SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-12<br />

SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 27<br />

PS 74<br />

PS 302<br />

LSU PS<br />

Intersection of Ridgehaven Avenue and<br />

Burbank Drive<br />

Northeast of Pecan Tree Drive and Jade<br />

Avenue intersection<br />

Southwest of Bluebonnet Boulevard and<br />

Highland Road intersection<br />

Near Intersection of Stadium Dr. and<br />

Nicholson Dr.<br />

382 382 80<br />

568 568 167<br />

5,150 5,150 915<br />

N/A 6,940 4,000<br />

Note: Estimated total dynamic head (TDH) for PS 120, PS 329, PS 40, PS 53A, PS 56, PS 68, PS 102, and LSU PS<br />

based on the Pump Station Design Requirements Hazen-Williams “C” value, rather than InfoWorks model “C” value.<br />

The TDH for PS 302, PS 27, and PS 74 is based on these pump stations being manifolded together and their design<br />

flow. The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $8,900,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-51 JANUARY 2011<br />

REV. 5