SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-2<br />

SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

101-00024 PS101 2,000 8 10<br />

031-00035 031-00030 1,100 8 15<br />

Comments<br />

031-00030 PS 31 2,600 8 to 12 21 PS upgraded in SGC-C-0001 (Florida<br />

Blvd PS Improvements)<br />

031-00378 031-00006 80 8 12 Crosses drainage canal<br />

031-00442 031-00435 670 8 10<br />

031-00435 031-00237 930 8 and 12 12<br />

031-00237 031-00132 260 10 15<br />

031-00132 031-00112 550 10 to 12 18<br />

031-00112 PS31 3,400 21 36<br />

031-00270 031-00112 2,600 18 24<br />

031-00289 031-00270 740 8 18<br />

031-00299 031-00289 320 15 18<br />

031-00330 031-00299 670 15 18<br />

031-00330A 031-00330 340 15 18<br />

PS21FM 031-00330A 310 8 10 Forcemain<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $11,200,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction Not Started.<br />

GNV31031158547.DOCX/103440004 3-26 JANUARY 2011<br />

REV. 5