SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.5 SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) project consists of<br />

forcemain upgrades in the South Forced Lower Basin. This project includes the upsizing of<br />

forcemain in an area that extends north to the intersection of Jefferson Highway and Tiger<br />

Bend Road and continues south to the Staring Lane extension and Burbank Drive intersection.<br />

The upgrades are designed to alleviate chronic SSOs at the pump stations and increase the<br />

forcemain capacity. The upgrades range in size from 48-inch to 60-inch diameter.<br />

Location<br />

The first segment of forcemain from node BPS 507 to BPS 514 begins at BPS 507 near the<br />

intersection of Kimbleton Avenue and Jefferson Highway. Upon leaving the pump station the<br />

forcemain travels south through a servitude along the east edge of the Briarwood Golf Club<br />

for approximately 2,800 feet before turning slightly east. At this point, the forcemain crosses<br />

the golf club for approximately 1,300 feet before crossing Airline Highway. After crossing<br />

Airline Highway, the forcemain continues south parallel to Pecue Lane. Approximately 1,200<br />

feet passed the Airline Hwy, new 48-inch forcemain connects to an existing 42-inch PCCP<br />

forcemain and 3,000 LF of existing forcemain is used for this alignment. Before I-10, the<br />

existing 42-inch PCCP forcemain crossing connects to a new 48-inch forcemain that then<br />

crosses I-10, Ward Creek, and the railroad, and continues south to BPS 514.The forcemain<br />

resumes downstream of BPS 514 and continues south to Highland Road, crosses, and follows<br />

the Entergy right-of-way to Buccaneer Avenue, then to Burbank Drive. It then follows<br />

Burbank Drive to the intersection of Burbank Drive and Staring Lane extension.<br />

Scope<br />

SFL-C-0005 (Highland Road – Burbank Drive Capacity Improvements) includes<br />

construction of approximately 12,600 feet of 48-inch forcemain, approximately 23,800 feet of<br />

54-inch forcemain, and approximately 6,200 feet of 60-inch forcemain downstream of BPS<br />

507 and BPS 514. Table 3-20 and Figure 3-33 shows the detailed scope of this project.<br />

TABLE 3-20<br />

SFL-C-0005 (Highland Road - Burbank Drive Capacity Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing Diameter<br />

(in)<br />

BPS 507 SS340 6,610 42 48<br />

SS340 SS364 3,780 42 48<br />

SS369 BPS514 2,200 42 48<br />

BPS514<br />

15,000 48 54<br />

Burbank Drive<br />

Intersection<br />

Bluebonnet Blvd<br />

Intersection<br />

Burbank Dr<br />

Intersection<br />

Bluebonnet Blvd<br />

Intersection<br />

Staring Lane<br />

Extension<br />

Proposed Diameter<br />

(in)<br />

8,800 48 54<br />

6,200 48 60<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Comments<br />

Total Construction Bid Amount is $20,700,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Construction Appropriation Year was 2010.<br />

Construction is on-going.<br />

GNV31031158547.DOCX/103440004 3-77 JANUARY 2011<br />