TABLE 1-1 Project Funding Schedule <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong> Capacity Improvement Projects 2007 2008 2009 2010 2011 2012 2013 2014 Project Description Estimated Cost CGN-C-0001 (Capital Lake Drive - Gayosa Street Area Capacity Improvements) Estimated Design Engineering $ 789,000 $ 789,000 Estimated Construction $ 10,498,000 $ 10,498,000 Estimated Land $ 58,000 $ 58,000 Estimated SDC $ 18,900 $ 296,100 $ 315,000 Project Sub-Total $ 789,000 $ - $ 10,574,900 $ 296,100 $ - $ - $ - $ 11,660,000 NFE-C-0001 (Gurney Road - Joor Road Sewer Area Upgrades) Estimated Design Engineering $ 360,700 $ 360,700 Estimated Construction $ 1,550,300 $ 1,550,300 Estimated SDC $ 45,000 $ 45,000 Project Sub-Total $ 360,700 $ 1,595,300 $ - $ - $ - $ - $ - $ - $ 1,956,000 NFE-C-0002 (Sullivan Rd./Lovett Rd./Wax Rd. Sewer Area Upgrades) Estimated Design Engineering $ 486,000 $ 486,000 Estimated Construction $ 2,200,000 $ 2,200,000 Estimated SDC $ - $ 24,700 $ 40,300 $ 65,000 Project Sub-Total $ 486,000 $ 2,200,000 $ 24,700 $ 40,300 $ - $ - $ - $ - $ 2,751,000 NFE-C-0003 (Comite Road - Foster Road Sewer Area Upgrades - Phase I) Estimated Design Engineering $ 471,000 $ 471,000 Estimated Construction $ 1,925,000 $ 1,925,000 Estimated SDC $ - $ 9,000 $ 46,800 $ 4,200 $ 60,000 Project Sub-Total $ 471,000 $ 1,925,000 $ 9,000 $ 46,800 $ 4,200 $ - $ - $ - $ 2,456,000 NFE-C-0004 (Foster Road - Hooper Road Sewer Area Upgrades) Estimated Design Engineering $ 367,000 $ 367,000 Estimated Construction $ 8,762,000 $ 8,762,000 Estimated SDC $ - $ 63,600 $ 201,400 $ 265,000 Project Sub-Total $ 367,000 $ 8,762,000 $ 63,600 $ 201,400 $ - $ - $ - $ - $ 9,394,000 NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - general) Estimated Design Engineering $ 4,510,000 $ 4,510,000 Estimated Construction $ - $ - Estimated Land $ 40,000 $ 68,587 $ 849,240 $ 958,000 Estimated SDC $ - $ - Project Sub-Total $ - $ 4,550,000 $ 68,587 $ 849,240 $ - $ - $ - $ - $ 5,468,000 NFW-C-HWY61-I (Zachary Area Transmission Network Improvements - Ph I) Estimated Design Engineering $ - $ - Estimated Construction $ 18,487,000 $ 18,487,000 Estimated Land $ - Estimated SDC $ - $ 88,000 $ 363,000 $ 99,000 $ 550,000 Project Sub-Total $ - $ - $ - $ 18,487,000 $ 88,000 $ 363,000 $ 99,000 $ - $ 19,037,000 NFW-C-HWY61-II (Zachary Area Transmission Network Improvements - Ph II) Estimated Design Engineering $ - Estimated Construction $ 14,584,000 $ 14,584,000 Estimated Land $ 1,425,000 $ 1,425,000 Estimated SDC $ - $ 306,680 $ 144,320 $ 451,000 Project Sub-Total $ - $ - $ - $ 16,009,000 $ 306,680 $ 144,320 $ - $ - $ 16,460,000 NFW-C-HWY61-III (Zachary Area Transmission Network Improvements - Ph III) Estimated Design Engineering $ - Estimated Construction $ 8,948,000 $ 8,948,000 Estimated SDC $ - $ 42,880 $ 176,880 $ 48,240 $ 268,000 Project Sub-Total $ - $ - $ - $ 8,948,000 $ 42,880 $ 176,880 $ 48,240 $ - $ 9,216,000 NFW-C-HWY61-IV (Zachary Area Transmission Network Improvements - Ph IV) Estimated Design Engineering $ - Estimated Construction $ 7,091,000 $ 7,091,000 Estimated SDC $ - $ 31,800 $ 139,920 $ 40,280 $ 212,000 Project Sub-Total $ - $ - $ - $ 7,091,000 $ 31,800 $ 139,920 $ 40,280 $ - $ 7,303,000 CGN-C-0003 (South Boulevard - St. Joseph Street Sewer Area Upgrades) Estimated Design Engineering $ 809,000 $ 809,000 Estimated Construction $ 17,970,000 $ 17,970,000 Estimated SDC $ 91,800 $ 437,400 $ 10,800 $ 540,000 Project Sub-Total $ - $ 809,000 $ 18,061,800 $ 437,400 $ 10,800 $ - $ - $ 19,319,000 CGN-C-0005 (Downtown Area Pump Station Improvements) Estimated Design Engineering $ 900,000 $ 900,000 Estimated Construction $ 4,841,000 $ 4,841,000 Estimated SDC $ 2,900 $ 104,400 $ 37,700 $ 145,000 Project Sub-Total $ - $ 900,000 $ 4,843,900 $ 104,400 $ 37,700 $ - $ - $ 5,886,000 GNV31031158160.xlsx/110050009 1-13 JANUARY 2011 REV. 5
TABLE 1-1 Project Funding Schedule <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong> Capacity Improvement Projects 2007 2008 2009 2010 2011 2012 2013 2014 Project Description Estimated Cost CGS-C-0004 (Highland Road - Buchanan Street Area Sewer Upgrades) Estimated Design Engineering $ 532,000 $ 532,000 Estimated Construction $ 4,326,000 $ 4,326,000 Estimated SDC $ - $ 120,900 $ 9,100 $ 130,000 Project Sub-Total $ - $ 532,000 $ 4,326,000 $ 120,900 $ 9,100 $ - $ - $ - $ 4,988,000 SGC-C-PS119 (Citiplace/Essen Area - PS119 & Forcemain Improvements) Estimated Design Engineering $ 480,000 $ 480,000 Estimated Construction $ 2,802,000 $ 2,802,000 Estimated SDC $ 31,450 $ 53,550 $ 85,000 Project Sub-Total $ - $ 480,000 $ 2,833,450 $ 53,550 $ - $ - $ - $ 3,367,000 Group Project 1A (Metro Airport Area Sewer Upgrades) Estimated Design Engineering $ 3,237,000 $ 3,237,000 Estimated Construction $ 19,581,000 $ 19,581,000 Estimated Land $ 840,000 $ 840,000 Estimated SDC $ - $ 70,200 $ 391,950 $ 122,850 $ 585,000 Project Sub-Total $ - $ 3,237,000 $ - $ 20,421,000 $ 70,200 $ 391,950 $ 122,850 $ - $ 24,243,000 Group Project 1B (Metro AirportSewer Area PS and FM Upgrades) Estimated Design Engineering $ 2,561,000 $ 2,561,000 Estimated Construction $ 19,309,000 $ 19,309,000 Estimated Land $ 635,000 $ 635,000 Estimated SDC $ - $ 71,400 $ 398,650 $ 124,950 $ 595,000 Project Sub-Total $ - $ 2,561,000 $ - $ 19,944,000 $ 71,400 $ 398,650 $ 124,950 $ - $ 23,100,000 SFL-C-0002 (Perkins/Old Perkins Area - Booster Pump Station 514 Improvements) Estimated Design Engineering $ 1,233,000 $ 1,233,000 Estimated Construction $ 7,730,000 $ 7,730,000 Estimated Land $ 203,000 $ 203,000 Estimated SDC $ - $ 88,800 $ 151,200 $ 240,000 Project Sub-Total $ - $ - $ 1,233,000 $ 7,933,000 $ 88,800 $ 151,200 $ - $ - $ 9,406,000 SFL-C-0004 (Group Project 2 - Old Perkins - Highland Road Area Sewer Upgrades) Estimated Design Engineering $ 525,000 $ 525,000 Estimated Construction $ 3,476,000 $ 3,476,000 Estimated SDC $ - $ 7,350 $ 75,600 $ 22,050 $ 105,000 Project Sub-Total $ - $ 525,000 $ 3,476,000 $ 7,350 $ 75,600 $ 22,050 $ - $ - $ 4,106,000 SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) Estimated Design Engineering $ 1,574,000 $ 1,574,000 Estimated Construction $ 20,591,000 $ 20,591,000 Estimated Land $ 430,000 $ 430,000 Estimated SDC $ 18,600 $ 539,400 $ 62,000 $ 620,000 Project Sub-Total $ - $ 1,574,000 $ 21,039,600 $ 539,400 $ 62,000 $ - $ - $ 23,215,000 SFL-C-0006 (Nicholson Dr - Highland Rd - Perkins Rd Capacity Improvements) Estimated Design Engineering $ 1,127,000 $ 1,127,000 Estimated Construction $ 11,365,000 $ 11,365,000 Estimated Land $ 575,000 $ 575,000 Estimated SDC $ - $ 177,500 $ 177,500 $ 355,000 Project Sub-Total $ - $ - $ 1,127,000 $ - $ 11,940,000 $ 177,500 $ 177,500 $ - $ 13,422,000 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) Estimated Design Engineering $ 534,000 $ 534,000 Estimated Construction $ 5,300,000 $ 5,300,000 Estimated Land $ 285,000 $ 285,000 Estimated SDC $ - $ 82,500 $ 82,500 $ 165,000 Project Sub-Total $ - $ - $ 534,000 $ - $ 5,585,000 $ 82,500 $ 82,500 $ - $ 6,284,000 CGN-C-0002 (25th Street - North Acadian Thruway Capacity Improvements) Estimated Design Engineering $ 521,000 $ 521,000 Estimated Construction $ - $ - Estimated SDC $ - $ - Project Sub-Total $ - $ - $ 521,000 $ - $ - $ - $ - $ - $ 521,000 GNV31031158160.xlsx/110050009 1-15 JANUARY 2011 REV. 5
- Page 1: Program Delivery Plan Sanitary Sewe
- Page 4 and 5: CONTENTS, CONTINUED Section Page 3.
- Page 6 and 7: CONTENTS, CONTINUED Section Page 5.
- Page 8 and 9: CONTENTS, CONTINUED Tables Page 3-2
- Page 10 and 11: CONTENTS, CONTINUED Figures Page ES
- Page 12 and 13: CONTENTS, CONTINUED Figures Page 5-
- Page 14 and 15: This page intentionally left blank.
- Page 16 and 17: EXECUTIVE SUMMARY Accommodate gr
- Page 18 and 19: Avenue K F 3rd 3rd 6th Lupine 9th 1
- Page 20 and 21: EXECUTIVE SUMMARY Station Facility
- Page 22 and 23: EXECUTIVE SUMMARY List of Completed
- Page 24 and 25: EXECUTIVE SUMMARY TABLE ES-3 List o
- Page 26 and 27: SECTION 1 Overview 1.1 Background T
- Page 28 and 29: SECTION 1. OVERVIEW 1.3.2 Capacity
- Page 30 and 31: TABLE 1-1 Project Funding Schedule
- Page 32 and 33: TABLE 1-1 Project Funding Schedule
- Page 36 and 37: TABLE 1-1 Project Funding Schedule
- Page 38 and 39: TABLE 1-1 Project Funding Schedule
- Page 40 and 41: TABLE 1-1 Project Funding Schedule
- Page 42 and 43: FIGURE 1-1 Program Funding Schedule
- Page 44 and 45: FIGURE 1-2 Program Schedule Program
- Page 46 and 47: FIGURE 1-2 Program Schedule Program
- Page 48 and 49: FIGURE 1-2 Program Schedule Program
- Page 50 and 51: SECTION 2 Planning Description 2.1
- Page 52 and 53: SECTION 2. PLANNING DESCRIPTION imp
- Page 54 and 55: SECTION 3 South Basin Projects Sect
- Page 56 and 57: F 3rd Lupine Alba East Sunshine Elm
- Page 58 and 59: SECTION 3. SOUTH BASIN PROJECTS 3.1
- Page 60 and 61: Energy Whitter Lobdell Cyril Carter
- Page 62 and 63: Lobdell Crown Cyril Carter Lasalle
- Page 64 and 65: 48th 49th Elm Topaz Garnet Waverly
- Page 66 and 67: Brookstown Topaz Garnet Juban Evang
- Page 68 and 69: Burbank Wylie Kenilworth Kenilworth
- Page 70 and 71: Issac Cline Etta Campus Dean Lee Pr
- Page 72 and 73: Frances Harriet Monterrey Redondo C
- Page 74 and 75: SECTION 3. SOUTH BASIN PROJECTS 3.2
- Page 76 and 77: SECTION 3. SOUTH BASIN PROJECTS Gra
- Page 78 and 79: Marilyn Elizabeth Brocade Aletha Ma
- Page 80 and 81: SECTION 3. SOUTH BASIN PROJECTS Gra
- Page 82 and 83: SECTION 3. SOUTH BASIN PROJECTS 3.2
- Page 84 and 85:
SECTION 3. SOUTH BASIN PROJECTS 3.2
- Page 86 and 87:
SECTION 3. SOUTH BASIN PROJECTS Gra
- Page 88 and 89:
SECTION 3. SOUTH BASIN PROJECTS Sco
- Page 90 and 91:
Whitter Monet Lobdell Lanier Cyril
- Page 92 and 93:
I-10 Essen Heights Essen Heights #I
- Page 94 and 95:
Burbank PS58_n6 !R Lochness Clover
- Page 96 and 97:
# Pollard Picardy Blair Summa # PS3
- Page 98 and 99:
Samoa PS58A PS58 # Essen Park One C
- Page 100 and 101:
Corporate Woodstock Moniteau Bocage
- Page 102 and 103:
SECTION 3. SOUTH BASIN PROJECTS TAB
- Page 104 and 105:
SECTION 3. SOUTH BASIN PROJECTS 3.2
- Page 106 and 107:
SECTION 3. SOUTH BASIN PROJECTS Gra
- Page 108 and 109:
SECTION 3. SOUTH BASIN PROJECTS TAB
- Page 110 and 111:
SECTION 3. SOUTH BASIN PROJECTS 3.2
- Page 112 and 113:
Mimosa Orchid Poplar Tupello Perkin
- Page 114 and 115:
SECTION 3. SOUTH BASIN PROJECTS 3.3
- Page 116 and 117:
Sassafras Antioch Shady Grove Vigne
- Page 118 and 119:
Inniswold Idlewood Parkbriar Cypres
- Page 120 and 121:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 122 and 123:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 124 and 125:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 126 and 127:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 128 and 129:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 130 and 131:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 132 and 133:
SECTION 3. SOUTH BASIN PROJECTS For
- Page 134 and 135:
SECTION 3. SOUTH BASIN PROJECTS TAB
- Page 136 and 137:
Antioch # # PS287 # Exchequer # PS3
- Page 138 and 139:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 140 and 141:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 142 and 143:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 144 and 145:
SECTION 3. SOUTH BASIN PROJECTS 3.4
- Page 146 and 147:
SECTION 3. SOUTH BASIN PROJECTS For
- Page 148 and 149:
SECTION 3. SOUTH BASIN PROJECTS Blv
- Page 150 and 151:
Mike O'Neal Elliot # # # Toulon # R
- Page 152 and 153:
SECTION 3. SOUTH BASIN PROJECTS 3.5
- Page 155:
N Feet 0 50 100 150 200 Legend IAP
- Page 158 and 159:
SECTION 3. SOUTH BASIN PROJECTS
- Page 160 and 161:
SECTION 3. SOUTH BASIN PROJECTS wei
- Page 162 and 163:
SECTION 4. CENTRAL BASIN PROJECTS T
- Page 164 and 165:
3rd Lupine 9th 15th 15th 16th 17th
- Page 166 and 167:
SECTION 4. CENTRAL BASIN PROJECTS T
- Page 168 and 169:
10th Emma Brickyard Aztec Gila St P
- Page 170 and 171:
21st 22nd West East 47th 48th 49th
- Page 172 and 173:
I-110 28th Brookstown Topaz Garnet
- Page 174 and 175:
9th 10th 15th 17th 18th 19th 21st 2
- Page 176 and 177:
SECTION 4. CENTRAL BASIN PROJECTS G
- Page 178 and 179:
SECTION 4. CENTRAL BASIN PROJECTS 4
- Page 180 and 181:
SECTION 4. CENTRAL BASIN PROJECTS G
- Page 182 and 183:
3rd 5th Royal 9th 15th 17th 18th 18
- Page 184 and 185:
3rd 9th 12th 22nd 28th 29th West Ea
- Page 186 and 187:
SECTION 4. CENTRAL BASIN PROJECTS G
- Page 188 and 189:
South §¨¦ I-110 Terrace Myrtle C
- Page 190 and 191:
SECTION 4. CENTRAL BASIN PROJECTS P
- Page 192 and 193:
SECTION 4. CENTRAL BASIN PROJECTS 4
- Page 194 and 195:
SECTION 4. CENTRAL BASIN PROJECTS 4
- Page 196 and 197:
SECTION 4. CENTRAL BASIN PROJECTS 4
- Page 198 and 199:
Aster # Stadium Iowa Iowa # PS1 Sta
- Page 200 and 201:
SECTION 4. CENTRAL BASIN PROJECTS T
- Page 202 and 203:
SECTION 4. CENTRAL BASIN PROJECTS T
- Page 204 and 205:
SECTION 5. NORTH BASIN PROJECTS Thi
- Page 206 and 207:
F 3rd 3rd Lupine Truth Alba East Su
- Page 208 and 209:
Chinn Helene Sussex Golden Muse Elm
- Page 210 and 211:
SECTION 5. NORTH BASIN PROJECTS Thi
- Page 212 and 213:
SECTION 5. NORTH BASIN PROJECTS Gra
- Page 214 and 215:
See Inset
- Page 216 and 217:
F Chinn Golden Sunshine Troy # Aven
- Page 218 and 219:
SECTION 5. NORTH BASIN PROJECTS Thi
- Page 220 and 221:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 222 and 223:
Hiawatha Mengel Sanchez Goudchaux K
- Page 224 and 225:
SECTION 5. NORTH BASIN PROJECTS Thi
- Page 226 and 227:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 228 and 229:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 230 and 231:
Sullivan Shoe Creek Lazy Lake Hoope
- Page 232 and 233:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 234 and 235:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 236 and 237:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 238 and 239:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 240 and 241:
SECTION 5. NORTH BASIN PROJECTS jus
- Page 242 and 243:
Blackwater Acres Hubbs Sullivan Car
- Page 244 and 245:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 246 and 247:
Greenway Rome Airway Vega Monterrey
- Page 248 and 249:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 250 and 251:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 252 and 253:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 254 and 255:
SECTION 5. NORTH BASIN PROJECTS 052
- Page 256 and 257:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 258 and 259:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 260 and 261:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 262 and 263:
SECTION 5. NORTH BASIN PROJECTS 5.4
- Page 264 and 265:
# PRIVATETMT # Port Hudson-Pride !R
- Page 266 and 267:
Burrel # PRIVATETMT PS357 # Port Hu
- Page 268 and 269:
Foster Cora # # Yancy # PS78 # # PS
- Page 270 and 271:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 272 and 273:
SECTION 5. NORTH BASIN PROJECTS Thi
- Page 274 and 275:
SECTION 5. NORTH BASIN PROJECTS Pla
- Page 276 and 277:
SECTION 5. NORTH BASIN PROJECTS TAB
- Page 278 and 279:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 280 and 281:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 282 and 283:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 284 and 285:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 286 and 287:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 288 and 289:
SECTION 6. EMERGENCY GENERATORS TAB
- Page 290 and 291:
SECTION 6. EMERGENCY GENERATORS Thi
- Page 293 and 294:
APPENDIX A Existing Pump Stations a
- Page 295 and 296:
APPENDIX A Existing Pump Stations a
- Page 297 and 298:
APPENDIX A Existing Pump Stations a
- Page 299 and 300:
APPENDIX A Existing Pump Stations a
- Page 301:
Appendix B PDP Lift Stations
- Page 304 and 305:
APPENDIX B PDP Lift Stations; Baton
- Page 306 and 307:
APPENDIX B PDP Lift Stations; Baton
- Page 308 and 309:
This page intentionally left blank.
- Page 310 and 311:
SECTION 7. SUPERVISORY CONTROL AND
- Page 312 and 313:
SECTION 7. SUPERVISORY CONTROL AND
- Page 314:
SECTION 7. SUPERVISORY CONTROL AND