SECTION 4. CENTRAL BASIN PROJECTS<br />

Gravity segment 005-03915 to 005-03914 starts southwest of the Eugene Street and Valley<br />

Street intersection. The gravity segment travels southeast until reaching 005-03914, located<br />

near the railroad crossing at Valley Street.<br />

Gravity segment 005-03808 to JM001 starts at the Nairn Drive and Valley Street intersection.<br />

The gravity segment travels southwest until reaching 005-03802. The line travels southeast<br />

until reaching 005-03801. The gravity line travels southwest until reaching JM001 , located<br />

near Valley St and Pump Station 5.<br />

Gravity segment JM001 to 005-03800 will travel in a southwesterly direction until reaching<br />

005-03800 near Valley Street and PS 5.<br />

Gravity segment 006-04250 to PS 6 starts southeast of the West Lakeshore Drive and<br />

Stanford Drive intersection. The gravity segment travels northwest until reaching PS 6.<br />

The new forcemain segment PS 91 FM to DUM 001 will start from PS 91 located near the<br />

intersection of Concord Avenue and Lexington Drive, and travels south then southwest<br />

along Moss Side Lane until reaching the railroad right-of-way on the north side of the<br />

railroad. The forcemain will then travel in a northwesterly direction within the railroad<br />

right-of-way until it intersects (DUM 001) with a new forcemain near the intersection of<br />

Glasgow Avenue and Perkins Road.<br />

The new forcemain segment Glasgow PS to DUM 0001 will start near the intersection of<br />

Tupelo Street and Glasgow Avenue, and follow Glasgow Avenue crossing Perkins Road<br />

and the railroad to intersection (DUM 001) with the forcemain segment from PS 91.<br />

The new forcemain segment DUM 001 to JM001 will begin at the intersection point of<br />

segments PS 91 forcemain to DUM 001 and DUM DS to DUM 001. The forcemain will then<br />

travel in a northwesterly direction mostly within the railroad right-of-way until reaching JM<br />

001.<br />

Forcemain segment PS6 to PS6DS starts southeast of West Lakeshore Drive and Stanford<br />

Drive intersection. The forcemain travels northeast, parallel to Stanford Drive until reaching<br />

PS6DS near the South Lakeshore Drive and Stanford Drive intersection.<br />

Scope<br />

Project CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) includes<br />

approximately 1,100 feet of 10-inch and 15-inch gravity sewer upstream of PS 1,<br />

approximately 2,000 feet of 21-inch and 24-inch gravity sewer upstream of PS 2,<br />

approximately 1,100 feet of 12-inch, 18-inch, and 42-inch gravity sewer upstream of PS 5,<br />

approximately 40 feet of 21-inch gravity sewer upstream of PS 6,approximately 1,400 feet of<br />

12-inch forcemain downstream of PS 6, and approximately 7,000 feet of 10-inch, 12-inch, and<br />

15-inch forcemain downstream of PS 91 and Glasgow PS, as shown in Table 4-5.<br />

GNV31031158548.DOCX/103440008 4-28 JANUARY 2011<br />