SECTION 4. CENTRAL BASIN PROJECTS<br />

Gravity segment 060-06987 to 060-06935 starts west of Main Street and N 12th Street<br />

intersection. The gravity segment travels southwest until reaching 060-06935 located east of<br />

the Main Street and North 11th Street intersection.<br />

Gravity segment 060-07038 to 060-06953A starts north of North Street between Canal Street<br />

and N 11th Street. The gravity segment travels north until reaching 060-06953A near<br />

Spanish Town Road.<br />

Gravity segment 060-7741 to 060-07736 starts west of Scenic Highway between Bay Street<br />

and Ellerslie Drive. The gravity segment travels southeast until reaching 060-07737 near<br />

Ellerslie Drive, where it then travels southwest along a drainage canal towards Foss Street to<br />

060-07736. Gravity segment 060-07736 to 060-07735 travels southwest ending at 060-07735<br />

near Foss Street.<br />

Gravity segment 060-07735 to 060-07735I starts northeast of Foss Street and North 19th<br />

Street intersection. The gravity segment travels southwest along Foss Street until reaching<br />

060-07735I.<br />

Gravity segment 060-07735I to 060-07735J travels west, parallel to Foss Street, until reaching<br />

060-07735J, located at the intersection of Foss Street and North 19 th Street.<br />

Gravity segment 060-07735J to 060-07734 travels southeast parallel to North 19 th Street until<br />

reaching 060-07734, located northwest of the intersection of North 19th Street and North 17 th<br />

Street.<br />

Gravity segment 060-7734 to 060-07729 starts northwest of the intersection of North 19 th<br />

Street and North 17 th Street and travels over land in a southwesterly direction near the<br />

Memorial Stadium to 060-07739, which is west of the interchange of I-110 and North 19 th<br />

Street.<br />

Gravity segment 060-7729 to 060-07931 travels south from 060-07729, crosses I-110, and<br />

parallels Frisco Street to 060-07931, which is located near the intersection of North 16 th Street<br />

and Spanish Town Road.<br />

Scope<br />

The entire CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) project<br />

consists of approximately 16,600 feet of gravity sewer upstream of PS 59 and PS 60. Table 4-<br />

3 shows the scope of this project.<br />

TABLE 4-3<br />

CGN-C-0003 (South Boulevard – St. Joseph Street Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

059-06088 New MH #C-3 570 24 36<br />

New MH #C-3 New MH #C-1 30 39 48<br />

059-06445 059-06532 2,195 10 & 12 21<br />

059-06532 059-06045 2,920 10 & 12 24<br />

059-06140 059-06236 1,100 10 15<br />

059-06236 059-06128 940 18 24<br />

GNV31031158548.DOCX/103440008 4-22 JANUARY 2011<br />