP Process Control Network housed in an air conditioned environment in the<br />
North WWTP Control room with security measures that limit access to network<br />
components, servers, and workstation computers. The process control network connects<br />
control system components, collects WWTP data and allows WWTP operators to<br />
monitor and control WWTP process equipment. Additionally, diagnostic information<br />
presented to operators can be used to prioritize maintenance activities and to plan<br />
preventive maintenance.<br />
<br />
A fiber optic Fast Ethernet local area network (LAN) to provide reliable communications<br />
between the North WWTP PLCs, located in several strategic areas in the plant, and the<br />
North WWTP redundant servers in the control room. A reliable data communication<br />
link (either T1 line or fiber optic) between the North WWTP servers and the centralized<br />
information servers located at the SCADA Operations Data/Control Center, to allow<br />
monitoring of the North WWTP from the control center.<br />
7.5 SCADA Project <strong>Delivery</strong> <strong>Plan</strong><br />
In order to install a SCADA system in a timely manner at all pump stations as well as the<br />
North WWTP, a project delivery plan was developed. The first step in developing the<br />
project delivery plan was to prioritize the pump stations that were to get a SCADA system<br />
using the following criteria:<br />
1) Pump stations to be replaced as a part of PDP<br />
2) Existing pump stations (not impacted by this PDP) that were on DPW staff’s list of<br />
critical pump stations<br />
3) Existing pump stations (not impacted by this PDP) that were not on any of the previous<br />
lists (with larger pump stations getting higher priority than smaller pump stations).<br />
The WWTPs were prioritized based on the PDP and Draft Master <strong>Plan</strong> projects. As<br />
mentioned above, the South WWTP SCADA system will be installed as part of the South<br />
WWTP – Phase 2 project, with the system funded as part of the overall project. The North<br />
WWTP SCADA system will be designed and installed as part of the North WWTP Master<br />
<strong>Plan</strong> project, and associated costs are presented below and also in Section 5.5 North WWTP<br />
Master <strong>Plan</strong> Improvements Table 5-25. The existing Central WWTP will not receive a<br />
SCADA system, since current plans call for it to be decommissioned.<br />
GNV31031158555.DOCX/103470008 7-3 JANUARY 2011<br />
REV. 5
SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />
The schedule of the project delivery is based on this prioritization. The project delivery plan<br />
involves design of the system components in three projects in 2010 and 2011. Construction<br />
will then commence in 2011 and continue throughout the program duration. Table 7-1<br />
shows the cost summary for the projects.<br />
TABLE 7-1<br />
SCADA Cost Summary<br />
Item<br />
North WWTP SCADA – construction $2,302,000<br />
Collection System SCADA – construction $12,902,000<br />
SCADA Operations Data/Control Center – construction $1,214,000<br />
Total $16,418,000<br />
In order to deliver these projects in a timely manner, the following criteria were used to<br />
develop the project delivery plan.<br />
<br />
<br />
<br />
<br />
<br />
A 5-year renewable maintenance contract is required for the service of the entire SCADA<br />
system.<br />
PDP Pump stations will be designed SCADA-ready.<br />
SCADA components (antenna modem, and PLC, where needed) will be provided by a<br />
SCADA vendor (systems integrator) and installed by a general contractor. For PDP<br />
pump stations and the North WWTP, the general contractor will be the general<br />
contractor for the entire project.<br />
The collection system SCADA will be separated by North and South, so that the North<br />
Collection System will communicate with the North WWTP and the South Collection<br />
System (consisting of both South and Central Basin pump stations) will communicate<br />
with the South WWTP.<br />
The SCADA vendor will be selected by a bidding process. The contract will be based on<br />
the number of pump stations to receive SCADA per year, with a unit price given for<br />
each type of unit for each year. The North WWTP SCADA system will be designed and<br />
bid separately from the collection system SCADA.<br />
The South WWTP SCADA system will be delivered on the <strong>Program</strong> schedule by 2014,<br />
when the South WWTP – Phase 2 project is scheduled to be completed.<br />
<br />
The North WWTP SCADA system will be delivered when the Master <strong>Plan</strong> project is<br />
implemented in 2015 or beyond.<br />
With these criteria in mind, the following project delivery plan was developed.<br />
1) C-P will finalize a location for SCADA Operations Data/Control Center, preferably in a<br />
downtown location.<br />
2) PM will develop a plan to remodel roughly 300 existing pump stations that are not being<br />
upgraded in the <strong>Program</strong>. Each pump station will need new SCADA equipment, with<br />
GNV31031158555.DOCX/103470008 7-4 JANUARY 2011<br />
REV. 5
SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />
some pump stations also requiring new controllers to be able to communicate with the<br />
SCADA equipment.<br />
3) PM will develop a plan to connect pump stations being replaced/added in the <strong>Program</strong><br />
to the SCADA system. Instructions will be provided to the design engineers for PDP<br />
projects to allow for connection of these stations to the SCADA system in the future by<br />
4 th quarter 2010.<br />
4) PM will develop a project definition to implement a SCADA system at the North<br />
WWTP. This project definition will be completed in 2014 in conjunction with the overall<br />
North WWTP Master <strong>Plan</strong> project.<br />
5) PM will prepare plans and specifications for the SCADA Operations Data/Control<br />
Center and collection system SCADA components (both PDP and non-PDP stations) in<br />
2010. This project will be ready to bid for construction in early 2011.<br />
6) PM or a design engineer will prepare plans and specifications for the North WWTP<br />
SCADA at a date to be determined.<br />
With this project delivery plan, the collection system and the South WWTP will have a<br />
SCADA system by the end of the <strong>Program</strong> (December 31, 2014). The North WWTP SCADA<br />
system will not be implemented prior to the end of the <strong>Program</strong>, since it is a Master <strong>Plan</strong><br />
issue, not a wet weather issue. The timeline for construction of the North WWTP SCADA<br />
system will be dependent on the available funding.<br />
GNV31031158555.DOCX/103470008 7-5 JANUARY 2011<br />
REV. 5
SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />
This page intentionally left blank.<br />
GNV31031158555.DOCX/103470008 7-6 JANUARY 2011<br />
REV. 5