SECTION 3. SOUTH BASIN PROJECTS<br />

Gravity segment 053-00010A to 053-00003 starts northwest of the Woodgate Blvd and North<br />

Woodgate Court intersection and travels southeasterly direction along a drainage canal<br />

between Woodgate Court and Millgate Place to manhole 053-00003, which is located on<br />

Boone Avenue halfway between Wylie Drive and Highland Park Drive.<br />

Gravity segment 053-00429 to 053-00410 runs parallel to Bancroft Way, set off southeasterly<br />

half a block. The segment starts northeast of Timbercove Street and ends at Highland Road.<br />

Gravity segment 068-00050 to PS 68 begins near the cul-de-sac on the northern end of<br />

Jennifer Jean Drive and follows a servitude east in between Highland Road and Burbank<br />

Drive to PS 68, which is located just south of the intersection of Highland Road and Delgado<br />

Drive<br />

The forcemain from PS 56 begins at PS 56, which is roughly located at the intersection of<br />

Highland Park Drive with Chandler Drive, and continues along Highland Park Drive for<br />

approximately 540 feet.<br />

The PS 329 forcemain will be replaced under this project. This forcemain starts at PS 329,<br />

which is located in a wooded area in a northerly direction from GSRI Avenue, then runs<br />

south to GSRI Avenue, and turns easterly on GSRI Avenue to Gulf South Parkway.<br />

The PS 53A forcemain is a new forcemain from PS 53 to the manifold with the new PS 58A<br />

forcemain, as described above. This forcemain begins at PS 53A, which will be located near<br />

the intersection of Boone Avenue and Chippenham Drive, and runs southeasterly along<br />

Boone Avenue to Staring Lane.<br />

Scope<br />

This project includes construction of the following: approximately 6,800 feet of 15-inch, 18-<br />

inch, 21-inch, 27-inch, 30-inch, 36-inch, and 42-inch gravity sewer upstream of PS 57;<br />

approximately 1,200 feet of 15-inch gravity sewer upstream of PS 40; approximately 2,000<br />

feet of 15-inch and 18-inch gravity sewer upstream of PS 329; approximately 7,800 feet of 12-<br />

inch, 15-inch, 18-inch, 24-inch, and 27-inch gravity sewer upstream of PS 302; approximately<br />

2,400 feet of 15-inch and 18-inch gravity sewer upstream of PS 61; approximately 18,300 feet<br />

of 18-inch, 21-inch, 24-inch, 27-inch, 30-inch, and 36-inch gravity sewer upstream of PS 53;<br />

approximately 1,200 feet of 18-inch gravity sewer upstream of PS 68; approximately 4,300<br />

feet of 10-inch forcemain from PS 329 to replace the existing forcemain; approximately 6,200<br />

feet of new 24-inch forcemain from PS 53A; and approximately 540 feet of 18-inch forcemain<br />

from PS 56 to replace the existing forcemain.<br />

Table 3-13 shows the detailed scope of this project.<br />

GNV31031158547.DOCX/103440004 3-55 JANUARY 2011<br />