CONTENTS, CONTINUED<br />

Section<br />

Page<br />

5.4.4 NFE-C-0004 (Foster Road – Hooper Road Sewer Area<br />

Upgrades) ................................................................................................. 5-34<br />

5.4.5 NFE-C-0005 (Hooper Road Pump Station Improvements) ................ 5-36<br />

5.4.6 NFE-C-0006 (Lovett Road – Greenwell Springs Road Sewer<br />

Area Upgrades) ........................................................................................ 5-38<br />

5.4.7 NFE-C-0007 (Multiple BPS – Hooper Road – Lovett Road) ............... 5-43<br />

5.4.8 NFW-C-0001 (Joor Road – Greenwell Springs Road Sewer Area<br />

Upgrades) ................................................................................................. 5-44<br />

5.4.9 NFW-C-0002 (Choctaw Storage and Pump Station Facility).............. 5-47<br />

5.4.10 NFW-C-0003 (Choctaw Storage Pump Station) .................................. 5-50<br />

5.4.11 NFW-C-0004 (Hooper Storage Facility) ............................................... 5-50<br />

5.4.12 Group Project 1A (Metro Airport Sewer Upgrades) .......................... 5-52<br />

5.4.13 Group Project 1B (Metro Airport Sewer Area Pump Station and<br />

Forcemain Upgrades).............................................................................. 5-58<br />

5.4.14 NFW-C-0007 (<strong>Plan</strong>k Road – Port Hudson Pride Road Sewer<br />

Area Upgrades) ........................................................................................ 5-62<br />

5.4.15 NFW-C-0009 (Multiple Pump Stations – Highway 61 –<br />

<strong>Plan</strong>k Road) .............................................................................................. 5-65<br />

5.4.16 NFW-C-0010 (Multiple Pump Stations – Prescott Road –<br />

Greenwell Springs Road) ....................................................................... 5-67<br />

5.4.17 NFW-HWY61 (Zachary Area Transmission Network<br />

Improvement Project – Phases I, II, III, and IV) .................................. 5-69<br />

5.5 North WWTP Master <strong>Plan</strong> Improvements ....................................................... 5-73<br />

5.5.1 Background ............................................................................................... 5-73<br />

5.5.2 Priority One Improvements .................................................................... 5-73<br />

5.5.3 Priority Two Improvements ................................................................... 5-74<br />

5.5.4 Estimated Costs ........................................................................................ 5-75<br />

6 Emergency Generators ....................................................................................................... 6-1<br />

6.1 Background ............................................................................................................. 6-1<br />

6.2 Collection System Pump Stations ........................................................................ 6-1<br />

6.3 Wastewater Treatment <strong>Plan</strong>ts ............................................................................... 6-3<br />

6.4 Generator Project <strong>Delivery</strong> <strong>Plan</strong> ........................................................................... 6-3<br />

7 Supervisory Control and Data Acquisition (SCADA) ................................................ 7-1<br />

7.1 Background ............................................................................................................. 7-1<br />

7.2 SCADA Operations Data/Control Center .......................................................... 7-1<br />

7.3 Collection System SCADA System ...................................................................... 7-2<br />

7.4 North Wastewater Treatment <strong>Plan</strong>t ..................................................................... 7-3<br />

7.5 SCADA Project <strong>Delivery</strong> <strong>Plan</strong> .............................................................................. 7-3<br />

GNV31031158642.DOCX/110310007 VI JANUARY 2011<br />