SECTION 5. NORTH BASIN PROJECTS<br />

Gravity segment 119N-00039 to PS 119N starts at manhole 119-00039, located near the<br />

intersection of Daytona Avenue and Flamingo Drive, runs northeast along Flamingo Drive,<br />

and turns north on Sarasota Drive to PS 119N, located on Sarasota Drive in between<br />

Flamingo Drive and Biscayne Drive.<br />

Gravity segment 183-00009 to 183-00001Z begins at manhole 183-00009, located near the<br />

intersection of Cardigan Avenue and Kilkenny Drive, and follows Kilkenny Drive north to<br />

manhole 183-00001Z, which is located near the intersection of Kilkenny Drive and N. Salem<br />

Drive.<br />

Gravity segment 128-00041A to PS 128 starts at manhole 128-00041A, located near the<br />

intersection of Toledo Bend Avenue and Redlands Drive, and heads south to PS 128, located<br />

on Redlands Drive, in between Cedar Bend Avenue and Elaine Drive.<br />

Scope<br />

The scope of this project includes construction of approximately 1,750 feet of 10-inch and 12-<br />

inch gravity sewer upstream of PS 119N and PS 128 and approximately 2,600 feet of 21-inch<br />

gravity sewer upstream of PS 183. This project also includes construction of 29,800 feet of 4-<br />

inch, 6-inch, 10-inch, 16-inch, and 24-inch forcemain in the North Forced West basin. The<br />

detailed scope of this project is given in Table 5-14.<br />

TABLE 5-14<br />

NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter (in)<br />

Proposed<br />

Diameter (in)<br />

PS 183 NS6512 160 14 16<br />

Comments<br />

NS6512 NS6485 1,600 14 16<br />

PS 119N NS6509 2,150 8 10<br />

BPS503 NS6550 8,500 14 24<br />

NS6550 NS6500 2,300 18 24<br />

NS6500 NS6438 10,200 14 24<br />

PS288 NS6461 3,400 4 6<br />

NS6499 NS6500 1,500 3 4<br />

119N-00039 PS119N 990 8 10 Gravity segment<br />

183-00009 183-00001Z 2,600 12, 15, & 16 21 Gravity segment<br />

128-00041A 128-00040A 360 10 12 Gravity segment<br />

128-00040A 128-00001Z 320 10 12 Gravity segment<br />

128-00001Z PS128 85 10 12 Gravity segment<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $6,900,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation Year is 2013.<br />

Design and Construction has Not Started.<br />

GNV31031158552.DOCX/103470004 5-45 JANUARY 2011<br />

REV. 5