SECTION 4. CENTRAL BASIN PROJECTS<br />

4.1 Central Gravity System Comprehensive Rehabilitation<br />

Projects<br />

4.1.1 CGS-R-0001, CGS-R-0002, CGS-R-0003, CGS-R-0004, CGS-R-0005, CGN-R-<br />

0001a, CGN-R-0001b, and CGN-R-0002<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the collection system to reduce the amount of infiltration and inflow<br />

that enter the system.<br />

Purpose<br />

The purpose of comprehensive rehabilitation is to correct defects in the system such as offset<br />

pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources. The water<br />

that enters the system through the defects is a major contributor to SSOs. Comprehensive<br />

rehabilitation of the collection system will contribute to alleviating SSOs.<br />

Location<br />

There are eight rehabilitation projects located within the Central Gravity Basin. The<br />

locations of the projects are shown in Figures 4-3 to 4-9.<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will consist of the physical<br />

inspection of the pipes and manholes including CCTV inspection. Smoke testing may also<br />

be included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and, based on that<br />

analysis, a listing of recommended repairs with associated construction costs will be generated.<br />

An engineering firm will then complete detailed design and preparation of construction<br />

documents for project bidding.<br />

The construction of comprehensive rehabilitation projects will typically include the<br />

following components::<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place pipe liners<br />

Rehabilitation or replacement of manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction cost for each project is presented in Table 4-1. These costs are<br />

based on preliminary estimates of the amounts for each component of the system that will<br />

require repair or replacement. During the physical inspection phase, the actual condition of<br />

the components will be assessed and appropriate methods recommended. At that time, the<br />

cost estimate for each project will be revised. For those projects under construction, the bid<br />

amounts were included as construction costs in Table 4-1.<br />

GNV31031158548.DOCX/103440008 4-7 JANUARY 2011<br />