SECTION 2. PLANNING DESCRIPTION<br />

2. Steady state calculations for evaluation of required pipe capacity<br />

3. Dynamic models runs for evaluation of existing pipes with future flows added to postrehabilitation<br />

flows<br />

4. Steady state calculations for evaluation of required pipe capacity with future flows<br />

5. Test of the revised model for its ability to handle future wet weather flows<br />

6. Evaluation of the model output for acceptable design criteria and physical evidence of<br />

overflows<br />

7. Documentation of project list<br />

8. DPW endorsement<br />

9. Prioritization of projects<br />

10. Development of planning level cost estimates<br />

11. Determine projects for reduction of existing SSOs<br />

12. Definition of projects<br />

Based on these steps, the capacity projects, described in Sections 3, 4, and 5 of this report<br />

were developed.<br />

2.4 Wastewater Treatment/Storage <strong>Plan</strong>ning<br />

The wastewater treatment planning process began in 2006 and concluded with the<br />

development of the Master <strong>Plan</strong> (CH2M HILL, 2008). The following documents describe the<br />

planning efforts:<br />

<br />

<br />

Technical Memorandum entitled Addressing Existing Noncompliance Issues and Future<br />

Wet-weather Flow Management Requirements for the South Wastewater Treatment <strong>Plan</strong>t:<br />

Summary of Findings and Recommendations (CH2M HILL, 2006)<br />

South Wastewater Treatment <strong>Plan</strong>t Immediate Action <strong>Plan</strong> Basis of Design Report<br />

(CH2M HILL, 2007)<br />

Draft Wastewater Master <strong>Plan</strong> (CH2MHILL, 2008)<br />

<br />

Consolidation of South and Central Wastewater Treatment <strong>Plan</strong>ts in Baton Rouge TM<br />

(CH2M HILL, 2008)<br />

This document describes the immediate action projects and wet weather capacity project for<br />

the South WWTP only. No wet weather capacity projects are required at the North WWTP.<br />

Other improvements at the treatment plants are not a part of this plan, since they are<br />

included in the Draft Master <strong>Plan</strong> (CH2MHILL, May 2008). Four of the preliminary master<br />

plan projects however, are briefly described in this document involve construction at the<br />

North WWTP, specifically those involving the priority one improvements, priority two<br />

improvements, standby generators and SCADA.<br />

This document also describes additional improvements that will be necessary at the South<br />

WWTP in order to consolidate the Central WWTP with the South WWTP. These<br />

GNV31031158569.DOCX/110050010 2-2 JANUARY 2011<br />

REV. 5