SECTION 5. NORTH BASIN PROJECTS<br />

5.3 North Forced System Comprehensive Rehabilitation<br />

Projects<br />

5.3.1 NFW-R-0001, NFW-R-0002, and NFE-R-0001<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the sewer collection system to reduce the amount of rainwater and<br />

groundwater that leak into the system.<br />

Purpose<br />

The purpose of the comprehensive sewer rehabilitation is to correct defects in the system<br />

such as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow<br />

sources. The water that enters the system through the defects is a major contributor to SSOs.<br />

Comprehensive rehabilitation of the collection system will contribute to alleviating SSOs.<br />

Location<br />

There are four projects located within the North Forced Basin. The attached maps show the<br />

locations of the projects, shown in Figure 5-7 to 5-9.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including CCTV inspection of pipes. Smoke testing may also be<br />

included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and based on that<br />

analysis a listing of recommended repairs with associated construction costs will be generated.<br />

An engineering firm will then complete detailed design and preparation of construction<br />

documents for project bidding.<br />

The construction of rehabilitation projects will typically include the following components.<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place pipe liners<br />

Rehabilitation or replacement of manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated costs for each project are presented in Table 5-4. These costs are based on<br />

preliminary estimates of the amounts of each component of the system that will require<br />

repair or replacement. During the physical inspection phase, the actual condition of the<br />

components will be assessed and appropriate methods recommended. At that time, the cost<br />

estimate for each project will be revised. For those projects under construction, the actual<br />

bid amounts are included as construction costs in Table 5-4.<br />

GNV31031158552.DOCX/103470004 5-19 JANUARY 2011<br />

REV. 5