SECTION 1<br />

Overview<br />

1.1 Background<br />

The purpose of the Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities<br />

<strong>Program</strong> is to reduce sanitary sewer overflows while also planning for the future. The City<br />

of Baton Rouge, East Baton Rouge Parish (C-P) entered into a Consent Decree (Civil Action<br />

01-978-B-M3) with the United States Environmental Protection Agency (EPA) and the State<br />

of Louisiana to take remedial actions in the collection system to reduce SSOs, and also to<br />

meet National Pollution Discharge Elimination System (NPDES) permit requirements at the<br />

wastewater treatment plants (WWTPs) by January 1, 2015. The Consent Decree details<br />

requirements for several components, including the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Cross Connections<br />

Preventive Maintenance (Collection System and WWTPs)<br />

SSO Responses and Reporting<br />

Remedial Measures Action <strong>Plan</strong> 1 (RMAP1)<br />

Remedial Measures Action <strong>Plan</strong> 2 (RMAP2)<br />

Wastewater Treatment Facility Assessment<br />

Environmental Results Monitoring<br />

Outreach and Public Awareness (O&PA) Quarterly and Annual Reporting<br />

Supplemental Environmental Projects (SEPs)<br />

Recordkeeping<br />

This document constitutes the RMAP2. Other portions of the Consent Decree are addressed<br />

in other documents. This document is the third annual update of the <strong>Program</strong> <strong>Delivery</strong> <strong>Plan</strong><br />

(PDP) that was initially published in January 2008.<br />

1.2 Major <strong>Program</strong> Goals<br />

The major goals of the program are to:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Reduce excess wet weather flows that cause SSOs<br />

Rehabilitate the collection system<br />

Increase the hydraulic capacity of the collection system<br />

Accommodate growth in project areas<br />

Comply with wastewater treatment plant National Pollutant Discharge Elimination<br />

System (NPDES) permit<br />

Comply with the terms of the Consent Decree<br />

GNV31031158568.DOCX/110050008 1-1 JANUARY 2011<br />