SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.17 SGL-C-0004 (Highland Road – Lee Drive)<br />

This project has been combined with the SGL-C-0003 (Essen Lane-Highland Road) from the<br />

October 2008 PDP. The combined project has been designated the SGL-C-0003 (Highland<br />

Pipeline Improvements) project and is found in Section 3.2.16.<br />

3.2.18 SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGL-C-0005 (Bayou Duplantier Area Sewer Upgrades) project was originally<br />

designated SGL-C-0005 (Perkins Road – Dahlia Street) project in the October 2008 PDP. This<br />

project includes the upsizing of gravity sewer and forcemain upstream of PS 56 and PS 91 to<br />

alleviate upstream SSOs.<br />

Location<br />

The SGL-C-0005 project includes gravity sewer and forcemain replacements in the area of<br />

Perkins Road and Bayou Duplantier, and is shown in Figure 3-24.<br />

Gravity segment 056-00133H to 056-00153 is located in a wooded area, starting south of<br />

Belvedere Drive and progressing in an easterly direction through the woods south of<br />

Elmcrest Drive and Pollard Parkway.<br />

Gravity segment 056-00208 to 056-00133H starts at Lee Drive south of Bennett Drive. The<br />

segment travels in a northeasterly direction, then goes easterly on Bluebell Drive. This<br />

segment continues easterly beyond the end of Bluebell Drive through a wooded area to<br />

manhole 056-00133H, which is south of Belvedere Drive.<br />

Gravity segment 056-00148 to PS 56 starts in the wooded area north of Chandler Drive and<br />

heads in a southeasterly direction to PS 56, which is located off Chandler Drive west of its<br />

intersection with Highland Park Drive. Gravity segment 056-00153 to 056-00148 starts south<br />

of the Christian Life Academy off Quail Drive and continues in a southwesterly direction to<br />

manhole 056-00148 in a wooded area.<br />

Gravity segment PS70DS to 056-00208 is located along Lee Drive north of the drainage canal<br />

north of PS 70.<br />

Gravity segment 091-00004 to 091-00001 is located along Concord Avenue between<br />

Yorktown Drive and Brandywine Drive. Segment 091-00074 to 091-00006 begins on Valley<br />

Creek Drive and continues southeasterly through a wooded area to the intersection of<br />

Concord Avenue and Congress Boulevard.<br />

Forcemain segment PS70 to 056-00208 starts south of Bayou Duplantier on Lee Drive. The<br />

segment travels in a northwesterly direction crossing Bayou Duplantier to 056-00208.<br />

Scope<br />

This project includes the construction of approximately 10,500 feet of 18-inch, 21-inch,<br />

24-inch, 30-inch, and 36-inch gravity sewer upstream of PS 56 and approximately 2,000 feet<br />

of 15-inch and 18-inch gravity sewer upstream of PS 91. Table 3-14 shows the detailed scope<br />

of this project.<br />

GNV31031158547.DOCX/103440004 3-59 JANUARY 2011<br />

REV. 5