SECTION 5. NORTH BASIN PROJECTS<br />

5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs<br />

Road)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road)<br />

project includes the upgrade of PS 24, PS 24A, PS 503, PS 119N, and PS 183. These upgrades<br />

are required to alleviate SSOs at and near the pump stations as well as in their respective<br />

upstream basins.<br />

Location<br />

The locations of the pump stations are shown in Table 5-22 and in Figure 5-23.<br />

Scope<br />

This project includes the replacement of pump stations as outlined in Table 5-22.<br />

TABLE 5-22<br />

NFW-C-0010 (Multiple Pump Stations – Prescott Road – Greenwell Springs Road) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 24<br />

PS 24A<br />

PS 503<br />

PS 119N<br />

PS 183<br />

Sherwood Street between Wildwood<br />

Parkway and Lemonwood Drive<br />

Sherwood Street between Wildwood<br />

Parkway and Lemonwood Drive<br />

Greenwell Springs Road between the<br />

intersection of Aletha Drive and Pasadena<br />

Drive<br />

Sarasota Drive between Biscayne Drive and<br />

Flamingo Drive<br />

Canterbury Drive between the intersection of<br />

Greenforest Drive and Monticello Blvd<br />

4,028 3,867 1,733<br />

5,902 3,692 165<br />

2,847 4,095 736<br />

417 968 108<br />

1,528 2,204 443<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,800,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction have Not Started.<br />

GNV31031158552.DOCX/103470004 5-67 JANUARY 2011<br />