SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.6 CGS-C-0001 (Roosevelt Street Area – PS 1 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation, as PS 1 no longer required<br />

improvements due to consolidation.<br />

4.2.7 CGS-C-0002 (University Lake Area – PS2, PS5, and PS6 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation. PS 2, PS 5, and PS 6 will all be<br />

part of the CC-EAST-PS (Central Consolidated Pump Station) project.<br />

4.2.8 CGS-C-0003 (Acadian/Claycut Area – PS3 and PS4 Improvements)<br />

Project Description<br />

This project was deleted due to the Central Consolidation. PS 3 and PS 4 will be part of the<br />

CC-EAST-PS (Central Consolidated Pump Station) project.<br />

4.2.9 CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The purpose of this project is to upgrade gravity sewers upstream of PS 1, PS 2, and PS 5to<br />

alleviate SSOs in the Central Gravity South basin. The project also includes new forcemain<br />

from PS 6, PS 91, and the new Glasgow PS, which will all be constructed as part of the<br />

Central Consolidated Pump Stations project. The original project from the January 2008 PDP<br />

had several hundred feet of gravity sewer deleted from it with several hundred feet of<br />

forcemain added to it due to Central Consolidation, and was combined with the CGS-C-<br />

0005 (Stanford Avenue – Ferndale Avenue) project. The combined project has been<br />

designated the CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />

described in this section.<br />

Location<br />

The forcemains and gravity segments in this project are shown in Figure 4-13.<br />

Gravity segment 001-00425A to 001-00425 starts on East Polk Street between Colorado Street<br />

and Nebraska Street. The gravity segment travels west until reaching 001-00425 located on<br />

East Polk Street between Nebraska Street and Highland Road.<br />

Gravity segment 001-00425 to 001-00293 starts on East Polk Street between Nebraska Street<br />

and Highland Road. The gravity segment travels west on Polk Street, then southeasterly<br />

along Highland Road, ending at Johnson Street.<br />

Gravity segment 002-01393 to 002-01390 starts northeast of the Stanford Avenue and West<br />

Lakeshore Drive intersection. The gravity segment travels northeast until reaching 002-<br />

01391. The line travels north until reaching 002-01390 near the Stanford Avenue and South<br />

Lakeshore Drive intersection.<br />

Gravity segment 002-01390 to 002-01361 starts near the Stanford Avenue and South<br />

Lakeshore Drive intersection. The gravity segment travels northeast along Stanford Ave<br />

until reaching 002-01361, located southwest of the Stanford Avenue and East Lakeshore<br />

Drive intersection.<br />

GNV31031158548.DOCX/103440008 4-27 JANUARY 2011<br />