SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-9<br />

CC-WWTP-FM (PS42 FM) – Pipeline Information<br />

US Node<br />

PS505A<br />

DS Node<br />

Ben Hur/<br />

Burbank<br />

Length<br />

(ft)<br />

Existing Diameter<br />

(in)<br />

Proposed Diameter<br />

(in)<br />

3,400 New 16<br />

LSU PS PS 42 6,900 New 20<br />

PS 42 Lee/Burbank 18,000 New 48<br />

Lee/Burbank SWWTP 18,000 New 54<br />

Staring Lane/<br />

Burbank<br />

SWWTP 6,300 New 60<br />

Staring Lane<br />

/Burbank<br />

SWWTP 3,700 New 64<br />

Comments<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $25,000,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-39 JANUARY 2011<br />

REV. 5