SECTION 5. NORTH BASIN PROJECTS<br />

5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

Project NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) includes the<br />

upgrade of PS 243, PS 105, BPS 513, PS OXLF, PS 123, PS 124, PS 429, and PS 43. These<br />

upgrades are required to alleviate SSOs at and near the pump stations as well as in their<br />

respective upstream basins.<br />

Location<br />

The locations of the pump stations are given in Table 5-21 and is shown in Figure 5-22.<br />

Scope<br />

This project includes the replacement of the pump stations shown in Table 5-21. BPS 513 is<br />

being replaced so that it becomes a wet well pump station, rather than an in-line booster<br />

station.<br />

TABLE 5-21<br />

NFW-C-0009 (Multiple Pump Stations – Highway 61 – <strong>Plan</strong>k Road) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 243 Northgate Drive 625 1,145 184<br />

PS 105 Jupiter Drive off Roman Drive 833 833 94<br />

BPS 513 Bentley Drive off <strong>Plan</strong>k Road 7,430 3,125 235<br />

PS OXLF<br />

Int of Little Farms Drive and<br />

Jersey Drive<br />

Not Available 1,416 112<br />

PS 123 Arleen Ave 139 403 31<br />

PS 124<br />

Int of Hudson Pride Road and<br />

Hagen Drive<br />

208 1,055 120<br />

PS 429 Hooper Ridge Blvd Not Available 412 22<br />

PS 43 Int of Ralph Street and Shada Ave 7,083 9,841 1,937<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $6,000,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction have Not Started.<br />

GNV31031158552.DOCX/103470004 5-65 JANUARY 2011<br />