SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.4 SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer<br />

Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The following pump stations will be replaced in this project: PS 182, PS 223, PS 327, PS 353,<br />

PS 278, PS 372, and PS 365. The new pump stations will work in conjunction with forcemain<br />

upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />

these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

Table 3-19 and Figure 3-32 show the locations of the pump stations in this project. These<br />

pump stations are generally located in the area of Jefferson Highway and Highland Road.<br />

Scope<br />

Table 3-19 shows the detailed scope of this project.<br />

TABLE 3-19<br />

SFL-C-0004 (Group Project 2 – Old Perkins – Highland Road Area Sewer Upgrades) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak<br />

Wet Weather<br />

Flow (GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 182 Near YMCA Plaza Drive 208 417 148<br />

Comments<br />

PS 223<br />

PS 327<br />

PS 353<br />

Intersection of Don Budge<br />

Avenue and Backcourt Drive<br />

Intersection of Alder Drive and<br />

Crepe Myrtle Drive<br />

Intersection of Azalea Lakes<br />

Avenue and Lake Iris Avenue<br />

278 795 168<br />

278 369 44<br />

486 537 49<br />

PS 278 Near Bainbridge Avenue 347 764 174<br />

PS 372<br />

PS 365<br />

Intersection of West Lake<br />

Terrace Drive and Lake Tulip<br />

Avenue<br />

Intersection of Sugar Mill<br />

Avenue and Umbehagen Lane<br />

278 544 314<br />

1,528 4,155 762<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $3,476,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction is on-going.<br />