SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2 Central Gravity System Capacity Improvements Projects<br />

4.2.1 CGN-C-0001 (Capital Lake Drive – Gayosa Street Area Capacity<br />

Improvements)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The purpose of this project is to re-route flow from PS 15 and PS 19 so that they directly<br />

pump through a common forcemain and manifold with the forcemain from PS 60 to<br />

increase the capacity of the system. The forcemain then discharges wastewater into the<br />

gravity system at the existing manhole (MH# 059-05885) located at the intersection of River<br />

Road and Capital Drive. The October 2009 version of the PDP add the construction of those<br />

gravity segments originating at the intersection of North Acadian Thruway and Ontario<br />

Street, and the intersection of Washington Avenue and West Belfair Drive, both terminating<br />

at PS 15, that were originally part of CGN-C-0002 (25 th Street-North Acadian) project to<br />

improve constructability and scheduling issues. Information about those segments has been<br />

included in this section.<br />

Location<br />

The locations of forcemains and gravity sewers in this project are shown in Figure 4-10.<br />

Forcemain segment PS 15FM to PS 15DS (manifold point of PS19 and PS15 forcemain) starts<br />

south of the Washington Ave and West Belfair Drive intersection. The forcemain travels<br />

west until reaching North Acadian Thruway. The forcemain then turns in a northerly<br />

direction until reaching the intersection of North Acadian Thruway West and Madison<br />

Avenue where the forcemain turns in a westerly direction, and continues until reaching<br />

Eiland Street. On Eiland Street, the PS 15 forcemain will be manifolded at PS 15DS with the<br />

forcemain exiting PS 19.<br />

Forcemain segment PS 15DS to PS 60 travels west along Eiland Street until reaching 3 rd<br />

Street and then travels south to PS 60 along River Road where it is manifolded with the PS60<br />

forcemain at PS60DS<br />

Forcemain segment PS 60DS to 059-05885 travels south from PS 60 on River Road to<br />

manhole 059-05885, which is located on River Road at the intersection of State Capitol Drive<br />

and River Road.<br />

Gravity segment 060-07642 to 060-07619 starts at the North Acadian Thruway West and<br />

Ontario Street intersection. The gravity segment travels south until reaching 060-07619, near<br />

the North Acadian Thruway West and Baron Street intersection.<br />

Gravity segment 060-07619 to 060-07544 travels south until reaching 060-07544 located near<br />

the North Acadian Thruway West and Fairfields Avenue intersection.<br />

Gravity segment 060-07544 to 060-07529 travels south until reaching 060-07529 located near<br />

the North Acadian Thruway and Washington Avenue intersection. Gravity segment 060-<br />

07529 to PS15 travels east until reaching PS15.<br />

Gravity segment 060-07529 to PS 15 travels east along Washington Avenue until reaching PS<br />

15, located south of the Washington Avenue and Belfair Drive intersection.<br />

GNV31031158548.DOCX/103440008 4-17 JANUARY 2011<br />