SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.2 CGN-C-0002 (25 th Street – North Acadian Thruway)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The original purpose of the CGN-C-0002 (25th Street – North Acadian Thruway) project was<br />

to increase the capacity of the gravity trunk sewer upstream of PS 60, PS 15, and PS 59 to<br />

alleviate SSOs. This project now consists of designing approximately 9,500 linear feet of<br />

gravity sanitary sewer pipeline replacement with pipelines ranging in diameter from 15 to<br />

24 inches, and installing approximately 3,000 lf of new gravity sanitary sewer pipeline with<br />

diameters of 21 to 24 inches.<br />

For constructability and schedule alignment, those segments originating near North<br />

Acadian Thruway to PS 15 will be constructed as project CGN-C-0001 (Capital Lake Drive-<br />

Gayosa Street), while those segments originating north of I-110 near Memorial Stadium and<br />

east of I-110 between Spanish Town Road and Main Street will be constructed in the vicinity<br />

of project CGN-C-0003 (South Boulevard-St. Joseph Street). The location descriptions and<br />

maps of those projects include the scope that is being designed under this project.<br />

Total Estimated Design Cost is $521,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Design has been Completed.<br />

GNV31031158548.DOCX/103440008 4-20 JANUARY 2011<br />

REV. 5