27.08.2015 Views

Program Delivery Plan

Program Delivery Plan - Baton Rouge Department of Public Works ...

Program Delivery Plan - Baton Rouge Department of Public Works ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 3<br />

South Basin Projects<br />

Section 3 presents summaries of the South Gravity System Comprehensive Rehabilitation<br />

Projects, the South Gravity System Capacity Improvement Projects, the South Forced System<br />

Comprehensive Rehabilitation Projects, the South Forced System Capacity Improvement<br />

Projects, and the South WWTP Projects. These projects are all shown on Figures 3-1 and 3-2.<br />

As of October 2010, there are three projects functionally completed, eight projects under<br />

construction, and 16 projects under design in the South Basin.<br />

The project summaries presented herein represent the information available during this<br />

annual update period. The PDP is revisited on an annual basis and revised as necessary<br />

based on results of additional hydraulic wastewater modeling, immediate needs, DPW and<br />

public input, and other factors.<br />

GNV31031158547.DOCX/103440004 3-1 JANUARY 2011<br />

REV. 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!