SECTION 5. NORTH BASIN PROJECTS<br />

problem. This project is currently nearing construction completion. Other odor control<br />

improvements recommended at the North WWTP include:<br />

<br />

<br />

<br />

Install flat covers on the primary effluent weir and launder portions of the primary<br />

clarifiers with biotower odor treatment.<br />

Rehabilitate the existing carbon scrubbers on the dewatering building and add a firststage<br />

wet scrubber.<br />

Provide scrubbers and covers at the new influent pump station and headworks.<br />

Digester Gas Utilization<br />

An evaluation of the potential to utilize biogas that it a by-product of the anaerobic<br />

digestion process was discussed in the Master <strong>Plan</strong> – Biogas Storage and Utilization TM<br />

(CH2M HILL, 2008). The feasibility to capture the biogas and utilize it as an alternative fuel<br />

for heating the anaerobic digesters, rather than flaring the biogas and utilizing natural gas<br />

for heating (the current practice at all three large WWTPs) was evaluated. During the<br />

evaluation, it was found that most of the gas storage equipment, gas compressors, and<br />

engine generators that are necessary to utilize biogas were present but not in use at any of<br />

the three large WWTPs. Based on the evaluation, it is recommended to install biogas storage<br />

at the North WWTP. The stored biogas would be used for heating the anaerobic digesters.<br />

SCADA<br />

The North WWTP SCADA system is discussed in the SCADA section of this PDP.<br />

5.5.4 Estimated Costs<br />

The Draft Master <strong>Plan</strong> outlines the estimated construction cost of the Priority One and<br />

Priority Two improvements. The costs for standby power and SCADA are included in the<br />

Emergency Generators and SCADA sections of this document, although they are also shown<br />

in Table 5-25 below. The table outlines the estimated construction costs of the North WWTP<br />

Master <strong>Plan</strong> improvements. Even though costs are presented separately for Priority One,<br />

Priority Two, Standby Power, and SCADA, it is likely that one project would be designed<br />

and constructed to implement all improvements at once. The Total Construction Bid<br />

Amount, assuming that sales tax will be waived on materials, for the North WWTP Master<br />

<strong>Plan</strong> Improvements is $34,349,000.<br />

TABLE 5-25<br />

Summary of Estimated Construction Costs for the North WWTP<br />

Item<br />

Estimated Cost<br />

Priority One<br />

Building Condition Assessment $3,000,000<br />

Equipment Condition Assessment $4,200,000<br />

Handrail Rehabilitation/Replacement $800,000<br />

Alternate Disinfection (Sodium Hypochlorite) $2,500,000<br />

Priority One Sub-Total Construction Bid Amount $10,500,000<br />

Estimated Sales Tax Waiver -$312,000<br />

GNV31031158552.DOCX/103470004 5-75 JANUARY 2011<br />

REV. 5