SECTION 4. CENTRAL BASIN PROJECTS<br />

Project CGS-C-0006 (Government St – South Acadian Thruway Sewer Area Upgrades)<br />

includes approximately 5,800 feet of 21-inch, 24-inch, and 27-inch gravity sewer construction<br />

upstream of PS 4 and approximately 5,200 feet of 12-inch, 15-inch, 18-inch, 24-inch, and 27-<br />

inch gravity sewer construction upstream of PS 3, as shown in Table 4-6.<br />

TABLE 4-6<br />

CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Proposed<br />

Diameter<br />

(in)<br />

004-03027 004-02967A 1,210 21<br />

004-02967D 004-03004 20 15<br />

004-02967A 004-02951 1,230 24<br />

004-02951 004-02950 110 27<br />

004-3201 004-02980B 3,730 24<br />

003-02286 003-02203 2,240 15<br />

003-02203 003-02039 340 18<br />

003-02039 003-01927B 1,410 21<br />

003-01927B 003-01927A 90 24<br />

003-01929 003-01927B 300 12<br />

003-02203B 003-02235 700 15<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Comments<br />

Total Construction Bid Amount is $4,700,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is On-Going.<br />

GNV31031158548.DOCX/103440008 4-32 JANUARY 2011<br />