SECTION 5. NORTH BASIN PROJECTS<br />

5.2.3 NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) Project includes the<br />

replacement of PS 127, PS 129, PS 38, PS 63, PS 64, PS 244, PS 44, PS 75, and PS 80. This<br />

project is the combination of NGS-C-0003 (Multiple PS – <strong>Plan</strong>k Road – Thomas Road) and<br />

NGS-C-0004 (Multiple PS-<strong>Plan</strong>k Road-Harding Boulevard) from the October 2008 PDP. The<br />

combined project has been designated NGS-C-0003 (<strong>Plan</strong>k Road Pump Station<br />

Improvements) project and is described in this section.<br />

The pump station replacements will work in conjunction with the forcemain and gravity<br />

sewer upgrades in the North Gravity Basin projects to alleviate chronic SSOs at the pump<br />

stations and in the gravity basins upstream of the pump stations.<br />

The upgrades will also allow the pump stations to handle future peak wet weather flows that<br />

modeling predicts will equal or exceed the existing maximum capacities.<br />

Location<br />

The locations of the pump stations are given in Table 5-3 and in Figure 5-6.<br />

Scope<br />

This project includes the replacement of the nine pump stations shown in Table 5-3.<br />

TABLE 5-3<br />

NGS-C-0003 (<strong>Plan</strong>k Road Pump Station Improvements) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

Future Peak Wet<br />

Weather Flow<br />

Dry<br />

Weather<br />

PS No.<br />

Location<br />

(GPM) (GPM) (GPM)<br />

PS 127 Gibbens Road, near intersection of Gore Road 1,805 1,805 308<br />

PS 129<br />

Near the intersection of Wynell Drive and Lebrent<br />

Avenue<br />

417 417 68<br />

PS 38 Desoto Drive, near Clifford Seymour Senior Park 1,389 1,389 186<br />

PS 63 Near the intersection of Groom Road and Georgia 7,152 12,492 2,586<br />

Street<br />

PS 64 Near the intersection of Cypress Street and South 1,319 1,640 567<br />

Street<br />

PS 244 Near the intersection of Captain Ryan Drive and 972 3,865 181<br />

General Chennault Drive<br />

PS 44 Near the intersection of Oriole Street and Thelma 11,180 11,180 1,558<br />

Street<br />

PS 75 Near the intersection of 72nd Avenue and<br />

278 278 49<br />

Yorkshire Street<br />

PS 80 Near the intersection of St. Peter Avenue and<br />

Kleinpeter Road<br />

417 694 0<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station Maintenance<br />

reference guide. The future peak wet weather flows were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9, 300,000.<br />

Scheduled Design Appropriation Year is 2011.<br />

Scheduled Construction Appropriation year is 2012.<br />

Design and Construction has Not Started.<br />

GNV31031158552.DOCX/103470004 5-15 JANUARY 2011<br />

REV. 5