SECTION 4. CENTRAL BASIN PROJECTS<br />

TABLE 4-5<br />

CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

001-00425A 001-00425 15 8 10<br />

Comments<br />

001-00425 001-00293 1,100 8 & 10 15<br />

002-01393 002-01390 1,200 15 & 18 21<br />

002-01390 002-01361 800 18 24<br />

005-03915 005-03914 400 8 12<br />

005-03808 JM 0001 560 10 18<br />

JM 001 005-03800 110 New 42<br />

PS 91 FM DUM 001 2,750 New 12 Forcemain<br />

Glasgow PS DUM 001 960 New 10 Forcemain<br />

DUM 001 JM 001 3,280 New 15 Forcemain<br />

006-04250 PS6 40 10 21<br />

PS6 PS6DS 1,400 8 12 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $4,326,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2009.<br />

Construction is On-Going.<br />

GNV31031158548.DOCX/103440008 4-29 JANUARY 2011<br />