SECTION 3. SOUTH BASIN PROJECTS<br />

3.4.3 SFL-C-0003 (Multiple PSs - Burbank Drive – Siegen Lane)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The following pump stations will be replaced in this project: PS 118, PS 221, PS 358, BPS 999,<br />

PS 239, and PS 229. The new pump stations will work in conjunction with forcemain<br />

upgrades in other South Forced Lower Basin projects to alleviate chronic SSOs at and near<br />

these pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

are predicted by the model to exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations are shown in Table 3-18 and in Figure 3-31.<br />

Scope<br />

The scope of the pump station replacements is shown in Table 3-18. BPS 999 will be<br />

converted from an in-line booster pump station to a wet well pump station.<br />

TABLE 3-18<br />

SFL-C-0003 (Multiple Pump Stations - Burbank Drive - Siegen Lane) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

Comments<br />

PS 118<br />

Near Rue Crozat and Rue<br />

Desiree<br />

417 909 171<br />

PS 221 Near Barkley and Mirkwood 694 1,058 232<br />

PS 358<br />

BPS 999<br />

PS 239<br />

PS 229<br />

Old Perkins Road, near<br />

Oakbrook Road<br />

Siegen Road, near Quail<br />

Ridge<br />

Near Neil Avenue and<br />

Highland Knoll Court<br />

Near intersection of<br />

Rendale Avenue and<br />

Brookhollow Drive<br />

208 235 29<br />

6,250 8,855 1,962 Will be converted<br />

from in-line to wet<br />

well.<br />

69 168 48<br />

278 694 202<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,100,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction has not started.<br />

GNV31031158547.DOCX/103440004 3-73 JANUARY 2011<br />

REV. 5