SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.12 CGS-C-0007 (Central Storage/Equalization)<br />

Project Description<br />

This project has been deleted from the PDP due to the Central Consolidation. The storage at<br />

the Central WWTP is no longer needed, although the storage volume required at the South<br />

WWTP has been increased due to the consolidation of the Central WWTP with the South<br />

WWTP operations.<br />

4.2.13 CC-WWTP-PS (PS 42)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CC-WWTP-PS (PS 42) Project includes the design and construction of one 48 MGD<br />

(33,300 gal/min) pump station facility (PS 42), vapor phase biotower-type odor control, and<br />

associated yard piping and valves to pump the flow from PS 1, PS 59, and the LSU pump<br />

station to the South WWTP. The Central WWTP pump station will be located near the<br />

current site of the Central WWTP, and will pump through the new forcemain described in<br />

the project entitled CC-WWTP-PS (PS 42 FM). Once this project is completed, the Central<br />

WWTP will be decommissioned and demolished.<br />

Location<br />

The Central Pump Station Project is located adjacent to the existing Central WWTP property<br />

at 2443 River Road, south of the downtown Baton Rouge area. The proposed location of the<br />

pump station is on existing property owned by the C-P and is shown in Figure 4-15.<br />

Scope<br />

The scope of this project is shown in Table 4-7.<br />

TABLE 4-7<br />

CC-WWTP-PS (PS 42) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

PS NO.<br />

LOCATION<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 42 2443 River Bend New 40,000 6,144<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $6,700,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-34 JANUARY 2011<br />