SECTION 7. SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)<br />

The schedule of the project delivery is based on this prioritization. The project delivery plan<br />

involves design of the system components in three projects in 2010 and 2011. Construction<br />

will then commence in 2011 and continue throughout the program duration. Table 7-1<br />

shows the cost summary for the projects.<br />

TABLE 7-1<br />

SCADA Cost Summary<br />

Item<br />

North WWTP SCADA – construction $2,302,000<br />

Collection System SCADA – construction $12,902,000<br />

SCADA Operations Data/Control Center – construction $1,214,000<br />

Total $16,418,000<br />

In order to deliver these projects in a timely manner, the following criteria were used to<br />

develop the project delivery plan.<br />

<br />

<br />

<br />

<br />

<br />

A 5-year renewable maintenance contract is required for the service of the entire SCADA<br />

system.<br />

PDP Pump stations will be designed SCADA-ready.<br />

SCADA components (antenna modem, and PLC, where needed) will be provided by a<br />

SCADA vendor (systems integrator) and installed by a general contractor. For PDP<br />

pump stations and the North WWTP, the general contractor will be the general<br />

contractor for the entire project.<br />

The collection system SCADA will be separated by North and South, so that the North<br />

Collection System will communicate with the North WWTP and the South Collection<br />

System (consisting of both South and Central Basin pump stations) will communicate<br />

with the South WWTP.<br />

The SCADA vendor will be selected by a bidding process. The contract will be based on<br />

the number of pump stations to receive SCADA per year, with a unit price given for<br />

each type of unit for each year. The North WWTP SCADA system will be designed and<br />

bid separately from the collection system SCADA.<br />

The South WWTP SCADA system will be delivered on the <strong>Program</strong> schedule by 2014,<br />

when the South WWTP – Phase 2 project is scheduled to be completed.<br />

<br />

The North WWTP SCADA system will be delivered when the Master <strong>Plan</strong> project is<br />

implemented in 2015 or beyond.<br />

With these criteria in mind, the following project delivery plan was developed.<br />

1) C-P will finalize a location for SCADA Operations Data/Control Center, preferably in a<br />

downtown location.<br />

2) PM will develop a plan to remodel roughly 300 existing pump stations that are not being<br />

upgraded in the <strong>Program</strong>. Each pump station will need new SCADA equipment, with<br />

GNV31031158555.DOCX/103470008 7-4 JANUARY 2011<br />

REV. 5